ASX/MEDIA RELEASE

6 May 2019

==> picture [184 x 81] intentionally omitted <==

AERIS RESOURCES LIMITED (ASX: AIS)

TORRENS EXPLORATION PROJECT ‐ DRILLING UPDATE

Key Points:

  • Drillhole TD10 is currently at 297 metres and successfully drilled through the artesian aquifer

  • Mitigation protocols implemented to avoid the issues encountered in previous drill holes have been successful

  • TD10 targeting a large (3km[2] ) coincident gravity and magnetic body interpreted from 1,200 metres below surface

Aeris Resources Limited (ASX: AIS) ( Aeris or the Company ), an Australian copper producer and explorer, is pleased to provide an update on its 70% owned Torrens Exploration Project in South Australia.

The current drillhole, TD10 commenced drilling on the 24[th] April and intersected the artesian aquifer between 60 metres to 90 metres below the lake surface. Drilling continued to 108 metres at which point casing was installed and cemented to surface ensuring the artesian aquifer was successfully sealed off and contained.

Excellent drill rates have been achieved beneath the artesian aquifer. TD10 had advanced to a depth of 297 metres (4[th] May). The target zone is defined by a large (3km[2] ) coincident gravity and magnetic anomaly (Figure 1) interpreted from 1,200 metres below surface.

==> picture [99 x 52] intentionally omitted <==

Figure 1: Plan view of the Torrens project area highlighting geophysical anomalies interpreted from the 2018 FALCON geophysical survey. Drill holes from the current drill program are denoted by red circles.

==> picture [436 x 195] intentionally omitted <==

==> picture [436 x 196] intentionally omitted <==

==> picture [436 x 196] intentionally omitted <==

2 | P a g e

==> picture [99 x 52] intentionally omitted <==

ENDS

For further information, please contact:

Mr. Andre Labuschagne Executive Chairman Tel: +61 7 3034 6200, or visit our website at www.aerisresources.com.au

Media:

Peta Baldwin Cannings Purple Tel: 0455 081 008 [email protected]

Competent Persons Statement – Exploration Results

The information in this report that relates to Exploration Results is based on information compiled by Bradley Cox, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Bradley Cox is a full time employee of Aeris Resources. Bradley Cox has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Bradley Cox consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

About Aeris

Aeris Resources Limited is an established mining and exploration company listed on the Australia Securities Exchange (ASX: AIS).

The Company’s flagship asset, the Tritton Copper Operations (Tritton) in New South Wales, produced 26,686 tonnes of copper in FY2018 and is targeting production of 25,500 tonnes of copper in FY2019. Tritton includes multiple underground mines (Tritton and Murrawombie) and a 1.8 million tonne per annum processing plant. Tritton also has a pipeline of advanced mining projects and a highly prospective tenement package covering 2,160km[2] , on which to date over 750,000 tonnes of copper has been discovered.

The Company also has 70% of the exciting Torrens Exploration Project (Torrens) in South Australia. Torrens is defined by a coincidental magnetic and gravity anomalous zone with a footprint larger than Olympic Dam. Stage 1 diamond drilling program, targeting IOCG style mineralisation, commenced in Q1 2019.

Aeris’ Board and Management team is experienced in all aspects of mining and corporate development. The Company has a clear vision to become a mid‐tier, multi‐operation company – delivering shareholder value through an unwavering focus on operational excellence.

3 | P a g e

APPENDIX A:

Table 1 – Drillhole details

Hole ID Northing Easting Dip Azimuth Planned Depth(m)
TD10 6,591,810 759,940 ‐90° ~1,200 ‐ 1,300

*Easting and northing coordinates are reported in GDA94 Zone 53 grid.

*Azimuth values are recorded as magnetic azimuths.

Section 2 Reporting of Exploration Results 2019 Phase 1 drill program

Criteria Commentary
Mineral tenement
and
land tenure status
1. The Torrens Project is held within exploration tenement EL5614. The project is
located within the Stuart Shelf region of South Australia approximately 75 kilometres
southeast from Roxby Downs.
2. The Torrens Project is a joint venture between Straits Exploration (Australia) 70%, a
wholly owned subsidiary of Aeris Resources Limited and Kelaray Pty Ltd 30% a wholly
owned subsidiary of Argonaut Resources NL.
3. EL5614 is in good standing and no known impediments exist.
Exploration done by other
parties
1. Several geophysical surveys (gravity and magnetics) were flown over EL5614 dating
back to the 1970s. WMC drilled three drillholes (TD1, TD2 and TD3) from the late
1970s to early 1980s. More recently the joint venture parties completed additional
geophysical surveys and completed three drillholes (TD4, TD5 and TD6) between
2007 to early 2008. More recently an airborne Falcon geophysical survey was flown
over the entire tenement. The dataset was heavily utilised to assist with drill
targeting for the current drill program which commenced in January 2019.
Geology 1. The Torrens project is located on the eastern margin of the Gawler Craton within the
interpreted IOCG (iron oxide copper gold) mineralised corridor. Basement rocks
intersected from the drillholes completed within the tenement to date have been
interpreted as Wallaroo group sediments. Proterozoic and younger cover sequences
unconformably overly Wallaroo Group basement unit. The thickness of cover varies
from approximately 400m along the western margin of the tenement and becomes
increasingly thicker further off shore within Lake Torrens.
Drillhole information 1. All relevant information pertaining to each drillhole has the current phase 1 drill
program has been provided.
Data aggregation methods 1. No data aggregation methods have been applied within this announcement.
Relationship
between
mineralisation widths and
intercept lengths
1. Drillholes are designed to intersect the target horizon across strike at a high angle to
the bedding contacts.
Diagrams 1. Relevant diagrams are included in the body of the report.
Balanced reporting 1. The reporting is considered balanced and all material information associated with the
drill program has been disclosed.
Other
substantive
exploration data
1. There is no other relevant substantive exploration data to report.
Further work 1. The phase 1 drill program will continue at the Torrens project systematically testing
drill targets.