Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ARUMA RESOURCES LIMITED Capital/Financing Update 2020

May 11, 2020

64273_rns_2020-05-11_e7eb63ab-2bb1-4dd7-a9f4-1b51d5e27ba8.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [157 x 66] intentionally omitted <==

12 May 2020 ASX Announcement

ARUMA'S NEW

ASX: AAJ

PILBARA GOLD PROJECTS

Capital Structure 709M Shares on Issue 8M Options on issue

Highlights

  • Aruma has applied for leases over two prospective gold projects in the Pilbara Minerals District in WA

  • The Melrose Project is located adjacent to Northern Star Resources’ Paulsens Gold Mine and covers an area of 100km[2]

  • Structural corridors that control Paulsens mineralisation interpreted to continue into Aruma’s Melrose Project area

  • Initial exploration targets have been identified

  • The Saltwater Project covers an area of 312km[2] and previous drilling has delivered elevated anomalous gold and silver results

  • Both projects sit within the Nanjilgardy Fault - reported as the primary source of mineralisation at the Paulsens and Mt Olympus gold mines

Cash: $740,000 (31/03/2020)

Board of Directors

Non-Executive Chairman Paul Boyatzis Managing Director Peter Schwann Non-Executive Director Mark Elliott Company Secretary Phillip MacLeod

Active Gold Projects

Aruma Resources Limited (ASX: AAJ) (Aruma or the Company) is pleased to announce the generation of a portfolio of gold prospective projects (Portfolio) in the Pilbara region of Western Australia.

SLATE DAM PROJECT TROJAN RESOURCE

The Portfolio consists of the Melrose Gold Project, which is strategically located in close proximity to Northern Star Resources’ (ASX: NST) Paulsens Gold Mine, and the Saltwater Gold Project, situated approximately 250 kilometres to the south-east.

Both Projects are interpreted to sit near the same regional structure (the Nanjilgardy Fault) reported as the primary source of gold mineralisation at Paulsens and also at Northern Star’s Mt Olympus Gold Mine. (see Figure 1).

The Projects have been applied for following a review by Aruma of its project holdings, designed to rationalise its current project portfolio and to pursue new potentially value-accretive projects. The Exploration Leases were applied for over vacant land after a comprehensive in-house research study of Pilbara gold identified prospective areas.

The study utilised open file data as well as the research papers from the Capricorn Orogeny Study (Geology Survey of WA) which involved major field mapping with integrated geological, geochronological, geochemical and prospectivity studies.

Head Office

Level 1, 6 Thelma Street West Perth, WA 6005 T +61 8 9321 0177 F +61 8 9226 3764

E [email protected] W www.arumaresources.com

Postal Address

PO Box 152 West Perth, WA 6872 ABN 77 141 335 364

The Company will now embark upon on a detailed initial ground truthing and targeting program to rank priority exploration areas within the new Project areas.

==> picture [452 x 227] intentionally omitted <==

Figure 1: Project Location Map of Melrose (blue circle) and Saltwater (red ellipse) Projects, with Nanjilgardy Fault shown in black dashed line.

PROSPECTIVITY RATIONALE

Both Projects are situated on the regional structure that is reported as the main source of gold mineralisation at the Paulsens Gold Mine and Mt Olympus Gold Mine. The structural corridors that control the Paulsens mineralisation appear to continue into Aruma’s Melrose Project area, where initial exploration targets have been identified (shown in Figure 2).

The different ages of the host rocks at Paulsens and Mt Olympus is not seen as critical, and these targets are in similar host rocks in the repeated sediment sequences in the corridors.

The hydrothermal alteration associated with the deposits indicates that multi-spectral mapping will form a key component of the first stage of work at both Projects, and will provide a guide for follow-up mapping and sampling. These methods use currently available satellite data which, when, combined with the large amount of data from the open file and research reports will be invaluable in targeting future work.

THE MELROSE PROJECT

The Melrose Gold Project consists of four Exploration Licence Applications (ELA08/3183, ELA08/3184, ELA08/3188 and ELA47/4362) and covers a total area of 90km[2] . It is located approximately 105 km south of the mining town of Pannawonica on the border of the Ashburton and West Pilbara Mineral Fields. Refer Figure 2 and Table 1 below for details of the Melrose ELA’s.

Project Lease Application Blocks km2
Melrose ELA08/3183 20/4/2020 8 25
Melrose ELA08/3184 20/4/2020 5 16
Melrose ELA08/3188 21/4/2020 14 43
Melrose ELA47/4362 21/4/2020 5 16
Total 32 100

Table 1: Melrose Project lease details

==> picture [434 x 422] intentionally omitted <==

Figure 2: Aruma’s Melrose leases (in yellow with red border) with initial exploration targets indicated by yellow dash ellipses. Interpreted structural corridors shown in magenta outline. Northern Star Resources leases shown in blue (GDA94)

Melrose Project Background

The Paulsens Deposit was discovered and mined in the early 1930s and was then called the Melrose Mine. It is situated in a +3M oz. gold camp and most production has come from multiple lodes at the Paulsen Mine.

Modern evaluation and mining of the Paulsens mine by NuStar Mining Corporation commenced in May 2004 and the Paulsens process plant poured the first bar in June 2005. In July 2010, Northern Star Resources took over the mine and successfully mined it until late 2017 producing up to 100,000 oz. Au per year through both existing and new ore shoots.

Since 2017 Northern Star have relinquished areas in the Paulsens district following initial exploration, and these areas represent the ground that Aruma has appraised, using "gold in sediment" models to seek stratigraphic repetitions in favourable structures associated with the Nanjilgardy Fault.

Most of the reported historic drilling and sampling was conducted on east-west traverses at a spacing that Aruma believes has left windows of opportunity for the discovery of further gold mineralisation.

Geological Assessment

The Paulsens gold mine is situated at the north-western end of the Wyloo Inlier, within metasedimentary and metavolcanic rocks of the Hardey Formation, near the base of the Fortescue Group. These strata are cut at a low angle by a ~50-metre-thick, folded and faulted, medium-to-coarse-grained mafic dike, known as the Paulsens gabbro, which, over short distances, follows the contact between fine-grained sandstone and laminated carbonaceous shale.

The figure below shows a classic sediment hosted "saddle" or dilational reef scenario and Aruma’s geological theory is that these may be repeated in the sediments within its Melrose Project area.

==> picture [330 x 227] intentionally omitted <==

Figure 3: Interpretation of Paulsens showing the typical dilation central zone of bucky quartz with the selvedge high-grade laminated or shaly zones (Source: NSR Report).

THE SALTWATER PROJECT

The Saltwater Gold Project consists of three Exploration Licence Applications (ELA52/3816, ELA52/3818 and ELA52/3825) and covers a total area of 311km[2] . It is located approximately 100 kilometres south-west of the regional mining centre of Newman.

Refer Figure 4 and Table 2 below for details of the Saltwater ELA’s.

Project Lease Applied Blocks km2
Saltwater E52/3816 15/4/2020 6 19
Saltwater E52/3818 17/4/2020 55 171
Saltwater E52/3825 5/5/2020 39 121
Total 61 311

Table 2: Saltwater Project lease details.

Aruma’s interest in the Saltwater Project was instigated by prospectors who have found several gold nuggets in the area and targeting of the area with subsequent Minedex research defined several anomalous areas.

==> picture [452 x 213] intentionally omitted <==

Figure 4: Aruma’s Saltwater Leases (in yellow with red border) with extensions of the Nanjilgardy Fault shown as a Cyan line. Results of a Tempest airborne electromagnetic survey (Figure 5) are shaded in magenta and overlies the fault in ELA52/3818. FMG Pilbara leases shown in green outline. (GDA94)

Saltwater Project Background

Various open file papers have provided some interpretation for crustal geology across the Pilbara and Capricorn Orogens but not in the detail needed for mineral system analysis. The significance of a structure at surface is not always apparent. The location of significant structures that could have acted as focused fluid pathways is an important consideration for exploration of uranium and gold-silver in the region. This choice has outlined the area highlighted on the figure below as an attractive cluster of gold-silver-uranium hydrothermal sediment hosted mineralisation on the Nanjilgardy or splays off it.

In the 1980s several uranium exploration companies explored and drilled the Turee Creek area as part of regional exploration programs. These results only revealed uranium measured by scintillometer and no other geochemistry.

In 2009 drilling was undertaken by U3O8 and targeted an EM target identified from an Airborne Electromagnetic (AEM) survey conducted using the Tempest System which covered a total area of 1088.3 line kilometres (Figure 5).

Reports on the WA government’s mines and mineral deposits (MINEDEX) database showed that reverse circulation (RC) drill hole AJVRC24 (location in Table 3) reported low uranium but elevated gold and silver results. The assays are helpful in defining hydrothermal alteration and quartz veining - with anomalous gold and silver values up to 100ppb and 210ppb respectively as well as hydrothermal mineralisation mineralogy and chemical indicators such as tungsten (W), tellurium (Te) and copper (Cu) in a quartz vein in a shale (Table 4: Drill hole assays).

==> picture [453 x 290] intentionally omitted <==

Figure 5: Plan of Tempest AEM survey with the pink highs representing the strong structure within ELA3818. The black-yellow triangle is drill hole AJVRC24 from U3O8 Limited in 2009. Minedex open file data . (GDA94)

The Report on the AEM Survey said,

"This survey identified a zone of intense structural deformation in the Saltwater Pool area."

This survey was used to site the RC holes in the area.

Historical Drilling at Saltwater

Hole ID Prospect Easting Northing Azimuth Dip End of hole
AJVRC22 Atlantis 667505 7354375 350 -60 58m
AJVRC23 Atlantis 667500 7353530 340 -60 160m
AJVRC24 Atlantis 667860 7353950 360 -60 148m

Table 3: Drill hole locations from Minedex open file data. (GDA94)

Below are the anomalous assays from U3O8 drilling from the Minedex Open File data base (Table 4). They show a definite hydrothermal assemblage and are also in the area of the highly deformed conductor that is the Nanjilgardy Fault.

The yellow and red highlights are considered anomalous and highly anomalous. The quartz veins at the base of hole may be cherts but are highlighted from 120 to 132m. The silver, gold tellurium, arsenic, copper and tungsten are strongly suggestive of hydrothermal mineralisation and backed up by the quartz veining. The lack of copper - phosphorus relationship indicates that the mineralisation may be different from the younger Telfer-Nifty copper - silver deposits, and fits with the Paulsens - Mt Olympus deposit types.

Drill Hole Method Au-AA25 ME-MS41r ME-MS41r ME-MS41r ME-MS41r ME-MS41r ME-MS41r
AJVRC024 unit ppb ppb % ppm ppm ppm ppm
From To Rock Det Limit 10 11 0.01 0.2 0.2 0.01 2
metres metres Type Samp ID Au Ag Fe Ni Cu Te Zn
100 104 Shale 73061 10 100 6.4 80.1 53.3 0.04 176
104 108 Shale 73062 40 90 4.32 67.7 47.4 0.03 122
108 112 Shale 73063 30 130 4.43 59.9 74.4 0.06 112
112 116 Shale 73064 40 110 4.13 59.6 60.6 0.05 110
116 120 Shale 73065 50 210 3.94 86.8 85.3 0.22 94
120 122 Qtz Vein 73066 70 180 4.22 103 94 0.44 99
122 124 Qtz Vein 73067 40 130 3.68 91.9 55.6 0.18 91
124 126 Qtz Vein 73068 20 90 15.15 84.1 115.5 0.04 264
126 128 Qtz Vein 73069 50 80 10.9 108 111.5 0.05 260
128 130 Qtz Vein 73070 100 90 7.17 138.5 102.5 0.11 232
130 132 Qtz Vein 73071 <10 60 7.73 89.7 39.4 0.04 295
132 136 Shale 73072 10 60 6.52 93.8 85.1 0.06 189
136 140 Shale 73073 <10 50 6.54 74.2 67.3 0.04 182
140 144 Shale 73074 <10 90 6.1 72.7 37 0.05 185
144 148 Shale 73075 <10 60 5.55 76.5 39.7 0.05 143
144 148 Shale 73076 <10 50 5.45 76.8 42.4 0.06 137
AnomalyLevel ≥50 ≥150 ≥10 ≥100 ≥100 ≥0.20 ≥200

Table 4: Drill hole AJVRC024 assays from Minedex open file data. The yellow shaded section is the quartz veined shale zone with highlighted anomalous geochemical results showing a hydrothermal signature. ( Minedex open file data)

Authorised for release by Peter Schwann, Managing Director.

FOR FURTHER INFORMATION PLEASE CONTACT:

Peter Schwann Managing Director

James Moses Media and Investor Relations

Aruma Resources Limited Telephone: +61 8 9321 0177 Mobile: +61 417 946 370 Email: [email protected]

Aruma Resources Limited is a proud supporter and member of the Association of Mining and Exploration Companies, 2020.

COMPETENT PERSON’S STATEMENT

Mandate Corporate Mobile: +61 420 991 574 Email: [email protected]

==> picture [90 x 77] intentionally omitted <==

The information in this release that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Peter Schwann who is a Fellow of the AIG and Australasian Institute of Mining and Metallurgy. Mr Schwann is Managing Director and a full time employee of the Company. Mr Schwann has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserve’. Mr Schwann consents to the inclusion in the release of the matters based on his information in the form and context in which it appears. All exploration results reported have been sourced from Minedex open file data and reported in a similar format in those reports.

FORWARD LOOKING STATEMENT

Certain statements contained in this document constitute forward looking statements. Such forwardlooking statements are based on a number of estimates and assumptions made by the Company and its consultants in light of experience, current conditions and expectations of future developments which the Company believes are appropriate in the current circumstances. These estimates and assumptions while considered reasonable by the Company are subject to known and unknown risks, uncertainties and other factors which may cause the actual results, achievements and performance of the Company to be materially different from the future results and achievements expressed or implied by such forwardlooking statements. Forward looking statements include, but are not limited to, statements preceded by words such as “planned”, “expected”, “projected”, “estimated”, “may”, “scheduled”, “intends”, “anticipates”, “believes”, “potential”, “could”, “nominal”, “conceptual” and similar expressions. There can be no assurance that Aruma plans to develop exploration projects that will proceed with the current expectations. There can be no assurance that Aruma will be able to conform the presence of Mineral Resources or Ore Reserves, that any mineralisation will prove to be economic and will be successfully developed on any of Aruma’s mineral properties. Investors are cautioned that forward looking information is no guarantee of future performance and accordingly, investors are cautioned not to place undue reliance on these forward-looking statements.

Section 1 Sampling Techniques and Data

The following data is in relation to Historic Drill Hole AJVRC024 which was drilled by Orbit Drilling Pty Ltd for the Ashburton Joint Venture (U3O8 Limited/Cameco 50% each) in 2009 and has been taken from their open 2010 Annual Report available as Minedex Report number A77020.

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc.). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed information.
•RC drill samples are taken from various depth holes and sampled in 4
m intervals
•Samples from depth down hole.
•Samples were riffle split for composites and the 1m samples left on
site
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails, face-sampling bit or
_other type, whether core is oriented and ifso, by what method, etc.). _
•Drilling was done with RC rigs using industry standard sampling
methods.
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gainof fine/coarse material.
•The best endeavors were used to ensure sample recovery and
splitting gave the best quality possible.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
•All samples were logged geologically and qualitatively.
Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc.) photography.
• _The total length and percentage of the relevant intersections logged. _
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
_being sampled. _
•All samples rotary split and noted wet or dry. Where sample quality
precluded riffle splitting, the material was tube sampled.
•The sample size satisfied the Gy size requirements.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
_of accuracy (ie lack of bias) and precision have been established. _
•Laboratory standards and methods are industry standards.
•Duplicate samples were not taken as any anomalous holes would be
assayed in the 1m splits
Verification of
sampling and
assaying
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
• _Discuss any adjustment to assay data. _
•All significant intersections were inspected by at least two competent
and relevant geologists.
•No holes were twinned as this is not required in grass roots
exploration.
Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
•Initial hole layout was by GPS. Australian Standard licenced
surveyors were used to position the drill holes where required.
•All locations are GDA94
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
• _Whether sample compositing has been applied. _
•The spacing was done to look at the Tempest AEM anomaly and
identify bedrock
•Compositing was done on all holes in 4m intervals
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
•All holes drilled as close to tangential as possible with rig limit at -60°.
Sample
security
The measures taken to ensure sample security. •All samples logged and numbered on site and checked as drilled, as
logged, as loaded to Laboratory and as submitted.
Audits or
reviews
The results of any audits or reviews of sampling techniques and data. •No audits were done as the U assays were low

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with any
_known impediments to obtaining a licence to operate inthe area. _
•All tenements and issues required are detailed in the reports.
•All work done under PoWs.
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by other parties. •The report is acknowledged in the announcement and is number
A77020 in Minedex
Geology Deposit type, geological setting and style of mineralisation. •Detailed in the "Gold in Sediments" exploration model published by
Aruma in previous announcements and presentations.
Drill hole
Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
_explain why this is the case. _
•Complete in Table 3 in the release
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
_should be clearly stated. _
•Drill holes are oriented to get intersections as close to true widths as
possible.
•Metal equivalents never used.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
_width not known’). _
•Sections are in the 2010 Report but not used in tthis announcement
by AAJ.
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Diagrams Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
_drill hole collar locations and appropriate sectional views. _
•As done
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
_Exploration Results. _
•Null results are not reported and minimum intersection grades are
reported and detailed in each table.
Other
substantive
exploration
data
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
_deleterious or contaminating substances. _
•Tempest Data and figures and the relationship with the Aruma
exploration and genesis model are detailed.
Further work The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.
•As detailed in the report.