Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Aker Solutions Regulatory Filings 2024

Apr 29, 2024

3531_iss_2024-04-29_e00bac47-766e-45a9-a00d-6267562eca4b.html

Regulatory Filings

Open in viewer

Opens in your device viewer

Aker Solutions ASA: Aker Solutions to upgrade Mongstad refinery for Equinor

Aker Solutions ASA: Aker Solutions to upgrade Mongstad refinery for Equinor

April 29, 2024 - Aker Solutions has been awarded a substantial[1] EPCIC-contract

by Equinor to upgrade the wastewater treatment plant facilities and lower the

environmental impact of the Mongstad refinery on the west coast of Norway.

The Mongstad refinery, situated 70 km north of Bergen, is closely integrated

with an oil-terminal connected to multiple oilfields in the North Sea. It also

interfaces with crude tankers that are docked at the port. The refinery has

wastewater treatment plant (WWTP) facilities that are designed to treat water

from the refinery, offsite sources and the oil terminal.

Mongstad plays an important role in the distribution of Norwegian oil and gas,

with a long production horizon ahead.

"Equinor's goal is to reduce emissions significantly from the Mongstad refinery.

This matches our aim to enable our customers to increase efficiency and minimize

emissions in their operations, and ensure safe and responsible production", said

Paal Eikeseth, executive vice president and head of Aker Solutions' Life Cycle

segment.

Aker Solutions will be in charge of project management, engineering,

procurement, construction and installation work, and commissioning in an EPCIC

contract.

Our engineering office in Bergen will be the main location for project

management, engineering,?and procurement work. In addition, Aker Solutions'

Mumbai office will be involved in engineering. Prefabrication and assembly work

will be done from the Egersund?yard, while the Stord yard will be responsible

for providing construction personnel to the Mongstad site.?The project will

employ over 500 employees at its peak.

Aker Solutions previously announced another contract award by Equinor to conduct

a feasibility study for its Mongstad Industrial Transformation project.

The project will start right away and is expected to be completed in the fourth

quarter of 2026.

The contract will be booked as order intake in the second quarter of 2024 in the

Life Cycle segment.

[1]Aker Solutions defines a substantial contract as between NOK 2.5 billion and

NOK 4.0 billion.

ENDS

Preben Ørbeck

investor relations

[email protected]

+47 470 10 611

Ruth Lycke

media contact

[email protected]

+47 906 65 931

Aker Solutions delivers integrated solutions, products and services to the

global energy industry. We enable low-carbon oil and gas production and develop

renewable solutions to meet future energy needs. By combining innovative digital

solutions and predictable project execution we accelerate the transition to

sustainable energy production. Aker Solutions employs approximately 11,000

people in more than 15 countries.

Visit akersolutions.com and connect with us on

Facebook (https://www.facebook.com/AkerSolutions/),

Instagram (https://instagram.com/akersolutions/),

LinkedIn (https://www.linkedin.com/company/aker-solutions), and

YouTube (https://www.youtube.com/akersolutions).

This press release may include forward-looking information or statements and is

subject to our disclaimer, see https://akersolutions.com

This information is considered to be inside information pursuant to the EU

Market Abuse Regulation and is subject to the disclosure requirements pursuant

to Section 5-12 the Norwegian Securities Trading Act.

This stock exchange release was published by Svend Thürmer, Communications, Aker

Solutions, on April 29, 2024 at 16:00 CEST.