XSTATE RESOURCES LIMITED Interim / Quarterly Report 2015

Oct 29, 2015

66107_rns_2015-10-29_c78b0ab9-2354-4b57-90f0-3e65a7b6b124.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [185 x 64] intentionally omitted <==

ABN 96 009 217 154

30 October 2015 ASX Limited

Electronic lodgement

September 2015 Quarterly Activity Report

Summary

  • Xstate has reviewed in detail several potentially value‐adding production opportunities onshore USA; in particular, those assets where undeveloped reserves can be accessed in the event of rising oil or gas price. It is intended that such lower risk assets will complement our existing high impact appraisal and exploration portfolio assets in the Sacramento basin.

  • In the Sacramento Basin, discussions continue with potential funding partners – specifically targeting the potential to drill the Dempsey prospect by early 2016. Related discussions continue for the Alvares prospect where consideration is being made to re‐enter the existing well bore in order to conduct a flow test program.

  • Also in the Sacramento Basin, at the Rancho‐Capay Gas Field, the Operator identified a gas reservoir which had been covered by produced sand in the well bore. When placed on well test, the reservoir produced gas at a stabilised flow rate of 425mcf/day.

  • The Company raised $164,798 via a Company Share Purchase Plan and issued 54,532,910 new shares

  • Mr Cosimo Damiano was appointed to the Board of XST providing XST with extensive commercial and finance experience as well as asset familiarity on the ground in XST’s core areas of interest.

Exploration

SACRAMENTO BASIN – Onshore Northern California

Drilling approvals for the Dempsey prospect are sufficiently advanced such that if a farmout were to be concluded, there is a possibility to drill the Dempsey well by early 2016.

ABN 96 009 217 154

==> picture [185 x 64] intentionally omitted <==

Dempsey Conventional Gas Prospect (XST 10% WI)

The Dempsey prospect remains the current focus of the Joint Venture’s plans – primarily because of the potential for near term production. This is because it is located beneath existing Xstate’s production facilities.

Dempsey’s proposed drilling depth is approximately 3,200m and is estimated to cost US$4.5 to drill. (100% cost).

The total (100%) unrisked recoverable prospective resource from 7 interpreted reservoir zones, on a best estimate deterministic basis, is approximately 1TCF.

Alvares Conventional Gas Prospect (XST 25% WI)

The Alvares gas appraisal prospect is located close to large natural gas pipelines and involves the appraisal drilling of a large anticline originally drilled in 1982 and which had extensive gas shows and flowed gas to surface.

It contains a total (100%) unrisked recoverable prospective resource on a best estimate deterministic basis of 2.4TCF.

The Joint Venture is currently investigating the feasibility to re‐enter the existing well bore to conduct a series of flow tests.

Production

SACRAMENTO BASIN

Rancho ‐ Capay Gas Field (XST 10% WI in 5 wells) & Los Medanos Gas Field (XST 10% WI in 2 wells)

Xstate acquired a working interest in minor gas production rights in the Sacramento Basin onshore California in 2013. The purpose of the acquisition was to acquire the leases for further exploration and to access an extensive 3D seismic database from which to generate new exploration opportunities. Production for the quarter was as follows:

Production Sep 2015 Quarter Jun 2014 Quarter
Gross mcf ** (100%) 31,675 41,744
Net XST mcf (after Royalty) 2,201 2,839

**mcf – Thousand Cubic feet gas

ABN 96 009 217 154

==> picture [185 x 64] intentionally omitted <==

Corporate

Share Purchase Plan

During the quarter, the Company announced a Company Share Purchase Plan (SPP) with the funds from the SPP to be used:‐

  • to meet costs in relation to the Xstate’s oil and gas interests in California

  • the pursuit and assessment of new venture opportunities, and

  • for day to day working capital purposes

The SPP was successful in that it raised $164,798 for the issue of 54,932,910 new shares.

Revised Growth Strategy

The Board intends to pursue a revised strategy of adding low operating cost, conventional oil and gas production assets with undeveloped reserves to the Company’s portfolio. Such assets are favourably priced in the current oil price environment and provide the opportunity to access additional production and reserves in the event of rising oil or gas prices. It is intended that such lower risk production assets will provide cash flow continuity and compliment XST’s existing high impact appraisal and exploration portfolio in the Sacramento basin.

Executive Director Appointment

The Company announced the appointment of Mr Cosimo Damiano to the Board of XST as an Executive Director. Mr Damiano will assist XST to pursue, assess and secure funding for additions to the portfolio in line with the Company’s revised strategy. He has extensive experience in North America, representing the Mercuria Group as a Director of Upstream Investments and represented Mercuria’s Board interests in the company’s oil and gas investments throughout North America located in California and North Dakota.

Mr Damiano’s remuneration will be based on a small retainer plus a day rate for actual productive days worked there by securing access to committed skills while minimising fixed overhead.

Planned Activity – December 2015 Quarter

  • Continue to evaluate value‐adding opportunities where undeveloped reserves can be accessed in the event of rising oil or gas price

  • Continue discussions with interested companies to farm‐out the Dempsey, Alvares and Arnaudo prospects

  • Continue to firm drilling preparations for Dempsey and the feasibility of a potential re‐entry and flow‐test programme for Alvares

ABN 96 009 217 154

==> picture [185 x 64] intentionally omitted <==

XSTATE RESOURCES LIMITED
Tenement List
Project name Location Working
Interest
Alvares Prospect Sacramento Basin Onshore Northern California
25%
Dempsey Prospect Sacramento Basin Onshore Northern California 10%
Arnaudo Prospect Sacramento Basin Onshore Northern California
10%
California AMI Prospects Sacramento Basin Onshore Northern California
30%
Rancho‐Capay Gas Field Sacramento Basin Onshore Northern California 10%
Los Medanos Gas Field Sacramento Basin Onshore Northern California
10%
Porter Ranch Oil Prospect Santa Maria Basin‐ Onshore Southern California
22.5%
SCU #1‐24 Water Disposal WellSan Joaquin Basin Onshore Southern California
13.25%
Changes in Reporting Period: There have been no changes in the Projects or Working Interests in the
reporting quarter. Projects are continuously reviewed for their strategic fit and are expected to be
modified over time to reflect industry conditions.

For and on behalf of the Board of Xstate Resources Limited

Chris Hodge Managing Director

ABN 96 009 217 154

==> picture [185 x 64] intentionally omitted <==

Competent Person

The technical information provided has been compiled by Mr Chris Hodge, Managing Director of Xstate Resources Limited. He is a qualified petroleum geologist with over 35 years technical, commercial and management experience in exploration for, appraisal and development of oil and gas and mineral and energy resources.

Mr Hodge has reviewed the results, procedures and data contained in this release.

Mr Hodge consents to the inclusion of the above information in the form and context in which it appears.

The estimated quantities of petroleum that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially moveable hydrocarbons.

US exploration is conducted on leases grant by Mineral Right owners, in XST’s case primarily private individuals or groups. Leases can vary in size from very small parcels (part of an acre) to large landholdings (covering a few square miles). Leases generally are for 5 years and rentals are paid annually. There are no work commitments associated with the leases. Some leases are ‘Held By Production’ and royalties, generally less than 20% of revenues, are paid to mineral right owners in lieu of rentals. XST has not listed all it leases as it is impractical and not meaningful for potential project value assessment in a conventional gas play. A detailed listing of leases may also lead to a loss of competitive advantage and consequent reduced value to XST shareholders.

Appendix 5B Mining exploration entity quarterly report

Rule 5.3

Appendix 5B

Mining exploration entity quarterly report

Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/01, 01/06/10, 17/12/10

Name of entity

XSTATE RESOURCES LIMITED

ABN
96 009 217 154
Quarter ended (“current quarter”)
96 009 217 154 30 SEPTEMBER 2015
Consolidated statement of cash flows Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for
(a) exploration and evaluation
(b) development
(c) production
(d) administration
1.3
Dividends received
1.4
Interest and other items of a similar nature received
1.5
Interest and other costs of finance paid
1.6
Income taxes received / (paid)
1.7
Other – surrender of bond
Net Operating Cash Flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
-
-
-
-
(38)
-
-
-
-
15
-
(157)
-
-
(338)
-
-
-
-
15
(23) (480)
Cash flows related to investing activities
1.8
Payment for purchases of: (a) prospects
(b) equity investments
(c) other fixed assets
1.9
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.10
Loans to other entities
1.11
Loans repaid by other entities
1.12
Other - sale of exploration assets
Net investing cash flows
1.13
Total operating and investing cash flows
(carried forward)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- -
(23) (480)
  • See chapter 19 for defined terms.

17/12/2010 - Appendix 5B

Page 1

Appendix 5B Mining exploration entity quarterly report

1.13
Total operating and investing cash flows
(brought forward)
(23) (480)
Cash flows related to financing activities
1.14
Proceeds from issues of shares, options, etc.
1.15
Proceeds from sale of forfeited shares
1.16
Proceeds from borrowings
1.17
Repayment of borrowings
1.18
Dividends paid
1.19
Other – capital raising costs
Net financing cash flows
165
-
-
-
-
-
165
-
-
-
-
-
165 165
Net increase (decrease) in cash held
1.20
Cash at beginning of quarter/year to date
1.21
Exchange rate adjustments to item 1.20
1.22
Cash at end ofquarter
142
48
2
(315)
490
17
192 192

Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities

1.23
1.24
Aggregate amount of payments to the parties included in item 1.2
Aggregate amount of loans to the parties included in item 1.10
Current quarter
$A'000
8
-
1.25 Explanation necessary for an understanding of the transactions
1.23 - Includes salaries and fees paid to directors, as well as superannuation paid on behalf of directors. Also
includes consultancy fees and corporate and accounting services paid to companies associated with the
directors. During the quarter, directors have withheld payments until such time as the company is in a position
to do so.

Non-cash financing and investing activities

2.1
2.2
Details of financing and investing transactions which have had a material effect on consolidated assets and
liabilities but did not involve cash flows
None
Details of outlays made by other entities to establish or increase their share in projects in which the reporting
entityhas an interest
None
  • See chapter 19 for defined terms.

17/12/2010 - Appendix 5B

Page 2

Appendix 5B Mining exploration entity quarterly report

Financing facilities available

Add notes as necessary for an understanding of the position.

3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
-
100
Amount used
$A’000
-
-

Estimated cash outflows for next quarter

4.1
Exploration and evaluation
4.2
Development
4.3
Production
4.4
Administration
$A’000
25
-
-
75
Total 101

Reconciliation of cash

Reconciliation of cash
Reconciliation of cash at the end of the quarter (as shown in
the consolidated statement of cash flows) to the related items
in the accounts is as follows.
Current quarter
$A’000
Previous quarter
$A’000
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
192 48
- -
- -
- -
Total: cash at end of quarter(item 1.22) 192 48

Changes in interests in mining tenements

Tenement
reference
Nature of interest
(note (2))
Interest at
beginning of
quarter
Interest at
end of
quarter
  • See chapter 19 for defined terms.

17/12/2010 - Appendix 5B

Page 3

Appendix 5B Mining exploration entity quarterly report

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

Total number Number quoted Issue
price
per
security (see note 3)
(cents)
Amount paid up per
security (see note 3)
(cents)
7.1
Preference
+securities
(description)
7.2
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns of
capital, buy-backs,
redemptions
Nil N/A N/A N/A
N/A N/A N/A N/A
7.3
+Ordinary
securities *
7.4
Changes during
quarter
(a) Increases
through issues

(b) Decreases
through returns of
capital, buy-backs
238,061,695 238,061,695 N/A N/A
54,932,510 54,932,510 0.3 cents 0.3 cents
7.5
+Convertible debt
securities
(description)
7.6
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through securities
matured, converted
Nil N/A N/A N/A
N/A N/A N/A N/A
7.7
Options
(description and
conversion factor)
7.8
Issued during
quarter
7.9
Exercised during
quarter
7.10
Expired during
quarter
19,500,000
17,000,000
2,500,000
-
-
Exercise price
Various
Various
5 cents
Expiry date
31 May 2016
31 December 2015
31 December 2016
- - - -
N/A N/A N/A N/A
7.11
Debentures
(totals only)
Nil N/A
7.12
Unsecured notes
(totals only)
Nil N/A
  • Shares issued in lieu of consultancy fees

  • See chapter 19 for defined terms.

17/12/2010 - Appendix 5B

Page 4

Appendix 5B Mining exploration entity quarterly report

Compliance statement

  • 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).

  • 2 This statement does give a true and fair view of the matters disclosed.

Sign here:

==> picture [114 x 43] intentionally omitted <==

Date: 30 October 2015

Company Secretary

Print name: David M McArthur

Notes

  • 1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  • 2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  • 3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .

  • 4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.

  • 5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

== == == == ==

  • See chapter 19 for defined terms.

17/12/2010 - Appendix 5B