AI assistant
ARUMA RESOURCES LIMITED — AGM Information 2013
Nov 14, 2013
64273_rns_2013-11-14_b62e5d16-f7c3-4fce-9fc5-28738c851e23.pdf
AGM Information
Open in viewerOpens in your device viewer
==> picture [143 x 92] intentionally omitted <==
ARUMA RESOURCES
==> picture [720 x 138] intentionally omitted <==
CLOSING IN ON GOLD DEPOSITS
Peter Schwann Managing Director
Aruma Resources Limited – Presentation AGM November 2013
ASX: AAJ
www.arumaresources.com.au
Disclaimer /Competent Person’s statement
Forward Looking Statements Caution
Certain statements contained in this document constitute forward looking statements. Such forward-looking statements are based on a number of estimates and assumptions made by the Company and its consultants in light of experience, current conditions and expectations of future developments which the Company believes are appropriate in the current circumstances. These estimates and assumptions while considered reasonable by the Company are subject to known and unknown risks, uncertainties and other factors which may cause the actual results, achievements and performance of the Company to be materially different from the future results and achievements expressed or implied by such forward-looking statements. Investors are cautioned that forward looking information is no guarantee of future performance and accordingly, investors are cautioned not to place undue reliance on these forward-looking statements
.
Competent Person Statement
Information in this announcement that relates to Mineral Resource and exploration results is based on information compiled by Mr Peter Schwann who is the Managing Director of Aruma Resources Limited. Mr Schwann is a Chartered Professional (Geology) and Fellow of the Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking, to qualify as Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Schwann consents to the inclusion in the document of the information in the form and context in which it appears.
2
WE WANT A BIG ONE
3
THE AIM = GOLD OPERATION IN WA
WE HAVE
-
[LEASES IN GOLDFIELDS ]
-
[•]
-
EXPERIENCED TEAM
-
PROVEN ENDOWMENT
-
CORRECT STRUCTURE AND GEOLOGY
-
COVERED AND UNEXPLORED
-
100% ARUMA OWNED
-
CLOSE TO INFRASTRUCTURE
-
Cash (31 October 2013)
$2.5M
4
THE GOLDFIELDS MODEL
==> picture [706 x 426] intentionally omitted <==
5
THE MINERALISATION
SURFACE INDICATION
6
==> picture [116 x 32] intentionally omitted <==
7
==> picture [350 x 515] intentionally omitted <==
THE PROJECTS
Jundee South
- 25km south of Jundee Mine
Glandore Hub
– 60km NE of
-
Kalgoorlie
-
– Includes Gindalbie and Bulong
8
JUNDEE SOUTH HYMAP
Marks
Red = Goethite, Green = Chlorite and Blue = Phengite
9
GLANDORE HUB LEASES
==> picture [464 x 351] intentionally omitted <==
Leases in a 50km radius of Glandore
10
HYMAP GLANDORE IMAGE
==> picture [574 x 435] intentionally omitted <==
----- Start of picture text -----
Clays
----- End of picture text -----
11
GLANDORE FLUID FLOW MODELLING
==> picture [300 x 438] intentionally omitted <==
==> picture [355 x 436] intentionally omitted <==
12
GLANDORE PRIORITY DRILLING TARGETS
==> picture [376 x 452] intentionally omitted <==
13
GLANDORE DRILLING AND SAMPLING
==> picture [341 x 433] intentionally omitted <==
14
RESULTS OF DRILLING
| Intersections | Grade | From | |
|---|---|---|---|
| GLANDORE | 10m | 10.27g/t Au | **58m ** |
| 8m | 10.4g/t Au | **18m ** | |
| 9m | 4.22g/t Au | **13m ** | |
| 5m | 4.3g/t Au | **60m ** | |
| JUNDEE | 4m | 15.37/t Au | 7m |
| 6m | 3.44g/t Au | **18m ** | |
| 4m | 4.84g/t Au | 21m | |
| GINDALBIE | 1m | 1.75 g/t Au | **68m ** |
| 1m | 1.6 g/t Au | **25m ** | |
| 12m | 0.5g/t Au | **19m ** |
ARUMA DRILLING IN YELLOW
15
MINERALISED ZONES
==> picture [715 x 324] intentionally omitted <==
PINK >1g/t Au -- UP TO 750M LONG
16
ARUMA – THE INVESTMENT ATTRACTION
==> picture [343 x 443] intentionally omitted <==
Cash $2.5M
Gold Projects
Active Exploration
New Technology
Experienced Team
17