Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

5E Advanced Materials, Inc. Capital/Financing Update 2025

Aug 7, 2025

34305_rns_2025-08-07_3221d97d-b375-49a0-ac24-605d7df37d87.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Announcement 8 August 2025

==> picture [135 x 60] intentionally omitted <==

5E Advanced Materials Publishes Fort Cady Project SK-1300 Pre-Feasibility Technical Report with a US$724.8M Pre-Tax NPV7, 19.2% IRR, Initial 39.5-Year Mine Life

Technical Report Underscores Large, Multi-generational High-Grade Colemanite Deposit to Support Domestic Supply of Boron Amid Growing Demand

HESPERIA, CA / ACCESS Newswire / August 8, 2025 / 5E Advanced Materials, Inc. (“5E” or the “Company”) (Nasdaq: FEAM) (ASX: 5EA), a boron and lithium company designated as Critical Infrastructure by the U.S. Department of Homeland Security, is developing one of the world’s largest new conventional boron deposits through a vertically integrated platform, is pleased to announce the completion of the Preliminary Feasibility Study (the “Technical Report”) for the Company’s Fort Cady Project (the “Project”) located in the Mojave Desert, near the town of Newberry Springs, California.

The Project underpins 5E’s strategy to become a vertically integrated global supplier of critical and industrial materials through in-situ extraction of colemanite, from which the Company intends to produce boron and calcium-based products which will support global electrification, energy, food security, and critical defense applications.

Highlights of the Pre-Feasibility Study

  • Technical Report is specifically focused on Phase 1 of the Project, converting 41% of the resource into 5.4M tons of boric acid (H3BO3) reserves yielding 39.5-year life of mine

  • Total Mineral Reserves of 5.4M tons boric acid with grade of 8.03% (B2O3)

  • Technical Report ONLY includes Phase 1 production and presents robust economics with forecasted pre-tax net present value (NPV7) of US$724.8 million and 19.2% unlevered IRR

  • Project retains optionality for future expansion phases of additional production tonnage and value-added boron derivatives

  • The initial Phase 1 plant targets delivery of 130,000 tons per year of boric acid production, approximately ~11% of global boric acid demand today

  • Mining permits in place with the colemanite reserve mined using an in-situ leaching (“ISL”) method, thereby minimizing the surface land disturbance required for the Project facilities

  • The expected initial project capital cost (inclusive of a gas COGEN facility) is US$367M for Phase 1 plus US$55M contingency (15%) and US$13M of owner’s cost

  • By-product mix includes calcium chloride and gypsum with expected all-in sustaining cash (including logistics) of US$554.80 per ton of boric acid

  • Market study indicates tight supply with demand forecasted to exceed supply in 2026 driving boric acid prices higher

  • Revenue from production will primarily be derived from boric acid sales, approximately 94% of total revenue, while by-products of calcium chloride and gypsum will provide approximately 6% of total revenue

5E Advanced Materials, Inc. ARBN 655 137 170 9329 Mariposa Road, Suite 210, Hesperia, California 92344 USA

==> picture [135 x 60] intentionally omitted <==

The Technical Report, which outlines an initial mine life of 39.5 years, confirms the strong economics of an ISL operation that would initially produce 130,000 short tons per year of boric acid along with calcium-based by-products; calcium chloride and gypsum. This Technical Report only includes Phase 1 of the Project, with optionality for phased expansion of additional tonnage and value-added boron derivatives.

The Company commenced mining operations in January 2024 and currently has a small-scale facility (“SSF”) that began operation in April 2024, which has provided invaluable operational data that has been incorporated into the basis of design for the Project. The SSF has achieved a steady state of production for boric acid and gypsum in addition to qualifying 14 customers who have set the stage for continued offtake negotiations. Most recently, two injection-recovery wells were converted to horizontal wells intercepting approximately 3,000 feet of high-grade colemanite.

“This technical report validates the economic strength and strategic importance of the Fort Cady Project,” stated Mr. Paul Weibel, Chief Executive Officer of 5E Advanced Materials. “With strong projected economics underpinned by meticulous technical work, we are now positioned to move into definitive feasibility planning, FEED-engineering and long-term project financing with the right team who have been critical in reaching this point in the development cycle. I am very pleased with 5E’s team and partners work to deliver this report. We have mined and processed for the last 18-months and have qualified product with over 14 large global end users. As we target large-scale commercial production in 2028, we look toward the economic potential of the Project, which we expect will provide high paying jobs in California and be a significant long-term U.S. producer of boron to maintain the security of the boron supply chain in the United States.”

5E will host a conference call to discuss the results of the Technical Report on Tuesday, August 12, 2025, at 5:00 p.m. EDT (2:00 p.m. PDT). The call will be hosted by 6ix with remarks from Mr. Paul Weibel, Chief Executive Officer of 5E Advanced Materials, Inc.

To participate, note the following:

DATE: August 12, 2025 TIME: 5:00 p.m. EDT (7:00 a.m. AEST on August 13, 2025) LINK: Registration (https://6ix.com/event/5e-advanced-materials-market-update-1)

Details of the Pre-Feasibility Technical Report

The Technical Report summary results are presented in Table 1.

Table 1. Project Summary

==> picture [374 x 155] intentionally omitted <==

----- Start of picture text -----

Description Units Total/Amount
Mine Life Years 39.5
Reserves B2O3 (tonnage) Tons (short) 3,003,955
Reserves H3BO3 (tonnage) Tons (short) 5,335,023
Reserves B2O3 (grade) % 8.03%
Recovery B2O3 (in-situ) % 81.9%
Mining Efficiency (drilling) % 95.0%
Recovery B2O3 (processing) % 95.1%
----- End of picture text -----

2

==> picture [135 x 60] intentionally omitted <==

Table 1. Project Summary (Continued)

==> picture [374 x 536] intentionally omitted <==

----- Start of picture text -----

Production
Tons (short)
Annual Production (H3BO3) 130,000
per year
Annual Production Tons (short)
129,000
(Gypsum) per year
Annual Production Tons (short)
57,000
(CaCl2 ~ 38%) per year
Capital Costs
Initial Capital with
$M USD 435.0
Contingency
Sustaining Capital $M USD 39.9
Total Capital (life of mine) $M USD 474.8
Operating Costs (Full-Run Rate)
Variable Costs $/t H3BO3 405.7
Fixed Costs $/t H3BO3 222.1
Credits $/t H3BO3 (73.0)
Net Total Costs (inclusive of $/t H3BO3
554.8
logistics) (net)
Economic Analysis
Average Price LOM – H3BO3 $/short ton 1,355
Netback Price – Gypsum $/short ton 21
Netback Price – CaCl2 ~38% $/short ton 120
Pre-Tax: Free Cashflow $M USD 3,749
Pre-Tax: NPV7 $M USD 725
Pre-Tax: IRR % 19.2
After-Tax: Free Cashflow $M USD 2,625
After-Tax: NPV7 $M USD 469
After-Tax: IRR % 15.9
After-Tax: Payback Period Years 5.9
----- End of picture text -----

3

==> picture [135 x 60] intentionally omitted <==

Project Location

The Project is located halfway between Las Vegas, Nevada and Los Angeles, California and includes both private and federal land. The Project is located approximately 2 miles south of Interstate 40 and approximately 25 miles east of Barstow, California. The site is connected to approximately 1 megawatt of grid power and is approximately 2 miles from major natural gas transmission lines and the BNSF rail line. Figure 1 shows the project location.

Figure 1. Fort Cady Project Location

==> picture [468 x 351] intentionally omitted <==

Mineral Resources

The Technical Report defines both Mineral Resources and Mineral Reserves for the Project. The Mineral Resources on lands under 5E’s mineral control include 23.5 million short tons of Measured ore containing 3.26 million short tons of in-situ boric acid, with an average grade of 7.91% B ₂ O ₃ . The Indicated category comprises 85.6 million short tons of ore containing 11.8 million short tons of insitu boric acid, with an average grade of 7.89% B ₂ O ₃ . Mineral resources were estimated using a 2.0% B2O3 cut-off grade and Table 2 summarizes the mineral resources.

4

==> picture [135 x 60] intentionally omitted <==

Table 2. Fort Cady Project Mineral Resources

==> picture [470 x 117] intentionally omitted <==

----- Start of picture text -----

Mineral Resources
Short Tons (MST) B2O3 (wt. %) B2O3 (MST) H3BO3 (MST)
Measured 23.50 7.91 1.84 3.26
Indicated 85.63 7.89 6.66 11.83
Total Measured + Indicated 109.13 7.89 8.50 15.09
Total Inferred 4.26 7.45 0.31 0.55
----- End of picture text -----*

*Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Under S-K 1300, inferred mineral resources are not considered economically recoverable within the current mine plan and are excluded from the production schedule and economic analysis. Inferred Mineral Resources include areas not currently under mineral tenure control. These are disclosed for transparency but excluded from the mine plan and economic model. The Company makes no assurance that mineral rights to these areas will be secured.

Notes to Mineral Resources:

  1. The Mineral Resources in this estimate were independently prepared, including estimation and classification, by Steven Kerr, P.G., C.P.G, Escalante Geological Services, LLC, and are reported in accordance with the definition for Mineral Resources in S-K 1300. The Mineral Resources are not reported in accordance with the JORC Code, a competent person has not done sufficient work to classify the Mineral Resources in accordance with the JORC Code, and it is uncertain that following evaluation and/or further exploration work that the Mineral Resources will be able to reported as mineral resources in accordance with the JORC Code.

  2. The Mineral Resources were completed using a gridded seam model with Carlson Mining™ software.

  3. The Mineral Resources are current as of March 10, 2025.

  4. Mineral Resources are constrained assuming in-situ leaching and are reported at a cutoff grade of 2.0% B2O3, assume mineralized horizons exhibit lateral continuity that supports insitu leaching mining methods and based on exploration data, there is reasonable continuity of colemanite mineralization throughout the deposit, respectively.

  5. Only resources located on lands under current mineral control are reflected in the mine plan and economic analysis.

Mineral Reserves

A detailed mine production plan was developed to support the calculation of Mineral Reserves. The mine plan and wellfield optimization are based on third-party engineering work that incorporated 19 months of actual wellfield performance data from the SSF into the design.

Mineral Reserve assumptions, such as plant efficiency, leaching efficiency, and mining efficiency were taken into consideration to calculate the reserve estimate. The operating costs were derived from material and energy balances as well as a detailed labor build developed from first principles. The following steps and assumptions were used to calculate Mineral Reserves:

  • Measured and Indicated Mineral Resource of fee-based land and the power corridor were used as the base resource and Inferred Resources were excluded.

5

==> picture [135 x 60] intentionally omitted <==

  • The mine plan includes a Phase 1 plan for which 5E has demonstrated mineral tenure.

  • Trade off analysis of actual vertical well performance relative to expected horizontal well performance can increase colemanite contact up to 20x with extended lateral wells and achieve permeable driven injection rates of +100 gallons per minute.

  • The surface chemical plant would deliver a 95.1% boric acid yield.

  • Leaching efficiency is 81.9% based on leach testing.

  • Solution mining efficiency is 95.0% based on the July 2025 horizontal well drill program.

  • Discounted cash flow incorporated capital and operating cost inputs.

Mineral Reserves are reported in-situ using a 2.0% B2O3 cut-off grade. Table 3 summarizes the Mineral Reserves for the Project.

Table 3. Fort Cady Project Mineral Reserves

==> picture [470 x 112] intentionally omitted <==

----- Start of picture text -----

Mineral Reserves
Average B2O3 Recoverable Mineralized H3BO3
B2O3 (MST)
Grade (wt. %) Bed Volume (ft [3] ) (MST)
Proven 8.03 19,894,414 0.76 1.35
Probable 8.03 58,565,846 2.24 3.98
Total Reserves 8.03 78,460,260 3.00 5.33
----- End of picture text -----

Notes to Mineral Reserves:

  1. The Mineral Reserves in this estimate were independently prepared, including estimation and classification, by Alan White, P.E., Miocene, Inc., and are reported in accordance with the definition for Mineral Reserves in S-K 1300. The Mineral Reserves are not reported in accordance with the JORC Code, a competent person has not done sufficient work to classify the Mineral Reserves in accordance with the JORC Code, and it is uncertain that following evaluation and/or further exploration work that the Mineral Reserves will be able to reported as ore reserves in accordance with the JORC Code.

  2. The Mineral Reserve Estimate is based on a cut-off grade of 2.0% B ₂ O ₃ . Mining recovery, mining efficiency, and process recovery factors applied were 81.9%, 95.0% and 95.1%, respectively, based on pilot-scale testing and engineering assumptions outlined in the PreFeasibility Study.

  3. Mineral Reserves are a subset of the Measured and Indicated Mineral Resources and do not include Inferred Mineral Resources nor any Mineral Resource for which 5E does not have mineral tenure.

  4. The Mineral Reserves are current as of August 4, 2025.

  5. Rounding, as required by the guidelines, may result in minor summation differences between tons, grade, and contained B2O3 or H3BO3 content.

6

==> picture [135 x 60] intentionally omitted <==

Mining Method

The Project will be employing in-situ leaching as its mining method to recover borates from the mineralized horizons. The depth and grade of the deposit precludes conventional mining techniques such as open pit and underground mining. With ISL mining, there is no stripping of waste rock or underground development required for the Project. ISL activities include drilling and constructing of injection/recovery wells, installing pumping or airlifting extraction equipment on the wells, and piping to transport barren leach solutions to the wellfield and Pregnant Leach Solution (“PLS”) back to the chemical plant for processing.

Based on the results of operating the SSF injection, recovery wells and work completed by 5E, the Large-scale Boron Facility (“LSBF”) calls for the installation of 27 directional wells targeting the upper mineralized horizon (“UMH”), major mineralized horizon (“MMH”), and lower mineralized horizon (“LMH”) spaced at 200-ft horizontal offset and 120 – 180-ft vertical spacing. The operating strategy of the wells will focus on high-grade mineralization zone cavern development through continuous injection and cyclic push-pull mechanics.

These wells are to operate as injection and recovery wells whereby injection and recovery of lixiviant through separate horizontal wellbores and full reservoir contact is accomplished by geo-steered laterals in a “fishbone” pattern and positively intercepting each well. The leach solution (lixiviant) is pumped into the well and, after a prescribed residence time, is retrieved from the same well, or offset wells as caverns develop, for processing. This method will be used until the dissolution of the colemanite in the deposit progresses to where complete reservoir flow is established between regional groups of wells. Figure 2 details the horizontal well schematic across the deposit.

Figure 2. Fort Cady Wellfield

==> picture [469 x 246] intentionally omitted <==

7

==> picture [135 x 60] intentionally omitted <==

Processing and Recovery Methods

The processing facility at the LSBF is engineered to support high-efficiency, high-throughput extraction and refinement of boric acid and associated byproducts from the PLS. 5E successfully executed an extensive program of mineral processing and metallurgical testing. Based on these results, the company has selected a proven, crystallization-based process for boric acid extraction. This method has been validated through both laboratory-scale experiments and the operational success of the SSF. The following is a description of the process steps:

  • Solution Mining and Injection: Target minerals are dissolved in-situ using solution mining techniques utilizing heat and steam. The resulting PLS is transported via pipeline infrastructure to the surface processing facilities.

  • PLS Recovery and Clarification: The PLS undergoes pH adjustment through lime addition, which reduces acidity and enables the use of more cost-effective materials of construction. A multi-stage solid-liquid separation process, including filtration, removes precipitated solids, yielding a clarified solution ready for downstream processing.

Figure 3 Planned Site Layout

==> picture [414 x 380] intentionally omitted <==

8

==> picture [135 x 60] intentionally omitted <==

  • Boric Acid Circuit: This core section of the process is dedicated to the concentration, extraction, and purification of boric acid. A two-stage vacuum chilled crystallization system initiates the precipitation of boric acid, followed by filtration, washing, and redissolution. A second two-stage recrystallization step ensures high-purity product formation. Final dewatering is achieved via centrifugation, and the wet crystals are dried in a rotary dryer, cooled, and packaged. A portion of the centrate is directed to the Impurity Removal Circuit and the remainder is sent to the Gypsum circuit.

  • Impurity Removal Circuit and Evaporation: In the Impurity Removal stage, magnesium hydroxide [Mg(OH) ₂ ] and other impurities are removed from the process stream through a reaction with hydrated lime. This reaction causes the impurities to precipitate, allowing them to be separated via filtration. The filtrate slurry then enters the evaporation circuit, where mechanical evaporators and evaporation ponds precipitate sodium chloride for removal. The concentrated brine, now enriched with calcium chloride (CaCl2), is either directed to truck loading for sale as a byproduct or sent to the Gypsum Circuit for further processing.

  • Gypsum Circuit: The Calcium Chloride rich brine reacts with sulfuric acid to precipitate gypsum, which is then filtered and refined to be sold as a byproduct. This circuit also facilitates the regeneration of hydrochloric acid, which is recycled back to the wellfield for reuse in the mining process.

Infrastructure

The Project is located near Interstate 40 along with nearby access to rail and a natural gas transmission line. Currently, the Project receives approximately 1 megawatt of shore power.

Infrastructure required for the Project is expected to consist of:

  • Natural gas – the Project will require a natural gas pipeline that will need to be connected into a nearby transmission pipeline to serve the processing plant. Discussions are ongoing with a proposal received from the owner of the pipeline and the cost of piping from the Mojave Pipeline to a cogeneration facility (COGEN) included in the capital estimate.

  • Electrical power upgrade – an economic trade-off study is currently being conducted to evaluate co-generation versus an upgraded and dedicated powerline to the Project. The economic analysis in the Technical Report assumes the Project utility is COGEN.

  • Rail – a connection to a rail spur adjacent to the Project is included in the federal permit. Phase 1 logistics contemplate trucking finished product to the customers in the western United States and the Los Angeles ports. Byproducts are expected to be sold in the local California market. Tie-in to rail is expected to be considered for expansion phases of the Project.

  • Roads – Plant access roads will require upgrades, and some roads may require paving. New access roads are also being considered.

  • Water – 5E currently has adequate water resources for Phase 1 of the project with two existing water wells with millsite claims for each well.

9

==> picture [135 x 60] intentionally omitted <==

  • Material storage – storage for materials products and consumables will need to be built with storage for boric acid and gypsum included in the capital estimate. A calcium chloride loadout station is also included in the capital estimate and is expected to be stored in tanker trucks ready for distribution.

Environmental

In 1990, a Plan of Operations was submitted to the United States Bureau of Land Management (“BLM”) and a Mining Conditional Use Permit and Reclamation Plan was submitted to San Bernardino County, which triggered environmental review under the National Environmental Policy Act (“NEPA”) and the California Environmental Quality Act (“CEQA”). The BLM and San Bernardino County prepared a joint Environmental Impact Statement (“EIS”) and Environmental Impact Report (“EIR”) to satisfy their environmental review requirements under NEPA and CEQA. In 1994, the EIS and EIR process resulted in the issuance of a Record of Decision from the BLM that approved the Plan of Operations and approval of the Mining Condition Use Permit and Reclamation Plan from San Bernardino County. The Project is permitted to produce 90,000 short tons per year of borates, defined as boron oxide or boron oxide equivalent, thus permitting up to approximately 160,000 short tons of boric acid.

In 2020, a Class 3 Underground Injection Control (“UIC”) permit was issued by the United States Environmental Protection Agency (“EPA”). The EPA retains primacy for Class 3 solution mining UIC permits. In November 2023, the EPA approved the commencement of mining operations under this permit. These regulatory approvals form the foundation for Phase 1 development, which aligns with the previously authorized project scope.

Capital Costs

The Technical Report Summary for the Project has been successfully completed by Engineering, Procurement, and Construction Management company Fluor Corporation, Petroleum Engineering and Operating Services company Miocene, Inc., along with collaboration with Ad Infinitum, an engineering firm specializing in chemical process design. An AACE Class 4 estimate capital cost estimate (± 25%) has been prepared. The AACE Class 4 capital estimate covers the period from Front End Engineering Design engineering to first production and is reported in real dollars.

Capital cost expectations for a 130,000 short ton per annum boric acid plant (inclusive of co-product processing and COGEN power) were determined to be $367M for the first stage plus a contingency of $55M and owner’s cost estimate of $13M for a total capital estimate of $435M. Table 4 outlines the capital cost estimate, including initial development costs and a conservative provision for sustaining capital, based on solution mining-specific assumptions, including periodic wellfield expansion, redrilling, and maintenance costs over the life of mine.

10

==> picture [135 x 60] intentionally omitted <==

Table 4. Capital Cost Estimate

==> picture [256 x 174] intentionally omitted <==

----- Start of picture text -----

Scope Capital Cost (USD Millions)
Process Facility $280.7
COGEN $50.2
Wellfield $30.8
Evaporation Ponds $5.6
Sub-total $367.3
Contingency $55.1
Owner’s Cost $12.5
Total Capital $434.9
----- End of picture text -----

Operating Costs

Operating costs for the project are segregated into Variable, Fixed, and Other operating costs and are based on detailed material and energy balances provided by Fluor Corporation and a principles first labor build-up. Variable operating costs include packaging, logistics, and raw materials such as natural gas, hydrochloric acid, sulfuric acid, and lime. Fixed operating costs include administrative labor, operating labor, general and administrative overhead, repair labor, repair materials, as well as taxes and insurance. Other operating costs include disposal costs of metals impurities offset with byproduct credits from gypsum and calcium chloride. Table 5 summarizes the operating cost by production phase.

Table 5. Operating Cost

Operating Costs (Full-Run Rate) Operating Costs (Full-Run Rate) Operating Costs (Full-Run Rate)
Variable Costs $/t H3BO3 405.7
Fixed Costs $/t H3BO3 222.1
Credits $/t H3BO3 (73.0)
Total Costs (inclusive of
logistics)
$/t H3BO3(net) 554.8

11

==> picture [135 x 60] intentionally omitted <==

Figure 4. Operating Cost Breakdown

==> picture [470 x 278] intentionally omitted <==

----- Start of picture text -----

-11.7%
10.2%
41.0%
17.2%
12.6% 7.0%
3.2%
20.5%
Reagants Utility Packaging Logistics Labor Maintenance Taxes, Insurance and Overhead Credits
----- End of picture text -----

Economic Analysis

The Project economics were evaluated using a discounted cashflow analysis based on annual cashflows for the life of the project. The financial model was prepared on an annual basis from the mineral reserve effective date to the exhaustion of mineral reserves for the current mining plan. Mine life can be extended and the Project has additional resources that can be converted to additional mineral reserves with expansion of the wellfield or mine plan in the future. The financial model results are presented in real U.S. dollars.

As with the capital and operating forecasts, the economic analysis is inherently a forward-looking exercise. These estimates rely upon a range of assumptions and forecasts that are subject to change depending upon macroeconomic conditions, operating strategy and new data collected through operation of the SSF. Table 6 summarizes the economic results and Figure 5 highlights project cashflows during the first 15 years.

12

==> picture [135 x 60] intentionally omitted <==

Table 6. Economic Analysis Summary

==> picture [356 x 251] intentionally omitted <==

----- Start of picture text -----

Description Units Total/Amount
Average Price LOM – H3BO3 $ / short ton 1,355
Netback Price – Gypsum $ / short ton 21
Netback Price – CaCl2 $ / short ton 120
Pre-Tax: Free Cashflow $M USD 3,749
Pre-Tax: NPV7 $M USD 725
Pre-Tax: IRR % 19.2
After-Tax: Free Cashflow $M USD 2,625
After-Tax: NPV7 $M USD 469
After-Tax: IRR % 15.9
After-Tax: Payback Period years 5.9
----- End of picture text -----

Figure 5. Cashflow Profile by Year

==> picture [468 x 232] intentionally omitted <==

----- Start of picture text -----

Project Economics Years (-3 thru 15)
$400 $1,000
$800
$200
$600
$0 $400
$200
($200) $0
($200)
($400)
($400)
($600) ($600)
Year
Revenue Operating Expenditure Working Capital
Capital Tax Net Cash Flow
Cumulative Cash Flow
$ Millions $ Millions
----- End of picture text -----

13

==> picture [135 x 60] intentionally omitted <==

Financial Model Sensitivity

Sensitivity analysis for the financial model was performed based on changes to boric acid price, annual production, discount rate, variable cost pricing, gypsum price, labor cost per person, and raw material acid utilization. Using a ±10% change for each variable, NPV7 is plotted in real dollars for comparison and arranged in order of total variability.

Figure 6. Economic Sensitivity

==> picture [360 x 217] intentionally omitted <==

----- Start of picture text -----

Sensitivity Analysis
Boric Acid Price
Annual Production
Discount Rate
Variable Cost Pricing
Capital Cost
Raw Material Acid Utilization
Labor Cost
Gypsum Price
$(250,000) $(150,000) $(50,000) $50,000 $150,000 $250,000
NPV Increase (US $M) NPV Decrease (US $M)
----- End of picture text -----

Qualified Persons

The Technical Report, entitled “Preliminary Feasibility Report & Technical Report Summary, 5E Advanced Materials Fort Cady Project,” dated August 7, 2025, was prepared in accordance with the Securities and Exchange Commission S-K regulations, Title 17, Part 229, Items 601 and 1300 through 1305. The Technical Report was prepared by the following firms and persons: Miocene, Inc., Fluor Corporation, Geomega, Inc., Escalante Geological Services, LLC and Mr. Paul Weibel. With the exception of Mr. Weibel, who serves as the Company's Chief Executive Officer, none of the qualified persons is affiliated with the Company or any other entity that has an ownership, royalty, or other interest in the property.

The Technical Report will be available on the U.S. Securities and Exchange’s EDGAR website as an Exhibit 96.1 to the Current Report on Form 8-K filed by the Company on August 7, 2025, in connection with this news release. The Technical Report includes relevant information regarding the assumptions, parameters, and methods used for the Mineral Resource and Mineral Reserve estimates for the Fort Cady Project, as well as information regarding data verification, exploration procedures, and other matters relevant to the scientific and technical disclosure contained in this news release.

Other disclosures of a scientific or technical nature included in this news release regarding the Fort Cady Project have been reviewed, verified, and approved by Mr. Paul Weibel, Chief Executive Officer of 5E Advanced Materials, Inc. who is a Qualified Person as defined by Regulation S-K, Subpart 1300

14

==> picture [135 x 60] intentionally omitted <==

promulgated by the U.S. Securities and Exchange Commission. Mr. Weibel is responsible for reviewing information related to market strategy, product pricing, and economic assumptions.’

The copy of the complete Technical Report titled “Preliminary Feasibility Report & Technical Report Summary, 5E Advanced Materials Fort Cady Project” is included as an annexure to this release.

This announcement has been authorised for release by the Company’s Chief Executive Officer, Paul Weibel.

About 5E Advanced Materials, Inc.

5E Advanced Materials, Inc. (Nasdaq: FEAM) (ASX:5EA) is focused on becoming a vertically integrated global leader and supplier of boron specialty and advanced materials, complemented by lithium coproduct production. The Company's mission is to become a supplier of these critical materials to industries addressing global decarbonization, food and domestic security. Boron and lithium products will target applications in the fields of electric transportation, clean energy infrastructure, such as solar and wind power, fertilizers, and domestic security. The business strategy and objectives are to develop capabilities ranging from upstream extraction and product sales of boric acid, lithium carbonate and potentially other co-products, to downstream boron advanced material processing and development. The business is based on our large domestic boron and lithium resource, which is located in Southern California and designated as Critical Infrastructure by the Department of Homeland Security's Cybersecurity and Infrastructure Security Agency.

Forward Looking Statements

This press release includes "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995, as amended. All statements other than statements of historical fact included in this press release should be considered forward looking statements, including without limitation statements regarding the Project’s capital and operating costs; cash costs to produce boron and its related byproducts, as well as estimated contingencies; projected future pricing for boric acid and its related byproducts; the forecasted net present value; projected production volumes and revenues; anticipated cash flows; anticipated cut-off grade and recovery rates; the proposed design of the commercial scale facility; the timing of large-scale commercial production; construction timelines; ability to maintain and modify permits; infrastructure needs; environmental impacts; potential to successfully finance the company and the proposed commercial scale facility; anticipated market value and demand for boric acid, calcium chloride and gypsum; potential technology solutions; anticipated use of land and water; potential for expansion of mineral resources; mineral resource and reserve estimates and assumptions; the potential for future phases of the Project; availability of energy to operate the facility; the economic potential of the Project; and our ability to produce boron and its related byproducts. When used in this press release, the words "believe," "project," "expect," "anticipate," "estimate," "intend," "budget," "target," "aim," "strategy," "plan," "guidance," "outlook," "intent," "may," "should," "could," "will," "would," "will be," "will continue," "will likely result," and similar expressions are intended to identify forwardlooking statements, although not all forward-looking statements contain such identifying words. These forward-looking statements are based on the Company's current expectations and assumptions about future events and are based on currently available information as to the outcome

15

==> picture [135 x 60] intentionally omitted <==

and timing of future events. We caution you that these forward-looking statements are subject to all of the risks and uncertainties, most of which are difficult to predict and many of which are beyond our control, incident to the extraction of the critical materials we intend to produce and advanced materials production and development. These risks include, but are not limited to: our ultimate ability to satisfy all customer qualification criteria and achieve commercial offtake agreements, our limited operating history in the borates and lithium industries and no revenue from our proposed extraction operations at our properties; our need for substantial additional financing to execute our business plan and our ability to access capital and the financial markets; our status as an exploration stage company dependent on a single project with no known Regulation S-K 1300 mineral reserves and the inherent uncertainty in estimates of mineral resources; our lack of history in mineral production and the significant risks associated with achieving our business strategies, including our downstream processing ambitions; our incurrence of significant net operating losses to date and plans to incur continued losses for the foreseeable future; risks and uncertainties relating to the development of the Fort Cady project, including our ability to timely and successfully complete our proposed Commercial Scale Boron Facility; our ability to obtain, maintain and renew required governmental permits for our development activities, including satisfying all mandated conditions to any such permits; the implementation of and expected benefits from certain reduced spending measures; the impact of changes in U.S. trade policies and the imposition of tariffs; and other risks and uncertainties set forth in our filings with the U.S. Securities and Exchange Commission from time to time. Should one or more of these risks or uncertainties occur, or should underlying assumptions prove incorrect, our actual results and plans could differ materially from those expressed in any forward-looking statements. No representation or warranty (express or implied) is made as to, and no reliance should be placed on any information, including projections, estimates, targets, and opinions contained herein, and no liability whatsoever is accepted as to any errors, omissions, or misstatements contained herein. You are cautioned not to place undue reliance on any forward-looking statements, which speak only as to the date of this press release.

For additional information regarding these various factors, you should carefully review the risk factors, uncertainties and other disclosures in the Company's Form 10-K filed on September 9, 2024, as updated by the Company's Form 10-Q filed on May 15, 2025, and subsequent filings with the U.S. Securities and Exchange Commission throughout the year, as well as in its filings under the Australian Securities Exchange. Any forward-looking statements are given only as of the date hereof. Except as required by law, 5E expressly disclaims any obligation to update or revise any such forward-looking statements. Additionally, 5E undertakes no obligation to comment on third party analyses or statements regarding 5E's actual or expected financial or operating results or its securities.

For further information contact:

Michael MacMillan or Paola Ashton PRA Communications [email protected] Ph: +1 (604) 681-1407

16

==> picture [151 x 67] intentionally omitted <==

Preliminary Feasibility Study & Technical Report Summary

5E Advanced Materials Fort Cady Project

==> picture [231 x 238] intentionally omitted <==

==> picture [231 x 238] intentionally omitted <==

==> picture [67 x 238] intentionally omitted <==

Report Date August 7, 2025

Report Effective Date August 4, 2025

Signature Page

List of Qualified Persons

Section(s) Date
Alan E. White, P. E., 12,13 and 18 (18.1.5 through August 7, 2025
Miocene, Inc. 18.1.8)
/s/ Alan E. White
Kevin R. Martina, P.Eng., 10,14 and 18 (18.1.1 through August 7, 2025
Fluor Corporation 18.1.4, 18.1.9 and 18.2)
/s/ Kevin R. Martina
Martin Roth, P.G., 7.3 August 7, 2025
Geomega, Inc.
/s/ Martin Roth
Steven Kerr, P.G., C.P.G., Principal, 2,3,4,5,6,7(except 7.3),8,9, August 7, 2025
Escalante Geological Services, LLC 11,15,17,20,21 and 22
/s/ Steven Kerr
Paul Weibel, CPA, 1,16,19,23,24 and 25 August 7, 2025
5E Advanced Materials, Inc.
/s/ Paul Weibel

2

Table of Contents
List of Qualified Persons................................................................................................................................................ 2
Table of Contents .......................................................................................................................................................... 3
List of Figures ................................................................................................................................................................ 7
List of Tables ................................................................................................................................................................. 8
Glossary of Terms .......................................................................................................................................................... 11
1 Executive Summary .............................................................................................................................................. 13
2 Introduction.......................................................................................................................................................... 14
2.1 Registrant for Whom the Technical Report was Prepared........................................................................... 14
2.2 Terms of Reference and Purpose of the Report ........................................................................................... 14
2.3 Sources of Information.................................................................................................................................. 14
2.4 Details of Inspection ...................................................................................................................................... 15
2.5 Report Version Update ................................................................................................................................. 15
2.6 Units of Measure........................................................................................................................................... 15
2.7 Mineral Resource and Mineral Reserve Definition....................................................................................... 15
2.7.1 Mineral Resources .................................................................................................................................. 15
2.7.2 Mineral Reserves .................................................................................................................................... 16
2.8 Qualified Persons .......................................................................................................................................... 16
3 Property Description and Location ....................................................................................................................... 17
3.1 Property Location .......................................................................................................................................... 17
3.2 Area of Property ............................................................................................................................................ 17
3.3 Mineral Title .................................................................................................................................................. 18
3.4 Mineral Rights ............................................................................................................................................... 19
3.5 Incumbrances ................................................................................................................................................ 19
3.5.1 Remediation Liabilities ........................................................................................................................... 19
3.6 Other Significant Risk Factors ....................................................................................................................... 19
3.7 Royalties ........................................................................................................................................................ 20
4 Accessibility, Climate, Local Resources, Infrastructure, and Physiography .......................................................... 20
4.1 Topography, Elevation, and Vegetation ........................................................................................................ 20
4.2 Accessibility and Transportation to the Property ......................................................................................... 20
4.3 Climate and Length of Operating Season ...................................................................................................... 20
4.4 Infrastructure Availability and Sources......................................................................................................... 20
5 History ................................................................................................................................................................. 21
5.1 Prior Ownership and Ownership Changes .................................................................................................... 21
5.2 Exploration and Development Results of Previous Owners......................................................................... 21
5.3 American Pacific Borates Share Exchange of Atlas Precious Metals ............................................................ 22
5.4 Historic Production ....................................................................................................................................... 22
6 Geological Setting, Mineralization and Deposit ................................................................................................... 26
6.1 Regional Setting ............................................................................................................................................ 26
6.1.1 Mineralization......................................................................................................................................... 27
6.2 Mineral Deposit ............................................................................................................................................. 27
6.3 Stratigraphic Column..................................................................................................................................... 28
7 Exploration ............................................................................................................................................................ 29
7.1 Non-drilling exploration................................................................................................................................ 29
7.2 Drilling........................................................................................................................................................... 29

3

7.2.1
Historic Drilling.......................................................................................................................................
29
7.2.2
Company Drilling ....................................................................................................................................
31
7.3
Hydrogeology ................................................................................................................................................
33
7.3.1
Hydraulic Setting....................................................................................................................................
33
7.3.2
Project Area Groundwater Levels...........................................................................................................
34
7.3.3
HydrogeologyExternal to the Ore Block................................................................................................
35
7.3.4
Formation Hydraulic Properties.............................................................................................................
35
7.3.4.1
Duval 1980-1982................................................................................................................................
35
7.3.4.2
In-Situ 1990........................................................................................................................................
36
7.3.4.3
Hydro-Engineering 1996....................................................................................................................
36
7.3.4.4
Geomega 2023...................................................................................................................................
36
7.3.5
Water Quality Compliance Monitoring..................................................................................................
36
8 Sample Preparation, Analysis and Security.......................................................................................................... 37
8.1
Sampling Method and Approach ..................................................................................................................
37
8.2
Sample Preparation, Analysis and Security...................................................................................................
37
9 Data Verification................................................................................................................................................... 44
9.1
Data Verification Procedures ........................................................................................................................
44
9.2
Data Limitations or Failures..........................................................................................................................
44
9.3
Data Adequacy..............................................................................................................................................
44
10 Mineral Processing and Metallurgical Testing ..................................................................................................... 44
10.1 Metallurgical Testing ..................................................................................................................................... 44
10.2 Representative Samples ................................................................................................................................ 45
10.3 Testing Laboratory ......................................................................................................................................... 45
10.4 Relevant Results ............................................................................................................................................. 45
10.4.1
Feedstock Assay Results .........................................................................................................................
45
10.4.2
PLS Characterization ...............................................................................................................................
47
10.4.3
Crystallization Results ............................................................................................................................
49
10.4.4
Impurity Removal Test Results ...............................................................................................................
54
10.5 Adequacy of Data ........................................................................................................................................... 55
11 Mineral Resource Estimates ................................................................................................................................. 55
11.1 Key Assumptions ............................................................................................................................................ 55
11.2 QP’s Estimate of Resource ............................................................................................................................. 56
11.2.1
Resource Database .................................................................................................................................
56
11.2.2
Geologic Model ......................................................................................................................................
58
11.2.3
Grade Estimation & Resource Classification ..........................................................................................
58
11.3 Model Validation ........................................................................................................................................... 59
11.3.1
Density Measurements..........................................................................................................................
60
11.4 Cut-off Grade ................................................................................................................................................. 60
11.5 Mineral Resource Estimation ......................................................................................................................... 62
11.6 Uncertainties .................................................................................................................................................. 66
11.7 Individual Grade for Each Commodity........................................................................................................... 66
11.8 Disclose Required Future Work ..................................................................................................................... 66
12 Mineral Reserve Estimates ................................................................................................................................... 66
12.1 Conversion Assumptions, Parameters, and Methods................................................................................... 66
12.2 Mineral Reserve Estimate.............................................................................................................................. 67

4

12.3 Relevant Factors ............................................................................................................................................ 67
13 Mining Methods ................................................................................................................................................... 68
13.1 Geotechnical and Hydrological Model Contribution to Mine Design ............................................................ 68
13.2 Artificial Lift .................................................................................................................................................... 69
13.3 Wellfield Operating Strategy ......................................................................................................................... 70
14 Processing and Recovery Methods ...................................................................................................................... 75
14.1 Processing Summary ...................................................................................................................................... 75
14.2 Processing Design Criteria / Usages ............................................................................................................... 77
14.2.1 Basis for Boric Acid (BA) Head Grade..................................................................................................... 78
14.3 Work Breakdown Structure and Plant Layout............................................................................................... 78
14.4 Description of Processing Facilities................................................................................................................ 83
14.5 �����������������������������Facilities................................................................................................ 85
15 Infrastructure ....................................................................................................................................................... 88
15.1 Access and Local Communities ...................................................................................................................... 88
15.2 Site Facilities and Infrastructure .................................................................................................................... 90
15.3 Security .......................................................................................................................................................... 90
15.4 Communications............................................................................................................................................ 90
15.5 Logistics Requirements and Off-site Infrastructure ....................................................................................... 90
15.5.1 Rail .......................................................................................................................................................... 90
15.5.2 Port and Logistics ................................................................................................................................... 90
15.5.3 Off-site storage and distribution ............................................................................................................ 90
16 Market Studies and Contracts .............................................................................................................................. 91
16.1 General Market Overview ............................................................................................................................. 91
16.2 Borates ........................................................................................................................................................... 91
16.2.1 Market Overview ..................................................................................................................................... 91
16.2.2 Historical Pricing ...................................................................................................................................... 91
16.2.3 Market Balance....................................................................................................................................... 93
16.2.4 Market Costs ........................................................................................................................................... 93
16.2.5 Boric Acid Market .................................................................................................................................... 94
16.2.6 Boric Acid Specifications ......................................................................................................................... 95
16.3 Calcium Chloride............................................................................................................................................ 95
16.3.1 Market Overview ..................................................................................................................................... 95
16.3.2 Historical Pricing ...................................................................................................................................... 95
16.3.3 Market Balance....................................................................................................................................... 95
16.3.4 Market Cost ............................................................................................................................................. 96
16.3.5 Calcium Chloride Market ......................................................................................................................... 96
16.3.6 Calcium Chloride Specifications .............................................................................................................. 97
16.4 Gypsum.......................................................................................................................................................... 97
16.4.1
Market Overview....................................................................................................................................
97
16.4.2
Historical Pricing .....................................................................................................................................
97
16.4.3
Market Imbalance ..................................................................................................................................
98
16.4.4
Market Costs ..........................................................................................................................................
98
16.4.5
Gypsum Market ......................................................................................................................................
98
16.4.6
Gypsum Specifications...........................................................................................................................
99
16.5 Conclusions.................................................................................................................................................... 99

5

16.6 Contracts ........................................................................................................................................................ 100
17 Environmental Studies, Permitting, and Closure ................................................................................................ 100
17.1 Environmental Requirements for Solution Mining ........................................................................................ 100
17.2 Environmental Study Results......................................................................................................................... 100
17.3 Required Permits and Status ......................................................................................................................... 100
18 Capital and Operating Costs ................................................................................................................................. 102
18.1 Capital Cost Estimates ................................................................................................................................... 102
18.1.1
Capital Cost Estimate-Processing Facility and Infrastructure ...............................................................
102
18.1.2
Processing Facility and Infrastructure-Basis and Methodology ...........................................................
103
18.1.3
Capital Cost Estimate-Evaporative Ponds ............................................................................................
106
18.1.4
Capital Cost Estimate-Cogeneration Combined Power & Heat (CHP) Plant ........................................
106
18.1.5
Capital Cost Estimate-Wellfield............................................................................................................
106
18.1.6
Other Sustaining Capital .........................................................................................................................
107
18.1.7
Wellfield Basis........................................................................................................................................
107
18.1.8
Closure Costs..........................................................................................................................................
107
18.1.9
Owner’s Costs.........................................................................................................................................
107
18.2 Operating Cost Estimates .............................................................................................................................. 107
18.2.1
Variable Operating Cost .........................................................................................................................
107
18.2.2
Fixed Operating Cost ..............................................................................................................................
108
18.2.3
Other Operating Costs ............................................................................................................................
108
18.2.4
Basis for Operating Cost Estimates ........................................................................................................
109
19 Economic Analysis ................................................................................................................................................ 109
19.1 General Description....................................................................................................................................... 109
19.2 Basic Model Parameters................................................................................................................................ 109
19.3 External Factors ............................................................................................................................................. 110
19.3.1
Pricing .....................................................................................................................................................
110
19.3.2
Taxes and Royalties................................................................................................................................
110
19.3.3
Working Capital......................................................................................................................................
110
19.4 Technical Factors ........................................................................................................................................... 110
19.4.1
Mining and Production Profile ...............................................................................................................
110
19.4.2
Operating Costs......................................................................................................................................
111
19.4.3
Variable Costs .........................................................................................................................................
112
19.4.4
Fixed Costs ..............................................................................................................................................
112
19.4.5
Other operating costs / (credits) ............................................................................................................
112
19.4.6
Capital Costs ...........................................................................................................................................
112
19.4.7
Infrastructure and Logistics ....................................................................................................................
112
19.4.8
Economic Results....................................................................................................................................
113
19.4.9
Sensitivity Analysis .................................................................................................................................
115
19.4.10
Cash Flow Snapshot..............................................................................................................................
115
20 Adjacent Properties .............................................................................................................................................. 117
21 Other Relevant Data and Information .................................................................................................................. 117
22 Interpretation and Conclusions ............................................................................................................................ 117
23 Recommendations ................................................................................................................................................ 118
24 References ............................................................................................................................................................ 119
25 Reliance on Information Provided by the Registrant ........................................................................................... 120

6

List of Figures

Figure 3.1 General location map .................................................................................................................................. 17
Figure 3.2 Property ownership .................................................................................................................................... 18
Figure 6.1 Surface geology in the Newberry Springs area ........................................................................................... 26
Figure 6.2 Topographic map with faults and infrastructure........................................................................................ 27
Figure 6.3 Long-section and cross-section through the Fort Cady deposit ................................................................. 28
Figure 6.4 Generalized lithological column for the Fort Cady deposit ........................................................................ 29
Figure 7.1 Cross-section through the Fort Cady deposit ............................................................................................. 32
Figure 7.2 Core photo, 17FTCBL-014........................................................................................................................... 32
Figure 7.3 Project area groundwater basins and surrounding area wells, Fort Cady Project ..................................... 33
Figure 8.1 Assay results of Standard SRM1835............................................................................................................ 38
Figure 8.2 Assay results of Standard SRM97b............................................................................................................. 39
Figure 8.3 Assay results for SRC Standard CAR110/BSM............................................................................................. 39
Figure 8.4 Assay results for SRC Standard CAR110/BSH.............................................................................................. 40
Figure 8.5 Sample blank assay results for boron ......................................................................................................... 40
Figure 8.6 Sample blank assay results for lithium........................................................................................................ 40
Figure 8.7 Duplicate sample results for boron ............................................................................................................. 41
Figure 8.8 Duplicate sample results for lithium........................................................................................................... 42
Figure 8.9 HARD diagram for 5E duplicate samples .................................................................................................... 42
Figure 8.10 SRC duplicate results ................................................................................................................................. 43
Figure 8.11 SRC duplicates HARD diagram .................................................................................................................. 43
Figure 10.1 Boric acid solubility curve at various temperatures for CRZ1-1, CRZ1-2, and CRZ1-3 .............................. 50
Figure 10.2 Boric acid continuous crystallization set-up including an agitated feed tank.......................................... 50
Figure 10.3 Boric acid crystals after continuous crystallization test (CRZ1-4)............................................................. 51
Figure 10.4 Boric acid crystals after continuous crystallization test (CRZ1-4) and centrifugation .............................. 51
Figure 10.5 Boric acid crystals after re-crystallization ................................................................................................. 52
Figure 10.6 Boric acid crystals after re-crystallization and dewatering process.......................................................... 52
Figure 11.1 Grade variation swath ............................................................................................................................... 60
Figure 11.2 Cash costs, $/st of boric acid..................................................................................................................... 62
Figure 11.3 Resource classification.............................................................................................................................. 65
Figure 13.1 Jet pump assembly.................................................................................................................................... 70
Figure 13.2 Year 1 production rates per cycle............................................................................................................. 71
Figure 13.3 LSBF block 2 mine plan.............................................................................................................................. 73
Figure 13.4 Block 2 mining cross section–MMH wells vertical spacing..................................................................... 73
Figure 13.5 Block 2 mining cross section–MMH wells later spacing ......................................................................... 74
Figure 13.6 Micro-defamation results ......................................................................................................................... 74
Figure 14.1 Small-Scale Facility .................................................................................................................................... 75
Figure 14.2 Block flow diagram of the Small-Scale Facility .......................................................................................... 76
Figure 14.3 LSBF plant layout ....................................................................................................................................... 81
Figure 14.4 LSBF detailed layout .................................................................................................................................. 82
Figure 15.1 Fort Cady Project Infrastructure ............................................................................................................... 89
Figure 16.1 Project market capacity versus demand................................................................................................... 92
Figure 16.2 Forecasted boric acid pricing, per Kline.................................................................................................... 92
Figure 16.3 Boric acid demand by end use, per Kline .................................................................................................. 94
Figure 16.4 U.S. calcium chloride market demand and growth 2024–2034 .............................................................. 96
Figure 16.5 Average market price for uncalcined gypsum by grade and application, per Kline................................. 97
Figure 16.6 Gypsum USA production ........................................................................................................................... 98

7

Figure 16.7 U.S. gypsum market demand and growth, 2024–2034 .......................................................................... 99
Figure 18.1 Summary of equipment pricing ................................................................................................................ 104
Figure 19.1 Resource Extraction Profile....................................................................................................................... 111
Figure 19.2 Operating costs (first ten years)................................................................................................................ 111
Figure 19.3 Capital profile of the mine ........................................................................................................................ 113
Figure 19.4 Cash flow projection................................................................................................................................. 113
Figure 19.5 Sensitivity Analysis .................................................................................................................................... 115

8

List of Tables

Table 3.1 5E mineral holdings .................................................................................................................................................. 19
Table 3.2 Current financial assurance obligations ................................................................................................................ 19
Table 5.1 Duval testing results ................................................................................................................................................. 22
Table 5.2 Mountain States testing injection summary ......................................................................................................... 22
Table 5.3 Mountain States testing recovery summary ......................................................................................................... 22
Table 5.4 Fort Cady Mineral Corporation production summary ......................................................................................... 23
Table 5.5 5E injection–recovery summary per cycle (IR-1, IR-2, and IR-3) ...................................................................... 23
Table 5.6 5E injection–recovery summary per cycle (IR-4) ................................................................................................ 25
Table 7.1 Historic drilling summary ......................................................................................................................................... 30
Table 7.2 2017 5E drilling summary ........................................................................................................................................ 31
Table 7.3 Recent 5E drilling ...................................................................................................................................................... 31
Table 8.1 Summary of QA/QC control samples ..................................................................................................................... 38
Table 10.1 Kemetco metallurgical analysis for the five brine samples .............................................................................. 46
Table 10.2 Kemetco metallurgical analysis for the five boric acid samples ...................................................................... 47
Table 10.3 Simulated crystallizer feed conditions ................................................................................................................. 48
Table 10.4 Amended PLS feed compositions for batch crystallization tests (CRZ1-1 through CRZ1-3) ........................ 48
Table 10.5 Feed solutions for continuous crystallization ..................................................................................................... 49
Table 10.6 Boric acid re-crystallization results ...................................................................................................................... 53
Table 10.7 Particle size distribution for batch crystallization test CRZ1-1 through CRZ1-3 ............................................ 53
Table 10.8 Particle size distribution for continuous crystallization test CRZ1-4 ............................................................... 54
Table 10.10 Boric acid crystal particle size distribution for re-crystallization ................................................................... 54
Table 10.11 Boric acid crystal particle size specification ...................................................................................................... 54
Table 11.1 Summary of drilling database ............................................................................................................................... 57
Table 11.2 Modelled horizons .................................................................................................................................................. 58
Table 11.3 Modelled variograms ............................................................................................................................................. 59
Table 11.4 Basis of design ratios .............................................................................................................................................. 61
Table 11.5 Cut-off grade input costs ....................................................................................................................................... 61
Table 11.6 Cut-off grade analysis ............................................................................................................................................. 62
Table 11.7 Fort Cady Project mineral resource estimate, March 10, 2025 ....................................................................... 64
Table 12.1 Proven mineral reserves ........................................................................................................................................ 67
Table 12.2 Probable mineral reserves .................................................................................................................................... 67
Table 12.3 Mineral reserve statement .................................................................................................................................... 67
Table 13.1 Wellfield operating strategy mining parameters ............................................................................................... 71
Table 13.2 Horizontal well program ICP-OES results (July 7, 2025) .................................................................................... 72
Table 14.1 LSBF design criteria ................................................................................................................................................. 77
Table 14.2 LSBF WBS processing facilities .............................................................................................................................. 78
Table 14.3 Major plant equipment selections ....................................................................................................................... 86
Table 18.1 Capital summary ..................................................................................................................................................... 102
Table 18.2 Detailed breakdown of process facility and infrastructure .............................................................................. 103
Table 18.3 Bid summary ............................................................................................................................................................ 104
Table 18.4 5E project deliverables versus standard AACE Class 4 criteria ........................................................................ 105
Table 18.5 Mining capital cost estimate ................................................................................................................................. 106
Table 18.6 Owner’s cost breakdown ....................................................................................................................................... 107
Table 18.7 Variable materials cost .......................................................................................................................................... 108

9

Table 18.8 Other operating costs ............................................................................................................................................ 109
Table 19.1 Basic model parameters ........................................................................................................................................ 109
Table 19.2 Life of mine summary ............................................................................................................................................ 111
Table 19.3 Variable operating cost over life of mine ............................................................................................................ 112
Table 19.4 Total fixed operating cost over life of mine excluding depreciation............................................................... 112
Table 19.5 Total other operating costs / (credits) over life of mine ................................................................................... 112
Table 19.6 Results of economic analysis................................................................................................................................. 114
Table 19.7 Summary of annual cash flow, US$ millions ....................................................................................................... 116

10

Glossary of Terms

Abbreviation Definition
5E 5E Advanced Materials, Inc.
amsl Above mean sea level
AOR Area of Review
APBL American Pacific Borate & Lithium
BA Boric acid
B2O3 Boron oxide
bgs Below ground surface
BLM US Bureau of Land Management
B2O3 Boron trioxide (chemical formula)
BMI Benchmark Mineral Intelligence
C Celsius
CaCl2 Calcium Chloride (chemical formula)
CAGR Compound annual growth rate
CEQA California Environmental Quality Act
cm/sec Centimeters per second
CSTR Continuous Stirred-Tank Reactor
Duval Duval Corporation
DXF file Drawing Interchange Format File
E East
EIR Environmental Impact Report (California lead)
EIS Environmental Impact Statement (BLM lead)
EPA United States Environmental Protection Agency
F Fahrenheit
FACE Financial Assurance Cost Estimate
FCMC Fort Cady Mineral Corporation
FEL Front End Loading, a stage gated project management system (with a number to the
corresponding stage, e.g., FEL-2)
ft Foot or Feet
Gal Gallon(s)
g/l Gram per liter
Gal/min Gallons per minute
gpm gallons per minute
H2SO4 Sulfuric acid (chemical formula)
H3BO3 Boric acid (chemical formula)
B(OH)3 Boric acid (chemical formula)
HCl Hydrochloric acid (chemical formula)
ICP Inductively Coupled Plasma
ID2 Inverse Distance Squared algorithm
IRR Internal Rate of Return
ISL In-Situ Leaching
JORC Australian Joint Ore Reserves Committee
K Hydraulic coefficient
k Thousand
kg Kilogram
kWh Kilowatt Hour
Kline Kline & Company, Inc.
lb(s) Pound(s) mass

11

LCE Lithium carbonate equivalents
Li2CO3 Lithium Carbonate
m Meters(s)
mm Millimeter(s)
MDAQCD Mojave Desert Air Quality Control District
MMBTU Millions of British Thermal Units
MSME Mountain States Mineral Enterprises Inc.
Mt Million tons
M Million
N North
NAD 83 North American Datum 83 is a unified horizontal or geometric datum providing a spatial
reference for mapping purposes
NEPA National Environmental Policy Act
NN Nearest neighbor
NPV Net present value
pH Potential Hydrogen – a numeric scale to specify the acidity or alkalinity of an aqueous solution
PLS Pregnant leach solution
Ppm Parts per million
psi Pounds per square inch of pressure
QA/QC Quality Assurance and Quality Control
QP Qualified Person per SK1300 definition
ROD The 1994 Record of Decision for the Fort Cady Project was issued after the EIS/EIR evaluations.
S Storage coefficient
SBC-LUS San Bernardino County Land Use Services Department
SBM San Bernardino Meridian
SCE SoCal Edison
SEC Securities and Exchange Commission
SOP Sulphate of Potash
stpa Short tons per annum
tpy Tons per year
UIC Underground Injection Control Class III Area Permit
USDW Underground source of drinking water
US United States
US$ United States dollars
UTM Universal Transverse Mercator coordinate system for mapping
XRF X-Ray Fluorescence Spectrometry

12

1 Executive Summary

This report was prepared as a pre-feasibility level Technical Report Summary in accordance with the Securities and Exchange Commission (SEC) S-K regulations (Title 17, Part 229, Items 601 and 1300 through 1305) for 5E Advanced Materials, Inc. and its subsidiary 5E Boron Americas, LLC, (together 5E or the Company) Fort Cady Project (the Project). The Project described herein is part of 5E’s strategy to become a globally integrated supplier of industrial minerals through in-situ extraction of colemanite. Once extracted, the Company will produce and refine boron and calcium-based products. The Project is in the Mojave Desert, near the town of Newberry Springs, California.

Using the volumes, market inputs, and anticipated operating and capital costs, a detailed economic model was created with a forecasted net present value (NPV7) of approximately US$725M and internal rate of return (IRR) of 19.2%. Further details, including key model assumptions, are included in Section 19. This Technical Report Summary includes Phase 1 of the Project, and while the resource base provides the opportunity for expansion that could include additional production tonnage or value-added boron derivatives, they are excluded from this Technical Report Summary.

The Project includes six parcels of private land owned by 5E, federal land owned by the United States Bureau of Land Management, and an electrical transmission corridor runs through the Project where Southern California Edison (SCE) has surface and subsurface control to a depth of 500 ft. While this limits surface access to the area within the right-ofway of the transmission lines, mineral rights are owned by 5E, and mineralization remains accessible as the ore body occurs at depths greater than 1,000 ft. The Project also includes 13 unpatented lode claims, 117 unpatented placer claims and two unpatented millsite claims from the Bureau of Land Management within the U.S. Department of the Interior. On the southwestern side of the Project, the State of California owns the mineral rights for 272 acres of land where 5E owns the surface rights. These mineral rights can be leased from the state.

Major mining permits were obtained in 1994, with a Record of Decision issued by the United States Bureau of Land Management and a Condition Use Permit issued by the State of California. In 2020, an Underground Injection Control Permit was obtained by the United States Environmental Protection Agency and approval to commence mining operations was obtained in 2023. The mining permits allow for 90,000 short tons of borate, defined as boron oxide or boron oxide equivalent, thus permitting up to approximately 160,000 short tons of boric acid.

5E believes the resource is the second largest deposit of borate globally with a history of exploration and mining of the ore body, beginning in 1964 with the resource discovery and includes production of boric acid and synthetic borates by Duval Corporation (Duval) and Fort Cady Mineral Corporation (FCMC). Geologically, the deposit is bounded by faults on both east and west sides and is the site of prior volcanic activity from the Pisgah Crater. Mineralization occurs in a sequence of lacustrine lakebed sediments ranging in depths from 1,300 ft to 1,500 ft below ground surface.

Exploration drilling has led to a geologic interpretation of the deposit as lacustrine evaporite sediments containing colemanite, a hydrated calcium borate mineral. The deposit also contains appreciable quantities of lithium. Geologic modeling based on drilling and sampling results depicts an elongate deposit of lacustrine evaporite sediments containing colemanite. The deposit is approximately 2.1 mi. long by 0.6 mi. wide and ranging in thickness from 70 to 262 ft. Mineralization has been defined in four distinct horizons defined by changes in lithology and B2O3 analyses.

A mineral resource and mineral reserve statement has been estimated and reported using a cut-off grade of 2.0% B2O3. Measured, indicated, and inferred resources for the Project total 135.8 Mt of ore and 18.1 Mt of boric acid. Proven reserves total 1.4 Mt and probable reserves total 4.0 Mt of boric acid, respectively. The initial life of mine for Phase 1 is 39.5 years based on the current mine plan and 41% of the resource has been converted to reserves. The southeastern side of the property includes an exploration target and there is additional resource potential with this target.

The colemanite resource is to be mined via in-situ leaching (ISL) using a hydrochloric acid solution. The leachate will be processed in the commercial-scale facility to initially produce 130,000 short tons per annum (k stpa) of boric acid along with calcium-based by-products calcium chloride and gypsum. A Class 4 or FEL-2 level engineering estimate for the phase 1 plant was prepared as part of this Technical Report Summary. In November 2023, the Company received

13

approval to commence in-situ mining operations from the United States Environmental Protection Agency (EPA) and began mining in January 2024. The Company’s small-scale facility (SSF) began operation in April 2024, has achieved production and has achieved a steady state of approximately one short ton per day of boric acid.

Global boric acid demand remains robust across established markets and future-facing industries while supply continues to be tight across the industry operating network. The supply deficit is expected to continue to materially worsen in the future and lead to elevated pricing. This outlook, along with a pricing forecast for boric acid and its calcium by-products, was assessed in a preliminary market study detailed in Section 16.

Capital cost expectations for a 130,000 stpa boric acid plant (inclusive of co-product processing and COGEN power) were determined to be $367M for the first stage plus a contingency of $55M and owner’s cost estimate of $13M for a total capital estimate of $435M. Operating costs are built upon detailed material and energy balances and recent historical pricing of raw materials and utilities.

Operation of the Company’s SSF has provided many of the parameters and scoping items for FEL-2 engineering and the mine plan, while also confirming historical data from operations in the 1980’s. Product produced from the SSF has been sent to various customers for qualification and sampling. Progression to Front End Loading Stage 3 Process Design Package (FEL-3) engineering will further refine the accuracy of the capital cost estimates for the chemical processing plant. Additionally, operation of horizontal directional wells is expected to confirm the mine plan for the commercial facility. Once these steps are completed, the Company will be well positioned to advance this pre-feasibility study to a full-feasibility study.

2 Introduction

2.1 Registrant for Whom the Technical Report was Prepared

This report was prepared as a pre-feasibility study level Technical Report Summary in accordance with the Securities and Exchange Commission S-K regulations Title 17, Part 229, Items 601 and 1300 through 1305 for 5E Advanced Materials, Inc. and its subsidiary 5E Boron Americas, LLC. The report was prepared by Qualified Persons (QPs) from third-party independent companies Fluor Corporation (Fluor), Miocene, Inc. (Miocene), Escalante Geological Services, LLC (Escalante), and Geomega, Inc. (Geomega) and Company management.

2.2 Terms of Reference and Purpose of the Report

The quality of information, conclusions, and estimates contained herein is based on the following:

  • a) information available at the time of preparation, and

  • b) assumptions, conditions, and qualifications set forth in this report.

This Technical Report Summary is based on a Class 4 or FEL-2 pre-feasibility study level engineering. This report is intended for use by 5E Advanced Materials, Inc. and its subsidiary 5E Boron Americas, LLC, subject to the terms and conditions of its agreements with Escalante, Fluor, Geomega, and Miocene and relevant securities legislation. Escalante, Fluor, Geomega, and Miocene permit 5E to file this report as a Technical Report Summary with the U.S. Securities and Exchange Commission (SEC) pursuant to the SEC S-K regulations, more specifically Title 17, Subpart 229.60, Item 601(b)(96) – Technical Report Summary and Title 17, Subpart 229.1300 – Disclosure by Registrants Engaged in Mining Operations. Except for the purposes specified under U.S. securities law, any other uses of this report by any third party are at that party’s sole risk. The responsibility for this disclosure remains with the Company.

The purpose of this Technical Report Summary is to report on mineral resources and reserves as well as inform parties with potential financial interests in 5E and the Project.

2.3 Sources of Information

14

This report is based in part on external consultants’ expertise and their technical reports, internal Company technical reports, previous technical reports, maps, published government reports, company letters and memoranda, and public information cited throughout this report and listed in Section 25.

Reliance upon information provided by the registrant is listed in Section 25, when applicable.

2.4 Details of Inspection

Escalante, Fluor, Geomega, and Miocene have visited the property, inspected core samples, reviewed relevant intellectual property and reports, and have extensive knowledge of the Project.

2.5 Report Version Update

The user of this document should ensure that this is the most recent Technical Report Summary for the property. This Technical Report Summary is an update of a previously filed Technical Report Summary filed pursuant to 17 CFR §§ 229.1300 through 229.1305 subpart 229.1300 of Regulation S-K. The previously filed Technical Report Summary has a report date of May 11, 2023, a revised report date of February 2, 2024, and an effective date of April 1, 2023.

2.6 Units of Measure

The U.S. System for weights and units has been used throughout this report. Tons are reported in short tons of 2,000 pounds (lb), drilling and resource model dimensions and map scales are in feet (ft). When included, metric tons are referred to as tonnes or mt. All currency is in U.S. dollars (US$) unless otherwise stated.

2.7 Mineral Resource and Mineral Reserve Definition

The terms “mineral resource” and “mineral reserves” as used in this Technical Report Summary have the following definitions below.

2.7.1 Mineral Resources

17 CFR § 229.1300 defines a “mineral resource” as a concentration or occurrence of material of economic interest in or on the Earth’s crust in such form, grade or quality, and quantity that there are reasonable prospects for economic extraction. A mineral resource is a reasonable estimate of mineralization, considering relevant factors such as cut-off grade, likely mining dimensions, location, or continuity, that, with the assumed and justifiable technical and economic conditions, is likely to, in whole or in part, become economically extractable. It is not merely an inventory of all mineralization drilled or sampled.

A “measured mineral resource” is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of conclusive geological evidence and sampling. The level of geological certainty associated with a measured mineral resource is sufficient to allow a qualified person to apply modifying factors, as defined in this section, in sufficient detail to support detailed mine planning and final evaluation of the economic viability of the deposit. Because a measured mineral resource has a higher level of confidence than the level of confidence of either an indicated mineral resource or an inferred mineral resource, a measured mineral resource may be converted to a proven mineral reserve or to a probable mineral reserve.

An “indicated mineral resource” is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of adequate geological evidence and sampling. The level of geological certainty associated with an indicated mineral resource is sufficient to allow a qualified person to apply modifying factors in sufficient detail to support mine planning and evaluation of the economic viability of the deposit. Because an indicated mineral resource has a lower level of confidence than the level of confidence of a measured mineral resource, an indicated mineral resource may only be converted to a probable mineral reserve.

An “inferred mineral resource” is that part of a mineral resource for which quantity and grade or quality are estimated on the basis of limited geological evidence and sampling. The level of geological uncertainty associated with an inferred

15

mineral resource is too high to apply relevant technical and economic factors likely to influence the prospects of economic extraction in a manner useful for evaluation of economic viability. Because an inferred mineral resource has the lowest level of geological confidence of all mineral resources, which prevents the application of the modifying factors in a manner useful for evaluation of economic viability, an inferred mineral resource considered when assessing the economic viability of a mining project must be presented along with economic viability excluding inferred resources and may not be converted to a mineral reserve.

2.7.2 Mineral Reserves

17 CFR § 229.1300 defines a “mineral reserve” as an estimate of tonnage and grade or quality of indicated and measured mineral resources that, in the opinion of the qualified person, can be the basis of an economically viable project. More specifically, it is the economically mineable part of a measured or indicated mineral resource, which includes diluting materials and allowances for losses that may occur when the material is mined or extracted. A “proven mineral reserve” is the economically mineable part of a measured mineral resource and can only result from conversion of a measured mineral resource. A “probable mineral reserve” is the economically mineable part of an indicated and, in some cases, a measured mineral resource.

2.8 Qualified Persons

This report was compiled by 5E and its management, with contributions from Escalante Geological Services, LLC, Fluor Corporation, Geomega, Inc., and Miocene, Inc. The QP’s, Escalante, Fluor, Geomega, and Miocene, are third-party firms comprising mining experts in accordance with 17 CFR § 229.1302(b)(1). 5E has determined that the third-party firms and internal management listed as qualified persons meet the qualifications specified under the definition of a qualified person in 17 CFR § 229.1300.

Escalante Geological Services, LLC prepared the following sections of the report:

Sections 2, 3, 4, 5, 6, 7 (excluding 7.3), 8, 9, 11, 15, 17, 20, 21, 22

Fluor Corporation prepared the following sections of the report:

Sections 10, 14, 18 (specifically Sections 18.1.1 through 18.1.4, 18.1.9 and 18.2, which are specific to operating and capital expenditures, excluding wellfield) and contributed to sections 22, 23, and 24

Geomega, Inc. prepared the following sections of the report:

Sections 7.3

Miocene, Inc. prepared the following sections of the report:

Sections 12, 13, 18 (specifically Sections 18.1.5 through 18.1.8, which are specific to wellfield capital expenditures)

The following members of 5E management prepared the following sections of the report:

  • Paul Weibel, CPA, and Chief Executive Officer Sections 1, 16, 19, 23, 24, 25

Section 16 Market Studies and Contracts was prepared by 5E. The company engaged Kline and Company, Inc. (Kline) to perform a preliminary market study and pricing forecast for boric acid, calcium chloride and gypsum. Forward pricing forecasts obtained from Kline were utilized as part of the financial model outlined in Section 19, Economic Analysis. Kline was not engaged as a qualified person; however, 5E has obtained permission to refer to the preliminary market study they have provided and cite accordingly.

16

3 Property Description and Location

3.1 Property Location

The Project is located in the Mojave Desert region in the high desert of San Bernardino County, California. Figure 3.1 outlines a map where the Project lies, which is approximately 118 mi northeast of Los Angeles, approximately 36 mi east of Barstow and approximately 17 mi east of Newberry Springs. The approximate center of the project area is N34°45’25.20”, W116°25’02.02”. The Project is in a similar geological setting as Rio Tinto’s U.S. Borax operations in Boron, California, and Searles Valley Minerals Operations in Trona, California, situated approximately 75 mi westnorthwest and 90 mi northwest of the Project, respectively.

Figure 3.1: General location map

==> picture [351 x 256] intentionally omitted <==

3.2 Area of Property

Figure 3.2 shows the 5E property and adjacent properties.

17

Figure 3.2: Property ownership

==> picture [445 x 312] intentionally omitted <==

3.3 Mineral Title

5E owns simple fee (private) lands in Sections 25 and 36, of Township 8 North, Range 5 East of the San Bernardino Principal Meridian. An electrical transmission corridor, operated by SCE, tracts from the northeast to the southwest through the fee lands with SCE having surface and subsurface control to a depth of 500 ft, affecting approximately 91 acres of surface lands in the two sections. While this limits surface access to the land, mineralization remains accessible as the ore body occurs at depths greater than 1,000 ft (~ 300 m.)

5E currently holds 13 unpatented lode claims, 117 unpatented placer claims, and two (2) unpatented millsite claims with the Bureau of Land Management within the U.S. Department of the Interior. Two lode claims were originally filed by Duval Corporation in 1978 with the 11 other lode claims filed by the Company in January 2025. Placer claims were filed between October 29, 2016, and February 24, 2017. A review of the US Bureau of Land Management (BLM) Mineral & Land Record System, the Mineral Land Record System (MLRS) database shows claim status as filed with next assessment fees due annually on September 1.

Lastly, in Section 36, Township 8 North, Range 5 East, 272 acres of land in Section 36 are split estate, with the surface estate owned by 5E and the mineral estate is owned by the State of California. These lands are available to 5E through a mineral lease from the California State Lands Commission. The remaining lands are owned by 5E, with the minerals underlying the transmission line available subsurface. Table 3.1 summarizes the mineral holdings held by 5E.

18

Table 3.1: 5E mineral holdings

Land Title Type Land Titles
Private (Patented Property with surface and mineral rights in Parcels: 05-29-251-01; 05-29-251-03;
Fee Simple Title owned by 5E) 05-29-251-05; 05-29-251-12; 05-29-251-13;
Private (Patented Property with surface rights in Fee Simple
Title owned by 5E; Mineral rights owned by State of
Parcel: 05-29-251-04
California)
Unpatented Lode Mining Claims Recorded and Located by 5E HEC #182, HEC #184, FC 001, FC 002, FC 003, FC
004, FC 005, FC 006, FC 007, FC 008, FC 009, FC 010,
FC 011
Unpatented Millsite Claims FCM 001, FCM 002
Unpatented Placer Mining Claims HEC #19, HEC #21, HEC #23, HEC #25, HEC #34 thru
HEC #41; HEC #43 thru HEC #67, HEC #70 thru HEC
#82; HEC#85 thru HEC #93; HEC #288, HEC #290,
HEC #292, HEC #294, HEC #296, HEC #297, HEC
#299 thru HEC #350

3.4 Mineral Rights

5E holds the rights to the mineral estate underlying Sections 25 and 36, except for the portion of the mineral estate held by the State of California in Section 36 .

3.5 Incumbrances

5E maintains financial assurance bonds for reclamation and closure for current and planned operations. Additional information on reclamation and closure liabilities is included in Section 17. The amount of bonds and certificate of deposits posted with the applicable agency are present in Table 3.2.

Table 3.2: Current financial assurance obligations

Regulatory Authority Regulatory Obligation Instrument Instrument US$ Instrument US$
United State Environmental
Protection Agency
Groundwater restoration
Groundwater monitoring
Plugging and abandonment of AOR wells
Bond
EACX173000037
$
1,212,455
County of San Bernardino Reclamation and Closure Certificate of
deposits
$
326,274

3.5.1 Remediation Liabilities

5E has submitted a Final Reclamation and Closure Plan to the Lahontan Regional Water Quality Control Board for closure of ponds constructed on the property in the 1980’s. The bonding for closure of these ponds is included in the certificate of deposits with San Bernardino County and upon closure of the ponds, the bond will be reduced and a portion of the deposited amount returned to the company.

3.6 Other Significant Risk Factors

The mineral resource estimate (Section 11) excludes BLM land where other third-parties have active lode claims for portions of the deposit.

An exploration program to expand the resource is possible in Section 36 on the southeastern portion of the property; however, this would require a mineral lease to be filed and executed with the California State Lands Commission for the State of California held mineral estate.

19

3.7 Royalties

There are no royalties associated with privately and publicly held lands in Section 25 and 36.

4 Accessibility, Climate, Local Resources, Infrastructure, and Physiography

4.1 Topography, Elevation, and Vegetation

The Project area is located on a gentle pediment with elevations ranging from approximately 1,970 ft above mean sea level (amsl) to approximately 2,185 ft amsl. Basalt lava flows cover most of the higher elevations or hilltops with flat ground and drainages covered in pale, gray-brown, silty soils. Basalt lava flows become more dominant south of the Project area with the Lava Bed Mountains located a few miles south of the Project area. The Project area’s vegetation is dominated by burro weed, creosote, cactus, and scattered grasses.

4.2 Accessibility and Transportation to the Property

Access to the Project is via U.S. Interstate 40 (I-40), eastbound from Barstow to the Hector Road exit. From the exit, travel south to Route 66, then east approximately 1 mile to County Road 20796 (CR20796). Travel south on CR20796 for 2.2 mi to the unnamed dirt access road bearing east for another 1.1 mi to the Project.

The BNSF Railroad main line from Chicago to Los Angeles runs parallel to I-40. A BNSF rail loadout is in Newberry Springs. There are potential options to develop rail access closer to the Project.

San Bernardino County operates six general aviation airports with the closest airport to the Project being the BarstowDaggett Airport located approximately 23 mi west of the Project off Route 66. Commercial flight service is available through five airports in the greater Los Angeles area and in Las Vegas, Nevada. A dedicated cargo service airport is located approximately 65 mi southwest of the Project.

4.3 Climate and Length of Operating Season

The Project is accessible year-round, located in the western Mojave Desert with arid, hot, dry, and sunny summers of low humidity and temperate winters. Based upon climate data from the nearby town of Newberry Springs, the climate over the past 30 years indicates average monthly high temperatures ranging from 55°F in December to 98.2°F in July. Monthly low temperatures range from 40.1°F in December to 74.3°F in August. Extremes range from a record low of 7°F to a record high of 117°F. Maximum temperatures in summer frequently exceed 100°F while cold spells in winter with temperatures below 20°F may occur but seldom last for more than a few days. Average rainfall is generally less than 10 inches per year with most precipitation occurring in the winter and spring.

4.4 Infrastructure Availability and Sources

5E continues to develop operating infrastructure for the Project in support of extraction and processing activities. A manned gate is located on the Project access road and provides required site-specific safety briefings and monitors personnel entry and exit to the site. Personnel are predominantly sourced from the surrounding area including Barstow, California, and Victorville, California.

The BNSF Railroad main line from Las Vegas, Nevada to Los Angeles, California runs parallel to I-40. A rail loadout is located approximately 1.2 mi north of the National Trails Highway on a road that bears north and located 0.4 mi west of CR20796.

The construction of the small-scale facility was performed by a construction contractor with additional local resources supporting construction contracting, construction materials, energy sources, employees, and housing. The Project has good access to I-40 which connects it to numerous sizable communities between Barstow, California and the greater Los Angeles area offering excellent access to transportation, construction materials, labor, and housing. The Project currently has limited electrical service (approximately 1 megawatt) that is sufficient for mine office, storage facilities on

20

site, and provides a good portion of the power for the small-scale facility. The small-scale facility operates on shore power and liquid natural gas and 5E is currently exploring options for upgrading electrical services to the Project. An electrical transmission corridor operated by SCE extends northeastward through the eastern part of the Project. The Project has two water wells located nearby to support in-situ leaching operations where unpatented millsite claims are filed. Currently there is no natural gas connected to the Project, but 5E has a proposal from Kinder Morgan to connect to the Mojave Pipeline. Two other natural gas transmission lines run along Interstate 40 near the Project.

The plant site currently has a 1,600 ft[2] mine office building, a control room, storage buildings, an analytical laboratory, an approximately 20-acre production facility called the small-scale facility, and an intended gypsum storage area occupying 17 acres. Gypsum is a byproduct of past pilot plant production and is intended to be a future byproduct that can be sold to the regional market.

5 History

Discovery of the Project borate deposit occurred in 1964 when Congdon and Carey Minerals Exploration Company found several zones of colemanite, a calcium borate mineral, between the depths of 1,330 ft to 1,570 ft (405m to 487m) below ground surface (bgs) in Section 26, Township 8 North, Range 5 East. Simon Hydro-Search, 1993.

5.1 Prior Ownership and Ownership Changes

In September 1977, Duval initiated land acquisition and exploration activities near Hector, California. By March 1981, Duval had completed 34 exploration holes (DHB holes), plus one 1 potential water well. After evaluation of the exploration holes, Duval considered several mining methods. Subsequent studies and tests performed by Duval indicated that in-situ mining technology was feasible. Duval commenced limited testing and pilot-scale solution mining operations in June 1981 per the Mining and Land Reclamation Plan, Fort Cady Project, 2019.

Mountain States Mineral Enterprises, Inc. (MSME) purchased the project from Duval in 1985 and, in 1986, conducted an additional series of tests. MSME eventually sold the project to Fort Cady Mineral Corporation in 1989. FCMC began the permitting process, which resulted in a 1994 Record of Decision (ROD) from the BLM and approval from San Bernardino County, the California lead agency.

5.2 Exploration and Development Results of Previous Owners

Duval commenced limited-scale solution mining tests in June 1981. Between 1981 and 2001, subsequent owners drilled an additional 17 wells, which were used for a series of injection testing and pilot-scale operations. In July 1986, tests were conducted by MSME, where dilute hydrochloric acid solution was injected into the ore body. The acid dissolved the colemanite and was then withdrawn from the same well.

The first phase of pilot plant operations was conducted between 1987 and 1988. Approximately 550 tons (500 tonnes) of boric acid were produced. The test results were positive; thus, the Project was viewed as commercially viable. In preparation for the permitting process, feasibility studies, detailed engineering and test works were completed with FCMC receiving the required permits for a commercial-scale operation. Final state and local approvals for commercialscale solution mining and processing was attained in 1994.

A second phase of pilot plant operations occurred between 1996 and 2001, during which approximately 2,200 tons of a synthetic colemanite product, marketed as CadyCal 100, were produced. Commercial-scale operations were not commissioned due to low product prices and other priorities of the controlling entity. For many years, boron was used in traditional applications such as cleaning supplies and ceramics, which never formulated in a strong pull-side demand investment thesis where pricing justified further development of the Project. However, a group of Australian investors, through extensive due diligence identified green shoots that the market dynamics were fundamentally beginning to change.

21

5.3 American Pacific Borates Share Exchange of Atlas Precious Metals

In 2017, a group of Australian investors identified the Project and formed the investment thesis that the boron market had similar dynamics to the lithium market a decade earlier. Like the lithium market ten years prior, the market was dominated by a few companies with a compelling pull-side demand growth story fueled by future-facing applications targeting decarbonization and critical materials. Prior to lithium-ion batteries and electric vehicles, lithium was used in traditional everyday applications like boron’s use in recent years. As a result of the investment thesis that boron is expected to experience a supply deficit relative to demand, the group of Australian investors formed American Pacific Borates and Lithium Ltd (APBL) and issued shares to Atlas Precious Metals in exchange for the Fort Cady (California) Corporation, the entity holding the permits, mineral and property rights of the Project. In 2017, APBL underwent an initial public offering on the Australian Stock Exchange and progressed exploration and development of the Project. In September 2021, APBL created a subsidiary, 5E, through a corporate reorganization which placed 5E at the top of the corporate structure. Upon 5E becoming the parent company of the organization, in March 2022 5E direct listed on Nasdaq and became an SEC issuer. Shortly before becoming an SEC issuer, 5E Boron Americas, LLC was designated as Critical Infrastructure by the Department of Homeland Security Cybersecurity and Infrastructure Security Agency.

5.4 Historic Production

Limited historic production data, provided to 5E by previous operators, is summarized in Table 5.1 through Table 5.4. Little other information is available for these tests; the results could not be independently verified.

Table 5.1: Duval testing results

Volume Injected
Gal
Volume
Recovered Gal
Average Maximum
Injection Rate Pump Pressure Recovery
Test No. Acid % Concentration Concentration
Gal/min PSI Rate Gal/min
H3BO3 % H3BO3 %
1 680 1.5 150 16% HCl 700 1.0-2.0 0.3
1,500 2 275 5% H2SO4 1,500 1.0-2.0 0.5 1.5
1,400 1.5-2.0 150 5% H2SO4 2,000 1.0-2.0 1.5 4.6
1,500 2 275 23% H2SO4 1,500 1.0-2.0 1.0 4.0
2 2,250 2 300 8% H2SO4 2,000 1.5-2.0 1.5 4.0
3 5,358 2-2.5 275 6.9% H2SO4 28,927 1.0-1.5 3.0 6.9
6,597 2-2.5 275 17.5% HCl 3.0 6.9
6.2% HCl &
4 19,311 2-2.5 230-275 67,995 1.0-1.5 3.0 6.5
2.4% H2SO4
5 20,615 2 290 16% HCL 112,637 1.0-1.5 2.5 5.2
6 21,569 20 275 1.6% HCl 63,460 1.0-1.5 1.1 1.7

Table 5.2: Mountain States testing injection summary

Date Gallons Gallons Pounds Theoretical H3BO3 Theoretical H3BO3
Series From To Test Nos. Wells SMT Series HCl CO2 Series
1 8/4/1986 8/23/1986 1-3 6 & 9 67,972 67,972 23,286 59,540 59,540
2 11/4/1986 11/10/1986 4-7 6 45,489 113,461 15,500 39,431 98,971
3 12/9/1986 12/18/1986 8-11 6 53,023 166,484 15,398 39,173 138,144
4 6/18/1986 6/27/1987 12-15 9 47,640 214,124 4,313 18,184 156,328
Total 214,124 214,124 54,184 4,313 156,328 156,328

Table 5.3: Mountain States testing recovery summary

Date Date Gallons Pounds BA % BA in Solution, by
Surge Tank
% BA in Solution, by
Surge Tank
% BA in Solution, by
Surge Tank
% BA in Solution, by
Surge Tank
Theoretical BA
Series From To Test Nos.
Wells
SMT
Series Series High End Avg Series
1 8/7/1986 10/17/1986 1-3 6 & 9 128,438 128,438 32,608 32,608
3.84
1.56 2.50
54.77
54.77
2 11/5/1986 11/13/1986 4-7 6 51,636 180,074 21,223 53,831
5.74
4.05 4.68
53.83
54.39
3 12/10/1986 1/13/1987 8-11 6 99,889 279,963 33,386 87,217
5.59
1.93 4.18
85.23
63.14
4 6/9/1987 7/0/1987 12-15 9 86,595 366,558 18,973 106,190
3.55
1.81 2.60
104.34
67.93
Total 366,558 366,558 106,190 106,190 3.79 67.93

22

In 2017, 5E completed an exploration drilling program to validate previous exploration efforts and expand mineral resources. Post drilling, an Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC) mineral resource estimate was prepared by Terra Modelling Services. TMS updated the JORC mineral resource estimate in December 2018. The 2018 JORC mineral resource estimate identified 4.63 million tonnes of measured resource, 2.24 million tonnes of indicated resource, and 7.07 million tonnes of inferred resource using a B2O3 cut-off grade of 5%.

In October 2021, 5E issued an Initial Assessment Report on the Fort Cady Borate Project reporting a measured plus indicated resource estimate of 97.55 million tons (Mt) grading at 6.53% B2O3 and 324 ppm Lithium using a 5.0% B2O3 cutoff grade. The Initial Assessment also identified 11.43 Mt of in Inferred resource grading at 6.40% B2O3 and 324 ppm Li. The Initial Assessment was subsequently updated in February 2022 with no changes to the resource estimate.

In October 2023, 5E updated and issued the Initial Assessment Report, dated October 2023, on the Project. The October 2023 Initial Assessment Report provided an updated estimate of 74.31 Mt of measured plus indicated resources grading at 4.15 B2O3 and 356 ppm Li using a 2.0% B2O3 cut-off grade, following a change in mineral tenure and improvements in processing. An inferred resource of 96.9 Mt grading at 4.75% B2O3 and 321 ppm LI was also identified in the estimate.

Table 5.4: Fort Cady Mineral Corporation production summary

Flow to Plant
Boric
Total Free Acid Boric Chloride Acid B2O3 CadyCal
Date Minutes Gallons Gal/min **pH ** **g/l ** Acid % **g/l ** **Sulfateg/l ** tons tons 100 tons
Jan-01 7,215 258,556 35.8 5.83 2.33 12.54 3.76 15 9 20
Feb-01 7,785 331,886 42.6 2.54 0.35 2.36 12.13 4.94 25 14 33
Mar-01 10,470 422,922 40.4 2.41 0.23 1.90 15.84 3.23 34 19 45
Apr-01 10,290 393,824 38.3 1.86 2.60 5.43 42.11 8.18 41 23 53
May-01 7,560 296,000 39.2 2.02 2.67 5.77 44.77 8.70 31 17 40
Jun-01 3,375 120,928 35.8 0.67 1.35 3.12 27.84 5.30 12 7 16
Jul-01 2,385 77,157 32.4 1.19 0.31 2.00 12.74 2.60 7 4 9
Aug-01 3,300 142,207 43.1 4.04 0.07 3.84 19.60 3.08 15 8 19
Sep-01 4,875 247,901 50.9 2.77 0.12 3.44 23.21 3.68 21 12 28
Oct-01 10,035 478,723 47.7 2.03 0.35 3.00 15.54 4.60 37 1 49
Nov-01 9,270 371,171 40.0 1.99 0.16 2.39 14.15 4.02 23 13 30
Dec-01 12,525 353,885 28.3 1.83 0.17 2.52 14.94 2.58 29 16 38
01-Total 89,085 3,495,160 39.2 2.44 0.73 3.19 21.37 4.74 291 164 381
00-Total 87,255 3,142,413 36.0 2.14 0.25 2.70 12.42 2.54 279 157 366
99-Total 92,820 2,475,770 26.7 1.59 0.48 2.82 10.13 6.84 201 113 263
98-Total 111,468 2,715,319 24.4 1.24 0.91 2.85 7.78 10.19 217 122 284
97-Total 109,040 2,692,940 24.7 0.99 1.84 3.10 3.52 13.00 252 142 329
96-Total 101,212 2,711,044 26.8 1.33 1.32 3.01 2.96 5.76 244 137 319

In January 2024, the Company began injection after receiving approval from the EPA to commence mining in November 2024. In April 2024, the Company began operating its small-scale facility and producing borates. Table 5.5 summarizes 5E’s injection – recovery summary per cycle for IR-1, IR-2, and IR-3 while and table 5.6 summarizes 5E’s injection – recovery summary per cycle for IR-4.

Table 5.5: 5E injection – recovery summary per cycle (IR-1, IR-2, and IR-3)

Complete I/R
Injection
Volume Injected Injection Rate Pump Pressure Recovery Recovery Rate Average
Cycle Well (gal) (gal/min) (psi) Well Volume Recovered(gal) (gal/min) H3BO3 %
1 IR-3 5,206.99 14.89 63.28
2 IR-1 9,230.59 11.45 24.13 IR-3 732.70 9.27 2.20
3 IR-2 4,443.94 14.86 116.50 IR-2 2,893.28 1.82 2.29
4 IR-1 18,369.41 27.61 121.20
5 IR-2 3,571.00 15.96 67.31 IR-1
IR-3
2,407.62
1,191.32
3.06
1.34
0.62
1.11
6 IR-1 13,745.17 18.14 67.64 IR-2 2,329.89 2.25 3.07
7 IR-3 26,375.01 39.82 42.61 IR-1
IR-2
8,346.20
12,717.00
17.27
34.55
2.11
1.96

23

Complete I/R
Injection
Volume Injected Injection Rate Pump Pressure Recovery Recovery Rate Average
Cycle Well (gal) (gal/min) (psi) Well Volume Recovered(gal) (gal/min) H3BO3 %
IR-3 3,247.43 14.60 1.60
IR-2 2,357.90 15.40 64.06 IR-1 707.36 4.62 0.99
8 IR-2
IR-3 1,414.70 9.24 0.55
IR-1 779.53 23.01 58.10 IR-1 472.02 13.37 0.79
9 IR-2 461.27 7.68 0.25
IR-3 464.61 7.74 0.55
10 IR-2 3,516.00 11.91 115.16 IR-1
IR-3
2,109.60
1,054.80
7.15
3.57
0.82
0.55
IR-1 11,620.79 20.08 25.47 IR-1
11 IR-2 3,673.40 7.91 2.09
IR-3 5,592.49 13.09 1.48
IR-2 11,047.68 2.62 80.31 IR-2 19,149.02 6.65 4.53
IR-3 16,450.00 21.08 140.30 IR-1 29,127.24 6.74 5.64
12 IR-1
IR-3
12,410.20
1,815.00
19.57
12.35
122.25
103.00
IR-3 16,107.29 7.45 4.24
IR-2 333.00 5.55 111.00
IR-1 5,209.97 43.40 28.59
13 IR-1
IR-3
27,337.13
22,531.94
6.70
3.54
60.57
55.19
IR-1 40,537.49 9.38 5.29
14 IR-1 33,894.24 6.35 64.34 IR-1 31,620.99 5.92 5.18
15 IR-1 32,065.38 8.60 115.38 IR-3 2,127.05 3.94 5.55
16 IR-1
IR-3
4,849.05
11,114.78
2.07
5.61
71.86
72.84
IR-1
IR-2
41,348.82
17,567.34
17.67
9.76
6.13
4.06
IR-3 2,521.19 28.19 52.33 IR-1 10,071.44 4.94 5.67
17 IR-1 2,758.17 61.29 98.48 IR-3 15,981.97 7.83 4.92
IR-2 863.74 0.25 5.67
IR-1 11,052.45 3.76 70.81 IR-1 19,205.31 16.01 7.07
18 IR-3 18,854.36 3.74 69.45 IR-2 1,545.69 0.80 9.17
IR-3 6,324.87 3.40 6.63
IR-1 4,905.86 7.43 73.67 IR-1 5,097.00 2.83 4.03
19 IR-2 13,070.53 7.26 4.68
IR-3 1,733.01 0.70 4.38
IR-1 5,249.52 5.15 40.20
IR-3 11,049.80 7.67 36.23
20 IR-1
IR-2
4,078.35
2,542.97
6.47
14.13
70.07
64.00
IR-1 655.19 0.91 4.12
IR-3 8,035.73 7.44 61.25 IR-2 6,197.07 4.68 4.13
IR-1 11,890.22 5.08 71.66 IR-3 5,450.06 4.54 5.19
IR-1 15,110.04 7.41 64.49 IR-1 23,296.09 3.23 7.43
21 IR-3 9,455.86 4.38 62.88 IR-2 17,009.05 2.36 7.65
IR-1 6,794.54 2.98 54.36 IR-3 4,835.47 0.67 8.21
IR-1 5,632.64 3.91 58.98 IR-1 986.47 0.46 8.32
IR-3 26,175.41 3.03 112.36 IR-2 10,971.17 5.08 7.53
IR-3 837.90 0.39 4.86
22 24 Hour Recovery Pause
IR-1 8,663.25 6.30 3.28
IR-2 8,831.20 4.54 3.26
IR-3 1,189.49 0.49 3.14
IR-1 20,111.84 16.76 51.24 IR-1 5,338.40 1.49 7.46
23 IR-3 1,305.83 21.76 41.98 IR-2 20,262.84 8.65 6.56
IR-3 3,839.77 4.92 4.15
IR-1 10,735.96 4.16 65.56 IR-1 433.72 7.22 2.12
IR-3 4,219.55 3.91 70.26 IR-2 6,726.29 10.19 2.79
IR-1 5,851.48 1.81 68.98 IR-3 433.72 7.22 3.29
24 IR-2 4,589.64 1.37 71.58 7 Day Recovery Pause
IR-3 10,217.39 2.94 72.65 IR-1 1,259.62 1.05 5.14
IR-2 12,583.30 13.12 6.23
IR-3 1,106.44 2.63 4.86
IR-1 6,657.38 2.71 60.05 IR-1 1,983.10 1.84 4.86
25 IR-3 8,684.07 16.08 71.24 IR-2 4,304.86 4.03 4.86
IR-3 16,086.25 9.15 6.06
26 IR-3 4,522.27 3.77 68.32 IR-3 33,720.96 4.68 6.27
27 IR-3 15,847.10 9.78 67.88 IR-2
IR-3
12,072.07
1,226.40
8.05
0.82
5.08
5.08
28 IR-1
IR-3
7,303.31
7,795.03
3.38
3.61
54.68
68.44
IR-2 33,433.04 14.65 4.83
29 IR-3 6,330.72 13.19 67.56 IR-3 25,288.41 17.56 5.49

24

Complete I/R
Injection
Volume Injected Injection Rate Pump Pressure Recovery Recovery Rate Average
Cycle Well (gal) (gal/min) (psi) Well Volume Recovered(gal) (gal/min) H3BO3 %
IR-1 4,228.14 4.70 44.36
30 IR-3 1,773.14 1.06 94.60 IR-2 12,790.93 17.76 4.63
31 IR-1
IR-3
24,119.86
13,818.41
23.65
12.79
114.25
77.86
IR-3
IR-1
15,666.38
5,285.80
14.51
3.52
5.49
4.49
IR-3 8,717.51 8.07 61.45
32 IR-1 11,354.01 10.51 101.36 IR-2 13,456.27 13.68 4.04
IR-3 2,979.31 8.28 99.25
33 IR-3 9,673.93 4.48 78.59 IR-1 1,792.07 4.97 4.74
34 IR-1
IR-3
4,181.65
8,053.74
3.87
8.95
85.69
114.23
IR-2
IR-1
12,871.21
6,517.74
11.92
3.62
4.72
4.73
Steam heated solution
35 IR-1 68,518.59 63.44 74.36 IR-3 68,518.59 63.44 5.65
36 IR-1 35,022.36 32.43 68.64 IR-2 35,022.36 32.43 5.62
37 IR-1 13,988.00 12.95 61.33 IR-2
IR-3
2,648.00
11,185.03
7.35
31.06
5.92
5.59
IR-1 6,021.82 5.58 57.68 IR-2 11,218.12 18.69 5.26
38 IR-3
IR-1
1,590.00
19,710.28
6.63
18.25
67.24
70.25
IR-3
IR-2
8,575.53
10,822.60
14.29
4.09
4.55
4.74
IR-3 9,168.02 3.47 3.70
IR-3 9,089.95 25.25 69.58
39 IR-1 1,556.98 1.44 71.68 IR-2 24,947.90 11.67 4.28
IR-1 3,429.60 3.18 78.36
40 IR-1
IR-1
4,545.51
25,433.09
4.21
23.55
64.39
61.48
IR-3 15,245.69 5.52 5.96
Total 627,453.08 658,696.49
Table 5.6: 5E injection – recovery summary per cycle (IR-4)
Complete I/R
Injection
Volume Injected Injection Rate Pump Pressure Recovery Recovery Rate Average
Cycle Well (gal) (gal/min) (psi) Well Volume Recovered(gal) (gal/min) H3BO3 %
1 IR--4 3,496.01 21.29 115.56 IR-4 2,663.89 10.82 0.40
2 IR-4 5,395.21 3.93 124.26 IR-4 8,136.86 22.04 3.20
3 IR-4 2,537.92 3.60 102.73 IR-4 715.80 20.92 2.69
4 IR-4 11,527.29 15.52 112.38 IR-4 8,650.70 28.63 4.60
5 IR-4 16,474.89 12.61 73.75 IR-4 3,564.96 16.50 3.01
6 IR-4 7,400.40 6.59 120.55 IR-4 8,729.30 20.19 4.78
7 IR-4 7,853.70 9.26 119.92 IR-4 7,937.90 17.94 5.55
8 IR-4 8,878.00 10.87 93.00 IR-4 15,790.90 10.34 6.01
9 IR-4 8,700.30 6.44 69.12 IR-4 12,922.89 6.05 5.90
10 IR-4 9,641.00 9.45 128.79 IR-4 21,252.32 6.78 5.39
11 IR-4 10,983.36 7.32 137.15 IR-4 28,551.44 15.17 4.74
12 IR-4 13,529.92 5.78 138.88 IR-4 14,205.00 11.80 4.81
13 IR-4 13,600.29 5.15 117.73 IR-4 15,109.93 9.33 4.88
14 IR-4 6,446.20 8.77 82.06 IR-4 20,930.95 7.75 4.90
15 IR-4 17,513.86 14.71 119.40 IR-4 18,259.44 6.34 5.51
16 IR-4 26,883.73 17.52 128.26 IR-4 13,426.25 9.32 5.30
17 IR-4 47,761.87 40.14 70.04 IR-4 12,123.06 50.51 3.20
18 IR-4 12,993.61 4.93 34.88 IR-4 33,627.47 7.57 6.13
19 IR-4 58,515.05 5.29 89.10 IR-4 7,731.22 1.30 5.05
20 IR-4 10,528.19 5.70 55.69 IR-4 10,844.75 4.11 7.35
21 IR-4 7,715.22 16.92 126.53 IR-4 8,752.76 12.16 3.97
22 IR-4 1,077.09 17.95 41.90 IR-4 17,930.93 3.11 5.69
23 IR-4 50,693.34 5.87 111.46 IR-4 25,935.29 9.01 5.85
24 IR-4 10,344.98 2.39 64.78 IR-4 13,928.74 4.84 6.31
25 IR-4 8,021.89 13.37 72.58 IR-4 34,964.89 6.07 5.18
26 IR-4 8,070.94 11.21 64.23 IR-4 5,078.17 3.53 2.92
27 IR-4 1,415.94 23.60 84.69 IR-4 13,223.72 10.50 5.08
28 IR-4 12,780.83 4.95 68.33 IR-4 10,037.30 11.15 4.86
29 IR-4 10,254.86 15.54 94.22 IR-4 10,227.39 4.73 3.39
30 IR-4 23,327.37 4.05 70.06 IR-4 16,649.16 4.62 6.32
31 IR-4 5,215.85 17.39 62.25 IR-4 15,252.04 4.24 6.92
32 IR-4 13,609.48 5.16 66.35 IR-4 14,282.18 4.96 10.93
33 IR-4 4,667.70 15.56 68.58 IR-4 17,595.95 12.22 4.33
Total 457,856.29 469,033.55

25

6 Geological Setting, Mineralization and Deposit

6.1 Regional Setting

The Project area is in the western Mojave Desert and is part of the Basin and Range Physiographic Province. The region is characterized by narrow faulted mountain ranges and flat valleys and basins, the result of tectonic extension that began approximately 17 million years ago. The Project lies within the Hector Basin of the Barstow Trough and is bounded on the southwest by the San Andreas fault zone and the Transverse Ranges, on the north by the Garlock fault zone, and on the east by the Death Valley and Granite Mountain infrastructure faults. Numerous faults of various orientations are found within the area with various orientations though the predominant trend is to the northwest.

The Barstow Trough, a structural depression, extends northwesterly from Barstow toward Randsburg and to eastsoutheast toward Bristol. It is characterized by thick successions of Cenozoic sediments, including borate-bearing lacustrine deposits, with abundant volcanism along the trough flanks. The northwest-southeast trending trough initially formed during Oligocene through Miocene times. As the basin was filled with sediments and the adjacent highland areas were reduced by erosion, the areas receiving sediments expanded, and playa lakes, characterized by fine-grained clastic and evaporitic chemical deposition, formed in the low areas at the center of the basins.

Exposures of fine-grained lacustrine sediments and tuffs, possibly Pliocene in age, are found throughout the Project area. Younger alluvium occurs in washes and overlying the older lacustrine lakebed sediments. Much of the Project area is covered by recent olivine basalt flows from Pisgah Crater, which is located approximately two miles east of the site as shown in Figure 6.1 and Figure 6.2. Thick fine-grained, predominantly lacustrine lakebed mudstones appear to have been uplifted, forming a block of lacustrine sediments interpreted to be floored by an andesitic lava flow.

Figure 6.1: Surface geology in the Newberry Springs area

==> picture [329 x 187] intentionally omitted <==

There are three prominent geologic features in the project area (Figure 6.2):

  • Pisgah Fault, which transects the southwest portion of the project area west of the ore body;

  • Pisgah Crater lava flow located approximately 2 miles east of the site: and

  • Fault B, located east of the deposit.

26

Figure 6.2: Topographic map with faults and infrastructure

==> picture [353 x 262] intentionally omitted <==

The Pisgah Fault is a right-lateral slip fault that exhibits at least 250 ft of vertical separation at the Project. The east side of the fault is up-thrown relative to the west side. Fault B is located east of the ore body and also exhibits at least 250 ft of vertical separation; however, at Fault B, the east side is down dropped relative to the west side. The uplifted zone containing the borate ore body the Wedge is situated within a thick area of fine-grained, predominantly lacustrine lakebed mudstones, east of the Pisgah Fault and west of Fault B.

6.1.1 Mineralization

Mineralization occurs in a sequence of lacustrine lakebed sediments ranging in depths from 1,300 ft to 1,500 ft bgs. The mineralization is hosted by a sequence of mudstones, evaporites and tuffs, consisting of variable amounts of colemanite, calcium borate 2CaO • 3B2O3• 5H2O, and lithium. Colemanite and lithium are the target minerals. Colemanite is a secondary alteration mineral formed from borax and ulexite. The mineral is semi-hard with a Mohs hardness of 4.5 and forms as discreet monoclinic, prismatic crystals or masses. Colemanite typically forms as a translucent colorless, white, or gray crystal with a vitreous luster. Colemanite is insoluble in water but soluble in HCl and sulfuric acid (H2SO4). Colemanite is associated with thinly laminated siltstone, clay and gypsum beds containing an average of 9% calcite, 35% anhydrite plus 10% celestite (SrSO4) per Wilkinson & Krier, 1985. In addition to colemanite and celestite, elevated levels of lithium have been found through chemical analyses of drill samples.X-ray diffraction analysis of core samples from the deposit indicates the presence of the evaporite minerals anhydrite, colemanite, celestite, and calcite. The mineralogy of the detrital sediments include quartz, illite, feldspars, clinoptilolite, and zeolite. The deposit underlies massive clay beds which appear to encapsulate the evaporite ore body on all sides as well as above and below the deposit. This enclosed setting makes the deposit an ideal candidate for in-situ mining technology affording excellent containment of the leachate solution.

6.2 Mineral Deposit

Boron is believed to have been sourced from regional thermal waters which flowed from hot springs during times of active volcanism. These hot springs vented into the Hector Basin when it contained a large desert lake. Borates were precipitated as the thermal waters entered the lake and cooled or as the lake waters evaporated and became saturated

27

with boron. Colemanite, being the least soluble mineral, would evaporate on the receding margins of the lake. The evaporite-rich sequence forms a consistent zone in which the borate-rich colemanite zone transgresses higher in the section relative to stratigraphic marker beds.

Based on drilling results, the deposit is elliptical in shape, with the long axis trending N40°W to N50°W. extending over an area of about 606-acres at an average depth of approximately 1,300 ft to 1,500 ft bgs. Beds within the colemanite deposit strike roughly N45°W and dip about 10° or less to the southwest. Using an isoline of 5% B2O3, mineralization has an approximate width of 2,800 ft and a length of 11,150 ft with thickness ranging from 70 to 262 ft exclusive of barren interbeds.

The western margin of mineralization appears to be roughly linear, paralleling the Pisgah Fault which lies approximately 1 mi to the west (Figure 6.2). Duval geologists consider this boundary to be controlled by facies change from evaporite rich mudstones to carbonate-rich lake beds, because of syn-depositional faulting. The northeast and northwest boundaries of the deposit are controlled by facies changes to more clastic material, reducing both the overall evaporite content and the concentration of colemanite within the evaporites. The southeast end of the deposit is open-ended, and additional drilling is necessary to define the southeastern limits of borate deposition per Wilkinson & Krier, 1985.

6.3 Stratigraphic Column

Drilling of the deposit by Duval in the late 1970’s and early 1980’s defined the following lithological sequence (Figure 6.3 and Figure 6.4). Four major units have been identified:

  • Unit 1: is characterized by a 490 to 655 ft thick sequence of red-brown mudstones with minor sandstone, zeolitized tuff, limestone, and rarely hectorite clay beds. Unit 1 is located immediately below the alluvium and surface basaltic lavas.

  • Unit 2: is a green-grey mudstone that contains minor anhydrite, limestone, and zeolitized tuffs. Unit 2 has a thickness ranging from 330 to 490 ft and is interpreted as lacustrine beds.

  • Unit 3: is a 245-to-490-foot thick evaporite section which consists of rhythmic laminations of anhydrite, clay, calcite, and gypsum. Unit 3 contains the colemanite mineralization. Thin beds of air fall tuff are found in the unit which provide time continuous markers for interpretation of the sedimentation history. These tuffs have variably been altered to zeolites or clays. Anhydrite is the dominant evaporite mineral, and the ore deposit itself is made up mostly of an intergrowth of anhydrite, colemanite, celestite, and calcite with minor amounts of gypsum and howlite.

  • Unit 4: is characterized by clastic sediments made up of red and grey-green mudstones and siltstones, with locally abundant anhydrite and limestone. The unit is approximately 160 ft thick and rests directly on an irregular surface of andesitic lava flows. Where drilling has intersected this boundary, it has been noted that an intervening sandstone or conglomerate composed mostly of coarse volcanic debris is usually present.

28

Figure 6.3 Long-section and cross-section through the Fort Cady deposit

==> picture [248 x 334] intentionally omitted <==

Figure 6.4: Generalized lithological column for the Fort Cady deposit

==> picture [252 x 279] intentionally omitted <==

7 Exploration

7.1 Non-drilling exploration

Non-drilling exploration has not been deemed appropriate for this deposit.

7.2 Drilling

7.2.1 Historic Drilling

As part of their exploration program, Duval completed 35 drill holes between 1979 and 1981. The DHB holes were drilled using a combination of rotary drilling through the overburden followed by core drilling through the evaporite sequence. DHB-32 was drilled as a water well southeast of the Project. Geologic logs of rotary cuttings and core were completed for all holes followed by geochemical analyses of the core. Duval paid particular attention during logging to identifying marker beds ash tuffs for correlation. In addition to geologic logging, down-hole geophysics were completed on 25 holes for gamma ray and neutron. A few holes had additional geophysical logs completed for compensated density, deviation, induction, elastic properties, and caliper.

In 1981 and 1982, after the exploration program, Duval drilled five solution mining test (SMT) wells which were used in injection/recovery (IR) tests. Like previous drilling, the wells were rotary drilled through the overburden and cored through the evaporite sequence. Following coring, a 5.5-inch casing was set through the cored interval. All SMT wells were logged, and analytical samples are available from the cored intervals of SMT-1, SMT-2, and SMT-3. Gamma ray and neutron logs were collected from all SMT wells. Caliper, compensated density, and induction logs were run on several,

but not all the SMT wells. Three additional SMT wells were established in 1992 and 1993 (SMT-92 & 93 Holes) and these three wells were rotary drilled to full depth and no geologic samples were collected.

FCMC completed two drilling campaigns during their participation in the Project. Additional P-Series holes were completed between 1987 and 1996 as rotary holes for injection/recovery test wells. Cuttings were sampled for analysis at 5-foot intervals for holes P-1, P-2, and P-3. A ten-foot sampling interval was used for sampling on P-4. No geologic samples were collected for holes P-5, P-6, and P-7. FCMC completed three S-Series wells in 1990. All three wells were rotary drilled and no geologic sampling was performed. FCMC completed down-hole geophysics on all the P and S-series wells. Historic drilling completed by Duval and FCMC is summarized in Table 7.1.

Table 7.1: Historic drilling summary

UTM 83-11 m 83-11 m Rotary Interval ft Rotary Interval ft Cored Interval ft
Collar No. of
Drill Hole ID Easting Northing Elev. ft Depth ft From To From
To
Samples
DHB-01 553,336 3,846,154 2,004 1,623
1,090
1,090 1,623 187
DHB-02 554,062 3,846,179 2,033 1,679
955
955 1,443
DHB-03 553,089 3,845,899 1,980 1,773
940
940 1,773 214
DHB-04 552,855 3,845,669 1,981 1,708
1,194
1,194 1,708 178
DHB-05 552,848 3,846,153 1,978 1,730
1,043
1,043 1,730 179
DHB-06 553,115 3,846,386 2,008 1,616
1,040
1,040 1,616 125
DHB-07 553,736 3,845,492 2,000 1,735
1,063
1,063 1,735 181
DHB-08 552,575 3,846,214 1,966 1,809
1,072
1,072 1,809 186
DHB-09 552,391 3,846,408 1,967 1,750
1,137
1,137 1,750 138
DHB-10 552,349 3,846,631 1,980 1,655
1,148
1,148 1,655 86
DHB-11 552,599 3,846,390 1,976 1,671
1,150
1,150 1,671 86
DHB-12 552,824 3,846,402 1,993 1,625
1,130
1,130 1,625 85
DHB-13 552,104 3,846,877 1,978 1,661 -
1,140
1,140 1,661 70
DHB-14 553,089 3,846,151 1,987 1,631
1,105
1,105 1,631 80
DHB-15 553,580 3,846,158 2,013 1,609
1,177
1,177 1,609 51
DHB-16 553,263 3,845,595 1,985 1,845
1,193
1,193 1,845 138
DHB-17 552,843 3,845,925 1,982 1,804
1,178
1,178 1,804 151
DHB-18 553,238 3,845,431 1,978 1,880
1,212
1,212 1,878 106
DHB-19 554,141 3,845,287 2,034 1,460
1,060
1,060 1,460 74
DHB-20 553,006 3,845,437 1,998 1,671
1,207
1,207 1,671
DHB-21 553,292 3,845,143 2,011 1,752
1,118
1,118 1,828 39
DHB-22 553,275 3,845,902 1,988 1,711
1,196
1,196 1,711 135
DHB-23 553,508 3,845,110 2,021 1,857
1,208
1,208 1,857 114
DHB-24 553,523 3,845,637 1,994 1,780
1,202
1,202 1,780 119
DHB-25 553,699 3,845,297 2,021 1,818
1,248
1,248 1,818 152
DHB-26 553,891 3,845,056 2,050 1,702
1,106
1,106 1,702 106
DHB-27 553,698 3,844,803 2,043 1,795
1,228
1,228 1,795 95
DHB-28 554,004 3,844,943 2,053 1,690
1,185
1,185 1,690 115
DHB-29 554,164 3,844,454 2,040 1,610
1,203
1,203 1,610 101
DHB-30 553,873 3,844,630 2,050 1,720
1,250
1,250 1,720 83
DHB-31 553,865 3,844,381 2,037 1,460
1,195
1,195 1,625 41
DHB-32 551,770 3,843,845 2,045 870
870
DHB-33 554,045 3,844,254 2,043 1,601
1,124
1,124 1,860 80
DHB-34 553,746 3,845,722 2,116 1,525
1,150
1,150 1,620 79
DHB-35 551,249 3,848,166 2,068 1,449
1,194
1,194 1,459
P1 553,093 3,845,908 1,984 1,500
1,500
20
P2 553,094 3,845,969 1,984 1,510
1,510
21
P3 553,033 3,845,902 1,981 1,510
1,510
18
P4 553,033 3,845,935 1,977 1,510
1,510
34
P5 553,193 3,845,874 1,985 1,547
1,547
P6 553,209 3,845,946 1,989 1,525
1,525
P7 553,217 3,846,023 1,992 1,475
1,475
SMT-1 553,323 3,846,144 2,004 1,315
1,235
1,235 1,315 59
SMT-2 553,310 3,846,135 2,004 1,679
1,234
1,234 1,316 55
SMT-3 553,211 3,845,897 1,988 1,679
1,325
1,325 1,518 69
SMT-6 553,210 3,845,934 1,988 1,450
1,341
1,341 1,450
SMT-9 553,194 3,845,837 1,985 1,497
1,341
1,341 1,497

This data, along with company drilling discussed in Section 7.2.2 and subsequent analysis discussed in Section 8, form the basis and confirmations for the geologic model.

30

7.2.2 Company Drilling

After acquisition of the Project in May 2017, American Pacific Borates and Lithium, Ltd, a predecessor entity to 5E, completed 14 drill holes, which confirmed previous drilling results and expanded the Mineral Resource Estimate. Table 7.2 provides a summary of the 2017 drilling program. A cross-section through the deposit is also displayed in Figure 7.1. Drilling through the overburden sequence was completed using rotary air blast drilling. This was followed by drilling a 2.5-inch core through the evaporite sequence. All drill holes were completed vertically with no greater than five degrees of deviation.

Table 7.2: 2017 5E drilling summary

UTM 83-11 m 83-11 m Rotary Interval ft Rotary Interval ft Cored Interval ft
Collar No. of
Drill Hole ID Easting Northing Elev. ft Depth ft From To From To Samples
17FTCBL-01 552,638 3,846,716 2,006 1,569 1,204 1,204 1,569 82
17FTCBL-02 552,711 3,846,490 1,997 1,509 1,208 1,208 1,509 107
17FTCBL-03 552,981 3,846,485 2,019 1,459 1,153 1,153 1,459 91
17FTCBL-04 552,695 3,846,268 1,978 1,738 1,266 1,266 1,738 162
17FTCBL-05 552,930 3,846,267 1,995 1,589 1,237 1,237 1,589 150
17FTCBL-06 553,145 3,846,260 2,002 1,502 1,189 1,189 1,502 83
17FTCBL-07 552,772 3,846,041 1,977 1,775 1,196 1,196 1,775 207
17FTCBL-08 552,972 3,846,042 1,984 1,625 1,202 1,202 1,625 153
17FTCBL-09 553,179 3,846,037 1,992 1,560 1,169 1,169 1,560 120
17FTCBL-10 552,831 3,845,939 1,989 1,647 1,208 1,208 1,647 176
17FTCBL-11 553,078 3,845,899 1,983 1,778 1,332 1,332 1,778 155
17FTCBL-12 552,963 3,845,801 1,973 1,750 1,281 1,281 1,750 212
17FTCBL-13 553,153 3,845,818 1,992 1,769 - 1,313 1,313 1,769 155
17FTCBL-14 553,270 3,845,608 1,987 1,845 1,328 1,328 1,845 260

Core logging was completed on all drill holes and included lithological and geotechnical logging. Downhole geophysical logs included Gam Ray, Induction, and standard caliper, and were completed on all drill holes from surface to total depth except for 17FTCBL009 where adverse hole conditions resulted in only partial geophysical logging. All core is logged and photographed according to industry standard procedures. An example of core photos is shown in Figure 7.2.

A geotechnical drill hole, APBL023, was also completed in 2017. This well was cored for its entire length and a geologic log was completed to define mineralized horizons. No splitting or analytical samples were collected from this hole to preserve the core for subsequent geotechnical testing.

In 2022, 5E drilled 13 wells as part of a monitoring well and testing program. One well, IR2-01-01, was cored and assayed and subsequently added to the drilling database as outlined in Table 7.3.

In 2023, three observation wells, OW-9, OW-10, and OW-11 were completed as part of the permitting process with the EPA. Down-hole geophysics were completed on the three wells. Rotary cuttings from the wells were logged and assayed and subsequently included into the drilling database.

The QP considers the drilling program by 5E to be of sufficient quality to support a Mineral Resource Estimate.

Table 7.3: Recent 5E Drilling

UTM 83-11 m 83-11 m Rotary Interval ft Rotary Interval ft Cored Interval ft Cored Interval ft
Collar No. of
Drill Hole ID Easting Northing Elev. ft Depth ft From To From To Samples
IR2-01-01 552,472 3,845,807 2,006 1,931 1,079 1,079 1,931 135
OW-9 553,364 3,845,874 1,972 1,527 1,527 46
OW-9 553,619 3,845,692 1,979 1,800 1,800 44
OW-11 552,669 3,845,877 1,978 1,538 1,538 41

31

Figure 7.1: Cross-section through the Fort Cady deposit

==> picture [351 x 267] intentionally omitted <==

Figure 7.2: Core photo, 17FTCBL-014

==> picture [353 x 266] intentionally omitted <==

32

7.3 Hydrogeology

7.3.1 Hydraulic Setting

The Project deposit is in the California Groundwater Bulletin 118 Unit Basin 14 Lavic Valley, and Hydrologic Unit 12 subbasin 180902081303. There is no name associated with the sub-basin and it is located north and west of the Lavic Lake and town of Lavic hydrologic sub basins. Basin 180902081303 is approximately 39,657 acres (160.48 square kilometers) in area and extends from the Rodman Mountains south and west of the Project in a north direction towards Highway 40, terminating at a topographical divide at the highway. The basin is bound to the south and east by the Pisgah Crater and Lavic Lake Volcanic Field.

The Fort Cady Mountains constrain Basin 14 to the north and the Rodman Mountains and Lava Bed Mountains constrain Basin 14 to the south of the Project. The groundwater flow in the Lavic Valley alluvial basin is generally west towards the Mojave River, but in the project area is poorly defined. The basin outflow is interpreted to occur to the east of Broadwell Valley, with no localized groundwater discharge such as evapotranspiration or discharge to springs or a river.

The mineral deposit is bounded to the west by the Pisgah Fault and to the east by subordinate faults that include Fault B. See the UIC permit application and the Confluence Water Resources CWR, 2019 Fault B Program Results, Technical Report .

The nearest industrial well, owned by Candeo Lava Products, is 3.5 miles east of the Project ore body. No other water wells are known to exist within the vicinity of the Project. Water level measurements from the Candeo Lava Products well are not currently available but are greater than 96 ft bgs based on the CWR investigation in 2018. The next closest water well is located north and west of the Project at the Desert Oasis Highway Rest Stop providing non-potable water to the rest stop facilities. This well is located approximately 7-miles northwest of the Project. The depth to water from the Rest Stop Well (Well 1807), was measured by CWR to be 54.75 ft bgs, at an approximate elevation of 1,758 ft amsl.

The nearest municipal well is screened in the valley alluvium, west of the Pisgah fault and approximately five miles northwest of the ore body (Figure 7.3).

Figure 7.3: Project area groundwater basins and surrounding area wells, Fort Cady Project

==> picture [413 x 305] intentionally omitted <==

33

Private domestic wells are associated with rural residences located greater than 6.5 miles west of the Project on the eastern edge of the town of Newberry Springs. Irrigation wells are located further west, the closest of which is approximately 10 miles west of the Project. The Pisgah Fault separates these residential and irrigation wells from the Project area, such that they are not within the same regional groundwater flow system and are not hydraulically connected.

The Project is located within a closed basin. Although surface water is rarely present in the vicinity of the Project, when it occurs, flow is in a northwesterly direction past the Project area from the Rodman Mountains and the Pisgah Crater topographic divide. There are no perennial springs or streams in the vicinity of the Project. Surface water-related features are seasonal, and ephemeral in response to meteorological events. These features consist of unnamed dry washes that may carry water during heavy storm events generally draining west through the Project area toward the Troy Lake playa in Newberry Springs.

7.3.2 Project Area Groundwater Levels

The orebody is “wedged” between the Pisgah Fault and Fault B. The static depths to groundwater in the vicinity of the orebody generally range between 240 and 350 ft bgs. Prior to injection in 2024, the measured groundwater elevation in the wedge ranged from approximately 1,500 ft amsl at MW-3A to 1,720 ft amsl at AOR-3A, although many wells were still recovering from fluid evacuation during drilling. Injection and recovery in the IR well beginning in January 2024 has caused pressure fluctuations in two wells, OW-6A and all three screens of OW-10 (nested well). The pressure response from injections causes water level fluctuations of about 35 ft in OW-6A which is about 1000 ft away from the IR wells. The deepest screen of OW-10 fluctuates ~50 ft while the middle and shallow screen fluctuate ~100 ft in response to injection and recovery at the IR wells. The water levels in the remaining wells do not show a response to injections and are either still recovering or remaining relatively flat.

The groundwater elevation outside the wedge, west of the Pisgah Fault in the quaternary alluvial fan sediments of the Lower Mojave River Valley Groundwater Basin is approximately 1,785 ft amsl in Project wells MWW-1, MWW-S1, and MWW-2.

The difference in groundwater elevation between Project wells presents a steepening of the gradient from west to east across the Pisgah Fault. There is approximately a 30 – 40 foot water level differential on the east and west sides of the Pisgah Fault, which is regionally recognized as a barrier to groundwater flow and represents one of the groundwater basin boundaries.

Groundwater in the vicinity of Fault B at Project wells TW-1, PW-1, and PW-2, is approximately 350 to 390 ft bgs in the coarser alluvial sediments to the east of Fault B (PW-1 and PW-2) and in a mix of alluvial and fine playa sediments to the west of Fault B (TW-1).

Monitoring wells drilled in 2021 by 5E as part of permit compliance did not encounter groundwater above the Unit 4 sediments except for a perched groundwater zone localized in fine sand lenses underlaying surficial basalt above the contact with Unit 1. The results of the Shallow Groundwater Characterization Program, CWR, June 2022, Shallow Groundwater Characterization Report on Mining Block 2 Near Pisgah Fault , indicated that groundwater encountered during drilling of the Series 7 wells is of low yield, poor quality and probably low storage capacity.

Recharge to the perched zone originates from precipitation occurring in the Lava Bed Mountains, and drainage from Sunshine Peak, located southwest of the project. The upgradient precipitation drains into the shallow alluvium southwest of the Pisgah Fault with shallow groundwater flowing in a northeasterly direction through unconsolidated alluvial sediments, before draining under the basalt flow at a gradient of 0.002 ft/ft into cemented sandstone and mudstone, where it is compartmentalized within the lithology and controlled by fault B. Interpretation of chip logs for all Series 7 and Series 3 wells, and the WSW and WMW wells, indicate the shallow cemented sandstone is not uniform, decreasing in depth to the east of the project, where the mudstone is encountered higher in most wellbores due to either pre-basalt flow topography and/or offset from faulting.

34

Since shallow groundwater was not encountered or observed during drilling of the Series 3 monitor wells, the Pisgah Fault is interpreted as being a strong influence on the shallow groundwater system flow dynamics, influencing the groundwater quality in Block 2. The lateral extent of the shallow groundwater system is anticipated to be confined to within the area underlying the surface basalt near the Series 7 wells to the extent of the Pisgah Fault zone northwest of the Project.

The Pisgah Fault compartmentalizes the shallow groundwater system’s lateral extent within the western Project area and is not the source of shallow groundwater.

Below Unit 4 is the Unit 5 andesite where groundwater was encountered in MW-3B. CWR, March 12, 2023, CWR Technical Memorandum, Results of OW-3A and MW-3B Hydraulic Testing, Fort Cady California Project , describe the results of groundwater testing between Unit 4 and the underlying andesite. The results of air lift testing found that the Unit 5 groundwater is under a highly confined pressure demonstrating that Unit 4 is an aquiclude up to 150 ft thick, preventing percolation of groundwater from Unit 3 to Unit 5. The current conceptual model indicates that recharge in the deep bedrock is extremely slow. This is particularly true between the Pisgah Fault and Fault B, where inflow from precipitation recharge through the alluvium or inflow from adjacent bedrock is minimal due to the bounding faults

Proven water resources have been deemed acceptable through Phase 1 of the Project.

7.3.3 Hydrogeology External to the Ore Block

The hydrology east of Fault B, approximately 3,500 ft east of the colemanite deposit was analyzed by CWR (2018) that found, 1) a significant groundwater resource east of Fault B, and 2) that the fault is a barrier to groundwater flow. Stable isotope analytical results compared against Nevada Meteoric Water Lines appropriate for desert terrains found that the aquifer east of Fault B and the aquifer west of the Pisgah Fault have different origins, while the limited groundwater between the two faults is of a different origin than both aquifers. Recovery rates from wells between the two faults, which includes the colemanite deposit, are less than one gpm as would be expected in mudstones and claystone with very limited groundwater present.

7.3.4 Formation Hydraulic Properties

Testing for hydraulic properties of the colemanite and evaporates/mudstones containing the colemanite have occurred on several occasions. Based on the pump test results in mudstone and claystone sediments above and below the ore body evaporites, CWR (2019) estimated hydraulic conductivity to be approximately 10[-5 ] ft/day, a very low value. Additionally, a majority of the monitoring wells have been recovering since development and have not reached a steady state value after 3+ years, a clear indicator of limited water in the confining units and low hydraulic conductivity.

The results of the testing in OW-3A indicate the contact between Units 2 and 4 is extremely low permeability, with K approximately 4.3 x 10-5 feet/day. Testing in MW-3B indicates the permeability of the underlying andesite is three orders of magnitude higher, approximately 8.9 x 10-2 feet/day (CWR, March 12, 2023, Results of OW-3A and MW-3B Hydraulic Testing, Fort Cady California Project).

7.3.4.1 Duval 1980-1982

Beginning in 1980, Duval retained Core Laboratories, Inc. to run injectivity tests on one-inch cores from borehole SMT-1. The samples were extracted with toluene, salts leached with cool methanol and dried in a controlled humidity oven. Permeability to air and Boyle’s Law porosity were determined for each sample.

The injectivity tests were run at the reservoir temperature of (simulated) formation water (120[o ] F) which flowed through the core until equilibrium occurred, and a minimum of three pore volumes had been injected. Sulfuric acid and hydrochloric acid solutions were injected through the core samples after which the permeability to acid solutions was determined.

35

In the 1981 testing, injection pressures were up to 1,250 psi, with flow velocities predominantly 10[7] cm/sec with groundwater, increasing to 10[5] cm/sec with acid concentrations between 10-20%, indicative of the hydraulically tight nature of the claystone hosting the deposit.

While detailed information on the Core Lab testing procedures is available, quality assurance and quality control (QA/QC) procedures are not.

Based on the colemanite content in the sediments and laboratory core analyses, the end-point porosity of the ore body formation after mining was predicted by Core Lab in 1981 to be 15-19%.

7.3.4.2 In-Situ 1990

A field pilot test found that the initial permeability ranged from 1.35 x 10[-9] to 2.9 x 10[-10] cm/sec as part as a multiple well constant rate injection test to determine the directional tendencies of hydraulic properties in the mineral deposit. InSitu also investigated the effects of prior injection/recovery testing using a Badger flow meter, a HEREMIT data logger, and pressure transmitters. The water-level responses were measured in the injection well and six nearby observation wells and the Cooper and Jacob method used to analyze data from each well and the Papadopulos Method to determine directional permeability. The results confirmed the earlier work that the permeability and transmissivity of the deposit are low.

7.3.4.3 Hydro-Engineering 1996

This analysis summarized some of the testing and provided interpretations of prior testing in 1981 and 1990. The mineralized sequence of rock transmissivity is estimated at 10 gal/day/ft, or 1.3 ft[2] /day. Assuming that the colemanite mineralized sequence occurs over an approximate 300 ft thickness, then the native hydraulic conductivity (K) was estimated at 4.5 x 10[-3] ft/day, similar to that of Simon Hydro-Search 1993 of 8.2 x 10-3 to 2.2 x 10[-2 ] ft/day K converted from millidarcy units. The storage coefficient (S) of the ore body was also estimated by Hydro-Engineering 1996 to be at 2.5 x 10[-6] .

Increases in the transmissivity, hydraulic conductivity and storage coefficient will occur as colemanite is dissolved from the formation. Hydro-Engineering, 1996, estimated that the end-point permeability of the ore body formation after colemanite dissolution would be approximately 30 times higher, with a long-term storage coefficient of approximately 1.1 x 10[-5] . The end-point hydraulic properties are still low because much of the formation is evaporites, anhydrite, and claystone that will not be dissolved.

7.3.4.4 Geomega 2023

Geomega analyzed step rate testing completed in the IR wells in block two in 2023. The step rate tests resulted in an average formation fracture pressure of 917 psi and a formation fracture gradient of 0.69 psi/ft, well aligned with prior estimates of 0.65 to 0.76 psi/ft from the Duval 1983 pilot tests. Further analysis of the data indicated that permeability ranged from 0.5 to 2 millidarcies with total porosity ranging from 27% to 34%, aligned with prior low permeability estimates.

7.3.5 Water Quality Compliance Monitoring

Routine sampling of monitoring wells is ongoing for water quality purposes, with OW-6A specifically used to monitor the movement of mining related solutions. While monitoring wells installed closer to the IR wells in late 2024 do not have enough data yet to determine mining related impacts (there is a wide range of natural variability in the ore body), none of the monitoring wells show definitive indications of mining related solution impact as of Q2 2025.

36

8 Sample Preparation, Analysis and Security

8.1 Sampling Method and Approach

Between September 2017 and October 2017, 14 holes for a total of 23,111 ft were completed as part of a confirmatory resource drilling program. Assay results from all 14 drill holes were used in the mineral resource estimate. There are 2,113 samples from the 2017 drilling program representing 1,713 ft of core. In conjunction with the 2017 drilling program, 29 historical drill holes completed by Duval and four holes completed by FCMC have been utilized in the mineral resource estimate. There are 3,672 samples from the historic drilling representing a cumulative total 10,831.3 ft of core. The QA/QC procedures for the historic drilling are unknown though the work products compiled during the historic drilling suggest it was carried out by competent geologists following procedures considered standard practice at that time.

Discussions held with Pamela A.K. Wilkinson, who was an exploration geologist for Duval at the time of drilling and sampling, indicate that Duval had internal quality control and quality assurance procedures in place to ensure that assay results were accurate. Duval utilized their Tucson, West Texas Culberson Mine or New Mexico Duval Potash Mine laboratories for analytical work carried out at the Project. Geochemical analyses were carried out using X-Ray Fluorescence Spectrometry (XRF). XRF results were reportedly checked against logging and assay data.

Entire core sequences were sampled. Sample intervals were determined at the time of logging based on changes in lithology, mineralogy, and bedding. Sample intervals range from 0.2 to 6.6 ft with an overall average sample length of 2.66 ft. Following determination of sampling intervals, the core was split in half using a core splitter. One half of the core is used for the analytical sample with the remaining half core being returned to the core box for archiving. Samples are then placed into labeled plastic sample bags along with a pre-numbered sample tag. A companion sample tag is placed back in the core box marking the interval sampled. Samples were dispatched by commercial carrier to the Saskatchewan Research Council (SRC) for geochemical analysis. SRC has been accredited by the Standards Council of Canada and conforms with the requirements of ISO/IEC 17025.2005.

Identical sampling procedures were followed in 2022 for IR2-01-01. One hundred thirty-five (135) samples were collected from IR2-01-01 and dispatched to SRC for analysis.

For observation wells OW-9, OW-10 and OW-11, 131 chip samples were collected on 1.0 to 16 ft. intervals with the most samples through the mineral horizons at 10 ft. lengths. Sample splits weighing approximately 640 grams were dispatched to SRC for analysis.

8.2 Sample Preparation, Analysis and Security

Upon receipt of samples from 5E, SRC would complete an inventory of samples received, completing the chain of custody documentation, and providing a ledger system to APBL tracking samples received and steps in process for sample preparation and analysis. Core samples and chip samples are dried in their original sample bags, then jaw crushed. A subsample is split out using a sample riffler. The subsample is then pulverized with a jaw and ring grinding mill. The grinding mill is cleaned between each sample using steel wool and compressed air or by using silica sand. The resulting pulp sample is then transferred to a barcode labeled plastic vial for analysis.

All samples underwent a multi-element Inductively Coupled Plasma Optical Emission Spectroscopy (ICP-OES), using a multi-acid digestion for Ag, Al2O3, Ba, Be, CaO, Cd, Ce, Cr, Cu, Dy, Er, Eu, Fe2O3, Ga, Gd, Hf, Ho, K2O, La, Li, MgO, MnO, Mo, Na2O, Nb, Nd, Ni, P2O5, Pb, Pr, Sc, Sm, Sn, Sr, Ta, Tb, Th, TiO2, U, V, W, Y, Yb, Zn, and Zr. Boron was also analyzed by ICP-OES but undergoes a separate digestion where an aliquot of the sample is fused in a mixture of NaO2/NaCO3 in a muffle oven, then dissolved in deionized water, prior to analysis. Major oxides Al2O3, CaO, Fe2O3, K2O, MgO, MnO, Na2O, P2O5 and TiO2 are reported in weight percent. Minor, trace, and rare earth elements are reported in parts per million (ppm). The detection limit for B is 2 ppm and 1 ppm for Li.

37

For the 2017 drilling program and IR2-01-01 in 2022, a total of 2,253 core samples and 441 control samples were submitted for multi-element analysis to SRC. 5E submitted control samples in the form of certified standards, blanks and coarse duplicates bags with sample identification supplied by 5E for SRC to make duplicate samples. In addition to these control samples, SRC also submitted their own internal control samples in the form of standards and pulp duplicates. A summary of all the QA/QC control samples submitted to SRC is shown in Table 8.1. Only the internal control samples provided by SRC were included with rotary chip samples from the observation wells drilled in 2023.

Table 8.1: Summary of QA/QC control samples

Submitted Number of Meters Coarse Pulp Total Primary
By Drilling Type Holes Drilled Standards Blanks Duplicates Duplicates Frequency Samples Total
5E Rotary 15 5,284.24
Diamond Tail
Tail 15 2,472.85 153 143 144 2,253 2,693
Total 15 7,757.09 153 143 144 2,253 2,693
Frequency 5.68
%
5.31
%
5.35
%
19.10
%
83.66
%
100
%
SRC SRC Internal QAQC 151 82
Frequency 7.10
%
3.90
%
11.00
%

Certified standards SRM 1835 and SRM 97b, prepared by the National Institute of Standards and Technology, were submitted as part of the APBL QA/QC procedures, the results of which are shown graphically on Figure 8.1 and Figure 8.2. Standard deviations shown are for the SRC assays. No two standards in any single batch submission were more than two standard deviations from the analyzed mean, implying an acceptable level of precision of SRC instrumentation.

Figure 8.1: Assay results of Standard SRM1835

==> picture [369 x 255] intentionally omitted <==

38

Figure 8.2: Assay results of Standard SRM97b

==> picture [371 x 256] intentionally omitted <==

SRC assayed two different standards, CAR110/BSM and CAR110/BSH, for its own QC protocol. CAR110/BSM is designated as a “medium boron standard.” CAR110/BSH is designated as a “high boron standard.” Figure 8.3 and Figure 8.4 display the analytical results for the certified standards. The analytical precision for analysis of both CAR110/BSM and CAR110/BSH is also reasonable, with no two standards in any single batch submission being more than two standard deviations from the analyzed mean.

Figure 8.3: Assay results for SRC Standard CAR110/BSM

==> picture [403 x 283] intentionally omitted <==

39

Figure 8.4: Assay results for SRC Standard CAR110/BSH

==> picture [403 x 283] intentionally omitted <==

Figure 8.5: Sample blank assay results for boron

==> picture [420 x 246] intentionally omitted <==

Blank samples inserted by 5E consisted of non-mineralized marble. One hundred and thirty-five blank samples were submitted, all of which had assay results of less than 73 ppm B. The level of boron detected in the blanks is likely sourced from pharmaceutical borosilicate glass used during sample digestion. These boron concentrations are considered immaterial in relation to the boron levels detected in the colemanite mineralization and do not appear to represent carryover contamination from sample preparation. Lithium levels in the blank samples are also at acceptable

40

levels with many assays <15 ppm Li. The four highest Li levels in the blanks immediately followed samples that contained relatively high Li concentrations. Overall, the concentration of the primary elements of interest B and Li in the blanks are at levels considered to be acceptable, implying a reasonable performance for sample preparation. The results of the blanks for B and Li are plotted in Figure 8.5 and Figure 8.6.

Figure 8.6: Sample blank assay results for lithium

==> picture [415 x 250] intentionally omitted <==

A total of 136 duplicate samples were submitted to the SRC. 5E commissioned SRC to compose coarse duplicate samples using a Boyd rotary splitter. Figure 8.7 and Figure 8.8 show the assay results of duplicate samples for B and Li. As can be seen from the regressions, there is a good correlation between original and duplicate samples.

Figure 8.7: Duplicate sample results for boron

==> picture [339 x 222] intentionally omitted <==

41

Figure 8.8: Duplicate sample results for lithium

==> picture [389 x 263] intentionally omitted <==

Figure 8.9 displays a HARD half absolute relative difference plot for the duplicates. This highlights reasonable precision for the duplicates. Regression and HARD results were also plotted for pulp duplicates assayed in SRC’s own QC protocol shown in Figure 8.10 and Figure 8.11. These also show a reasonable level of precision.

Figure 8.9: HARD diagram for 5E duplicate samples

==> picture [347 x 254] intentionally omitted <==

42

Figure 8.10: SRC duplicate results

==> picture [349 x 236] intentionally omitted <==

Figure 8.11: SRC duplicates HARD diagram

==> picture [367 x 266] intentionally omitted <==

The QP believes reasonable care has been taken to collect and dispatch samples for analysis. The QA/QC program has shown that the analyses are viable with a minimum of dispersion or contamination errors. The QP considers the sampling program to be of sufficient quality to support a mineral resource estimate.

43

9 Data Verification

9.1 Data Verification Procedures

During a site visit, the QP examined the core and also visited the site in 2024. Core has been safely stored in a designated storage building near the mine site office and is in good condition. The QP examined the core and compared the core to the geologic logs and sample interval records and found good agreement with the log descriptions and with no discrepancies with sample intervals.

The QP has done a visual check of drilling locations through Google Earth. Drill sites from the 2017 drilling program are still visible in imagery. Older sites completed by Duval and FCMC are not discernible on imagery.

Historic drilling location records were originally recorded in California State Plane coordinates or in metes and bounds. The QP checked historic drilling location data to ensure these records had been properly converted to Universal Transverse Mercator (UTM) coordinates, the coordinate system used in the 2017 drilling program. All historic location data has been properly converted to the current UTM coordinate system.

The QP received drilling records, sample intervals, and assay results in excel workbook files that were used as input for the drill hole database. Through a variety of data checks drill hole information was evaluated for duplicate entries, incorrect intervals, lengths, or distance values less than or equal to zero, out-of-sequence intervals and intervals or distances greater than the reported drill hole length. Historical drill hole records were also checked against relevant Duval and FCMC data sets. A review comparing original field logs and assay reports showed the data to have been transcribed accurately into the Excel files.

9.2 Data Limitations or Failures

The QP did not identify any data limitations or failures.

9.3 Data Adequacy

The QP believes adequate care has been taken in preserving and transcribing the historic data to digital format and drill hole data accurately corresponds back to the sample ledger and assay certificates. The QP believes that the data used is adequate and suitable for a mineral resource estimate.

10 Mineral Processing and Metallurgical Testing

This section summarizes at a high level the overall metallurgical program and flowsheet development work completed during the PFS. This test work validates the selected options of the PFS flowsheets.

The most recent phase of metallurgical test work was primarily focused on the evaluation and optimization of the crystallization and impurity removal circuits for boric acid production. Crystallization represents a critical unit operation, directly influencing both product purity and throughput.

The impurity removal process step occurs downstream of the boric acid crystallization steps, but it is critical for the operation that impurities such as magnesium and calcium are removed. A portion of the crystallizer mother liquor is recycled back to be re-injected in the solution mining process. If the impurities are not removed, then they will build up and adversely affect the in-situ leaching process.

10.1 Metallurgical Testing

To support the development and design verification of the Large-Scale Borate Facility (LSBF) process, 5E initiated a comprehensive metallurgical test work program. Pregnant leach solution (PLS) from the wellfield (i.e. representative samples) was collected from the SSF and shipped to Kemetco Research Inc. (Kemetco), an independent metallurgical laboratory based in Richmond, British Columbia, Canada. Kemetco was selected based on its demonstrated expertise in crystallization technologies and other critical hydrometallurgical unit operations relevant to boric acid production. The

44

laboratory also brings extensive prior experience with borate systems, making it a strategic partner for validating process assumptions and optimizing key parameters. Prior to engaging Kemetco, 5E commissioned Ardent Technologies (Ardent) to perform preliminary test work. Ardent’s studies, which focused on gypsum processing, impurity removal, and boric acid crystallization, which provided valuable insights and formed the basis for subsequent testing at Kemetco. The Kemetco program expanded on this foundation, incorporating process solutions and refining key parameters to inform the FEL-2 process design.

10.2 Representative Samples

To ensure the test work was based on realistic process conditions, 5E shipped five drums of brine solution and five buckets of crude boric acid—both generated from the SSF—to Kemetco. These materials were used to reconstitute a representative PLS for metallurgical testing. Prior to combining the materials, Kemetco conducted a full analytical characterization of each component. The results of this analysis are presented in Section 10.4.

10.3 Testing Laboratory

In March of 2025, 5E selected and engaged Kemetco, an independent and ISO-certified laboratory, to conduct the metallurgical testing program. The facility has no financial interest in 5E and was chosen for its expertise in crystallization and process development.

In addition to Kemetco’s work, earlier test programs (July 2022) were conducted by Ardent. While Ardent’s initial studies primarily used synthetic solutions, some of their later work incorporated actual process materials and contributed to the development of the current test program. Their findings, particularly in the areas of impurity removal and crystallization behavior, were valuable in shaping the scope and direction of the Kemetco testing.

10.4 Relevant Results

10.4.1 Feedstock Assay Results

5E shipped brine solution and crude boric acid, both produced at the SSF, to Kemetco’s testing facility. These materials were directly generated from actual wellfield operations, making them highly representative of the expected feedstock for the LSBF. The use of authentic, wellfield-derived PLS is a critical component of the metallurgical test program, ensuring that the results are directly applicable to full-scale operations. This approach enhances confidence in the process design, performance assumptions, and downstream engineering decisions.

At Kemetco, the brine and crude boric acid were combined to reconstitute the PLS. Prior to blending, each component underwent comprehensive metallurgical analysis to characterize its composition. The results of this analysis are presented in Table 10.1.

45

Table 10.1: Kemetco metallurgical analysis for the five brine samples

5E-PLS #1 PLS #2 PLS #3
PLS #4
PLS #5 Average
Ag Silver mg/L
<0.5
<0.5 <0.5 <0.5 <0.5 <DL
Al Aluminum mg/L
51
49 50 50 50 50
As Arsenic mg/L
<2.
<2. <2. <2. <2. <DL
B Boron mg/L
4,006
3,995 3,836 3,858 3,846 3,908
Ba Barium mg/L
1
1 1 1 1 1
Be Beryllium mg/L
<0.2
<0.2 <0.2 <0.2 <0.2 <DL
Bi Bismuth mg/L
<2.
<2. <2. <2. <2. <DL
Ca Calcium mg/L
21,284
20,693 21,312
21,121
21,151 21,112
Cd Cadmium mg/L
<0.2
<0.2 <0.2 <0.2 <0.2 <DL
Co Cobalt mg/L
<0.5
<0.5 <0.5 <0.5 <0.5 <DL
Cr Chromium mg/L
<0.5
<0.5 <0.5 <0.5 <0.5 <DL
Cu Copper mg/L
<1.
<1. <1. <1. <1. <DL
Fe Iron mg/L
183
172 174 183 178 178
K Potassium mg/L
185
179 187 186 183 184
Li Lithium mg/L
39
38 39 39 38 38
Mg Magnesium mg/L
1,341
1,305 1,369 1,331 1,358 1,341
Mn Manganese mg/L
44
42 44 44 43 43
Mo Molybdenum mg/L
<1.
<1. <1. <1. <1. <DL
Na Sodium mg/L
4,462
4,323 4,457 4,416 4,423 4,416
Ni Nickel mg/L
2
2 2 2 2 2
*** P Phosphorus** mg/L
<5.
<5. <5. <5. <5. <DL
Pb Lead mg/L
<2.
<2. <2. <2. <2. <DL
*** S Sulfur** mg/L
404
393 382 407 393 396
Sb Antimony mg/L
<2.
<2. <2. <2. <2. <DL
Se Selenium mg/L
3
3 3 <2. 3 3
Si Silicon mg/L
25
25 24 24 24 24
Sn Tin <2. <2. <2. <2. <2. <DL
Sr Strontium mg/L
225
219 224 224 223 223
Ti Titanium mg/L
<1.
<1. <1. <1. <1. <DL
Tl Thallium mg/L
<2.
<2. <2. <2. <2. <DL
U Uranium mg/L
<5.
<5. <5. <5. <5. <DL
V Vanadium mg/L
<1.
<1. <1. <1. <1. <DL
Zn Zinc mg/L
3
3 3 3 3 3
Density (g/mL) g/mL
1.08
1.09 1.09 1.09 1.08 1.08
Cl (colorimetric) mg/L
48,377
48,472 49,576 51,116 49,233 49,355
F by ISE (ppm) mg/L
101
96 99 101 97 99
pH 4.85 4.88 4.83 4.90 4.89
H3BO3 g/kg 21 21 20 20 20 21

*** Not certified**

46

Table 10.2: Kemetco metallurgical analysis for the five boric acid samples

Boric
Acid #1
Boric
Acid #2
Boric
Acid #3
Boric
Acid #4
Boric
Acid #5
Average
Ag Silver mg/kg <5. <5. <5. <5. <5. <DL
Al Aluminum mg/kg <10. <10. <10. <10. <10. <DL
As Arsenic mg/kg <20. <20. <20. <20. <20. <DL
B Boron mg/kg 158,991 163,909 155,827 160,997 157,943 159,533
Ba Barium mg/kg <2. <2. <2. <2. <2. <DL
Be Beryllium mg/kg <2. <2. <2. <2. <2. <DL
Bi Bismuth mg/kg <20. <20. <20. <20. <20. <DL
Ca Calcium mg/kg 19,181 16,696 18,409 18,283 18,282 18,170
Cd Cadmium mg/kg <2. <2. <2. <2. <2. <DL
Co Cobalt mg/kg <5. <5. <5. <5. <5. <DL
Cr Chromium mg/kg <5. <5. <5. <5. <5. <DL
Cu Copper mg/kg <10. <10. <10. <10. <10. <DL
Fe Iron mg/kg 18.3 14.1 14.6 14.1 14.5 15
K Potassium mg/kg <50. <50. <50. <50. <50. <DL
Li Lithium mg/kg <10. <10. <10. <10. <10. <DL
Mg Magnesium mg/kg <10. <10. <10. <10. <10. <DL
Mn Manganese mg/kg <2. <2. <2. 5.6 <2. 6
Mo Molybdenum mg/kg <10. <10. <10. <10. <10. <DL
Na Sodium mg/kg <50. <50. <50. <50. <50. <DL
Ni Nickel mg/kg <5. <5. <5. <5. <5. <DL
*** P Phosphorus** mg/kg <50. <50. <50. <50. <50. <DL
Pb Lead mg/kg <20. <20. <20. <20. <20. <DL
*** S Sulfur** mg/kg 15,260 13,021 15,540 14,630 14,707 14,632
Sb Antimony mg/kg <20. <20. <20. <20. <20. <DL
Se Selenium mg/kg <20. <20. <20. <20. <20. <DL
Si Silicon mg/kg 87.2 80.6 87.2 84.1 86.7 85
Sn Tin mg/kg <20. <20. <20. <20. <20. <DL
Sr Strontium mg/kg 35.9 30.7 36.5 33.9 35.4 34
Ti Titanium mg/kg <10. <10. <10. <10. <10. <DL
Tl Thallium mg/kg <20. <20. <20. <20. <20. <DL
U Uranium mg/kg <50. <50. <50. <50. <50. <DL
V Vanadium mg/kg <10. <10. <10. <10. <10. <DL
Zn Zinc mg/kg <5. <5. <5. <5. <5. <DL
H3BO3 g/kg 909 937 891 921 903 912

10.4.2 PLS Characterization

The PLS composition that is fed to the crystallizers was simulated using METSIM® modelling software and is shown below. Kemetco amended the reconstituted PLS with small amounts of magnesium chloride, calcium chloride, and sodium chloride to approach the simulated feed conditions. This was done to simulate the various recycle streams within the plant.

The target boric acid head grade expected from the mining operation is 10.2 wt.%. Actual testing by Kemetco was performed at a target of 10.4 wt.%. The slight variation in boric acid head grade is a result of some adjustments to the overall process simulation that were performed after the test work program had begun. Table 10.3 provides the simulated crystallizer feed conditions from the METSIM model.

47

Table 10.3: Simulated crystallizer feed conditions

Component
wt. %
H2O 76.6%
H3BO3 10.4%
CaCl2 5.3%
NaCl 3.8%
MgCl2 2.4%
KCl 1.0%
LiCl 0.5%
CaSO4 0.1%
pH 4.0

The amended PLS feed compositions for the crystallization tests are shown in Table 10.4 and Table 10.5 provides the feed solutions compositions for continuous crystallization tests (CRZ1-4 and CRZ1-5).

Table 10.4: Amended PLS feed compositions for batch crystallization tests (CRZ1-1 through CRZ1-3)

Unit CRZ1-1 CRZ1-2
CRZ1-3
Ag Silver mg/kg <1. <2.5 <1.
Al Aluminum mg/kg 63 65 58
As Arsenic mg/kg <4.0 <10.0 <4.0
B Boron mg/kg 15,941 21,030
18,491
Ba Barium mg/kg 1 1 1
Be Beryllium mg/kg <0.4 <1.0 <0.4
Bi Bismuth mg/kg <4.0 <10.0 <4.0
Ca Calcium mg/kg 17,380 16,830
17,095
Cd Cadmium mg/kg <0.4 <1.0 <0.4
Co Cobalt mg/kg <1.0 <2.5 <1.0
Cr Chromium mg/kg <1.0 <2.5
2
Cu Copper mg/kg <2.0 <5.0 <2.0
Fe Iron mg/kg 146 153 142
K Potassium mg/kg 244 250 249
Li Lithium mg/kg 69 70 68
Mg Magnesium mg/kg 6,067 6,069 5,762
Mn Manganese mg/kg 33 38 31
Mo Molybdenum mg/kg <2. <5.0 <2.0
Na Sodium mg/kg 14,504 14,467 15,575
Ni Nickel mg/kg <1.0 <2.5 3
*** P Phosphorus** mg/kg <10.0 <25.0 <10.
Pb Lead mg/kg <4.0 <10.0 <4.0
*** S Sulfur** mg/kg 249 243 313
Sb Antimony mg/kg <4.0 <10.0 <4.0
Se Selenium mg/kg <4.0 <10.0 <4.0
Si Silicon mg/kg 27 27 27
Sn Tin mg/kg <4.0 <10.0 <4.0
Sr Strontium mg/kg 166 163 161
Ti Titanium mg/kg <2.0 <5.0 <2.0
Tl Thallium mg/kg <4.0 <10.0 <4.0
U Uranium mg/kg <10.0 <25.0 <10.0
V Vanadium mg/kg <2.0 <5.0 <2.0
Zn Zinc mg/kg
3
<2.5
3

48

Table 10.5: Feed solutions for continuous crystallization

Unit CRZ1-4 CRZ1-5
Ag Silver mg/kg <1.0 <1.0
Al Aluminum mg/kg 40 12
As Arsenic mg/kg <4.0 <4.0
B Boron mg/kg 19,967 16,484
Ba Barium mg/kg 1 1
Be Beryllium mg/kg <0.4 <0.4
Bi Bismuth mg/kg <4.0 <4.0
Ca Calcium mg/kg 17,460 16,609
Cd Cadmium mg/kg <0.4 <0.4
Co Cobalt mg/kg <1.0 <1.0
Cr Chromium mg/kg 2 <1.0
Cu Copper mg/kg <2.0 <2.0
Fe Iron mg/kg 125 <2.0
K Potassium mg/kg 248 244
Li Lithium mg/kg 67 65
Mg Magnesium mg/kg 5,915 5,350
Mn Manganese mg/kg 33 31
Mo Molybdenum mg/kg <2.0 <2.0
Na Sodium mg/kg 15,983 14,480
Ni Nickel mg/kg 2 2
*** P Phosphorus** mg/kg <10.0 <10.0
Pb Lead mg/kg <4.0 <4.0
*** S Sulfur** mg/kg 319 324
Sb Antimony mg/kg <4.0 <4.0
Se Selenium mg/kg <4.0 <4.0
Si Silicon mg/kg 22 50
Sn Tin mg/kg <4.0 <4.0
Sr Strontium mg/kg 167 34
Ti Titanium mg/kg <2.0 <2.0
Tl Thallium mg/kg <4.0 <4.0
U Uranium mg/kg <10.0 <10.0
V Vanadium mg/kg <2.0 <2.0
Zn Zinc mg/kg 3 4
Cl mg/kg 76,599 66,522

10.4.3 Crystallization Results

Five boric acid crystallization tests and a re-crystallization test were performed. These tests were performed using 1- stage crystallization, 2-stage crystallization, flash crystallization, and re-crystallization processes. In each test, representative samples were collected and analyzed. The crystal samples were analyzed using Inductively Coupled Plasma (ICP) techniques. Crystallization tests CRZ1-1 to CRZ1-3 were performed in batch mode and CRZ1-4 and CRZ1-5 were performed in a continuous process.

Boric acid solubility curves were generated by measuring boric acid concentrations at various temperatures ranging from 10°C to 80°C (50°F to 176°F). This is a critical step in designing full-scale crystallizers, as it defines the temperature range required for crystal growth and enables calculation of the amount of boric acid that can be crystallized from solution— directly impacting plant throughput. The solubility curve data collected, confirmed previously postulated data used in the process simulation. This information is essential for accurately sizing crystallizers and associated process equipment by informing the mass and energy balance requirements needed to meet design capacity. A well-characterized solubility curve also supports optimized process control, helping to prevent fouling and poor crystal quality, and is used to validate the overall process simulation model.

49

Figure 10.1: Boric acid solubility curve at various temperatures for CRZ1-1, CRZ1-2, and CRZ1-3

==> picture [361 x 226] intentionally omitted <==

Figure 10.2: Boric acid continuous crystallization set-up including an agitated feed tank

==> picture [239 x 179] intentionally omitted <==

50

Figure 10.3: Boric acid crystals after continuous crystallization test (CRZ1-4)

==> picture [159 x 212] intentionally omitted <==

Figure 10.4: Boric acid crystals after continuous crystallization test (CRZ1-4) and centrifugation

==> picture [159 x 212] intentionally omitted <==

The boric acid crystals in the continuous crystallization test, CRZ1-4, had a distinct brown-orange layer that is indicative of ferric iron precipitation. The boric acid crystals pictured are not the finished product. They are the result of the crude crystallization step. The full process includes a filtration step for the crude crystallizer slurry. The resulting filter cake is washed and redissolved. This solution is filtered again before being fed to the re-crystallization process as shown in Figure 10.5 and Figure 10.6 below.

51

Figure 10.5: Boric acid crystals after re-crystallization

==> picture [141 x 188] intentionally omitted <==

Figure 10.6: Boric acid crystals after re-crystallization and dewatering process

==> picture [219 x 165] intentionally omitted <==

The re-crystallization testing yielded a bright-white boric acid crystal product. This is a visual indicator of higher product purity and was confirmed in the lab testing through ICP and chloride analysis as shown below. The boric acid recrystallization test confirmed that the product can achieve the customer specifications listed in Section 16 through water dissolution and displacement washing. This method successfully met or exceeded target chemical specifications, particularly for iron and chloride, and is the design basis for the Large-scale Boron Facility.

52

Table 10.6: Boric acid re-crystallization results

Solutions Crystals - wet solids Crystals - dry solids
Unit Feed
Mother
Liquor
Wet
Discharge
Batch 1-
Crystals-
wet
Batch 2-
Crystals
-wet
Batch 3-
Washed
Crystals
wet
Batch 1-
Crystals
-dry
Batch 2-
Crystals
-dry
Batch 3-
Washed
Crystals -
dry
BA assay
wt%
-
-
-
-
-
-
98.89
98.85
98.61
Calc H3BO3 wt% 12.50
5.14
4.50
102.71
95.62
95.94
101.68
108.03
109.08
Ag
mg/kg
<1.0
<1.0
<1.0
<5.0
<5.0
<5.0
<5.0
<5.0
<5.0
Al
mg/kg
<2.0
<2.0
<2.0
<10.0
<10.0
<10.0
<10.0
<10.0
<10.0
As
mg/kg
<4.0
<4.0
<4.0
<20.0
<20.0
<20.0
<20.0
<20.0
<20.0
B
mg/kg
21,862
8,983
7,869
170,117
146,588
152,546
177,782
175,656
177,375
Ba
mg/kg
<0.4
<0.4
<0.4
<2.0
<2.0
<2.0
<2.0
<2.0
<2.0
Be
mg/kg
<0.4
<0.4
<0.4
<2.0
<2.0
<2.0
<2.0
<2.0
<2.0
Bi
mg/kg
<4.0
<4.0
<4.0
<20.0
<20.0
<20.0
<20.0
<20.0
<20.0
Ca
mg/kg
187
200
33.0
17.8
38.3
<10.0
18
35
<10.0
Cd
mg/kg
<0.4
<0.4
<0.4
<2.0
<2.0
<2.0
<2.0
<2.0
<2.0
Co
mg/kg
<1.0
<1.0
<1.0
<5.0
<5.0
<5.0
<5.0
<5.0
<5.0
Cr
mg/kg
<1.0
<1.0
<1.0
<5.0
<5.0
<5.0
<5.0
<5.0
<5.0
Cu
mg/kg
<2.0
<2.0
<2.0
<10.0
<10.0
<10.0
<10.0
<10.0
<10.0
Fe
mg/kg
2.6
2.9
<2.0
<10.0
<10.0
<10.0
<10.0
<10.0
<10.0
K
mg/kg
<10.0
<10.0
<10.0
<50.0
<50.0
<50.0
<50.0
<50.0
<50.0
Li
mg/kg
<2.0
<2.0
<2.0
<10.0
<10.0
<10.0
<10.0
<10.0
<10.0
Mg
mg/kg
58.6
63.7
9.9
<10.0
10.2
<10.0
<10.0
11
<10.0
Mn
mg/kg
2.2
2.5
0.9
<2.0
<2.0
<2.0
<2.0
<2.0
<2.0
Mo
mg/kg
<2.0
<2.0
<2.0
<10.0
<10.0
<10.0
<10.0
<10.0
<10.0
Na
mg/kg
154
162
25.3
<50.0
<50.0
<50.0
<50.0
<50.0
<50.0
Ni
mg/kg
<1.0
<1.0
<1.0
<5.0
<5.0
<5.0
<5.0
<5.0
<5.0
*** P**
mg/kg
<10.0
<10.0
<10.0
<50.0
<50.0
<50.0
<50.0
<50.0
<50.0
Pb
mg/kg
<4.0
<4.0
<4.0
<20.0
<20.0
<20.0
<20.0
<20.0
<20.0
*** S**
mg/kg
20.7
21.2
6.0
<20.0
<20.0
<20.0
<20.0
<20.0
<20.0
Sb
mg/kg
<4.0
<4.0
<4.0
<20.0
<20.0
<20.0
<20.0
<20.0
<20.0
Se
mg/kg
<4.0
<4.0
<4.0
<20.0
<20.0
<20.0
<20.0
<20.0
<20.0
Si
mg/kg
<4.0
<4.0
<4.0
<20.0
<20.0
<20.0
<20.0
<20.0
<20.0
Sn
mg/kg
<4.0
<4.0
<4.0
<20.0
<20.0
<20.0
<20.0
<20.0
<20.0
Sr
mg/kg
1.9
2.0
<0.4
<2.0
<2.0
<2.0
<2.0
<2.0
<2.0
Ti
mg/kg
<2.0
<2.0
<2.0
<10.0
<10.0
<10.0
<10.0
<10.0
<10.0
Tl
mg/kg
<4.0
<4.0
<4.0
<20.0
<20.0
<20.0
<20.0
<20.0
<20.0
U
mg/kg
<10.0
<10.0
<10.0
<50.0
<50.0
<50.0
<50.0
<50.0
<50.0
V
mg/kg
<2.0
<2.0
<2.0
<10.0
<10.0
<10.0
<10.0
<10.0
<10.0
Zn
mg/kg
<1.0
<1.0
<1.0
<5.0
<5.0
<5.0
<5.0
<5.0
<5.0
Cl
mg/kg
687
775
123
40.1
105
10.0
28.8
104
12.6

Table 10.7: Particle size distribution for batch crystallization test CRZ1-1 through CRZ1-3

Unit CRZ1-1 CRZ1-2 CRZ1-3
D10 �� 101 73 58
D50 �� 283 215 189
D90 �� 492 419 404

53

Table 10.8: Particle size distribution for continuous crystallization test CRZ1-4

Batch #
D10
D50 D90
Unit
um
um
um
1
79.0
318.0 646.7
3
82.5
250.2
696.5
5
75.9
238.9 663.4
7
79.6
233.7
653.2
9
80.1
225.4 586.3
10
96.6
366.9
793.6

Table 10.9: Particle size distribution for continuous crystallization test CRZ1-5

Batch #
D10
D50 D90
Unit
um
um
um
1
78.0
289.5 573.8
3
43.6
233.8
651.1
5
54.8
175.2 648.1
7
61.9
177.6
635.8
9
47.9
175.9 591.1
10
73.5
184.9
526.9

Table 10.10: Boric acid crystal particle size distribution for re-crystallization

D10 D50 D90
μm μm μm
147.9 269.7 449.3

The particle size distribution for the re-crystallization test yielded boric acid crystals that are coarser than the final product specification.

Table 10.11: Boric acid crystal particle size specification

PARAMETER UNIT DESIGN VALUE
Dry Sieve Analysis - -
8 mesh (2360 micron) %, Max 0.0
20 mesh (850 micron) %, Max 2.0
30 mesh (600 micron) %, Max 5.0
100 mesh (150 micron) %, Min 60.0
200 mesh (75 micron) % Report

Crystal growth dynamics are influenced by several interdependent process parameters, including residence time, slurry density, degree of supersaturation, cooling method and rate, agitation intensity, and mixing efficiency. These variables can be strategically manipulated to control nucleation and growth rates, thereby influencing the final crystal size distribution—favoring either larger crystals or a greater yield of smaller crystals, depending on process objectives. While crystal growth optimization was not a primary focus of the current test work campaign, the data generated—including operating conditions and corresponding residence times—provides a valuable baseline. These results will inform future optimization efforts during final process design.

10.4.4 Impurity Removal Test Results

Impurity removal testing was conducted on crystallizer mother liquor to evaluate two process flow options for removing magnesium while minimizing boron losses. The goal was to selectively precipitate impurities without compromising boron recovery. Two different flow sheet options were evaluated as part of the test work.

54

Option 1: Crystallizer mother liquor � Evaporation (50% mass) � Cooling Crystallization � Sequential pH Adjustments with Lime Slurry

  • The mother liquor was first evaporated to 50% of its original mass, followed by cooling crystallization and two sequential pH adjustments using lime slurry.

  • At a mid-range acidic pH, approximately 45% of boron and 2% of the magnesium were removed.

  • A second pH adjustment to a higher and more basic pH removed an additional 38% of boron and 84% of the magnesium.

  • The final solid phase contained 53% of the initial boron, primarily as a calcium–boron complex with measurable magnesium content (11% B, 15.2% Ca, 8.2% Mg).

  • Option 2: CRZ1 mother liquor � Sequential pH adjustments � Evaporation (EVP1) (60% mass reduction)

  • The mother liquor underwent sequential pH adjustments to a mid-ranged acidic pH and then to a higher and more basic pH. This was followed by evaporation to 60% of its original mass.

  • At the first pH adjustment (mid-ranged acidic), only 8% of boron was removed, with no measurable magnesium removal.

  • At the second (basic) pH adjustment, 60% of boron and 12% of magnesium were removed.

Note that the actual pH values were determined through experimentation.

The difference in magnesium removal at a basic pH (Option 1) was 84% compared to a basic pH (Option 2) was 12% removal. Magnesium removal is strongly pH dependent. Boron precipitates out at lower pH and the resulting boron calcium complex can be recycled to increase overall boron recovery. Removing magnesium is important because it is a waste product, and the remaining filtrate is rich in calcium chloride which is to be further concentrated and sold as a byproduct. Both options that were tested were successful. The major difference between the two options was that the size of evaporation ponds was smaller in Option 2. Option 2 is included in the basis of design.

These data points are helpful for understanding the sensitivities of the selective precipitations in order to further recover valuable boron while removing impurities.

10.5 Adequacy of Data

The QP for Fluor, Kevin R. Martina, has conducted a thorough review of the metallurgical test methods and results of the metallurgical test involving the PLS sample collected from the SSF. He confirms that the reporting is consistent with industry standard practice and that the appropriate protocols were followed during sample preparation. Mr. Martina further verifies that the processing and testing of the PLS sample were conducted in accordance with the accepted methodologies. Based on this evaluation, he QP concludes that the extent of testing performed is suitable for the current engineering study level and provides relevant data to support ongoing process design development.

11 Mineral Resource Estimates

In March 2025, Mr. Steven Kerr of Escalante Geological Services, LLC completed an updated resource estimate for the Project. Since the previous resource estimate in 2021, 5E completed three more bore holes and acquired additional mineral tenure for the Project. The 2021 resource estimate identified a total resource of 171.3 million short tons of B2O3 with 30.95 million short tons classified as measured resource and 43.35 million short tons classified as indicated resource using a cut-off grade of 2.0% B2O3.

11.1 Key Assumptions

Key assumptions used in the economic assessment include:

  • Mineralized horizons exhibit lateral continuity that will support mining using in-situ leaching mining methods;

  • Mineralized horizons are not disrupted by structural or stratigraphic features that could limit mining;

  • There is reasonable continuity of colemanite mineralization throughout the deposit; and

  • There is adequate exploration data to support estimation of resources

55

A detailed financial model using a discount rate of 7% delivered a positive net present value to support the cut-off grade and more broadly the resulting mineral resource estimation.

11.2 QP’s Estimate of Resource

11.2.1 Resource Database

The database used for resource estimation includes 52 core holes and three rotary holes for a total of 55 bore holes. Thirty of the core holes were completed by Duval between 1979 and 1981. 5E completed 14 core holes in 2017 and another hole in 2022. In 2024, 5E completed three rotary holes as observation wells from which chip samples were collected through the mineral horizons for B2O3 and Li analyses. The cumulative sampled length for the database is 5,440.19 m (17,848.39 ft). Table 11.1 summarizes the drilling database. The Project’s exploration dataset is current as of February 12, 2025. Drilling coordinates in the database are in UTM NAD 83-11, and depths and elevations are reported in meters. Borate is listed as weight percent (%) B2O3 and Li as ppm. The drilling database contains 5,767 analytical values for B2O3 and 5,402 analytical values for Li.

Core recovery for the 5E drilling programs has ranged from 93% to 100% with an overall average of 97.60%. Core recovery records for earlier drilling conducted by Duval are not available, but based on missing intervals in the drilling database, core recovery likely exceeded 90% in the core drilling. The QP has completed a thorough review and verification of the drilling database and found the database to be sufficient for resource modeling.

56

Table 11.1: Summary of drilling database

Cumulative Core Cumulative Cumulative B2O3
Core Hole ID Length(m) Sample Length(m) Analyses Li Analyses
APBL-01 111.13 88.90 82 82
APBL-02 91.74 87.74 107 107
APBL-03 93.11 92.80 91 91
APBL-04 143.77 142.71 162 162
APBL-05 107.35 104.76 150 150
APBL-06 95.34 90.47 83 83
APBL-07 176.27 166.09 207 207
APBL-08 128.96 127.20 153 153
APBL-09 119.33 118.51 120 120
APBL-10 133.81 126.50 176 176
APBL-11 135.72 134.79 155 155
APBL-12 142.77 138.42 212 212
APBL-13 138.99 136.75 155 155
APBL-14 157.43 156.99 260 260
DHB-01 162.49 158.41 184 184
DHB-03 212.90 212.12 213 213
DHB-05 207.26 207.26 179 179
DHB-06 175.57 155.42 124 124
DHB-07 204.83 204.06 179 179
DHB-08 224.63 224.63 186 186
DHB-09 170.69 170.69 138 138
DHB-10 139.08 81.79 86 86
DHB-11 112.90 73.28 86 86
DHB-12 120.67 74.04 85 -
DHB-13 102.57 61.17 70 70
DHB-14 117.63 75.71 80 -
DHB-15 125.70 56.18 51 51
DHB-16 145.48 122.62 138 138
DHB-17 141.25 104.49 151 151
DHB-18 139.48 92.32 105 105
DHB-19 106.68 59.40 74 74
DHB-21 26.33 25.93 39 39
DHB-22 135.94 101.81 135 135
DHB-23 136.24 100.80 114 114
DHB-24 146.00 120.00 119 119
DHB-25 173.74 134.87 152 152
DHB-26 121.37 81.99 106 106
DHB-27 132.71 67.07 95 95
DHB-28 128.62 80.07 115 115
DHB-29 120.64 75.28 101 101
DHB-30 137.53 68.49 83 83
DHB-31 49.00 57.36 41 -
DHB-33 111.19 92.17 80 -
DHB-34 68.76 87.47 79 -
IR-2-01-01 137.59 119.57 135 135
SMT-1 24.40 24.40 57 59
SMT-2 24.60 24.60 55 -

57

SMT-3 33.10 33.10 69 -
P1 61.10 61.10 20 -
P2 64.20 64.20 21 -
P3 55.10 55.10 18 -
P4 54.20 54.20 34 -
Total 6,327.89 5,375.80
5,910
5,330
Cumulative B2O3
Rotary Hole ID Hole Depth Sample Length(m) Analyses Li Analyses
OW-09 480.06 126.50 46 46
OW-10 466.00 132.88 44 44
OW-11 460.00 121.71 41 41
Total 381.09 131 131

11.2.2 Geologic Model

The QP developed a gridded geologic model of the Project using Carlson Mining™ software. The mineralization does not correlate to lithological markers as the entire sequence is predominantly lacustrine mudstone. However, detailed examination of the analytical results reveals distinct mineralized horizons. The deposit was delineated based on these patterns of mineralization into four mineralized horizons, two non-mineralized or weakly mineralized interbeds and two non-mineralized horizons bounding the deposit. These horizons are listed in Table 11.2.

The grid model was constructed across the deposit area, with a grid cell size of 50 m x 50 m. Grids represent the bounding elevation surfaces of key horizons, horizon thicknesses, and analytical grades. Grids representing the bounding surface elevations of the mineral horizon were interpolated through triangulation. Mineral horizon grids for thickness and analytical grades were interpolated using Ordinary Kriging (OK) and Inverse Distance Squared (ID2) algorithms. Mineralization is spatially defined by a resource boundary using a distance of 200 m from the last intersection of mineralization in a drill hole and by property boundaries. Grids are masked to the outside of the resource boundary.

Table 11.2: Modelled horizons

Average
Thickness Range Thickness Composite B2O3
Composited Li
Horizon Abbreviation (m) (m) Range (wt.%) Range (ppm)
Overburden OBN 317.0 - 507.7 381.8 NA NA
Upper Mineralized Horizon UMH 0.1 - 12.5 4.3 0.87 - 14.45 99 - 588
Upper Interbed UI 0.1 - 16.7 6.7 0.5 - 4.1 108 - 623
Main Mineralized Horizon MMH 0.7 - 69.4 27.4 2.6 - 17.6 98 - 550
Medial Interbed MI 0.2 - 5.2 9.7 0.3 - 1.9 386 - 492
Intermediate Mineralized
Horizon IMH 1.8 - 58.3 22.5 0.7 - 12.0 23 - 534
Lower Mineralized Horizon LMH 0.0 - 53.9 19.7 0.2 - 5.7 91 - 534
Lower Sandstone* LSS 0.1 - 58.6 15.6 NA NA
* Horizon not fully penetrated, NA: Not Applicable

11.2.3 Grade Estimation & Resource Classification

Using composites for each mineralized horizon, variography was successful for B2O3 grades for the Major Mineralized Horizon (MMH), Intermediate Mineralized Horizon (IMH), and the Lower Mineralized Horizon (LMH) and are summarized in Table 3. Variogram modelling was unsuccessful for the Upper Mineralized Horizon and with Li in all horizons. Grids representing B2O3 grades for the MMH, IMH, and LMH were constructed using OK based on the constructed variograms. ID2 interpolation was used with all remaining grade grids using the same spatial limits established with the horizon grids.

58

Table 11.3: Modelled variograms

Horizon **Type ** Nugget First Structure Second Structure
MMH Spherical, omnidirectional 200.0 400
IMH Spherical, omnidirectional 0.2 180.0 450
LMH Spherical, omnidirectional 0.2 530.0

Based on the variography above, the deposit was classified as follows:

  • Measured Resource Category: based on a maximum spacing between mineralized drill holes for each horizon of 200 m.

  • Indicated Resources Category: based on a maximum spacing between mineralized drill holes for each horizon of 400 m.

  • Inferred Resources Category: based on a maximum spacing between mineralized drill holes for each horizon of 800 m.

Drilling and sampling density is sufficient that no further limits on classification are required.

11.3 Model Validation

The QP has conducted an audit of the gridded model. The audit and validation of the gridded model consisted of the following steps:

  1. Drilling data was loaded into Carlson Mining to compare drill hole postings with the provided grids representing the top and bottom surfaces for each mineralized horizon. This comparison was done using a grid inspector tool in Carlson Mining that enables simultaneous viewing of drill hole data along with grid values at each drilling location. The QP found the resulting comparisons to be satisfactory. This step was repeated comparing drill hole composite grades from drill hole data with grids representing the grades of B2O3 and Li for each mineralized horizon. While there are some fluctuations with grid values generated by OK and ID2, these fluctuations are small and within expected ranges.

  2. The gridded model was evaluated using a series of swath plots. A swath plot is a graphical display of the grade distribution derived from a series of bands, or swaths, generated as sections through the deposit. Grade variations from the OK model are compared to nearest neighbor (NN) searches on drill hole composites.

  3. On a local scale, the NN search does not provide reliable estimations of grade but, on a much larger scale, it represents an unbiased estimation of the grade distribution based on the underlying data. If the model estimation completed by OK is unbiased, the grade trends may show local fluctuations on a swath plot, but the overall trend should be similar to the NN distribution of grade. Three swath plots are shown in Figure 11.1.

59

Figure 11.1: Grade variation swath

==> picture [456 x 278] intentionally omitted <==

11.3.1 Density Measurements

The 2017 drilling program included the collection of 777 density measurements from core samples. Density determinations were made using the weight in air/weight in water method. The weighted average bulk density determined from the 381 samples collected through the mineralized horizons is 2.18 g/cm[3] . and has been used as the bulk density in resource estimation.

11.4 Cut-off Grade

A 5.0% B2O3 cut-off grade was previously established by Duval and was carried forth by previous QP’s in previous technical report summaries. An in-depth assessment of cut-off grade was undertaken in 2022 and 2023 as mass and energy balances were developed to fundamentally begin to assess economic viability. Data informing the mass and energy balances included incorporating the results of leaching tests, historical results, mining, and processing costs, as well as commodity pricing. This assessment derived a 2.0% cut-off calculation based on the most recent previous initial assessment.

Cut-off grade is an economic analysis to measure cash costs (i.e., the variable cost to produce boric acid compared to the price that can be achieved in the market for the sale of boric acid). 5E commenced mining operations in January 2024 and began operating the SSF in April 2024. The SSF achieved a steady state of operation in the Summer of 2024 and optimized mining operations by September 2024. As such, mining data from September and October 2024 have been utilized as the basis of design and further leveraged for the cut-off grade analysis. Using this data set, an in-depth assessment was performed that included an analysis of the cash costs (i.e., the variable cost to produce boric acid) and excluded book costs (i.e., depreciation) as the capital is assumed to have already been invested to build the project such that it can operate. The definition of cut-off grade for the in-situ mining operation is the point at which the Company would cease operating a particular well or in the case of a combination of wells, the wellfield. As such, cash costs are established as the basis for the analysis.

The in-depth analysis incorporates mineralization and at what point economic extraction or boron in solution is no longer viable. The driver of this analysis focuses on three specific ratios derived from the basis of design using mining

60

data during the period of September and October 2024: calcium to boron, sodium to boron, and magnesium to boron. These three ratios are drivers of various costs, chemical utilizations, and byproduct production rates. For example, calcium to boron impacts sulfuric acid utilization and gypsum production compared to boric acid production. Additionally, magnesium to boron impacts lime utilization and metal salt waste production compared to boric acid production. Lastly, sodium to boron impacts HCl utilization and sodium chloride production compared to boric acid production. Table 11.4 below details the average, minimum and maximum ratios of elements utilized in the basis of design from September and October 2024:

Table 11.4: Basis of design ratios

Ca:B
Mg:B
Na:B
Ca:B
Mg:B
Na:B
Ca:B
Mg:B
Na:B
Ca:B
Mg:B
Na:B
Average 1.27 0.13 0.34
Minimum
0.77
0.03
0.02
Maximum 2.05 0.22 0.70

To calculate cut-off grade, the following assumptions were utilized which are in-line with the basis of design noted in Section 14:

  • Overall boric acid yield of 95.1% and HCl utilization of 90%;

  • Magnesium accounts for 50% of the metal impurities and all impurities are extracted at similar rates;

  • Sodium chloride is 80% of the chloride losses;

  • The LSBF is designed for 130,000 short tons per year with a maximum 50% recycling and 10% excess flow capacity in the plant and max solubility of 10% boric acid; and

  • Orebody calcite is held constant at 7.03% (Note: This assumption is derived from XRD results (7.03% calcite) of core and historical pilot plant results from the 1980’s (3.80%, 6.08%, and 6.08% calcite).

Table 11.5 provides the cost inputs used in the sensitivity analysis for cut-off grade:

Table 11.5: Cut-off grade input costs

Raw Material Unit Price
36% HCl per short ton BA $158.61
H2SO4 per short ton BA $124.13
Lime per short ton BA $197.47
Metal impurities waste per short ton BA $45.00
Natural gas per MMBTU $3.19

Finally, a sensitivity analysis was performed where cash costs were calculated at each discreet cutoff grade to determine where the cost curves relative to the price of boric acid intersect. For this analysis, the magnesium to boron ratio and the sodium to boron ratio were held constant using the averages obtained from actual mining data and noted in Table 11.4 above. Table 11.6 provides this analysis:

61

Table 11.6: Cut-off grade analysis Table 11.6: Cut-off grade analysis Table 11.6: Cut-off grade analysis Table 11.6: Cut-off grade analysis Table 11.6: Cut-off grade analysis Table 11.6: Cut-off grade analysis
B2O3 1.5% 2.0% 3.0% 4.0% 6.0% 8.0% 10.0%
Ca:B 6.98 5.47 3.96 3.20 2.45 2.07 1.85
Mg:B 0.13 0.13 0.13 0.13 0.13 0.13 0.13
Na:B 0.34 0.34 0.34 0.34 0.34 0.34 0.34
Max head grade BA wt% 4.4% 4.9% 5.9% 6.7% 7.8% 8.7% 9.3%
Production rate (kst/yr) 40.9 51.3 68.6 82.5 103.6 118.7 130.0
Plant flow (gpm) 880 880 880 880 880 880 880
36% HCl (lb/st) 655 655 655 655 655 655 655
H2SO4 (lb/st) 7,216 5,743 4,270 3,534 2,797 2,429 2,208
Lime (lb/st) 957 821 685 618 550 516 496
Gypsum production (kST/yr) 259 259 257 256 255 253 252
Metal waste (kST/yr) 6.3 7.9 10.6 12.7 16.0 18.3 20.1
NaCl Production (kST/yr) 6.2 7.7 10.4 12.5 15.7 17.9 19.6
Heating (MMBTU/ST) 7.7 7.7 7.7 7.7 7.7 7.7 7.7
Electricity (kwh/ST) 3,424 2,734 2,043 1,698 1,353 1,180 1,078
BTU/ST 21.7 19.2 16.6 15.3 14.1 13.4 13.0
BA Packaging ($/ST) $18.00 $18.00 $18.00 $18.00 $18.00 $18.00 $18.00
BA freight ($/ST) $113.50 $113.50 $113.50 $113.50 $113.50 $113.50 $113.50
Variable cost ($/ST) $877.98 $749.52 $621.06 $556.83 $492.60 $460.49 $441.20
Fixed cost ($/ST) $746.52 $595.99 $445.45 $370.19 $294.92 $257.29 $235.00
Cash cost ($/ST) $1,624.50 $1,345.51 $1,066.52 $927.02 $787.53 $717.78 $676.20
Cash cost w/ credit ($/ST) $1,417.49 $1,180.75 $944.01 $825.64 $707.27 $648.09 $612.85

Sales pricing has risen over the past several years and is currently tracking around $1,100 to $1,300 per short ton F.O.B. in the spot market as of July 2025. For this evaluation, current pricing was used along with price forecasting based on the preliminary market study performed by Kline.

Figure 11.2 plots the cutoff grade relative to cash costs. The result of this exercise is a 2.0% financially viable cutoff grade, where our cash costs are near the current and forecasted boric acid pricing at the commencement of production. The geological model used a 2.0% B2O3 cutoff grade which has a boric acid equivalent cutoff of 3.55% boric acid.

Figure 11.2: Cash costs, $/st of boric acid

==> picture [351 x 211] intentionally omitted <==

----- Start of picture text -----

Cash Cost, $ / ST Boric Acid with Gypsum Credit
$1,600
$1,400
$1,200
$1,000
$800
$600
$400
$200
$-
0.0% 2.0% 4.0% 6.0% 8.0% 10.0% 12.0%
----- End of picture text -----

11.5 Mineral Resource Estimation

Results of the mineral resource estimation are shown in Table 11.7. Below, Figure 11.3 shows resource classification of the Project. The resource estimate for lands under mineral control by 5E contains a combined 109.13 million short tons of measured plus indicated resources with an average grade of 7.89% B2O3 and 303 ppm Li, using a 2.0% cut-off grade

62

for B2O3. The mineral resource estimate also identifies 3.35 million short tons of inferred resources under mineral control. Uncontrolled land (State of California Surface) contains approximately 22.36 million short tons of measured plus indicated resources and an inferred resource of 0.93 million short tons. The electrical transmission corridor contains 27.78 million short tons or 25% of the total mineral resources are contained within the electrical transmission corridor operated by SCE. While SCE maintains control of the surface and resources to a depth of 500 ft, it does not impinge on 5E’s mineral rights for B2O3 and Li which occur at depths greater than 1,000 ft.

It is noted that these numbers are different to previous reports, which are ascribed to the change in cut-off grade as detailed in Section 11.4 and Section 3.6 as well as an increase in mineral tenure. Regulation S-K 1300 requires a current economic assessment to be completed which provides a reasonable basis for establishing the prospects of economic extraction of the mineral resource estimation.

63

Resource Classification Tons
Product Tons - Measured
Product Tons - Indicated
Product Tons - Inferred
Measured
Indicated
Inferred
B2O3
H3BO3
LCE
B2O3
H3BO3
LCE
B2O3
H3BO3
LCE
Unpatented Lode
Claims
UMH 1.29 6.95 12.34 305.2 0.16
1,019,259
1,123,540
134,825
988,715
-
9,370
16,642
219
68,716
122,039
1,606
-
-
-
MMH 5.81 8.53 15.15 382.3 0.20
4,604,120
5,075,172
609,021
4,466,151
-
51,949
92,262
1,239
380,963
676,590
9,089
-
-
-
IMH 10.02 6.66 11.82 334.1 0.18
7,930,744
8,742,146
1,049,058
7,693,089
-
69,824
124,008 1,866
512,046
909,393
13,681
-
-
-
LMH 5.18 9.42 16.73 252.7 0.13
4,097,952
4,517,217
542,066
3,975,151
-
51,069
90,698
729
374,505
665,121
5,348
-
-
-
Sub-Total
17,652,074
19,458,075
2,334,969
17,123,106
-
182,213
323,610
4,053
1,336,229
2,373,143
29,724
-
-
-
Fee Land
UMH 2.96 6.60 11.72 250.6 0.13
5,239,482
5,775,538
1,443,885
4,216,143
115,511
95,296
169,246 1,926
278,265
494,199
5,624
7,624
13,540
154
MMH 15.25 8.23 14.62 323.0 0.17 26,950,960 29,708,340
7,427,085
21,687,088 594,167
611,249 1,085,578 12,770 1,784,847 3,169,889
37,289
48,900
86,846 1,022
IMH 6.09 7.24 12.85 349.4 0.19 10,770,455 11,872,391
2,968,098
8,666,845
237,448
214,781
381,451 5,520
627,160
1,113,837
16,119
17,182
30,516
442
LMH 8.11 8.63 15.33 222.9 0.12 14,330,824 15,797,025
3,949,256
11,531,828 315,941
340,831
605,316 4,686
995,227
1,767,523
13,682
27,266
48,425
375
Sub-Total
57,291,720
63,153,293
15,788,323
46,101,904
1,263,066
1,262,157
2,241,592
24,902
3,685,500
6,545,448
72,714
100,973
179,327
1,992
Power Corridor
UMH 2.57 5.91 10.50
2.7
0.00
2,094,642
2,308,947
415,611
1,731,711
161,626
24,563
43,623
6
102,344
181,763
25
9,552
16,965
2
MMH 22.06 7.83 13.91 277.0 0.15 17,965,945 19,804,059
3,564,731
14,853,044 1,386,284 279,118
495,714 5,256 1,162,993 2,065,476
21,900
108,546 192,778 2,044
IMH 4.40 5.09 9.04 279.0 0.15
3,580,525
3,946,852
710,433
2,960,139
276,280
36,168
64,234
1,055
150,699
267,642
4,396
14,065
24,980
410
LMH 4.25 7.83 13.90 250.0 0.13
3,461,337
3,815,470
686,785
2,861,603
267,083
53,754
95,466
914
223,973
397,776
3,808
20,904
37,126
355
Sub-Total
27,102,450
29,875,328
5,377,559
22,406,496
2,091,273
393,602
699,038
7,231
1,640,010
2,912,658
30,129
153,068
271,848
2,812
Total
102,046,244 112,486,697
23,500,851
85,631,507 3,354,339 1,837,973 3,264,240 36,186 6,661,739 11,831,248 132,567 254,040 451,175 4,804
CA Surface Section
36 (Uncontrolled)
UMH
4.78
6.99
12.41
313.2
0.17
3,788,533
4,176,141
167,046
3,842,050
167,046
11,676
20,737
279
268,559
476,961
6,406
11,676
20,737
279
MMH
14.02
6.76
12.01
376.0
0.20
11,109,308
12,245,912
489,836
11,266,239
489,836
33,113
58,809
980
761,598
1,352,598
22,549
33,113
58,809
980
IMH
4.88
3.66
6.50
340.3
0.18
3,869,439
4,265,325
170,613
3,924,099
170,613
6,243
11,088
309
143,590
255,016
7,109
6,243
11,088
309
LMH
2.98
6.18
10.98
465.9
0.25
2,358,930
2,600,274
104,011
2,392,252
104,011
6,431
11,422
258
147,921
262,708
5,933
6,431
11,422
258
Uncontrolled Total
21,126,210 23,287,653
931,506
21,424,641 931,506
57,464
102,056 1,826 1,321,669 2,347,283
41,996
57,464
102,056 1,826
* Denotes 2.0% cut-off
Tons
Tonnes

LCE
%
LI ppm
H3BO3
%
B203
%
Thick
(m)
Bed
Property

==> picture [129 x 9] intentionally omitted <==

----- Start of picture text -----

Figure 11.3: Resource classification
----- End of picture text -----

==> picture [520 x 629] intentionally omitted <==

11.6 Uncertainties

The QP is not aware of any known environmental, permitting, legal, title, taxation, socio-economic, marketing, or other relevant factors or uncertainties that could affect the mineral resource estimate.

The accuracy of resources and reserve estimates is, in part, a function of the quality and quantity of available data and of engineering and geological interpretation and judgment. Given the data available at the time this report was prepared, the estimates presented herein are considered reasonable. However, they should be accepted with the understanding that additional data and analysis available after the date of the estimates may necessitate revision. These revisions may be material. There is no guarantee that all or any part of the estimated resources or reserves will be recoverable.

11.7 Individual Grade for Each Commodity

Included with Section 11.5.

11.8 Disclose Required Future Work

Approximately 96% of the deposit is measured plus indicated resources. Though there is potential to expand the resource with step-out drilling, there are more than sufficient resources defined to focus efforts on development and production.

12 Mineral Reserve Estimates

A detailed mine plan was prepared in Section 13 in support of mineral reserves. The EPA UIC permit subdivides the mineralized deposit into three blocks for development. Block 1 comprises the northwestern third of the orebody, Block 2 occupies the central portion of the orebody, and Block 3 comprises the southeastern third of the orebody. The SSF currently operates in Block 2 and Block 2 is permitted for mining with sufficient resources on fee-based lands and within the power corridor to convert resources to reserves on an economic basis, which provides for 39.5 years of mining life. To convert additional resources to reserves, Block 1 and Block 3 would need to be authorized by the EPA and a mine plan devised that includes this mineral tenure.

For economic modeling, a mine plan (Section 10) was designed where recovery and flow rates are sufficient to feed the chemical plant (Section 14) where PLS is converted to a finished refined borate product available for sale. Production output is within permitted parameters with forecasted revenue from borate sales based on a pricing forecast based on a preliminary market study commissioned by 5E, as discussed in Section 16 of this report.

The mine plan and wellfield optimization were based on third-party engineering work that incorporated 18 months of actual wellfield data from the SSF into the design and includes a bottoms-up capital estimate. A capital estimate was derived by Fluor for the inside and outside battery limits above ground and a total capital estimate was derived and incorporated into the economic analysis. The operating costs were derived from material and energy balances provided by Fluor as well as a bottoms-up labor build for human capital requirements. The revenue and cost inputs for the economic model were on a real basis and the economic model yields an NPV of $725million.

12.1 Conversion Assumptions, Parameters, and Methods

All conversion assumptions such as plant efficiency, leaching efficiency, and mining efficiency were taken into consideration to calculate the reserve estimate.

The following steps and assumptions were used to calculate reserves:

  • Measured and indicated resource of fee-based land and the power corridor were included as the base resource.

  • The mine plan includes 80% of 5E’s fee-based lands and 5% of the power corridor.

  • Trade off analysis performed based on actual vertical well performance relative to expected horizontal well performance.

66

  • Fluor designed the above ground chemical plant with a 95.1% boric acid yield.

  • The leaching efficiency is 81.9% based on leach testing performed by 5E, Hazen, and MSME.

  • Mining efficiency is 95% based on the July 2025 horizontal well drill program.

  • Discounted cash flow based on capital and operating cost inputs.

Reserves are stated in-situ with a 2.0% cutoff grade established based on the analysis performed with mineral resources in Section 11. Cut-off was established using a long-term forecasted sales price of $1,350 per ton F.O.B. and a cash cost as detailed in Table 11.6 of $1,181 per short ton. The long-term price was obtained from a preliminary market study with the price of boric acid having increased, which has been driven by supply-demand fundamentals. B2O3 grade was captured from the measured and indicated grades of the fee-based land and power corridor.

12.2 Mineral Reserve Estimate

The mine plan considered measured and indicated resources with measured resources converted to proven reserves and indicated resources converted to probable reserves. The plan design results in 1.4 million tons of boric acid proven reserve and 4.0 million tons of boric acid probable reserve with an average grade of 8.03% boric oxide. The mineral reserve statement, as of August 4, 2025, for the Fort Cady Project is presented in Table 12.3. Table 12.1 provides the proven mineral reserves and Table 12.2 provides the probable mineral reserves. The reference point for the mineral reserves is in-situ.

Table 12.1: Proven mineral reserves

Proven Mineral Reserves Proven Mineral Reserves Proven Mineral Reserves Proven Mineral Reserves Proven Mineral Reserves Proven Mineral Reserves Proven Mineral Reserves Proven Mineral Reserves
Bed
Mean
Mineralized Bed
Thickness(ft)
Avg. B2O3
Grade
(wt. %)
Insoluble
Material
Grade(wt. %)
Mineralized
Bed Volume
(ft3)
Recoverable
Mineralized Bed
Volume(ft3)
B2O3
Reserve
Tons
H3BO3
Reserve
Tons
UMH 9.08 6.59 52.5 1,924,171 1,497,102 57,319 101,798
MMH
61.18
8.22
56.9
12,492,985
9,720,167
372,149
660,937
IMH 17.20 7.21 55.9 4,312,901 3,355,652 128,476 228,173
LMH
20.27
8.62
54.2
6,839,526
5,321,493
203,740
361,843

Table 12.2: Probable mineral reserves

Probable Mineral Reserves Probable Mineral Reserves Probable Mineral Reserves Probable Mineral Reserves Probable Mineral Reserves Probable Mineral Reserves Probable Mineral Reserves Probable Mineral Reserves
Bed
Mean
Mineralized Bed
Thickness(ft)
Avg. B2O3
Grade
(wt. %)
Insoluble
Material
Grade(wt. %)
Mineralized
Bed Volume
(ft3)
Recoverable
Mineralized Bed
Volume(ft3)
B2O3
Reserve
Tons
H3BO3
Reserve
Tons
UMH 9.08 6.58 52.5 5,656,611 4,401,126 168,503 299,261
MMH
61.18
8.21
56.9
36,911,677
28,719,130
1,099,550
1,952,800
IMH 17.20 7.20 55.9 12,649,669 9,842,075 376,817 669,227
LMH
20.27
8.62
54.2
20,054,643
15,603,515
597,401
1,060,984

Table 12.3: Mineral reserve statement

Proven and Probable Mineral Reserves Proven and Probable Mineral Reserves Proven and Probable Mineral Reserves Proven and Probable Mineral Reserves Proven and Probable Mineral Reserves
Reserve
Avg. B2O3
Grade(wt. %)
Insoluble
Material
Grade(wt. %)
Mineralized Bed
Volume(ft3)
Recoverable
Mineralized Bed
Volume(ft3)
B2O3
Reserve Tons
H3BO3
Reserve Tons
Proven
8.03
55.7
25,569,583
19,894,414 761,684 1,352,751
Probable
8.03
55.7
75,272,600
58,565,846
2,242,271
3,982,272

12.3 Relevant Factors

The reserve statement herein is subject to potential change based on changes to the forward-looking cost and revenue assumptions utilized in this TRS. It is assumed that 5E will produce and sell borates to customers once the LSBF is constructed, commissioned, and in operation. Full extraction of this reserve is dependent upon the modification of the UIC permit to include the finalized mine plan based on the learnings obtained from the Company’s horizontal wells. 5E

67

obtained a minor modification and authorization to drill the horizontal and sidetrack program in July 2025 and it is 5E’s expectation that it will be successful in modifying the UIC permit. In the QP’s opinion, 5E’s expectation is reasonable. The evaporation ponds incorporated into the design of the LSBF and placed on 5E’s fee-based land require a waste discharge permit (WDR) with the Lahontan Regional Water Quality Control Board. 5E had a WDR for evaporation ponds and 5E expects to obtain the WDR for the evaporation ponds to remove calcium and sodium. In the QP’s opinion, 5E’s expectation is reasonable.

The QP is not aware of other existing environmental, permitting, legal, socio-economic, marketing, political, or other factors that might materially affect the in-situ mineral reserve estimate. An increase to mineral reserves is possible as the current mine plan only captures approximately 41% of the resource. Additionally, an exploration target is available which, with further exploration work, could increase the resource and provide potential to increase the mineral reserves.

13 Mining Methods

Given the geological and stratigraphic suitability, the Project will be employing ISL as its mining method to recover borates from the mineralized horizons. Depth and grade of the deposit precludes conventional mining techniques such as open pit and underground mining as effective methods for economical extraction of ore. With ISL mining, there is no stripping of waste rock or underground development required for the Project. Mine development steps include drilling and constructing of injection/recovery wells (IR Wells), installing pumping or airlifting extraction equipment on wells, and piping to transport leach solutions to the wellfield and PLS to the chemical plant for processing. Mining fleet and machinery are not required for the Project.

The process designed by 5E and Fluor assumed an initial production rate of 130,000 stpa boric acid. This production rate should correspond to 880 – 900 gallons/min of PLS to the processing plant, assuming a head grade of 10.2% weight boric acid in the PLS (160°F), and 95.1% yield of boric acid in the processing plant. This translates to a minimum of 100 gpm production from at least nine wells during recovery phase of injection cycles when operating under the proven cyclic injection-residence-recovery well operation. Required well production capacity will be minimized when recovering from dedicated production wells outside of the cyclic cycle and/or during continuous mining operation of horizontal wells.

Based on the results of operating the SSF injection – recovery wells and preliminary work completed by 5E, the LSBF calls for the installation of 27 directional wells targeting the upper mineralized horizon (UMH), major mineralized horizon (MMH), and lower mineralized horizon (LMH) spaced at 200-ft horizontal offset and 120 – 180-ft vertical spacing. Operating strategy of the wells will focus on high-grade mineralization zone cavern development through continuous injection and cyclic push-pull mechanics. These wells are to operate as injection and recovery wells whereby injection and recovery of lixiviant through separate horizontal wellbores and full reservoir contact is accomplished by geo-steered laterals in a “fishbone” pattern and positively intercepting each well. The leach solution (lixiviant) is pumped into the well and, after a prescribed residence time, is retrieved from the same well, or offset wells as caverns develop, for processing. This method will be used until the dissolution of the colemanite in the deposit progresses to where complete reservoir flow is established between regional groups of wells.

13.1 Geotechnical and Hydrological Model Contribution to Mine Design

The mineralized body exists in four major evaporite sequences totaling approximately 108-ft thickness and comprised of interbedded layers of claystone, anhydrite, heulandite, biotite, quartz, and muscovite, inhibiting permeability. The Major Mineralized Horizon contains 40 – 60% colemanite in nearly continuous 50 – 60-ft thick intervals providing the basis for targeting for primary wells. Upper Mineralized Horizon (UMH) contains 30 – 50% colemanite in semi-continuous 15 – 20ft thick intervals interbedded with associated insoluble material providing the targeting basis secondary wells. Lower Mineralized Horizon (LMH) contains 40 – 60% colemanite in nearly-continuous 15 – 18-ft thick intervals. The Intermediate Mineralized Horizon (IMH) is in the target range with the MMH for wellfield development and mine planning.

68

Static geotechnical model and drilling programs indicate orebody deposition exists in stratigraphically continuous beds at an 8 – 10° NE – SW inclination. Regional water monitoring wells have indicated solution migration and pore pressure transmission along this inclination of the orebody from IR Wells via transducer response from monitoring wells. Microdeformation instrumentation has provided fluid migration via plume tracking of injected fluids to confirm orebody dip migration of lixiviant. Incorporating an operating strategy to utilize injection wells with the end of the well placed up-dip provides the opportunity to leverage the downward dip of the 8 – 10° inclination to ensure solvent flows downward through the orebody dissolving colemanite. Since production wells down-dip and the plan equips the bottom of wells with jet pumps to efficiently lift the PLS to surface, this operating strategy utilizes the natural 8 – 10° inclination and gravity to assist with recovery. This knowledge supports a mine plan for a 27-well network to manage cavity formation and maintain artificial lift when operating wells within each horizon.

Well planning of mineralized horizons and the sequence of the drilling program utilize directional drilling to target MMH/IMH in a primary set of IR Wells in 90 – 92° trajectory drilled along the strike of orebody, perpendicular to the 8 – 10° structural dip/inclination. The horizontal well’s extended reach along the strike enables multiple injection/production points via perforated intervals and slotted liners promoting uniform dissolution of colemanite and ensures effective leaching across a wider area than vertical well patterns. Gravity driven flow of the solvent from up-dip wells to dedicated production wells at lower elevations de-risks fluid injection leak off concerns and higher probability of fluid capture, which is necessary for maintaining hydraulic gradient per the EPA UIC permit.

Vertical production wells have indicated that wellbore collapse due to collapsing clay will not occur if the operating strategy is followed. Reservoir re-charge to wellbore is greater than geo-mechanical collapse stress and is evident during recovery phase of production cycles. Pilot horizontal wells will run geophysical logging tools to quantify degree of geomechanical collapse stresses and jet pump deployment will confirm quantification. Given the estimated degree of geomechanical stability within the mineralized zones, directional and horizontal wellbores become feasible as tools of scaling to increase contact area by a factor of 20X with a 3,450-ft lateral well and permeability driven sustainable injection rates of +100 gpm.

13.2 Artificial Lift

Current recovery method at the SSF wellfield is airlifting solution using compressed air injected into production tubing to force fluids up the backside annulus of the well between 7-in casing and production tubing. Average recovery rates are approximately 15 – 20 gpm and heavily rely on reservoir pressure to maintain higher recovery rates. The LSBF design includes installation of jet pump systems due to proven designs with artificial lift in oil and gas fields and ability to recover higher rates of PLS needed for commercial plant design.

Hydraulic jet pumps are planned as the primary means of PLS recovery from the orebody when reservoir pressure has not been maintained for adequate recovery rates between a network of communicating wells within a target horizon. Each dual use IR Well and dedicated production well will contain a jet pump BHA (bottom-hole assembly) constructed of corrosion resistant alloy (CRA) and the possible addition of corrosion inhibitor to ensure adequate production rates of PLS. Jet pumps have no moving parts and operate using a high-pressure fluid to create a Venturi effect, drawing reservoir fluids into the pump and lifting to the surface.

Each jet pump will consist of a nozzle, throat, and diffuser. High-pressure power fluid is pumped from the surface through the nozzle, creating a high velocity, low-pressure jet which draws in corrosive reservoir PLS from the wellbore and mining region in the absence of reservoir pressure. The mixed fluids (power fluid + PLS) pass through the diffuser where kinetic energy is converted back to pressure, enabling the fluid to be lifted to surface. The absence of moving parts reduces the need for maintenance and the ability of the jet pumps to tolerate solids without significant wear. The diagram in Figure 13.1 below provides the assembly structure of the jet pump.

Typical jet pump systems in oil and gas applications are frequently used to produce residual acid with minimal erosion and corrosion to conventional steel designs. 5E anticipates near-term deployment of a conventional jet pump to prove out required recovery rates of leachate. Deployment of exotic alloy jet pump expected in Q4 2025 to acquire data on possible further optimization of wellfield strategy.

69

Figure 13.1: jet pump assembly

==> picture [258 x 234] intentionally omitted <==

13.3 Wellfield Operating Strategy

The wellfield will be operating under an artificially induced reservoir pressure environment with the main objective of maintaining a high enough productivity index while remaining below the established fracture gradient. Maintenance of reservoir pressure will be key to achieving adequate recovery rates of PLS from each targeted horizon, particularly for offset wells within direct communication where displacement of reacted HCl will need to be recovered at surface. The network of 27 jet pumps will be key to maintaining the ability of the orebody to deliver fluids to the wellbore by recovering fluid during production phase and circulation of unspent or reacted HCl during injection phase.

In addition to recovery rate of fluids, the installation of a jet pump network provides the ability to maintain a high temperature power fluid to the reservoir fluid and maintain a critical temperature needed for boric acid to remain in solution. Installation of the centralized surface facility (CSF) will supply high-pressure power fluid to multiple jet pumps across the 27 well network, recovering and circulating fluid as needed. After lifting at-grade PLS to surface, the power fluid and produced fluid are separated at surface with PLS directed towards plant and lower concentration PLS recycled and directed towards the next group of wells undergoing recovery operations.

Dissolution kinetics of the rate at which colemanite dissolves and boron is extracted assumes that the solid colemanite particle reacts with HCl, and the reaction front moves inward as mineralized particles dissolve. Geo-steered wells adjust the wellbore path using measurement while drilling (MWD) and logging while drilling (LWD) technology to ensure the well stays within target horizon. The rate of dissolution is mainly controlled by film diffusion of HCl through the liquid boundary layer, underground surface reaction between HCl and colemanite, and diffusion of reaction products through a porous layer of undissolved precipitates. To progressively leach the orebody in required amounts, greater volumes of fluid will need to be injected to replace previously leached volume and contact new colemanite. The underground surface chemical reaction is the rate-controlling step because the reaction at the colemanite surface is slower than the diffusion of HCl to the mineralized particle or removal of products, thus resource temperature needs to be maintained at dissolution levels to produce required head grades. Table 13.1 below provides the parameters for which the wellfield operating strategy will be deployed, and Figure 13.2 provides the first-year production rates per cycle.

70

Table 13.1: Wellfield operating strategy mining parameters

Well Group Unit MMH UMH LMH IMH
Geologic Unit horizon
Major
Upper Lower Intermediate
Colemanite Reserve tons 3,270,047 501,765 1,780,099 1,122,736
MMH Reserve, H3BO3 tons 2,613,737.67 401,058.83 1,422,827.36 897,399.29
No. of Wells each 9.00 9.00 9.00 * accounted in
MMH
Open-Hole, Open-Hole, Open-Hole, Open-Hole,
Well Completion type limited entry
perforated tubing,

limited entry
perforated tubing,

limited entry
perforated tubing,

limited entry
perforated tubing,
liner hanger liner hanger liner hanger liner hanger
Avg Length ft 3,450 3,450 3,450 3,450
Avg Thickness ft 61.18 9.08 20.27 17.20
Group Injection Rate gpm 1,125 1,170 1,350 1,125
Group Production Rate gpm 1,125 1,170 1,350 1,125
H3BO3tons per year (TPY) tons 43,333 43,333 43,333 *
Colemanite Mass Leached,
TPY
tons 74,377 77,352 89,252 *
Horizon Life years 43.97 6.49 19.94 *
Mining Efficiency % 95.0 95.0 95.0 *
Leaching Efficiency % 81.9 81.9 81.9 *
Plant Efficiency % 95.1 95.1 95.1 *
Dedicated Injection Wells each 1.0 - - *
Dedicated Production Wells each 1.0 - - *
Dual Injection/Recovery Wells
each
7.00 9.00 9.00 *

*Accounted for in MMH

Figure 13.2: Year 1 production rates per cycle

Production Rate per Cycle - Singular Directional Well - Year One

==> picture [498 x 157] intentionally omitted <==

----- Start of picture text -----

400,000 160
350,000 140
300,000 120
250,000 100
200,000 80
150,000 60
100,000 40
50,000 20
0 0
0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 62 64 66 68
Cycle No.
Recovery Volume Cycle Time
Cycle Time, hrs
Cycle Production Volume, gals
----- End of picture text -----

The mine plan utilizes in-situ leaching operations via lixiviant solutions to mine the colemanite resource in place without physically removing large volumes of ore or overburden. The process relies on the natural and enhanced permeability of the deposit to allow leaching solution to flow through and dissolve targeted mineralization. Solution mining accesses the colemanite deposit through wells drilled into the orebody, where leaching solution is then injected directly into the mineralized zone. The colemanite mineral’s moderate solubility combined with its geological and stratigraphic suitability allows leaching solutions to extract boron without stripping the surface or backfilling voids from underground development.

Mine recovery rate (leaching efficiency) of 81.9% is applied to account for losses for leaching solution not reaching and reacting with the ore body, as well as for non-recoverable saturated solution underground. This is based on studies conducted by 5E, Hazen, and MSME. Leaching efficiency requires lixiviant to contact colemanite, therefore an additional “mining efficiency” factor for fluid to contact colemanite probability has been introduced to account for reduction

71

anomalies due to wellbore traversing in lower grade zones or discontinuous colemanite beds along horizontal well paths. The mining efficiency factor is based on drilling experience during a 3000-ft horizontal well and sidetrack program deployed in July 2025 which tested drill cuttings using ICP-OES and confirmed approximately 95% of the wellbore was in the planned zone. Table 13.2 below provides the ICP-OES results from the horizontal well program.

Table 13.2: Horizontal Table 13.2: Horizontal Table 13.2: Horizontal Table 13.2: Horizontal well program ICP-OES results (July well program ICP-OES results (July well program ICP-OES results (July well program ICP-OES results (July well program ICP-OES results (July 7, 2025) 7, 2025)
Test Depth Al As B B Ca Fe K Li Mn S Si Ti Zn
Sample ID
(md ft)
Date Test Date (ppm) (ppm) (ppm) (wt. %) (ppm) (ppm) (ppm) **(ppm) ** Mg (ppm) **(ppm) ** Na(ppm) (ppm) **(ppm) ** Sr(ppm) (ppm) (ppm)
7092563 1090-1100 7/7/2025
7/17/2025

1,429
49 261 0.1% 125,607 2,233 6,279 - 1,896 590 4,802 >38,702 2,485 6,210 21 -
7092562 1190-1200 7/7/2025 7/17/2025
954
133 370 0.2% 101,618 2,752 6,026 - 1,795 347 9,440 >43,670 1,462 6,224 - -
7092561 1220-1230 7/7/2025
7/17/2025

1,073
96 451 0.3% 100,893 1,852 7,782 - 2,058 272 6,911 >42,540 1,478 8,714 - -
7092560 1230-1240 7/7/2025 7/17/2025 1,179 192 567 0.3% 113,484 3,433 7,240 - 2,002 332 8,914 >42,951 1,515 3,806 - -
7092559 1240-1250 7/7/2025
7/17/2025

2,308
67 602 0.3% 45,406 2,611 10,940 - 2,146 186 13,398 >27,689 1,554 7,538 - -
7092558 1250-1260 7/7/2025 7/17/2025 1,206 111 603 0.3% 99,541 3,605 9,300 - 2,056 474 6,951 >41,829 1,191 2,783 - -
7092557 1260-1270 7/7/2025
7/17/2025

1,419
123 774 0.4% 135,328 3,629 9,211 - 1,710 446 7,660 >43,335 1,271 4,382 - -
7092556 1270-1280 7/7/2025 7/17/2025 1,572 123 1,040 0.6% 116,244 3,276 8,530 - 1,683 425 8,870 >43,810 1,147 2,761 - -
7092555 1280-1290 7/7/2025
7/17/2025

1,646
88 390 0.2% 82,825 2,059 11,775 - 1,868 277 7,276 >44,076 1,514 3,686 - -
7092554 1290-1300 7/7/2025 7/17/2025 1,325 84 600 0.3% 103,330 2,181 4,191 - 1,713 303 4,821 >43,003 1,679 4,099 - -
7092553 1370-1380 7/7/2025
7/17/2025

1,380
125 810 0.5% 113,453 2,612 9,955 - 2,714 300 9,277 >42,004 - 12,491 - -
7092552 1380-1390 7/7/2025 7/17/2025
913
202 822 0.5% 156,475 2,809 8,358 - 2,303 334 6,742 >42,702 1,288 13,441 - -
7092551 1390-1400 7/7/2025
7/17/2025

1,565
323 1,205 0.7% 128,577 4,084 8,446 - 2,608 296 9,043 >42,849 1,397 11,787 - -
7092550 1400-1410 7/7/2025 7/17/2025
838
206 10,478 6.0% 175,003 2,289 8,333 - 1,996 306 5,845 >44,070 1,292 13,966 - -
7092549 1410-1420 7/7/2025
7/17/2025

1,041
162 9,456 5.4% 147,142 2,307 7,282 - 2,652 280 7,079 >43,938 1,572 4,219 - -
7092548 1420-1430 7/7/2025 7/17/2025 1,289 169 7,031 4.0% 123,375 3,127 8,459 - 2,642 277 7,845 >44,396 1,564 7,765 - -
7092547 1430-1440 7/7/2025
7/17/2025

1,198
116 5,288 3.0% 173,385 1,858 7,458 - 2,691 287 7,329 >43,984 1,410 10,056 - -
7092546 1440-1450 7/7/2025 7/17/2025
781
115 11,449 6.5% 157,714 1,256 6,834 - 1,983 263 6,230 >42,023 1,080 8,933 - -
7092545 1530-1540 7/7/2025
7/15/2025

649
141 16,792 9.6% 192,185 1,343 5,246 - 1,398 183 405 >52,789 1,079 17,493 - -
7092544 1550-1560 7/7/2025 7/15/2025 1,378 163 7,387 4.2% 176,049 2,547 7,565 - 1,725 194 1,957 >52,386 1,599 10,261 - 220
7092543 1580-1590 7/7/2025
7/15/2025

813
74 17,522 10.0% >206,819 1,248 2,417 - 947 193 377 >51,705 1,331 10,044 - 163
7092542 1690-1700 7/7/2025 7/15/2025
493
133 7,901 4.5% >197,773 2,106 3,969 - 1,332 160 2,966 >49,443 1,617 14,302 - 167
7092541 1780-1800 7/7/2025
7/15/2025

-
87 4,274 2.4% 201,932 1,936 4,191 - 1,054 212 866 >54,254 1,379 13,362 - 230
7092540 1800-1820 7/7/2025 7/15/2025
401
166 10,417 6.0% >206,458 2,923 4,377 - 1,486 455 1,700 >51,615 1,727 18,578 - 156
7092539 1820-1840 7/7/2025
7/14/2025

292
197 35,684 20.4% >167,183 2,618 6,990 - 1,501 273 4,580 >41,796 1,529 17,113 - -
7092538 1840-1860 7/7/2025 7/14/2025
310
189 35,610 20.4% >153,839 2,720 6,670 - 1,476 265 4,458 >38,460 1,416 17,058 - -
7092537 1860-1880 7/7/2025
7/14/2025

718
141 42,442 24.3% >159,921 3,284 6,309 - 1,427 210 2,841 >39,980 1,219 14,588 - -
7092536 1880-1900 7/7/2025 7/14/2025
605
126 23,761 13.6% >167,104 2,202 6,204 - 1,328 221 2,285 >41,776 1,035 15,672 - -
7092535 1900-1920 7/7/2025
7/14/2025

582
132 29,091 16.6% >17,895 2,140 6,331 - 1,355 266 2,968 >44,724 1,401 18,983 - -
7092534 1920-1940 7/7/2025 7/14/2025
997
171 19,077 10.9% 133,397 2,811 11,536 - 1,737 196 2,653 >43,156 1,209 15,413 - -
7092533 1940-1960 7/7/2025
7/9/2025
- 192 33,517 19.2% >155,231 1,875 6,611 90 1,074 145 1,347 >38,808 1,075 15,226 82 -
7092532 1960-1980 7/7/2025 7/9/2025 63 222 49,058 28.0% >155,569 2,222 6,539 91 1,013 105 1,056 >38,892 656 13,455 80 -
7092531 1980-2000 7/7/2025
7/9/2025
304 379 10,202 5.8% >138,112 1,909 8,576 91 1,429 128 1,505 >34,528 4,611 8,094 75 -
7092530 2000-2020 7/7/2025 7/9/2025 157 155 19,179 11.0% >137,156 1,691 8,113 87 1,409 94 1,937 >34,289 811 7,930 69 -
7092529 2020-2040 7/7/2025
7/9/2025
277 176 17,087 9.8% >141,,037
2,278
11,755 104 1,667 61 3,343 >39,921 1,158 10,534 86 -
7092528 2040-2060 7/7/2025 7/9/2025 - 163 43,631 24.9% >161,324 1,237 6,670 89 988 85 1,989 >40,331 912 15,596 79 -
7092527 2060-2080 7/7/2025
7/9/2025
75 191 16,692 9.5% >156,423 2,009 9,584 88 1,246 139 2,552 >39,106 1,028 11,085 81 -
7092526 2100-2120 7/7/2025 7/9/2025 - 158 16,692 9.5% >155,883 1,353 6,995 93 1,215 97 2,268 >38,971 1,010 12,078 77 -
7092525 2180-2200 7/7/2025
7/9/2025
- 122 16,918 9.7% >157,460 830 2,519 75 762 48 - >39,365 727 8,635 76 -
7092524 2220-2240 7/7/2025 7/9/2025 - 141 27,287 15.6% >158,720 1,072 2,392 82 752 37 248 >39,680 1,074 10,737 83 -
7092523 2280-2300 7/7/2025
7/9/2025
- 148 12,674 7.2% >146,014 1,202 3,586 74 984 77 490 >36,503 1,169 9,618 74 -
7092522 2380-2400 7/7/2025 7/9/2025 - 146 9,210 5.3% >165,228 1,104 2,160 86 918 101 1,445 >41,307 1,150 10,993 84 -
7092521 2548 7/7/2025
7/9/2025
- 165 7,976 4.6% >159,690 1,228 2,233 86 882 122 382 >39,922 961 11,579 81 -
7092520 2580-2600 7/7/2025 7/9/2025 37 238 2,696 1.5% >171,634 2,321 5,803 108 1,431 144 1,445 >42,908 900 8,782 88 -
7092519 2600-2620 7/7/2025
7/9/2025
- 206 7,440 4.3% >161,274 2,003 4,912 105 1,346 101 1,616 >40,319 1,176 11,114 87 -
7092518 2640-2660 7/7/2025 7/9/2025 212 172 12,033 6.9% >144,798 1,945 8,102 108 1,484 87 2,426 >36,199 1,408 13,307 82 -
7092517 2680-2700 7/7/2025
7/9/2025
47 160 14,388 8.2% >149,230 1,391 5,160 98 1,162 52 1,518 >37,308 1,386 13,046 80 -
7092516 2780-2800 7/7/2025 7/9/2025 108 157 6,899 3.9% >159,966 1,523 4,711 100 1,259 103 924 >39,991 1,257 10,514 90 -
7092515 2880-2900 7/7/2025
7/9/2025
77 201 6,021 3.4% >156,296 2,067 4,207 89 1,117 130 1,020 >39,074 1,288 12,675 80 -
7092514 2980-3000 7/7/2025 7/9/2025 131 162 4,054 2.3% >162,181 1,688 5,649 94 941 80 1,374 >40,543 1,276 10,815 82 -
7092513 3022 7/7/2025
7/9/2025
122 146 35,828 20.5% >140,990 1,222 3,236 82 810 65 1,043 >35,247 1,431 10,926 70 -

The EPA UIC permit subdivides the mineralized deposit into three blocks for development. Block 1 comprises the northwestern third of the orebody, Block 2 occupies the central portion of the orebody, and Block 3 comprises the southeastern third of the orebody. The SSF currently operates in Block 2 and Figure 13.3 presents the commercial mine plan of the 27 wells in Block 2. Figure 13.4 provides an example of the cross section in Block 2 and the MMH wells with vertical spacing while Figure 13.5 provides an example of the cross section in Block 2 and the MMH wells with lateral spacing. To permit mining of Block 1 and Block 3, the EPA UIC permits will require additional monitoring wells to be installed and baseline parameters to be established via sampling and laboratory testing. Block 2 has established enough resources and reserves for the first phase of mining.

72

Figure 13.3: LSBF block 2 mine plan

==> picture [491 x 292] intentionally omitted <==

Figure 13.4: Block 2 mining cross section – MMH wells vertical spacing

==> picture [491 x 258] intentionally omitted <==

73

Figure 13.5: Block 2 mining cross section – MMH wells lateral spacing

==> picture [491 x 254] intentionally omitted <==

Drilling and construction of the 27 wells for the LSBF wellfield requires a precision super single automated drilling rig operating by a 5-man crew with 24 hour per day and seven days a week (24/7) operations. Additional personnel require a dedicated tool-pusher and drill site manager on-site 24/7 while the rig deploys a rotary steerable directional drilling method. During the program, the commercial production wells will actively be adjusted or geo-steered based on logging during drilling operations.

Given the progressive nature of cavern development and injection fluid recharge and re-injection, cavern voids are expected to remain fluid-filled thus limiting subsidence risks at surface. Existing Micro-deformation instrumentation monitors the surface for subsidence and indicates cyclical net balance of subsidence and heave, and results are displayed in Figure 13.6 below. The injection interval is isolated to colemanite bearing orebody with overburden geological layers providing a bridge to reduce subsidence effects. Micro-deformation instrumentation will continue to monitor orebody throughout life of mine.

Figure 13.6: Micro-deformation results

==> picture [467 x 164] intentionally omitted <==

----- Start of picture text -----

5E Monthly Deformation (Inch)
0.15
0.1
0.05
0
-0.05
-0.1
Mar-25 Apr-25 May-25 Jun-25
Min Movement (Inch) Max Movement (Inch)
----- End of picture text -----

74

14 Processing and Recovery Methods

This section outlines the processing facilities established in the final stage of the 2025 Prefeasibility Study for the LargeScale Borate Facility Project (LSBF). It encompasses all processing operations, from the delivery of PLS from the mine wells to the production of boric acid and associated byproducts.

14.1 Processing Summary

During the Front-End Loading Phase 2 (FEL-2), 5E successfully executed an extensive program of mineral processing and metallurgical testing, as detailed in Section 10. Building on these results, the company has selected a proven, crystallization-based process for boric acid extraction. This method has been validated through both laboratory-scale experiments and the operational success of the SSF, illustrated in Figure 14.1.

Figure 14.1: Small-Scale Facility

==> picture [491 x 277] intentionally omitted <==

The SSF has consistently produced boric acid that meets or exceeds customer quality specifications. Operational insights, performance data, and key learnings from the SSBF have been integrated into the design of the forthcoming Large-Scale Borate Facility.

A high-level overview of the selected process, along with a simplified block flow diagram (Figure 14.2), is presented below. Additional technical details are available in Section 14.3 and the Process & Utility Description document (5EAMG1-RPT-225-00003).

75

==> picture [300 x 701] intentionally omitted <==

  • Solution Mining and Injection: Target minerals are dissolved in situ using solution mining techniques utilizing heat and steam. The resulting PLS is transported via pipeline infrastructure to the surface processing facilities.

  • PLS Recovery and Clarification: The PLS undergoes pH adjustment through lime addition, which reduces acidity and enables the use of more cost-effective materials of construction. A multi-stage solid-liquid separation process, including filtration, removes precipitated solids, yielding a clarified solution ready for downstream processing.

  • Boric Acid Circuit: This core section of the process is dedicated to the concentration, extraction, and purification of boric acid. A two-stage vacuum chilled crystallization system initiates the precipitation of boric acid, followed by filtration, washing, and redissolution. A second two-stage recrystallization step ensures high-purity product formation. Final dewatering is achieved via centrifugation, and the wet crystals are dried in a rotary dryer, cooled, and packaged. A portion of the centrate is directed to the Impurity Removal Circuit and the remainder is sent to the Gypsum circuit.

  • Impurity Removal Circuit and Evaporation: In the Impurity Removal stage, magnesium hydroxide [Mg(OH)�] and other impurities are removed from the process stream through a reaction with hydrated lime. This reaction causes the impurities to precipitate, allowing them to be separated via filtration. The resulting filtrate slurry then enters the Evaporation Circuit, where mechanical evaporation and evaporation ponds concentrate solution. During this process, sodium chloride is precipitated and removed as waste. The concentrated brine, now enriched with calcium chloride, is either directed to truck loading for sale as a byproduct or sent to the Gypsum Circuit for further processing.

  • Gypsum Circuit: Here, the Calcium Chloride rich brine reacts with sulfuric acid to precipitate gypsum, which is then filtered and refined to be sold as a byproduct. This circuit also facilitates the regeneration of hydrochloric acid, which is recycled back to the wellfield for reuse in the mining process.

14.2 Process Design Criteria / Usages

The LSBF’s engineering and design framework is guided by the specifications detailed in the Process Design Criteria document (5EAM-G1-DBD-225-00001), with summary of the most critical process parameters, assumptions, and usages reflected in Table 14.1 below:

Table 14.1 LSBF design criteria

Design Criteria/ Usages – Process Summary
Parameter
Units
Value (Gypsum
only)
Value (CaCl2
and Gypsum)
Comments
Feed Rate
st/hr
25.6
25.6
Operating Days per Year
days/yr
365
365
Operating Factor
%
91
91
Plant Operating Hours
hr/yr
8,000
8,000
Boron Recovery
%
95.1
95.1
Boric Acid Production Rate
st/hr
16.25
16.25
Boric Acid Design Production
stpy
130,000
130,000
Gypsum Production
stpy
162,000
129,000
Dry Basis
Calcium Chloride Production
stpy
0
57,000
~57,000 @ 40% weight CaCl2solution,
equivalent to 60,000 @38%
Water Consumption
gpm
237
237
Make up from wells
Hydrochloric Acid
lbs/st Boric Acid
291
510
100% basis
Sulfuric Acid
lbs/st Boric Acid
1,451
1,157
100% basis
Lime
lbs/st Boric Acid
423
423
100% basis
Natural Gas
MMBTU/st
7
7
Electricity
kW/st
1,000
1,000
Employees
people
110
110
80 operators and 30 overhead

14.2.1 Basis for Boric Acid (BA) Head Grade

As stated in Section 11.1 Key Assumptions, it is the opinion of the QP for Section 13 that 5E may achieve a boric acid head grade of 10.2% weight in the PLS at 160°F, with 12% head grade being the maximum potentially achieved at 212°F for PLS recovery. The drivers assume to achieve this rate are two-fold: (1) injectate solution can be heated above ground at a temperature above 200°F with PLS solution leaving the formation at 160°F, or (2) the formation can be heated via dedicated steam injection such that PLS solution exits the formation at 160°F. Other drivers that have been proven include: (1) recycled boron remains in solution during mining, (2) boron solubility curves follow calcium curves as demonstrated by work performed by MSME in the 1980’s, and (3) 5E’s extracted PLS aligns with the solubility curves versus temperature. See Kemetco solubility curve in Section 10.

14.3 Work Breakdown Structure and Plant Layout

To support the execution and management of the LSBF project, the processing facilities have been organized using a structure Work Breakdown Structure (WBS). This framework provides a clear, hierarchical representation of the project scope, enabling effective planning, coordination, and control throughout the project lifecycle. Table 14.2 presents the processing facilities by WBS, while the plant layout is illustrated in Figure 14.3 and Figure 14.4. This WBS divides the LSBF into five primary geographic areas, each representing a distinct portion of the processing infrastructure. Two additional areas are included for cost accounting purposes. During FEL-2, the project scope was defined to the Level 2 WBS, providing sufficient detail for pre-feasibility level planning and reporting. Further refinement to Levels 3 and 4 will be completed during FEL-3 and the detailed design phase.

This structured approach ensures that each component of the processing facilities is clearly defined and traceable, supporting efficient execution and alignment with overall project objectives.

Table 14.2 LSBF WBS processing facilities

FEL-2 (DEFINITION LVL) FEL-2 (DEFINITION LVL) FEL-3/EXECUTION DESCRIPTION
AREA AREA AREA
LEVEL 1 LEVEL 2 LEVEL 3
PLANT AREA UNIT TYPE CWA – DRAFT
“N” “N#” “N###”
G General
G100000 GENERAL
S Site and Infrastructure
S100000 Site Preparation
S101000 Site Preparation
S102000 Mass Earthworks
S103000 Site Drainage
S104000 Sediment Handling
S105000 Site Finish Grading
S106000 Topsoil/Overburden Storage
S200000 Plant Roads
S201000 Plant Site Roads
S202000 Parking
S203000 Access Roads
B Buildings/Ancillary Facilities
B100000 Buildings
B101000 Administration Buildings (by 5E)
B102000 Guard House/Security Buildings/Gate House
B103000 Truck Weigh Scale
B104000 Central Control Room
B105000 Warehouses
B106000 Process Controls Lab
B107000 Maintenance Building
P Hydrometallurgical Processing Facility
P100000 Solution Mining and Injection
P101000 Mining Acid Make-up
P102000 Reserved for Owner
P200000 PLS Recovery and Clarification
P201000 Mine FEED Storage and Return

78

FEL-2 (DEFINITION LVL) FEL-3/EXECUTION DESCRIPTION
P202000 PLS Solid/Liquid Separation
P203000 PLS Tailings Filtration
P204000 Tailings Handling and Storage
P300000 Boric Acid Circuit
P301000 Boric Acid Crystallization
P302000 Boric Acid Filtration and Washing
P303000 Boric Acid Recrystallization and Dissolution
P304000 Boric Acid Drying
P305000 Boric Acid Product Packing and Loadout System
P306000 Boric Acid Building
P307000 Brine Storage and Distribution
P400000 Impurity Removal Circuit
P401000 Impurity Precipitation/Concentration
P402000 Impurity Filtration
P403000 Impurity Handling and Storage
P500000 Evaporation Circuit
P501000 Brince Concentration
P600000 Gypsum Circuit
P601000 Gypsum Precipitation/Concentration
P602000 Gypsum Filtration
P603000 Gypsum Refining
P604000 Gypsum Drying
P605000 Gypsum Product Packing and Truck Loadout System(s)
P606000 Gypsum Plant Building
P700000 Reagents
P701000 Lime System
P702000 Hydrochloric Acid System
P703000 Sulfuric Acid System
P704000 Sodium Hydroxide System
P705000 Miscellaneous Reagent Systems
P800000 Evaporation Ponds
U Utilities and Offsite (U&O)
U100000 Plant Utilities (Above/Underground)
U100000 Utilities General
U101000 Natural Gas
U102000 Process Water Storage and Supply
U103000 Gland Water Storage and Supply
U104000 Potable Water Storage and Supply
U105000 Reverse Osmosis Water Storage and Supply
U106000 Firewater/Raw Water Storage and Supply
U107000 Fire Protection System
U108000 Cooling Water
U109000 Chilled Water
U110000 Demin Water
U111000 Steam and Condensate Systems
U112000 Storm Water System
U113000 Compressed Air
U114000 Instrument Air
U115000 Lube Oil/Hydraulic
U116000 Oily Water Treatment
U117000 Environmental Monitoring
U118000 Utility Shelters
U119000 Sanitary Sewer
U200000 Interconnecting Systems
U201000 Piperack
U202000 Piperack (Placeholder)
U203000 Piperack (Placeholder)
U203000 Piperack Utilities
U300000 Power Supply and Distribution
U301000 Plant Site Power Distribution
U302000 Plant Site Grounding
U303000 Main Sub-Station E-House
U304000 E-House 1
U305000 E-House 2
U400000 Communications

79

FEL-2 (DEFINITION LVL) FEL-3/EXECUTION DESCRIPTION
U401000 Plant Control Systems
U402000 Fire Detection System
U403000 Security System
U404000 Process Monitoring System (CCTV)
U405000 Telephone System
U406000 Fiber Optics/Networks
U407000 Satellite Connection
U408000 Radio Communication
U500000 Offsites
U600000 Cogen Facility

80

==> picture [474 x 714] intentionally omitted <==

==> picture [464 x 700] intentionally omitted <==

14.4 Description of Processing Facilities

The processing facility at the LSBF is engineered to support high-efficiency, high-throughput extraction and refinement of boric acid and associated byproducts from the PLS. This section provides a more detailed overview of each major processing area, highlighting the unit operations, equipment, and supporting systems that collectively enable the transformation of raw leached solution into finished, market-ready products. The design integrates industry best practices and leverages proven technologies validated through extensive test work and the successful operation of the SSF.

At the core of the LSBF is the Hydrometallurgical Processing Area, which encompasses all major processing functions. The following subsections describe this area. For a comprehensive breakdown of the facility scope, refer to the Scope of Facilities document 5EAM-G1-RPT-201-00003.

  • Solution Mining and Injection: This unit area utilizes in-situ mining techniques to dissolve target minerals underground. The resulting PLS is then transferred for further processing via pipelines to the Hydrometallurgical Processing area.

  • PLS Recovery and Clarification: In this unit, PLS undergoes a pH adjustment and a multi-stage solid-liquid separation process. Lime is added to increase the pH, reducing the solution's acidity before it enters the Crystallization Circuit. This adjustment allows for better material of construction selection for downstream equipment. Filtration units then remove the precipitated solids, resulting in clarified PLS for the next stages and dewatered tailings. Dedicated storage tanks (PLS Storage) ensure a constant flow of clarified PLS to subsequent stages.

  • In addition to the above, this area contains the mine feed and regenerated acid return scope (i.e., storage and pipe headers).

  • Boric Acid Circuit: This critical sub-area focuses on boric acid concentration, extraction, and purification and employs the following unit operations:

  • Crystallization: A two-stage vacuum cooled crystallization system is employed to precipitate the primary boric acid. This is followed by a filtration and washing operation using a belt filter. The boric acid crystals are then redissolved and recrystallized through another two-stage vacuum cooled crystallization system to achieve high-purity boric acid. The product is dewatered via centrifugation to a moisture content suitable for drying.

  • Boric Acid Drying/Cooling: Wet boric acid crystals from the filtering/washing centrifuge stage will undergo a rotary drying process to remove residual moisture. After the drying operation, the crystals will be cooled prior to being sent to the packaging and loadout system.

  • Boric Acid Product Packing & Loadout System: This system facilitates the packaging of dried boric acid crystals into appropriate containers for shipment and sale.

  • Boric Acid Building: This building encompasses the equipment and machinery required for the boric acid packaging and loadout area to remove risks of product contamination from external moisture, dust etc.

  • Brine Storage and Distribution: Concentrated brine from the boric acid extraction process is stored and distributed from this area.

  • Impurity Removal Circuit: This circuit aims to precipitate and remove bulk impurities from the boric acid filtrate/centrate, which is disposed of as a waste material.

  • The circuit includes equipment to precipitate impurities through reagent addition. This process is carried out in two separate steps, each involving filtration equipment to separate the precipitated material from the solution. Impurities will be disposed of as waste via a manual handling process performed by 5E.

  • Evaporation Circuit: This circuit focuses on further concentrating the received brine solution to reduce the evaporation pond area necessary to promote precipitation of sodium in the form of sodium chloride as a waste material.

  • Brine concentration: Includes an Evaporation system (i.e., Evaporator and Heat Exchangers) to concentrate the brine solution, thus minimizing the downstream evaporation pond area needed to precipitate and remove solid sodium chloride before proceeding to the Gypsum Circuit.

  • Evaporation Ponds: Following the Evaporation Circuit, the brine stream undergoes further concentration through a dedicated evaporation pond system. This system comprises six sequential ponds designed to extract sodium chloride (NaCl) from a calcium chlorid��������� rich brine. The process begins in Buffer-1, which manages seasonal fluctuations by storing brine during cooler months and releasing it during warmer periods. The brine then passes through four main evaporation ponds (P-2 to P-5), where water evaporates and NaCl precipitates. The final stage occurs in the reservoir pond, which holds the remaining brine and ensures a consistent, yearround feed to the downstream processing plant.

In total, the pond system spans approximately 37 acres, with around 33.5 acres actively engaged in brine processing. Once the brine is sufficiently concentrated, the resulting calcium chloride stream is directed either to the Gypsum Circuit for further treatment or to a truck load-out facility for sale as a byproduct.

  • Gypsum Circuit: This section addresses two key objectives:

  • Gypsum precipitation and removal: Includes reaction equipment (CSTR) to precipitate gypsum by the addition of sulfuric acid, followed by filtration to produce gypsum cake. This crude gypsum cake will be further refined to a product via a repulp step and a centrifugation step. The final gypsum product is transported to storage for truck load out and shipping. Additionally, this process serves to regenerate HCl acid that will then be recycled back to the IR Wells.

  • Reagents: This area contains the various reagent systems for storing, preparing, and supplying various chemicals required throughout the processing plant. Examples include:

  • Lime

  • Hydrochloric Acid

  • Sulfuric Acid

  • Sodium Hydroxide

  • Soda Ash

  • Miscellaneous Reagents as defined on the PFDs

  • Plant Utilities (Above/Underground): This covers the design, installation, and operation of all utility systems within the plant boundaries, including both above ground and underground piping and infrastructure.

  • Utilities General: Overall planning and coordination of the various utility systems within the plant.

  • Natural Gas: Delivery, pressure regulation, and distribution of natural gas for use as fuel in boilers, dryers, or other process equipment.

  • Process Water Storage and Supply: Storage and distribution of treated water used in various process applications.

  • Potable Water Storage and Supply: Storage and distribution of treated potable water.

  • Reverse Osmosis Water Storage and Supply: Production, storage, and distribution of high-purity water through reverse osmosis for specific process needs.

  • Firewater/Raw Water Storage and Supply: Storage and distribution of water for fire protection systems and potentially raw water for treatment and use in other applications.

  • Fire Protection System: Installation of a fire protection system including fire hydrants, sprinklers, and alarms.

  • Cooling Water: Delivery, treatment, and distribution of cooling water used to regulate process temperatures in various equipment.

84

  • Chilled Water: Production, storage, and distribution of chilled water for specific cooling requirements within the process.

  • Demin Water: Production, storage, and distribution of demineralized water, which is high-purity water with minimal ionic content, for critical process applications.

  • Steam & Condensate Systems: Generation, distribution, and recovery of steam for use in various process equipment including the wellfield, along with management of condensate (returned condensed steam).

  • Compressed Air: Production, storage, and distribution of compressed air for use in various instruments, etc. (excludes air for mine wells).

  • Sanitary Sewer: This section covers the collection and treatment of sanitary wastewater generated within the plant before discharge to a leach field.

  • Interconnecting Systems:

  • This area is meant to capture major pipe rack systems which provide utilities to multiple process areas.

  • Power Supply and Distribution:

  • Electrical Distribution: Installation of the main ring grounding system, electrical distribution system within the plant, including transformers, switchgear, and cabling to deliver power to various equipment.

  • Communications: This includes the installation of communication and auxiliary systems supporting multiple areas of the facility. Systems include the following:

  • Plant Control Systems

  • Fire Detection System

  • Security System

  • Process Monitoring System (CCTV)

  • Telephone System

  • Fiber Optics and Networks

  • Satellite Connection

  • Radio Communication

  • Offsites:

  • Offsite Utilities: By Others; Natural Gas header and tie-in to offsite gas supplier metering stations is included.

  • Combined Heat and Power Plant (CHP) Facility

  • A modular system featuring a gas engine or turbine generator set, capable of generating approximately 20 MW of electricity. This system will support the processing facility's operations independently, without requiring integration with the electrical grid.

  • An integrated waste heat recovery system designed to efficiently capture and economically utilize the generated heat/energy in other areas of the process design.

14.5 Equipment Selection – Processing Facilities

The selection of equipment for the LSBF is directly informed by the process design and operational requirements established during the FEL-2 phase. Each piece of equipment has been chosen to ensure reliable performance, alignment with throughput targets, and compatibility with the crystallization-based boric acid recovery process.

In addition to process suitability, the selection criteria emphasized:

  • Safety

  • Low capital cost

  • Reliability

85

  • Proven history of operation in similar applications

  • Readily available spare parts

  • Standardization of components to minimize inventory

Table 14.3 below summarizes the major plant equipment selections for the processing facilities that form the basis of the capital cost estimate. An all-inclusive list of equipment can be viewed in the plant mechanical equipment list (Mechanical Equipment List 5EAM-G1-EQL-255-00001). Details on equipment purchasing are provided in Project Execution Strategy 5EAM-G1-PEP-100-00001.

Table 14.3 Major Plant Equipment Selections Table 14.3 Major Plant Equipment Selections
MAJOR EQUIPMENT SUMMARY – PROCESSING FACILITIES
EQUIPMENT TAG EQUIPMENT TYPE EQUIPMENT DESCRIPTION
P2-TNK-201 TANK PREGNANT LEACH SOLUTION HOLDING TANK
P2-SBR-202 SCRUBBER HCL MAKE-UP TANK SCRUBBER
P2-TNK-202 TANK HCL MAKE-UP TANK
P2-VPK-202 PACKAGE HCL MAKE-UP TANK SCRUBBER PACKAGE
P2-TNK-205 TANK PLS PH ADJUSTMENT TANK
P2-TNK-206 TANK PLS FILTER PRESS FEED TANK
P2-FIP-201 FILTER PRESS PLS FILTER PRESS
P2-FIL-201 FILTER PLS POLISHING FILTER
P2-TNK-208 TANK PLS FILTER PRESS WASH WATER TANK
P2-TNK-207 TANK PLS FILTRATE TANK
P2-CRN-001 CRANE FILTER PRESS CRANE
P3-TNK-301 TANK BA CRYSTALLIZER FEED TANK
P3-VPK-301 PACKAGE BORIC ACID CRYSTALLIZER PACKAGE
P3-CRZ-301 CRYSTALLIZER 1ST STAGE BA CRYSTALLIZER
P3-CRZ-302 CRYSTALLIZER 2ND STAGE BA CRYSTALLIZER
P3-HEX-301-A CONDENSER BA CRYSTALLIZER VENT CONDENSER 1
P3-HEX-302-A HEAT EXCHANGER INTER CONDENSER 1
P3-HEX-303-A HEAT EXCHANGER AFTER CONDENSER 1
P3-EJR-301-A EJECTOR FIRST VACUUM EJECTOR 1
P3-EJR-302-A EJECTOR SECOND VACUUM EJECTOR 1
P3-HEX-304 CONDENSER BA CRYSTALLIZER VENT CONDENSER 2
P3-HEX-305 HEAT EXCHANGER INTER CONDENSER 2
P3-HEX-306 HEAT EXCHANGER AFTER CONDENSER 2
P3-EJR-303 EJECTOR FIRST VACUUM EJECTOR 2
P3-EJR-304 EJECTOR SECOND VACUUM EJECTOR 2
P3-TNK-302 TANK BA CRYSTALLIZER HOTWELL
P3-VPK-302 PACKAGE BA BELT FILTER VENDOR PACKAGE
P3-FIB-301 BELT FILTER BA BELT FILTER
P3-TNK-303 TANK BA DISSOLUTION TANK
P3-HEX-307 HEAT EXCHANGER BA DISSOLUTION TANK HEAT EXCHANGER
P3-FIL-301 FILTER PRESS CALCIUM SULFATE FILTER
P3-CRZ-303 CRYSTALLIZER 1ST STAGE BA RECRYSTALLIZER
P3-CRZ-304 CRYSTALLIZER 2ND STAGE BA RECRYSTALLIZER
P3-HEX-308 CONDENSER BA RECRYSTALLIZER VENT CONDENSER STAGE 1
P3-HEX-309 CONDENSER RECRYSTALLIZER INTER CONDENSER STAGE 1
P3-HEX-310 CONDENSER RECRYSTALLIZER AFTER CONDENSER STAGE 1
P3-EJR-305 EJECTOR RECRYSTALLIZER FIRST VACUUM EJECTOR STAGE 1
P3-EJR-306 EJECTOR RECRYSTALLIZER SECOND VACUUM EJECTOR STAGE 1
P3-HEX-311 CONDENSER BA RECRYSTALLIZER VENT CONDENSER STAGE 1
P3-HEX-312 CONDENSER RECRYSTALLIZER INTER CONDENSER STAGE 1

86

MAJOR EQUIPMENT SUMMARY – PROCESSING FACILITIES
EQUIPMENT TAG EQUIPMENT TYPE EQUIPMENT DESCRIPTION
P3-HEX-313 CONDENSER RECRYSTALLIZER AFTER CONDENSER STAGE 1
P3-EJR-307 EJECTOR RECRYSTALLIZER FIRST VACUUM EJECTOR STAGE 1
P3-EJR-308 EJECTOR RECRYSTALLIZER SECOND VACUUM EJECTOR STAGE 1
P3-TNK-304 TANK BA RECRYSTALLIZER HOTWELL
P3-CTF-301 CENTRIFUGE BA CENTRIFUGE
P3-TNK-305 TANK BA CENTRIFUGE FEED TANK
P3-TNK-306 TANK BA CENTRATE TANK
P3-BLO-301 BLOWER BA DRYER COMBUSTION AIR BLOWER
P3-BLO-302 BLOWER BA DRYER AIR BLOWER
P3-BLO-303 BLOWER BA COOLER AIR BLOWER
P3-BRN-301 BURNER BA DRYER BURNER
P3-CLR-301 COOLER BA COOLER
P3-HET-301 HEATER BA AIR HEATER
P3-DRY-301 DRYER BA DRYER
P3-HEX-314 COOLER BA COOLER AIR COOLER
P3-CYC-301 CYCLONE BA CYCLONE 1
P3-CYC-302 CYCLONE BA CYCLONE 2
P3-VPK-303 PACKAGE BA DRYER SCRUBBER PACKAGE
P3-SBR-301 SCRUBBER BA SCRUBBER
P3-BUE-301 BUCKET ELEVATOR BA PRODUCT BUCKET ELEVATOR
P3-DCO-301 DUST COLLECTOR BA SILO DUST COLLECTOR
P3-SLO-301 SILO BA PRODUCT STORAGE SILO
P3-VPK-304 BAGGING SYSTEM BA PRODUCT BAGGING SYSTEM
P3-TNK-308 TANK BRINE HOLDING TANK
P4-TNK-402 TANK NEUTRALIZATION TANK
P4-THK-401 THICKENER IMPURITY REMOVAL THICKENER
P4-TNK-403 TANK IMPURITY REMOVAL THICKENER OVERFLOW TANK
P4-TNK-404 TANK IMPURITY REMOVAL FILTER FEED TANK
P4-FIP-401 FILTER PRESS IMPURITY REMOVAL FILTER PRESS
P4-TNK-405 TANK IMPURITY REMOVAL FILTER CLOTH WASH TANK
P4-TNK-406 TANK MAGNESIUM REMOVAL TANK
P4-FIP-402 FILTER PRESS MAGNESIUM REMOVAL FILTER PRESS
P4-TNK-407 TANK MAGNESIUM REMOVAL FILTER CLOTH WASH TANK
P4-TNK-408 TANK MAGNESIUM REMOVAL FILTRATE TANK
P5-TNK-501 TANK EVAPORATOR FEED TANK
P5-EVP-501 EVAPORATOR EVAPORATOR
P5-EJR-501 EJECTOR EVAPORATOR STEAM EJECTOR 1
P5-EJR-502 EJECTOR EVAPORATOR STEAM EJECTOR 2
P5-HEX-501 HEAT EXCHANGER EVAPORATOR PRE-HEATER
P5-HEX-502 HEAT EXCHANGER EVAPORATOR HEATER
P5-FIL-501 FILTER EVAPORATOR POLISHING FILTER
P6-TNK-601 TANK GYPSUM PRECIPITATION TANK
P6-VPK-601 PACKAGE GYPSUM VENT SCRUBBER PACKAGE
P6-SBR-601 SCRUBBER GYPSUM VENT SCRUBBER
P6-CTF-601 CENTRIFUGE GYPSUM CENTRIFUGE
P6-FIB-601 BELT FILTER GYPSUM BELT FILTER
P6-VPK-602 PACKAGE GYPSUM BELT FILTER PACKAGE
P6-TNK-603 TANK GYPSUM CENTRIFUGE FEED TANK
P6-TNK-604 TANK GYPSUM CENTRATE TANK
P6-TNK-606-A/B TANK CALCIUM CHLORIDE TANK A/B

87

MAJOR EQUIPMENT SUMMARY – PROCESSING FACILITIES
EQUIPMENT TAG EQUIPMENT TYPE EQUIPMENT DESCRIPTION
P7-BLO-701 BLOWER LIME BULK UNLOADING BLOWER
P7-SLO-701 SILO LIME SILO
P7-TNK-701 TANK LIME MIXING TANK
P7-TNK-702 TANK LIME STORAGE TANK
P7-TNK-703-A/B TANK HYDROCHLORIC ACID STORAGE TANK A/B
P7-TNK-704-A TANK SULFURIC ACID STORAGE TANK A
P7-TNK-704-B TANK SULFURIC ACID STORAGE TANK B
P7-TNK-705 TANK SODIUM HYDROXIDE STORAGE TANK
U1-MSC-101 SKID NATURAL GAS METERING SKID
U1-FIL-101 FILTER RO 1 POLISHING FILTER
U1-ROS-101 REVERSE OSMOSIS REVERSE OSMOSIS NO. 1
U1-TNK-103 TANK RAW WATER TANK
U1-TNK-104 TANK TREATED WATER TANK
U1-TNK-105 TANK RO 1 FEED TANK
U1-VPK-101 PACKAGE RAW WATER TREATMENT PACKAGE
U1-VPK-102 PACKAGE REVERSE OSMOSIS NO. 1 PACKAGE
U1-TNK-106 TANK RO WATER TANK
U1-FIL-106 FILTER GLAND SEAL WATER FILTER
U1-TNK-109 TANK PROCESS WATER TANK
U1-TNK-111 TANK POTABLE WATER TANK
U1-VPK-104 PACKAGE POTABLE WATER TREATMENT PACKAGE
U1-TNK-112 TANK FIRE WATER TANK
U1-VPK-105 PACKAGE BOILER SYSTEM PACKAGE
U1-TNK-113 TANK CHILLED WATER EXPANSION TANK
U1-VPK-106 PACKAGE CHILLED WATER PACKAGE
U1-FIL-103 FILTER WATER RECOVERY RO POLISHING FILTER
U1-ROS-103 REVERSE OSMOSIS WATER RECOVERY REVERSE OSMOSIS
U1-TNK-114 TANK WATER RECOVERY TANK
U1-VPK-107 PACKAGE WATER RECOVERY RO PACKAGE
U1-ACO-101-A/B/C COMPRESSOR PLANT AIR COMPRESSOR
U1-DRY-101 DRYER PLANT AIR DRYER
U1-FIL-104-A/B FILTER PLANT AIR PRE-DRYER FILTERS
U1-FIL-105-A/B FILTER PLANT AIR POST-DRYER FILTER
U1-VPK-108 PACKAGE AIR COMPRESSOR PACKAGE
U1-VSL-101 RECEIVER PLANT AIR RECEIVER
U1-VSL-102 RECEIVER INSTRUMENT AIR RECEIVER
B1-CRN-101 CRANE MAINTENANCE SHOP CRANE

15 Infrastructure

15.1 Access and Local Communities

The Project is located near Interstate-40 along with nearby access to rail and a natural gas transmission line. Currently, the Project receives electrical power from a 12kV powerline and the SSF operates off this power. Figure 15.1 shows general infrastructure needs for the Project.

88

==> picture [456 x 607] intentionally omitted <==

15.2 Site Facilities and Infrastructure

The infrastructure required for the Project is expected to consist of the following:

  • Natural gas – 5E will require a natural gas pipeline that will need to be tied into a nearby transmission pipeline to serve the processing plant. Discussions are ongoing with a proposal received from Kinder Morgan and the cost of piping from the Mojave Pipeline to a cogeneration facility (COGEN) included in the CAPEX estimate.

  • Electrical power upgrade– an economic trade-off study is currently being conducted to evaluate cogeneration versus an upgraded and dedicated powerline to the Project.

  • Rail – connection to a rail spur adjacent to our EIS boundary is being considered for rail loading and the BLM Plan of Operations includes a permitted rail spur. In conjunction, a truck-to-rail transloading operation is being evaluated at another, existing rail spur location located 15 miles from the Project, which may be implemented as part of Phase II expansion.

  • Roads – Plant access roads will require upgrades, and some roads may require paving. New access roads are also being considered. 5E has a pending application with the Bureau of Land Management’s Barstow office for two right-of-way applications for the east and west side of the property. Both right-of-way applications are expected to be granted and have National Environmental Policy Act exclusions.

  • Water – 5E currently has adequate water resources for Phase 1 of the project with two existing water wells. Wells and pipelines will need to be expanded to accommodate later phases and expansion. The well southwest of the property is included in the permitted Plan of Operations. The well northeast of the property is not yet included in the Plan of Operations. 5E has secured millsite claims for each well.

  • Material storage – storage for materials products and consumables will need to be built near the plant site including a stacking system for gypsum. Off-site storage and distribution are being explored with potential partners.

15.3 Security

The Project currently has 24-hour security service and camera surveillance for critical areas and areas with high-traffic, with gates at entrances to the Project area. 5E is considering constructing a fence around the property.

15.4 Communications

The Project currently utilizes a satellite-based internet service, which is fully functional. For larger operations, 5E has considered a dedicated fiber line to site or a dedicated cell tower amongst other potential options. Additionally, a strong cell phone signal is available.

15.5 Logistics Requirements and Off-site Infrastructure

15.5.1 Rail

Rail is not currently used by the Project; however, the BNSF rail is situated next to the Project and is being assessed for logistical requirements. Several transloading and rail service providers have also been contacted for potential off-site loading to rail transport.

15.5.2 Port and Logistics

The Port of Los Angeles, Long Beach, and San Diego are all within a half-day drive from the Project on major highways. 5E has a truck scale on-site that can weigh deliveries to and from ports or rail.

15.5.3 Off-site storage and distribution

Storage and distribution locations off-site are being explored, and discussions have been initiated with several potential providers.

16 Market Studies and Contracts

This section was completed with reference to a preliminary market study performed by Kline and Company, Inc. titled Boric Acid, Calcium Chloride, Gypsum Market Studies and Pricing Models dated June 19, 2025. 5E incorporated information obtained through consultation with industry experts, discussions with current end-use customers, and other publicly available sources to complete this section.

16.1 General Market Overview

Initially, 5E recognizes two primary minerals mined through ISL at the Project : borate and calcium. 5E will produce boric acid from its borate mineral and either calcium chloride or gypsum from the calcium mineral. Additional byproducts can be produced from other minerals and elements included with metals salts (i.e., lithium and magnesium); however, additional testing, analysis and research will need to occur to finalize a process before these minerals can be included in economic analysis.

16.2 Borates

16.2.1 Market Overview

Based on the preliminary market study, global boric acid demand was estimated at approximately 1,137k metric tonnes per year in 2024 and is projected to grow at a compounded annual growth rate (CAGR) of 5.5%, reaching 1,834k metric tonnes per year by 2033.

The growth is driven by both traditional and emerging sectors, with applications spanning E-glass, textile fiberglass, specialty borosilicate glass, fertilizers, ceramics, and detergents, as well as high-value uses such as permanent magnets, semiconductors, nuclear energy, and advanced defense materials. Currently, glass applications account for 21% of total demand, non-glass applications for 40%, and the remaining 39% is attributed to specialty borates. The boron market is a global oligopoly where two companies dominate approximately 85% of global supply. Specific to boric acid, there are approximately 13 global suppliers; however, the market remains dominated by the two largest suppliers.

16.2.2 Historical Pricing

The global boric acid market has historically demonstrated stable prices with periods of relatively low volatility. Between 2010 and 2024, prices averaged $789 per short ton F.O.B. with the material driver to prices being supply and demand. Figure 16.1 provides the historical and forecasted supply and demand. and Figure 16.2 provides the historical pricing and forecasted pricing.

There are two historical periods where pricing significantly increased relative to historical averages, and both are driven by tightness in supply and demand. In 2010 and 2011, a labor dispute caused a plant shutdown at one of the larger producers which caused a supply constraint such that demand exceeded supply. This led to a period where pricing increased to $1,229 per short ton in Q4 2011. In 2020, the world experienced the COVID-19 pandemic. During the COVID-19 pandemic, demand dissipated causing pricing to drop to as low as $470 per short ton in Q2 2020. Once the pandemic ended, demand surged such that supply capacity could not keep pace with demand. This led to the second period where pricing significantly increased to $1,213 per short ton in Q2 2022. Although there has been a small decline since the COVID-19 pandemic, increases in demand have led to prices remaining elevated relative to long term historical averages. At the end of 2024, boric acid prices stabilized around $1,000 per short ton.

91

Figure 16.1: Project market capacity versus demand

==> picture [527 x 325] intentionally omitted <==

----- Start of picture text -----

Boric Acid Supply and Demand
2,000
1,500
1,000
500
-
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
(500)
Year
Supply Demand Excess Deficit
k T
----- End of picture text -----

==> picture [527 x 221] intentionally omitted <==

----- Start of picture text -----

Figure 16.2: Forecasted boric acid pricing, per Kline
Forecasted Boric Acid Pricing
$1,600
$1,400
$1,200
$1,000
$800
$600
$400
$200
$0
Time Period
Historical Price ($/ST) Forecast Price ($/ST)
Price per Short Ton
----- End of picture text -----

Boric acid is commercially available in two primary grades: granular and powder. Granular technical grade is the most traded form and serves as the standard product for large industrial customers. Powder grade, typically a byproduct of the screening process, is more variable in quality and availability and is required for high-specification applications such as pharmaceuticals or electronics.

Pricing is also influenced by packaging format. While bulk shipments offer the lowest-cost logistics solution, producers typically charge a $25 – 50 per short ton premium for smaller pack sizes, such as 50 lb. bags, to account for handling and

92

purchasing in smaller quantities. Despite these differences, the underlying production costs for both grades and pack sizes are similar, indicating that pricing differentials are driven more by market dynamics and buyer preferences than by cost structure.

16.2.3 Market Balance

Over the period of 2010 through 2021, supply was sufficient to meet demand. Since 2021, global boric acid demand has steadily outpaced, with the imbalance expected to widen further through the end of the decade. Estimates project boric acid demand to grow from 1,137k metric tonnes in 2024 to 1,834k metric tonnes per year by 2033, driven by strong momentum in specialty glass, agriculture, EVs, and specialty applications. In contrast, supply is forecast to grow at a slower pace relative to demand, increasing from 1,242k metric tonnes in 2024 to 1,488k metric tonnes per year by 2033, resulting in a cumulative market shortfall that begins in 2025 and reaches approximately 346k metric tonnes by 2033.

On the supply side, growth remains limited due to the industry’s high consolidation, with most of the production concentrated among Rio Tinto in the U.S. and Eti Maden in Turkey. Most other global producers operate at smaller scales or focus on lower-grade borates. While Eti Maden has confirmed a capacity expansion of 60k metric tonnes per year by 2027, no other major new supply is expected in the next 3 – 4 years. Several announced projects face delays or uncertainty. Additionally, China’s opportunistic capacity has shifted toward domestic consumption and is often constrained by quality limitations.

Given the limited pipeline of new capacity and rising demand from sectors such as EVs, permanent magnets, and highend agriculture, the boric acid market is expected to remain imbalanced. This tight supply outlook is likely to support continued pricing strength and enhance the commercial case for new entrants capable of delivering high-purity, reliable supply to strategic regions such as the U.S. and Asia.

The supply-side analysis in Figure 16.1 presumes moderate expansion at existing suppliers, 5E’s anticipated supply per schedule in late 2028, and one additional major boric acid supplier entering the market per their publicly stated timeline. Demand-side analysis was built based on bottom-up analysis of expected and/or published end market expansion, moderated with the end market value in use as price pressures build on lower value applications. With existing market tightness, tailwinds for pricing exist as customers seek new supply sources outside of the existing oligopolistic market.

The analysis of the substitutability of boric acid in end uses concluded that most large volume applications have low or no risk of substitutability. Specifically, boric acid provides unique functionality in applications such as specialty glass, boron steel, and permanent magnets that have limited, and in many cases, higher cost alternatives such as rare earth elements, or would require significant investment to reformulate. Additionally, concerns for moderately substitutable applications have been identified as primarily other borate containing molecules (i.e., colemanite mineral), however, most market participants who can producer end products with a concentrate such as colemanite have already switched versus the boric acid alternative.

16.2.4 Market Costs

Estimating the operating unit cost of boric acid production is challenging due to limited public disclosures. One major supplier, being state-owned, does not report production costs separately, while another producer groups all boraterelated products under a broader minerals category in its annual filings, complicating the isolation of boric acid costs. Recent company reports indicate that overall borate production costs are increasing due to input cost inflation, higher third-party expenses, and operational pressures. Although some inflationary effects have begun to stabilize, one of the larger producers faces margin pressure, incurred a reserve downgrade in 2018, and have implemented active costcontrol measures with its board reportedly pushing for stronger operational discipline. 5E expected costs are given in Section 18.2.

93

16.2.5 Boric Acid Market

Boric acid is essential in diverse industries, catering to both commodity and specialty markets. Customers include largescale users in glass and agriculture as well as smaller buyers purchasing through distributors. In high-value applications like specialty glass, flame retardants, and boron derivatives, performance outweighs price. Substitution is uncommon due to boric acid’s reliable boron content and superior downstream performance compared to boron ores like colemanite or ulexite. Figure 16.3 provides an overview of boric acid demand by end use.

Figure 16.3: Boric Acid Demand by End Use, per Kline

==> picture [526 x 393] intentionally omitted <==

Logistics and customer proximity dictate packaging and shipment formats for boric acid, usually provided in 25-kg bags, one-ton bags, or bulk containers which are transported by truck, rail, or ocean freight. Asia remains the leading sales region due to proximity and demand, but interest is rising in North America and Europe. This along with supply chain security efforts drives demand for high-purity boric acid from nations of reliable jurisdictions. In some areas, reliance on a single supplier prompts buyers to seek diverse and dependable sources.

Geopolitical concerns and consistent quality needs are likely to lead some buyers to pay a scarcity premium for reliable boric acid supply. Governments, especially in the U.S. and European Union, are encouraging domestic production of critical and strategic materials, boosting interest in new market entrants.

The market’s opacity, reliance on negotiated contracts, and duopolistic nature mean there is no standard index price for boric acid. Pricing is highly influenced by demand, purity requirements, and capacity utilization. Kline’s latest model

94

predicts Chinese boric acid prices will increase to about $1,364 per short ton by 2030, driven by ongoing supply constraints and rising demand from high-specification sectors. Figure 16.2 provides forecasted boric acid pricing.

16.2.6 Boric Acid Specifications

Boric acid expected technical grade specifications are as follows:

  • Chemical Specification:

  • Analyte Guarantee

  • B2O3%: 56.25 – 56.5

  • Equivalent H3BO3%: 99.9 – 100.9

  • SO4 ���������

  • �����������

  • ����������

  • Sieve Specification

  • U.S. Sieve Mesh Size mm % Retained Guarantee

  • ����������������������

16.3 Calcium Chloride

16.3.1 Market Overview

Calcium chloride (CaCl2) is a versatile chemical compound widely used in various industries due to its hygroscopic properties and ability to lower the freezing point of water. It is commonly employed in de-icing and dust control applications, where it effectively melts ice and suppresses dust on roads and construction sites. In the oil and gas industry, it is used to increase fluid densities and control swelling. The compound is produced through several methods, both naturally from brine purification and synthetically via the Solvay process, where it is a byproduct of soda ash manufacturing, and by reacting hydrochloric acid with limestone.

The global calcium chloride market was estimated to be 3,825k metric tonnes in 2024, having seen higher-than-normal growth from the previous year of 1.5%. North America represents approximately 40% of global demand, followed by Asia, Europe, the Middle East and Africa, and South America. U.S. demand in 2024 was 1,050k metric tonnes, with growth expectations of 0.6% CAGR until 2034.

16.3.2 Historical Pricing

Calcium chloride pricing has nearly doubled since 2007, when average prices in the U.S. were $267 per metric tonne, reaching $500 in early 2025. The two biggest year-over-year increases during that time were between 2008 and 2009 and 2021 and 2022. The U.S. market has some of the highest average prices seen globally, driven by recent demand for winter road treatment and a supply deficit due to plant closures during the twenty-first century. The U.S. is thus a net importer of calcium chloride, with Mexico, China, Canada, Europe, and the Middle East as the main sources in recent years.

16.3.3 Market Balance

The U.S. calcium chloride market is dominated by two large public companies. The larger company operates a former Dow plant in Ludington, Michigan, with a calcium chloride capacity of 700k metric tonnes per year. The plant processes brine supplied by a Canadian operation. The second largest U.S. producer currently operates four plants throughout the U.S., two brine-based facilities in the Mojave Desert (California), and two facilities that use HCl and limestone feedstock in West Virginia, and Louisiana.

95

Outside of these two market leaders, the U.S. has limited calcium chloride producers. The U.S. market is also supplied by both Canada and Mexico. Leading Canadian producers include two brine-based producers. One Mexican-based producer is the only plant in North America running the Solvay Process.

16.3.4 Market Cost

Calcium chloride is sold in liquid and solid form, but the market always sells on a dry weight basis (dry metric tonnes – DMT) with pricing and margins determined by application. De-icing and dust control are the lowest price applications, selling for around $240 per metric tonne, followed by construction ($300-350) and oil and gas ($450-550). While not consumed in large quantities, calcium chloride can sell for over $600 per metric tonne and approach $1,000 in food, agriculture, electronics, and chemical industry applications.

Production costs can be as low as $80-100 per metric tonne for liquid calcium chloride produced from brine. Producing flake and pellet grades requires additional capital and operational costs for drying, typically adding around $100 per metric tonne for flake and an additional $50-100 per metric tonne for pellet capabilities.

16.3.5 Calcium Chloride Market

When combined, the use of calcium chloride for road de-icing and dust control represents the largest application, with 2024 demand in the U.S. reaching 252k metric tonnes for each. De-icing is tied to winter weather patterns, where demand in the northern U.S. and Canada was strong in 2024 and early 2025. Historically and looking ahead, both segments are expected to grow at around 0.5% CAGR.

Usage in the oil and gas sector as a drilling fluid is the largest individual use in the U.S. at 294k metric tonnes. Key markets include Permian (West Texas), Marcellus (Appalachia), and offshore (Gulf of Mexico). U.S. oilfield growth projections are roughly 0.75% in 2025 and 2026, with similar growth expected through 2030, followed by a gradual decline.

The remainder of the market comprises construction (147k metric tonnes) and other uses (105k metric tonnes), spread across numerous end-use applications such as food and beverage, agriculture, desiccants, refrigeration and cooling, water treatment, concrete and masonry surface treatment, metallurgy, tire weighting, humidification, and chemical synthesis. Growth for these categories is slightly higher, at 1.0% and 1.25% CAGR for construction and other uses, respectively. Figure 16.4 provides a breakdown of U.S. calcium chloride market demand and growth from 2024 to 2034.

Figure 16.4: U.S. calcium chloride market demand and growth, 2024 – 2034

US Calcium Chloride Market Demand and Growth

==> picture [371 x 153] intentionally omitted <==

----- Start of picture text -----

119
105
147 162
252 258
252 258
294 315
2024 2034
Year
Metric Tonnes (thousands)
----- End of picture text -----

==> picture [7 x 7] intentionally omitted <==

==> picture [305 x 11] intentionally omitted <==

----- Start of picture text -----

O&G Deicing Dust Control Construction Others
----- End of picture text -----

96

16.3.6 Calcium Chloride Specifications

Calcium chloride is sold in the market in various forms: liquid (with concentrations ranging from 28-42%), flake (72-87%), pellets or prill (92-97%), and powder (83-99%). These ranges represent observed concentrations from U.S. producers. Powder is collected from pellet or prill processing. Most applications utilize calcium chloride in liquid form, so solids are dissolved in water for most final uses. Given its exothermic properties, which make solid calcium chloride effective at melting snow, heat management must be considered during dissolution.

Product purity is separate from the above-mentioned criteria. Common contaminants include alkali chlorides (such as NaCl), magnesium (such as MgCl2), and calcium hydroxide and specifications typically call for impurities to be less than 5%. For certain food and beverage applications, producers can obtain various certifications, such as Halal, Kosher, etc.

16.4 Gypsum

16.4.1 Market Overview

Gypsum, a versatile mineral, finds extensive use in construction, agriculture, and industry. Primarily utilized for drywall, plaster, and cement, it provides fire resistance and acoustic insulation in construction. In agriculture, gypsum enhances soil structure by supplying calcium and sulfur. It is obtained through natural mining and as a synthetic byproduct from flue-gas desulfurization (FGD). Between 2019 and 2024, U.S. gypsum demand held steady at approximately 44 million metric tonnes, with prefabricated products leading the market. During this period, the U.S. market experienced a modest growth rate of 0.1% CAGR.

16.4.2 Historical Pricing

Between 2019 and 2024, gypsum prices rose steadily due to supply constraints and cost pressures. In 2024, the average price for calcined gypsum reached $63 per metric tonne, while uncalcined gypsum averaged $13 per metric tonne. The sharper increase in calcined gypsum prices was driven by value-added processing and strong demand from the construction sector.

In 2024, the price of crude uncalcined gypsum used in cement and agriculture were estimated to vary from $36 to $87 per metric tonne, depending on the grade and application. Meanwhile, synthetic gypsum prices remained stable at approximately $6.5 per metric tonne from 2019 to 2024. Figure 16.5 below provides historical pricing for various types of gypsum.

Figure 16.5 Average market price for uncalcined gypsum by grade and application, per Kline

==> picture [411 x 228] intentionally omitted <==

----- Start of picture text -----

Average Market Price
Synthetic Uncalcined Gypsum
Crude Uncalcined - Cement
Crude Uncalcined - Agriculture & Infrastructure
87
80
65
40 40 40
31 33 33 36
19 19
6 .5 6.5 6.5 6.5 6.5 6. 5
2019 2020 2021 2022 2023 2024
Year
Price per Metric Tonne
----- End of picture text -----

97

16.4.3 Market Imbalance

The U.S. gypsum market is supported by both domestic production and imports. Imports have risen due to limited local supply near demand centers and the decline in synthetic gypsum output caused by the phase-out of coal-fired power plants. As coal-fired power plants reduce production, the drop in synthetic gypsum supply is anticipated to open market opportunities for 5E's gypsum output. The Project is strategically located near major agricultural demand centers and wallboard manufacturers, which are expected to be primary outlets for the byproduct.

Gypsum is imported from countries such as Mexico, Spain, and Canada. Despite these imports, the U.S. retains substantial domestic production capacity, with major producers including USG, National Gypsum, and Georgia-Pacific. Figure 16.6 provides a breakdown of the U.S. production between crude and synthetic gypsum.

Figure 16.6 Gypsum USA production

==> picture [395 x 273] intentionally omitted <==

----- Start of picture text -----

Gypsum USA Production by Source, Million Metric Tonnes 2019-2024 per Kline
14.4 14.1 15.9 15.4 15.4 15.0
23.4 23.8 23.6 22.2 21.7 21.6
2019 2020 2021 2022 2023 2024
Year
Crude Gypsum Synthetic Gypsum
Million Metric Tonnes
----- End of picture text -----

16.4.4 Market Costs

The operating costs for gypsum production can vary significantly due to several factors. Major producers typically do not disclose detailed operating costs publicly, making it difficult to determine the exact figures. However, overall production costs are influenced by factors such as increased manufacturing efficiency, recycling practices, and import dynamics. For example, synthetic gypsum, a byproduct of coal-fired power plants, is favored for its high purity levels (95–99%) and consistent quality. The cost of crude gypsum has increased due to rising energy and transportation expenses, while synthetic gypsum prices fluctuate based on transport distance and contractual agreements. Additionally, regional factors, such as proximity to mines and local demand, are crucial in determining market costs.

16.4.5 Gypsum Market

The U.S. gypsum market is projected to grow steadily at a 2.8% CAGR through 2034, driven by rising use of prefabricated gypsum products like lightweight wallboards, strong construction activity, and consistent cement demand. Agricultural applications are also gaining traction, especially in regions with saline soil and poor water quality, such as California. Specialty uses in plaster, joint compounds, and fillers add niche demand. Limited domestic supply near key consumption hubs has heightened reliance on imports, driving up delivered costs and creating an opportunity for regionally available

98

synthetic gypsum to meet growing demand. Figure 16.7 provides the U.S. gypsum market and demand growth forecasted from 2024 to 2034.

Figure 16.7: U.S. gypsum market demand and growth, 2024 – 2034

==> picture [501 x 367] intentionally omitted <==

----- Start of picture text -----

Gypsum Market Demand and Growth, 2024-2034
Masonry Cement Agriculture Plaster Prefabricated Gypsum Products Others
12.7
9.6
23.3
15.6
17.6
14.4
4.4 5.1
2024 2034
Year
Metric Tonnes
----- End of picture text -----

16.4.6 Gypsum Specifications

Final gypsum specifications are not confirmed at this time but it is expected that 5E will meet specification requirements for cement manufacturing.

16.5 Conclusions

Boric acid is a versatile product with hundreds of end-use applications that are critical to food security, national defense, decarbonization, electrification, and consumer consumption, among others. Due to increased demand for existing applications and new projected demand from future-facing technologies, combined with two major suppliers operating at, or near capacity, the supply of boric acid, and many downstream derivatives that require boric acid as feedstock, has been in tight supply, resulting in higher prices over the past 18 months. With existing suppliers unlikely, or unable, to add meaningful capacity, and only six new boric acid projects identified, of which only 5E is substantially permitted, the supply-demand deficit is expected to continue or worsen over the remainder of the decade. As a result, pricing will likely remain elevated and continue to rise. As a US-based producer, 5E is positioned to secure both domestic and strategic global supply chains for boric acid and other key boron derivatives that require boric acid.

99

16.6 Contracts

5E is engaged in discussions with several direct end-users as well as distributors for supply of boric acid, calcium chloride, and gypsum. 5E also has multiple signed non-binding letters-of-intent and/or proposal letters with terms agreed in principle which could result in definitive offtake agreements for multi-year supply. For boric acid specifically, these customers and distributors represent multiple end-use applications including specialty glass, insulation, defense, agriculture, and others, as well multiple geographic regions. Since 5E has produced products from its SSF, 5E has supplied and qualified finished products with future customers, with the intent of securing contracts for most of the available phased capacity, while reserving a portion for spot market sales and increased tonnage for contracted customers. 5E is in discussions with a large, local cement manufacturer for offtake of gypsum and the customer has sampled the product. Additionally, 5E is discussing a calcium chloride offtake agreement with two different counterparties who have visited the site. One is a large regional distributor, and the other is a large global manufacturer with operations in the southeastern United States. Delivery and saleable gypsum and calcium chloride will likely focus on customers within a certain geographical radius to minimize overall delivered costs.

17 Environmental Studies, Permitting, and Closure

17.1 Environmental Requirements for Solution Mining

Due to the depth and characteristics of both the ore body and overburden, in the 1980’s the decision was made to recover the ore via solution mining. The Project mineralized deposit is an ideal candidate for solution mining as it is bound by faults. The Project is permitted to produce 90,000 short tons per year of borate, defined as boron oxide or boron oxide equivalent, thus permitting up to approximately 160,000 short tons of boric acid.

17.2 Environmental Study Results

The Project is located on both public and private lands. The public lands are managed by the BLM in accordance with its 43 CFR §§ 3809 Surface Management Regulations, the Federal Land Policy and Management Act, and federal environmental laws. The private lands are administered by San Bernardino County Land Use Planning (SBC – LUS) in accordance with the California Surface Mining and Reclamation Act, the County Development Code, and state environmental laws.

In 1990, a Plan of Operations (PoO) was submitted to the BLM and a Mining Conditional Use Permit and Reclamation Plan was submitted to San Bernardino County, which triggered environmental review under the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). BLM and the County prepared a joint Environmental Impact Statement (EIS)/Environmental Impact Report (EIR) to satisfy their environmental review requirements under NEPA and CEQA, respectively.

The EIS/EIR process follows clearly defined requirements for public participation and studies, such as threatened and endangered species, cultural resources, light, noise, and impacts to local communities. The studies were completed, as was the public participation process. Additional studies are currently not required at this time.

In 1994, the EIS/EIR process resulted in the issuance of a ROD from the BLM that approved the PoO and approval of the Mining Condition Use Permit and Reclamation Plan from the SBC – LUS, as discussed below.

17.3 Required Permits and Status

5E currently has the following permits in place:

  1. The Mojave Desert Air Quality Management District (MDAQMD) has issued Operating Permits for the SSF and the permits are renewed annually. After FEED engineering and during detail design of the LSBF, once 5E has determined each original equipment manufacturer (OEM) for major pieces of equipment and based on the specification sheets for each piece of equipment, Authorization to Construct (ATC) permits for the LSBF will

100

be provided to MDAQMD for approval. It is expected that the issuance of the LSBF ATCs will require that the Operating Permit for the SSF be closed. The ATC permits for the LSBF must meet National Ambient Air Quality Standards (NAAQS) and MDAQMD requirements (ARB, MDAQMD, and EPA).

There is no reclamation or closure requirement under MDAQMD.

  1. The Lahontan Regional Water Quality Control Board (LRWQCB) issued the current Waste Discharge Requirements (WDRs) in 1988. The WDRs regulate activities in the existing surface impoundments, which were used in the 1990’s to produce CadyCal and are no longer being used. 5E remains compliant with the permit by complying with the monitoring requirements and submitting quarterly reports. A Final Permanent Closure Plan has been approved by the LRWQCB for closure of the existing impoundments. Closure of the ponds and 1988 WDRs is expected to be finalized later in 2025 or 2026. The current LSBF design includes approximately 37 acres of evaporation ponds for the purpose of removing sodium and calcium from the back end of the processing plant. 5E will apply for a new or amended WDRs order from LRWQCB for the LSBF.

There is an existing reclamation and closure requirement approved by LRWQCB. The bond amount to close the ponds is included in the SBC – LUS Financial Assurance Cost Estimate (FACE), discussed below. This is currently a cash bond.

  1. The LRWQCB previously issued a Notice of Non-applicability (NONA), verifying that the Project does not require a stormwater permit for approved construction and operations activities.

There is no reclamation or bonding requirement associated with the NONA.

  1. SBC- LUS issued the Mining Conditional Use Permit and Reclamation Plan in 1994, based upon the 1990 application and ensuing EIR. The Reclamation Plan was amended, and the permit was modified in 2019 to address changes such as relocation of the processing plant and additional water related infrastructure. Ground use is regulated in accordance with applicable state law. The Mining Conditional Use Permit and Reclamation Plan includes Conditions of Approval for engineering and planning related activities, as well as requirements to avoid impacts to desert tortoises. The permitted production throughput under the Mining Conditional Use Permit is 90,000 short tons of boron oxide or boron oxide equivalent.

5E maintains a cash bond with the California State Mining and Reclamation Agency, as administered by SBC – LUS. The FACE is updated annually. The FACE includes demolition of all existing structures, regrading, and revegetation of all disturbance on private lands. This bond also includes plugging and abandonment of all wells located outside the U.S Environmental Protection Agency (EPA) UIC purview (discussed below).

  1. The BLM issued a ROD in 1994, establishing the EIS boundary (Figure 6.2). The ROD authorizes the mining of borates. The ROD also has requirements for company activities to avoid adverse impacts to desert tortoises and cultural resources.

Reclamation and land disturbance for BLM is currently included with the FACE on file with the County and bonded in cash with the California Division of Mine Reclamation.

  1. The EPA retains primacy for Class 3 solution mining Underground Injection Control UIC permits in the State of California. EPA issued the UIC permit for the Project in August 2020. The permit defines the Area of Review (AOR) boundary. All subsurface solution mining activities, including monitoring wells, are located within the AOR boundary. The EPA approved mining operations in November 2023.

Per the permit conditions, 5E has installed five upgradient and four downgradient monitor wells for the initial mining block. As a condition to receive final approval in November 2023, the EPA required modification to the permit and the installation of three additional water monitoring wells. The permit was modified in June 2024, and the three additional wells were installed in Fall 2024.

5E installed four IR Wells and subsequently modified the permit to include horizontal wells. In July 2025, two of the IR Wells were converted from vertical wells to horizontal-side tracks where each well extends approximately 1,500 ft. 5E expects to submit a final mine plan to the EPA for review based on the performance of the horizontal-side track IR wells.

101

5E has submitted and maintains a surety bond with the EPA for plugging and abandonment of all wells within the EPA AOR boundary.

  1. Additional environmental permitting that will likely be required for the LSBF includes:

  2. a) The California Unified Control Act/Agency (CUPA) has primacy over EPA’s Tier II reporting requirements. The Hazardous Material Business Plan (HMBP) has been submitted for construction related activities and will be updated with processing related chemicals that are expected to be utilized to operate the LSBF.

18 Capital and Operating Costs

Capital and operating costs are incurred and reported in US dollars and are estimated at an initial assessment level with an accuracy of approximately +/-25%.

18.1 Capital Cost Estimate

The capital cost estimate includes the first phase of commercial production for the LSBF and a summary by scope or area is provided below in Table 18.1. Capital expended for the SSF is excluded as that is in operation and for purposes of this TRS has been sunk.

Table 18.1: Capital summary

Scope / Area Capital Cost (USD millions)
Process Facility & Infrastructure $280.7
COGEN $50.2
Evaporation Ponds $5.6
Wellfield $30.8
Sub-total Capital Costs $367.3
Contingency $55.1
Owner’s Cost $12.5
Total Capital $434.9

18.1.1 Capital Cost Estimate – Processing Facility and Infrastructure

The capital cost estimate for the LSBF Project has been developed with a high level of confidence and rigor, in alignment with Association for Advancement of Cost Engineering (AACE) Class 4 standards. This estimate supports the development of a new greenfield processing facility, strategically located adjacent to 5E’s existing SSF. Designed for a production capacity of 130,000 short tons per year of boric acid and associated byproducts, the LSBF Project marks a significant milestone in the company’s long-term growth strategy.

Led by Fluor, an industry leading engineering and construction firm, in close collaboration with 5E and Tier 1 equipment vendors, the estimate reflects the project’s scope as defined in February 2025. Between February and June 2025, the project team successfully completed a targeted value engineering program and additional technical test work. These efforts resulted in meaningful refinements to both the process design and execution strategy, which have been integrated into the project’s critical engineering deliverables, including updated process narratives, flow diagrams, material balances, and equipment list/pricing.

These refinements have contributed to a more efficient and cost-effective project configuration. Key improvements included optimizing the boric acid head grade, removing the need for upfront solid/liquid separation equipment such as clarifiers, and incorporating evaporation ponds for sodium chloride handling. Additional efficiencies were achieved through the optimization of utilities and tankage, the removal of the boiler system (now supported by the Cogen WHRS), reuse of existing site infrastructure, and a more compressed facility layout.

102

Collectively, these enhancements have led to a reduction in the capital expenditure estimate while simultaneously increasing the facility’s design capacity. The improvements have also strengthened the project’s financial model, resulting in a more favorable internal rate of return (IRR) and improved overall economic performance. Furthermore, the process modifications and supporting test work have increased confidence in the technical basis of design, providing a solid foundation for the next phase of project development. Table 18.2 provides a detailed breakdown of the Process Facility and Infrastructure portion of the estimate in Table 18.1.

Table 18.2: Detailed breakdown of process facility and infrastructure

Description Total Cost (USD millions)
Direct Field Costs $265.1
Indirect Field Costs $28.3
Total Field Costs $293.4
Home Office Costs $18.6
Total Field and Office Costs $312.0
Escalation $12.4
Contingency $46.8
Sales and Use Taxes $3.3
February 2025 Class 4 – Indicated Total Cost $374.6
Value Engineering and Process Refinements ($47.1)
July 2025 Class 4 – Indicated Total Cost with Adjustment $327.5

The capital estimate summary above reflects the outcome of a structured and disciplined development process. To support this estimate, a robust methodology was applied—grounded in industry best practices and tailored to the specific characteristics of the LSBF Project. The following section outlines the basis of estimate, including the data sources, engineering inputs, pricing strategies, and assumptions that underpin the capital cost model.

18.1.2 .Processing Facility and Infrastructure – Basis and Methodology

The capital estimate methodology integrates a combination of vendor budget pricing, historical cost data, and engineering-developed material take-offs (MTOs), and Fluor’s proprietary unit rate databases. Direct field costs were calculated using Fluor’s Standard Unit Effort Hours Catalog, adjusted for site-specific productivity factors derived from a proprietary algorithm that considers labor availability, climate, site logistics, and project complexity. Mechanical equipment pricing was based on a mix of formal vendor quotes and internal benchmarks from similar projects.

103

Figure 18.1: Summary of equipment pricing

==> picture [289 x 239] intentionally omitted <==

Table 18.3: Bid summary

Tier # Equipment Description Bid(s) Requested Bid(s) Received
1 Crystallizer/Evaporator Package (including Heat
Exchangers and Ancillaries)
3 3
1 Centrifuge Package 4 3
1 Filter Press Package 4 4
1 Belt Filter Package 4 3
1 Sedimentation Package (Clarifier/Thickeners) 4 4
1 Dryer/Cooler Packages (with Cyclones) 4 4
1 Chilled Water Package 1 1
1 Boiler System Package 1 1
1 Boric Acid Bagging System In-house N/A
1 Electric House Package In-house N/A

The estimate includes detailed cost modeling for civil works, concrete, structural steel, buildings, mechanical equipment, piping, electrical systems, instrumentation, and control systems. Indirect field costs, home office costs, and construction services were applied using historical percentages and industry norms. Allowances were included for material overbuy, construction waste, and MTO uncertainty. Escalation was applied at 4% from Q1 2025 forward, and a deterministic contingency of 15% was included to account for uncertainties within the defined scope.

The estimate assumes an EPCM execution strategy, with contractors providing construction labor, supervision, tools, and equipment. All costs are presented in U.S. dollars and reflect pricing as of Q1 2025. The capital estimate excludes owner’s costs, permitting, land acquisition, environmental remediation, and other external factors. Owner’s costs such as mine well development, insurance, commissioning, and infrastructure outside the battery limits are addressed separately.

The estimated accuracy range for this AACE Class 4 estimate is ±25%, which is consistent with industry standards for projects at the PFS stage. This range reflects the typical level of definition at this phase and is not indicative of the quality of the estimate itself. Rather, it highlights the prudent approach taken to account for early-stage variables. To

104

further demonstrate the strength and maturity of the LSBF estimate, Table 18.4 benchmarks the project’s deliverables against standard AACE Class 4 criteria. The estimate is supported by a comprehensive suite of engineering deliverables, including process flow diagrams, simulation and material balance data, equipment lists, and preliminary design documentation, all of which contribute to a well-substantiated capital cost basis. For further details on the capital basis of estimate refer to 5EAM-G1-PLN-310-00001.

Table 18.4: 5E project deliverables versus standard AACE Class 4 criteria

Estimate Accuracy & Deliverable Requirements Class 4 Estimate Accuracy & Deliverable Requirements Class 4 Estimate Accuracy & Deliverable Requirements Class 4
Category Estimate Items AACE Class 4
(Typical)
5E PFS
MaturityDefinition Engineering% Complete 1-5% 2.5-5%
Project Definition Plant Capacity Preliminary Defined
Class of Facility Preliminary Defined
Plant Location Preliminary Defined
Soils Hydrology /Geotech Preliminary Semi Defined
Project Master Schedule Preliminary Preliminary
Construction Execution Strategy Preliminary Preliminary
Procurement & ContractingStrategy Preliminary Semi Defined
EngineeringDesign Criteria Preliminary Semi Defined
Engineering Deliverables Process Flow Diagrams Preliminary Defined
Plot Plans Preliminary Preliminary
Mechanical Equipment List & Datasheets Partial Semi Defined
PipingLine List & Line Classes N/A Preliminary
PipingSpecialtyItem List N/A N/A
Electrical Equipment List Preliminary Semi Defined
Instrument Index N/A N/A
Material Specifications N/A Preliminary
Bulks Quantification Equipment Envelope Cost Factor Equipment Modelling /Layout
Civil Cost Factor 100% EngMTO
Concrete Cost Factor 50% EngMTO/50% Est MTO
Steel Cost Factor 85% EngMTO/15% Est MTO
Piping Cost Factor 65% EngMTO/35% Est MTO
Electrical Cost Factor 25% EngMTO/75% Est MTO
Infrastructure Cost Factor 100% EngMTO
Mechanical Equipment 100%
Budgetaryor
Inhouse
60% Budgetary / 40% Inhouse
Electrical Equipment
l DCS/Control System
Materia Pricing Basis Pipe & Pipe Fabrication Cost Factor In-House Prices from nearby
representative project firm
pricing
Fabricated Structural Steel
Bulk Electrical & Instruments
Contract Pricing Basis Civil/Site Prep /Piling Cost Factor In-House Prices
Concrete In-House Prices
Buildings In-House Prices
Steel In-House Prices
Mechanical Cost Factor
Piping In-House Prices
Electrical & Instrumentation In-House Prices
Insulation & Paint Cost Factor
Module Fabrication N/A
Logistics Cost Cost Factor
Construction Inputs TempFacilities & Services(incl. Man camp) Cost Factor Preliminary; Historical DFC and
IFC Factored Average Rates Used
Construction Equipment Utilizationplan
HeavyHaul & HeavyLiftplan
CM StaffingPlan
Site Assignment Policy

105

Estimate Accuracy & Deliverable Requirements Class 4 Estimate Accuracy & Deliverable Requirements Class 4 Estimate Accuracy & Deliverable Requirements Class 4
Category Estimate Items AACE Class 4
(Typical)
5E PFS
Area Market Labor Analysis N/A
Estimate Accuracy AACE (18R-97) L: -15% to -
30% / H: +20%
to +50%
+/-25%
Typical Contingency 20% to 30% 15%

18.1.3 Capital Cost Estimate – Evaporative Ponds

The capital cost estimate for the solar evaporation pond system was developed by Ad-Infinitum who are recognized in the industry as one of the global leaders in evaporative pond design and execution. The estimate is in alignment with AACE Class 4 standards and is a culmination of a FEL-2 specific study commissioned by 5E.

This estimate supports the development of a new greenfield solar evaporative pond system encompassing a total of 37 acres including a scope taking into site and environmental parameters (topography, evaporation rates, temperature, wind, and radiation) developing steady-state mass and energy balances, and geometric and operational sizing of the ponds and berms, as well as developing a salt harvesting plan.

The capital estimate methodology integrates a combination of vendor and area subcontractor budget and material pricing, historical cost data, and engineering-developed material take-offs (MTOs). A contingency of 15% was included to account for uncertainties within the defined scope. All costs are presented in U.S. dollars and reflect pricing as of Q2 2025.

18.1.4 Capital Cost Estimate – Cogeneration Combined Power & Heat (CHP) Plant

A capital cost estimate for the Combined Power & Heat Plant (CHP) was derived from competitive budgetary bid quotations received from recognized global Tier 1 OEM vendors suppliers. The total direct and indirect packages installation cost was established by using a Lang factor which is a process industry standard methodology that utilizes a multiplier that represents the ration of the total installed cost (TIC) to the total equipment cost (TEC).

18.1.5 Capital Cost Estimate – Wellfield

The operation is an owner operated mining operation. A third-party contractor will perform drilling of the in-situ injection recovery well field and a third-party OEM has designed and will manufacture the artificial lift system. As detailed in Section 13, the wellfield calls for the installation of 27 horizontal wells and jet pumps for artificial lift. Table 18.5 below provides a summary of the wellfield capital cost. The cost for the wellfield includes the following: drill pad construction, 3[rd] party drilling, downhole material (casing, production tubing, and cement), and artificial lift (jet pumps and jet pump triplex surface pumps).

Table 18.5 Mining capital cost estimate

Description Total Cost (USD $ millions)
Site Works $1.9
Well Materials $9.4
Drilling $5.6
Logging $2.0
Stimulation and Completions $2.1
Surface Facilities $3.7
Artificial Lift $6.1
Wellfield Sub-total $30.8
Contingency $4.6
Total Wellfield $35.4

106

18.1.6 Other Sustaining Capital

The wellfield is designed such that the quantity of wells is expected to be sufficient for the current life of mine and it is expected that overtime the extraction method will transition from injection of the mining fluid until the well becomes hydrostatic and then recovery of the fluid (i.e., “huff and puff” extraction) to complete reservoir flow and recovery. Using the current estimate of the wellfield as a basis, 5E assumed $5.7 million is outlaid incrementally every five years as sustaining for major workovers and any additional necessary wells.

18.1.7 Wellfield Basis

The wellfield capital estimates were based on actual equipment purchased for the SSF, vendor bids, actual costs derived from the injection recovery wells for the small-scale facility and July 2025 drill program, and third-party quotes. The quantity of wells estimated to provide the chemical plant with PLS to achieve the stated design is based on engineering simulations, actual wellfield data from the SSF, and incorporates work from MSME.

Mining equipment, initial wells, and sustaining capital cost estimates were based on the following:

  • All injection recovery wells were based on new casing, production tubing, screens, and well heads.

  • Costs for drilling, auxiliary, and overhead were based on third-party estimates and work performed.

  • Mining capital includes a 15% contingency.

18.1.8 Closure Costs

Closure costs have not been included in this estimate as the reserve and life of mine only account for 41% of the measured and indicated resource and it is assumed that expansion capital can be deployed in the future and the wellfield and mine plan can be updated to convert incremental resources to reserves.

18.1.9 Owner’s Costs

Table 18.6 provides the breakout of Owner’s Costs breakout and totals $12.5 million. This estimate was provided by 5E. No formal contingency is applied to Owner’s Cost.

Table 18.6: Owner’s cost breakdown

Item Cost (US $ million)
Owner’s team $4.2
Construction insurance $3.6
Taxes $4.7
Total $12.5

18.2 Operating Cost Estimates

Operating costs have been forecasted based on the material and energy balance provided by Fluor. Operating costs are segregated as variable operating costs and fixed operating costs in the financial model. Variable operating costs include packaging, logistics, and raw materials such as natural gas, hydrochloric acid, sulfuric acid, and lime. Fixed operating costs include administrative labor, operating labor, general and administrative overhead, repair labor, repair materials, depreciation as well as taxes and insurance.

As with capital costs, operating costs are captured in US dollars and are estimated at an initial assessment level with an accuracy of approximately +/- 25%.

18.2.1 Variable Operating Cost

Variable operating costs are derived from a material balance with the following assumptions:

107

  • Calcium-to-boron ratio of 1.2 calcium and sodium byproduct volumes and sulfuric acid consumption. This ratio is consistent with wellfield data obtained during operation of the SSF,

  • 90% HCl efficiency rate with 10% HCl lost in the process, and

  • 10.2% weight boric acid concentration in the PLS.

Variable materials and prices represented on the basis of cost per a produced short ton of boric acid are shown in Table 18.7. Cost figures include estimated freight to 5E. Pricing for raw materials is based on historical costs over the last 12 months.

Table 18.7 Variable materials cost
Material Units Cost US$/short ton
HCl 36% solution basis 1,416.7 lb. /short ton H3BO3 $158.61
Sulfuric acid 1,180.6 lb. /short ton H3BO3 $124.13
Lime 423 lb. /short ton H3BO3 $197.47

The basis for packaging and logistics included the following:

  • $18 per short ton of boric acid for packaging based on actual packaging for SSF.

  • $113.50 per short ton of boric acid for shipping and freight delivered to customers based on actual quotes received and paid by third-party logistic carriers.

The basis for utilities included the following:

  • Natural gas consumption to operate COGEN facility consuming 1,791,477 MMBTU per year or 12.25 MMBTU per short ton of boric acid derived from the energy balance. Pricing for natural gas is based on a 12-month average of $3.19 per MMBTU based on California City Gate pricing.

18.2.2 Fixed Operating Cost

Fixed operating costs include the following:

  • Operating labor

  • Site administrative labor

  • Site general overhead

  • Repair labor and materials

  • Taxes and insurance

  • Depreciation

Operating labor was derived from a principle first plan of operations with 80 operators and 30 employees for site administrative labor. Cost per person was estimated at $86,680 and the basis for fixed overhead was derived by the current overhead rate of spend for 5E which is approximately $150,000 per quarter and this is assumed to double for the LSBF. Repair labor and maintenance is estimated to be 3.0% of cumulative capital including sustaining capital. Taxes and insurance are assumed to be 1.5% of cumulative capital including sustaining capital. Depreciation assumes a 10-year useful life for initial capital and any sustaining capital is depreciated in the year incurred.

18.2.3 Other Operating Costs

Other operating costs include costs and credits associated with the material balance and process flow sheet which includes a byproduct credit for gypsum and calcium chloride and costs associated with metals precipitation waste. Gypsum is assumed to be net neutral cost and sold in the market at cost. Table 18.8 provides the breakdown of units

108

and cost associated with other operating costs and Figure 19.2 provides the total operating costs and credits over life of mine.

Table 18.8 Other operating costs

Table 18.8 Other operating costs
Material Units Cost US$
Metals precipitation waste $ per short ton $ 45
Gypsum $ per short ton $ 12
Calcium chloride $ per short ton $ 55

18.2.4 Basis for Operating Cost Estimates

Operating assumptions were based on the following assumptions:

  • Year 1 operates at 64% capacity, 7,000 hours and produces 13.37 short tons of boric acid per hour.

  • Year 2 operates at 88.9% capacity, 8,000 hours and produces 16.25 short tons of boric acid per hour.

  • Year 3 operates at 93.3% capacity, 8,000 hours and produces 17.06 short tons per hour.

  • Utilizations are based on mass and energy balances.

  • Input costs use historical pricing over the last 12 months, third-party vendor quotes or actual inputs based on real time purchases at the SSF.

19 Economic Analysis

19.1 General Description

5E prepared a cash flow model to evaluate the Project’s reserves on a real basis. This model was prepared on an annual basis from the reserve effective date to the exhaustion of mineral reserves for the current mine plan. As discussed in previous sections, additional resources could be converted to additional reserves with expansion of the wellfield or mine plan in the future. This section presents the main assumptions used in the cash flow model and the resulting indicative economics. The model results are presented in U.S. dollars US$, unless otherwise stated.

All results in this section are presented on a 100% basis. As with the capital and operating forecasts, the economic analysis is inherently a forward-looking exercise. These estimates rely upon a range of assumptions and forecasts that are subject to change depending upon macroeconomic conditions, operating strategy and new data collected through operation of the small-scale facility.

19.2 Basic Model Parameters

Key criteria used in the analysis are presented throughout this section. Basic model parameters are summarized in Table 19.1.

Table 19.1 Basic model parameters

Table 19.1 Basic model parameters
Description Value
Time Zero Start Date July 1, 2025
Mine Life 40 years with partial last year using Proven and Probable Reserve.
Chemical Plant Start-up 2028
Discount Rate 7%

All costs incurred prior to the model’s start date are considered sunk costs. The potential impact of these costs on the economics of the operation is not evaluated. This includes contributions to depreciation and the small-scale facility as these items are assumed to have a zero balance at model start. The selected discount rate is 7% given the Projects risk profile, U.S. jurisdiction, permitting status, capability to secure U.S.-agency financing and was chosen as a reasonable cost for funding based on review of comparable projects in the development phase of the mining cycle. Additionally,

109

economic analysis is performed on a real basis that does not capture the nominal aspects of inflation, thus driving a slightly lower discount rate than would traditionally be captured on a nominal basis.

19.3 External Factors

19.3.1 Pricing

Modeled prices are based on the prices developed in the Market Studies and Contracts section of this report Section 16 (see Figure 16.3) and were developed on a real basis. 5E engaged Kline to perform a preliminary market study and the assumptions and inputs for revenue in the financial model were based on the preliminary market study. A sensitivity analysis is performed below, and the financial model is most sensitive to boric acid pricing and this forecast is a material assumption. The prices are modeled as:

  • Boric Acid: $1,248 F.O.B. per short ton when production is forecasted to commence

  • Gypsum: $32.66 per short ton is held flat on a real basis throughout the model

  • Calcium Chloride: $174.18 per short ton is held flat on a real basis throughout the model

All products produced by the operation are modeled based on independent pricing forecasts as described in Section 16 and were prepared as part of a preliminary market study performed by Kline. Kline built a regression pricing model forecast for boric acid on a real basis with key inputs and drivers of the forecast utilization of supply and demand, sulfuric acid pricing, and cost of freight. The material driver to the pricing forecast is supply and demand utilization whereby the boric acid market is forecasted to grow at 5.5% as disclosed in Section 16 but supply is forecasted to fall short. Gypsum pricing was based on actual 2024 real pricing and the model assumes 5E handles freight and logistics. The netback price for gypsum is $20.66 per short ton. Calcium chloride pricing was based on actual 2024 real pricing to the end market customers. This price was further discounted in the model to assume 5E would sell to distribution at bulk and the model assumes 5E handles freight and logistics. The netback price for calcium chloride is $119.64.

19.3.2 Taxes and Royalties

As modeled, the operation is subject to a combined 27.98% federal and state income tax rate. This tax rate is derived from 5E Boron Americas LLC tax rate as of June 30, 2025, the most recent fiscal year end. The model does not include any tax loss carryforwards and no existing depreciation pools are accounted for in the model. Any application of tax loss carryforwards would reduce the tax burden of the operation. The capital for the project is subject to depreciation over a 10-year period and sustaining capital is depreciated in the year incurred for purposes of financial modeling. There are no royalties to account for currently. The project is being evaluated as a standalone entity for this initial assessment without a corporate structure. As such, tax calculations presented here may differ significantly from the actual incurred by 5E.

19.3.3 Working Capital

The assumptions used for working capital in this analysis are as follows:

  • Accounts Receivable: 30 days

  • Accounts Payable: 30 days

  • Zero opening balance for accounts receivable and payable

19.4 Technical Factors

19.4.1 Mining and Production Profile

The modeled mining profile was developed by 5E. The details of the mining profile are presented previously in this report. No modifications were made to the profile for use in the economic model. The modeled profile is presented in Figure 19.1.

110

Figure 19.1: Resource Extraction Profile

==> picture [526 x 243] intentionally omitted <==

----- Start of picture text -----

Mining Profile
20,000,000
18,000,000
16,000,000
14,000,000
12,000,000
10,000,000
8,000,000
6,000,000
4,000,000
2,000,000
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41
Years
Total Resources Total Reserves Cumulative Production
Short Tons
----- End of picture text -----

A summary of the modeled mine life profile is presented in Table 19.2 Life of Mine Summary.

Table 19.2: Life of mine summary

==> picture [501 x 336] intentionally omitted <==

----- Start of picture text -----

Description Unit Value
Life of mine Years 39.5
Reserves – Boric Acid Short Tons 5.3 M
Quantity – Boric Acid Produced Short Tons 11.4 M
Resources – Boric Acid Short Tons 17.5 M
19.4.2 Operating Costs
Operating costs modeled in US dollars can be categorized as variable, fixed and other operating costs credits. A summary
of operating costs over the life of operation is presented in Figure 19.3 and Figure 19.4.
Figure 19.2: Operating costs (first ten years)
Operating Cost (First 15 Years)
100,000
80,000
60,000
40,000
20,000
0
-20,000
-3 -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
Years
Variable Fixed Other
USD Thousands
----- End of picture text -----

Operating costs modeled in US dollars can be categorized as variable, fixed and other operating costs credits. A summary of operating costs over the life of operation is presented in Figure 19.3 and Figure 19.4.

111

19.4.3 Variable Costs

Total variable operating costs over the life of mine are provided in Table 19.3 and Table 19.4.

Table 19.3: Variable operating cost over life of mine

Table 19.3: Variable operating cost over life of mine
Variable operating cost: Total US$000’s
Materials $ 1,309,153
Logistics 605,539
Naturalgas 208,214
Total $ 2,122,906

19.4.4 Fixed Costs

Table 19.4: Total fixed operating cost over life of mine excluding depreciation

Table 19.4: Total fixed operating cost over life of mine excluding depreciation
Fixed operating cost: Total US$000’s
Administrative labor $ 99,230
Operating labor 286,200
General and administrative overhead 51,000
Repair labor 214,757
Repair materials 300,659
Taxes and insurance 257,708
Total $ 1,209,554

19.4.5 Other operating costs / (credits)

Table 19.5: Total other operating costs / (credits) over life of mine

Table 19.5: Total other operating costs / (credits) over life of mine
Other operating cost/ credit Total US$000’s
Calcium chloride $ (265,530
)
Metals precipitation waste 41,736
Gypsum (109,368)
Total $ (333,162
)

19.4.6 Capital Costs

Capital is modeled on an annual basis and is used in the model as developed in previous sections with 15% contingency. The modeled capital profile is presented in Figure 19.3.

112

Figure 19.3: Capital profile of the mine

==> picture [351 x 211] intentionally omitted <==

----- Start of picture text -----

Capital Profile
$300,000 $500,000
$250,000
$400,000
$200,000
$300,000
$150,000
$200,000
$100,000
$100,000
$50,000
$0 $0
-3 -1 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40
Year
Capital Cumulative Capital
USD $ Thousands
----- End of picture text -----

19.4.7 Infrastructure and Logistics

The economic analysis includes OSBL and ISBL capital, which includes a warehouse for boric acid storage and calcium chloride loadout station. Boric acid and calcium chloride transport will be serviced via truck with calcium chloride sold as a by-product credit in the local California market. Boric acid transport will be serviced via truck to local customers in the western United States, to the Los Angeles ports for shipment to Asia, and either shipped via truck to the eastern United States or shipped to rail for further transport. Capital includes a covered storage facility for gypsum which will be serviced via truck with gypsum sold as a by-product credit in the local California market. While revenue and by-product credits are captured in the economic model at F.O.B. pricing, freight and logistics are assumed as costs to 5E and included in operating costs estimates. Capital also includes an upgrade to the SoCal Edison service road that provides the main access to the Project. While a trade-off study is being performed, utility is assumed to be sourced via natural gas and main power delivered via gas COGEN. The capital estimate includes the cost and installation of the COGEN facility as well as a metering station and connection to the gas pipeline and all required piping to the COGEN facility. While it is common for similar projects to finance COGEN off-balance sheet and include as part of operating expenditure, the economic analysis assumes the COGEN is 5E operated and owned.

19.4.8 Economic Results

The economic analysis metrics are prepared on an annual after-tax basis in U.S. dollars. The results of analysis are presented in Table 19.6. The annual project after tax cash flow is presented in Figure 19.4.

113

USD $ Millions
Figure 19.4: Cash flow projection Project Cash Flow (US $ millions) $3,000
$250
$2,000
$2,500
$100
$150
$200
$500
$1,000
$1,500
-$100
-$50
$0
$50
$0
-$150
-$200 -$500
-$250
-$1,000
-$300
-3 -2 -1 1
2
3
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Year Revenue
Operating Cost
Working Capital
Capital
Tax
Net Cash Flow
Cumulative Net Cash Flow
USD $ Millions

Table 19.6: Results of economic analysis

Table 19.6: Results of economic analysis
Life of Mine Cashflow Units Value
Total Revenue US$ Million 7,227.0
Operating Expenses US$ Million 2,999.3
Operating Margin Ratio % 58.5
Capital Outlay US$ Million 474.8
Taxes Paid US$ Million 1,123.5
Depreciation US$ Million 474.8
Free Cash Flow US$ Million 2,625.4
NPV @ 7% US$ Million 724.8
IRR % 19.2
Payback Years 6.1

19.4.9 Sensitivity Analysis

Sensitivity analysis for the financial model was performed based on changes to boric acid price, annual production, discount rate, variable cost pricing, gypsum price, labor cost per person, and raw material acid utilization. Using a ±10% change for each variable, NPV7 is plotted in real dollars for comparison and arranged in order of total variability in Figure 19.5.

Figure 19.5: Sensitivity analysis

==> picture [351 x 211] intentionally omitted <==

----- Start of picture text -----

Sensitivity Analysis
Boric Acid Price
Annual Production
Discount Rate
Variable Cost Pricing
Capital Cost
Raw Material Acid Utilization
Labor Cost
Gypsum Price
$(250,000) $(150,000) $(50,000) $50,000 $150,000 $250,000
USD $
NPV Increase (US $M) NPV Decrease (US $M)
----- End of picture text -----

19.4.10 Cash Flow Snapshot

The annual cashflow, expressed in million U.S. dollars, is presented in Figure 19.6.

Description
LOM Total
Units
Pre-Production
Production
YR-3
YR-2
YR-1
YR1
YR2
YR3
YR4
YR5
YR6
YR7
YR8
YR9
YR10
YR11
YR12
YR13
YR14
YR15
YR16-40
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044-2067
Assumptions
Production Quantity
5,335.0
ST
-
-
-
93.6
130.0 136.5 136.5 136.5 136.5 136.5 136.5 136.5 136.5 136.5 136.5 136.5 136.5
136.5
3,336.9
Boric Acid Price
$1,354.6
$/ST
-
-
-
$1,273
$1,266
$1,234
$1,305
$1,353
$1,360
$1,364
$1,364
$1,364
$1,364
$1,364
$1,364
$1,364
$1,364
$1,364
$1,364
Income
Revenue
7,227.0
$M
-
-
-
119.2 164.6 168.4 178.1 184.7 185.6 186.2 186.2 186.2 186.2 186.2 186.2 186.2 186.2
186.2
4,550.9
Operating Expenditure
Variable
(2,122.9)
$M
-
-
-
(37.2)
(51.7)
(54.3)
(54.3)
(54.3)
(54.3)
(54.3)
(54.3)
(54.3)
(54.3)
(54.3)
(54.3)
(54.3)
(54.3)
(54.3)
(1,327.8)
Fixed
(1,209.6)
$M
(3.5)
(3.5)
(5.3)
(30.3) (30.3) (30.3) (30.3) (30.3) (30.3) (30.3) (30.3) (30.3) (30.3) (30.3) (30.3) (30.3) (30.3)
(30.3)
(742.5)
Other (Operating)/Credit
333.2
$M
-
-
-
1.2
1.6
6.6
8.5
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
8.9
217.3
Total
(2,999.3)
$M
(3.5)
(3.5)
(5.3)
(66.4) (80.4) (78.0) (76.1) (75.7) (75.7) (75.7) (75.7) (75.7) (75.7) (75.7) (75.7) (75.7) (75.7)
(75.7)
(1,853.0)
Working Capital Costs
(3.9)
$M
1.2
13.8
5.7
(25.0)
(2.6)
(0.5)
(1.0)
(0.6)
0.4
(0.5)
-
-
-
0.5
(0.5)
-
-
-
5.2
Capital Costs
Initial
(435.0)
$M
(10.9)
(178.3)
(245.7)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Sustaining
(39.9)
$M
-
-
-
-
-
-
-
-
(5.7)
-
-
-
-
(5.7)
-
-
-
-
(28.5)
Total Capital
(474.8)
$M
(10.9)
(178.3)
(245.7)
-
-
-
-
-
(5.7)
-
-
-
-
(5.7)
-
-
-
-
(28.5)
Pre-Tax Cash Flow
3,749.0
$M
(13.2)
(168.1)
(245.4)
27.8
81.6
89.9
101.1
108.4
104.6
109.9
110.4
110.4
110.4
105.2
110.0
110.4
110.4
110.4
2,674.6
Income Tax
(1,123.6)
$M
-
-
-
(2.8)
(12.2)
(14.0)
(17.5)
(19.5)
(18.1)
(20.0)
(20.0)
(20.0)
(20.0)
(31.3)
(33.0)
(33.0)
(33.0)
(33.0)
(796.5)
After-Tax Cash Flow
2,625.4
$M
(13.2)
(168.1)
(245.4)
25.0
69.5
75.9
83.6
88.9
86.5
89.9
90.5
90.5
90.5
73.9
77.0
77.5
77.5
77.5
1,878.0

20 Adjacent Properties

Elementis operates their hectorite mine adjacent to the west side of the Project. The mine produces hectorite, a specialty clay mineral used in ceramics, cosmetics, and other specialties requiring high viscosity or high thermal stability. While the mine is adjacent to the Project it produces a product that does not compete with 5E.

Land status around the Project area includes the following:

  • To the west are the patented and unpatented lands of the Elementis hectorite mine as well as public lands managed by the U.S. Department of Interior, Bureau of Land Management. Both Elementis and BLM land are included within the EIS boundary. While Elementis has placer claims over the 5E deposit, 5E has staked and filed lode claims. 5E has completed extensive diligence with third-party geologists, counsel, and mineral experts and it has been determined that as colemanite is a mudstone with the appropriate claim to establish mineral tenure being a lode claim.

  • BLM land is to the north and east of the Project.

  • Lands south of the Project area are part of the U.S. Marine Corps Twentynine Palms Marine Base. Figure 3.2 Property Ownership shows the mineral tenure for the project.

21 Other Relevant Data and Information

There is currently no other relevant information or data to present.

22 Interpretation and Conclusions

This pre-feasibility study provides substantial updates to sections 10, 12, 13, 14, 18, and 19. This report is a work product of 18-months of actual in-situ mining, over 12-months of operating 5E’s SSF, comprehensive testing with various OEMs on specific pieces of equipment that have been incorporated into the design, and over 15,000 engineering hours. The LSBF mine plan includes 27 directional wells feeding a chemical plant designed by Fluor with pregnant leach solution at a feed rate of 25.6 short tons per hour with a boric acid head grade of 10.2% weight. The head grade in the plant feed plays a critical role for process control and for the sizing of the plant’s equipment, piping and instrumentation. Variations in the in-situ mining conditions can drive a variable range of boric acid head grades with boric acid solubility, HCl concentration and temperature being drivers to head grade. The head grade assumption reflects both what is realistically achievable as demonstrated by the SSF and an optimal value for equipment design to meet the stated production goals of 130,000 short tons of boric acid and achieving a 95.1% recovery rate in the chemical plant. Byproducts produced include gypsum and calcium chloride, with the production rate of gypsum being 129,000 short tons per annum on a dry basis and the projected rate of calcium chloride being 60,000 short tons per annum in solution (38% weight).

Crystallization is a pivotal step in achieving purity and meeting customer specifications and represents a major capital investment due to the complexity and material requirements of the equipment. Kemetco performed a comprehensive metallurgical test program and was critical in further understanding process behavior and optimizing the overall design. The testing confirmed that two-stage crystallization leaves behind too many impurities, necessitating a selective dissolution and recrystallization phase where boric acid slurry is filtered, washed, redissolved, and then recrystallized. This approach enables tighter control over crystal growth and significantly improves product quality. The impurity removal process is another critical component, particularly for managing magnesium levels, which are highly pH dependent. Precise control of sequential pH adjustments is essential to selectively precipitating and removing impurities while minimizing boron losses and this step is vital for maintaining the integrity of the in-situ mining process as recycled process streams are re-injected into the wellfield. Inadequate removal of impurities could negatively impact boron leaching efficiencies and this purification step supports the downstream process and refinement of the byproducts.

Given the high temperature and aridity of the local climate, the most cost-effective approach to concentrate the calcium rich return brine is by maximizing the use of evaporation ponds.

The total capital estimate for the project is $435 million and economic analysis yields an NPV of $724.8 million and project IRR of 19.2%. Based on the economic analysis, mineral resources and mineral reserves have been estimated and reported using a cut-off grade of 2.0% B2O3. Measured, Indicated, and Inferred resources for the Project total 135.8 Mt of ore, 18.1 Mt of boric acid and 0.2 Mt of lithium carbonate equivalent. Proven reserves total 1.4 Mt of H3BO3 and probable reserves total 4.0 short tons of H3BO3.

5E has an established mineral holding through ownership of fee lands and unpatented placer and lode claims. The property has undergone prior exploration primarily conducted in the 1980’s along with more recent drilling conducted in 2017 which validated previous exploration and expanded known mineral occurrences. Drilling completed on the Project is sufficient for the delineation of a mineral resource estimate and economic analysis has provided justification for establishing mineral reserves.

Geologic interpretation of the deposit describes mineralization as lacustrine evaporite sediments containing colemanite, a hydrated calcium borate mineral. The deposit also contains appreciable quantities of lithium. Geologic modeling based on drilling and sampling results depicts an elongate deposit of lacustrine evaporite sediments containing colemanite. The deposit is approximately 2.1 mi. long by 0.6 mi. wide, and ranges in thickness from 70 to 262 ft. with mineralization that has been defined in four distinct horizons defined by changes in lithology and B2O3 analyses.

In conclusion, there are reasonable prospects for economic extraction for the mineral resources and reserves estimated and presented in this pre-feasibility study. 5E has been diligent in validating the work completed by the previous operators and further expanding the size and classification assurance of the deposit. Current and previous evaluations of mining methods indicate a deposit well suited for ISL solution mining as a preferred method for economic extraction. Progression to FEL-3 or FEED engineering will further define the accuracy and optimization of the capital cost estimates for the chemical processing plant and some additional exploration and in-fill drilling can further bolster the resource and reserve. Using the samples produced from the SSF, 5E is positioned to secure bankable offtake agreements for commercialization. Once these steps are completed, the Company is well positioned to update this prefeasibility study to a feasibility study.

23 Recommendations

The QP’s have made the following recommendations:

  • Stage-gate to FEL-3 engineering. FEL-3 engineering and relevant required testing are estimated to cost approximately $6.6M. Additional details of the work to be performed include the following:

  • Further test work to optimize the crystallizer design is required for optimizing crystal growth and particle size distribution which are specification requirements. Factors such as residence time, slurry density, supersaturation, type of cooling, cooling rate, level of agitation, and mixing rate, should all be evaluated and considered for controlling crystal size.

  • Completion of additional locked cycle testing be conducted on the crystallization process during FEL-3 to better simulate steady-state operation and assess long-term process stability. This test will help identify potential impurity buildup and equipment fouling to validate product quality over multiple cycles, and support more accurate mass balance and equipment design decisions.

  • The harsh nature of the pregnant leach solution necessitates that a robust and quantitative materials of construction coupon testing program be completed. This is critical to ensure that compatible materials are selected for equipment, piping, and instrumentation. Improper material selection may cause safety, production, and/or quality issues.

118

  • Further test work on fluid and slurry flow characteristics including density (carrier fluid and solids for slurries), particle size distributions, solids weight percents, and viscosity.

  • Completion of a detailed heat integration study and an optimized water balance to help to reduce both capital and operating expenditures as well as reduction in the environmental resource requirements.

  • More detailed studies on environmental impact should be performed in the next engineering phase, specifically emissions (gaseous and particulate), scrubber efficiencies, gypsum stockpiles, wastewater discharge, solids waste handling (clay and metal impurities), biodiversity and habitat impact.

  • Completion of a Reliability, Availability, and Maintainability (RAM) analysis to evaluate the long-term performance and operational efficiency of critical systems. This analysis helps identify potential bottlenecks, optimize maintenance strategies, and improve overall system uptime, ultimately supporting more accurate cost estimates and design decisions.

  • Investigate setting up purchasing agreements with reagent suppliers to ensure that there will be adequate availability and that the costs are fully understood.

  • A thickener for the PLS feed to the plant is not considered due to the low solids content seen in the PLS feed to the SSF. It is recommended to perform test work to confirm the solids content that will come from the wellfield.

  • Continued operation of the SSF to gain a more in-depth understanding of the performance of the horizontal wells, including artificial lift (jet pump) and integrating a dedicated steam injection well. Through operation of existing horizontal and directional wells, confirm residence time and length of injection – recovery cycles with reconciliation to commercial recovery rates. Injection cycle volume should target volume required to produce desired feed rate to LSBF plus contingency volume required due to mining efficiency and void space created by previous cycles. Injection rates need to balance with expected residence time to achieve desired PLS concentration versus expected recovery production rates. Cost is estimated at $1.6 million.

24 References

5E SSF high frequency wellfield instrumentation results via SSF DCS

5E SSF Injection Schedule and Results

5E July 2025 Horizontal Drill Program ICP results

Ardent Technologies, Test Work Report – Consolidated Ardent Testing Data

Bartlett, R.W., 1998. Solution Mining: Leaching and Fluid Recovery of Materials, Second Edition, Routledge Publishing.

Confluence Water Resources, LLC 2019. 2019 Fault B Program Results, Technical Report, March 2019.

Confluence Water Resources, LLC 2022. Shallow Groundwater Characterization Report Mining Block 2 Near Pisgah Fault, June 2022.

Confluence Water Resources, LLC 2023. Results from OW-3A and MW3B Hydraulic Testing, Technical Memorandum, March 2023.

Core Laboratories, Inc, 1981. Boron Analysis of Core Leachings Well SMT-1, San Bernadino County by D. Burnett, July 1981.

Fort Cady California Corporation, 2019. Revised 2019 Mining/Land Reclamation Plan and Plan of Operations. Revised April 2019.

Haliburton Micro-deformation instrumentation results

119

Hazen Research, Inc, 2019. Recovery and Purification of Boric Acid from Colemanite Leach Liquor using Solvent Extraction – Report 12574, Sep. 2019.

Hydro-Engineering, 1996. Aquifer Characteristics and potential well field geometry, by G Hoffman & E Sandberg, Feb. 1996.

Kemetco Research, Inc., Test Work Report – Scoping Boric Acid Production Testing: T0903 Report

Kline Preliminary Market Study, June 2025

Simon Hydro-Search, 1993. Fort Cady Mineral Corporation Solution Mining Project Feasibility Report, San Bernardino County, California. Prepared for Southern California Edison by Simon Hydro-Search. October 22, 1993.

Swenson Technology, Inc. 2019. Test Report – Crystallization of Boric Acid by J Majors, April 2019.

Wilkinson & Krier, 1985. Geological Summary – Duval Corp. internal review, by P Wilkinson and Krier N, Jan 1985.

25 Reliance on Information Provided by the Registrant

5E has provided the external QP’s with a variety of materials for the preparation of this report. These materials include the following:

  • Drilling records from the 2017 drilling program completed by APBL, which includes drilling locations, drill logs, sampling records, analytical results/certificates, geophysical logs, and core photos.

  • Drilling records from Duval and FCMC, which include drill logs, sampling records, analytical results/certificates, and geophysical logs.

  • Historical drilling maps and testing records.

  • Third-party laboratory reports related to process test work based on synthetic brine.

  • Testing performed by Kemetco on crystallization.

  • Commodity pricing forecasts and a preliminary market study performed by Kline.

  • Historic solution mine information from MSME and Duval.

120