Aruma Resources Limited

ASX ANNOUNCEMENT 29 April 2011

QUARTERLY ACTIVITIES REPORT 31 MARCH 2011

HIGHLIGHTS

Glandore Project

  • RC Drilling Programme of 74 holes returns 55 anomalous holes

  • Previously reported intersection of 2m at 4.77 g/t from 18m

  • Eight holes intersected gold mineralisation >1.0 g/t

  • Gravity Survey completed

  • PLs 25/2153 and 25/2154 granted

  • Heritage agreements signed for Mining Lease approvals

Hyvista

  • Hyvista interpretations completed for all leases surveyed

  • Multiple Anomalous alteration zones mapped

Kurnalpi South Project

  • Good Hyvista anomalies apparent on all leases

  • Programmme of Work granted on Steeple Hill

  • Heritage Clearance arranged

Laverton East Project

  • Good Hyvista anomaly over anomalous gold area

  • Programmme of Work application submitted

Aruma Resources Limited ABN 77 141 335 364 ASX: AAJ 24 Colin Street, West Perth WA 6005, Australia I PO Box 2803, West Perth WA 6872, Australia T +61 8 9481 2425 I F +61 8 9481 1756 I W www.arumaresources.com

Page 1

ASX ANNOUNCEMENT 29 April 2011

ACTIVITY REPORT TO THE ASX FOR THE QUARTER ENDED 31 MARCH 2011

==> picture [124 x 69] intentionally omitted <==

Exploration Activities

Figure 1: North Glandore showing target generation area (Yellow) and possible structures. The image shows the area of the Gravity Survey, with the Salt CreekMajestic Lineament (in Blue) and the major cross faults (in Green). This Lineament is the targets for mineralisation where it intersects the mineralising cross structures (Pink Dots).

Glandore Leases

During the Quarter, Aruma Resources Limited (ASX: AAJ) (“Aruma” or “the Company”) reported final assay results from the 74 hole, two Phase drilling program designed to test gold anomalies in previously unexplored or underexplored areas at the flagship Glandore Project in Western Australia’s eastern Kalgoorlie Goldfields region.

The effectiveness of the drilling is shown in Table 1 with a total of 55 from 74 holes returning anomalies and 8 being >1.0 g/t over a meter or more.

The drilling results at the Glandore Project have indicated the presence of a strong

==> picture [291 x 449] intentionally omitted <==

gold mineralised system and a gravity survey will be used to define targets under shallow cover. This covered area has not been explored to date and the magnetics and gravity will be used by CSIRO to model the fluid flow in the area to generate targets for subsequent drilling. This modelling has been successful in generating targets in the east Kalgoorlie area that have yielded good gold grades in similar structural environments.

Native Title Agreements and mining licences are already in place at the Glandore Project which is located in an area that has shown a gold mineralising system of significant grade and remains at the early stages of exploration evaluation.

Aruma Resources Limited ABN 77 141 335 364 ASX: AAJ 24 Colin Street, West Perth WA 6005, Australia I PO Box 2803, West Perth WA 6872, Australia T +61 8 9481 2425 I F +61 8 9481 1756 I W www.arumaresources.com

Page 2

ASX ANNOUNCEMENT 29 April 2011

ACTIVITY REPORT TO THE ASX FOR THE QUARTER ENDED 31 MARCH 2011

==> picture [124 x 69] intentionally omitted <==

The Company is progressing its strategic focus on proving mineralisation to develop Glandore as regional gold production hub, with regional satellites at Gindalbie and the Kurnalpi South Tenements.

Intersections
>0.1g/t
Intersections
>0.1g/t
Intersections
>0.1g/t
Intersections
>0.1g/t
Hole
No
Easting Northing Total
m**
Ave Au
(g/t)
Hole No Easting Northing Total
m**
Ave Au
(g/t)
AGR01 391410 6595300 6 0.22 AGR42 390616 6593299 2 0.12
AGR02 391449 6595298 2 0.25 AGR44 390701 6593298 1 0.15
AGR04 391404 6595199 1 0.17 AGR45 391658 6592497 2 0.51
AGR06 391448 6595193 5 0.36 AGR47 392454 6593870 2 0.25
AGR07 391563 6595098 2 0.16 AGR48 392487 6593868 2 0.42
AGR08 391530 6595096 2 0.32 AGR49 391681 6594200 7 0.38
AGR09 391487 6595093 5 0.30 AGR50 391639 6594200 6 0.53
AGR10 391418 6595089 5 0.39 AGR51 391622 6594162 5 0.28
AGR11 391419 6595091 3 0.20 AGR52 391665 6594161 5 0.28
AGR12 391366 6594997 11 0.24 AGR53 391700 6594163 2 0.12
AGR13 391404 6594996 11 0.29 AGR54 391621 6594244 4 0.36
AGR14 391483 6594998 5 0.51 AGR55 391659 6594237 5 0.19
AGR15 391444 6594996 1 0.14 AGR56 391698 6594219 2 0.24
AGR16 391336 6594897 2 0.17 AGR58 391668 6594318 8 0.21
AGR17 391414 6594895 3 0.15 AGR59 391717 6593900 7 0.20
AGR18 391378 6594896 4 0.28 AGR60 391759 6593901 11 0.72
AGR19 391309 6594801 1 0.12 AGR61 391742 6593775 11 0.78
AGR20 391350 6594799 1 0.13 AGR62 391784 6593780 8 0.27
AGR23 391647 6594357 9 0.38 AGR63 391794 6593629 8 0.21
AGR26 391814 6594390 3 0.14 AGR65 392004 6592393 6 0.23
AGR28 391661 6594194 30 1.26 AGR66 392001 6592360 6 0.23
AGR29 391772 6594369 2 0.14 AGR68 391904 6594574 5 0.31
AGR30 391580 6594132 5 0.16 AGR69 391724 6594898 8 1.34
AGR31 392300 6593700 1 0.13 AGR70 391893 6594589 6 0.17
AGR32 392341 6593699 1 0.32 AGR71 391729 6594943 5 0.20
AGR33 392378 6593699 1 0.13 AGR72 391702 6595019 6 0.21
AGR36 392340 6593502 1 1.60 AGR74 391781 6595220 2 0.32
AGR38 392278 6593391 1 0.14

Table 1 Anomalous Drilling Results from Aruma's RC Program at Glandore. ** The total m is the total for the holes >0.1 g/t, and may not be continuous.

Aruma Resources Limited

ABN 77 141 335 364 ASX: AAJ 24 Colin Street, West Perth WA 6005, Australia I PO Box 2803, West Perth WA 6872, Australia T +61 8 9481 2425 I F +61 8 9481 1756 I W www.arumaresources.com

Page 3

ASX ANNOUNCEMENT 29 April 2011

ACTIVITY REPORT TO THE ASX FOR THE QUARTER ENDED 31 MARCH 2011

==> picture [124 x 69] intentionally omitted <==

Kurnalpi South Project

The approval of the Programme of Works (PoW) at Steeple Hill was achieved during the Quarter and will allow the drilling to commence after the heritage survey is completed. Granting of the surrounding Exploration Licences will increase landholding within a 60 km radius of Glandore to an area of some 460 km[2] (shown in Figure 2). To this end the EL27/436 has been granted at Gindalbie allowing exploration to commence this Quarter.

==> picture [480 x 362] intentionally omitted <==

Figure 2 Gindalbie and Kurnalpi South tenements surrounding the Glandore Project.

Aruma Resources Limited ABN 77 141 335 364 ASX: AAJ 24 Colin Street, West Perth WA 6005, Australia I PO Box 2803, West Perth WA 6872, Australia T +61 8 9481 2425 I F +61 8 9481 1756 I W www.arumaresources.com

Page 4

ASX ANNOUNCEMENT 29 April 2011

ACTIVITY REPORT TO THE ASX FOR THE QUARTER ENDED 31 MARCH 2011

==> picture [124 x 69] intentionally omitted <==

North Eastern Goldfields Projects Progressing

Applications for PoWs over Laverton East and Jundee South were submitted during the Quarter. These are expected to be approved in the coming Quarter, with a resultant steady work program developing into the new financial year.

The Hyvista interpretation was completed for the northern areas during the Quarter. Recent results of the interpretation generated for Laverton East, shown in Figure 3 below, looks promising. The reddish areas shows the Goethite signal which is directly over the anomalous gold areas identified in the rock chip sampling reported by Hemisphere Resources Limited ( ASX: HEM ) to the market in December 2009.

==> picture [462 x 415] intentionally omitted <==

Figure 3: Laverton East Hyvista anomaly showing Goethite (Red) and gold anomalism (yellow ellipse).

Aruma Resources Limited

ABN 77 141 335 364 ASX: AAJ 24 Colin Street, West Perth WA 6005, Australia I PO Box 2803, West Perth WA 6872, Australia T +61 8 9481 2425 I F +61 8 9481 1756 I W www.arumaresources.com

Page 5

ASX ANNOUNCEMENT 29 April 2011

ACTIVITY REPORT TO THE ASX FOR THE QUARTER ENDED 31 MARCH 2011

==> picture [124 x 69] intentionally omitted <==

For further information please contact:

Media:

Company: Media: Peter Schwann Annette Ellis/ Karen Oswald Managing Director Purple Communications Aruma Resources Limited Tel: +61 (0) 8 6314 6300 Tel: +61 (0) 8 9481 2425 [email protected] Mob: +61 (0)417 946 370 [email protected]

The information in this release that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Peter Schwann who is a Fellow of the Australasian Institute of Mining and Metallurgy and Chartered Professional (Geology). Mr Schwann is an employee of the Company. Mr Schwann has sufficient relevant experience to qualify as a Competent Person as defined in the JORC Code (2004) and consents to the inclusion of this information in the form and context in which it appears.

Background

Aruma Resources Limited (ASX: AAJ) is a focussed West Australian based gold exploration company with five prospective project areas within the Eastern Goldfields region of Western Australia. Inclusive of several tenements which are still under application, Aruma’s tenement package now totals approximately 613km[2] located on regional structures in the Norseman - Wiluna Greenstone Belt which contains most of Australia's lode-type gold deposits..

The flagship Glandore Project is approximately 40km east of Kalgoorlie-Boulder. Previous exploration of the Glandore Project, has identified several advanced exploration areas and some twenty under-explored prospective exploration targets.

The Kurnalpi South Project lies approximately 100km to the east of Kalgoorlie-Boulder and comprises several gold exploration prospects including Lake Yindarlgooda, Christmas Well, Pinnacles South, Mt Quin and Steeple Hill, within a minimally explored area of a greenstone belt that hosts several major mines.

The Laverton East Project is located approximately 20km east of Laverton. Previous exploration of the area includes relatively shallow RAB drilling over much of the tenement and reconnaissance rock chip sampling returned several gold assays of greater than 0.2 g/t. An EL over 80 km[2] has been applied for to the north of the current leases at Paul Well in the prospective stratigraphy.

The Jundee South Project is approximately 50km to the east of Wiluna within the Yandal Greenstone belt. The Gourdis and Vause deposits are thought to be located on structures that extend to the west, through the Aruma Lease.

Each of the project areas can be readily accessed from the regional towns of Kalgoorlie-Boulder, Laverton or Wiluna.

Aruma Resources Limited ABN 77 141 335 364 ASX: AAJ 24 Colin Street, West Perth WA 6005, Australia I PO Box 2803, West Perth WA 6872, Australia T +61 8 9481 2425 I F +61 8 9481 1756 I W www.arumaresources.com