Asia Cement Corporation IR Presentation
CEO K.Y Lee Chief Executive VP Y.F. Chang CFO Doris Wu IRO Giselle Lin IRO Linus Chen
2017 07 27
==> picture [58 x 52] intentionally omitted <==
1. ACC 1H17 briefing
2
ACC: 1H17 Overview
==> picture [58 x 52] intentionally omitted <==
Cement
==> picture [58 x 58] intentionally omitted <==
==> picture [70 x 70] intentionally omitted <==
Taiwan:inland ASP stays flat as shipment suffers from weak domestic property demand, export sales decreased due to highly competitive market.
China:recorded a turnaround from loss to profit, as cement ASP increased significantly yoy, and the adjusted debt portfolio eliminated 。 the risk of FX swings
Consolidated Subsidiaries
Equity investee
==> picture [78 x 156] intentionally omitted <==
IPP: profitability stays as 。 LNG cost keeps low
Stainless steel: benefited from strategic adjustment
==> picture [78 x 155] intentionally omitted <==
U-ming Marine: profitability improves as fundamental recovers.
FENC: the niche market and the expansion plan in Vietnam brought more upside potential
3
China Cement Sector: policy and market
==> picture [58 x 52] intentionally omitted <==
2017 demand stays flat, supply side reform is driving the sector to a healthier future in the mid to long term
Top-down
Raised industry 1 requirements
Regularly nationwide check on energy-consumption, eco-friendly, quality, safety standards
Capacity phrase Aim to retire 10~20% clinker capacity by 2020. 2 out
Bottom-up
Scheduled 3 production halt
Restrain output and inventory, stabilize the ASP and the profit
Explore the potential of jointly operation and Consolidation 4 the subsidy scheme to buy capacity out
4
==> picture [58 x 52] intentionally omitted <==
2. ACC’s mining site in Hualien
==> picture [641 x 362] intentionally omitted <==
5
==> picture [547 x 540] intentionally omitted <==
----- Start of picture text -----
太魯閣
國家公園
礦區
太魯閣
崇德村
國家公園
富世村
太
魯
閣
礦區
大
廠
橋
區
花蓮縣秀林鄉
----- End of picture text -----
Asia Cement is no longer in the Taroko National Park
The mining in the overlapping area has stopped and finished the replantation since Oct 2015
Automatically monitor air and water quality, noise and vibration in and surrounding the mining site.
==> picture [58 x 52] intentionally omitted <==
==> picture [713 x 469] intentionally omitted <==
----- Start of picture text -----
水質檢測-2:立霧溪匯流口上游
水質檢測-3:立霧
噪音、振動檢測
溪匯流口下游
(共2站)
交通流量
水質檢測-1:沉砂池溢洪口
氣象、空氣檢測
(共2站)
7
----- End of picture text -----
Good air quality approved by EPA
==> picture [58 x 52] intentionally omitted <==
Data of air quality monitoring (2016~2017)
| 監測項目 | 監測項目 | 礦區內(周界) | 礦區內(周界) | 礦區內(周界) | 礦區內(周界) | 礦區外鄰近民宅 | 礦區外鄰近民宅 | 礦區外鄰近民宅 | 礦區外鄰近民宅 | 法規 標準 |
符合 法規 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 夏季 | 秋季 | 冬季 | 春季 | 夏季 | 秋季 | 冬季 | 春季 | ||||
| 一氧化碳 (ppm) |
最大小時值 | 0.3 | 0.5 | 0.4 | 0.2 | 0.3 | 0.3 | 0.7 | 0.3 | <35 | OK |
| 最大8小時值 | 0.2 | 0.3 | 0.3 | 0.2 | 0.2 | 0.2 | 0.6 | 0.2 | <9 | OK | |
| 二氧化硫 (ppm) |
日平均值 | 0.003 | 0.005 | 0.005 | <0.001 | 0.003 | 0.002 | 0.004 | 0.002 | <0.1 | OK |
| 最大小時值 | 0.007 | 0.011 | 0.025 | 0.002 | 0.007 | 0.013 | 0.026 | 0.010 | <0.25 | OK | |
| 二氧化氮 (ppm) |
最大小時值 | 0.017 | 0.031 | 0.044 | 0.020 | 0.024 | 0.023 | 0.026 | 0.035 | <0.25 | OK |
| PM2.5 (μg/m3) |
24小時平均值 | 12 | 8 | 15 | 22 | 12 | 12 | 21 | 26 | <35 | OK |
| PM10 (μg/m3) |
日平均值 | 40 | 29 | 35 | 50 | 52 | 40 | 38 | 62 | <125 | OK |
| TSP (μg/m3) |
24小時平均值 | 45 | 44 | 183 | 124 | 60 | 44 | 132 | 106 | <250 | OK |
資料來源:日揚環境工程公司執行現場採樣及分析檢測工作均經環保署認可
8
Low exposure to noise, approved by EPA
==> picture [58 x 52] intentionally omitted <==
Data of noise monitoring (2016~2017)
監測項目 |
礦區內(周界) |
礦區內(周界) |
礦區內(周界) |
礦區內(周界) |
礦區外鄰近民宅 |
礦區外鄰近民宅 |
礦區外鄰近民宅 |
礦區外鄰近民宅 |
管制標準 |
符合 法規 |
|---|---|---|---|---|---|---|---|---|---|---|
| 夏季 | 秋季 | 冬季 | 春季 | 夏季 | 秋季 | 冬季 | 春季 | |||
L日(dB)06:00~20:00 |
53.2 | 56.9 | 52.9 | 44.9 | 57.2 | 54.9 | 54.9 | 53.7 | <60 | OK |
L晚(dB)20:00~22:00 |
50.9 | 52.7 | 50.6 | 40.9 | 53.8 | 52.0 | 50.7 | 51.3 | <55 | OK |
L夜(dB)22:00~06:00 |
42.7 | 48.8 | 42.6 | 38.6 | 58.7 | 48.7 | 50.3 | 34.5 | <50 | OK |
Ps: no mining operation in the mining site at night
資料來源:日揚環境工程公司執行現場採樣及分析檢測工作均經環保署認可
9
Water quality and the level of vibration all fit the re ulation re uirements g q
==> picture [58 x 52] intentionally omitted <==
監測項目Vibration |
礦區內(周界) | 礦區內(周界) | 礦區內(周界) | 礦區內(周界) | 礦區外鄰近民宅 | 礦區外鄰近民宅 | 礦區外鄰近民宅 | 礦區外鄰近民宅 | 管制標準 |
符合 法規 |
|
|---|---|---|---|---|---|---|---|---|---|---|---|
| 夏季 | 秋季 | 冬季 | 春季 | 夏季 | 秋季 | 冬季 | 春季 | ||||
LV10日(dB)8:00~22:00 |
40.2 | 34.9 | 50.4 | 30.2 | 30.0 | 30.4 | 31.9 | 38.8 | <65.0 | OK | |
LV10晚(dB)22:00~8:00 |
36.8 | 33.4 | 31.6 | 30.0 | 30.0 | 30.0 | 30.0 | 36.8 | <60.0 | OK |
| 監測項目 quality |
立霧溪上游 | 立霧溪上游 | 立霧溪上游 | 立霧溪上游 | 立霧溪下游 | 立霧溪下游 | 立霧溪下游 | 立霧溪下游 | 河川 水體 標準 |
沉砂池放流口 | 沉砂池放流口 | 沉砂池放流口 | 沉砂池放流口 | 放流水 標準 |
符合 法規 |
|
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Water | ||||||||||||||||
| 夏季 | 秋季 | 冬季 | 春季 | 夏季 | 秋季 | 冬季 | 春季 | 夏季 | 秋季 | 冬季 | 春季 | |||||
| pH值 | 8.0 | 7.8 | 8.1 | 8.0 | 8.1 | 7.9 | 8.2 | 8.0 | 6.5~8 .5 |
8.0 | 8.1 | 8.3 | 8.0 | 6.0~9.0 | OK | |
| 水溫(°C) | 31.6 | 23.7 | 17.4 | 21.9 | 30.3 | 24.1 | 17.1 | 22.0 | - | 28.4 | 27.1 | 17.9 | 25.8 | 5~9月 <38 4~10月 <35 |
OK | |
| 導電度 (μmho/cm) |
362 | 345 | 399 | 386 | 354 | 377 | 375 | 369 | - | 528 | 545 | 525 | 432 | - | OK | |
| DO(mg/L) | 10.1 | 6.7 | 8.3 | 8.1 | 9.3 | 7.1 | 8.4 | 8.0 | ≧6.5 | 6.9 | 5.3 | 6.2 | 6.8 | - | OK | |
| SS(mg/L) | 3.8 | 27.4 | 52.7 | 15.4 | 16.8 | 35.0 | 23.6 | 24.4 | 25 | 13.1 | 7.2 | 46.3 | 23.8 | <50 | OK | |
| BOD5(mg/L) | <1.0 | <1.0 | <1.0 | <1.0 | <1.0 | <1.0 | <1.0 | <1.0 | 2.0 | <1.0 | <1.0 | <1.0 | <1.0 | - | OK | |
| COD(mg/L) | N.D. | 3.8 | N.D. | 2.6 | 2.9 | 4.3 | 4.4 | N.D. | - | 3.3 | 2.8 | N.D. | N.D. | <100 | OK | |
| 油脂(mg/L) | <0.5 | 0.9 | <0.5 | <0.5 | <0.5 | <0.5 | <0.5 | <0.5 | - | <0.5 | <0.5 | <0.5 | <0.5 | - | OK |
資料來源:日揚環境工程公司執行現場採樣及分析檢測工作均經環保署認可
10
Effective flood channel and anti-landslide instalment
==> picture [58 x 52] intentionally omitted <==
Survived though all the historical mega typhoons
==> picture [537 x 233] intentionally omitted <==
----- Start of picture text -----
Horizontal and vertical flood channel
395
295
Served as temporary
detention pond
120
----- End of picture text -----
==> picture [316 x 97] intentionally omitted <==
----- Start of picture text -----
Designed
detention
To the Li-wu river
pond
----- End of picture text -----
11
Drainage facilities
==> picture [58 x 52] intentionally omitted <==
==> picture [302 x 235] intentionally omitted <==
----- Start of picture text -----
殘壁橫向排水溝
SL295m
----- End of picture text -----
==> picture [324 x 235] intentionally omitted <==
----- Start of picture text -----
殘壁縱向排水溝
----- End of picture text -----
==> picture [397 x 201] intentionally omitted <==
----- Start of picture text -----
寬1m
深1m
----- End of picture text -----
內降階段採礦法
12
No landslide even during 921 & 331 earthquake
==> picture [58 x 52] intentionally omitted <==
==> picture [392 x 294] intentionally omitted <==
----- Start of picture text -----
2016年攝
----- End of picture text -----
-
1986.11.15 Epicenter Hualien (magnitude 6.8)
-
1990.12.14 Epicenter Hualien (magnitude 6.7)
-
1999.09.21 Epicenter Nantou (magnitude7.3)
-
2002.03.31 Epicenter Hualien (magnitude6.8)
-
2015.01.07 Epicenter Hualien (magnitude 5.4)
==> picture [246 x 316] intentionally omitted <==
Epicenter of 921 earthquake Epicenter of 331 earthquake
13
Immediate replantation after the concave mining
==> picture [58 x 52] intentionally omitted <==
==> picture [369 x 245] intentionally omitted <==
1. Concave mining for security concern。
2. Replantation right after the mining to reduce the impact to the landscape。
==> picture [641 x 216] intentionally omitted <==
14
Trees are 5~6m tall 5 years after the replantation
==> picture [58 x 52] intentionally omitted <==
The eco-system of the primary forest can be restored after 18 years
Oct 2016
15
ACC’s replantation achievement has became global benchmark
==> picture [58 x 52] intentionally omitted <==
==> picture [697 x 467] intentionally omitted <==
----- Start of picture text -----
日本琦玉縣秩父郡武甲山礦區 義大利馬蕯卡拉拉礦區
亞泥花蓮新城山礦場
日本九州大分縣太平洋水泥津久見礦區 澳洲 Kalgoorlie 礦區 瑞士霍爾希姆 (Holcim) 礦區
----- End of picture text -----
16
==> picture [58 x 52] intentionally omitted <==
The promise and the future
==> picture [420 x 235] intentionally omitted <==
Reuse and regeneration of the mining site (Botanical garden, museum etc)
==> picture [188 x 114] intentionally omitted <==
==> picture [188 x 114] intentionally omitted <==
Learn from experience of Butchart Garden: Used to be a mining site of a cement company.
==> picture [188 x 114] intentionally omitted <==
==> picture [188 x 114] intentionally omitted <==
Now one of the most popular tourist spot in Canada