Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ASARA RESOURCES LIMITED Capital/Financing Update 2021

May 19, 2021

64427_rns_2021-05-19_d2baef2f-ff3c-42a9-b644-26a49ba01b55.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

20 May 2021

GOLDEN RIM EXTENDS MAJOR BEDROCK GOLD CORRIDOR TO 4.7KM AT KADA

West African gold explorer Golden Rim Resources Ltd (ASX: GMR; Golden Rim or Company ) is pleased to announce it has received encouraging new assay results from auger drilling at its Kada Gold Project ( Kada ) in Guinea.

Highlights

  • Auger drilling has extended a major, north-south trending corridor of strongly anomalous bedrock gold in the western portion of the Kada permit from 3.5km to 4.7km.

  • New gold anomalous auger results lie up to 1.2km south of those recently announced.

  • Kada gold corridor now extends 1.4km north and 2.4km south of the Newmont gold resource area and remains open in both directions.

  • Golden Rim believes there is excellent potential for follow-up drilling to delineate additional gold mineralisation in these corridor extension areas for inclusion in the maiden JORC Mineral Resource scheduled for 2HCY21 .

  • Three power auger rigs are operating at Kada, with 2,047 holes for 21,843m completed to date.

  • Golden Rim is completing 2,500m of infill diamond drilling on the Newmont resource area at Kada. Samples for the first two holes dispatched to the laboratory; results expected end-May.

  • Golden Rim is also drilling the high-grade Diabatou Gold Shoot at Kouri; first results expected end-May.

Comment from the Managing Director

Golden Rim’s Managing Director, Craig Mackay, said:

“We have now delineated a broad 4.7km corridor of strongly anomalous gold in bedrock at Kada, which remains open to the north and south. This gold-anomalous corridor provides an exciting target area for Golden Rim to outline additional gold mineralisation outside the Newmont gold resource area.

“We expect the gold anomalous corridor to grow. We have dispatched samples from a further 920 auger holes to the laboratory and we eagerly await the results.

“Infill diamond drilling is underway in the Newmont gold resource area at Kada, where Golden Rim is working to deliver a maiden JORC Mineral Resource in 2HCY21. The first diamond drilling results are now expected end-May.

“Progress of the diamond drilling has been slower than expected due to soft ground conditions in the deep oxide zone at Kada and we have deliberately slowed the drilling to ensure acceptable core recoveries are achieved. Golden Rim is looking to mobilise a second diamond drilling rig to site so the infill drilling program remains on schedule.”

GOLDEN RIM RESOURCES ASX:GMR 1

20 May 2021

==> picture [489 x 337] intentionally omitted <==

Figure 1. Location of the Newmont gold resource area at Kada, with planned 400m spaced auger drilling lines, completed auger holes and Newmont gold-in-soil anomalies on regional airborne magnetics.

Kada Gold Project

Golden Rim is completing a 30,000m auger drilling program at Kada, increased from 15,000m, designed to delineate mineralised zones outside the area where Newmont calculated a non-JORC gold resource in 2012. Currently, three power auger rigs are operating at Kada, with 2,047 holes for 21,843m completed to date (Figure 1).

Golden Rim has received assay results for 1,139 holes (including 581 holes reported in this announcement), drilled at 50m spacing along 400m spaced lines. The new results are from holes located to west and south of the previously announced auger results[1] .

The new auger results extend the broad, north-south-trending, corridor of anomalous bedrock gold (>20ppb gold) in the western portion of the Kada permit for a further 1.2km to the south (Figure 2). The corridor now has a total strike length of 4.7km and remains open to the north and south.

The gold anomalous corridor extends for 1.4km north and 2.4km south of the Newmont gold resource area and Golden Rim believes there is excellent potential for follow-up drilling to delineate additional gold mineralisation in these corridor extension areas for inclusion in the maiden JORC Mineral Resource scheduled for 2HCY21 .

1 ASX announcement: Golden Rim Confirms Major 3.5km Bedrock Gold Corridor at the Kada Gold Project dated 19 April 2021

GOLDEN RIM RESOURCES ASX:GMR 2

20 May 2021

==> picture [459 x 654] intentionally omitted <==

Figure 2. Location of auger and soil samples and the Newmont gold resource area in the major bedrock gold corridor in western portion of the Kada permit (blue circles are completed auger holes with assays pending).

GOLDEN RIM RESOURCES ASX:GMR

20 May 2021

A priority for follow-up drilling is an area of new anomalous auger gold results and historical anomalous soil gold results (up to 2,265ppb ) adjacent to a small granite intrusion to the south of the Newmont gold resource area (Figure 2).

Golden Rim has dispatched a third consignment of auger samples from Kada ( 920 holes ) to the laboratory and results are expected in approximately two weeks. The samples are from further holes to the north and south along the gold anomalous corridor and include holes over a larger granite intrusion located in the Bamfele permit (Figure 1). Auger drilling continues to intersect strong quartz – limonite mineralisation in saprolite (weathered bedrock), beneath ~10m of transported and residual laterite and soil cover, which is highly encouraging.

Golden Rim is progressing infill diamond drilling in the Newmont gold resource area at Kada, which is the focus of Golden Rim’s work to deliver the maiden JORC Mineral Resource. The first two diamond drill holes have been dispatched to the laboratory and results are expected around the end of May.

In addition, Golden Rim is drilling at the Kouri Gold Project (Indicated and Inferred Mineral Resource of 50Mt at 1.3g/t gold for 2Moz[2] ) in Burkina Faso, with a ~2,000m diamond drilling program underway at the high-grade Diabatou Gold Shoot.

Three holes have now been completed and the first assays are also expected end-May.

-ENDS-

2 ASX announcement: Kouri Mineral Resource Increases by 43% Increase to 2 Million ounces Gold dated 26 October 2020 (Total Mineral Resource includes: Indicated Mineral Resource of 7Mt at 1.4g/t gold and Inferred Mineral Resource of 43Mt at 1.2g/t gold).

GOLDEN RIM RESOURCES ASX:GMR 4

20 May 2021

Competent Persons Statements

The information in this report relating to previous exploration results and Mineral Resources are extracted from the announcements: Golden Rim Confirms Major 3.5km Bedrock Gold Corridor at the Kada Gold Project dated 19 April 2021; Golden Rim Ramps Up Drilling on West African Gold Projects dated 23 March 2021; Golden Rim Commences Major Exploration Program at Kada dated 25 February 2021; Broad zones of deep oxide gold mineralisation confirmed at Kada dated 16 November 2020; Kouri Mineral Resource Increases by 43% Increase to 2 Million ounces Gold dated 26 October 2020; New Granite Contact Targets and High-Grade Gold Shoot at Kouri dated 2 June 2020; Drilling Intersects 4m at 12.6g/t gold at Kouri dated 31 March 2020; Drilling Intersects 6m at 9.5 g/t Gold at Kouri dated 23 March 2020; New Resource Estimation for Paguanta dated 30 May 2017. These reports are available on the Company’s website (www.goldenrim.com.au). The Company confirms that it is not aware of any new information or data that materially affects the information included in these announcements and, in the case of the Mineral Resource estimate, that all material assumptions and technical parameters underpinning estimate continue to apply and have not materially changed.

The information in this report that relates to exploration results is based on information compiled by Craig Mackay, a Competent Person, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Mackay is a full-time employee of the Company and has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Mackay consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Forward Looking Statements

Certain statements in this document are or maybe “forward-looking statements” and represent Golden Rim’s intentions, projections, expectations or beliefs concerning among other things, future exploration activities. The projections, estimates and beliefs contained in such forward-looking statements necessarily involve known and unknown risks, uncertainties and other factors, many of which are beyond the control of Golden Rim, and which may cause Golden Rim’s actual performance in future periods to differ materially from any express or implied estimates or projections. Nothing in this document is a promise or representation as to the future. Statements or assumptions in this document as to future matters may prove to be incorrect and differences may be material. Golden Rim does not make any representation or warranty as to the accuracy of such statements or assumptions.

Contact Information:

Golden Rim Resources Ltd

ABN 39 006 710 774

Craig Mackay Managing Director

+61 3 8677 0829 [email protected]

This announcement was authorised for release by the Board of Golden Rim Resources Ltd.

GOLDEN RIM RESOURCES ASX:GMR 5

20 May 2021

ABOUT GOLDEN RIM RESOURCES

Golden Rim Resources Limited is an ASX listed exploration company with a portfolio of advanced minerals projects in Burkina Faso and Guinea, West Africa and in Chile, South America.

The Company discovered and has outlined an Indicated and Inferred Mineral Resource of 50Mt at 1.3g/t gold for 2Moz[1 ] at the Kouri Gold Project, located in north-east Burkina Faso. Kouri covers 325km[2] of highly prospective Birimian greenstones. As exploration progresses, significant additional gold mineralisation, including a high-grade gold shoot, has been discovered and the gold inventory at Kouri is expected to grow.

The Company has recently entered into a joint venture on the Kada Gold Project in eastern Guinea. Guinea remains one of the most under-explored countries in West Africa. Kada was previously explored by Newmont who completed 39km of drilling and defined a non-JORC gold resource. With infill drilling Golden Rim believes a maiden JORC Mineral Resource can be defined at Kada in the nearterm. Most of the 200km[2] project area remains poorly explored and there is considerable upside for the discovery of additional gold mineralisation.

In northern Chile, Golden Rim has the Paguanta Silver-Lead-Zinc-Copper Project. Historically a silver mine, the Company has outlined a Measured, Indicated and Inferred Mineral Resource of 2.4Mt at 88g/t silver, 5.0% zinc and 1.4% lead for 6.8Moz silver, 265Mlb zinc and 74Mlb lead[2] at Paguanta. The Mineral Resource remains open. In addition, the project has several exceptional porphyry-copper targets that remain untested.

ASX:GMR

Market Capitalisation: A$27million

Shares on Issue: 2,670million

T + 61 3 8677 0829 | E [email protected] | goldenrim.com.au

  1. ASX announcement: Kouri Mineral Resource Increases by 43% Increase to 2 Million ounces Gold dated 26 October 2020 (Total Mineral Resource includes: Indicated Mineral Resource of 7Mt at 1.4g/t gold and Inferred Mineral Resource of 43Mt at 1.2g/t gold). 2. ASX announcement: New Resource Estimation for Paguanta dated 30 May 2017 (Total Mineral Resource includes: Measured Mineral Resource of 0.41Mt at 5.5% zinc, 1.8% lead, 88g/t silver, 0.3g/t gold; Indicated Mineral Resource of 0.61Mt at 5.1% zinc, 1.8% lead, 120g/t silver, 0.3g/t gold; Inferred Mineral Resource of 1.3Mt at 4.8% zinc, 1.1% lead, 75g/t silver, 0.3g/t gold).

GOLDEN RIM RESOURCES ASX:GMR 6

20 May 2021

Appendix 1: JORC Code (2012 Edition), Assessment and Reporting Criteria

Section 1: Sampling Techniques and Data

Criteria JORC Code Explanation Explanation
Sampling
Techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
The sampling described in this report refers to auger
drilling.
Vertical holes were drilled on a 50m spacing along
400m lines.
Hole depths range from 5m to 20m. The average hole
depth is ~10m.
Bottom of hole samples were collected by qualified
geologists or under geological supervision.
The samples are judged to be representative of the
rock being drilled.
The nature and quality of sampling is carried out under
QAQC procedures as per industry standards.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
Sampling is guided by Golden Rim’s protocols and
Quality Control procedures as per industry standards.
Aspects of the determination of
mineralisation that are Material to the Public
Report.
Auger drilling samples are firstly crushed using a Jaw
Crusher and there after crushed to 90% passing -2mm
using a RSD Boyd crusher. A 1kg split sample is then
pulverised via LM2 to a nominal 90% passing -75μm.
Assayed by SGS in Ouagadougou 24 hour,1kg
Leachwell gold analysis.
Drilling
Techniques
Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether
core is oriented and if so, by what method,
etc.).
Auger drilling was carried out by Sahara Geoservices.
The rig is a landcruiser mounted power auger rig.
The location of each hole was recorded by handheld
GPS with positional accuracy of approximately +/-5m.
Location data was collected in WGS 84, UTM zone 29N.
All drill holes were planned to be drilled at -90 degrees.
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Not applicable for auger drilling.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Not applicable for auger drilling.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Not applicable for auger drilling.

GOLDEN RIM RESOURCES ASX:GMR 7

20 May 2021

Criteria JORC Code Explanation Explanation
Logging Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Logging of auger samples recorded lithology,
mineralogy, mineralisation, weathering, alteration,
colour and other features of the samples.
The geological logging was done using a standardised
logging system. This information and the sampling
details were transferred into Golden Rim’s drilling
database.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
Logging is both qualitative and quantitative, depending
on the field being logged.
The total length and percentage of the
relevant intersections logged.
Not applicable for auger drilling.
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
Not applicable for auger drilling.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
Auger samples were not riffled or split.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Samples were transported by road to SGS Laboratory in
Ouagadougou, Burkina Faso.
The sample preparation for all samples follows industry
best practice.
At the laboratory, all samples were weighed, dried and
crushed to -2mm in a jaw crusher. A split of the crushed
sample was subsequently pulverised in a ping mill to
achieve a nominal particle size of 90% passing 75 μm.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
Golden Rim has protocols that cover the sample
preparation at the laboratories and the collection and
assessment of data to ensure that accurate steps are
used in producing representative samples.
The crusher and pulveriser are flushed with barren
material at the start of every batch.
Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
Sampling is carried out in accordance with Golden
Rim’s protocols as per industry best practice.
Field QC procedures involve the use of certified
reference material as assay standards and, blanks. The
insertion rate of these averaged 3:30.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
The sample sizes are considered appropriate to
correctly represent the style of mineralisation, the
thickness and consistency of the intersections.
Quality of
assaydata and
The nature, quality and appropriateness of
the assayingand laboratory procedures used
Assayed by 24 hour, 1kg Leachwell gold analysis.

GOLDEN RIM RESOURCES ASX:GMR 8

20 May 2021

Criteria JORC Code Explanation Explanation
laboratory
tests
and whether the technique is considered
partial or total.
The analytical method is considered appropriate for this
mineralisation style and is of industry standard.
The quality of the assaying and laboratory procedures
are considered to be appropriate for this deposit type.
For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
No geophysical tools were used to determine any
element concentrations.
Nature of quality control procedures
adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias)
and precision have been established.
Sample preparation checks for fineness were carried
out by the laboratory as part of their internal
procedures to ensure the grind size of 90% passing 75
microns.
Internal laboratory QAQC checks are reported by the
laboratory.
Review of the internal laboratory QAQC suggests the
laboratory is performing within acceptable limits.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
Reported results are compiled and verified by the
Company’s Managing Director.
The use of twinned holes. None of the drill holes in this report are twinned.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Primary field data is collected by Golden Rim geologists
on standardised logging sheets. This data is compiled
and digitally captured.
The compiled digital data is verified and validated by
the Company’s database geologist.
Discuss any adjustment to assay data. The primary data is kept on file. There were no
adjustments to the assay data.
Location of
data points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
No down-hole surveys were completed. The location
of each hole collar was recorded by handheld GPS with
positional accuracy of approximately +/-5m. Location
data was collected in WGS 84, UTM zone 29N.
Specification of the grid system used. Location data was collected in UTM grid WGS84, zone
29 North.
Quality and adequacy of topographic control. Topographic control was established by using a survey
base station.
Data spacing
and
distribution
Data spacing for reporting of Exploration
Results.
Auger drillholes generally located at 50m spacing along
lines that are 400m apart..
Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
Auger holes not used for Mineral Resource estimation.

GOLDEN RIM RESOURCES ASX:GMR 9

20 May 2021

Criteria JORC Code Explanation Explanation
Whether sample compositing has been
applied.
There was no sample composting.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
Not applicable for auger drilling.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
No orientation-based sampling bias has been identified
in the data at this point.
Sample
security
The measures taken to ensure sample
security.
Samples are stored on site prior to road transport by
SGS personnel to the laboratory in Ouagadougou,
Burkina Faso.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
There has been no external audit or review of the
Company’s techniques or data.

Section 2: Reporting of Exploration Results

Criteria JORC Code explanation Explanation
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The reported drilling results are from the Kada permit.
Golden Rim can acquire up to a 75% interest in the
Kada permit.
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
Tenure is in good standing.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration
by other parties.
The area that is presently covered by the Kada permit
has undergone some previous mineral exploration.
Geology Deposit type, geological setting and style of
mineralisation.
The Kada Project covers an area of 200km2and is
located in the central Siguiri Basin. It lies 36km along
strike from and to the south of the 10Moz Siguiri Gold
Mine operated by AngloGold Ashanti.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:

easting and northing of the drill hole
collar elevation or RL (Reduced Level –
elevation above sea level in metres) of the
drill hole collar

dip and azimuth of the hole

down hole length and interception depth

hole length.

Appropriate locality maps for some of the holes also
accompanies this announcement.
Further information referring to the drill hole results
can be found on Golden Rim’s website
http://www.goldenrim.com.au/site/News-and-
Reports/ASX-Announcements

GOLDEN RIM RESOURCES ASX:GMR 10

20 May 2021

Criteria JORC Code explanation Explanation
If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain why
this is the case.
There has been no exclusion of information.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging
techniques,
maximum
and/or
minimum grade truncations (eg cutting of
high-grades) and cut-off grades are usually
Material and should be stated.
No weighting or high-grade cutting techniques have
been applied to the data reported.
Where aggregate intercepts incorporate short
lengths of high-grade results and longer
lengths of low-grade results, the procedure
used for such aggregation should be stated
and
some
typical
examples
of
such
aggregations should be shown in detail.
Not applicable in this document as no exploration
results are announced.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
Metal equivalent values are not reported in this
announcement.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important
in the reporting of Exploration Results.
The orientation of the mineralised zone has been
established and the drilling was planned in such a way
as to intersect mineralisation in a perpendicular
manner.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
Not applicable in this document as no exploration
results are announced.
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not known’).
Not applicable in this document as no exploration
results are announced.
Diagrams Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
Maps are provided in the main text.
Balanced
reporting
Where
comprehensive
reporting
of
all
Exploration
Results
is
not
practicable,
representative reporting of both low and high-
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
The accompanying document is considered to
represent a balanced report.
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical
survey
results;
geochemical
survey results; bulk samples – size and method
of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
There is no other exploration data which is considered
material to the results reported in the announcement.

GOLDEN RIM RESOURCES ASX:GMR 11

20 May 2021

Criteria JORC Code explanation Explanation
characteristics;
potential
deleterious
or
contaminating substances.
Further work The nature and scale of planned further work
(eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Exploration and infill drilling will continue to target
projected lateral and depth extensions of the
mineralisation and to increase the confidence in the
Mineral Resource.
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Refer to main body of this report.

GOLDEN RIM RESOURCES ASX:GMR 12