WEST WITS MINING LIMITED — Capital/Financing Update 2021
Jul 22, 2021
66091_rns_2021-07-22_c6ddeb02-80df-4a07-8bca-4c3005b438db.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
ASX Announcement and Media Release 23 July 2021
ASX Announcement and Media Release
Friday, 23 July 2021
Restated JORC Resource of 3.55Moz at 4.26g/t Au for the Granted Mining Right at the WBP
West Wits Mining Limited (ASX: WWI, “ West Wits ” or “ the Company ”) provides this restated Mineral Resource Estimate (“MRE”) to reflect the reduction in surface footprint provided for in the recently granted mining right at the Company’s Witwatersrand Basin Project (“WBP”), South Africa. As previously disclosed[2] the mining right footprint was constrained relative to the prospecting right area to minimise the impact of the mine on interested and affected parties. The areas not included in the reduced mining right area were non-core and do not affect the mine plan. The Company has lodged applications to re-secure certain sections of the old prospecting right area and thereby reintroduce additional resources to the MRE. The Company anticipates that, subject to the acceptance of the new prospecting right (Figure 1), a significant portion of the old resource would be recaptured.
HIGHLIGHTS
-
➢ West Wits’ Mining Right grant[1] paves the way for completion of the Definitive Feasibility Study (“DFS”) on the flagship Witwatersrand Basin Project which will facilitate declaration of the maiden Ore Reserve in August 2021.
-
➢ The global JORC MRE for the Mining Right area restated at 25.91Mt @ 4.26g/t for 3.55Moz Au (2g/t cut-off)
-
➢ 2.25Moz Au at 3.98g/t of the restated MRE is in Measured and Indicated Mineral Resource categories (63%) being the pre cursor categories for possible conversion to Ore Reserves
West Wits Managing Director Mr Jac van Heerden said, “The granting of the mining right was the last major hurdle for development of the Witwatersrand Basin Project. The restated Mineral Resource of 3.55Moz @ 4.26g/t is sizeable and provides the resource base to sustain a long life mine to underpin the growth of the Company. The WWI team have been busy finalising the DFS with Bara Consulting on the Qala Shallows, first stage of the project, which is due for release in August. The Company is looking forward to commencement of project execution with site establishment expected to commence in September and underground mine development to follow shortly after.”
TABLE 1: UPDATED GLOBAL MRE FOR THE WITWATERSRAND BASIN PROJECT AT 2.0G/T CUT-OFF
| MRE Category | Tonnes (M) | Grade (g/t Au) | Ounces |
|---|---|---|---|
| Measured | 4.91 | 4.33 | 683,000 |
| Indicated | 12.70 | 3.84 | 1,570,000 |
| Measured & Indicated | 17.61 | 3.98 | 2,253,000 |
| Inferred | 8.31 | 4.86 | 1,298,000 |
| Total | 25.91 | 4.26 | 3,551,000 |
Notes: Global MRE set at a 2.0g/t Au cut-off. Reported in accordance with the JORC Code of 2012. Number differences may occur due to rounding errors.
page i
ASX Announcement and Media Release 23 July 2021
Overview
West Wits mining right (GP 30/5/1/2/2/10073 MR) (Figure 1: black boundary), recently granted by the Department of Mineral Resources and Energy[1] , replaces the Company’s previous Prospecting Right (GP 30/5/1/1/2/183 (10035) PR) (Figure 1: red boundary) over the Witwatersrand Basin Project. Through consultation with the DMRE, other stakeholders and mining specialists the Company reduced the MR footprint to facilitate the granting of the MR and remove areas which were deemed to not meet economic requirements.
==> picture [361 x 256] intentionally omitted <==
Figure 1 : The Witwatersrand Basin Project’s granted mining right boundary (black line) replaces the previous prospecting right boundary (red line). The company has applied for a new prospecting right (blue line) to re-introduce areas of long-term interest.
The restated Global MRE for the mining right area results in a 918,000oz Au reduction compared to the previous Global MRE[2] . As previously stated[2] , the areas impacted were deemed to be non-core and reduction in ounces has no impact in the mine schedule, or life of mine, in the Qala Shallows definitive DFS which is due to be completed in August 2021 or the Scoping Study over the entire WBP which was completed in 2020[3] .
Importantly, WBP’s Measured & Indicated MRE categories contain 17.61Mt @ 3.98g/t for 2.25Moz Au (2g/t cut-off) or 63% of the global MRE. The higher degree of confidence is fundamental in declaring a maiden Ore Reserve on successful completion of the DFS.
Witwatersrand Basin Project Geology
The WBP deposit forms part of the Central Rand Goldfield hosted by the Witwatersrand Supergroup strata. The Central Rand Goldfield is situated immediately to the south of Johannesburg and has been host to one of the most extensive gold reserves in the world. The reefs have been mined continuously on strike for approximately 55km in an east/west direction, bordered by DRD in the west, and downdip, to the south, for about 6km from its outcrop position to depths of approximately 3km. The reef horizons are channelised conglomerates and the major orebodies mined in the Central Rand Goldfield are the Main Reef, Main Reef Leader, South Reef, Bird reefs and Kimberley reefs.
page ii
ASX Announcement and Media Release 23 July 2021
Updated Mineral Resource Statement for WBP’s Mining Right area
The resource modelling was carried out by Shango Solutions, a South African based geological consultancy with significant experience in this region. The previous MRE dataset covering the Main, Leader, Bird, South & VCR reefs[4] and the K9A & K9B reefs[2] was updated for the new mining right boundary. The estimate was carried out after a detailed data capturing and validation process that included historic underground mining data as well as surface diamond drilling completed by WWI in 2009 and 2021[2] .
The Competent Person validated the databases that served as input for geological modelling and resource estimation. The mining right polygon, which was developed by a certified Land Surveyor, has been used by Shango to calculate the MR resource within the polygon.
The new Mineral Resource estimation utilises advanced geostatistical estimation methods, which includes simple and Ordinary Kriging. To ensure a complete result, both previously mined and unmined areas of the reefs were estimated and then the mined areas were subtracted from the modelling result.
Sampling
Samples from the recently concluded infill drilling campaign[2] included 2cm waste from the footwall and hangingwall of the reef. Samples were on average 20 – 25cm in length with a minimum of 10cm. Samples of the footwall and hangingwall waste were also taken with a 20cm sample nearest to the reef followed by two more samples of 40 – 50cm in length.
Samples were assayed by fire assay using 25g charges, applying discounts for silver-by-silver discount chart. The standard practice of fire assaying in the Witwatersrand Goldfield was deemed appropriate and representative for the samples. The laboratory inserted suitable certified reference samples for calibration purposes and also participated in round robin exercises with other laboratories to determine precision and reproducibility.
The historical sampling data used in the MRE comes solely from the underground workings. Diamond drilling was extensively utilised during previous mining history of the area but its use was confined to defining the spatial location of the reefs and the down hole assays were not included in the resource calculations.
Extensive underground sampling was conducted over the course of the mining. All underground samples were sampled from bottom to top over the full exposure of the reef in question and included 2cm footwall and hangingwall waste so as to ensure high grades typically associated with the bottom and top contacts were included. All sample locations were spatially recorded with reference to the surveyed underground mine plans and transferred onto master plans which were subsequently used in formulating the resource statement.[4]
Estimation Methodology & Mineral Resource Classification
K9A & K9B Reefs, sample grades are capped per estimation domain, the dataset consisted of underground chip samples and stretch composite samples with various lengths and boreholes. Samples and estimation domains were unfolded to a planar surface. Simple and Ordinary Kriging was performed into 50m x 50m parent cells for all regions, with Ordinary Macro Kriging performed into 500m x 500m parent cells estimating channel probability in the K9B Reef and the western region of the K9A Reef. In the eastern region of the K9A Reef a sequential indicator simulation was performed for channel probability into 10m x 10m parent cells for the Inferred Mineral Resource beyond estimation range. Grade and tonnage above cut-off in the Mineral Resource was calculated from the block variance between 50m blocks considering the cm.g/t variogram. Global channel grade and
page iii
ASX Announcement and Media Release 23 July 2021
fraction above cut-off was calculated from the estimated global mean of the channel and the calculated block variance.
The estimation results were classified according to the observed relationship between Kriging Efficiency and sample spacing into Measured, Indicated, and Inferred Mineral Resource categories, which were manually modified according to interpretation for expected geological continuity. Drill data spacing varied with some well-informed areas closer than 25m and in other areas the drill spacing was in the order of 100 – 150m. Geostatistical modelling confirmed drillhole spacing to be suitable to upgrade previous areas of Inferred Mineral Resource to Indicated Mineral Resources with the number of samples present in the areas influencing the estimation parameters. Full geostatistical estimation methods were applied to the study.
Measured, Indicated and Inferred Mineral Resource blocks for the Main, Leader, Bird, South & VCR reefs[4] were estimated using lognormal third parameter ordinary kriging (OK) utilising a minimum of five samples and a maximum of 40 samples within each defined pass. The estimation was completed in Datamine 5 utilising 15x15, 30x30 and 50x50 metre regularised data respectively. The orebody was classified into geozones with similar grade characteristics by its macro features for each reef. Kriging was conducted within these defined geozones;
Cut-Off Grade
The cut-off grade applied was 2g/t over a minimum stoping width of 100cm, based on similar practises to those applied at other Witwatersrand Gold mines.
Mining and Metallurgical Methods and Parameters / Other Material Modifying Factors
Mining methods were based on traditional Witwatersrand conventional hand-held drilling and scraper cleaning operations, except for the steep Kimberley reefs where overhand shrinkage methods were employed. Mining dilution was based on reef width with a minimum thickness of 100cm. Plans that featured steeply dipping reef were projected vertically instead of horizontally, thus the position of the steeply dipping unmined areas was determined in 3D space in Leapfrog Geo. Gold extraction was based on traditional Carbon-In-Leach methods (CIL).
Exploration – Next Steps
Shango’s recent report identified significant potential to increase the current MRE with additional drilldefined MRE generation which could be achieved by decreasing the drillhole spacing, implementing infill drilling, through strike extension drilling and by extending the drillhole depths. Shango further notes that most of the recently performed infill-drilling on the Kimberley East project area did not extend below a depth of 300m, though high-grade mineralisation is historically known to extend to depths in excess of 1,500m.
Underground sampling and infill drilling will form part of the West Wits Exploration Team’s on-going activities upon commencement of underground mine development and production. Such activities will inform ongoing mine planning and improve the confidence level of resources beyond the near to midterm production plan.
page iv
ASX Announcement and Media Release 23 July 2021
Approved for release by the Company’s Managing Director,
==> picture [63 x 44] intentionally omitted <==
Jac van Heerden Managing Director West Wits Mining Limited
For further information contact:
Ryan Batros Investor Relations [email protected]
ABOUT WEST WITS MINING LIMITED
West Wits Mining Limited (ASX: WWI) is focused on the exploration, development and production of high value precious and base metals for the benefit of shareholders, communities and environments in which it operates. Witwatersrand Basin Project, located in the proven gold region of Central Rand Goldfield of South Africa boasts a 3.55Moz gold project at 4.26g/t and the Company’s development strategy is to produce 60,000oz per annum over a 20+ year mine life. The Witwatersrand Basin is a largely underground geological formation which surfaces in the Witwatersrand. It holds the world's largest known gold reserves and has produced over 1.5 billion ounces (over 40,000 metric tons), which represents about 22% of all the gold accounted for above the surface[4] . In Western Australia, WWI is exploring for gold and copper at the Mt Cecilia Project in a district that supports several world-class projects such as Woodie Woodie manganese mine, Nifty copper and Telfer gold/copper/silver mines.
-
1 ASX Release: 20th July 2021 “Mining Right Granted at Witwatersrand Basin Project”
-
2 ASX Release: 5th July 2021 “Infill-drill Program Grows JORC Resource at WBP to 4.47Moz”
-
3 ASX Release: 30th July 2020 “Positive Scoping Study to Advance Development”
-
4 ASX Release: 22nd January 2016 “Updated Mineral Resource Estimate for the Soweto Cluster”
-
5 Norman, N.; Whitfield, G. (2006) Geological Journeys. pp. 38–49, 60–61. Cape Town: Struik Publishers
Competent Person
The information in this report that relates to Mineral Resources and Exploration Results for the Witwatersrand Basin Project is based on and fairly represents information compiled by Mr Hermanus Berhardus Swart. Mr Swart is a Competent Person who is a Professional Natural Scientist registered with the South African Council for Natural Scientific Professions (No. 400101/00) and a Fellow of the Geological Society of South Africa, each of which is a “Recognised Professional Organisation” (RPO). Mr Hermanus Berhardus Swart has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Hermanus Berhardus Swart consents to the release of the report and the information contained here within.
Mr Swart is not employed by or related to any employees, representatives or directors of West Wits Mining. In addition, neither Shango nor its employees have or have had any personal interest in this project resulting in a conflict of interest. Mr Hermanus Berhardus Swart is a full-time employee of Shango Solutions. Shango Solutions (hereafter referred to as Shango), registered as Dunrose Trading 186 (Pty) Ltd and established in April 2004, provides a diverse range of services to the mineral and mining sectors.
page v
==> picture [86 x 32] intentionally omitted <==
JORC TABLE 1 Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
| Criteria | JORC Code Explanation | Practices During 2020/21 Drilling Campaign | ||
|---|---|---|---|---|
| Sampling Techniques | • | Nature and quality of sampling (e.g. cut channels, | • |
The core was split and the one half submitted for assays. The samples included |
| random chips, or specific specialised industry | 2 cm waste on the footwall and hangingwall of the reef. Samples were on | |||
| standard measurement tools appropriate to the | average 20 to 25 cm in length with a minimum of 10 cm. Samples of the footwall | |||
| minerals under investigation, such as down hole | and hangingwall waste were also taken with a 20 cm sample nearest to the reef | |||
| gamma sondes, or handheld XRF instruments, | followed by two more samples of 40 to 50 cm in length. | |||
| etc.). These examples should not be taken as | ||||
| limiting the broad meaning of sampling. | ||||
| • | Include reference to measures taken to ensure | |||
| sample representivity and the appropriate |
||||
| calibration of any measurement tools or systems | ||||
| used. | ||||
| • | Aspects of the determination of mineralisation that | |||
| are Material to the Public Report. | ||||
| • | In cases where ‘industry standard’ work has been | |||
| done this would be relatively simple (e.g. ‘reverse | ||||
| circulation drilling was used to obtain 1 m samples | ||||
| from which 3 kg was pulverised to produce a 30 g | ||||
| charge for fire assay’). In other cases more | ||||
| explanation may be required, such as where there | ||||
| is coarse gold that has inherent sampling | ||||
| problems. Unusual commodities or mineralisation | ||||
| types (e.g. submarine nodules) may warrant | ||||
| disclosure of detailed information. | ||||
| Drilling Techniques | • | Drill type (e.g. core, reverse circulation, open-hole | • |
Diamond drilling was conducted. |
| hammer, rotary air blast, auger, Bangka, sonic, | ||||
| etc.) and details (e.g. core diameter, triple or | ||||
| standard tube, depth of diamond tails, face- | ||||
| sampling bit or other type, whether core is oriented | ||||
| _and if so, by what method, etc.). _ | ||||
| Drill | • | Method of recording and assessing core and chip | • |
A minimum of 95% core recovery was required, otherwise holes were redrilled. |
| Sample Recovery | sample recoveries and results assessed. | Core was fitted and measured against drill meters provided by driller. | ||
| • | Measures taken to maximise sample recovery and | |||
| ensure representative nature of the samples. |
vi
==> picture [86 x 32] intentionally omitted <==
| • | Whether a relationship exists between sample | |||
|---|---|---|---|---|
| recovery and grade and whether sample bias may | ||||
| have occurred due to preferential loss/gain of | ||||
| fine/coarse material. | ||||
| Logging | • | Whether core and chip samples have been | • | Diamond core was sampled and logged geologically and geotechnically to a |
| geologically and geotechnically logged to a level of | detail that supported appropriate Mineral Resource estimations, mining studies | |||
| detail to support appropriate Mineral Resource | and metallurgical studies. | |||
| estimation, mining studies and metallurgical | • | Core logging was qualitative in nature. Core trays were separately | ||
| studies. | photographed after the core was fitted and orientated both, dry and wet. Once | |||
| • | Whether logging is qualitative or quantitative in | reef sections were cut, sampled and marked, photos were once again taken of | ||
| nature. Core (or costean, channel, etc.) |
the final product. | |||
| photography. | • | The total length of the relevant core intersections was 100% logged. | ||
| • | The total length and percentage of the relevant | |||
| intersections logged. | ||||
| Sub-sampling | • | If core, whether cut or sawn and whether quarter, | • | Core was cut and half samples were taken. |
| Techniques and | half or all core taken. | • | Individual samples were placed in separate sample bags with two unique | |
| Sample Preparation | • | If non-core, whether riffled, tube sampled, rotary | number labels of which one was placed inside the bag and the other one stapled | |
| split, etc. and whether sampled wet or dry. | to the outside of the bag, after which the bags were sealed. Each batch of | |||
| • | For all sample types, the nature, quality and | samples was placed in a large sample bag and the borehole number and | ||
| appropriateness of the sample preparation |
sample numbers marked on the outside of the bag. | |||
| technique. | • | Waste and reef samples were taken separately. Reef samples were further split | ||
| • | Quality control procedures adopted for all sub- | based on lithology and mineralisation. | ||
| sampling stages to maximise representivity of | • | Samples were accompanied by blanks and standards. A blank was inserted | ||
| samples. | every time before and after reef intersections. Each reef intersection was | |||
| • | Measures taken to ensure that the sampling is | accompanied by certified reference material appropriate to the expected grade | ||
| representative of the in situ material collected, | range i.e. low or high grade. Selected returned pulps were resubmitted under a | |||
| including for instance results for field |
new number for each batch to serve as a duplicate field sample. | |||
| duplicate/second-half sampling. | • | Sampling was typical of standard practices in the Witwatersrand Goldfield and | ||
| • | Whether sample sizes are appropriate to the grain | was deemed appropriate and representative for the grain size. | ||
| size of the material being sampled. | ||||
| Quality of Assay Data | • | The nature, quality and appropriateness of the | • | Samples were assayed by fire assay using 25 g charges, applying discounts |
| and Laboratory Tests | assaying and laboratory procedures used and | for silver by silver discount chart. The standard practice of fire assaying in the | ||
| whether the technique is considered partial or total. | Witwatersrand Goldfield was deemed appropriate and representative for the | |||
| • | For geophysical tools, spectrometers, handheld | samples. | ||
| XRF instruments, etc., the parameters used in | • | Industry standard fire assays were applied. | ||
| determining the analysis including instrument | • | The laboratory inserted suitable certified reference samples for calibration | ||
| make and model, reading times, calibrations | purposes and also participated in round robin exercises with other laboratories | |||
| factors applied and their derivation, etc. | to determine precision and reproducibility. The laboratory is SANAS accredited | |||
| • | Nature of quality control procedures adopted (e.g. | and is audited on a regular basis in order to comply with accreditation | ||
| standards, blanks, duplicates, external laboratory | regulations. | |||
| checks) and whether acceptable levels of accuracy |
vii
==> picture [86 x 32] intentionally omitted <==
| (i.e. lack of bias) and precision have been | ||||
|---|---|---|---|---|
| established. | ||||
| Verification of Sampling | • | The verification of significant intersections by | • | 10% of pulp samples are analysed at an independent umpire laboratory. |
| and Assaying | either independent or alternative company |
• | Twinned holes were not utilised. | |
| personnel. | • | Data was captured into Microsoft Excel and then imported into a Datamine | ||
| • | The use of twinned holes. | Fusion Database. | ||
| • | Documentation of primary data, data entry | • | No assays were adjusted except for capping and cutting during the Mineral | |
| procedures, data verification, data storage |
Resource estimation stage. | |||
| (physical and electronic) protocols. | ||||
| • | Discuss any adjustment to assay data. | |||
| Location of Data Points | • | Accuracy and quality of surveys used to locate drill | • | Collars were surveyed by a qualified surveyor utilising differential GPS. |
| holes (collar and down-hole surveys), trenches, | • | The WG27 coordinate system (World Geographic Datum) was applied. | ||
| mine workings and other locations used in Mineral | • | Topographic control was achieved utilising differential GPS in the WG27 | ||
| Resource estimation. | coordinate system. | |||
| • | Specification of the grid system used. | |||
| • | Quality and adequacy of topographic control. | |||
| Data | • | Data spacing for reporting of Exploration Results. | • | Drillhole spacing was suitable to upgrade the previous Inferred Mineral |
| Spacing and Distribution | Whether the data spacing and distribution is | Resource to Indicated Mineral Resources. Amount of samples present in the | ||
| sufficient to establish the degree of geological and | areas influenced the estimation parameters. Kriging efficiency was calculated | |||
| grade continuity appropriate for the Mineral | during the estimation process which is an indication of the estimates ability to | |||
| Resource and Ore Reserve estimation |
represent the data which was considered for resource categories. | |||
| procedure(s) and classifications applied. | • | Each sample section was composited to represent the total reef intersection. | ||
| • | Whether sample compositing has been applied. | |||
| Orientation of | • | Whether the orientation of sampling achieves | • | Structures have no known influence on the mineralisation of the Witwatersrand |
| Data in Relation to | unbiased sampling of possible structures and the | placer type reefs, other than displacements. No known sampling bias is | ||
| Geological Structure | extent to which this is known, considering the deposit type. |
• | present. A 3D model of the reef was established in Leapfrog Geo which also |
|
| • | If the relationship between the drilling orientation | incorporates structures, predominantly faults and dykes. These structures are | ||
| and the orientation of key mineralised structures is | defined at high confidence levels due to their locations being precisely defined | |||
| considered to have introduced a sampling bias, | by historical mining and being detailed on mining plans. Structures have no | |||
| this should be assessed and reported if material. | known influence on the mineralisation of the Witwatersrand placer type reefs, | |||
| other than displacements. | ||||
| Sample Security | • | The measures taken to ensure sample security. | • | Line of custody procedures was applied. |
| Audits or Reviews | • | The results of any audits or reviews of sampling | • | Stringent internal audit by the Competent Person and QA/QC procedures were |
| techniques and data. | applied. This especially considered the validation of the databases that served | |||
| as input for geological modelling and resource estimation. |
viii
==> picture [86 x 32] intentionally omitted <==
Section 2 Reporting of Exploration Results
| Criteria | JORC Code Explanation | JORC Code Explanation | JORC Code Explanation | Practices During 2020/21 Drilling Campaign | ||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Mineral tenement and land tenure | • | Type, reference | name/number, location and ownership | • | The Prospecting Right GP 30/5/1/1/2/183 (10035) PR was originally held by | |||||
| status | including | agreements or material issues with | third | Durban Roodepoort Deep (Pty) Ltd. In 2012 West Wits signed a contractual | ||||||
| parties such as joint ventures, partnerships, overriding | agreement with the Prospecting Right holder allowing the prospecting of | |||||||||
| royalties, | native title interests, |
historical | sites, | underground resources. On the 1stof February 2018 the application for consent | ||||||
| wilderness or national park and environmental settings. | in terms of Section 11 (1) of the Mineral and Petroleum Resources Development | |||||||||
| • | The security of the tenure held at the | time of reporting | Act, Act 28 of 2002 to cede the renewed Prospecting Right GP 30/5/1/1/2/183 | |||||||
| along with any | known impediments to obtaining | a | (10035) PR to West Wits MLI (Pty) Ltd (WWI) was accepted. West Wits holds | |||||||
| licence to | operate in the area. | 66.6% in the company with the remaining 33.6% being held by Lalitha (Pty) Ltd | ||||||||
| a black empowered (“BEE”) entity ensuring compliance with South African laws. | ||||||||||
| The Prospecting Right was renewed for 3 years in April 2016. | ||||||||||
| • | A Mining Right Application GP 30/5/1/2/2/10073 MR, was submitted in April | |||||||||
| 2018. West Wits is proposing to establish a mining operation in an area located | ||||||||||
| south of Roodepoort and to the north of Soweto in the City of Johannesburg | ||||||||||
| Metropolitan Municipality, Gauteng. The Department of Mineral Resources and | ||||||||||
| Energy (DMRE) granted the West Wits application for a mining right for gold, | ||||||||||
| uranium and silver on 16thJuly 2021 over various portions of the farms | ||||||||||
| Roodepoort 236 IQ, Roodepoort 237 IQ (excluding a portion of the remainder of | ||||||||||
| portion 14 and a portion of portion 408), Tshekisho 710 IQ (previously known as | ||||||||||
| portions 402 and 445 of the farm Roodepoort 237 IQ and portion 95 of the farm | ||||||||||
| Vlakfontein 238 IQ), Uitval 677 IQ (previously known as portion 91 of the farm | ||||||||||
| Vogelstruisfontein 233 IQ and portion 47 of the Farm Vlakfontein 238 IQ), | ||||||||||
| Vlakfontein 238 IQ, Vogelstruisfontein 231 IQ, Vogelstruisfontein 233 IQ, | ||||||||||
| Witpoortjie 245 IQ (excluding a portion of portion 1) and Glenlea 228 IQ in the | ||||||||||
| Magisterial District of Roodepoort and Krugersdorp. | ||||||||||
| • | The DMRE formally accepted WWI’s Scoping Report including the Plan of Study | |||||||||
| for Environmental Impact Assessment during 2019. The DMR thereafter granted | ||||||||||
| the Environmental Authorisation (EA) authorisation on the 24thof June 2020. | ||||||||||
| South Africa’s Minister of Forestry, Fisheries and the Environment has through | ||||||||||
| a detailed written appeal decision dismissed all three appeals lodged against the | ||||||||||
| DMR EA approval. The Minister’s decision reinstated the DMRE’s EA approval, | ||||||||||
| initially granted 24thJune 2020. | ||||||||||
| Exploration done by other parties | • | Acknowledgment and appraisal of exploration by | other | • | Since the MSA drilling in 2009, no other parties have performed exploration in | |||||
| parties. | the KimberleyEastproject area. | |||||||||
| Geology | • | Deposit | type, | geological | setting | and style |
of | • | The deposit forms part of the Central Rand Goldfield hosted by the | |
| mineralisation. | Witwatersrand Supergroup strata. The Central Rand Goldfield is situated | |||||||||
| immediately to the south of Johannesburg and has been host to one of the most | ||||||||||
| extensive gold reserves in the world. The reefs have been mined continuously | ||||||||||
| on strike for approximately 55 km in an east/west direction, bordered by DRD in | ||||||||||
| the west,and down-dip,to the south,for about 6 km from its outcrop position,to |
ix
==> picture [86 x 32] intentionally omitted <==
| depths of approximately 3 km. Between 1897 and 1984, approximately 247 | ||||||
|---|---|---|---|---|---|---|
| million ounces of gold were extracted from the Central Rand Goldfield. The reef | ||||||
| horizons are channelised conglomerates. The major orebodies mined in the | ||||||
| Central Rand Goldfield are the Main Reef, Main Reef Leader, South Reef, Bird | ||||||
| reefs and Kimberley reefs. The Kimberley East project area targets the K8, K9B | ||||||
| and K9A Kimberleyreefs. | ||||||
| • | Drill hole Information | • | A summary of all information material to the | • | Appendix 1 | |
| understanding of the exploration results including a | ||||||
| tabulation of the following information for all Material | ||||||
| drill holes: | ||||||
oeasting and northing of the drill hole |
||||||
| collar | ||||||
oelevation or RL (Reduced Level – |
||||||
| elevation above sea level in metres) of the | ||||||
| drill hole collar | ||||||
odip and azimuth of the hole |
||||||
odown hole length and interception depth |
||||||
| hole length. | ||||||
| • | If the exclusion of this information is justified on the | |||||
| basis that the information is not Material and this | ||||||
| exclusion does not detract from the understanding of | ||||||
| the report, the Competent Person should clearly explain | ||||||
| why this is the case. | ||||||
| Data aggregation methods | • | In reporting Exploration Results, weighting averaging | • | Compositing was conducted against relative sample lengths due to no | ||
| techniques, maximum and/or minimum grade |
differences in waste and ore bulk densities. Minimum grades were dependent | |||||
| truncations (e.g. cutting of high grades) and cut-off | on laboratory detection limits. Cutting of low and high-grade samples were | |||||
| grades are usually Material and should be stated. | applied in the Mineral Resource estimation process. | |||||
| • | Where aggregate intercepts incorporate short lengths | • | Samples were on average 20 to 25 cm in length with a minimum of 10 cm. Waste | |||
| of high grade results and longer lengths of low grade | and reef samples were taken separately. Reef samples were further split based | |||||
| results, the procedure used for such aggregation should | on lithology and mineralisation. | |||||
| be stated and some typical examples of such | • | Metal equivalent values were not applicable. | ||||
| aggregations should be shown in detail. | ||||||
| • | The assumptions used for any reporting of metal | |||||
| equivalent values should be clearly stated. | ||||||
| Relationship | • | These relationships are particularly important in the | • | All downhole lengths were converted to true widths by correcting for the dip of | ||
| between mineralisation widths | reporting of Exploration Results. | the strata. | ||||
| and | intercept lengths | • | If the geometry of the mineralisation with respect to the | |||
| drill hole angle is known, its nature should be reported. | ||||||
| • | If it is not known and only the down hole lengths are | |||||
| reported, there should be a clear statement to this effect | ||||||
| (e.g.‘down hole length, true width not known’). |
x
==> picture [86 x 32] intentionally omitted <==
| Diagrams | • | Appropriate maps and sections (with scales) and | • | Appendix 2 |
|---|---|---|---|---|
| tabulations of intercepts should be included for any | ||||
| significant discovery being reported These should | ||||
| include, but not be limited to a plan view of drill hole | ||||
| _collar locations and appropriate sectional views. _ | ||||
| Balanced reporting | • | Where comprehensive reporting of all Exploration | • | Appendix 3 |
| Results is not practicable, representative reporting of | ||||
| both low and high grades and/or widths should be | ||||
| practiced to avoid misleading reporting of Exploration | ||||
| Results. | ||||
| Other substantive exploration data | • | Other exploration data, if meaningful and material, | • | Geology of reef intercepts was noted in detail on standardised logging sheets. |
| should be reported including (but not limited to): | • | Geophysical and geochemical surveys were not conducted. | ||
| geological observations; geophysical survey results; | • | Bulk samples were not taken. | ||
| geochemical survey results; bulk samples – size and | • | Bulk density was measured applying the Archimedes technique by three | ||
| method of treatment; metallurgical test results; bulk | repeats each for hangingwall and footwall waste as well as for the reef. | |||
| density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating |
• • |
Groundwater intersections and flow rate was measured in litres per hour. Geotechnical and rock characteristics were noted for selected boreholes to |
||
| substances. | modern geotechnical parameters such as Rock Quality Determination (RQD) | |||
| and Rock Mass Rating (RMR), etc. The hole was then repeated by drilling a | ||||
| deflection 18 m above the reef in order to obtain undisturbed core for logging | ||||
| and sampling purposes. | ||||
| • | Deleterious or contaminating substances such as methane were tested for by | |||
| drill operators utilisingappropriate sensors. | ||||
| Further work | • | The nature and scale of planned further work (e.g. tests | • | No further work is planned, other than mine planning on the final block model. |
| for lateral extensions or depth extensions or large-scale | ||||
| step-out drilling). | ||||
| • | Diagrams clearly highlighting the areas of possible | |||
| extensions, including the main geological |
||||
| interpretations and future drilling areas, provided this | ||||
| _information is not commercially sensitive. _ |
xi
==> picture [86 x 32] intentionally omitted <==
Section 3 Estimation and Reporting of Mineral Resources
(Criteria listed in section 1, and where relevant in section 2, also apply to this section)
| Criteria | JORC Code Explanation | Practices During 2020/21 Drilling Campaign | ||||
|---|---|---|---|---|---|---|
| Database Integrity | • | Measures taken to ensure that data has not been corrupted by, | • | Sample values received from the laboratory were captured into Microsoft Excel, | ||
| for example, transcription or keying errors, between its initial | and then imported into a Datamine Fusion Database. QA/QC was performed by | |||||
| collection and its use for Mineral Resource estimation purposes. | the Chief Geologist of West Wits. Final independent QA/QC was performed by | |||||
| • | Data validation procedures used. | the team represented by the Competent Person. | ||||
| • | FullQA/QC wasperformed utilisingvariousgraphicalpresentations. | |||||
| Site Visits | • | Comment on any site visits undertaken by the Competent | • | The Mineral Resources were reported by the Competent Person, the former | ||
| Person and the outcome of those visits. | Mineral Resource Manager of DRD and who has relevant experience and | |||||
| • | If no site visits have been undertaken indicate why this is the | qualifies as a Competent Person in South Africa and internationally according to | ||||
| case. | the requirements as stipulated by JORC (2012). The Competent Person also | |||||
| audited the exploration conducted byWest Wits. | ||||||
| Geological | • | Confidence in (or conversely, the uncertainty of) the geological | • | The previous geological model was updated with the latest drilling. Resource | ||
| Interpretation | interpretation of the mineral deposit. | blocks were generated in Datamine Studio RM. | ||||
| • | Nature of the data used and of any assumptions made. | • | The previous wireframing was updated in Leapfrog Geo utilising the latest drilling. | |||
| • | The effect, if any, of alternative interpretations on Mineral | • | Analysis of grade continuity was undertaken for the total dataset, that was | |||
| Resource estimation. | updated with the latest drilling, from which homoscedastic geodomains were | |||||
| • | The use of geology in guiding and controlling Mineral Resource | derived exhibiting stationarity with respect to gold accumulation and channel | ||||
| estimation. | width. | |||||
| • | _The factors affecting continuity both ofgrade andgeology. _ | |||||
| Dimensions | • | The extent and variability of the Mineral Resource expressed as | • | The reefs are part of the world-famous Witwatersrand Basin, and are renowned | ||
| length (along strike or otherwise), plan width, and depth below | for their regional lateral (hundreds of kilometres) and down dip (tens of kilometres) | |||||
| surface to the upper and lower limits of the Mineral Resource. | continuity. | |||||
| • | The K8, K9B and K9A reefs were reported down to 2.2 km below surface, the | |||||
| strike length totalling4.8 km. | ||||||
| Estimation | • | The nature and appropriateness of the estimation |
• | Sample grades were capped per estimation domain. | ||
| and | technique(s) applied and key assumptions, including | • | The capped estimation dataset consisted of underground chip samples and | |||
| Modelling Techniques | treatment of extreme grade values, domaining, interpolation | stretch composite samples with various lengths and boreholes. After inspection of | ||||
| parameters and maximum distance of extrapolation from data | distribution characteristics it was identified that the distribution attributes of these | |||||
| points. If a computer assisted estimation method was chosen | three data types overlap sufficiently for them to be considered part of the same | |||||
| include a description of computer software and parameters | distribution. | |||||
| used. | • | Samples and estimation domains were unfolded to a planar surface. | ||||
| • | The availability of check estimates, previous estimates and/or | • | A regional grade trend was observed within the K9A Reef producing a lower grade | |||
| mine production records and whether the Mineral Resource | expectation towards the east of the project. The K9A dataset was spatially divided | |||||
| estimate takes appropriate account of such data. | into east and west regions and these subsets were treated separately. Log | |||||
| • | The assumptions made regarding recovery of by-products. | probability plots were generated for cm.g/t which displayed potential mixed | ||||
| • | Estimation of deleterious elements or other non-grade | populations within the three datasets as inflections within the log probability-grade | ||||
| variables of economic significance (e.g. sulphur for acid mine | function. Population was split on these inflections which produced a channel and | |||||
| drainage characterisation. | overbank data subset,which aligns with the channel and overbank depositional |
xii
==> picture [86 x 32] intentionally omitted <==
| • In the case of block model interpolation, the block size in |
model for Kimberly reefs. Orientation of regional continuity for channelisation was | |||
|---|---|---|---|---|
| relation to the average sample spacing and the search | graphically determined and considered for the orientation of anisotropy for an | |||
| employed. | estimate of channel probability. A binary reclassification of channel probability was | |||
| • Any assumptions behind modelling of selective mining units. |
performed to generate estimation domains. | |||
| • Any assumptions about correlation between variables. |
• | Simple and Ordinary Kriging was performed into 50 x 50 m parent cells for all | ||
| • Description of how the geological interpretation was used to |
regions, with Ordinary Macro Kriging into 500 x 500 m parent cells estimating | |||
| control the resource estimates. | channel probability in the K9B Reef and the west region of the K9A Reef. In the | |||
| • Discussion of basis for using or not using grade cutting or capping. • The process of validation, the checking process used, the comparison of model data to drill hole data, and use of reconciliation data if available. |
eastern region of the K9A Reef a sequential indicator simulation was performed for channel probability into 10 x 10 m parent cells for the inferred resource beyond estimation range. Grade and tonnage above cut-off in the resource was calculated from the block variance between 50 m blocks considering the cm.g/t variogram. Global channel grade and fraction above cut-off was calculated from the |
|||
| estimated global mean of the channel and the calculated block variance. | ||||
| • | Historically no by-products were recovered, hence no quantification or estimation. | |||
| • | Although the presence of pyrite resulted in severe acid mine water, sulphide was | |||
| not quantified and estimated. | ||||
| • | Selective mining units were considered to be the estimation parent cells of 50 x | |||
| 50 m, which is slightly larger than the area of the general mining panel length of | ||||
| 30 m multiplied byhalf of the inter-raise distance of 120 m. | ||||
| Moisture | • | Whether the tonnages are estimated on a dry basis or with natural | • | Tonnages were estimated on a dry basis. |
| moisture, and the method of determination of the moisture content. | ||||
| Cut-off Parameters | • | The basis of the adopted cut-off grade(s) or quality parameters | • | The cut-off was based on similar practises to those applied at other |
| applied. | Witwatersrand Gold mines. The cut-off grade applied was 2 g/t over a minimum | |||
| stopingwidth of 100 cm. | ||||
| Mining Factors | • | Assumptions made regarding possible mining methods, minimum | • | Mining methods were based on traditional Witwatersrand conventional hand-held |
| or Assumptions | mining dimensions and internal (or, if applicable, external) mining | drilling and scraper cleaning operations, except for the steep Kimberley reefs | ||
| dilution. It is always necessary as part of the process of | where overhand shrinkage methods were employed. Mining dilution was based | |||
| determining reasonable prospects for eventual economic | on reef width with a minimum thickness of 100 cm. | |||
| extraction to consider potential mining methods, but the | • | Plans that featured steeply dipping reef were projected vertically instead of | ||
| assumptions made regarding mining methods and parameters | horizontally on plans. Thus the position of the steeply dipping unmined areas | |||
| when estimating Mineral Resources may not always be rigorous. | was determined in 3D space in Leapfrog Geo. | |||
| Where this is the case, this should be reported with an explanation | ||||
| of the basis of the mining assumptions made. | ||||
| Metallurgical | • | The basis for assumptions or predictions regarding metallurgical | • | Gold extraction was based on traditional Carbon In Leach methods (CIL). |
| Factors Applied | amenability. It is always necessary as part of the process | |||
| of determining reasonable prospects for eventual economic | ||||
| extraction to consider potential metallurgical methods, but the | ||||
| assumptions regarding metallurgical treatment processes and | ||||
| parameters made when reporting Mineral Resources may not | ||||
| always be rigorous. Where this is the case, this should be reported |
xiii
==> picture [86 x 32] intentionally omitted <==
| with an explanation of the basis of the metallurgical assumptions | ||||
|---|---|---|---|---|
| made. | ||||
| Environmental Factors | • | Assumptions made regarding possible waste and process residue | • | Residues would be deposited on environmentally approved tailings storage |
| or Assumptions | disposal options. It is always necessary as part of the process of | facilities. No detailed environmental or logistical designs were considered. | ||
| determining reasonable prospects for eventual economic | ||||
| extraction to consider the potential environmental impacts of the | ||||
| mining and processing operation. While at this stage the | ||||
| determination of potential environmental impacts, particularly for a | ||||
| greenfields project, may not always be well advanced, the status | ||||
| of early consideration of these potential environmental impacts | ||||
| should be reported. Where these aspects have not been | ||||
| considered this should be reported with an explanation of the | ||||
| environmental assumptions made. | ||||
| Bulk Density | • | Whether assumed or determined. If assumed, the basis for the | • | Bulk density was accepted as the standard industry norm for pyritic conglomerate |
| assumptions. If determined, the method used, whether wet or dry, | i.e. 2.73 g/cm3and this was performed on a dry basis. | |||
| the frequency of the measurements, the nature, size and | • | Bulk density for the new drillholes was measured by utilising the Archimedes | ||
| representativeness of the samples. | principle. | |||
| • | The bulk density for bulk material must have been measured by | • | The same bulk density was multiplied with the respective volumes for all reefs in | |
| methods that adequately account for void spaces (vugs, porosity, | order to obtain tonnages. | |||
| etc.), moisture and differences between rock and alteration zones | ||||
| within the deposit. | ||||
| • | Discuss assumptions for bulk density estimate used in the | |||
| evaluationprocess of the different materials. | ||||
| Classification | • | The basis for the classification of the Mineral Resources into | • | The estimation results were classified according to the observed relationship |
| varying confidence categories. | between Kriging Efficiency and sample spacing into Measured, Indicated and | |||
| • | Whether appropriate account has been taken of all relevant factors | Inferred categories, which were manually modified according to interpretation for | ||
| (i.e. relative confidence in tonnage/grade estimations, reliability of | expected geological continuity. | |||
| input data, confidence in continuity of geology and metal values, | • | Appropriate account was taken of all relevant factors. | ||
| quality, quantity and distribution of the data). | • | The results appropriately reflect the Competent Person’s view of the deposit. | ||
| • | Whether the result appropriately reflects the Competent Person’s | |||
| view of the deposit. | ||||
| Audits or Reviews | • | The results of any audits or reviews of Mineral Resource | • | The Competent Person audited the latest exploration work. |
| estimates. | ||||
| Discussion of Relative | • | Where appropriate a statement of the relative accuracy | • | Estimate to model reconciliation was performed for blocks containing samples |
| Accuracy/ | • | And confidence level in the Mineral Resource estimate using an | which provided a model to regularised data correlation coefficient of 0.7. This is | |
| Confidence | approach or procedure deemed appropriate by the Competent | appropriate for a gold estimate within a Witwatersrand style deposit. | ||
| Person. For example, the application of statistical or geostatistical | ||||
| procedures to quantify the relative accuracy of the resource within | ||||
| stated confidence limits, or, if such an approach is not deemed | ||||
| appropriate, a qualitative discussion of the factors that could affect | ||||
| the relative accuracy and confidence of the estimate. | ||||
| • | The statement should specify whether it relates to global or local |
xiv
==> picture [86 x 32] intentionally omitted <==
| • | estimates, and, if local, state the relevant tonnages, which should |
|---|---|
| be relevant to technical and economic evaluation. Documentation | |
| should include assumptions made and the procedures used. | |
| • | These statements of relative accuracy and confidence of the |
| estimate should be compared with production data, where | |
| available. |
xv
==> picture [67 x 23] intentionally omitted <==
Appendix 1
| Interception Depths | Interception Depths | Interception Depths | Interception Depths | Interception Depths | Interception Depths | Interception Depths | Interception Depths | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K9A | K9B | K8 | K7 | ||||||||||
| Ac tual Bh ID | Y | X | Z | AZIMUT H_DEG | Dip | From | To | From | To | From | To | From | To |
| RLKPDRE-22 | -90320.197 | 2900104.497 | 1681.044 | 7.9 | -62.48 | 266.53 | 268.63 | 275.69 | 277.47 | 277.82 | 281.10 | 281.27 | 291.99 |
| RLKPDRE-23 | -90165.686 | 2899905.457 | 1685.956 | 29.8 | -61.96 | 177.65 | 177.29 | 189.97 | 191.65 | 191.95 | 193.59 | 195.39 | 205.09 |
| RLKPDRE-24 | -90494.251 | 2900093.224 | 1670.620 | 0.0 | -60.44 | 199.95 | 202.57 | 210.81 | 211.11 | 212.88 | 214.76 | 215.16 | 226.19 |
| RLKPDRE-31 | -89678.724 | 2899808.809 | 1725.859 | 3.5 | -62.10 | 284.36 | 284.58 | 293.99 | 295.50 | 296.13 | 296.84 | 297.41 | 320.20 |
| RLKDRE-39 | -90342.004 | 2899956.510 | 1672.382 | 31.8 | -58.31 | 153.32 | 155.03 | 162.05 | 163.10 | 163.65 | 164.15 | 165.39 | 174.75 |
| RLKDD-40 | -90173.558 | 2899719.227 | 1688.404 | 352.7 | -70.25 | 88.54 | 93.53 | 98.32 | 101.23 | 102.60 | 104.83 | 105.07 | 107.21 |
| RLKDD-41 | -90442.916 | 2899878.549 | 1669.371 | 32.9 | -58.88 | 73.30 | 78.54 | 83.19 | 83.96 | 86.41 | 88.09 | 88.77 | 89.20 |
| RLKDRE-42 | -90585.653 | 2899977.471 | 1656.930 | 47.7 | -60.20 | 95.40 | 98.91 | 104.31 | 106.60 | 108.06 | 109.06 | ||
| RLKDD-43 | -90227.271 | 2899795.539 | 1682.984 | 36.8 | 61.50 | ||||||||
| RLKDD-44 | -90318.875 | 2899883.109 | 1677.388 | 27.1 | -57.74 | 113.9 | 118.24 | 123.73 | 125.39 | 126.55 | 127.74 | 127.74 | 129.08 |
1
Appendix 2
==> picture [67 x 23] intentionally omitted <==
==> picture [581 x 411] intentionally omitted <==
==> picture [67 x 23] intentionally omitted <==
Appendix 3
| Interception Grades | Interception Grades | Interception Grades | Interception Grades | Interception Grades | Interception Grades | Interception Grades | Interception Grades | Interception Grades | Interception Grades | Interception Grades | Interception Grades | Interception Grades | Interception Grades | Interception Grades | Interception Grades | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| K9A | K9B | K8 | K7 | |||||||||||||
| Ac tual Bh ID | From | To | Width(cm) | Grade(g/t) | From | To | **Width(cm) ** | Grade(g/t) | From | To | **Width(cm) ** | Grade(g/t) | From | To | **Width(cm) ** | Grade(g/t) |
| RLKPDRE-22 | 266.12 | 268.57 | 2.45 | 1.56 | 275.33 | 277.36 | 2.03 | 2.05 | 277.82 | 281.10 | 281.27 | 291.99 | ||||
| 267.23 | 268.35 | 1.12 | 2.80 | 275.95 | 276.83 | 0.88 | 2.92 | 278.87 | 279.32 | 0.45 | 2.04 | |||||
| 279.07 | 279.32 | 0.25 | 3.18 | |||||||||||||
| RLKPDRE-23 | 177.39 | 181.29 | 3.90 | 0.20 | 189.79 | 191.55 | 1.76 | 1.58 | 192.49 | 194.40 | 1.91 | 0.67 | 195.39 | 205.21 | ||
| 179.26 | 179.47 | 0.21 | 0.89 | 189.79 | 190.45 | 0.66 | 2.40 | 192.96 | 193.89 | 0.93 | 0.93 | 195.11 | 195.53 | 0.42 | 0.44 | |
| RLKPDRE-24 | 199.94 | 202.57 | 2.63 | 0.75 | 210.78 | 211.84 | 1.06 | 2.40 | 212.88 | 214.76 | 215.16 | 226.19 | ||||
| 201.51 | 201.97 | 0.46 | 2.45 | 211.62 | 211.84 | 0.22 | 4.16 | |||||||||
| RLKPDRE-31 | 284.34 | 286.68 | 2.34 | 0.12 | 293.98 | 295.53 | 1.55 | 0.17 | 296.13 | 296.84 | 297.41 | 320.20 | ||||
| RLKDRE-39 | 153.72 | 155.47 | 1.75 | 1.15 | 162.22 | 163.34 | 1.12 | 1.12 | 165.50 | 166.15 | 0.65 | 1.84 | 165.39 | 174.75 | ||
| 155.19 | 155.47 | 0.28 | 4.92 | 162.46 | 163.34 | 0.88 | 1.37 | 166.31 | 167.20 | 0.89 | 0.26 | |||||
| RLKDD-40 | 88.51 | 94.91 | 6.40 | 0.50 | 98.29 | 101.23 | 2.94 | 0.50 | 102.60 | 104.83 | 2.08 | 0.93 | 105.07 | 112.25 | ||
| 89.22 | 91.42 | 2.20 | 1.11 | 98.29 | 99.85 | 1.56 | 0.65 | 102.77 | 103.70 | 0.93 | 1.69 | 105.00 | 105.97 | 0.97 | 0.18 | |
| 90.42 | 91.42 | 1.00 | 1.54 | |||||||||||||
| RLKDD-41 | 73.28 | 78.66 | 5.38 | 0.47 | 83.16 | 84.00 | 0.84 | 1.25 | 86.37 | 88.11 | 1.74 | 1.07 | 88.76 | 89.14 | 0.38 | 0.43 |
| 73.75 | 74.43 | 0.68 | 1.10 | 86.37 | 87.28 | 0.91 | 1.94 | |||||||||
| 75.09 | 75.92 | 0.83 | 1.45 | |||||||||||||
| RLKDRE-42 | 96.38 | 99.05 | 2.67 | 0.11 | 104.58 | 106.49 | 1.91 | 1.04 | 108.84 | 110.57 | 1.73 | 0.27 | 110.57 | 111.66 | 1.09 | 0.78 |
| 104.58 | 105.31 | 0.73 | 1.74 | |||||||||||||
| RLKDD-43 | ||||||||||||||||
| RLKDD-44 | 113.87 | 118.36 | 4.49 | 0.85 | 123.71 | 125.39 | 1.68 | 5.81 | 126.53 | 127.74 | 1.21 | 1.38 | 127.74 | 129.63 | ||
| 113.87 | 114.98 | 1.11 | 2.68 | 124.41 | 125.39 | 0.98 | 9.07 | 126.53 | 127.14 | 0.61 | 1.82 | 127.74 | 128.86 | 1.12 | 0.58 |
3