Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

XPEDRA RESOURCES LIMITED Capital/Financing Update 2017

Feb 12, 2017

66100_rns_2017-02-12_259f8d3c-b958-4714-903f-cdadade23782.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [202 x 88] intentionally omitted <==

ASX Release

13 February 2017

VALOR RESOURCES LIMITED ACN 076 390 451

22 Lindsay Street PERTH, WA Australia

Tel: +61 8 9200 3467 Fax: +61 8 9200 4469

Contact: Mr Mark Sumner

E-mail: [email protected]

ACQUISITION OF ADVANCED COPPER-SILVER PROJECT & STRATEGIC ALLIANCE IN PERU

Valor Resources Limited (“Valor” or the “Company”) is very pleased to announce it has entered into a definitive agreement (the “Agreement”) to acquire 100% of the Berenguela Copper-Silver-Manganese Project (“the Berenguela Project”) from Silver Standard Resources Inc. (NASDAQ: SSRI) (“Silver Standard”). Under the terms of the Agreement Valor and Silver Standard will form a Strategic Alliance with Silver Standard continuing to support and assist in the development of the Berenguela Project.

Berenguela Project Highlights:

The Berenguela Project is an advanced stage Copper, Silver and Manganese project, located within a well defined mineralized district in the Puno Department of Southeastern Peru. The district hosts some of Peru’s largest metals mines and world class deposits. The highlights of the Berenguela project include:

  • Approximately 6,594 hectares of exploration concessions;

  • JORC (2012) compliant indicated and inferred resources

Directors

Mr Mark Sumner Mr Brian McMaster Ms Paula Cowan Mr Mark Reilly Mr Gregory Wood

ASX Code :

VAL

  • Over 30,000 meters of historical drilling;

  • Over 17,000 meters of underground workings;

  • Over 18,476 assays for silver, copper and manganese;

  • Extensive metallurgical and process database;

  • Current resource near surface; and

  • Potential exploration upside with a potential porphyry or sulphide copper and silver deposit.

Extensive Near-Surface Resources: Between surface & 100 meters of depth

Silver Standard completed a total of 19,029 meters of core and RC drilling between 2004 and 2011 and collected 18,476 samples for copper, silver and manganese. Berenguela resources, which have been confirmed for JORC (2012) by Valor are as follows:

Category Tonnes
(mil)
Ag Grade
(g/t)
Cu Grade
(%)
Mn Grade
(%)
Contained
Silver
(mil oz)
Contained
Copper
(mil lbs)
Indicated 15.60 132.0 0.92 8.80 66.1 317.30
Inferred 6.00 111.7 0.74 6.50 21.60 98.21

Note: Refer to end of this announcement for fully completed JORC Code Table 1.

Page | 1

Commenting on the Definitive Agreement, Valor Chairman, Mark Sumner stated: “The acquisition of the Berenguela project is a major milestone in the Company’s transition and stated business strategy of developing quality South American metal assets. The Berenguela Project represents excellent potential for the company in copper, silver and manganese.”

Berenguela Project Overview:

The Berenguela Project consists of 14 mineral concessions, totaling approximately 6,594 hectares in the Puno Department of Southeastern Peru, approximately 50 kilometers west of the city of Juliaca and 6 kilometers northeast of the town of Santa Lucia. The Berenguela Project is accessible all year-round by gravel roads and a paved, major highway from the city of Juliaca which has a population of over 215,000, with a local airport accessible by daily flights from Lima, the capital of Peru. A main-line railway crosses the southern claims within the Berenguela Project area.

==> picture [389 x 250] intentionally omitted <==

==> picture [339 x 227] intentionally omitted <==

View Across Berenguela Property

Page | 2

The Berenguela Project is situated within the Western Cordillera of the Andean range, which since the Late Cretaceous era has been formed by collisional plate tectonics where Pacific oceanic crust is being subducted beneath the South American plate. The regional geology of the Western Cordillera in south eastern Peru is dominated by volcanic and sedimentary rocks of Cenozoic to Quaternary age. In the region west of Lake Titicaca where the Berenguela Project is found, referred to here as the Santa Lucia district, there are several large erosional or structural windows in the volcano sedimentary terrane where structurally deformed Paleozoic and Mesozoic sedimentary strata are exposed. The Berenguela Project deposit lies within one of these areas of Mesozoic sedimentary rocks.

Project History:

The Berenguela Project has been extensively explored and exploited starting in 1906 as property of the Lampa Mining Company – Peru. It is estimated that the Lampa Mining Company extracted approximately 500,000 tonnes of ore, producing an estimated 15 million ounces of silver between 1906 and 1965. Ore was extracted from small open-pits and underground workings.

==> picture [365 x 274] intentionally omitted <==

Open Pit Location of Historical Mining

Approximately 30,000 meters of drilling has been executed at Berenguela, with the majority of drilling completed by Silver Standard between 2004 and 2011, completing a total of 19,029 meters of core and RC drilling, with an additional 5,250 meters of core drilling in 2015. Silver Standard delivered a National Instrument 43-101 Technical Report on the Berenguela Property, South-Central Peru dated October 4, 2005. Valor has recalculated and confirmed for JORC (2012) compliance the Mineral Resources outlined in the Technical Report:

Category
(JORC)
Tonnes
(mil)
Ag Grade
(g/t)
Cu Grade
(%)
Mn Grade
(%)
Contained
Silver
(mil oz)
Contained
Copper
(mil lbs)
Indicated 15.60 132.0 0.92 8.80 66.1 317.30
Inferred 6.00 111.7 0.74 6.50 21.60 98.21

Note: Refer to end of this announcement for fully completed JORC Code Table 1.

Page | 3

Silver Standard delineated a deposit which extends approximately 1,400 meters in length, between 200 and 350 meters in width and a thickness between 30 and 100 meters.

==> picture [389 x 303] intentionally omitted <==

Berenguela Deposit Model

Valor plans to upgrade mineral resources, including information from Silver Standard’s 2015 drilling campaign, as well as design and execute an advanced exploration program to complement historical campaigns and open pit studies, with an aim to convert current resources into Ore reserves. The Company will also assess potential to target near-surface, high grade silver resources for near-term mining opportunities. Berenguela constitutes an extensive near-surface resource, which presents an excellent opportunity for Valor to develop and assess near-term production scenarios.

Definitive Agreement:

Valor has entered into a definitive agreement with Silver Standard, whereby Valor will acquire 100% of the share capital of SOMINBESA (Peru) and Fossores Ltd. (Grand Cayman), which collectively hold 100% of the ownership in the Berenguela Project.

Valor will acquire Berenguela through a series of payments staged over a 5-year period, as well as granting a 1% net smelter return royalty to Silver Standard* referred to below. The Company expects the transaction to close in the first quarter of 2017.

Terms of the Acquisition:

The material terms of the acquisition are summarized below:

  • Completion of the transaction is subject to customary closing conditions, including receipt of required shareholder and other regulatory approvals. ASX have advised it will require shareholder approval pursuant to Listing Rule 11.1.2. The Company notes that it is currently preparing the necessary notice of meeting and anticipates the general meeting will be held in March 2017.

Page | 4

 Consideration -

Milestone Payment (US$)
Cash Deposit $150,000 (paid)
Equity at time of Closing That number of Shares that results in Silver Standard
holding an aggregate of 9.9% in Valor (on a fully-diluted
basis).
Top-up Rights Subject to ASX granting necessary waivers, that number of
Shares that gives Silver Standard a shareholding in the
Company of not less than 9.9% (on a fully-diluted basis)
upon completion of the Capital Raisings (defined below), so
that Silver Standard’s interest in Valor is not diluted as a
consequence of the Capital Raisings.
Participation/Anti Dilution Right Subject to ASX granting necessary waivers, following the
completion of the Capital Raisings, as long as Silver
Standard’s interest in Valor remains 5% or higher (on a
fully-diluted basis), Silver Standard will have a
participation right to maintain its equity position in Valor
following any Valor equity issue, whereby Silver Standard
will be offered to participate by paying the relevant arm’s
length consideration for the equity securities offered.
Cash after 12 months from the date of
the Agreement
$400,000
Cash after 24 months from the date of
the Agreement
$700,000
Cash after 36 months from the date of
the Agreement
$1,750,000
Cash after 48 months from the date of
the Agreement
$3,000,000
Cash after 60 months from the date of
the Agreement
$6,000,000
Net Smelter Return Royalty 1.0% on all metals

* Concessions 1-10, the Berenguela concessions have an outstanding NSR of 2% on all metals, concessions 11-14, the Lagunillas concessions, have an outstanding NSR of 2.5% on all metals.

  • Capital raising – Valor will need to raise at least US$8 million within the first year following the execution of the Agreement. The Company acknowledges that the US$8 million will largely be raised by way of a number of capital raisings ( Capital Raisings ).

  • Strategic Alliance - The Agreement will create the foundation for a strategic alliance between the Parties by providing Silver Standard with a 9.9% shareholding in Valor and Silver Standard agreeing to provide support to Valor in respect of the Berenguela Concessions and operations in Peru going forward.

  • Call right - In the case of an event of default of Valor, Silver Standard will have a Call Right, to require Valor to transfer to Silver Standard all such shares or securities which Valor holds, directly or indirectly, in relation to the Berenguela Concessions for the consideration of US$10.

Page | 5

  • Change of control – where there is a change of control of Valor all outstanding cash and share consideration becomes immediately payable to Silver Standard otherwise an event of default will occur. Silver Standard will be able to elect to have the remaining consideration paid in cash or shares of the new controlling shareholder.

  • Security – Valor will also provide sufficient security over its assets in favour of Silver Standard to secure Valor’s obligations under the Agreement.

For further information, please contact:

Mark Sumner

Page | 6

Berenguela Concessions:

No. NAME Hectares DISTRICT PROVINCE DEPARTMENT
1 BERENGUELA 100.0000 SANTA LUCIA LAMPA PUNO
2 BERENGUELA 01-09 300.0000 SANTA LUCIA LAMPA PUNO
3 BERENGUELA 02-09 526.0618 SANTA LUCIA LAMPA PUNO
4 BERENGUELA 03-09 36.3580 SANTA LUCIA LAMPA PUNO
5 BERENGUELA 04-09 313.0869 SANTA LUCIA LAMPA PUNO
6 BERENGUELA 05-09 1,000.0000 SANTA LUCIA LAMPA PUNO
7 BERENGUELA 06-09 1,000.0000 SANTA LUCIA LAMPA PUNO
8 BERENGUELA 07-09 1,000.0000 SANTA LUCIA LAMPA PUNO
9 BERENGUELA 08-09 200.0000 SANTA LUCIA LAMPA PUNO
10 BERENGUELA 97 41.3313 SANTA LUCIA LAMPA PUNO
11 LAGUNILLAS 01-04 440.0675 SANTA LUCIA/
PARATIA
LAMPA PUNO
12 LAGUNILLAS 02-04 600.00 SANTA LUCIA/
PARATIA
LAMPA PUNO
13 LAGUNILLAS 08-04 995.65 SANTA LUCIA LAMPA PUNO
14 LAGUNILLAS 10-04 41.9928 SANTA LUCIA/
PARATIA
LAMPA PUNO

Berenguela Concessions Map:

==> picture [444 x 307] intentionally omitted <==

Page | 7

About Silver Standard

Silver Standard is a Canadian-based precious metals producer with three wholly-owned and operated mines, including the Marigold gold mine in Nevada, U.S., the Seabee Gold Operation in Saskatchewan, Canada and the Pirquitas silver mine in Jujuy Province, Argentina. Silver Standard also has two feasibility stage projects and an extensive portfolio of exploration properties throughout North and South America. Silver Standard is committed to delivering safe production through relentless emphasis on Operational Excellence. Silver Standard is focused on growing production and Mineral Reserves through the exploration and acquisition of assets for accretive growth, while maintaining financial strength. www.silverstandard.com

Competent Persons Statement

The technical information in this release is based on compiled and reviewed data by Mr. Marcelo Batelochi. Mr. Batelochi is an independent consultant with MB Geologia Ltda and is a Chartered Member of AusIMM – The Minerals Institute. Mr. Batelochi has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Batelochi consents to the inclusion in the report of the matters based on their information in the form and context in which it appears. Mr. Batelochi accepts responsibility for the accuracy of the statements disclosed in this release.

Page | 8

The Following Table and Sections are provided to ensure compliance with JORC Code (2012 Edition)

TABLE 1 – Section 1: Sampling Techniques and Data

Note: Information from NI-43101 report performed by James A. McCrea, audited and revised by Marcelo A. Batelochi (MAusimm – CP)

  • Criteria JORC Code explanation Commentary SamplingNature and quality of sampling (eg cut channels, random chips, or specifictechniques specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broadmeaning of sampling.

    • In the Berenguela Deposit are 222 drill holes containing 18,972 metres of reverse circulation drilling.

    • The deposit was drilled off on a regular grid pattern.

    • The drill program expanded the areas of known mineralization to the east and subsequently the resource of the deposit.

  • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

  • The objective of the drill program was to delineate the deposit for resource estimate.

  • Aspects of the determination of mineralisation that are Material to the Public Report.

  • Silver Standard Resources (SSR), during the 2004 and 2005 RC drill programs, sampled the drill holes on one-metre intervals.

  • In cases where ‘industry standard’ work has been done this would be relatively simple (eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.

  • RC drill samples were collected at the drill site by the drill crews.

  • The RC drill holes were sampled from collar to total depth. Sampling intervals were dependent on the drilling equipment selected, the density of samples required and not based on geological controls or other features of the zone of interest.

  • The RC drill crews collected 18,476 samples and 1,035 sample duplicates for a total of 19,511 samples.

  • The drill holes were laid out on a 50-metre pattern to cover the known areas of mineralization and test the limits of mineralization.

  • As is normal with RC drilling there were occasional samples that were not recovered, however, sample recoveries were of 98.6 percent for the whole drill program.

Page | 9

Criteria JORC Code explanation Commentary
Drilling
techniques
Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc).
 Two drill programs were run almost back to back, one in the late fall of
2004 and the second ran from March 1st after the rains decreased and
ended in early May 2005.
 AK Drilling International of Lima was the contractor who performed the
drilling for both programs.
 During the first program fifty seven (57) RC holes were drilled and
during the second program one hundred and sixty five (165) RC holes
were drilled totalling 222 holes.
 AK Drilling used a 4x4 buggy mounted RC drill accompanied by a 4x4
support and water truck. The contractor typically had 3 personnel on
the drill rig on each 12 hour shift, a driller and two helpers. None of
their personnel helped with the sampling however they would assist SSR
samplers at times.
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and results
assessed.
Measures taken to maximise sample recovery and ensure representative nature
of the samples.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
 Drilling conditions ranged from difficult to good. Drilling through dry
highly manganese replaced limestone was good however clay altered
carbonates when wet posed difficult drilling conditions. Where the rock
was dry typically in the upper 20-50 meters drilling conditions were
good and drilling was done without water. When the rock was wet at
depth and clay zones were encountered drilling conditions were
difficult. When these conditions were encountered the drillers had to
inject water along with additives.
 During the first part of the first drilling program (holes 1-57) the drillers
had numerous lost intervals. They learned how to drill the property by
the end of the first program increasing recoveries and improving
penetration rates. They learned that by using additives along with water
and a face sampling hammer clay zones could be drilled while still
recovering sample. A typical reason why there were zones with no
recovery was that clay would clog the hammer and or tubes and the
drillers would continue to drill. This usually occurred on night shift when
the driller didn’t want to take the time to check either the drill rods,
tubes leading to the cyclone or the hammer. During the second program
when it appeared that there might be clogging they immediately
switched to water injection.

Page | 10

Criteria JORC Code explanation Commentary
Logging Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc) photography.
The total length andpercentage of the relevant intersections logged.
 Lithology, alteration, veining, mineralisation and weathering were
logged from the RC chips and stored in Datashed. Chips from selected
holes were also placed in chip trays and stored in a designated building
at site for reference
Sub-
sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken.
If non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the sampling is representative of the in situ
material collected, including for instance results for field duplicate/second-half
sampling.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
 The RC Drill crews collected the samples and the samples were split 3
times, using a Jones Splitter, down to 1/8th size.
 The sample size ranges from approximately 2 to 10 kilograms.
Approximately every 40th sample had a second, field duplicate sample
collected.
 The samples were tagged with the hole number and depth and then
sent to the warehouse for further preparation were SSR Peru
personnel prepared the samples for shipment to the assay lab.

Page | 11

  • Criteria JORC Code explanation Quality ofThe nature, quality and appropriateness of the assaying and laboratory assay data procedures used and whether the technique is considered partial or total. andFor geophysical tools, spectrometers, handheld XRF instruments, etc, the laboratory parameters used in determining the analysis including instrument make and tests model, reading times, calibrations factors applied and their derivation, etc.

  • Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established.

Commentary

  • The samples were prepared and tagged for shipment to the assay lab and blanks and standards were inserted into the sample stream at a rate of approximately one sample in 40 for blanks and two in 40 for standards. Three different standards were utilized in the program. Periodically SSR Peru staff would deliver the samples to the ALS Chemex Labs depot in Arequipa and the samples were shipped to Lima, Peru for preparation.

  • The assay pulps were shipped to ALS Chemex Labs in North Vancouver for analysis.

  • The Samples were prepared using a standard sample preparation (PREP-31) to produce a 250-gram pulp.

  • The analyses performed were four acid “near total” digestions with a 27 element ICP analysis (ME-ICP61).

  • Samples over the maximum for silver, copper or manganese were analyzed using Atomic Absorption (AA62b) and very high silver samples were analyzed using a fire assay procedure with a gravimetric finish (Ag- GRA21)

  • Employed a comprehensive Quality Control/Quality Assurance (QA/QC) program during the drill program on Berenguela. The program included: standards, blanks, field duplicates and outside lab check assays as described above with the sampling procedures. Following the drill program, the author compiled the QA/QC data for the 2004 and 2005 drill programs and completed a summary of the QA/QC program results. The QA/QC summary contains recommendations for the improvement of QA/QC results, which included checking for Standard Reference Material (SRM) failures and contaminated blanks and follow up with corrective action. Other recommendations were to improve sample handling so as to reduce labelling errors.

Page | 12

Criteria JORC Code explanation Commentary
Verification
of sampling
and
assaying
The verification of significant intersections by either independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
 Data verification included surface samples to confirm the
mineralization at Berenguela.
 James A. McCrea, in 2005, collected four randomly located surface
grab samples (BER-01 to BER-04) from the property. Each sample
location was surveyed with a GPS. Samples were taken over an area of
approximately 1 square meter. Approximately 2 kilograms of material
was taken from each sample site. The four samples were taken to
represent different areas of the Berenguela Deposit.
 The author carried out a visual comparison (quick logging and grade
checks) between 5 twin diamond drill carried out in 2015 for Sliver
Standard, that shown a excelente correlation between 2004/2005 RC
Drilling (used for Mineral Resources Report) and 2015 diamond drilling
(new information, It will be included to the next Mineral Resource
Evaluation).
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.

Topographic survey was done of the property which included locating
all roads, drill holes, claim boundaries, and topographic features in
sufficient detail.

A local surveyor did the work using a Total Station Laser instrument.
Data during the day was loaded into the instrument and downloaded
later directly into a computer for plotting.
Data
spacing and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the degree
of geological and grade continuity appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.

The RC have been drilled up to a maximum 180 vertical metres below
surface on an irregular 50 m x 50 m drill pattern.

The data spacing and distribution is sufficient to demonstrate spatial
and grade continuity of the mineralised domains to support the
definition of Inferred and Indicated Mineral resources under the 2012
JORC code.

Drill hole samples have been composited to a nominal 2 m interval for
the resource calculation.

Page | 13

Criteria JORC Code explanation Commentary
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.

The majority of drilling is orientated with a 350 – 20 degree azimuth and 45-50 dip northeast, but
there are significant vertical orientated drill holes.

Generally intercepts the mineralisation at a reasonable high angle of intersection.
Sample
security
The measures taken to ensure sample security. All samples were stored and preserved in the SSR warehouse near Lima – Peru, in a dry and ventilated
place.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.

Geology audits and site visit were completed in 2005 by James A. McCrea, P.Geo, independent
consultants to review sampling procedures and QAQC practices. This visit concluded the sampling to be
at an industry standard, and of sufficient quality to carry out a Mineral Resource Estimation.

In 2017, this author visited the project and revised the NI-43101 Mineral Resources carried out by
James A. McCrea, endorsing his conclusion and recommended an immediate revision of Mineral
Resources, updating with the 2011/2015 diamond drilling information and also the geological
knowledge, which improved considerably since 2005.

In addition, there are a poor precision of Copper and Silver high grade, that needs an additional study
and reanalysis.

Page | 14

TABLE 1 – Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section)

Note: Information from NI-43101 report performed by James A. McCrea, audited and revised by Marcelo A. Batelochi (MAusimm – CP)

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical sites, wilderness or
national park and environmental settings.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.

The Berenguela Property encompasses approximately 141.33 hectares
situated in the eastern part of the Western Cordilleran of south-central
Peru and consists of two mineral concessions. The Berenguela
concessions are located within the Department of Puno and lie within
Peruvian National Topographic System (NTS) map area Lagunillas, No.
32-U. The centre of the Berenguela concessions is at 15° 40' South
Latitude and 70° 34' West Longitude
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by other parties.
In March of 2004, SSR entered into an option agreement with
SOMINBESA (KCA) to purchase 100% of the silver resources contained
in the Berenguela Project. SSR completed the exploration drill program
in July of 2005 after completing 222 reverse circulation drill holes.
Geology Deposit type, geological setting and style of mineralisation.
Based on the distribution and form of the potentially economic bodies
of Mn-Cu-Ag mineralization within the structurally deformed limestone
formation there is little doubt that Berenguela represents a type of
epigenetic, replacement-type ore deposit (Clark et al., 1990). Silver- and
copper-mineralized veins of quartz and/or carbonate appear to be a very
minor component of the deposit. What is debateable at Berenguela is
whether or not, or to what extent supergene processes played a role in
the formation of the deposit.

More specifically, is the extensive development of manganese oxides
the result of the surface oxidation of hypogene manganiferous
carbonates (manganocalcite and/or rhodochrosite) which had replaced
calcite and dolomite adjacent to fractures in the precursor limestone
and where silver, copper and zinc were deposited as sulphides
synchronous with or subsequent to the Mn-carbonate replacement
event. Or are the Mn- and Fe-oxides the direct metasomatic products of
a hydrothermal system marked by strongly oxidized fluids enriched in
Ag, Cu.

Page | 15

Criteria JORC Code explanation Commentary

Considering that the replacement-type ore bodies at Uchucchacua have
vertical extents of up to 300 meters, one could presume that good
exploration potential still exists at Berenguela for the discovery of
hypogene Ag-Cu-Mn mineralization at depths of 150 meters or greater.
A possible indication of additional and extensive metasomatic alteration
at depth is represented by the thick gypsum zone that has been
intersected by several of the deeper holes in the deposit. (Strathern,
1969) While this gypsum may be of sedimentary origin, it could also be
explained as forming a well-developed zone of sulphate alteration
(perhaps originally occurring as anhydrite) that is related to a high level
intrusion which exsolved a large volume of sulphur-rich fluids and/or
vapour
Drill hole
Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from the
understanding of the report, the Competent Person should clearly explain
why this is the case.

Drill hole information has not been included due to the large quantity of
information. This information is available in digital basis in the project
data room.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques, maximum
and/or minimum grade truncations (e.g. cutting of high grades) and cut-off
grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade results
and longer lengths of low grade results, the procedure used for such
aggregation should be stated and some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should be
clearly stated.

Drill hole information has not been included due to the large quantity of
information. This information is available in digital basis in the project
data room.

Page | 16

Criteria JORC Code explanation Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in the reporting of Exploration
Results.
If the geometry of the mineralisation with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there should
be a clear statement to this effect (e.g. ‘down hole length, true width not
known’).

Since few drill holes completed at Berenguela are longer than 150 m,
there are few accounts of hypogene, sulphide-rich mineralization.
However, this is not to say that such mineralization does not exist in
altered limestones at greater depths.
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts
should be included for any significant discovery being reported These should
include, but not be limited to a plan view of drill hole collar locations and
appropriate sectional views.

Diagrams, maps and sections have not been included due to the large
quantity of information. This information is available in digital basis in
the project data room.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should
be practiced to avoid misleading reporting of Exploration Results.

Weekly and Monthly reports are not included due to the large quantity
of information. This information is available in digital basis in the project
data room.
Other
substantive
exploration data
Other exploration data, if meaningful and material, should be reported
including (but not limited to): geological observations; geophysical survey
results; geochemical survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density, groundwater,
geotechnical and rock characteristics; potential deleterious or contaminating
substances.

Other substantive exploration data information has not been included
due to the large quantity of information. This information is available in
digital basis in the project data room.
Further work The nature and scale of planned further work (e.g. tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the
main geological interpretations and future drilling areas, provided this
information is not commercially sensitive.

Berenguela deposit remain open at depth and there are other orebodies
near the deposit.

Is strongly recommended the revision of Mineral Resources, updating
with the 2011/2015 diamond drilling information and also the geological
knowledge, which improved considerably since 2005;

The timing of Infill and extension drilling at Berenguela will be
determined at completion of the Mineral Resources and prefeasibility
study.

Page | 17

TABLE 1 – Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section)

Note: Information from NI-43101 report performed by James A. McCrea, audited and revised by Marcelo A. Batelochi (MAusimm – CP)

Criteria JORC Code explanation Commentary
Database
integrity
Measures taken to ensure that data has not been
corrupted by, for example, transcription or keying
errors, between its initial collection and its use for
Mineral Resource estimation purposes.
Data validation procedures used.

The database was checked against the original raw data with respect to drill collar locations and
down-hole surveys, and final drill hole depths.

All data with respect to sample intervals has been (overlaps and duplicate records) have been verified.

No issues were identified with the data.
Site visits Comment on any site visits undertaken by the
Competent Person and the outcome of those
visits.
If no site visits have been undertaken indicate why
this is the case.

Mr Marcelo A. Batelochi is a member of The Australian Institute of Mining and Metallurgy and is a
Competent Person who has visited this site.

In the opinion of the competent person, the drilling, sampling and mining practices used on site are of
a high industry standard.
Geological
interpretation
Confidence in (or conversely, the uncertainty of)
the geological interpretation of the mineral
deposit.
Nature of the data used and of any assumptions
made.
The effect, if any, of alternative interpretations on
Mineral Resource estimation.
The use of geology in guiding and controlling
Mineral Resource estimation.
The factors affecting continuity both of grade and
geology.

The mineralized zone on the property is bowl shaped and elongated in an east west direction. North
south sections for the entire property were created to domain the mineralization. The sectional
interpretations were entered into Gemcom as 3D polylines.

The polylines were stitched together to produce 3D solid body models, or grade shells for the
mineralized zones. The solid model was used to code the rock type model in the block model, control
the interpolation and to filter the composites for statistics and geostatistics.

Grade shell domain based on a 20 g/t Au reference grade.
Dimensions The extent and variability of the Mineral Resource
expressed as length (along strike or otherwise),
plan width, and depth below surface to the upper
and lower limits of the Mineral Resource.

The Berenguela Ag-Cu-Mn deposit trends in a WNW direction for more than 1,400 meters along a
whale-back ridge that separates two valleys, the broader one being to the south.

The eastern and western limits of the deposit roughly correspond to where steep slopes truncate the
ridge and descend to the pampa valleys some 200 metres below the ridge-crest.

Moderately to isoclinally folded limestones and dolomites of the Cretaceous-age Ayavacas Formation
are the dominant lithologies exposed along the ridge and host the deposit mineralization.
Estimation and
modelling
techniques
The nature and appropriateness of the estimation
technique(s) applied and key assumptions,
including treatment of extreme grade values,
domaining, interpolationparameters and
 The 1-metre samples were composited into 2-metre composites for resource modelling and grade
interpolation. Compositing produced 9400 2-metre composites. The solid model was used to code the
composites as being from within the ore zone or the background domain.

Page | 18

Criteria JORC Code explanation Commentary
maximum distance of extrapolation from data
points. If a computer assisted estimation method
was chosen include a description of computer
software and parameters used.
The availability of check estimates, previous
estimates and/or mine production records and
whether the Mineral Resource estimate takes
appropriate account of such data.
The assumptions made regarding recovery of by-
products.
Estimation of deleterious elements or other non-
grade variables of economic significance (e.g.
sulphur for acid mine drainage characterisation).
In the case of block model interpolation, the block
size in relation to the average sample spacing and
the search employed.
Any assumptions behind modelling of selective
mining units.
Any assumptions about correlation between
variables.
Description of how the geological interpretation
was used to control the resource estimates.
Discussion of basis for using or not using grade
cutting or capping.
The process of validation, the checking process
used, the comparison of model data to drill hole
data, and use of reconciliation data if available.
 Grades were capped for the Berenguela resource. Capping was based on histograms, probability plots
and the coefficient of variation. Silver grades were capped at 2000 ppm Ag, copper grades were capped
at 4.5 Cu% and manganese grades were capped at 35 Mn%. The assays were capped and then the
composites were created. Capping of silver at 2000 ppm Ag is equivalent to the 99.6 percentile; capping
of copper at 4.5 Cu% is equivalent to the 99.4 percentile and capping the manganese at 35 Mn% is
equivalent to the 99.4 percentile. These capping levels are consistent with industry standard practice.
 Filtering left 6233 composites in the domain for interpolation and variogram modelling.
 The 2-metre composites for silver, copper and manganese were imported into Isaaks’ Sage software for
Variogram analysis. The variograms were modelled with exponential structures. All metals exhibited
low nuggets in the 5 to 10% range and reasonable search ranges.
 A 3D whole block model was laid out to cover the mineralization on the Berenguela Property and to
allow room for pit optimizations during later analyses of the project.

 The solid models were used to code the rock type model and control the interpolation.The block model
was coded for air (above topography), background and for the mineralized zone by coding blocks using
a 50% threshold. Blocks with more then 50% of the block inside the solid were given the code of the
solid. During the interpolation of the model, the background zone was not interpolated and the ore
zone was not allowed to use data points from the background zone.
 The block model was interpolated using inverse distance squared where a minimum of four composites
was required to interpolate a block with a maximum of 16 composites.
 The interpolation was required to use data from two drill holes to interpolate grade into a block.
Moisture Whether the tonnages are estimated on a dry
basis or with natural moisture, and the method of
determination of the moisture content.
 All tonnages were calculated using dry density.
Cut-off
parameters
The basis of the adopted cut-off grade(s) or
quality parameters applied.
 A reference grade of 20 Ag g/t was used to wireframe the lode envelopes.
 A cut off of 50 Ag g/t was used to report mineral resources.
Mining factors
or assumptions
Assumptions made regarding possible mining
methods, minimum mining dimensions and
internal (or, if applicable, external) mining
dilution. It is always necessary aspart of the

Page | 19

Criteria JORC Code explanation Commentary
process of determining reasonable prospects for
eventual economic extraction to consider
potential mining methods, but the assumptions
made regarding mining methods and parameters
when estimating Mineral Resources may not
always be rigorous. Where this is the case, this
should be reported with an explanation of the
basis of the mining assumptions made.
Metallurgical
factors or
assumptions
The basis for assumptions or predictions regarding
metallurgical amenability. It is always necessary
as part of the process of determining reasonable
prospects for eventual economic extraction to
consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment
processes and parameters made when reporting
Mineral Resources may not always be rigorous.
Where this is the case, this should be reported
with an explanation of the basis of the
metallurgical assumptions made.
 Kappes, Cassiday & Associates, after purchasing Berenguela collected bulk samples and carried out
metallurgical testing at their Reno facilities
Environmental
factors or
assumptions
Assumptions made regarding possible waste and
process residue disposal options. It is always
necessary as part of the process of determining
reasonable prospects for eventual economic
extraction to consider the potential environmental
impacts of the mining and processing operation.
While at this stage the determination of potential
environmental impacts, particularly for a
greenfield project, may not always be well
advanced, the status of early consideration of
these potential environmental impacts should be
reported. Where these aspects have not been
considered this should be reported with an
explanation of the environmental assumptions
made.
 An environmental permit was obtained from the Ministerio de Minas, in Lima in order to drill and was
amended in order to sink shafts. A blasting permit was also obtained in order to sink the shafts
Bulk density Whether assumed or determined. If assumed, the
basis for the assumptions. If determined, the
method used, whether wet or dry, thefrequency
 The specific gravity used for tonnage calculations in the past and more specifically by the government is
2.47. Nine samples were recently taken at the Berenguela property of representative mineralized
material and specificgravities ranged from 1.87 to 2.73, givingan average of the of 2.32

Page | 20

Criteria JORC Code explanation Commentary
of the measurements, the nature, size and
representativeness of the samples.
The bulk density for bulk material must have been
measured by methods that adequately account for
void spaces (vugs, porosity, etc.), moisture and
differences between rock and alteration zones
within the deposit.
Discuss assumptions for bulk density estimates
used in the evaluation process of the different
materials.
 An extensive database of density measurements were recorded at 2015 drilling campaign, which will be
used to estimate the density in the next resource update.
Classification The basis for the classification of the Mineral
Resources into varying confidence categories.
Whether appropriate account has been taken of
all relevant factors (i.e. relative confidence in
tonnage/grade estimations, reliability of input
data, confidence in continuity of geology and
metal values, quality, quantity and distribution of
the data).
Whether the result appropriately reflects the
Competent Person’s view of the deposit.
 The model was classified as indicated and inferred based on distance.
 No measured category was defined because of no geologic model and a lack of surface trenches.
 Only blocks inside the grade shell were classified.
 All other blocks were not interpolated or classified. The table below contains a summary of the
resource model.
 Blocks were classified as follows: an indicated range of 0 to 25 metres and inferred range of 25 to 60
metres.
 Blocks outside these ranges are not reported.
Audits or
reviews
The results of any audits or reviews of Mineral
Resource estimates.
Discussion of
relative
accuracy/
confidence
Where appropriate a statement of the relative
accuracy and confidence level in the Mineral
Resource estimate using an approach or
procedure deemed appropriate by the Competent
Person. For example, the application of statistical
or geostatistical procedures to quantify the
relative accuracy of the resource within stated
confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of
the factors that could affect the relative accuracy
and confidence of the estimate.
The statement should specify whether it relates to
global or local estimates, and, if local, state the
relevant tonnages, which should be relevant to

The stated resources are not materially affected by any known environmental, permitting, legal,
title, taxation, socio-economic, marketing, political or other relevant issues, unless stated in this
report, to the best knowledge of the author.
 There are no known mining, metallurgical, infrastructure, or other factors that materially affect this
resource.
 The Berenguela Property contains a large potentially exploitable resource of silver and copper. The
objective of the exploration program was to delineate and possibly expand the resource at Berenguela.
The property is now ready for advancement towards production.
 In 2017, this author visited the project and revised the NI-43101 Mineral Resources carried out by
James A. McCrea, endorsing his conclusion and recommended an immediate revision of Mineral
Resources, updating with the 2011/2015 diamond drilling information and also the geological
knowledge, which improved considerably since 2005.

Page | 21

Criteria JORC Code explanation Commentary
technical and economic evaluation.
Documentation should include assumptions made
and the procedures used.
These statements of relative accuracy and
confidence of the estimate should be compared
with production data, where available.

Page | 22