Zooz Power Ltd. Investor Presentation 2021

Nov 7, 2021

7123_rns_2021-11-07_54516f6a-fb5c-4d59-be1f-b59774c5299c.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

Enabling EV fast-charging Anywhere

1

Legal Disclaimer

• The information included in this presentation is not comprehensive and does not include all the information on Chakratec Ltd. ("Chakratec" or the "Company") and its business. (the "Presentation") is not an offer or solicitation to buy securities of the Company, and its provisions are not a recommendation or an opinion. This Presentation includes forecasts, estimates, assessments and other information pertaining to future events and/or matters, whose materialization is uncertain and is beyond the Company's control, and which constitute forward- looking information, as defined in the Securities Law, 5728-1968. Such information may not materialize, in whole or in part, or may materialize in a manner significantly different to that forecast. No representation or warranty, express or implied, is made by the Company or any of its affiliated entities, as to the fairness, accuracy or completeness of the information contained herein. The past performance information contained herein is not indicative of future results and there can be no assurance that the Company will achieve comparable results or that the Company will be able to implement its investment strategy or achieve any investment objective. The summary information herein does not purport to be complete. No reliance should be placed on the fairness, accuracy, completeness or correctness of the information or opinions contained in this Presentation.

• This presentation is for informational purposes only and does not constitute or form any part of any offer for sale or subscription of, or solicitation of, any offer to buy or subscribe for any shares or other securities of the Company or any of its affiliated entities nor shall it or any part of it form the basis of, or be relied on in connection with, any contract, commitment or any investment decision whatsoever in Israel or in any other jurisdiction.

• This Presentation has been prepared to provide preliminary information about the Company to a limited number of prospective sophisticated and experienced investors, to assist them in determining whether they have an interest in investing in the Company. No legally binding obligations will be created, implied, or inferred from this Presentation.

• If any inconsistency shall be found between the information included in the Presentation and the information included in the Company's reports on www.magna.isa.gov.il, the information provided on www.magna.isa.gov.il shall prevail.

• With the exception of trademarks owned by the Company and / or trademarks which the Company has rights to use, any trademarks mentioned in this presentation are the property of their owners and are used in the presentation for the sole purpose of understanding the context. The use of such trademarks should not be construed as approval or verification of the Company's software, services or securities.

Power Booster – Enabling Fast-Charging Anywhere

Accelerating mobility Electrification

Flywheel based POWER BOOSTERS

EV Fast charging ANYWHERE

Boost Grid at powerconstrained locations

Added Value for entire ecosystem

Innovative

Unique & Patented CE & UL Certified

Sustainable

No toxic materials. No re-cycling costs

Cost Effective

Lowest Lifetime Costs

The EV revolution is accelerating…

000's, Outlets

Fast Charging is Critical for EV adoption

*DCFC – Direct Current (DC) Fast Charging

Charging Infrastructure – a fast moving market

Public sector Utilities Elec. OEM Retail O&G

Gas stations

Car makers

New players

7

Market dynamics in action:

  • S-curve
  • Arms race
  • Land & Expand
  • Network effects
  • Pay to Play

2020 2030

Early days Low penetration Cherry picking Install where grid is strong Govt grants Longer payback period

Mass Deployment High penetration Wide coverage Install everywhere Free market Short payback period June 21st 2021

"Market leaders in DC fast charging

can create stickiness by leveraging their knowhow for brands, enabling software, and a seamless customer experience."

Infrastructure Disruption

Gas Stations

Centralized Approach

  • 100% refueling in public stations
  • 'Few' 'big' gas stations, serving 100s vehicles a day
  • Fast Refueling (5-10 min.) everywhere
  • Amenities added around the station

  • 20%-40% charging in public chargers
  • 'Many' 'small' Stations – 10s EVs/day/charger*
  • Fast Charging is rare & not trivial
  • chargers ARE the amenity

Distributed Fast Charging Vs Fast Charging Hubs

A Mixed-solution Infrastructure

Fast Charging Hubs

"gas-stations-like" – multiple FC ports, Located where the grid is powerful

Small Distributed fast charging sites

  • At destination (inside cities)
  • On-the-go every 30-50km

Legend

Intercity Highway National roads

Fast-Charging Hub (@ powerful grid)

On-the-go distributed FC

Existing Grid cannot support Fast Charging

Dilemma: Accelerate DCFC roll-out or Defer investment

Grid upgrade challenges

"… some fleet operators are taking delivery of EVs only to find that they face a long wait to get the necessary charging equipment up and running"

July 20th , 2021

DCFC can draw the equivalent of a whole neighborhood's electricity needs at once.

Large investments ...are required in transmission lines, substations, transformators etc.

May 5 th , 2021

The Value of Power Booster - Example

Energy Storage technologies are not created equal…

Li-ion Batteries shortcomings

Rapid Aging & Performance Degradation

Recycling Costs & Environmental footprint

Safety

Flammable & Toxic materials, Safety hazards & limitations

Batteries are Not Optimized Not Cost-effective Not Sustainable Not reliable For Fast Charging

Chakratec Technology & Product

Core Technology – Flywheel (V8)

  • Power > 12.5kW
  • C-rate 4 (for 15')
  • Patent-protected
  • Mature and robust
  • Inherently Safe
  • >10 years guaranteed warranty

  • Power > 100kW (for 15')
  • 200,000 charging cycles
  • CE (EU) and UL (US) certification
  • Optional Site Power Management (EMS) Software package
  • Enables Fast-Charging (>150kW) at power-limited grid (50kW)

Innovative & unique, patented.

x 8

High Power

High performance

Durable & Reliable

Cost effective

Flexible & Modular

Sustainable – Non-chemical

Complementary Services

Turnkey Fast-Charging Solution

  • Based on KPB100 product
  • Including Chakratec micro-grid Power Management SW (EMS)
  • Complementary HW, SW & Services (by partners)
  • White label/ Co-branding

Professional Services – lifetime support

  • 'Make-ready' support
  • Installation support
  • Relocation support
  • Technical support
  • O&M Support
  • Professional O&M
  • Extended warranty

Faster, better & lower cost than alternatives

Accelerate Deployment

Faster alternative to grid-upgrade ✓Safer & more flexible alternative to Li-Batteries-ESS

Boost Brand

Better availability and quality ✓Innovative & sustainable

Minimize Total Cost of Ownership

✓Defer Grid investment ✓Gradually increase investment ✓Avoid batteries replacement, ✓Avoid demand charges

TCO of Fast-Charging with Power Booster

Assumptions of presented example (considering above utilization forecast example):

• Batteries lifespan of 3,500 cycles

• Batteries replacement cost ~33% of the initial system cost

A new Value-Chain is evolving

Benefits To All Stakeholders

Benefits To All Stakeholders

Huge Market Potential

Go-to-Market

Market channels:

Indirect:

21

  • Charge Point Operators
  • EPCs
  • Equipment providers
  • Local Distributors
  • Direct Sales offices

Near-term Focus Territories

Market Introduction

Generate traction:

  • Market education
  • Build First Pilots

2021: US, UK, Austria. 2022: expand EU penetration Key Accounts & Channel Development

Enable scale:

  • Build relationship w/ key accounts
  • Sign agreements w/ channels
  • Get into key tenders' consortiums
  • Expand partnership / supply chain
  • Expand installation / use cases

2021: Germany 2022: US, UK (& EU others)

Scale-up

Execute and expand:

  • Sell through channels
  • Focus on Products & Services
  • Expand Customer base
  • Expand customer support
  • Scale-up supply chain
  • Align roadmap & Expand offering

Increasing Market traction

Vienna Airport

Operating since 2018 Over 700 vehicles charged EU demo site

Commercial DCFC pilot Site construction in progress Expected COD 2Q2022 Upon success –+5 sites expansion and enter US distribution agreement

Pilot for use case analysis Over 1500 vehicles charged Data Collection System-level maturation

NY/CA

Joint R&D Funded by BIRD Planned commercial DCFC pilot Expected COD 2Q2022 DEV of joint solution & marketing

1 st commercial Sale Underground parking use case Operational since Dec. '20. Discussions for site expansion

Customers across value chain

2022 Installations support EU expansion & US penetration

NextGen validation & SCALE

Recent Achievements & Short-Term Plan

Recent Achievements

  • ✓KPB100 Design completion & Production kickoff
  • ✓Significant progress in V8.1 Flywheel Verification & Certification process
  • ✓Build & training of Flywheel supply chain
  • ✓Cooperation agreement with Flex as the Serial Production partner.
  • ✓Company moved to new location to support expected growth.
  • Expansion of Marketing & Sales efforts in EU & US.

(**) The provided information is forward looking as defined in Securities Law, section 32A. It may not be materialized as presented, as detailed in slide 2 of this presentation.

(*) Future products information is still preliminary and may change

Charging Ahead – Become a leading global supplier

Notes:

25

(*) Quantities refer to systems to be delivered to Customers, based on various business models, and therefore do not represent annual sales forecast.

(**) The provided information is forward looking as defined in Securities Law, section 32A. It may not be materialized as presented, as detailed in slide 2 of this presentation.

Thank You !

Enabling EV fast-charging Anywhere

26

Enabling EVfast-charging Anywhere

Appendix slides

27

Range Anxiety

February 27th , 2021

… The road trips made one thing clear – Range Anxiety is real, and it can be quite traumatic…

The complete article:

https://www.wsj.com/articles/whats-missing-in-the-electric-vehicle-revolution-enough-places-to-plug-in-except-tesla-11614380406

Maximize value of fleet electrification

Example Configuration: Fleet < 20 Evs, Grid power – 100kW, Equipment – L2 –chargers + 1DCFC + 1 KPB100 (phase-1) / 2 DCFC+ 2 KPB100 (Phase2)

29

Example Configuration: Grid power – 400kW, Equipment – L2-chargers + 4-6 DCFC + 2-3 KPB100

Hybrid Booster to support Charging-Hub

Hub Power consumption varies significantly

  • At different times of day/year
  • Multiple demand spikes

The Challenge

Maximizing the benefit of two technologies

  • Kinetic Power Booster (C-rate of ~5)
    • support frequent, short, demand spikes
    • multiple high-rate cycles per day
  • Li-Ion Energy Storage (C-rate of ~0.5)

  • support grid during rush-hours' demand peak
  • 1 full equivalent cycle per day

Hybrid Booster can reduce CAPEX & OPEX

  • Avoid / reduce demand charges
  • Reduce grid upgrade costs
  • Gradually increase CAPEX (ESS and KPB)
  • Reduce batteries replacements costs

• Power booster – 250kW, C-5

The Benefits

30

Competition - Flywheel-based Solutions

Chakratec Beacon
Power
Active
Power
Amber
Kinetics
Discharge
Duration
10-30 min. < 1 min. < 1 min. ~4 hours
Focus
application
EV Fast-
Charging
Balancing UPS Renewable
Energy
Speed (rpm) 17,000 17,000 7,000-8,000 7,000-8,000
Rotor material
(cost)
Steel Plates
(\$1.5/kg)
Carbon fiber
(\$20/kg)
Stainless
Steel
(~\$4/kg)
Stainless
Steel
(~\$4/kg)
Installation Over ground Buried Over gnd. Buried
Charging
Cycles
High
(200,000)
High
(175,000)
Low Low
(11,000)
Continuous
Operation
Yes (air
cooled)
Yes (liquid
cooled)
No (require
relax time)
Yes (low
power)

Recently additional competitors announced Flywheel-based solutions targeting EV Fast-Charging application: www.teraloop.org www. levistor.com

According to Company's estimate solutions are still immature

Payment plans

Monthly Rent Full Purchase Purchase with Long-term
service commitment
Benefit Low upfront cost Minimal total cost of
ownership (TCO)
Moderate upfront cost +
High certainty of OPEX
System Ownership Chakratec Site Owner/Operator Site Owner/Operator
Commitment Period Min. 36 months - Min. 36 months
Upfront Payment \$0 to little down Full system cost 40%-70% of system cost
Monthly Payment With BoostProtection
Warranty
Full Service With BoostProtection

Pilot location – Rockhill, SC

  • ✓ Delivery of Chakratec Power Booster and Setup of EV fast-charging infrastructure – Q2/2022
  • ✓ Expected Pilot duration 3 months

✓ Upon success –

  • ✓ +5 sites expansion
  • ✓ Enter US distribution agreement

ACRONYMS

Acronym Meaning
EV Electrical Vehicle
DCFC Direct Current Fast Charger
CAPEX Capital Expenditure
OPEX Operational Expenditure
HW OEM Hardware Originial
Equipment Manufacturer
O&G Oil & Gas
LFP Lithium Ferrophosphate
NMC Nickel Manganese Cobalt
EMS Energy Management Software
CPO Charge Point Operator
EPC Engineering Procurement Construction
FW Flywheel

References