AI assistant
ZENITH MINERALS LIMITED — AGM Information 2011
Nov 23, 2011
66123_rns_2011-11-23_448ad0af-0b03-41d3-a930-c2fbc970d294.pdf
AGM Information
Open in viewerOpens in your device viewer
==> picture [172 x 82] intentionally omitted <==
24 November 2011
ASX Operations Announcement Office Level 10, 20 Bond Street SYDNEY NSW 2000
Electronic Lodgement
Dear Sir/Madam,
PRESENTATION TO BE MADE TO SHAREHOLDERS AT AGM
Please find attached for release to market a copy of the presentation to be delivered by Zenith Mineral’s Managing Director at the Company’s Annual General Meeting today.
Yours sincerely
==> picture [91 x 29] intentionally omitted <==
Alex Dermedgoglou Company Secretary
Level 3, 33 Ord Street, West Perth, Western Australia 6005 PO Box 1426, West Perth, Western Australia 6872 Tel: (+61-8) 9226 1110 Fax: (+61-8) 9321 0070 Email: [email protected]
==> picture [239 x 243] intentionally omitted <==
Zenith Minerals Limited
ABN 96 119 397 938
Annual General Meeting 24 November 2011 Managing Director’s Presentation
Disclaimer
Forward looking statementsForward looking statements
Some statements in this presentation regarding estimates or future events are forward looking statements. They involve risk and uncertainties that couldSome statements in this presentation regarding estimates or future events are forward looking statements. They involve risk and uncertainties that could cause actual results to differ from estimated results. Forward-looking statements include estimates of future production, reserve and mineralised materialcause actual results to differ from estimated results. Forward-looking statements include estimates of future production, reserve and mineralised material estimates, capital costs, and other estimates or prediction of future activities. They include statements preceded by words such as "believe", "estimate",estimates, capital costs, and other estimates or prediction of future activities. They include statements preceded by words such as "believe", "estimate", "expect","expect", "intend","intend", "will""will" andand similarsimilar expressions.expressions. ActualActual resultsresults couldcould differdiffer materiallymaterially dependingdepending onon suchsuch thingsthings asas politicalpolitical events,events, labourlabour relations,relations, currency fluctuations and other general economic conditions, market prices for Zenith Minerals Limited products, timing of permits and other governmentcurrency fluctuations and other general economic conditions, market prices for Zenith Minerals Limited products, timing of permits and other government approvals and requirements, change in operating conditions, lower than expected ore grades, unexpected ground and mining conditions, availability andapprovals and requirements, change in operating conditions, lower than expected ore grades, unexpected ground and mining conditions, availability and cost of materials and equipment, and risks generally inherent in the ownership and operation of mining properties and investment in foreign countries.cost of materials and equipment, and risks generally inherent in the ownership and operation of mining properties and investment in foreign countries.
Information presented is a summaryInformation presented is a summary ThisThis presentationpresentation aimsaims toto provideprovide aa highhigh levellevel summarysummary ofof variousvarious technicaltechnical aspectsaspects ofof thethe Company'sCompany's projects.projects. ForFor moremore detailsdetails onon thethe underlyingunderlying technical parameters the reader is referred to the ASX Reports on Zenith Minerals Limited’s website:technical parameters the reader is referred to the ASX Reports on Zenith Minerals Limited’s website: www.zenithminerals.com.au www.zenithminerals.com.au
JORC competent person statementJORC competent person statement
The information in this report that relates to Exploration Results and to the Exploration Target at Mount Alexander is based on information compiled by A MThe information in this report that relates to Exploration Results and to the Exploration Target at Mount Alexander is based on information compiled by A M Hespe, who is a Member of the Australasian Institute of Geoscientists.Hespe, who is a Member of the Australasian Institute of Geoscientists. Mr Hespe has sufficient experience which is relevant to the style of mineralisationMr Hespe has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of theand type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'.'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Hespe is a full time employee of Zenith Minerals LimitedMr Hespe is a full time employee of Zenith Minerals Limited and consents to the inclusion in the report of the matters based on his information in the form and context in which it appear.and consents to the inclusion in the report of the matters based on his information in the form and context in which it appear.
The information in this Report that relates to the Inferred Resource at Mount Alexander and the Exploration Target at Mount Alexander West is based onThe information in this Report that relates to the Inferred Resource at Mount Alexander and the Exploration Target at Mount Alexander West is based on information compiled by Grant Louw of CSA Global. Grant Louw takes overall responsibility for the estimates. He is a Member of the Australian Institute ofinformation compiled by Grant Louw of CSA Global. Grant Louw takes overall responsibility for the estimates. He is a Member of the Australian Institute of Geoscientists and has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity heGeoscientists and has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity he is undertaking, to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Oreis undertaking, to qualify as a Competent Person in terms of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2004 Edition). Grant Louw consents to the inclusion of such information in this Report in the form and context in which it appears.Reserves (JORC Code 2004 Edition). Grant Louw consents to the inclusion of such information in this Report in the form and context in which it appears.
Zenith Minerals Limited
ASX code: ZNC
Issued shares: 81.31 million Market Cap: A$33.7m undiluted* Options: 1.05 million unlisted Cash Sept 2011: A$2.75m Investments $210,000**
Share price Nov 2010 to Nov 2011
==> picture [396 x 18] intentionally omitted <==
==> picture [396 x 18] intentionally omitted <==
==> picture [396 x 19] intentionally omitted <==
==> picture [396 x 18] intentionally omitted <==
==> picture [396 x 18] intentionally omitted <==
==> picture [396 x 18] intentionally omitted <==
==> picture [396 x 18] intentionally omitted <==
==> picture [396 x 18] intentionally omitted <==
==> picture [396 x 18] intentionally omitted <==
https://onlineinvesting.westpac.com.au/Private/MarketPrices/Charts/
Major shareholders:
| HSBC CUSTODY NOM AUST LTD | 11.1% |
|---|---|
| GIRALIA (ATLAS IRON LTD) | 10.8 % |
| JP MORGAN NOM AUST LTD | 3.7% |
| YANDAL INV PL | 3.4% |
| BUCKLEY ROBERT JAMES H | 3.4% |
| BREAMLEA PL | 3.1% |
*** At 11/Nov/2011, SP 41.5c ** 550,000 $0.16 options expiring 1 Feb 2013; 500,000 $0.14 options expiring 31 Dec 2013**
Zenith Minerals Limited
Corporate events 2010-2011
Name change from Zinc Co Australia Limited effective 16 December 2011
Capital raising announced March 2011 raised $3.1 million through a share placement at $0.42 cents per share, comprising 7,440,000 shares to Australian and overseas sophisticated investors
New major shareholder – Atlas Iron Ltd Appointment of Managing Director
Projects Overview – Year to Nov 2011
==> picture [231 x 30] intentionally omitted <==
IRON – Mt Alexander (ZNC 100%)
==> picture [231 x 29] intentionally omitted <==
- Announced JORC Inferred Resource 393 Mt @ 29.5% Fe
==> picture [231 x 29] intentionally omitted <==
- Scoping study completed on 8Mtpa production
==> picture [231 x 30] intentionally omitted <==
-
Exploration Target* increased to 0.75Bt to 1.43Bt
-
Pre feasibility study components initiated – environment, water
==> picture [231 x 29] intentionally omitted <==
==> picture [231 x 29] intentionally omitted <==
==> picture [231 x 27] intentionally omitted <==
MANGANESE – Earaheedy (ZNC 100%)
-
New tenements granted
-
Regional prospecting located two new manganese occurrences
-
Drilling for high grade manganese oxide in progress
-
BASE METALS Cu, Zn, Pb, (Au) - Snake Well (ZNC can earn up to 75%) • RAB and diamond drilling completed at Kerbar prospect
-
2.7km alteration zone identified
-
Ground EM in progress to locate massive sulphide zone
*JORC statement regarding the use of the term “Exploration Target” throughout this presentation “The potential quantity and grade of this exploration target is conceptual in nature. There has been insufficient exploration to define a Mineral Resource, and it is uncertain if further exploration will result in the determination of a Mineral Resource.”
Mount Alexander
Project Location
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 15] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 15] intentionally omitted <==
==> picture [496 x 15] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 16] intentionally omitted <==
==> picture [496 x 10] intentionally omitted <==
Owned 100% Zenith
Well located close to infrastructure – sealed roads, gas pipelines, 120km from coast at Onslow Proposed West Pilbara Project rail and Anketell port – API have publicly indicated 3[rd] party access can be negotiated
Mount Alexander
Mt Alexander resource model (looking north east)
==> picture [512 x 16] intentionally omitted <==
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 16] intentionally omitted <==
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 16] intentionally omitted <==
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 16] intentionally omitted <==
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 16] intentionally omitted <==
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 16] intentionally omitted <==
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 16] intentionally omitted <==
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 16] intentionally omitted <==
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 16] intentionally omitted <==
Exploration Target* (red) – interpreted from surface geology mapping, sampling. JORC Inferred - Resource (yellow) estimated from drilling and the surface map.
Results from drilling support subsurface interpretation from surface mapping
==> picture [512 x 15] intentionally omitted <==
==> picture [512 x 5] intentionally omitted <==
| Zenith Minerals Mt Alexander Magnetite Project Mineral Resource estimate | Zenith Minerals Mt Alexander Magnetite Project Mineral Resource estimate | Zenith Minerals Mt Alexander Magnetite Project Mineral Resource estimate | Zenith Minerals Mt Alexander Magnetite Project Mineral Resource estimate | Zenith Minerals Mt Alexander Magnetite Project Mineral Resource estimate | Zenith Minerals Mt Alexander Magnetite Project Mineral Resource estimate | Zenith Minerals Mt Alexander Magnetite Project Mineral Resource estimate | Zenith Minerals Mt Alexander Magnetite Project Mineral Resource estimate |
|---|---|---|---|---|---|---|---|
| Classification | Tonnes | Fe % | SiO~~2 ~~% | Al~~2~~O~~3 ~~% | P% | S % | LOI % |
| Inferred | 392.9 | 29.5 | 48.3 |
2.4 |
0.10 | 0.47 | -0.7 |
Mount Alexander
==> picture [573 x 14] intentionally omitted <==
==> picture [573 x 14] intentionally omitted <==
==> picture [573 x 363] intentionally omitted <==
----- Start of picture text -----
Mount Alexander (looking south west)
Mount Alexander West
Inferred Resource
Iron Formation continues north east
Exploration Target
4.1km
----- End of picture text -----
==> picture [573 x 13] intentionally omitted <==
==> picture [573 x 14] intentionally omitted <==
==> picture [573 x 14] intentionally omitted <==
==> picture [573 x 7] intentionally omitted <==
Mount Alexander
Location of project resources and mineralisation
==> picture [438 x 18] intentionally omitted <==
==> picture [438 x 18] intentionally omitted <==
==> picture [438 x 18] intentionally omitted <==
==> picture [438 x 17] intentionally omitted <==
==> picture [438 x 18] intentionally omitted <==
==> picture [438 x 18] intentionally omitted <==
==> picture [438 x 18] intentionally omitted <==
==> picture [438 x 18] intentionally omitted <==
==> picture [438 x 17] intentionally omitted <==
==> picture [438 x 18] intentionally omitted <==
==> picture [438 x 18] intentionally omitted <==
==> picture [438 x 18] intentionally omitted <==
==> picture [438 x 18] intentionally omitted <==
==> picture [438 x 17] intentionally omitted <==
Mt Alexander Exploration Target* (2010) 0.6 to1.2 Bt at 25% to 35% Fe
Inferred Resource (this year) 393 Mt @ 29.5% Fe (contained within Exploration Target volume) Mt Alexander West Exploration Target* (this year) 150 to 230 Mt @ 20% to 25% Fe
==> picture [438 x 18] intentionally omitted <==
Exploration Target* total 0.75 to 1.43 Bt Image – TMI RTP aeromagnetics Additional resource potential to north east around anticline
Mount Alexander
Scoping Study* – announced May 2011 Preliminary identification of a development plan and potential costs
Base case selected:
-
Production of 8Mtpa concentrate at 68.6% Fe
-
Transport concentrate to Onslow by slurry pipeline, de-water at Onslow
-
Transport concentrate by barge to an offshore mooring for transfer into ships for export
-
Power station at Onslow
: Operating cost per tonne of concentrate FOB A$57 (contract power) A$50 (own power)
Capital cost:
A$1,700M (contract power) A$1,900M (own power)
*Zenith does not represent that the scoping study shows Mount Alexander is an economically viable project as the assumptions used in the study are preliminary. The study is used to identify critical issues for project development and to prioritise development effort and expenditure
Mount Alexander
Pre-feasibility study:
Work has commenced on elements of a pre-feasibility study for a magnetite project at Mount Alexander
Environmental
A plan is in place to complete by December 2012 all field studies required for an Environmental Impact Assessment at the mining/processing site.
Stage 1 field studies commenced in August and will be completed by December 2011
The study is managed by a leading environmental consultant group
Water
Applications for 3 Miscellaneous Licences for water were lodged in September 2011.
The application areas were identified in June 2011 by a leading hydrological consultant group.
Exploration for a bore field to provide water for mining and processing will commence on grant of the tenements.
Mount Alexander
Project development plan 2012:
Continue with elements of a pre-feasibility study:
-
•Complete environmental field studies required for an Environmental Impact Assessment for mine and concentrator
-
•Commence exploration for a bore field for process water (subject to grant of tenements)
Continue to assess export infrastructure options:
-
•Access to Onslow
-
•Access to the proposed Anketell Port
Resource drilling:
-
•Low case – add to Inferred Mineral Resource base by drilling at south east ridge
-
•Medium case – low case plus conversion of north west ridge Inferred Mineral Resource to Indicated status
-
•High case – drill out both ridges to Indicated Mineral Resource, plus exploration drilling around north east anticline
Metallurgical process test work:
-
•Expand coverage of metallurgical data as new drill samples become available
-
•Optimise processing flow sheet based on new metallurgical data
Earaheedy
==> picture [299 x 26] intentionally omitted <==
==> picture [299 x 26] intentionally omitted <==
==> picture [299 x 26] intentionally omitted <==
==> picture [299 x 26] intentionally omitted <==
==> picture [299 x 26] intentionally omitted <==
==> picture [299 x 26] intentionally omitted <==
==> picture [299 x 26] intentionally omitted <==
==> picture [299 x 25] intentionally omitted <==
==> picture [299 x 25] intentionally omitted <==
==> picture [299 x 26] intentionally omitted <==
==> picture [299 x 26] intentionally omitted <==
==> picture [299 x 26] intentionally omitted <==
==> picture [299 x 26] intentionally omitted <==
==> picture [299 x 26] intentionally omitted <==
Zenith100% owned project
Earaheedy Project originally acquired for zinc
Zenith recognised manganese potential of the west Earaheedy Basin in 2010 Zenith first mover, strong land position Exploration target is a deposit of shallow high grade manganese oxide
First drilling program for manganese completed September 2010 at Lockeridge Prospect
==> picture [299 x 21] intentionally omitted <==
Earaheedy
Lockeridge drilling 2010 – cross section
==> picture [543 x 368] intentionally omitted <==
----- Start of picture text -----
1.6m @ 42.9% Mn
----- End of picture text -----
Mineralisation occurs in a stratigraphic unit extending 1.2km down dip and along strike for 1.6 km. - not limited by drilling to date.
==> picture [721 x 541] intentionally omitted <==
----- Start of picture text -----
Earaheedy
Lockeridge drilling 2010 – cross section
1.6m @ 42.9% Mn
Primary
mineralisation
is carbonate
Carbonate
mineralisation
is enriched
near surface to
high grade
-
oxide this is
the current
exploration
target
----- End of picture text -----
Earaheedy
Western Earaheedy Basin manganese – Zenith activity
==> picture [485 x 16] intentionally omitted <==
==> picture [485 x 17] intentionally omitted <==
==> picture [485 x 16] intentionally omitted <==
==> picture [485 x 16] intentionally omitted <==
==> picture [485 x 17] intentionally omitted <==
==> picture [485 x 16] intentionally omitted <==
==> picture [485 x 16] intentionally omitted <==
==> picture [485 x 17] intentionally omitted <==
==> picture [485 x 16] intentionally omitted <==
==> picture [485 x 16] intentionally omitted <==
==> picture [485 x 17] intentionally omitted <==
==> picture [485 x 16] intentionally omitted <==
==> picture [485 x 16] intentionally omitted <==
==> picture [485 x 144] intentionally omitted <==
----- Start of picture text -----
Zenith manganese
prospect
Other company new
manganese prospect
----- End of picture text -----
New Zenith tenements granted March 2011
Helicopter prospecting May 2011 - located two new high grade manganese oxide prospects at Red Lake and Blue Line in new tenements
Regional scale of manganese mineralisation confirmed
Drilling in progress at Black and Blue and at Red Lake
Earaheedy
Black and Blue Prospect
Drilling in progress Minimum program 1,100 metres RC
==> picture [487 x 17] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [229 x 32] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [487 x 17] intentionally omitted <==
==> picture [229 x 31] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [229 x 32] intentionally omitted <==
==> picture [487 x 17] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [229 x 32] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [487 x 17] intentionally omitted <==
==> picture [229 x 32] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [229 x 31] intentionally omitted <==
==> picture [487 x 17] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [229 x 32] intentionally omitted <==
==> picture [487 x 17] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [229 x 32] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [487 x 17] intentionally omitted <==
==> picture [229 x 31] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [487 x 16] intentionally omitted <==
==> picture [229 x 29] intentionally omitted <==
==> picture [487 x 17] intentionally omitted <==
==> picture [487 x 8] intentionally omitted <==
Earaheedy
Red Lake Prospect
Drilling in progress Minimum program 2,000 metres RC
==> picture [495 x 16] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [217 x 32] intentionally omitted <==
==> picture [495 x 15] intentionally omitted <==
==> picture [495 x 15] intentionally omitted <==
==> picture [217 x 32] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [217 x 32] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [217 x 31] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [217 x 38] intentionally omitted <==
----- Start of picture text -----
Aeromagnetic image
----- End of picture text -----
==> picture [495 x 16] intentionally omitted <==
==> picture [495 x 15] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [218 x 35] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [218 x 34] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [218 x 35] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [495 x 15] intentionally omitted <==
==> picture [218 x 34] intentionally omitted <==
==> picture [495 x 16] intentionally omitted <==
==> picture [495 x 15] intentionally omitted <==
Haematite target - C
==> picture [187 x 16] intentionally omitted <==
----- Start of picture text -----
Manganese target – A, B
----- End of picture text -----
Manganese outcrop at “A”
Earaheedy
Project development plan 2012:
Follow up results of Red Lake and Black and Blue drilling Prospecting and drill target definition in tenements not yet granted Drill testing of the targets so defined and of the Blue Line prospect Assess potential for primary manganese carbonate as an exploration target
Snake Well JV
==> picture [442 x 17] intentionally omitted <==
Joint Venture with Atlas Iron
==> picture [442 x 18] intentionally omitted <==
==> picture [442 x 17] intentionally omitted <==
==> picture [442 x 17] intentionally omitted <==
==> picture [442 x 18] intentionally omitted <==
==> picture [442 x 17] intentionally omitted <==
==> picture [442 x 17] intentionally omitted <==
==> picture [442 x 17] intentionally omitted <==
==> picture [442 x 17] intentionally omitted <==
==> picture [442 x 17] intentionally omitted <==
==> picture [442 x 17] intentionally omitted <==
==> picture [442 x 18] intentionally omitted <==
==> picture [442 x 17] intentionally omitted <==
==> picture [442 x 17] intentionally omitted <==
Zenith can earn up to 75%
Atlas retains certain gold rights Located in Archaean Tallering Greenstone belt
Exploration target is high unit value volcanic hosted massive sulphide (VHMS) deposit.
==> picture [442 x 18] intentionally omitted <==
==> picture [442 x 17] intentionally omitted <==
==> picture [442 x 17] intentionally omitted <==
==> picture [442 x 11] intentionally omitted <==
Examples include Golden Grove, Jaguar, Doolgunna/DeGrussa
Snake Well JV
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 16] intentionally omitted <==
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 16] intentionally omitted <==
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 16] intentionally omitted <==
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 16] intentionally omitted <==
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 16] intentionally omitted <==
50 strike kilometres of prospective volcanics
Predominantly under shallow cover Two VHMS prospects at A Zone, Conquistador
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 16] intentionally omitted <==
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 16] intentionally omitted <==
VHMS deposits commonly occur in clusters
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 16] intentionally omitted <==
==> picture [493 x 15] intentionally omitted <==
==> picture [493 x 16] intentionally omitted <==
==> picture [493 x 14] intentionally omitted <==
==> picture [198 x 31] intentionally omitted <==
==> picture [198 x 30] intentionally omitted <==
Potential new VHMS occurrence at Kerbar – discovered 2010
Snake Well JV
Kerbar Prospect
==> picture [439 x 17] intentionally omitted <==
==> picture [439 x 18] intentionally omitted <==
==> picture [439 x 17] intentionally omitted <==
• Previous drilling at Conquistador shows that chargeability anomaly is a response to VHMS footwall style alteration
==> picture [439 x 17] intentionally omitted <==
==> picture [439 x 18] intentionally omitted <==
==> picture [439 x 17] intentionally omitted <==
==> picture [439 x 17] intentionally omitted <==
==> picture [439 x 18] intentionally omitted <==
==> picture [439 x 17] intentionally omitted <==
==> picture [439 x 17] intentionally omitted <==
==> picture [439 x 18] intentionally omitted <==
==> picture [439 x 17] intentionally omitted <==
==> picture [439 x 17] intentionally omitted <==
==> picture [439 x 17] intentionally omitted <==
==> picture [439 x 17] intentionally omitted <==
==> picture [439 x 17] intentionally omitted <==
- •Kerbar located within a 2.6km long chargeability anomaly
• RAB at Kerbar in 2010 and 2011 intersected gossanous iron oxide after sulphide over 200m width, maximum: 0.16% Cu; 0.20% Zn 0.65 g/t Au
==> picture [439 x 17] intentionally omitted <==
==> picture [439 x 18] intentionally omitted <==
==> picture [439 x 17] intentionally omitted <==
Geophysical images are gradient array IP/chargeability – hot colours = high chargeability
•3.2 strike km of chargeability anomalies untested
Snake Well JV
Kerbar Prospect – diamond drilling (July 2011)
==> picture [313 x 24] intentionally omitted <==
==> picture [313 x 24] intentionally omitted <==
==> picture [313 x 24] intentionally omitted <==
==> picture [313 x 24] intentionally omitted <==
==> picture [313 x 24] intentionally omitted <==
==> picture [313 x 24] intentionally omitted <==
==> picture [313 x 24] intentionally omitted <==
==> picture [313 x 24] intentionally omitted <==
==> picture [313 x 24] intentionally omitted <==
==> picture [281 x 26] intentionally omitted <==
==> picture [281 x 26] intentionally omitted <==
==> picture [281 x 26] intentionally omitted <==
==> picture [281 x 26] intentionally omitted <==
==> picture [281 x 26] intentionally omitted <==
==> picture [281 x 26] intentionally omitted <==
==> picture [281 x 26] intentionally omitted <==
==> picture [281 x 26] intentionally omitted <==
==> picture [671 x 66] intentionally omitted <==
----- Start of picture text -----
20,200E
20,000E
----- End of picture text -----
Two diamond holes drilled to test the Kerbar alteration zone.
Both holes intersected thick sericite pyrite alteration with anomalous copper and zinc geochemistry – typical of VHMS deposit foot wall
Ground EM in progress to locate massive sulphide within the alteration zone
Snake Well JV
Ground EM in progress
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 19] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 19] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 19] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
Kerbar FLEM to locate massive sulphide within alteration zone – in progress
Six Mile FLEM over chargeability anomaly – completed, no anomaly detected
A Zone MLEM along the A Zone stratigraphic position – infill CRAE 600m spaced Sirotem
==> picture [426 x 19] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 18] intentionally omitted <==
==> picture [426 x 14] intentionally omitted <==
MLEM – moving loop EM FLEM – fixed loop EM
Constrictor FLEM covering historical RAB drilling with +1000 ppm Cu/Zn over 1200m strike
Snake Well JV
Project development plan 2012:
Evaluate results of current ground EM surveys and drill test anomalies attributed to a massive base metal sulphide source. RAB and ground EM over 3.2 strike km of untested chargeability anomalies
Program for 2012 - Summary
IRON – Mt Alexander
-
Continue with elements of pre-feasibility study
-
Continue to assess export infrastructure options
-
Resource drilling
-
Metallurgical test work
MANGANESE – Earaheedy
-
Follow up results of current drilling
-
Drill testing of new targets
-
Assess exploration potential of primary manganese carbonate
BASE METALS Cu, Zn, Pb, (Au) - Conquistador/Snake Well
-
drilling of targets identified by Kerbar EM
-
RAB and ground EM over 3.2 strike km untested chargeability anomalies
Zenith Minerals Limited
==> picture [579 x 14] intentionally omitted <==
==> picture [579 x 14] intentionally omitted <==
Registered office: Level 3, 33 Ord St West Perth WA 6005
Postal address: PO Box 1426 West Perth WA 6872
==> picture [579 x 14] intentionally omitted <==
==> picture [579 x 14] intentionally omitted <==
==> picture [579 x 14] intentionally omitted <==
+61 8 9226 1110 +61 8 9321 0070 [email protected] www.zenithminerals.com.au ZNC Managing Director Director
Telephone Fax Email Website
Australian Securities Exchange Code Further information: Anthony Hespe Mike Joyce
==> picture [579 x 14] intentionally omitted <==
Photo: Mt Alexander iron formation ridges
==> picture [579 x 11] intentionally omitted <==