Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

XPEDRA RESOURCES LIMITED Capital/Financing Update 2017

Oct 2, 2017

66100_rns_2017-10-02_754160c9-0e2f-47ad-9ab5-9f8f3021aef0.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [202 x 88] intentionally omitted <==

ASX Release

3 October 2017

VALOR RESOURCES LIMITED ACN 076 390 451

22 Lindsay Street PERTH, WA Australia

Tel: +61 8 9200 3467 Fax: +61 8 9227 6390

HIGH GRADE COPPER & SILVER INTERCEPTS

CONTINUE AT BERENGUELA

Valor Resources Limited (“ VAL ” or the “ Company ”, ASX: VAL) is pleased to report latest assay results from the drilling program at the Berenguela CopperSilver Project in Southern Peru. Drilling from platform 032 (see Figure 2 – Drilling Platform Map), has returned multiple high grade copper and silver intercepts for the Berenguela project.

Highlights:

  • Multiple Cu intercepts with average grades over 2% Cu, including multiple intervals over 3% and 4%.

Contact:

Mr Mark Sumner

E-mail: [email protected]

  • Thick, high grade Ag intercepts, including intervals of 7 meters at 328.26 g/t Ag, 15 meters at 254.59 g/t Ag and 16 meters at 204.18 g/t Ag.

  • Updated JORC resource estimate expected in the coming days.

Directors

Mr Mark Sumner Mr Brian McMaster Ms Paula Cowan

Company Secretary Ms Kelly Moore Ms Paula Cowan

ASX Code :

VAL

Key drilling intercepts (refer to Tables 1 & 2 for complete results) include:

BEP-032 – BER261

  • 15 m @ 1.90% Cu + 254.59 g/t Ag + 18.49% Mn + 0.43% Zn (from 0m). 3.350% CuEq , including:

  • 8 m @ 2.64% Cu + 190.13 g/t Ag + 20.00% Mn + 0.44% Zn (from 0m). 3.779% CuEq; and

  • 7 m @ 1.05% Cu + 328.26 g/t Ag + 16.77% Mn + 0.41% Zn (from 8m) 2.860% CuEq

BEP-032 – BER263

  • 15 m @ 2.48 Cu% + 124.92 Ag g/t + 13.09 Mn% + 0.29 Zn% (from 0 m). 3.229% CuEq including:

  • 6 m @ 4.47% Cu + 144.63 g/t Ag + 19.03% Mn + 0.35% Zn (from 6m). 5.343 % CuEq; and

BEP-032 – BER264

  • 16 m @ 2.65% Cu + 204.19 g/t Ag + 19.06% Mn + 0.42% Zn (from 0m). 3.849 % CuEq, including:

  • 8 m @ 2.62% Cu + 186.75 g/t Ag + 18.82% Mn + 0.53% Zn (from 0m). 3.790 % CuEq; and

  • 4 m @ 3.85% Cu + 169.25 g/t Ag + 18.74% Mn + 0.22% Zn (from 8m) 4.786% CuEq; and

  • 4 m @ 1.49% Cu + 274 g/t Ag + 19.86% Mn + 0.40% Zn (from 12m) 4.786% CuEq

Key drilling intercepts continued (refer to Tables 1 & 2 for complete results):

BEP032 – BER260:

  • 11 m @ 1.02% Cu + 76.45 g/t Ag + 4.42% Mn + 0.30% Zn (from 5m). 1.536 % CuEq

BEP032 – BER262:

  • 22 m @ 0.88% Cu + 89.44 g/t Ag + 12.62% Mn + 0.76% Zn (from 64m). 1.677 % CuEq

Management Commentary

Valor Chairman, Mark Sumner said: “This is another set of excellent drill holes confirming high grade mineralisation, which continues to materialise within the central area of the Berenguela deposit. The silver intercepts are excellent, but the extraordinarily high grades of copper again exceed our expectations, as grades are consistently coming back significantly higher than the current average across the Indicated and Inferred JORC estimate.

“This program reinforces our view that Berenguela is an excellent copper-silver deposit and look forward to delivering more drill results, as well as the updated JORC mineral resource estimate soon.”

Drilling Program Overview

The drilling program commenced on 10 July 2017. The program includes 66 drill holes for a total of 9,570 metres, targeting depths between 100 and 200 metres focusing primarily on the Berenguela central deposit area, with select drill holes targeting mineralisation outside of the area current Inferred Resource shell. To date, 42 holes for a total of 5,745 meters been completed. The drill holes are spaced on 35m x 35m grid and were performed from 15 platforms (BEP-002, BEP-003, BEP-005, BEP-006, BEP-007, BEP-008, BEP-021, BEP022, BEP-023, BEP-025, BEP-029, BEP-031, BEP-032)

==> picture [423 x 218] intentionally omitted <==

Figure 2 - 2017 Drilling Platform Map

Table 1: Drillhole Results at the Berenguela Project (Cut off Cu eq ~ 0.50)

Platform HoleId Comments From
(m)
To
(m)
Interval
(m)
% eCu
Excl
Mn
Summary
BEP-006 BER223-17 4 11 7 0.855 7 m @ 0.69 Cu% + 17.44 Ag g/t + 1.16 Mn% + 0.17 Zn%
26 49 23 0.974 23 m @ 0.54 Cu% + 41.17 Ag g/t + 4.31 Mn% + 0.5 Zn%
66 69 3 0.631 3 m @ 0.26 Cu% + 40.47 Ag g/t + 3.43 Mn% + 0.37 Zn%
79 90 11 0.744 11 m @ 0.43 Cu% + 28.11 Ag g/t + 4.36 Mn% + 0.38 Zn%
113 175 62 1.591 62 m @ 0.6 Cu% + 109.92 Ag g/t + 8.98 Mn% + 0.97 Zn%
BER224-17 4 47 43 0.586 43 m @ 0.42 Cu% + 16.69 Ag g/t + 2.26 Mn% + 0.18 Zn%
65 92 27 0.535 27 m @ 0.35 Cu% + 19.70 Ag g/t + 2.1 Mn% + 0.19 Zn%
BER225-17 5 68 63 1.586 63 m @ 1.08 Cu% + 40.84 Ag g/t + 7.62 Mn% + 0.66 Zn%
BER226-17 10 45 35 1.671 35 m @ 0.62 Cu% + 90.35 Ag g/t + 12.6 Mn% + 1.31 Zn%
52 61 9 0.892 9 m @ 0.63 Cu% + 25.03 Ag g/t + 4.38 Mn% + 0.3 Zn%
BEP-007 BER227-17 2 73 71 1.655 71 m @ 0.82 Cu% + 111.09 Ag g/t + 6.81 Mn% + 0.62 Zn%
100 112 12 0.592 12 m @ 0.35 Cu% + 23.73 Ag g/t + 2.96 Mn% + 0.27 Zn%
BER228-17 7 92 85 0.963 85 m @ 0.55 Cu% + 38.66 Ag g/t + 5.4 Mn% + 0.48 Zn%
BER229-17 11 42 31 1.067 31 m @ 0.59 Cu% + 28.43 Ag g/t + 10.58 Mn% + 0.73 Zn%
50 54 4 0.583 4 m @ 0.3 Cu% + 19.93 Ag g/t + 3.99 Mn% + 0.4 Zn%
BER230-17 0 42 42 1.605 42 m @ 0.93 Cu% + 70.35 Ag g/t + 11.13 Mn% + 0.71 Zn%
BEP-008 BER231-17 0 5 5 1.034 5 m @ 0.47 Cu% + 31.94 Ag g/t + 7.93 Mn% + 0.88 Zn%
25 65 40 0.746 40 m @ 0.43 Cu% + 19.17 Ag g/t + 5.82 Mn% + 0.48 Zn%
BER232-17 1 6 5 2.093 5 m @ 1.19 Cu% + 71.58 Ag g/t + 15.74 Mn% + 1.19 Zn%
30 37 7 0.837 7 m @ 0.45 Cu% + 20.44 Ag g/t + 8.65 Mn% + 0.62 Zn%
96 102 6 0.856 6 m @ 0.57 Cu% + 27.93 Ag g/t + 3.07 Mn% + 0.32 Zn%
BER233-17 0 17 17 0.729 17 m @ 0.46 Cu% + 19.82 Ag g/t + 3.9 Mn% + 0.37 Zn%
BER234-17 0 23 23 1.112 23 m @ 0.73 Cu% + 33.39 Ag g/t + 5.12 Mn% + 0.47 Zn%
BEP-002 BER235-17 0 28 28 1.148 28 m @ 0.65 Cu% + 30.71 Ag g/t + 9.32 Mn% + 0.75 Zn%
39 59 20 1.167 20 m @ 0.57 Cu% + 78.73 Ag g/t + 8.05 Mn% + 0.45 Zn%
59 66 7 10.870 7 m @ 2.18 Cu% + 1,719.83 Ag g/t + 13.21 Mn% + 0.41 Zn%
BER236-17 0 44 44 1.499 44 m @ 0.9 Cu% + 85.63 Ag g/t + 8.42 Mn% + 0.38 Zn%
BEP-023 BER237-17 21 32 11 0.597 11 m @ 0.31 Cu% + 47.80 Ag g/t + 1.27 Mn% + 0.11 Zn%
35 46 11 1.461 11 m @ 0.86 Cu% + 94.43 Ag g/t + 10.49 Mn% + 0.29 Zn%
67 71 4 1.638 4 m @ 0.68 Cu% + 139.62 Ag g/t + 9.02 Mn% + 0.58 Zn%
81 85 4 0.658 4 m @ 0.45 Cu% + 22.43 Ag g/t + 3.74 Mn% + 0.21 Zn%
BER238-17 18 36 18 0.989 18 m @ 0.56 Cu% + 65.28 Ag g/t + 7.43 Mn% + 0.23 Zn%
82 92 10 1.179 10 m @ 0.79 Cu% + 61.03 Ag g/t + 3.98 Mn% + 0.19 Zn%
BER239-17 30 57 27 1.715 27 m @ 1.01 Cu% + 117.80 Ag g/t + 8.73 Mn% + 0.26 Zn%
88 100 12 1.811 12 m @ 0.82 Cu% + 177.05 Ag g/t + 5.27 Mn% + 0.26 Zn%
BER240-17 26 43 17 1.925 17 m @ 0.76 Cu% + 214.60 Ag g/t + 9.24 Mn% + 0.24 Zn%
43 49 6 3.222 6 m @ 2.96 Cu% + 34.65 Ag g/t + 13.04 Mn% + 0.2 Zn%
75 80 5 0.746 5 m @ 0.46 Cu% + 37.80 Ag g/t + 4.19 Mn% + 0.21 Zn%
BER241-17 20 61 41 1.323 41 m @ 0.69 Cu% + 113.22 Ag g/t + 4.84 Mn% + 0.15 Zn%
Platform HoleId Comments From
(m)
To
(m)
Interval
(m)
% eCu
Excl
Mn
Summary
BEP-029 BER242-17 9 35 26 1.721 26 m @ 0.91 Cu% + 105.30 Ag g/t + 7.14 Mn% + 0.63 Zn%
48 57 9 1.645 9 m @ 0.72 Cu% + 165.57 Ag g/t + 3.94 Mn% + 0.23 Zn%
BER243-17 0 5 5 1.122 5 m @ 0.63 Cu% + 49.42 Ag g/t + 7.7 Mn% + 0.54 Zn%
16 21 5 1.372 5 m @ 0.57 Cu% + 101.48 Ag g/t + 16.57 Mn% + 0.66 Zn%
24 29 5 1.267 5 m @ 0.63 Cu% + 70.66 Ag g/t + 17.53 Mn% + 0.63 Zn%
32 36 4 2.068 4 m @ 1.31 Cu% + 110.70 Ag g/t + 19.29 Mn% + 0.46 Zn%
37 91 54 2.605 54 m @ 1.48 Cu% + 202.66 Ag g/t + 14.47 Mn% + 0.27 Zn%
37 45 8 5.996 8 m @ 2.09 Cu% + 754.13 Ag g/t + 20 Mn% + 0.38 Zn%
68 73 5 2.480 5 m @ 2.12 Cu% + 62.12 Ag g/t + 4.59 Mn% + 0.11 Zn%
BER244-17 0 6 6 1.468 6 m @ 1.18 Cu% + 32.25 Ag g/t + 2.23 Mn% + 0.27 Zn%
8 11 3 2.473 3 m @ 1.95 Cu% + 58.23 Ag g/t + 7.11 Mn% + 0.51 Zn%
14 64 50 2.195 50 m @ 1.39 Cu% + 130.77 Ag g/t + 11.63 Mn% + 0.34 Zn%
32 41 9 3.663 9 m @ 3.02 Cu% + 107.11 Ag g/t + 9.45 Mn% + 0.24 Zn%
41 51 10 2.351 10 m @ 1.24 Cu% + 177.18 Ag g/t + 18.11 Mn% + 0.5 Zn%
BER245-17 3 15 12 1.229 12 m @ 0.79 Cu% + 48.40 Ag g/t + 8.9 Mn% + 0.42 Zn%
20 34 14 2.320 14 m @ 1.07 Cu% + 186.18 Ag g/t + 9.83 Mn% + 0.71 Zn%
22 30 8 3.144 8 m @ 1.47 Cu% + 252.96 Ag g/t + 12.95 Mn% + 0.93 Zn%
45 48 3 1.428 3 m @ 0.99 Cu% + 48.73 Ag g/t + 6.89 Mn% + 0.42 Zn%
52 64 12 2.309 12 m @ 0.85 Cu% + 243.52 Ag g/t + 15.69 Mn% + 0.55 Zn%
60 64 4 1.656 4 m @ 0.59 Cu% + 195.55 Ag g/t + 8.16 Mn% + 0.21 Zn%
BER246-17 0 3 3 0.911 3 m @ 0.52 Cu% + 16.50 Ag g/t + 19.09 Mn% + 0.67 Zn%
10 17 7 2.031 7 m @ 1.15 Cu% + 116.61 Ag g/t + 18.57 Mn% + 0.66 Zn%
22 29 7 0.659 7 m @ 0.52 Cu% + 16.89 Ag g/t + 2.43 Mn% + 0.12 Zn%
32 43 11 1.468 11 m @ 0.84 Cu% + 63.65 Ag g/t + 9.6 Mn% + 0.68 Zn%
51 53 2 1.163 2 m @ 0.46 Cu% + 105.90 Ag g/t + 6.36 Mn% + 0.39 Zn%
59 75 16 8.205 16 m @ 1.88 Cu% + 1,243.31 Ag g/t + 10.43 Mn% + 0.39 Zn%
59 62 3 2.803 3 m @ 1.12 Cu% + 293.73 Ag g/t + 10.99 Mn% + 0.5 Zn%
63 71 8 13.859 8 m @ 2.95 Cu% + 2,161.23 Ag g/t + 14.64 Mn% + 0.49 Zn%
BEP-003 BER247-17 24 35 11 0.792 11 m @ 0.46 Cu% + 56.91 Ag g/t + 11.61 Mn% + 0.1 Zn%
43 51 8 1.724 8 m @ 0.96 Cu% + 125.78 Ag g/t + 11.83 Mn% + 0.3 Zn%
BER248-17 30 45 15 1.577 15 m @ 0.83 Cu% + 143.40 Ag g/t + 12.01 Mn% + 0.08 Zn%
BER249-17 30 33 3 1.700 3 m @ 1 Cu% + 94.63 Ag g/t + 11.82 Mn% + 0.5 Zn%
36 41 5 3.422 5 m @ 2.05 Cu% + 234.00 Ag g/t + 11.54 Mn% + 0.47 Zn%
43 52 9 2.363 9 m @ 1.7 Cu% + 87.17 Ag g/t + 6.92 Mn% + 0.51 Zn%
59 91 32 2.944 32 m @ 2.07 Cu% + 143.64 Ag g/t + 10.59 Mn% + 0.35 Zn%
77 81 4 3.701 4 m @ 3.3 Cu% + 63.83 Ag g/t + 6.4 Mn% + 0.19 Zn%
84 88 4 4.452 4 m @ 4.09 Cu% + 55.45 Ag g/t + 15.65 Mn% + 0.2 Zn%
BER250-17 29 34 5 3.695 5 m @ 1.68 Cu% + 353.86 Ag g/t + 11.51 Mn% + 0.56 Zn%
36 52 16 1.749 16 m @ 1.13 Cu% + 107.30 Ag g/t + 12.45 Mn% + 0.2 Zn%
29 34 5 3.695 5 m @ 1.68 Cu% + 353.86 Ag g/t + 11.51 Mn% + 0.56 Zn%
36 52 16 1.749 16 m @ 1.13 Cu% + 107.30 Ag g/t + 12.45 Mn% + 0.2 Zn%
Platform HoleId Comments From
(m)
To
(m)
Interval
(m)
% eCu
Excl
Mn
Summary
BEP-005 BER251-17 0 55 55 3.353 55 m @ 1.87 Cu% + 251.90 Ag g/t + 13.55 Mn% + 0.51 Zn%
22 34 12 3.641 12 m @ 2.78 Cu% + 132.44 Ag g/t + 12.77 Mn% + 0.45 Zn%
38 46 8 5.656 8 m @ 3.12 Cu% + 455.50 Ag g/t + 12.48 Mn% + 0.61 Zn%
46 50 4 4.118 4 m @ 1.14 Cu% + 529.50 Ag g/t + 12.46 Mn% + 0.77 Zn%
50 54 4 6.048 4 m @ 2.42 Cu% + 680.75 Ag g/t + 14.25 Mn% + 0.57 Zn%
54 68 14 0.677 14 m @ 0.46 Cu% + 36.84 Ag g/t + 1.17 Mn% + 0.09 Zn%
BER252-17 0 35 35 2.395 35 m @ 1.35 Cu% + 166.99 Ag g/t + 12.06 Mn% + 0.48 Zn%
1 5 4 3.139 4 m @ 1.41 Cu% + 272.54 Ag g/t + 14.7 Mn% + 0.82 Zn%
9 33 24 2.551 24 m @ 1.54 Cu% + 158.08 Ag g/t + 11.67 Mn% + 0.5 Zn%
BEP-031 BER255-17 52 70 18 2.217 18 m @ 1.51 Cu% + 100.30 Ag g/t + 12.62 Mn% + 0.45 Zn%
52 57 5 3.472 5 m @ 2.22 Cu% + 210.60 Ag g/t + 19.22 Mn% + 0.45 Zn%
BER256-17 29 54 25 2.372 25 m @ 1.99 Cu% + 57.38 Ag g/t + 10.71 Mn% + 0.21 Zn%
29 35 6 3.539 6 m @ 3.17 Cu% + 55.90 Ag g/t + 14.74 Mn% + 0.21 Zn%
51 54 3 4.973 3 m @ 4.13 Cu% + 137.77 Ag g/t + 16.93 Mn% + 0.36 Zn%
BER257-17 67 80 13 3.492 13 m @ 2.94 Cu% + 91.76 Ag g/t + 6.16 Mn% + 0.21 Zn%
67 70 3 4.625 3 m @ 3.84 Cu% + 140.70 Ag g/t + 4.96 Mn% + 0.2 Zn%
BER258-17 68 87 19 1.953 19 m @ 1.33 Cu% + 72.86 Ag g/t + 10.24 Mn% + 0.58 Zn%
BER259-17 63 100 37 1.397 37 m @ 1.07 Cu% + 47.43 Ag g/t + 5.58 Mn% + 0.2 Zn%
69 73 4 2.786 4 m @ 2.33 Cu% + 72.48 Ag g/t + 7.3 Mn% + 0.22 Zn%
BEP-032 BER260-17 5 16 11 1.536 11 m @ 1.02 Cu% + 76.45 Ag g/t + 4.42 Mn% + 0.3 Zn%
BER261-17 0 15 15 3.350 15 m @ 1.9 Cu% + 254.59 Ag g/t + 18.49 Mn% + 0.42 Zn%
0 8 8 3.779 8 m @ 2.64 Cu% + 190.13 Ag g/t + 20 Mn% + 0.44 Zn%
8 15 7 2.860 7 m @ 1.05 Cu% + 328.26 Ag g/t + 16.77 Mn% + 0.41 Zn%
BER262-17 63 85 22 1.677 22 m @ 0.88 Cu% + 89.44 Ag g/t + 12.62 Mn% + 0.76 Zn%
BER263-17 0 15 15 3.229 15 m @ 2.48 Cu% + 124.92 Ag g/t + 13.09 Mn% + 0.29 Zn%
6 12 6 5.343 6 m @ 4.47 Cu% + 144.63 Ag g/t + 19.03 Mn% + 0.35 Zn%
BER264-17 0 16 16 3.849 16 m @ 2.65 Cu% + 204.19 Ag g/t + 19.06 Mn% + 0.42 Zn%
0 8 8 3.790 8 m @ 2.62 Cu% + 186.75 Ag g/t + 18.82 Mn% + 0.53 Zn%
7 11 4 4.786 4 m @ 3.85 Cu% + 169.25 Ag g/t + 18.74 Mn% + 0.22 Zn%
11 15 4 3.031 4 m @ 1.49 Cu% + 274.00 Ag g/t + 19.86 Mn% + 0.4 Zn%

*Intercepts are calculated using: True width intervals of the mineralisation are interpreted as being between 50-80% true widths from oriented RC drilling core and sectional interpretation

Copper equivalent (CuEq) calculations assume:

Base of
Calculus
Units Price-LME (London
Metal Exchange)
Recovery (%)
Concentrate
Cu US Dollarsper tonne 6,426.00 0.85
Ag US Dollars and centsper troyounce 16.795 0.5
Zn US Dollarsper tonne 3,150.00 0.8

LME Prices on 27 Sep 2017. Mn grades are not considered for eCu calculus.

Table 2: Drill Collar Information for Berenguela Project: )

Hole ID East_WGS North_WGS Elevation Depth(m) Azimuth Dip
BEP-006-BER223-17 332339.410 8268762.630 4260.650 200 15 -60
BEP-006-BER224-17 332339.080 8268760.870 4260.790 180 0 -90
BEP-006-BER225-17 332338.780 8268759.210 4260.570 150 195 -71
BEP-006-BER226-17 332338.460 8268757.500 4260.500 110 195 -51
BEP-007-BER227-17 332392.650 8268742.000 4254.980 180 15 -57
BEP-007-BER228-17 332392.070 8268740.090 4255.210 160 0 -90
BEP-007-BER229-17 332391.650 8268738.240 4254.950 150 195 -70
BEP-007-BER230-17 332391.200 8268736.590 4254.920 100 195 -50
BEP-008-BER231-17 332449.560 8268738.380 4246.690 170 0 -57
BEP-008-BER232-17 332449.460 8268737.180 4246.710 120 290 -61
BEP-008-BER233-17 332449.460 8268736.080 4246.700 120 215 -70
BEP-008-BER234-17 332448.590 8268734.830 4246.730 100 215 -50
BEP-002-BER235-17 332080.460 8268590.960 4250.510 130 15 -70
BEP-002-BER236-17 332080.610 8268587.750 4250.550 150 195 -50
BEP-023-BER237-17 332339.420 8268411.700 4234.640 100 15 -47
BEP-023-BER238-17 332339.020 8268410.440 4234.530 100 15 -60
BEP-023-BER239-17 332335.050 8268412.860 4234.610 105 330 -46
BEP-023-BER240-17 332340.630 8268410.140 4234.620 100 50 -44
BEP-023-BER241-17 332339.190 8268409.000 4234.630 100 50 -65
BEP-029-BER242-17 332169.770 8268559.000 4249.480 150 15 -64
BEP-029-BER243-17 332167.540 8268550.810 4249.250 150 195 -43
BEP-029-BER244-17 332170.440 8268552.370 4249.230 150 150 -45
BEP-029-BER245-17 332170.780 8268557.070 4249.440 150 50 -65
BEP-029-BER246-17 332167.700 8268557.340 4249.460 150 330 -64
BEP-003-BER247-17 332273.340 8268582.060 4251.940 110 15 -49
BEP-003-BER248-17 332272.910 8268580.540 4251.950 100 15 -69
BEP-003-BER249-17 332271.670 8268576.170 4251.720 200 195 -50
BEP-003-BER250-17 332272.150 8268577.920 4251.850 140 195 -69
BEP-005-BER251-17 332581.210 8268643.310 4234.760 140 15 -55
BEP-005-BER252-17 332580.780 8268641.890 4234.800 170 15 -75
BEP-005-BER253-17 332579.530 8268637.300 4234.690 110 195 -54
BEP-005-BER254-17 332579.900 8268638.750 4234.780 120 195 -74
BEP-031-BER255-17 332362.940 8268506.690 4255.170 100 15 -64
BEP-031-BER256-17 332362.290 8268504.480 4255.280 100 195 -65
BEP-031-BER257-17 332360.520 8268509.530 4255.160 100 330 -45
BEP-031-BER258-17 332365.520 8268508.090 4255.210 100 50 -45
BEP-031-BER259-17 332365.160 8268501.640 4255.390 100 150 -43
BEP-032-BER260-17 332435.720 8268473.320 4256.940 100 15 -64
BEP-032-BER261-17 332434.600 8268469.560 4256.920 100 195 -64
BEP-032-BER262-17 332437.950 8268474.170 4256.910 100 50 -45
BEP-032-BER263-17 332437.250 8268468.870 4256.870 100 150 -45
BEP-032-BER264-17 332432.430 8268469.770 4256.910 100 230 -45
BEP-002-BER265-17 332080.200 8268589.880 4250.660 80 0 -90
BEP-002-BER266-17 332080.030 8268589.090 4250.530 80 195 -75
BEP-029-BER267-17 332165.460 8268552.820 4249.310 100 230 -44
BEP-021-BER268-17 332035.530 8268511.420 4226.940 163 15 -44
BEP-021-BER269-17 332034.960 8268509.480 4226.930 105 15 -65
BEP-021-BER270-17 332033.880 8268510.410 4226.950 63 330 -64
BEP-021-BER271-17 332037.090 8268510.700 4227.000 45 50 -46
BEP-022-BER272-17 332144.270 8268461.710 4234.090 200 15 -45
BEP-022-BER273-17 332143.670 8268459.650 4234.100 57 15 -65
BEP-022-BER274-17 332142.120 8268461.390 4234.090 77 330 -45
BEP-022-BER275-17 332145.990 8268461.080 4234.210 160 50 -45
BEP-022-BER276-17 332144.530 8268459.860 4234.180 60 50 -65
BEP-025-BER277-17 332479.360 8268405.840 4244.750 120 15 -46
BEP-025-BER278-17 332476.080 8268405.410 4244.680 135 330 -45
BEP-025-BER279-17 332477.130 8268403.850 4244.590 110 330 -66
BEP-025-BER280-17 332481.530 8268404.410 4244.780 150 50 -45
BEP-025-BER281-17 332480.200 8268403.250 4244.660 110 50 -65
BEP-024-BER282-17 332420.200 8268403.680 4242.430 130 15 -45
Hole ID East_WGS North_WGS Elevation Depth(m) Azimuth Dip
BEP-024-BER283-17 332419.790 8268401.990 4242.280 120 15 -63
BEP-024-BER284-17 332416.350 8268403.510 4242.180 130 330 -45
BEP-024-BER285-17 332422.980 8268402.230 4242.250 140 50 -46
BEP-024-BER286-17 332421.640 8268401.100 4242.300 135 50 -65
BEP-005-BER287-17 332581.110 8268637.860 4234.820 140 150 -65
BEP-001-BER288-17 331639.150 8268582.600 4196.330 150 15 -45
BEP-001-BER289-17 331638.660 8268580.740 4196.360 140 15 -66
BEP-001-BER290-17 331636.420 8268572.910 4196.110 100 195 -45
BEP-001-BER291-17 331636.990 8268575.040 4196.350 100 195 -63

-ENDS-

For further information, please contact:

Mark Sumner Chairman

Media Relations:

Ben Jarvis, Six Degrees Investor Relations: +61 (0) 413 150 448

==> picture [36 x 36] intentionally omitted <==

Follow us on Twitter @valorresources

About the Berenguela Project:

The Berenguela Project is an advanced stage copper-silver project located in the Puno District of Peru. On 10 March 2017 in an announcement titled “Mineral Resource Confirmation – Additional Information for ASX LR 5.8.1”, Valor informed the market that Berenguela has confirmed Mineral Resources, according to the JORC (2012) Code of:

  • Indicated: 15.6 million tonnes at 132 g/t Ag and 0.92% Cu

  • Inferred: 6 million tonnes at 111 g/t Ag and 0.74% Cu

The current resource base covers an area of approximately 140 hectares, which accounts for only 2% of the total 6,594 hectares of exploration concessions in Valor’s total land package. Valor believes this drilling program will continue to confirm and upgrade the existing resource, while paving the way to further resource expansion drilling in the future.

Copper Equivalent Calculations & Recoveries Assumptions

The calculation formula used to calculate the reported Copper Equivalent (CuEq %) is as follows: Cu Eq (%) = Cu G (%) + ((Ag G / 10000) x Ag P x C x ReAg) / (Cu P x ReCu) + (Zn% x Zn P x ReZn) / (Cu P x ReCu)

Equation Key: Cu G = Copper grade % Ag G = Silver grade in g/t Ag P = Silver price in USD per troy ounce: US$16.795 C = Conversion of tonnes to ounces, 1 tonne = 10[6] /31.1035=32150.7465 ounces ReAg = Expected recovery of silver = 50% Cu P = Copper price at US$6,426.00 per tonne ReCu = Expected recovery of copper = 85% Zn% = Zinc Grade %; Zn P = Zinc price = US$3,150.00 per tonne; ReZn = Expected recovery of zinc = 80% See Table 1 for further information on metals grades and drilling intervals.

The metals price assumptions were calculated using spot prices taken from the London Metals Exchange (LME) on Monday, 27 September 2017.

Metallurgical test work has been completed on multiple Berenguela ore samples by independent laboratories and consulting groups. Recovery rates are based on historical work conducted on Berenguela ore samples, as well as guidance from Valor’s metallurgical consultants. Valor’s metallurgists were consulted regarding the potential for Cu, Ag and Zn recovery based on historical metallurgical work in order to confirm Reasonable Prospects for Eventual Economic Extraction. A Quality Assurance-Quality Control (QAQC) analysis has been conducted to confirm mineralisation, which showed positive intervals. Based on historical metallurgical work and QAQC, it is the Company’s opinion that all the elements included in the metal equivalents calculation have a reasonable potential to be recovered and sold.

Competent Person’s Statement

The technical information in this release is based on compiled and reviewed data by Mr. Marcelo Batelochi. Mr. Batelochi is an independent consultant with MB Geologia Ltda and is a Chartered Member of AusIMM – The Minerals Institute. Mr. Batelochi has sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which is being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Batelochi consents to the inclusion in the report of the matters based on their information in the form and context in which it appears. Mr. Batelochi accepts responsibility for the accuracy of the statements disclosed in this release.

JORC Code, 2012 Edition – Table 1 report

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling Nature and quality of sampling (eg cut channels, RC drilling the entire 1m RC samples were obtained and split by an adjustable
techniques random chips, or specific specialised industry standard
measurement tools appropriate to the minerals under
cone splitter attached to the base of the cyclone or riffle split separately to 1.5kg
– 3.0kg and were utilized for both lithology logging and assaying;
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of
sampling.
Include reference to measures taken to ensure sample Samples are split into single meter intervals.
representivity and the appropriate calibration of any Certified standards were inserted every 20th sample and to assess the accuracy
measurement tools or systems used. and methodology of the external laboratories. Field duplicates were inserted
every 20th sample to assess the repeatability and variability of the Polymetallic
mineralisation. Laboratory duplicates were also completed approximately every
20th sample to assess the precision of the laboratory as well as the repeatability
and variability of the mineralisation. A blank standard was inserted at the start
of every batch. Results of the QAQC sampling were assessed on a batch by batch
basis and were considered acceptable.
1m RC samples were obtained by an adjustable cone splitter attached to the
Aspects of the determination of mineralisation that are
Material to the Public Report.
base of the cyclone (1.5kg – 3.0kg) and were utilized for both lithology logging
and assaying.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge for fire
assay’). In other cases more explanation may be
required, such as where there is coarse gold that has
These identified samples are sent to SGS preparation Laboratory, which are re-
identified with SGS number linked to a code bar, the samples are weighed, dried
at 105°C, grain size reduced to -8mm in primary crusher and in a secondary to
90%@ - 2mm, split to 0.15-0.3kg before being pulverised to 95% @ - 140mesh.
The final pulp is sent to SGS laboratories in Callao – Lima Peru for chemical
analysis assay.
inherent sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.
Drilling Drill type (eg core, reverse circulation, open-hole A AKD RC Drill Rig (Schramm T660H) Being 5.5’’ diameter face sampling hammer
techniques hammer, rotary air blast, auger, Bangka, sonic, etc)
and details(eg core diameter, triple or standard tube,
was used
Criteria JORC Code explanation Commentary
depth of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method,
_etc). _
Drill sample Method of recording and assessing core and chip RC recovery was visually assessed, with recovery being excellent in this case due
recovery sample recoveries and results assessed. to the all drilled interval are above the water table. There are rare (-3%) of high
intense fractured interval with no recovery, or less than 1 kg that is discarded.
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
RC samples were visually checked for recovery, moisture and contamination
during the drill rig operation. The drilling contractor utilized a cyclone and cone
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred

splitter to provide uniform sample size. The cone splitter was cleaned at the end
of every rod and the cyclone cleaned at the completion of every hole.
due to preferential loss/gain of fine/coarse material. Sample recoveries for RC drilling were high within the mineralized zones,
confirmed by the check between RC x DD drilling performed by Silver Standard
in 2015 and checked by Valor Resources in 2017. No significant bias is expected
and high reproducibility between RC and DD drilling.
Logging Whether core and chip samples have been geologically Lithology, alteration, veining, mineralization and manganese alteration were
and geotechnically logged to a level of detail to support logged from the RC chips and stored in Datashed. Chips from selected holes
appropriate Mineral Resource estimation, mining were also placed in chip trays and stored in a designated building at site for
studies and metallurgical studies. future reference.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc) photography. All drill holes intervals are logged by geologists acquiring the qualitative
The total length and percentage of the relevant information, and all RC chip boxes are photography
intersections logged.
Sub- If core, whether cut or sawn and whether quarter, half Non cores;
sampling or all core taken.
techniques
and sample
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.
RC drilling recovery samples using a cyclone and cone splitter or riffle, in a
weather sampled wet, natural humidity less than 10%.
preparation
For all sample types, the nature, quality and
appropriateness of the sample preparation technique.
These identified samples are sent to SGS preparation Laboratory in Arequipa,
which are re-identified with SGS number linked to a code bar, the samples are
weighed,dried at 105°C, grain size reduced to -8mm inprimarycrusher and in a
Criteria JORC Code explanation Commentary
secondary to 90%@ - 2mm, split to 0.15-0.3kg before being pulverised to 95% @
- 140mesh. The final pulp is sent to SGS laboratories in Callao – Lima Peru for
chemical analysis assay.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field duplicate/second-
half sampling.

Certified standards and blanks were inserted every 20thsample to assess the
accuracy and methodology of the external laboratory (SGS), and field duplicates
were inserted every 20thsample to assess the repeatability and variability of the
polymetallic mineralization.
Laboratory duplicates (sample preparation split) were completed every 20th
sample to assess the precision of the laboratory as well as the repeatability and
variability of the mineralization.
Whether sample sizes are appropriate to the grain size
of the material being sampled.
Sample sizes (1.5kg to 3kg) are considered to be a sufficient size to accurately
represent the mineralization based on the mineralisation style, the width and
continuity of the intersections, the sampling methodology.
5 twin DD drilling were performed in 2005 to ensure of the sub-sampling quality.
Acceptable precision and accuracy is noted in this comparison RC x DD and also
the duplicates are acceptable and consistent with this mineralization style.
Quality of The nature, quality and appropriateness of the All 2017 RC Drilling are analysing following the procedure summarized below:
assay data
and
laboratory
assaying and laboratory procedures used and whether
the technique is considered partial or total.
All Samples of Geochemical Exploration Total Digestion - ICP Scheme:
ICP40B - Method: SGS-MN-ME-41
 Weigh out 0.20 grams of sample and transfer to a Teflon beaker Add nitric
acid and perchloric acid;
tests  Digest to dryness;
 Cool, add fluoric acid and digest to dryness;
 Add chloric acid;
 Heat to dissolve the salts;
 Cool and transfer to 20 ml tube;
 Make up to ultra pure water;
 Cover and homogenized;
 Read with the Inductively Coupled Plasma Optical Emission Spectrometry
(ICPOES)
Elements:
Criteria JORC Code explanation Commentary Commentary
Element - Detection Upper Element - Detection Upper
Unit Limit Limit Unit Limit Limit
Ag - PPM 0.2 100 Mo - PPM 1 10000
Al - % 0.01 15 Na - % 0.01 15
As - PPM 3 10000 Nb - PPM 1 10000
Ba - PPM 1 10000 Ni - PPM 1 10000
Be - PPM 0.5 10000 P - % 0.01 15
Bi - PPM 5 10000 Pb - PPM 2 10000
Ca - % 0.01 15 S - % 0.01 10
Cd - PPM 1 10000 Sb - PPM 5 10000
Co - PPM 1 10000 Sc - PPM 0.5 10000
Cr - PPM 1 10000 Sn - PPM 10 10000
Cu - PPM 0.5 10000 Sr - PPM 0.5 5000
Fe - % 0.01 15 Ti - % 0.01 15
Ga - PPM 10 10000 Tl - PPM 2 10000
K - % 0.01 15 V - PPM 2 10000
La - PPM 0.5 10000 W - PPM 10 10000
Li - PPM 1 10000 Y - PPM 0.5 10000
Mg - % 0.01 15 Zn - PPM 0.5 10000
Mn - PPM 2 10000 Zr - PPM 0.5 10000
Samples above ICP40B upper limit: Multi-acid Digestion - Atomic Absorption
Scheme: AAS41B - Method: SGS-MN-ME-106
 Weigh 0.25 grams of sample and transfer to a Teflon beaker;
 Add 2.5 ml nitric acid, 7.5 ml chloric acid, 1.5 ml perchloric acid and 10 ml
fluoric acid;
 Digest to dryness;
 Cool and add chloric acid.
 Heat and dissolve the salts.
 Cool and complete the solution with deionized water to 100 ml;
 Cover and homogenize.
 Read by atomic absorption.
Criteria JORC Code explanation Commentary
Element -
Detection
Upper
Unit
Limit
Limit
Ag - PPM
10
4000
Cu - %
0.002
20
Pb - %
0.01
20
Zn - %
0.01
20
Geophysical tools not used.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining
the analysis including instrument make and model,
reading times, calibrations factors applied and their
derivation, etc.


Three Certified Reference Material (standards) were inserted every 20thsample
to assess the assaying accuracy of the external laboratories.
Coarse duplicates were inserted every 20thsample to assess the repeatability
from the preparation and variability of the Cu, Ag, Zn and Mn mineralization.
Laboratory duplicates were also completed approximately every 20thsample to
assess the precision of assaying.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (ie
lack of bias) and precision have been established.
Evaluation of control samples has been carry out every received batch received
from laboratory, which the submitted standards, duplicates and blanks (blinded)
and the internal laboratory quality control data (non blinded), indicates assaying
to be accurate and without significant bias.
Field duplicate sample show excellent levels of correlation, above 0.85 for
blinded duplicates (inserted by Valor Resources) and non blinded (inserted by
SGS).
.
Verification The verification of significant intersections by either The Cu, Ag, Mn and Zn high grade intersections of RC drilling, have been
of sampling independent or alternative company personnel. intensively re-logged by the field geologists and also for the Competent Person
and with extensive experience in similar gold deposit styles
assaying The use of twinned holes. Silver Standard in 2015 performed five Diamond twin holes, which was analyzed
internally and checked by Valor Resources during the Due Diligences, showing
the high correlation considering distinct sample support and the deviations are
considered to be normal variations in this mineralization type deposit.
All sample controls, geological logging, assays are entered directly into excel
Criteria JORC Code explanation Commentary
Documentation of primary data, data entry procedures, spreadsheets files, with daily backup with a local copy replicated to a Valor
data verification, data storage (physical and electronic) Resources Ftp.
protocols.
Updating the procedures for database storage
Discuss any adjustment to assay data.
Location of Accuracy and quality of surveys used to locate drill The surveys were carried out by the contracted Company “Servicios Múltiples
data points holes (collar and down-hole surveys), trenches, mine
workings and other locations used in Mineral Resource
Cáceres S.R.L” – Arequipa Peru;
Two Geomax Zenith 35Pro GNSS equipment with their respective accessories
estimation. were used;
Specification of the grid system used. The method used was that of RTK for stakeout by satellite tracking;
Quality and adequacy of topographic control. Base station at geodesic point BE-01;
The grid system is PSAD-56 Zone 19S
Data Data spacing for reporting of Exploration Results. Valor Resource is carrying 9750 meters of infill drilling, using platforms to
spacing and perform no regular fan drill to cover the main areas of the deposit with
distribution approximately 35x35 meters space. In these platforms are drill holes to
investigate extensions out of previous resources.
Whether the data spacing and distribution is sufficient The data spacing and distribution is sufficient to demonstrate spatial and grade
to establish the degree of geological and grade continuity of the mineralized domains to support the definition of Inferred,
continuity appropriate for the Mineral Resource and Indicated and Measured Mineral resources under the 2012 JORC code
Ore Reserve estimation procedure(s) and classifications
applied.
Whether sample compositing has been applied. No sample compositing has been applied in the field within the mineralized
zones
Orientation Whether the orientation of sampling achieves unbiased
The drilling is orientated N15 and N195 with dip varying from 40° to 90°, as a
of data in
relation to
sampling of possible structures and the extent to which
this is known, considering the deposit type.
non regular fan drill, performing about 4-5 RC drilling starting at a referred
platform
geological
structure
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
The previous sectional interpretation of 50m spaced holes shows reasonable
continuity of the mineralized zone both along strike and down dip. The drill
should be assessed and reported if material. orientation crossing a stock work mineralization trying to reproduce with high
Criteria JORC Code explanation Commentary
accuracy the spatial variability of this polymetallic Cu, Ag, Zn and Mn deposit
Sample The measures taken to ensure sample security. Samples are securely sealed and stored onsite;
security Samples delivery to SGS warehouse in Juliaca, by Valor Resources Staff;
SGS staff delivery to SGS Arequipa for preparation;
SGS Arequipa sent to SGS Callao – Lima to chemical analysis.
Audits or The results of any audits or reviews of sampling The 2017 procedure was revised and audited internally by Valor Resources in
reviews techniques and data. August 2017. Checking RC Drilling, Sampling, Preparation and Chemical Analysis,
by independent consultant M. Batelochi (AUSIMM Chattered Professional)

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary Commentary
Mineral Type, reference name/number, location and The Berenguela Property encompasses approximately 141.33 hectares situated in
tenement ownership including agreements or material issues the eastern part of the Western Cordilleran of south-central Peru and consists of
and land
tenure
status
with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
two mineral concessions. The Berenguela concessions are located within the
Department of Puno and lie within Peruvian National Topographic System (NTS)
map area Lagunillas, No. 32-U. The centre of the Berenguela concessions is at 15°
The security of the tenure held at the time of 40' South Latitude and 70° 34' West Longitude
reporting along with any known impediments to
obtaining a licence to operate in the area.
Exploration Acknowledgment and appraisal of exploration by In March of 2004, SSR entered into an option agreement with SOMINBESA (KCA) to
done by other parties. purchase 100% of the silver resources contained in the Berenguela Project.
other parties SSR performed 3 drill programmes:
• 2005 - 222 reverse circulation drill holes.
• 2010 – 17 Diamond Drill holes
• 2015 – 12 Diamond Drill holes
In 2017 Valor Resources is carrying out this RC drilling for a Feasibility study
Geology Deposit type, geological setting and style of Based on the distribution and form of the potentially economic bodies of Mn-Cu-Ag
mineralisation. mineralization within the structurally deformed limestone formation there is little
doubt that Berenguela represents a type of epigenetic, replacement-type ore
Criteria JORC Code explanation Commentary Commentary
deposit (Clark et al., 1990). Silver- and copper-mineralized veins of quartz and/or
carbonate appear to be a very minor component of the deposit. What is debateable
at Berenguela is whether or not, or to what extent supergene processes played a
role in the formation of the deposit.
More specifically, is the extensive development of manganese oxides the result of
the surface oxidation of hypogene manganiferous carbonates (manganocalcite
and/or rhodochrosite) which had replaced calcite and dolomite adjacent to
fractures in the precursor limestone and where silver, copper and zinc were
deposited as sulphides synchronous with or subsequent to the Mn-carbonate
replacement event. Or are the Mn- and Fe-oxides the direct metasomatic products
of a hydrothermal system marked by strongly oxidized fluids enriched in Ag, Cu.
Considering that the replacement-type ore bodies at Uchucchacua have vertical
extents of up to 300 meters, one could presume that good exploration potential still
exists at Berenguela for the discovery of hypogene Ag-Cu-Mn mineralization at
depths of 150 meters or greater. A possible indication of additional and extensive
metasomatic alteration at depth is represented by the thick gypsum zone that has
been intersected by several of the deeper holes in the deposit. (Strathern, 1969)
While this gypsum may be of sedimentary origin, it could also be explained as
forming a well-developed zone of sulphate alteration (perhaps originally occurring
as anhydrite) that is related to a high level intrusion which exsolved a large volume
of sulphur-rich fluids and/or vapour
Drill hole A summary of all information material to the See Tables 1 and 2 and Section 1 - Sampling Techniques and Data
Information understanding of the exploration results including a
tabulation of the following information for all
Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the
basis that the information is not Material and this
Criteria JORC Code explanation Commentary Commentary
exclusion does not detract from the understanding
of the report, the Competent Person should clearly
explain why this is the case.
Data In reporting Exploration Results, weighting In the reporting of exploration results, un-cut outliers grades are reported.
aggregation
methods
averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and
cut-off grades are usually Material and should be
stated.
The lower cut-off limit is considered to be Cu eq 0.5g/t for the reporting of drill hole
intercepts with no more than 2 m downhole internal dilution. Intercepts are
determined using a weighted average over the length of the intercept.
The intercepts were included on Exploration results to incorporate results of Cu, Ag,
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
Zn and Mn, in which there are high grade ranges of one metal and sterile of another
metal in this range. These were incorporated by calculating Cu equivalent.
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
The assumptions used for any reporting of metal Copper equivalent (CuEq) calculations assume:
equivalent values should be clearly stated. Base of
Calculus
Units
Costs-LME
(London Metal
Exchange)
Recovery
(%)
Concentra
te
Cu
US Dollarsper tonne
6,353.50
0.85
US Dollars and cents per troy
Ag
ounce
17.09
0.5
Zn
US Dollarsper tonne
2,886.50
0.8
Mn grades are not considered for eCu calculus.
Relationship These relationships are particularly important in the
Since few drill holes completed at Berenguela are longer than 150 m, there are few
between reporting of Exploration Results. accounts of hypogene, sulphide-rich mineralization. However, this is not to say that
mineralisati
on widths
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should be
reported.
such mineralization does not exist in altered limestones at greater depths.
and If it is not known and only the down hole lengths
intercept are reported, there should be a clear statement to
lengths this effect (eg ‘down hole length, true width not
Criteria JORC Code explanation Commentary Commentary
_known’). _
Diagrams Appropriate maps and sections (with scales) and See diagrams in main body of the announcement
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill
hole collar locations and appropriate sectional
views.
Balanced Where comprehensive reporting of all Exploration All the significant results of Cu, Ag, Zn and Mn greater than 0.5 % e Cu least 2m
reporting Results is not practicable, representative reporting
of both low and high grades and/or widths should
downhole have been reported in the main body of the announcement
be practiced to avoid misleading reporting of
Exploration Results.
Other Other exploration data, if meaningful and material, There are other substantive exploration data in the Silver Standard data room. Valor
substantive should be reported including (but not limited to): Investments has plans to investigate these data in detail after this drilling campaign
exploration
data
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
Further work
The nature and scale of planned further work (eg
Revision of Mineral Resources, updating with the 2011/2015 diamond drilling and
tests for lateral extensions or depth extensions or 2017 RC Drilling information and also the geological knowledge, which improved
large-scale step-out drilling). considerably since 2005;
Diagrams clearly highlighting the areas of possible
extensions, including the main geological
interpretations and future drilling areas, provided
This Mineral Resource should be detailed and complete to support a Feasibility
Study of Berenguela Project.
this information is not commercially sensitive.