Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

XTRACT RESOURCES PLC Regulatory Filings 2016

Jun 16, 2016

8030_rns_2016-06-16_42c2643a-ba0f-49bc-8847-02c41dafb5a8.html

Regulatory Filings

Open in viewer

Opens in your device viewer

National Storage Mechanism | Additional information

You don't have Javascript enabled. For full functionality this page requires javascript to be enabled.

RNS Number : 4313B

Xtract Resources plc

16 June 2016

16 June 2016

Xtract Resources Plc

("Xtract" or "the Company")

Presentation to shareholders and update on Chepica

Xtract Resources Plc (AIM: XTR) announces that the presentation to be presented to shareholders today at 12.30pm can be accessed by the following link: http://www.xtractresources.com/reports.htm

The Company will present the following operational highlights at its Chepica mine:

Further scope to increase volume from underground:

·      Chepica is consistently delivering on volume of 280t/day

·      Upgrading crushing circuit to provide capacity to produce volume of up to 340t/day (next six months)

·      Upgrade in crushing circuit is improving milling capacity and grind (improved recoveries)

·      Underground grade is running at 3.5g/t (highest grade ever mined)

·      Mineralised zone at Chepica almost 10m wide

·      Continue to expose reef along strike on 5, 6 and 7 level

·      Almost at the position to drive 2 reef ends at Chepica on 8 level

·      Total of 7 ends on reef (when Chepica intersects 8 level)

·      Making up total milling target of 10kt from development only

·      Mine pre-developed on 3 levels ready for stoping

·      Do not have to install any roof bolts on 7 level at Colin (rock extremely competent)/rheology has improved

Lead-Zinc concentrate in addition to Gold concentrate:

·      Ore body at depth at Colin has significant quantities of lead and zinc

·      Up to 1% zinc in rock samples and core

·      Lead-zinc has caused a problem in past 2 months in terms of floating gold

·      We have changed the plant circuit and will now produce a lead-zinc and gold concentrate

·      The lead-zinc concentrate will result in additional revenue

·      We need to install additional floatation cells to increase grade and quantity of concentrate produced

·      Build a lead-zinc circuit and expand gold circuit

·      Capex of U$150,000 to US$250,000 (over 2 months)

Increased production from tailings operation by 10kt/month:

·      We are allocating debt capital to start construction of 6 tailings ponds that will leach an additional 10kt/mth

·      Capital of US$1.25m to complete the project

·      Have completed raising the current tailings dam wall by 4m and have doubled the wall thickness in preparation for the tailings operation (moved over 1Mt of material)

·      Need to complete additional sampling and metallurgical test work (2 months - samples have been dispatched to lab)

·      Need to build a gold elution facility that will produce dorey gold bars from alluvial operation

·      Increase recoveries to 85%

·      Increase the effective gold price we receive from US$800/oz to the current spot gold price

·      Tailings operation will double monthly production output from the mine within 4 months

Earn-in Option

We were pleased to renegotiate the earn-in option agreement on Chepica, with payment schedule deferred, and the renegotiation of the option payments remains ongoing.

Enquiries:

Xtract Resources Plc Jan Nelson, CEO +44 (0)20 3416 6471
Cenkos Securities plc Derrick Lee

Beth McKiernan
+44 (0)131 220 6939
Beaufort Securities Jon Belliss +44 (0)207 382 8300
St James's Corporate Services Limited Phil Dexter +44 (0)20 7796 8647

+44 (0)7798 634398
Gable Communications John Bick

[email protected]
+44 (0)20 7193 7463

+44 (0) 7872 061007

This information is provided by RNS

The company news service from the London Stock Exchange

END

MSCLLFFLRRIRLIR