66091_rns_2016-08-23_edfa651e-0725-40b9-9f21-0ac044fbdd01.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
ASX: WWI www.westwitsmining.com
ASX Announcement and Media Release Wednesday, 24 August 2016
==> picture [100 x 76] intentionally omitted <==
Fast Facts @ 24 Aug 2016 Capital Structure: Shares on issue 456 million Options 52 million Market Cap A$16.88 million Available Cash A$0.5 million Debt Nil Enterprise Value (EV) A$16.38 million EV/oz A$12.41/oz
| Company Directors & Management | Company Directors & Management |
|---|---|
| Michael Quinert | Chairman |
| Vin Savage | Executive Director |
| Neil Pretorius | Non-Exec Director |
| Hulme Scholes | Non-Exec Director |
| Top Shareholders ≈ | |
|---|---|
| Twynam Ag | 19.9% |
| DRD Gold Ltd | 11% |
| Top 40 Shareholders | 74% |
Company Highlights
South Africa
-
near surface and underground targets
-
o1.326m oz JORC resource[1] - Measures: 302,000 - Indicated: 582,500 - Inferred: 441,000 -
oHistoric estimate of 12.8m oz at 4.6g/to31.8m ozs Au produced historically
==> picture [154 x 109] intentionally omitted <==
Ore now being extracted from Sol Plaatjies open pit
Highlights
-
Ore now being extracted from the Sol Plaatjies open pit and trucked to plant
-
WWI will be paid price equal to 0.6 grams of gold (approx. US$25) for each tonne mined
-
130,000 tonnes schedule for extraction in Stage 1 over first 12 months with a 50,000 tonnes schedule in Stage 2 over further 6 months
-
Tonnages expected to be upgraded and available either concurrently or subsequent to Stage 1
-
Potential upside payments through 50:50 profit share post costs & priority payments
-
Planning and design is underway to bring numerous other ore positions to the point of mineability, within the previously announced 1.326 Moz JORC resource.
West Wits Mining Limited (“West Wits” or “the Company”) is delighted to announce ore extracted from the Sol Plaatjies Project (“Sol Plaatjies”) has now begun being trucked to the nearby Mogale plant.
Michael Quinert, Chairman commented, “Sol Plaatjies is the catalyst for the development of the significant 1.326 Moz JORC resource at the Soweto Cluster Gold Project. The proceeds from Sol Plaatjies provides for cashflow to now expedite plans for further exploration to expand the Company’s JORC statement as well as development of gold mining operations.
Indonesia
-
High grade placer deposit
-
oProject show early stage similarities with discoveries inc; Porgera, Edie Creek, Wau -
Independent geologists believe source of nuggets likely to be local, based on the size and shape of the nuggets discovered
==> picture [145 x 118] intentionally omitted <==
Contact Details
West Wits Mining Limited ACN 124 894 060 Suite 1, 1233 High Street Armadale VIC 3143
T: +61 3 8692 9049
F: +61 3 8692 9040
The first stage provides for the extraction of approx. 130,000 tonnes of ore over 12 months from the first two of five planned pits. Indications are that at least another 50,000 tonnes are available in the second stage. Work is now well underway to upgrade further tonnes along strike from pit two which will provide for potentially a much larger project at Sol Plaatjies.”
The Company will provide further ASX releases once these extensions plans and mining schedule are finalised. Updates will also be provided once production rates settle for this initial production at Sol Plaatjies.
For and on behalf of the board
==> picture [151 x 51] intentionally omitted <==
Michael Quinert Chairman
W: www.westwitsmining.com
West Wits Mining Limited
- 2 -
==> picture [521 x 163] intentionally omitted <==
Figure 1. Site panorama – Ore truck being filled for transport to nearby Mogale Plant
==> picture [171 x 228] intentionally omitted <==
==> picture [302 x 227] intentionally omitted <==
Figure 2. Trucks being loaded with ore Figure 3. Ore being ripped and prepared for removal
- Original report “Soweto Gold Project Resource Increases to 1.32 Mill Ozs” Competent Person Hermanus Berhardus Swart ASX release 10 May 2016. The Company is not aware of any new information or data that materially affects the information included in the announcement and confirms that all material assumptions and technical parameters underpinning the estimates above continue to apply and have not materially changed. The form and context in which the Competent Persons findings are presented have not materially changed.