Laconia to acquire extensive and highly prospective Kraaipan Gold-Nickel-Copper-PGM Project.

The Kraaipan Gold-Nickel-Copper-PGM Project represents a unique and exciting opportunity to acquire 866km[2 ] of a well-endowed and highly prospective greenstone belt in one of Africa’s premier mining destinations, Botswana.

Project Highlights

  • Binding agreement to acquire Kraaipan Founders Pty Ltd and all its subsidiaries, which hold 100% of the Kraaipan Project tenure.

  • The Kraaipan Project tenure covers ~50km length of the Kraaipan Greenstone Belt; situated 40km north, along strike and within the same geological units as Harmony Gold Mining Company Ltd’s Kalgold Mine (~4 million oz gold pre-mining resource[1] ).

  • The Kraaipan Project is also in the same terrane that hosts the Kalplats Project (~6.5 million oz of 3E PGMs[2] ) and is therefore, interpreted to also be highly prospective for nickel, copper and PGM mineralisation.

  • The Project comes with an extensive inventory of geochemical (14,000 soil samples) and geophysical data that have uncovered several strong bedrock VTEM anomalies, some of which are spatially associated with an interpreted highly magnetised, mafic intrusive body.

  • Laconia plans to immediately commence an extensive exploration program utilising geochemical and geophysical techniques successfully employed in Australia (e.g. Yilgarn Goldfields) but not applied in this terrane.

  • Previous first pass exploration by third parties only focused on 10 km section of this greenstone belt and confirmed its gold prospectivity with RAB drilling intersecting significant, shallow gold mineralisation including:

    • KP037: 13m @ 1.7g/t Au from 11m, including 3m @ 5.1g/t Au;

    • KP052: 21m @ 1.0g/t Au from 6m, including 5m @ 2.3g/t Au from 27m;

    • KP077: 9m @ 1.1g/t Au from 17m, including 4m @ 2.3g/t Au; and

    • KP074: 42m @ 0.6g/t from 3m, including 21m @ 1g/t Au from 9m.

  • 1- 2010 Mineral Resources and Mineral Reserves Report for Harmony Gold Mining Company Ltd (JSE: HAR)

  • 2- 2016 Mineral Resources and Mineral Reserves Report for African Rainbow Minerals (JSE: ARI)

==> picture [596 x 70] intentionally omitted <==

==> picture [596 x 79] intentionally omitted <==

Laconia Resources Limited (‘ Laconia ’ or ‘ Company ’) ( ASX: LCR ) is pleased to announce that it has entered into a binding agreement to acquire the Kraaipan Gold-Nickel-Copper-PGM Project (‘Kraaipan Project’ or ‘Project’) in Botswana. The Kraaipan Project is comprised of a single but extensive Prospecting Licence, PL232/2016 (‘Project Tenure’) that is 866km[2] and covers approximately 50 kilometre stretch of Kraaipan Greenstone Belt in southern Botswana (Figure 1).

The Project is part of the larger NNW trending Amalia-Kraaipan-Greenstone-Terrane (‘AKGT’) of the Kaapvaal Craton. The AKGT in Botswana is directly along strike from significant gold deposits, as well as adjacent to significant PGE deposits across the border in South Africa.

The southern boundary of the Project Tenure is located along Botswana’s southern border with South Africa and accessed via well-maintained roads from Gaborone (capital of Botswana), approximately 150 kilometres to the north.

==> picture [377 x 408] intentionally omitted <==

Figure 1: Location of the Kraaipan Gold-Nickel-Copper-PGM Project in relation to the Harmony’s Kalgold Mine and the African Rainbow Minerals’ Kalplats Project across the border in South Africa.

==> picture [596 x 59] intentionally omitted <==

==> picture [596 x 79] intentionally omitted <==

Kraaipan Gold-Nickel-Copper-PGM Project

The Kraaipan Greenstone Belt in Botswana is interpreted as highly prospective for both lode-gold and magmatic nickel-copper-PGM sulphide mineralisation within the same geological units and directly along strike of the well-known Kalgold Mine and Kalplats Project in South Africa (Figure 1). The Kraaipan Greenstone Belt in Botswana is relatively underexplored when compared to many other greenstone belts around the world, a consequence of the variable thicknesses of overlying Kalahari overburden obscuring the prospective greenstone rocks. While this overburden has traditionally been an impediment for exploration and explains the under-explored prospectively of the concession, recent advances in geochemical and geophysical methods used for detecting mineralisation undercover do not appear to have been utilised in the terrane. Part of Laconia’s exploration strategy for the Kraaipan Project is to apply these highly successful exploration methodologies, already proven and well-developed in other greenstone terranes. Inclusive with the transaction is an extensive regional geochemical survey of over 14,000 samples yet to analysed. The Company plans to consult a leading expert in gold exploration geochemistry immediately after the completion of the Kraaipan Project acquisition.

Gold Prospectivity

Previous first pass exploration of the Project area by third parties only focused on approximately a 10 kilometre-long section of the Project and confirmed gold prospectivity with RAB drilling intersecting significant, shallow gold mineralisation such as:

KP037: 13m @ 1.7g/t Au from 11m, including 3m @ 5.1g/t Au;

KP052: 21m @ 1.0g/t Au from 6m, including 5m @ 2.3g/t Au from 27m; KP077: 9m @ 1.1g/t Au from 17m, including 4m @ 2.3g/t Au; KP074: 42m @ 0.6g/t from 3m, including 21m @ 1g/t Au from 9m; KP045: 13m @ 0.5g/t Au from 17m, including 6m @ 0.8g/t Au;

KP038: 15m @ 0.3g/t Au from 9m, including 5m @ 0.7g/t Au; KP061: 19m @ 0.3g/t Au from surface, including 9m @ 0.6g/t Au; and KP060: 12m @ 0.5g/t Au from surface.

  • All mineralised intervals reported are downhole lengths, true width unknown. Detailed drill hole locations are show in Fig. 5. Drill hole details in Appendix 1.

==> picture [274 x 423] intentionally omitted <==

Figure 2: Area of historical drilling

==> picture [596 x 59] intentionally omitted <==

==> picture [596 x 79] intentionally omitted <==

The Project is directly along strike from significant gold deposits across the border in South Africa, including the well-known Kalgold Mine (Figure 1). The Kalgold Mine, owned by Harmony Gold Mining Company Ltd (‘Harmony’, JSE: HAR) has been in production since 1996 and had an estimated pre-mining mineral resource containing over 4 million oz gold.[1] Harmony’s 2016 Mineral Resources and Mineral Reserves Report indicates that there is still almost 1.4 million ounces of gold contained within mineral resources that comprise the Kalgold Mine.

The gold mineralisation identified by previous exploration in the Kraaipan Greenstone Belt within Botswana is distinctly similar to that found at Kalgold. It occurs in shallow dipping quartz-carbonate veins, found in clusters or swarms, within steeply dipping, sub-greenschist facies, magnetite-chert, Banded Iron Formation (‘BIF’) rock units. In both areas, the gold mineralized veins are associated with disseminated sulphide mineralisation, dominated by pyrite, distributed around and between the shallowly dipping quartz vein swarms.

Nickel, Copper and Platinum Group Metals Prospectivity

The Kraaipan Greenstone Belt is also interpreted to be prospective for Nickel, Copper and Platinum Group Metals (PGM) mineralisation associated with mafic intrusive rocks, similar to the style of mineralisation found at the Kalplats Project across the border in South Africa (Figure 1). The Kalplats mineralisation is hosted within the Stella Layered Intrusion, which is a layered intrusion of variably magnetite-rich gabbroic material (mafic intrusive igneous rocks). The PGM mineralisation at Kalplats occurs as magmatic segregation reef deposits hosted in magnetite gabbro closely associated with BIF, magnetite-rich quartzite and amphibolite layers.

Figure 3 – VTEM Targets

The Kalplats Project is reported to contain over 6.5 million ounces of 3E (platinum + palladium + gold) PGMs. The SAMREC compliant Kalplats Mineral Resource estimate is: 69.91Mt @ 1.48g/t 3E PGM Measured/Indicated and 67.44Mt @ 1.57g/t 3E PGM Inferred Mineral Resources using a 0.5 g/t 3E PGM cut-off and extended to a maximum depth of approximately 200 metres below soil cover.[2 ]

==> picture [235 x 351] intentionally omitted <==

Historical exploration within the Project uncovered several strong bedrock VTEM (Versatile Time-Domain Electromagnetic) anomalies, some of which are spatial associated with an interpreted highly magnetised, mafic intrusive body. These targets were never drill tested.

Proposed Exploration Activities

1 - 2010 Mineral Resources and Mineral Reserves Report for Harmony Gold Mining Co. Ltd (JSE: HAR). 2- 2016 Mineral Resources and Mineral Reserves Report for African Rainbow Minerals (JSE: ARI)

==> picture [596 x 59] intentionally omitted <==

==> picture [596 x 79] intentionally omitted <==

Laconia plans to execute two strategies in parallel to advance the Kraaipan Project:

  • 1) conduct grassroots geochemical/geophysical analysis by leading exploration experts on the strike extent of the belt that has not been previously tested; and

  • 2) follow up on the historic first pass exploration work (especially the significant drilling results) completed in the southern, outcropping part of the tenure by trying to understand the controls on the gold mineralisation already found and test if this area contains any economic accumulations of mineralisation.

Key Commercial Terms of Acquisition

Laconia Resources Limited has agreed to acquire all of the issued capital of Kraaipan Founders Pty Ltd (KFPL) from KFPL’s shareholders (‘Acquisition’).

Through its subsidiaries, including South East Metals (Pty) Ltd, which is incorporated in Botswana, KFPL holds a 100% interest in the Project Tenure.

The consideration for the Acquisition is summarised as follows:

  1. a non-refundable deposit of A$50,000 has been paid to the Vendors to secure the exclusive right to acquire the Project;

  2. a further A$50,000 cash to be paid to the Vendors upon completion for past expenses;

  3. issue 450,000,000 ordinary fully paid shares in the Company (‘Shares’) to the Vendors or their nominees on Completion at deemed issue price of $0.002 for each Share;

  4. Laconia granting the Vendors a 1% net smelter return royalty on all processed mineral products sold from the Project Tenure on standard industry terms and conditions (‘Royalty’); and

  5. issue further Shares to the Vendors or their nominees upon the achievement of certain milestones as follows (‘Milestone Consideration’):

  6. a. upon certification of a JORC compliant resource of gold or gold equivalent of 250,000oz which at least 50% is classified as Indicated or above (‘First Milestone’), Shares with a total value of $500,000 based on an issue price per Share equal to the higher of $0.002 or the 5 day volume weighted average price for Shares for the previous five days on which Shares traded prior to the announcement of the First Milestone;

  7. b. upon certification of a JORC compliant resource of 500,000oz gold or gold equivalent of which at least 50% is classified as Indicated or above (‘Second Milestone’), Shares with a total value of $1,000,000 based on an issue price per Share equal to the higher

==> picture [596 x 59] intentionally omitted <==

==> picture [596 x 79] intentionally omitted <==

of $0.002 or the 5 day volume weighted average price for Shares for the previous five days on which Shares traded prior to the announcement of the Second Milestone;

  • c. upon certification of a JORC compliant resource of 750,000oz gold or gold equivalent of which at least 50% is classified as Indicated or above (‘Third Milestone’), Shares with a total value of $1,000,000 based on an issue price per Share equal to the higher of $0.002 or the 5 day volume weighted average price for the previous five days on which Shares traded prior to the announcement of the Third Milestone; and

  • d. upon certification of a JORC compliant resource of 1,000,000oz gold or gold equivalent of which at least 50% is classified as Indicated or above (Fourth Milestone), Shares with a total value of $1,000,000 based on an issue price per Share equal to the higher of $0.002 or the 5 day volume weighted average price for the previous five days on which Shares traded prior to the announcement of the Fourth Milestone.

No person will acquire a relevant interest of greater than 20% in the Company and as a result of the Shares issued at completion of the Acquisition and any subsequent issue of Shares under the consideration for the Acquisition will be deferred to the extent that, as a result of any such issue, the resulting voting power of any shareholder will increase to more than 20% in contravention of section 606(1) of the Corporations Act 2001 (Cth).

Completion of the Acquisition is subject to and conditional upon the satisfaction of various conditions precedent including:

  1. on or before 14 March 2017 Laconia obtaining all approvals from Laconia shareholders required under Listing Rules 7.1, 10.1, 10.11 and 11.1.2 or any other approvals required by the ASX in relation to the Acquisition;

  2. Laconia obtaining the necessary waivers from ASX to facilitate the issue of Shares for Milestone Consideration more than 3 months following the approval of the Acquisition by shareholders of Laconia at a general meeting of the Company;

  3. Laconia completing an equity capital raising of $2,400,000 by 31st March 2017;

  4. on or before 28[th] of February 2017, Laconia completing due diligence to its satisfaction of KFPL, its subsidiaries and the Vendor Shares;

  5. on or before 28[th] of February 2017, the Vendors completing due diligence to their satisfaction of Laconia; and

  6. the Vendors executing any restriction agreements in relation to any Laconia securities issued as consideration for the Acquisition that may be required by the ASX in accordance with the ASX Listing Rules.

==> picture [596 x 59] intentionally omitted <==

==> picture [596 x 79] intentionally omitted <==

ASX Listing Rule Chapter 11 submissions

The Company has made a submission to the ASX in relation to the application of ASX Listing Rule 11.1.2 and 11.1.3 to the proposed Acquisition.

The ASX has confirmed that based solely on the information provided by Laconia to ASX:

  • the Company is required to obtain approval of its shareholders for the Acquisition for the purpose of Listing Rules 11.1.2; and

  • the Company will not be required to re re-comply with Chapters 1 and 2 of the ASX Listing Rules pursuant to Listing Rule 11.1.3 for the purpose of the Acquisition.

Shareholder approvals

The Vendors include certain related parties of the Company. Accordingly, Laconia will require approval of its shareholders for the Acquisition for the purpose of Listing Rules 7.1, 10.1, 10.11 and 11.1.2.

The Company will despatch a notice of meeting to shareholders seeking the relevant approvals to proceed with the proposed Acquisition, with such notice to contain detailed information relating to the Acquisition, KFPL, the Project and the Vendors, an assessment of the financial effect of the Acquisition and the Capital Raising on the Company, an independent expert report in relation to the Project and details the Company’s capital structure following completion of the Acquisition (including any issue of Milestone Consideration).

Cautionary Statement

Laconia is optimistic about concluding this transaction, however as at the date of this announcement there cannot be any assurance that the conditions precedent with respect to the transaction will be completed to the satisfaction of each party. Accordingly, investors are cautioned against making investment decisions based on this announcement.

Capital Raising

In conjunction with, and as a condition to completion of, the Acquisition and subject to Shareholder approval of the Acquisition, Laconia proposes to conduct a capital raising by way of a rights issue, a placement to sophisticated investors or a combination of both, to raise $2.4 million at an issue price of $0.002 per Share ( Capital Raising ) subject and in accordance with the Corporations Act 2001 (Cth) and the ASX Listing Rules including Chapter 7.

==> picture [596 x 59] intentionally omitted <==

==> picture [596 x 79] intentionally omitted <==

Use of Capital Raising Proceeds

It is proposed that the budget for the 12 months following completion of the Transaction will be as follows (assuming completion of the Capital Raising):

Item Amount
Vendor cash consideration $100,000
Acquisition and Capital Raisingcosts $180,000
Operational expenditure – Project exploration and development $1,649,000
Corporate and administrative costs and workingcapital $471,000
Total $2,400,000

The above table is a statement of current intentions. As with any budget, changes in market conditions, intervening events and new circumstances have the potential to affect the ultimate way funds will be applied and the directors reserve the right to alter the way funds are applied on this basis.

It is proposed that initial work on the Project will focus on identifying a JORC compliant economic gold resource. The proposed work program will encompass:

  • (a) trenching, sampling and surveying;

  • (b) geochemical activities;

  • (c) geophysical activities;

(d) drilling programs for the purpose of defining a JORC 2012 resource; and

(e) assaying and test work.

Indicative Timetable

The indicative timetable for the proposed acquisition will be provided following finalisation of a definitive sale and purchase agreement and before the dispatch of the Notice of Meeting and Explanatory Memorandum to shareholders.

Consolidation of Capital

The company anticipate seeking approval from shareholders for a consolidation of securities on issue on a 1 for 10 basis.

==> picture [596 x 59] intentionally omitted <==

==> picture [596 x 79] intentionally omitted <==

Indicative Capital Structure

The indicative effect of the Acquisition and the Capital Raising on the capital structure of the Company (assuming that no consolidation of capital) is anticipated to be as follows:

Shares 1,010,350,213 Current on issue 1,200,000,000 Capital Raising @ $0.002 per Share to raise $2,400,000 450,000,000 Proposed issue of Shares to Vendors at Completion (Share Consideration) 2,660,350,213 Proposed maximum total LCR Shares on issue at Completion 250,000,000 Proposed issue of Shares to Vendors upon satisfaction of First Milestone (assuming issue price of $0.002 per Share) 500,000,000 Proposed issue of Shares to Vendors upon satisfaction of Second Milestone (assuming issue price of $0.002 per Share) 500,000,000 Proposed issue of Shares to Vendors upon satisfaction of Third Milestone (assuming issue price of $0.002 per Share) 500,000,000 Proposed issue of Shares to Vendors upon satisfaction of Fourth Milestone (assuming issue price of $0.002 per Share) 4,410,350,213 Proposed maximum total LCR Shares on issue if Milestones are met Options Current Options on Issue 343,788,417 343,788,417 quoted Options exercisable at $0.06 (6 cents) on or before 30 September 2018 6,000,000 6,000,000 unlisted Options exercisable at $0.014 (1.4 cents) on or before 30 September 2018 349,788,417 Proposed total Options on issue after Completion Performance Shares Current Performance Shares on Issue 14,500,000 14,500,000 unlisted Performance Shares which will convert into Shares upon Laconia announcing commercial production of silver or gold from Patachancha No 1-4 Tenements(Disposed). 14,500,000 Proposed total Performance Shares on issue after Completion 4,574,638,630 Total Securities (including Milestone Consideration, Options and Performance Shares)

==> picture [596 x 59] intentionally omitted <==

==> picture [596 x 79] intentionally omitted <==

Pro-forma balance sheet

The pro-forma balance sheet of the Company upon completion of the Capital Raising and Acquisition is summarised below.

Proforma - Consolidated Balance Sheet as at 30 September 2016

CURRENT ASSETS
Cash and cash equivalents
Trade and other receivables
TOTAL CURRENT ASSETS
NON-CURRENT ASSETS
Plant and equipment
Mining properties
TOTAL NON-CURRENT ASSETS
TOTAL ASSETS
CURRENT LIABILITIES
Trade and other payables
TOTAL CURRENT LIABILITIES
TOTAL LIABILITIES
NET ASSETS
EQUITY
Issued capital
Reserves
Accumulated losses
TOTAL EQUITY
Capital
Cash
Share
Raising (net)
Consideration
Consideration
74,301
2,220,000
(100,000)
28,188
102,489
10,955
75,000
100,000
900,000
85,955
188,444
114,821
114,821
114,821
73,623
17,058,660
2,220,000
900,000
2,123,239
(19,108,276)
73,623
Pro-forma
2,194,301
28,188
2,222,489
10,955
1,075,000
1,085,955
3,308,444
114,821
114,821
114,821
3,193,623
20,178,660
2,123,239
(19,108,276)
3,193,623

For further information please visit www.laconia.com.au or contact:

Peter Fox Non-executive Director Laconia Resources Limited Tel: +61 8 6268 2688 Email: [email protected]

==> picture [596 x 59] intentionally omitted <==

==> picture [596 x 79] intentionally omitted <==

Competent Person Statement

The information in this report that relates to exploration results is based upon information reviewed by Dr Quinton Hills who is a Member of the Australasian Institute of Mining and Metallurgy. Dr Hills has been engaged by Laconia Resources Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Dr Hills is a director and shareholder of Kraaipan Founders Pty Ltd. Dr Hills consents to the inclusion in this report of the matters based on information in the form and context in which it appears

Figure 4: Location of the Kraaipan Gold-Nickel-Copper-PGM Project within southern Africa. This map also shows the other greenstone terranes of the Kaapvaal Craton.

==> picture [465 x 399] intentionally omitted <==

==> picture [596 x 59] intentionally omitted <==

==> picture [596 x 79] intentionally omitted <==

Figure 5: Map showing the location of all of the historical RAB drill holes in relation to the gold anomalous zones from a historic soil geochemical survey. Displayed on an Interpreted Geological Map derived from an interpretation of the Total Magnetic Intensity data, as well as some surface mapping.

==> picture [482 x 563] intentionally omitted <==

==> picture [596 x 59] intentionally omitted <==

Figure 6: Characteristic drill hole sections from the historic drill hole program in 1998

==> picture [668 x 470] intentionally omitted <==

==> picture [684 x 477] intentionally omitted <==

APPENDIX 1:

Reunion Mining Historic Drilling from 1998

The following Table and Sections shown in Figure 6 are provided to ensure compliance with the JORC Code (2012 Edition)

Hole No Arc1950
East
Arc1950
North
total
depth
declination azimuth Significant Gold Mineralised Down Hole
Intersections
KRP 001 307545 7159700 50 60 90 No Significant Gold Mineralisation Intersected
KRP 002 307625 7159700 5 60 90 No Significant Gold Mineralisation Intersected
KRP 003 307630 7159700 43 90 0 No Significant Gold Mineralisation Intersected
KRP 004 307825 7159700 50 60 270 No Significant Gold Mineralisation Intersected
KRP 005 307850 7159700 50 60 270 No Significant Gold Mineralisation Intersected
KRP 006 308400 7156900 50 60 90 No Significant Gold Mineralisation Intersected
KRP 007 308425 7156900 50 60 90 No Significant Gold Mineralisation Intersected
KRP 008 308450 7156900 50 60 90 No Significant Gold Mineralisation Intersected
KRP 009 308475 7156900 50 60 90 No Significant Gold Mineralisation Intersected
KRP 010 308500 7156900 50 60 90 No Significant Gold Mineralisation Intersected
KRP 011 308375 7156900 50 60 90 No Significant Gold Mineralisation Intersected
KRP 012 308350 7156900 50 60 90 No Significant Gold Mineralisation Intersected
KRP 013 307640 7159700 75 60 90 No Significant Gold Mineralisation Intersected
KRP 014 307665 7159700 75 60 90 No Significant Gold Mineralisation Intersected
KRP 015 307690 7159700 70 60 90 No Significant Gold Mineralisation Intersected
KRP 016 307715 7159700 50 60 90 No Significant Gold Mineralisation Intersected
KRP 017 307740 7159700 50 60 90 No Significant Gold Mineralisation Intersected
KRP 018 307765 7159700 50 60 90 No Significant Gold Mineralisation Intersected
KRP 019 307790 7159700 70 60 90 No Significant Gold Mineralisation Intersected
KRP 020 307615 7159700 75 60 90 No Significant Gold Mineralisation Intersected
KRP 021 307595 7159700 70 60 90 No Significant Gold Mineralisation Intersected
KRP 022 307725 7160100 50 60 270 4m @ 0.31g/t Au from 4m and 2m @ 0.49g/t Au from
46m
KRP 023 307750 7160100 50 60 270 [email protected]/t Au from 4m
KRP 024 307850 7160100 50 60 270 No Significant Gold Mineralisation Intersected
KRP 025 307875 7160100 50 60 270 [email protected]/t Au from 8m
KRP 026 307900 7160100 60 60 270 No Significant Gold Mineralisation Intersected
KRP 027 307865 7160100 40 75 270 No Significant Gold Mineralisation Intersected
KRP 028 307825 7160100 50 60 270 No Significant Gold Mineralisation Intersected
KRP 029 307800 7160100 50 60 270 [email protected]/t Au from 36m
KRP 030 307775 7160100 50 60 270 No Significant Gold Mineralisation Intersected
KRP 031 307645 7160100 36 60 270 No Significant Gold Mineralisation Intersected
KRP 032 307630 7160100 40 60 270 No Significant Gold Mineralisation Intersected
KRP 033 307615 7160100 16 60 270 No Significant Gold Mineralisation Intersected
KRP 034 307548 7160100 36 60 270 No Significant Gold Mineralisation Intersected
KRP 035 307800 7159900 50 60 270 [email protected]/t Au from 25m
KRP 036 307775 7159900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 037 307750 7159900 50 60 270 [email protected]/t Au from 11m,[email protected]/t Au
KRP 038 307825 7159900 50 60 270 [email protected]/t Au from 9m,[email protected]/t Au
KRP 039 307850 7159900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 040 307600 7159500 36 60 90 No Significant Gold Mineralisation Intersected
KRP 041 307575 7159500 50 60 90 No Significant Gold Mineralisation Intersected

==> picture [596 x 37] intentionally omitted <==

KRP 042 307550 7159500 50 60 90 No Significant Gold Mineralisation Intersected
KRP 043 307525 7159500 50 60 90 No Significant Gold Mineralisation Intersected
KRP 044 307500 7159500 50 60 90 No Significant Gold Mineralisation Intersected
KRP 045 307625 7159500 30 60 270 [email protected]/t Au from 17m,[email protected]/t Au
KRP 046 307619 7159500 20 60 270 No Significant Gold Mineralisation Intersected
KRP 047 307800 7160900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 048 307775 7160900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 049 307900 7160900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 050 307925 7160900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 051 307875 7160900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 052 307850 7160900 50 60 270 21m @ 1.0g/t Au from 6m, including 5m @ 2.3g/t Au
from 27m
KRP 053 307825 7160900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 054 306875 7164300 65 60 90 [email protected]/t Au from 48m,[email protected]/t Au
KRP 055 306900 7164300 50 60 90 No Significant Gold Mineralisation Intersected
KRP 056 306925 7164300 50 60 90 No Significant Gold Mineralisation Intersected
KRP 057 306950 7164300 50 60 90 No Significant Gold Mineralisation Intersected
KRP 058 306975 7164300 50 60 90 No Significant Gold Mineralisation Intersected
KRP 059 306980 7164700 50 60 270 No Significant Gold Mineralisation Intersected
KRP 060 306955 7164700 50 60 270 12m @ 0.47g/t Au from 8m, including 4m @ 0.81g/t Au
from 16m
KRP 061 306930 7164700 50 60 270 19m @ 0.3g/t Au from surface, including 9m @ 0.6g/t
Au
KRP 062 306905 7164700 50 60 270 [email protected]/t Au from 38m
KRP 063 306525 7163900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 064 306500 7163900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 065 306475 7163900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 066 307875 7164900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 067 307850 7164900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 068 307825 7164900 50 60 270 No Significant Gold Mineralisation Intersected
KRP 069 307800 7164900 55 60 270 No Significant Gold Mineralisation Intersected
KRP 070 307375 7166500 34 60 270 [email protected]/t Au from 47m,[email protected]/t Au
KRP 071 307400 7166500 50 60 270 No Significant Gold Mineralisation Intersected
KRP 072 306935 7166500 50 75 270 [email protected]/t Au from 10m
KRP 073 307330 7166100 50 60 125 [email protected]/t Au from 12m
KRP 074 307310 7166080 45 60 125 42m @ 0.6g/t Au from 3m, including 21m @ 0.99g/t Au
from 9m
KRP 075 307290 7166120 55 60 125 [email protected]/t Au from 25m
KRP 076 306600 7166300 40 60 90 No Significant Gold Mineralisation Intersected
KRP 077 306575 7166300 50 60 90 [email protected]/t Au from 17m,[email protected]/t Au
KRP 078 306550 7166300 60 60 90 [email protected]/t Au from 47m

==> picture [596 x 37] intentionally omitted <==

TABLE 1 – Section 1: Sampling Techniques and Data

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as downhole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report. In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Percussion drilling (RAB) with adown hole hammer and cyclone was used to
obtain a drill chip sample for every metre down hole. Where mineralisation was
visible the 1 metre samples were assayed, while geologically controlled 3m or
5m composites were used in barren zones. If any of the 3m or 5m composites
returned positive assay results, then all the original 1m samples were re-split
and assayed individually.
A 1.5 to 2 kg sample was riffle spilt from the recovered drill chip sample and
sent for assay. Laboratory preparation included crushing and pulverising of the
entire sample to -75um. Then a 50g split was taken for gold analysis using fire
assay.
Drilling
techniques
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).
Drilling was completed with an Ingersoll Rand ECM350 Crawler Rig and a
XHP 750/250 Compressor. Samples were collected from 3.5inch (90mm)
diameter holes using Rotary Air Blast (RAB) drilling with adown hole hammer
and cyclone. This drilling technique is considered appropriate as it is industry
standard for early stage exploration drilling programs, especially for gold
exploration in greenstone terranes.
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and
results assessed.
Measures taken to maximise sample recovery and ensure representative
nature of the samples.
Whether a relationship exists between sample recovery and grade and
whether sample bias may have occurred due to preferential loss/gain of
fine/coarse material.
Recovered drill chip samples were weighed in order to assess sample recovery.
Sample weight varied between 10 and 20kg depending on the geological unit
and recovery was considered to be good.
There was no observed bias between sample recovery and grade.
Logging Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
The total length and percentage of the relevant intersections logged.
All drill holes were logged in full from start to finish of the hole.
The logging was qualitative in terms of lithology, weathering, mineralogy,
mineralisation, colour and other features but quantitative in terms of observed
estimates of the percentage of various minerals/mineralisation. No photography
of the chip trays has been found.
The logging of the drill chip samples was appropriate for this early stage of
exploration drilling but not for supporting Mineral Resource Estimations,
Mining Studies or Metallurgical Studies.

2

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ
material
collected,
including
for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled
Drill chip samples were Riffle Split.
All samples were dry.
Sample preparation was carried out according to industry standard practices at
a certified, independent minerals industry analytical laboratory. The sample
preparation included oven drying, coarse crushing and pulverisation to 75μm,
which is considered appropriate and industry standard for analysis of gold
content from this style of mineralisation.
Sample sizes are considered to be appropriate for the style and type of
mineralisation.

3

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the
parameters used in determining the analysis including instrument make
and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels of
accuracy (ie lack of bias) and precision have been established.










Laboratory preparation included oven drying, crushing and pulverising of the
entire sample to less than 75um. Then a 50g split was taken for gold analysis
using fire assay with Atomic Absorption analysis (AAS) and detection to a
detection limit of <0.01ppm. This analysis technique is industry standard for
gold mineralisation.

Duplicate samples were submitted every 20 samples or less as a control
measure.

The results from duplicate samples were compared with the corresponding
routine sample to ascertain whether the sampling was representative. These
results indicated that there was no discernible bias between the routine sample
and the duplicate.

No standards or blanks were used.

At the end of the programme, splits from a number of the best sample intervals
were sent to another laboratory for comparison. All results compared favourably
with the original assays.

The assaydata was also checked against loggingfor confirmation.
Verification of
sampling and
assaying
The verification of significant intersections by either independent or
alternative company personnel.

At the end of the programme, splits from a number of the best sample intervals
were sent to another laboratory for comparison. All results compared favourably
with the original assays.
The use of twinned holes. No twinned holes have been completed yet.
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols.
Drill logs and sampling data were written on paper and then later transferred
into excel spreadsheets.
Discuss any adjustment to assay data. No adjustments were made to assay data.

4

Criteria JORC Code explanation
Commentary
JORC Code explanation
Commentary
Location of data
points
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations used in
Mineral Resource estimation.
Drill holes were located on a local grid and converted to Arc1950/UTM zone
35S with a 2 point transformation.
Local grids were cut using a compass, ranging rods and tape, with lines being
pegged with wooden stakes at 25 metre intervals. Base Lines pegs were later
cemented for further exploration.
Accuracy of drill hole collar locations has not been established and therefore
they cannot be used in Mineral Resource estimation until this is achieved.
No down hole surveys.
Specification of the grid system used. Geodetic Datum: Arc 1950.UTM zone 35S.Arc 1950 references the Clarke
1880 (Arc) ellipsoid and the Greenwich prime meridian. Arc 1950 origin is
Fundamental point: Buffelsfontein. Latitude: 33°59'32.000"S, longitude:
25°30'44.622"E (of Greenwich). Arc 1950 is a geodetic datum for
Topographic mapping, geodetic survey. UTM Zone
Quality and adequacy of topographic control. No topographic control on collar locations but area is a relatively flat savanna
(rolling grassland scattered with shrubs and isolated trees), part of the Kalahari
Desert.
Data spacing and
distribution
Data spacing for reporting of Exploration Results. Areas where drilling was completed and the orientation of the drill holes
themselves were controlled using the information obtained from mapping the
outcropping geological units, geochemical assay data and ground geophysical
data collected. Four main areas were targeted to follow up on anomalous gold
surface geochemical sampling results. Drill holes were completed along east-
west trending fences and were evenly spaced at 25m intervals. Holes were
mainly drilled at a 60 degree dip, mainly towards either the east or west. Several
holes were drilled at 75 degrees, when the outcrop indicated that geological
units dipped shallowly. Most holes were drilled to 50 metres depth, except were
overburden was greater than 10 metres and then holes were extended to 70-75
metres. In total 78 drill holes were completed for 3,791 metres.

5

Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Criteria
JORC Code explanation
Commentary
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications
applied.
The data spacing and distribution of this drilling is insufficient to establish the
degree of geological and grade continuity appropriate for the Mineral Resource
Estimation.
Whether sample compositing has been applied. Geologically controlled 3m or 5m composites were used in barren zones.
However, if any of the 3m or 5m composites returned positive gold assay
results, then all the original 1m samples were re-split and assayed individually.
Orientation of
data in relation to
geological
structure
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering the
deposit type.
Drill holes were orientated perpendicular to the strike of and at a high angle to
the geological units that have been observed to contain the gold mineralisation
structures/veins. Similar style gold mineralisation within the same geological
units at a gold mine 40kms to the south of this area but along strike, has been
observed to be contained within two main gold vein orientations. Therefore,
structurally oriented diamond core drilling will be needed to establish if
multiple orientations of gold veins occur in this area.
If the relationship between the drilling orientation and the orientation of
key mineralised structures is considered to have introduced a sampling
bias, this should be assessed and reported if material.
As the drill holes were orientated perpendicular to the strike of geological units
and drilled at any angle to intersect the geological units at a high angle, it is
interpreted that no sampling bias has been introduced. However, further drilling
needs to be completed to properly understand the geometry of the mineralised
structures within the host geological units to more confidently say there is no
sampling bias in relation to the orientation of drilling and the orientation of the
mineralised structures.
Sample security The measures taken to ensure sample security. No information on sample security from the historic drilling is known.
Audits or reviews The results of any audits or reviews of sampling techniques and data. No information of any audits or reviews of sampling techniques and data from
the historic drilling is known.

6

TABLE 1 – Section 2: Exploration Results

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
Prospecting Licence No. PL232/2016.
South East Metals (Pty) Ltd, which is incorporated in Botswana and holds the
Kraaipan Project tenure is a wholly owned subsidiary of Kraaipan Founders Pty
Ltd, which is incorporated in Australia.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
Tenure was granted on the 1stof October 2016 for a period of three years. There is
no known impediments to obtaining a licence to operate in this area.
Exploration done
by other parties
Acknowledgment and appraisal of exploration by other parties. The drill holes reported here were completed by Reunion Mining (Botswana) (Pty)
Ltd, a wholly owned subsidiary of Reunion Mining plc, a Private Limited
Company based in London, UK.

7

Criteria JORC Code explanation Commentary
Geology Deposit type, geological setting and style of mineralisation. The Kraaipan Project covers an approximately 50 kilometre long stretch of the
Kraaipan Greenstone Belt (KGB) in Southern Botswana. The KGB is a part of the
larger Amalia-Kraaipan Greenstone Terrane of the Kaapvaal Craton (AKGB),
consisting of north trending, linear belts of older Archaean (~3500 Ma) meta-
volcanic and meta-sedimentary rocks, separated by granitoid units. The KGT in
Botswana is interpreted to be highly prospective for both orogenic gold and
magmatic nickel-copper-PGM sulphide mineralisation as these rocks are directly
along strike and within the same geological units as the well-known Kalgold (over
4.0 million ounces of gold) and Kalplats (over 6.5 million ounces of PGMs)
deposits across the border in South Africa.
The gold mineralisation identified by previous exploration within the KGB is
distinctly similar to that found at Kalgold. It occurs in shallow dipping
(approximately 65°E) quartz-carbonate veins, found in clusters or swarms, within
a steeply dipping, sub-greenschist facies, magnetite-chert, banded iron formation
(BIF) rock units. While, the mineralisation at Kalgold is associated with two sub
horizontal quartz-carbonate groups of veins (IIA and IIB), which also dip
shallowly at 20 to 40°W. Group IIA are ladder veins preferentially developed in
centimeter-scale Fe-rich mesobands, while Group IIB consists of large quartz-
carbonate veins, which crosscut the entire orebody and extends into the footwall
and hanging-wall in places. In both areas the gold mineralized veins are
associated with disseminated sulphide mineralisation, dominated by pyrite,
which is distributed around and between the shallowly dipping quartz vein
swarms.
Drill hole
Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information
for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
See Appendix 1 for this information.

8

Criteria JORC Code explanation Commentary
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.
This information has not been excluded.
Data aggregation
methods
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of high grades)
and cut-off grades are usually Material and should be stated.
The gold grade of the longer, lower grade intersection lengths were calculated
using a weighted average method with a 0.1g/t Au cut-off. The gold grade of the
shorter, higher grade intersection lengths was calculated using a weighted average
method of either 0.3g/t Au, 0.5g/t Au or 1g/t Au cut-off depending on whatever
was the highest-grade interval that could be defended over at least 3 metres. No
higher-grade assay results were interpreted to be outlying enough for a top-cut to
be used. Internal dilution (an assay result lower than the cut-off) was included in
some instances where the weighted average remained above the cut-off grade
between the start of the interval and the assay result that was lower than the cut-
off.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used for
such aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
See above explanation of the procedure of the weighted average intersection
reporting used.
The assumptions used for any reporting of metal equivalent values should
be clearly stated.
No metal equivalents used.
Relationship
between
mineralisation
widths and
intercept lengths
If the geometry of the mineralisation with respect to the drill-hole angle
is known, its nature should be reported.
Drill holes were orientated perpendicular to the strike of and at a high angle to the
geological units that have been observed to contain the gold mineralisation
structures/veins. However, further drilling (especially structurally oriented
diamond core) needs to be completed to properly understand the geometry of the
mineralised structures within the host geological units to more confidently
understand the angle between the orientation of drilling and the orientation of the
mineralised structures within the host geological units.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (e.g. ‘down hole length, true
width not known’).
All assay intervals results reported in this announcement are downhole lengths.
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts See Figure 5 for a map of the historic RAB drilling. See Figure 6 for various cross-

9

Criteria JORC Code explanation Commentary
should be included for any significant discovery being reported These
should include, but not be limited to a plan view of drill hole collar
locations and appropriate sectional views.
sections from the historic RAB drilling. All drill hole results have been reported
in Appendix 1.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades and/or
widths should be practiced to avoid misleading reporting of Exploration
Results.
Not applicable as all drill hole results have been reported in Appendix 1.
Other substantive
exploration data
Other exploration data, if meaningful and material, should be reported)
including (but not limited to): geological observations; geophysical
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious or contaminating substances.
The only other material exploration data that is only briefly mentioned in this
announcement is the Reunion soil geochemical survey results that are shown as an
underlay in Figure 5. These soil geochemical survey results were used to plan the
historic exploration drilling that is discussed in this announcement.
Further work The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Twin historic drill holes with structurally oriented diamond core help understand
the relationship between the host geological units and the mineralised veins, as
well as test the veracity of the historic assay results.
Drill test lateral extensions of gold mineralisation in order to determine if a mineral
resource can be defined in this area.
Drill other geochemical and geophysical exploration targets in order to try to find
gold or nickel-copper -PGM mineral resources.
Diagrams clearly highlighting the areas of possible extensions, including
the main geological interpretations and future drilling areas, provided
this information is not commercially sensitive.
It is difficult to interpret the areas of possible extensions without the use of the
results from the structurally oriented diamond core that is planned to be completed
to twin some of the more significant historic drill holes. As this work progresses
interpretations and the definition of targets will be announced.

10