Independent Technical Report on the Maligonga-East Gold Project

==> picture [131 x 51] intentionally omitted <==

BIRIMA GOLD RESOURCES CONSULTING

S09/Hann Mariste II - Dakar Senegal N.I.N.E.A 007 054 521 - Register No SN DKR 2018 A 27289 Tel +221 77 722 2295, Dakar, Senegal. +226 625 87 3748, Conakry, Guinea Email. [email protected] / [email protected]

INDEPENDENT TECHNICAL REPORT FOR THE MALIGONGA EAST GOLD PROJECT

Kéniéba –Mali West – West Africa

PREPARED FOR

WARABA GOLD LIMITED

Suite 1080, 789 West Pender Street Vancouver, BC, Canada V6C 1H2

by

BIRIMA GOLD RESOURCES CONSULTING

- Report for NI 43 101

Qualified Person:

Olufemi Ajayi (MAIG)

Effective Date: 18[th] November, 2022

Independent Technical Report on the Maligonga-East Gold Project

QUALIFIED PERSON DECLARATION

I, Olufemi Ajayi, in the capacity of Qualified Person of this NI43-101 Technical Report, do hereby certify that:

  1. To the best of my Knowledge, information and belief, the Report contains all scientific

  2. and technical information required to to be disclosed to make the report not misleading.

  3. The facts presented in this report are correct to the best of my knowledge.

  4. The analyses and conclussions are limited only by the reported forecasts and conditions

  5. I have no present or prospective interest in the subject property or asset.

  6. My compensation, employment or contractual relationship with the Commissioning

Entity is not contingent on any aspect of the Report.

  1. I have no bias with respect to the assets that are the subject of the Report or the parties involved with the assignment.

Yours Faithfully

  • /S/ Signed and Sealed Olufemi Ajayi

Olufemi Ajayi

MAIG (Membership Number 7790) Consulting Geologist for BGR-Consult BSc. Geology, Federal University of Technology, Minna, Nigeria Tel +2348033668482, +2348086854753 Email. [email protected]

Independent Technical Report on the Maligonga-East Gold Project

TABLE OF CONTENTS

Page

1. SUMMARY
1
1.1. EXECUTIVE SUMMARY
1
1.2. CONCLUSIONS
3
1.3. RECOMMENDATIONS
4
1.3.1. DRILLING
5
1.3.1.1. Recommended Phase I Drilling Program
5
a. RC Drilling Program
5
b. Air Core drilling
5
1.3.1.2. Recommended Phase II Drilling Program
6
1.3.2. RECOMMENDED BUDGET
8
1.4. TECHNICAL SUMMARY
9
1.4.1. PROPERTY LOCATION
9
1.4.2. PROPERTY DESCRIPTION AND LAND TENURE
9
1.4.3. REGIONAL GEOLOGY
10
1.4.4. PROPERTY GEOLOGY
11
1.4.5. STRUCTURES
11
1.4.6. MINERALIZATION
13
1.4.7. EXPLORATION HISTORY
14
1.4.7.1. Exploration Programs Completed by BRGM between 1987 and 1992
14
1.4.7.2. Exploration Programs Completed by Ressources Robex Inc. between 2005 and 2007
14
1.4.7.3. Exploration Programs Completed by Cluff Gold Plc. 2012
14
1.4.7.4. Exploration Programs Completed by Fokolore from 2015 to 2018
15
2. INTRODUCTION
17
2.1 Preparation
17
2.2 Purpose of the Report
17
2.3 Source of Information and Data
17
3. RELIANCE UPON OTHER EXPERTS
19
4. PROPRIETY DESCRIPTION AND LOCATION
20
4.1 Location
20
4.2 Property Description and Ownership, Ownership Obligations. Government Participation, Royalties and
Encumbrances
20
4.2.1 Exploration Permit
24
4.3 Environmental Liabilities
26
4.4 Other significant factors and risks
26
5. ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURES AND
PHYSIOGRAPHY
27
5.1 Accessibility
27
5.2 Climate
27
5.3 Local Resources
28
5.4 Infrastructure
30
5.5 Physiography
30
6. HISTORY
33
6.1 Summary of the gold exploration history in the Maligonga-east permit from 1992 to 2022
33
6.2 Exploration Programs Completed by BRGM (1987 - 1992)
35
6.2.1 Soil sampling geochemical survey in 1987
35
6.2.2. Trenches Completed by BRGM in 1992
37

Independent Technical Report on the Maligonga-East Gold Project

6.3
Exploration Programs Completed by Ressources Robex Inc. (between 2005 and 2006
6.3.1.
Exploration programs completed from September 2005 to September 2006
6.3.1.1.
Geomorphology / regolith
6.3.1.2.
Pits sampling
6.3.2.
Exploration programs completed from September 2006 to September 2007
6.3.2.1.
Geophysical surveys
6.3.2.2.
Drilling
6.3.2.2.1.
Conclusion
6.4
Exploration Programs Completed by Cluff Gold Plc in 2012
6.4.1.
Follow-up termite mounds geochemical survey
6.4.2.
Results of the Follow-up geochemical survey
6.4.3.
Geophysical Survey
6.4.3.1.
Gradient Array
6.4.3.2.
Gradient Resistivity
6.4.3.3.
Gradient Chargeability
6.4.3.4.
Gradient Interpretation maps
6.4.4.
RC Drilling Program
6.5
Exploration Programs Completed by Fokolore from 2016 to 2018
6.5.1.
Exploration Programs Completed by Fokolore in 2016
6.5.1.1.
Geological and structural mapping of the Mamadouya gold anomaly
6.5.1.2.
Auger Drilling Program
6.5.1.3.
Gold panning
6.5.1.4.
Rock chips sampling
6.5.1.5.
Conclusions
6.5.2.
Exploration Programs Completed by Fokolore in 2017
6.5.3.
Exploration Programs Completed by Fokolore in 2018
6.6. .
Historical drillingdescriptions
6.6.1. .
Reverse cCirculation (RC) Drilling
6.6.2.
Folkolore Auger drilling
6.6.3.
Drilling Quality
6.6.4.
RC and Auger Drill Hole Logging
6.6.5.
Logging Quality
7.
GEOLOGICAL SETTING AND MINERALISATION
7.1
REGIONAL GEOLOGICAL AND STRUCTURAL SETTING
7.1.1.
Geology of the Birimian of West Africa
7.1.2.
Lithostratigraphy of the Kedougou-Kenieba Inlier (KKI)
7.1.2.1.
The Mako Volcanic Belt (MVB)
7.1.2.2.
The Dialé-Daléma series
7.1.2.3.
The Falémé Volcanic Belt
7.1.2.4.
The Kofi Series
7.1.3.
Structural Setting of the Kedougou-Kenieba Inlier
7.1.4.
Metamorphism of the Kedougou-Kenieba Inlier
7.1.5.
Regional Surficial Geology of the Kedougou-Kenieba Inlier
7.2
Permit Geological and Structural Setting
7.3
GOLD MINERALISATION
8.
DEPOSIT TYPES
9.
EXPLORATION
9.1
Exploration Programs Completed by Waraba Gold Limited in 2021
9.1.1.
Compilation and interpretation of existing termite mound and soil geochemistry data
9.1.2.
Geomorphology / Regolith Mapping
9.1.2.1.
High Laterite plateau
6.3
Exploration Programs Completed by Ressources Robex Inc. (between 2005 and 2006
6.3.1.
Exploration programs completed from September 2005 to September 2006
6.3.1.1.
Geomorphology / regolith
6.3.1.2.
Pits sampling
6.3.2.
Exploration programs completed from September 2006 to September 2007
6.3.2.1.
Geophysical surveys
6.3.2.2.
Drilling
6.3.2.2.1.
Conclusion
6.4
Exploration Programs Completed by Cluff Gold Plc in 2012
6.4.1.
Follow-up termite mounds geochemical survey
6.4.2.
Results of the Follow-up geochemical survey
6.4.3.
Geophysical Survey
6.4.3.1.
Gradient Array
6.4.3.2.
Gradient Resistivity
6.4.3.3.
Gradient Chargeability
6.4.3.4.
Gradient Interpretation maps
6.4.4.
RC Drilling Program
6.5
Exploration Programs Completed by Fokolore from 2016 to 2018
6.5.1.
Exploration Programs Completed by Fokolore in 2016
6.5.1.1.
Geological and structural mapping of the Mamadouya gold anomaly
6.5.1.2.
Auger Drilling Program
6.5.1.3.
Gold panning
6.5.1.4.
Rock chips sampling
6.5.1.5.
Conclusions
6.5.2.
Exploration Programs Completed by Fokolore in 2017
6.5.3.
Exploration Programs Completed by Fokolore in 2018
6.6. .
Historical drillingdescriptions
6.6.1. .
Reverse cCirculation (RC) Drilling
6.6.2.
Folkolore Auger drilling
6.6.3.
Drilling Quality
6.6.4.
RC and Auger Drill Hole Logging
6.6.5.
Logging Quality
7.
GEOLOGICAL SETTING AND MINERALISATION
7.1
REGIONAL GEOLOGICAL AND STRUCTURAL SETTING
7.1.1.
Geology of the Birimian of West Africa
7.1.2.
Lithostratigraphy of the Kedougou-Kenieba Inlier (KKI)
7.1.2.1.
The Mako Volcanic Belt (MVB)
7.1.2.2.
The Dialé-Daléma series
7.1.2.3.
The Falémé Volcanic Belt
7.1.2.4.
The Kofi Series
7.1.3.
Structural Setting of the Kedougou-Kenieba Inlier
7.1.4.
Metamorphism of the Kedougou-Kenieba Inlier
7.1.5.
Regional Surficial Geology of the Kedougou-Kenieba Inlier
7.2
Permit Geological and Structural Setting
7.3
GOLD MINERALISATION
8.
DEPOSIT TYPES
9.
EXPLORATION
9.1
Exploration Programs Completed by Waraba Gold Limited in 2021
9.1.1.
Compilation and interpretation of existing termite mound and soil geochemistry data
9.1.2.
Geomorphology / Regolith Mapping
9.1.2.1.
High Laterite plateau
6.3
Exploration Programs Completed by Ressources Robex Inc. (between 2005 and 2006
6.3.1.
Exploration programs completed from September 2005 to September 2006
6.3.1.1.
Geomorphology / regolith
6.3.1.2.
Pits sampling
6.3.2.
Exploration programs completed from September 2006 to September 2007
6.3.2.1.
Geophysical surveys
6.3.2.2.
Drilling
6.3.2.2.1.
Conclusion
6.4
Exploration Programs Completed by Cluff Gold Plc in 2012
6.4.1.
Follow-up termite mounds geochemical survey
6.4.2.
Results of the Follow-up geochemical survey
6.4.3.
Geophysical Survey
6.4.3.1.
Gradient Array
6.4.3.2.
Gradient Resistivity
6.4.3.3.
Gradient Chargeability
6.4.3.4.
Gradient Interpretation maps
6.4.4.
RC Drilling Program
6.5
Exploration Programs Completed by Fokolore from 2016 to 2018
6.5.1.
Exploration Programs Completed by Fokolore in 2016
6.5.1.1.
Geological and structural mapping of the Mamadouya gold anomaly
6.5.1.2.
Auger Drilling Program
6.5.1.3.
Gold panning
6.5.1.4.
Rock chips sampling
6.5.1.5.
Conclusions
6.5.2.
Exploration Programs Completed by Fokolore in 2017
6.5.3.
Exploration Programs Completed by Fokolore in 2018
6.6. .
Historical drillingdescriptions
6.6.1. .
Reverse cCirculation (RC) Drilling
6.6.2.
Folkolore Auger drilling
6.6.3.
Drilling Quality
6.6.4.
RC and Auger Drill Hole Logging
6.6.5.
Logging Quality
7.
GEOLOGICAL SETTING AND MINERALISATION
7.1
REGIONAL GEOLOGICAL AND STRUCTURAL SETTING
7.1.1.
Geology of the Birimian of West Africa
7.1.2.
Lithostratigraphy of the Kedougou-Kenieba Inlier (KKI)
7.1.2.1.
The Mako Volcanic Belt (MVB)
7.1.2.2.
The Dialé-Daléma series
7.1.2.3.
The Falémé Volcanic Belt
7.1.2.4.
The Kofi Series
7.1.3.
Structural Setting of the Kedougou-Kenieba Inlier
7.1.4.
Metamorphism of the Kedougou-Kenieba Inlier
7.1.5.
Regional Surficial Geology of the Kedougou-Kenieba Inlier
7.2
Permit Geological and Structural Setting
7.3
GOLD MINERALISATION
8.
DEPOSIT TYPES
9.
EXPLORATION
9.1
Exploration Programs Completed by Waraba Gold Limited in 2021
9.1.1.
Compilation and interpretation of existing termite mound and soil geochemistry data
9.1.2.
Geomorphology / Regolith Mapping
9.1.2.1.
High Laterite plateau
)
38
38
38
40
40
40
42
45
45
45
45
46
48
48
48
48
53
61
61
61
64
66
67
69
69
70
78
78
78
79
79
80
81
81
81
83
83
85
85
85
86
86
86
87
89
91
92
92
92
93
93

Independent Technical Report on the Maligonga-East Gold Project

9.1.2.2.
Low Laterite plateau
9.1.2.3.
Erosional regime
9.1.2.4.
Depositional regime of alluvium and colluvium
9.1.3.
Lithogeochemical sampling
9.1.4.
Geological and structural mapping
9.1.4.1.
Quartz veins in shear
9.1.4.2.
Stereographic representation of structures
a)
Stratification
b)
Lithological contact
c)
Schistosity-foliation
9.1.4.3.
Fault description
a.
Reverse faults
b.
The overlap faults
c.
Vertical to subvertical faults
d.
Transforming faults (detachment)
e.
Fish breach
f.
Diaclases
9.1.4.4.
Interpreted geological and structural sections of the northern part of Mamoudouya
9.1.4.5.
Structural interpretation of the gold mineralization
9.1.6.
Airborne Geophysical survey completed in 2021 by Waraba Gold Limited
9.1.6.1.
Survey Description
9.1.6.2.
Survey specifications
9.1.6.3.
Magnetic data
9.1.6.4.
Radiometric data
9.1.6.5.
Altimeter
9.1.6.6.
Results of the Survey
a.
Total field gradient enhanced magnetics
b.
First vertical derivative magnetics
c.
Reduced to pole magnetic
d.
Analytic signal
e.
Digital terrain model
f.
Final radiometric data
9.1.6.7.
Structural interpretation by Waraba Gold
9.2
Exploration Programs Completed by Waraba Gold Limited in 2022
10.
DRILLING
11.
SAMPLING PREPARATION ANALYSIS AND SECURITY
11.1.
RC Sampling
11.2.
Auger Sampling
11.3.
Sample Recovery
11.4.
Analytical Laboratories
11.5.
QA/QC Procedures
11.6.
QA/QC Program Quality Control Procedures
11.7.
Sample Preparation and Analytical Procedures by SGS
11.8
Cluff sampling quality assurance and quality control (QA/QC)
18.8.1.
Cluff RC drilling Quality Assurance and Quality Control
11.8.1.1.
Cluff RC drilling Standard Samples
a.
Cluff Standard Std OXL93 Control Chart
b.
Cluff Standard Std Si42 Control Chart
c.
Cluff Standard Std SI54 Control Chart
d.
Cluff Standard Std OXN92 Control Chart
e.
Cluff Standard Std SL51 Control Chart
9.1.2.2.
Low Laterite plateau
9.1.2.3.
Erosional regime
9.1.2.4.
Depositional regime of alluvium and colluvium
9.1.3.
Lithogeochemical sampling
9.1.4.
Geological and structural mapping
9.1.4.1.
Quartz veins in shear
9.1.4.2.
Stereographic representation of structures
a)
Stratification
b)
Lithological contact
c)
Schistosity-foliation
9.1.4.3.
Fault description
a.
Reverse faults
b.
The overlap faults
c.
Vertical to subvertical faults
d.
Transforming faults (detachment)
e.
Fish breach
f.
Diaclases
9.1.4.4.
Interpreted geological and structural sections of the northern part of Mamoudouya
9.1.4.5.
Structural interpretation of the gold mineralization
9.1.6.
Airborne Geophysical survey completed in 2021 by Waraba Gold Limited
9.1.6.1.
Survey Description
9.1.6.2.
Survey specifications
9.1.6.3.
Magnetic data
9.1.6.4.
Radiometric data
9.1.6.5.
Altimeter
9.1.6.6.
Results of the Survey
a.
Total field gradient enhanced magnetics
b.
First vertical derivative magnetics
c.
Reduced to pole magnetic
d.
Analytic signal
e.
Digital terrain model
f.
Final radiometric data
9.1.6.7.
Structural interpretation by Waraba Gold
9.2
Exploration Programs Completed by Waraba Gold Limited in 2022
10.
DRILLING
11.
SAMPLING PREPARATION ANALYSIS AND SECURITY
11.1.
RC Sampling
11.2.
Auger Sampling
11.3.
Sample Recovery
11.4.
Analytical Laboratories
11.5.
QA/QC Procedures
11.6.
QA/QC Program Quality Control Procedures
11.7.
Sample Preparation and Analytical Procedures by SGS
11.8
Cluff sampling quality assurance and quality control (QA/QC)
18.8.1.
Cluff RC drilling Quality Assurance and Quality Control
11.8.1.1.
Cluff RC drilling Standard Samples
a.
Cluff Standard Std OXL93 Control Chart
b.
Cluff Standard Std Si42 Control Chart
c.
Cluff Standard Std SI54 Control Chart
d.
Cluff Standard Std OXN92 Control Chart
e.
Cluff Standard Std SL51 Control Chart
9.1.2.2.
Low Laterite plateau
9.1.2.3.
Erosional regime
9.1.2.4.
Depositional regime of alluvium and colluvium
9.1.3.
Lithogeochemical sampling
9.1.4.
Geological and structural mapping
9.1.4.1.
Quartz veins in shear
9.1.4.2.
Stereographic representation of structures
a)
Stratification
b)
Lithological contact
c)
Schistosity-foliation
9.1.4.3.
Fault description
a.
Reverse faults
b.
The overlap faults
c.
Vertical to subvertical faults
d.
Transforming faults (detachment)
e.
Fish breach
f.
Diaclases
9.1.4.4.
Interpreted geological and structural sections of the northern part of Mamoudouya
9.1.4.5.
Structural interpretation of the gold mineralization
9.1.6.
Airborne Geophysical survey completed in 2021 by Waraba Gold Limited
9.1.6.1.
Survey Description
9.1.6.2.
Survey specifications
9.1.6.3.
Magnetic data
9.1.6.4.
Radiometric data
9.1.6.5.
Altimeter
9.1.6.6.
Results of the Survey
a.
Total field gradient enhanced magnetics
b.
First vertical derivative magnetics
c.
Reduced to pole magnetic
d.
Analytic signal
e.
Digital terrain model
f.
Final radiometric data
9.1.6.7.
Structural interpretation by Waraba Gold
9.2
Exploration Programs Completed by Waraba Gold Limited in 2022
10.
DRILLING
11.
SAMPLING PREPARATION ANALYSIS AND SECURITY
11.1.
RC Sampling
11.2.
Auger Sampling
11.3.
Sample Recovery
11.4.
Analytical Laboratories
11.5.
QA/QC Procedures
11.6.
QA/QC Program Quality Control Procedures
11.7.
Sample Preparation and Analytical Procedures by SGS
11.8
Cluff sampling quality assurance and quality control (QA/QC)
18.8.1.
Cluff RC drilling Quality Assurance and Quality Control
11.8.1.1.
Cluff RC drilling Standard Samples
a.
Cluff Standard Std OXL93 Control Chart
b.
Cluff Standard Std Si42 Control Chart
c.
Cluff Standard Std SI54 Control Chart
d.
Cluff Standard Std OXN92 Control Chart
e.
Cluff Standard Std SL51 Control Chart
93
93
93
94
96
97
97
98
98
98
99
99
99
99
99
100
100

100
102
103
103
104
105
105
106
106
106
107
107
108
109
110
111
114
127
128
128
128
129
129
129
129
129
130
130
130
131
131
132
133
133
ns
PREPARATION ANALYSIS AND SECURITY
)

Independent Technical Report on the Maligonga-East Gold Project

f. Cluff Standard Std Oxl78 Control Chart 134
g. Cluff Standard Std Oxj80 Control Chart 135
h. Cluff Standard Std Oxj68 Control Chart 135
i. Cluff Standard Std OxA89 Control Chart 135
11.8.1.2.
Cluff RC drilling Duplicates Sample
136
11.8.1.3.
Cluff RC drilling Blank Samples
136
11.8.2. Cluff Termite Mounds Sample Quality Assurance and Quality Control (QA/QC) 137
11.8.2.1.
Cluff Soil Standard
137
a. Cluff Standard Std SI42 Control Chart 137
b. Cluff Standard Std oxc88 Control Chart 138
11.8.2.2.
Cluff termite mounds Blank Samples
139
11.8.2.3.
Cluff termite mounds Duplicate Samples
139
11.9 Fokolore sampling Quality Assurance and Quality Control (QA/QC) 140
11.9.1. Fokolore RC sampling Quality Assurance and Quality Control 140
11.9.1.1.
Fokolore RC Sample Standards
140
a. Fokolore Standard SP 5828 Control Chart 141
b. Fokolore Standard SP 2335 Control Chart 141
c. Fokolore Standard SP 0607 Control Chart 142
d. Fokolore Standard SP 0599 Control Chart 142
11.9.1.2.
Fokolore RC Sample Duplicates
142
11.9.1.3.
Fokolore RC Sample Blanks
143
11.9.2. Fokolore Auger Sample sampling quality assurance and quality control 144
11.9.2.1.
Fokolore Auger Drill Sample Standards
144
a. Fokolore Standard STD 2,65 Control Chart 144
b. Fokolore Standard SP 0,6 Control Chart 145
11.9.2.2.
Fokolore Auger Drill Sample Duplicates
146
12. DATA VERIFICATION
147
12.1. Site Visit Activities 148
13. MINERAL PROCESSING ET METALLURGICAL TESTING 153
14. MINERAL RESOURCE ESTIMATES 153
15. MINERAL RESERVE ESTIMATES 153
16. MIMING METHOD 153
17. RECOVERY METHOD 153
18. PROJECT INFRASTRUCTURE 153
19. MARKET STUDIES ET CONTRACTS 153
20. ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL OR COMMUNITY IMPACTS153
21. CAPITAL AND OPERATING COST 153
22. ECONOMIC ANALYSIS 153
23. ADJACENT PROPRITIES 154
23.1. Siribaya and Diakha Gold Deposits 155
23.1.1. Siribaya Gold Deposit 155
23.1.2. Diakha Gold Deposit 155
24. OTHER RELEVANT DATA AND INFORMATION 156
25. INTERPRETATION AND CONCLUSSIONS 158
25.1. Geological and structural interpretation of the Mamadouya Gold Mineralization 158
25.2. Regional Overview: Geological and Structural Evolution of the Mamadouya Gold Mineralization173

Independent Technical Report on the Maligonga-East Gold Project

25.2.1.
Basin Formation
25.2.2.
The first Deformation D1
25.2.3.
The second Deformation D2
25.2.4.
Mesozoic tectonism and dolerite intrusion
25.2.5.
Late faulting
25.2.6.
Origin of the mineralizing fluids
25.3.
Conclussions
26.
RECOMMENDATIONS
26.1.
DRILLING
26.1.1.
Recommended Phase I Drilling Program
26.1.2.
Recommended Phase II RC and Diamond (DD) Drilling Program
26.2.
RECOMMENDED BUDGET
27.
REFERENCES
28.
DATE AND SIGNATURE PAGE
29.
CERTIFICATE OF QUALIFIED PERSON
30.
APPENDIX
Figures
25.2.1.
Basin Formation
25.2.2.
The first Deformation D1
25.2.3.
The second Deformation D2
25.2.4.
Mesozoic tectonism and dolerite intrusion
25.2.5.
Late faulting
25.2.6.
Origin of the mineralizing fluids
25.3.
Conclussions
26.
RECOMMENDATIONS
26.1.
DRILLING
26.1.1.
Recommended Phase I Drilling Program
26.1.2.
Recommended Phase II RC and Diamond (DD) Drilling Program
26.2.
RECOMMENDED BUDGET
27.
REFERENCES
28.
DATE AND SIGNATURE PAGE
29.
CERTIFICATE OF QUALIFIED PERSON
30.
APPENDIX
Figures
25.2.1.
Basin Formation
25.2.2.
The first Deformation D1
25.2.3.
The second Deformation D2
25.2.4.
Mesozoic tectonism and dolerite intrusion
25.2.5.
Late faulting
25.2.6.
Origin of the mineralizing fluids
25.3.
Conclussions
26.
RECOMMENDATIONS
26.1.
DRILLING
26.1.1.
Recommended Phase I Drilling Program
26.1.2.
Recommended Phase II RC and Diamond (DD) Drilling Program
26.2.
RECOMMENDED BUDGET
27.
REFERENCES
28.
DATE AND SIGNATURE PAGE
29.
CERTIFICATE OF QUALIFIED PERSON
30.
APPENDIX
Figures
25.2.1.
Basin Formation
25.2.2.
The first Deformation D1
25.2.3.
The second Deformation D2
25.2.4.
Mesozoic tectonism and dolerite intrusion
25.2.5.
Late faulting
25.2.6.
Origin of the mineralizing fluids
25.3.
Conclussions
26.
RECOMMENDATIONS
26.1.
DRILLING
26.1.1.
Recommended Phase I Drilling Program
26.1.2.
Recommended Phase II RC and Diamond (DD) Drilling Program
26.2.
RECOMMENDED BUDGET
27.
REFERENCES
28.
DATE AND SIGNATURE PAGE
29.
CERTIFICATE OF QUALIFIED PERSON
30.
APPENDIX
Figures
25.2.1.
Basin Formation
25.2.2.
The first Deformation D1
25.2.3.
The second Deformation D2
25.2.4.
Mesozoic tectonism and dolerite intrusion
25.2.5.
Late faulting
25.2.6.
Origin of the mineralizing fluids
25.3.
Conclussions
26.
RECOMMENDATIONS
26.1.
DRILLING
26.1.1.
Recommended Phase I Drilling Program
26.1.2.
Recommended Phase II RC and Diamond (DD) Drilling Program
26.2.
RECOMMENDED BUDGET
27.
REFERENCES
28.
DATE AND SIGNATURE PAGE
29.
CERTIFICATE OF QUALIFIED PERSON
30.
APPENDIX
Figures
25.2.1.
Basin Formation
25.2.2.
The first Deformation D1
25.2.3.
The second Deformation D2
25.2.4.
Mesozoic tectonism and dolerite intrusion
25.2.5.
Late faulting
25.2.6.
Origin of the mineralizing fluids
25.3.
Conclussions
26.
RECOMMENDATIONS
26.1.
DRILLING
26.1.1.
Recommended Phase I Drilling Program
26.1.2.
Recommended Phase II RC and Diamond (DD) Drilling Program
26.2.
RECOMMENDED BUDGET
27.
REFERENCES
28.
DATE AND SIGNATURE PAGE
29.
CERTIFICATE OF QUALIFIED PERSON
30.
APPENDIX
Figures
25.2.1.
Basin Formation
25.2.2.
The first Deformation D1
25.2.3.
The second Deformation D2
25.2.4.
Mesozoic tectonism and dolerite intrusion
25.2.5.
Late faulting
25.2.6.
Origin of the mineralizing fluids
25.3.
Conclussions
26.
RECOMMENDATIONS
26.1.
DRILLING
26.1.1.
Recommended Phase I Drilling Program
26.1.2.
Recommended Phase II RC and Diamond (DD) Drilling Program
26.2.
RECOMMENDED BUDGET
27.
REFERENCES
28.
DATE AND SIGNATURE PAGE
29.
CERTIFICATE OF QUALIFIED PERSON
30.
APPENDIX
Figures
25.2.1.
Basin Formation
25.2.2.
The first Deformation D1
25.2.3.
The second Deformation D2
25.2.4.
Mesozoic tectonism and dolerite intrusion
25.2.5.
Late faulting
25.2.6.
Origin of the mineralizing fluids
25.3.
Conclussions
26.
RECOMMENDATIONS
26.1.
DRILLING
26.1.1.
Recommended Phase I Drilling Program
26.1.2.
Recommended Phase II RC and Diamond (DD) Drilling Program
26.2.
RECOMMENDED BUDGET
27.
REFERENCES
28.
DATE AND SIGNATURE PAGE
29.
CERTIFICATE OF QUALIFIED PERSON
30.
APPENDIX
Figures
25.2.1.
Basin Formation
25.2.2.
The first Deformation D1
25.2.3.
The second Deformation D2
25.2.4.
Mesozoic tectonism and dolerite intrusion
25.2.5.
Late faulting
25.2.6.
Origin of the mineralizing fluids
25.3.
Conclussions
26.
RECOMMENDATIONS
26.1.
DRILLING
26.1.1.
Recommended Phase I Drilling Program
26.1.2.
Recommended Phase II RC and Diamond (DD) Drilling Program
26.2.
RECOMMENDED BUDGET
27.
REFERENCES
28.
DATE AND SIGNATURE PAGE
29.
CERTIFICATE OF QUALIFIED PERSON
30.
APPENDIX
Figures
25.2.1.
Basin Formation
25.2.2.
The first Deformation D1
25.2.3.
The second Deformation D2
25.2.4.
Mesozoic tectonism and dolerite intrusion
25.2.5.
Late faulting
25.2.6.
Origin of the mineralizing fluids
25.3.
Conclussions
26.
RECOMMENDATIONS
26.1.
DRILLING
26.1.1.
Recommended Phase I Drilling Program
26.1.2.
Recommended Phase II RC and Diamond (DD) Drilling Program
26.2.
RECOMMENDED BUDGET
27.
REFERENCES
28.
DATE AND SIGNATURE PAGE
29.
CERTIFICATE OF QUALIFIED PERSON
30.
APPENDIX
Figures
173
173
173
175
175
175
177
179
179
mineralizing fluids
Program
Diamond (DD) Drilling Program
179
180
182
183
185
186
PERSON
187
Figure 1.1: Recommended Phase I RC drill program in Mamadouya gold Mineralization
6
Figure 1.2: Long section view of the recommended Phase I RC drill program in Mamoudouya gold Mineralization7
Figure 1.3: Recommended Phase II drill program in Kabafing prospect
7
Figure 1.4: Location of the Maligonga-East gold property in southwest Mali, West Africa
9
Figure 1.5: Regional geology map of the KKI showing the location of the Maligonga-East gold project
10
Figure 1.6.: Interpreted Geological and Structural Map of the Mamadouya Gold Mineralization
13
Figure 4.1: Location of the Maligonga-East gold property in southwest Mali, West Africa
20
Figure 4.2: Maligonga East Permit (White outline) in Southwest Mali and exisiting mines and advanced projects21
Figure 4.3: Maligonga-East “Permit de Recherche Minière” (black outline) as displayed in the Mining Cadastral 26
Figure 5.1: Main Access Road from Bamako to the Maligonga-East Gold Project
27
Figure 5.2: Average monthly temperatures and Average yearly precipitation at Kenieba, Mali
28
Figure 5.3: Typical artisanal mining area over the Maligonga East property (Photo taken during September 2021,
site visit
29
Figure 5.4: Summary of project physiography
31
Figure 5.5: Typical vegetation within the Malogonga East permit (Photo taken during September 2021, site visit32
Figure 6.1.: Regional soil geochemical sampling within the Maligonga-East permit in 1987
36
Figure 6.2: Regional soil geochemical sampling results within the Maligonga-East permit in 1987
36
Figure 6.3: Location of the trenches completed by BRGM in the Maligonga-East permit in 1992
37
Figure 6.4: Geomorphological and regolith mapping and soil sampling survey of the Wili Wili Permit
39
Figure 6.5.: Geophysical IP resistivity survey on the Mamadouya zone by Robex from 2006 to 2007
41
Figure 6.6: Location map of the RC Drill holes completed by Robex in the Mamadouya zone in 2007
43
Figure 6.7: Cross-section L1 of the RC Drill holes completed by Robex in the Mamadouya zone in 2007
43
Figure 6.8: Cross-section L2 of the RC Drill holes completed by Robex in the Mamadouya zone in 2007
44
Figure 6.9: Geophysical IP resistivity survey on the Mamadouya zone showing trenches and drilling location44
Figure 6.10: Follow-up termite mounds geochemical survey within the Maligonga-East permit in 2012
45
Figure 6.11: Follow-up termite mounds geochemical results within the Maligonga-East permit in 2012
46
Figure 6.12: Sitemap - Aera of investigation.
47
Figure 6.13: Gradient Chargeability Interpretation Map showing geological and structural elements
49
Figure 6.14: Interpreted structures from the Gradient Survey-Apparent resistivity
50
Figure 6.15: Gradient Survey-Apparent resistivity Map showing structural elements
51
Figure 6.16: IP Map showing structural elements
52
Figure 6.17: Location of the RC drill holes completed by Cluff in the Mamadouya zone in 2012
53
Figure 6.18: Geological Cross-section of Cluff RC Drill holes Line 1378 450N
55
Figure 6.19: Geological Cross-section of Cluff RC Drill holes Line 1378 350N
55

Independent Technical Report on the Maligonga-East Gold Project

Figure 6.20: Geological Cross-section of Cluff RC Drill holes Line 1378 250N

Figure 6.21: Geological Cross-section of Cluff RC Drill holes Line 1378 150N

Figure 6.22: Geological Cross-section of Cluff RC Drill holes Line 1378 050N

Figure 6.23: Geological Cross-section of Cluff RC Drill holes Line 1377 950N

Figure 6.24: Geological Cross-section of Cluff RC Drill holes Line 1377 850N

Figure 6.25: Geological Cross-section of Cluff RC Drill holes Line 1377 750N

Figure 6.26: Geological Cross-section of Cluff RC Drill holes Line 1377 650N

Figure 6.27: Geological Cross-section of Cluff RC Drill holes Line 1377 550N

Figure 6.28: Geological Cross-section of Cluff RC Drill holes Line 1377 450N

Figure 6.29: Geological Cross-section of Cluff RC Drill holes Line 1377 350N

Figure 6.30: Geological Cross-section of Cluff RC Drill holes Line 1377 250N

Figure 6.31: Location Map of the RC Drill Line in the Mamadouya target

Figure 6.32: Geological and structural map of the Mamadouya target of the Maligonga-East permit

Figure 6.33: Correlation between RC anomaly, conductive, resistive and magnetic zones

Figure 6.34: Location Map of the Auger Drill holes completed by Fokolore in the Mamadouya target in 2016
Figure 6.35: Grabs sampling results on the Maligonga-East permit

Figure 6.36: Interpretation by Fokolore of the gold mineralization intercepted in RC drill holes

Figure 6.37: Location map of the RC Drill holes completed by Fokolore at Mamadouya in 2018

Figure 6.38: Best results in the northern portion of the permit

Figure 6.39: Location map and the best results of the Fokolore RC drilling program

Figure 6.40: Best results in the southern portion of the permit (Section 1377407N (EW)

Figure 6.41: Map showing the location and the best results of the Fokolore RC drilling program

Figure 6.42: Map showing the gold contours interpreted from the Fokolore and Cluff RC drilling

Figure 6.43: One meter interval dcreened chips for logging.
Figure 7.1: Geological Map of the West African Shield showing Maligonga East Permit

Figure 7.2: Simplified geological map of West African craton showing settings of main gold deposits

Figure 7.3: Geological and structural map of the Kedougou-Kenieba Inliers showing Maligonga East Permit
Figure 7.4: Geological map of the Maligonga-East permit showing the main lithological units

Figure 7.5: Geological and structural section of the Mamadouya gold mineralization

Figure 7.6: Interpreted geological and structural Map of the Mamadouya Gold mineralization

Figure 9.1: Overlay of the geochemical values greater than 25 ppb with the structural lineaments

Figure 9.2: Regolith map of the Maligonga-East Permit showing the main regolith units

Figure 9.3: Interpreted geological and structural map of the Mamadouya Prospect

Figure 9.4: Interpreted geology and structural map of the Maligonga-East permit

Figure 9.5: Profile of the stereonet of all pole: bedding, contact, foliation and shear at Mamoudouya

Figure 9.6: Pink diagram of all the faults in Mamoudouya

Figure 9.7: Granodiorite – Metasedimentary contact, brecciatedfault, fish and shear structures

Figure 9.8: Geological cross section in target 1 north of Mamoudouya

Figure 9.9: Geological cross section in target 1 north of Mamoudouya

Figure 9.10 Geological cross section in target 1 north of Mamoudouya

Figure 9.11: Interpreted geological and structural map of the Mamadouya Prospect showing the main

Figure 9.12. Digital terrain model and horizontal gradient of the digital terrain model of the Maligonga permi
Figure 9.13: Helicomag survey grid lines over the Maligonka gold permit

Figure 9.14: Gradient enhanced magnetics

Figure 9.15: Magnetic derivative first vertical

Figure 9.16: Reduced to pole magnetics

Figure 9.17: Analytic signal

Figure 9.18: Computed Digital Terrain Model

Figure 9.19: Radiometric data processed by 4-channel NASVD (total count, K, U Th) Radiometric data

Figure 9.20: Inferred structures from Gradient Enhanced magnetics RTPLL

Figure 9.21: Inferred structures from Gradient Enhanced magnetics TDR

Figure 9.22: Inferred structures from Gradient Enhanced magnetics Analytic Signal

Figure 9.23: identified targets for ground IP follow up over geophysics anomalies defined

Figure 9.24: Map of surveyed area showing Mamoudouta and Kabafing

Figure 9.25: Resistivity Map of Mamoudouya.

Figure 9.26: Residual Resisitivity Map of Mamoudouya.

Figure 9.27: Chargeability Maps of Mamoudouya.
Figure 6.20: Geological Cross-section of Cluff RC Drill holes Line 1378 250N

Figure 6.21: Geological Cross-section of Cluff RC Drill holes Line 1378 150N

Figure 6.22: Geological Cross-section of Cluff RC Drill holes Line 1378 050N

Figure 6.23: Geological Cross-section of Cluff RC Drill holes Line 1377 950N

Figure 6.24: Geological Cross-section of Cluff RC Drill holes Line 1377 850N

Figure 6.25: Geological Cross-section of Cluff RC Drill holes Line 1377 750N

Figure 6.26: Geological Cross-section of Cluff RC Drill holes Line 1377 650N

Figure 6.27: Geological Cross-section of Cluff RC Drill holes Line 1377 550N

Figure 6.28: Geological Cross-section of Cluff RC Drill holes Line 1377 450N

Figure 6.29: Geological Cross-section of Cluff RC Drill holes Line 1377 350N

Figure 6.30: Geological Cross-section of Cluff RC Drill holes Line 1377 250N

Figure 6.31: Location Map of the RC Drill Line in the Mamadouya target

Figure 6.32: Geological and structural map of the Mamadouya target of the Maligonga-East permit

Figure 6.33: Correlation between RC anomaly, conductive, resistive and magnetic zones

Figure 6.34: Location Map of the Auger Drill holes completed by Fokolore in the Mamadouya target in 2016
Figure 6.35: Grabs sampling results on the Maligonga-East permit

Figure 6.36: Interpretation by Fokolore of the gold mineralization intercepted in RC drill holes

Figure 6.37: Location map of the RC Drill holes completed by Fokolore at Mamadouya in 2018

Figure 6.38: Best results in the northern portion of the permit

Figure 6.39: Location map and the best results of the Fokolore RC drilling program

Figure 6.40: Best results in the southern portion of the permit (Section 1377407N (EW)

Figure 6.41: Map showing the location and the best results of the Fokolore RC drilling program

Figure 6.42: Map showing the gold contours interpreted from the Fokolore and Cluff RC drilling

Figure 6.43: One meter interval dcreened chips for logging.
Figure 7.1: Geological Map of the West African Shield showing Maligonga East Permit

Figure 7.2: Simplified geological map of West African craton showing settings of main gold deposits

Figure 7.3: Geological and structural map of the Kedougou-Kenieba Inliers showing Maligonga East Permit
Figure 7.4: Geological map of the Maligonga-East permit showing the main lithological units

Figure 7.5: Geological and structural section of the Mamadouya gold mineralization

Figure 7.6: Interpreted geological and structural Map of the Mamadouya Gold mineralization

Figure 9.1: Overlay of the geochemical values greater than 25 ppb with the structural lineaments

Figure 9.2: Regolith map of the Maligonga-East Permit showing the main regolith units

Figure 9.3: Interpreted geological and structural map of the Mamadouya Prospect

Figure 9.4: Interpreted geology and structural map of the Maligonga-East permit

Figure 9.5: Profile of the stereonet of all pole: bedding, contact, foliation and shear at Mamoudouya

Figure 9.6: Pink diagram of all the faults in Mamoudouya

Figure 9.7: Granodiorite – Metasedimentary contact, brecciatedfault, fish and shear structures

Figure 9.8: Geological cross section in target 1 north of Mamoudouya

Figure 9.9: Geological cross section in target 1 north of Mamoudouya

Figure 9.10 Geological cross section in target 1 north of Mamoudouya

Figure 9.11: Interpreted geological and structural map of the Mamadouya Prospect showing the main

Figure 9.12. Digital terrain model and horizontal gradient of the digital terrain model of the Maligonga permi
Figure 9.13: Helicomag survey grid lines over the Maligonka gold permit

Figure 9.14: Gradient enhanced magnetics

Figure 9.15: Magnetic derivative first vertical

Figure 9.16: Reduced to pole magnetics

Figure 9.17: Analytic signal

Figure 9.18: Computed Digital Terrain Model

Figure 9.19: Radiometric data processed by 4-channel NASVD (total count, K, U Th) Radiometric data

Figure 9.20: Inferred structures from Gradient Enhanced magnetics RTPLL

Figure 9.21: Inferred structures from Gradient Enhanced magnetics TDR

Figure 9.22: Inferred structures from Gradient Enhanced magnetics Analytic Signal

Figure 9.23: identified targets for ground IP follow up over geophysics anomalies defined

Figure 9.24: Map of surveyed area showing Mamoudouta and Kabafing

Figure 9.25: Resistivity Map of Mamoudouya.

Figure 9.26: Residual Resisitivity Map of Mamoudouya.

Figure 9.27: Chargeability Maps of Mamoudouya.
Figure 6.20: Geological Cross-section of Cluff RC Drill holes Line 1378 250N

Figure 6.21: Geological Cross-section of Cluff RC Drill holes Line 1378 150N

Figure 6.22: Geological Cross-section of Cluff RC Drill holes Line 1378 050N

Figure 6.23: Geological Cross-section of Cluff RC Drill holes Line 1377 950N

Figure 6.24: Geological Cross-section of Cluff RC Drill holes Line 1377 850N

Figure 6.25: Geological Cross-section of Cluff RC Drill holes Line 1377 750N

Figure 6.26: Geological Cross-section of Cluff RC Drill holes Line 1377 650N

Figure 6.27: Geological Cross-section of Cluff RC Drill holes Line 1377 550N

Figure 6.28: Geological Cross-section of Cluff RC Drill holes Line 1377 450N

Figure 6.29: Geological Cross-section of Cluff RC Drill holes Line 1377 350N

Figure 6.30: Geological Cross-section of Cluff RC Drill holes Line 1377 250N

Figure 6.31: Location Map of the RC Drill Line in the Mamadouya target

Figure 6.32: Geological and structural map of the Mamadouya target of the Maligonga-East permit

Figure 6.33: Correlation between RC anomaly, conductive, resistive and magnetic zones

Figure 6.34: Location Map of the Auger Drill holes completed by Fokolore in the Mamadouya target in 2016
Figure 6.35: Grabs sampling results on the Maligonga-East permit

Figure 6.36: Interpretation by Fokolore of the gold mineralization intercepted in RC drill holes

Figure 6.37: Location map of the RC Drill holes completed by Fokolore at Mamadouya in 2018

Figure 6.38: Best results in the northern portion of the permit

Figure 6.39: Location map and the best results of the Fokolore RC drilling program

Figure 6.40: Best results in the southern portion of the permit (Section 1377407N (EW)

Figure 6.41: Map showing the location and the best results of the Fokolore RC drilling program

Figure 6.42: Map showing the gold contours interpreted from the Fokolore and Cluff RC drilling

Figure 6.43: One meter interval dcreened chips for logging.
Figure 7.1: Geological Map of the West African Shield showing Maligonga East Permit

Figure 7.2: Simplified geological map of West African craton showing settings of main gold deposits

Figure 7.3: Geological and structural map of the Kedougou-Kenieba Inliers showing Maligonga East Permit
Figure 7.4: Geological map of the Maligonga-East permit showing the main lithological units

Figure 7.5: Geological and structural section of the Mamadouya gold mineralization

Figure 7.6: Interpreted geological and structural Map of the Mamadouya Gold mineralization

Figure 9.1: Overlay of the geochemical values greater than 25 ppb with the structural lineaments

Figure 9.2: Regolith map of the Maligonga-East Permit showing the main regolith units

Figure 9.3: Interpreted geological and structural map of the Mamadouya Prospect

Figure 9.4: Interpreted geology and structural map of the Maligonga-East permit

Figure 9.5: Profile of the stereonet of all pole: bedding, contact, foliation and shear at Mamoudouya

Figure 9.6: Pink diagram of all the faults in Mamoudouya

Figure 9.7: Granodiorite – Metasedimentary contact, brecciatedfault, fish and shear structures

Figure 9.8: Geological cross section in target 1 north of Mamoudouya

Figure 9.9: Geological cross section in target 1 north of Mamoudouya

Figure 9.10 Geological cross section in target 1 north of Mamoudouya

Figure 9.11: Interpreted geological and structural map of the Mamadouya Prospect showing the main

Figure 9.12. Digital terrain model and horizontal gradient of the digital terrain model of the Maligonga permi
Figure 9.13: Helicomag survey grid lines over the Maligonka gold permit

Figure 9.14: Gradient enhanced magnetics

Figure 9.15: Magnetic derivative first vertical

Figure 9.16: Reduced to pole magnetics

Figure 9.17: Analytic signal

Figure 9.18: Computed Digital Terrain Model

Figure 9.19: Radiometric data processed by 4-channel NASVD (total count, K, U Th) Radiometric data

Figure 9.20: Inferred structures from Gradient Enhanced magnetics RTPLL

Figure 9.21: Inferred structures from Gradient Enhanced magnetics TDR

Figure 9.22: Inferred structures from Gradient Enhanced magnetics Analytic Signal

Figure 9.23: identified targets for ground IP follow up over geophysics anomalies defined

Figure 9.24: Map of surveyed area showing Mamoudouta and Kabafing

Figure 9.25: Resistivity Map of Mamoudouya.

Figure 9.26: Residual Resisitivity Map of Mamoudouya.

Figure 9.27: Chargeability Maps of Mamoudouya.
250N
150N
050N
950N
850N
750N
650N
550N
450N
350N
250N
t
250N
150N
050N
950N
850N
750N
650N
550N
450N
350N
250N
t
250N
150N
050N
950N
850N
750N
650N
550N
450N
350N
250N
t
250N
150N
050N
950N
850N
750N
650N
550N
450N
350N
250N
t
250N
150N
050N
950N
850N
750N
650N
550N
450N
350N
250N
t
55
56
56
56
56
57
57
57
57
58
58
59
62
63
64
67
70
72
73
74
75
76
77
80
81
82
84
88
89
90
92
94
95
97
98
99
100
101
101
102
103
t104
105
106
107
108
109
110
111
112
112
113
113
114
115
116
117
t


Independent Technical Report on the Maligonga-East Gold Project

Figure 9.28: Induced Polarization_Resistivity Map of Mamoudouya. 118
Figure 9.29: Conductivity Map of Mamoudouya. 119
Figure 9.30: Residual Conductivity Map of Mamoudouya. 120
Figure 9.31: Contact Resistance Map of Mamoudouya. 121
Figure 9.32: Lithology_Resisitivity _Induced Polarization Map of Mamoudouya.
122
Figure 9.33: Resistivity Map of Kabafing.
123
Figure 9.34: Residual Resistivity Map of Kabafing. 123
Figure 9.35: Chargeability Map of Kabafing. 124
Figure 9.36: Induced Polarization_Resistivity Map of Kabafing.
124
Figure 9.37: Conductivity Map of Kabafing.
125
Figure 9.38: Residual Conductivity Map of Kabafing. 125
Figure 9.39: Contact Resistance Map of Kabafing. 126
Figure 9.40: Lithology_Induced Polarization_Resistivity Map of Kabafing.
126
Figure 11.1: Standard Std OXL93 Control Chart. Fire Assays Analysis of Cluff RC Drill Samples 131
Figure 11.2: Standard Std Si42 Control Chart. Fire Assays Analysis of Cluff RC Drill Samples 132
Figure 11.3: Standard Std SI54 Control Chart. Fire Assays Analysis of Cluff RC Drill Samples 132
Figure 11.4: Standard Std OXN92 Control Chart. Fire Assays Analysis of Cluff RC Drill Samples 133
Figure 11.5: Standard Std SL51 Control Chart. Fire Assays Analysis of Cluff RC Drill Samples 133
Figure 11.6: Standard Std Oxl78 Control Chart. Fire Assays Analysis of RC Drill Samples 134
Figure 11.7: Standard Std Oxj80 Control Chart. Fire Assays Analysis of RC Drill Samples 134
Figure 11.8: Standard Std Oxj68 Control Chart. Fire Assays Analysis of RC Drill Samples 135
Figure 11.9: Standard Std OxA89 Control Chart. Fire Assays Analysis of RC Drill Samples 135
Figure 11.10: Duplicate Control Chart for Cluff RC Drilling Samples 136
Figure 11.11: Blank Sample Control Chart Fire Assays for Cluff RC Drill Samples 137
Figure 11.12: Standard Std SI42=1760 Control Chart. Fire Assays Analysis of Cluff termite mounds Samples138
Figure 11.13: Standard Std oxc88 Control Chart. Fire Assays Analysis of Cluff soil Samples 138
Figure 11.14: Blank Sample Control Chart. Fire Assays for Cluff termite mounds Samples 139
Figure 11.15: Duplicate Control Chart for Cluff termite mounds Samples 140
Figure 11.16: Standard SP 5828 Control Chart. Fire Assays Analysis of Fokolore RC Samples 141
Figure 11.17: Standard SP 2335 Control Chart. Fire Assays Analysis of Fokolore RC Samples 142
Figure 11.18: Standard SP 0607 Control Chart. Fire Assays Analysis of Fokolore RC Samples 142
Figure 11.19: Standard SP 0599 Control Chart. Fire Assays Analysis of Fokolore RC Samples 143
Figure 11.20: Duplicate Control Chart for Fokolore RC Drilling Samples 143
Figure 11.21: Blank Sample Control Chart. Fire Assays for Fokolore RC Drilling Samples 144
Figure 11.22: Standard SP 2,65 Control Chart. Fire Assays Analysis of Fokolore Auger Samples 145
Figure 11.23: Standard SP 0,6 Control Chart. Fire Assays Analysis of Fokolore Auger Samples 145
Figure 11:24 Duplicate Samples Control Chart for Fokolore Auger Drilling Samples 146
Figure 12.1: Summary of traverses undertaken during site visit in 2021
148
Figure 12.2: Rock exposures observed during site visit in 2021
149
Figure 12.3: Summary map showing historical trenches observed during site visit in 2021 150
Figure 12.4: Historical trench observed during site visit in 2021
151
Figure 12.5: Historical drill collar observed during site visit in 2021
151
Figure 12.6: Artisanal mining pit and tailings observed during site visit in 2021
152
Figure 23.1: Adjacent gold properties to the Maligonga-East Project 154
Figure 23.2: Geological and structural cross-section showing the style of mineralization at Siribaya 155
Figure 23.3: Geological and structural cross-section showing the style of mineralization at Diakha 156
Figure 25.1: Photograph showing the steeply ENE turbidite sequence in the permit 158
Figure 25.2: Photograph showing highly sheared black siltstone in the permit 159
Figure 25.3: Photograph showing stock work of extensional dilation quartz vein in sandstone layer 159
Figure 25.4: Photograph of Mamoudouya shear zone in vertical section 160
Figure 25.5: Structural Interpretation: Overlay of the IP structures with interpreted gold structure 161
Figure 25.6: Structural Interpretation: Overlay of the Gradient Chargeability Interpreted structures 162
Figure 25.7: Interpreted geological and structural Map of the Mamadouya Gold Mineralization 163
Figure 25.8: Interpreted geological and structural map of the Mamadouya gold mineralization 164
Figure 25.9: Geological and structural cross-section Line 1378 950 N showing the gold mineralized structure165
Figure 25.10: Geological and structural cross-section Line 1378 475 N showing the gold mineralized structure166
Figure 25.11: Geological and structural cross-section Line 1378 450 N showing the gold mineralized structure166

Independent Technical Report on the Maligonga-East Gold Project

Figure 25.12: Geological and structural cross-section Line 1378 350 N showing the gold mineralized structure 167 Figure 25.12: Geological and structural cross-section Line 1378 350 N showing the gold mineralized structure 167
Figure 25.13: Geological and structural cross-section Line 1378 250 N showing the gold mineralized structure 167
Figure 25.14: Geological and structural cross-section Line 1378 150 N showing the gold mineralized structure168
Figure 25.15: Geological and structural cross-section Line 1378 050 N showing the gold mineralized structure 168
Figure 25.16: Geological and structural cross-section Line 1377 950 N showing the gold mineralized structure169
Figure 25.17: Geological and structural cross-section Line 1377 850 N showing the gold mineralized structure169
Figure 25.18: Geological and structural cross-section Line 1377 750 N showing the gold mineralized structure 170
Figure 25.19.: Geological and structural cross-section Line 1377 650 N showing the gold mineralized structure 170
Figure 25.20: Geological and structural cross-section Line 1377 550 N showing the gold mineralized structure171
Figure 25.21: Geological and structural cross-section Line 1377 450 N showing the gold mineralized structure171
Figure 25.22: Geological and structural cross-section Line 1377 350 N showing the gold mineralized structure172
Figure 25.23: Geological and structural cross-section Line 1377 250 N showing the gold mineralized structure172
Figure 25.24: Geological and Structural interpretation of the Mamadouya Gold Mineralization
174
Figure 25.25: Overlay of the geological, gold geochemical and structural data
176
Figure 26.1: Recommended phase I RC drill program in Mamoudouya mineralization
180
Figure 26.2: Long section view of recommended phase I RC drill program in Mamoudouya mineralization 181
Figure 26.3: Recommended phase II drill program in Kabafing prospect
181
Tables
Table 1.1: Recommended Exploration Budget for the Maligonga-East permit
8
Table 1.2: Exploration works completed in the Maligonga-East permit from 1987 to 2022
14
Table 4.1: Summary of exploration on the property by Waraba Gold Limited
22
Table 4.2: Corner coordinates for the Maligonga-East gold project
25
Table 6.1: Exploration works completed in The Maligonga-East permit from 1992 to 2018
35
Table 6.2: Location and technical parameters of the trenches completed by BRGM in 1992
37
Table 6.3: Location and technical parameters of the RC Drill Holes completed by Robex in 2007
42
Table 6.4: Best gold intersects from the RC drilling program in the Mamoudouya Zone by Robex in 2007 42
Table 6.5: Technical parameters of the RC Drill Holes completed by Cluff in the Mamadouya zone in 2012 55
Table 6.6: Best gold intercepts from the Cluff RC drilling program in 2012
60
Table 6.7: Best gold intercepts from the Fokolore Auger drilling program in 2016
65
Table 6.8: Grab sample descriptions and analytical results
68
Table 6.9: Grab sample Descriptions and analytical results
68
Table 6.10: Location and technical parameters of the RC Drill holes completed by Fokolore in 2018
71
Table 9.1.: Best gold values from pits litho-geochemical sampling
96
Table 9. 2: Points and structural data measurements within the Mamadouya prospect
98
Table 9.3: Summary of helicomag surveys parameters at Maligonga Gold
104
Table 9.4: Coordinates of the helicomag surveys boundaries
104
Table 11.1. Statistical Parameters for Standards of RC Drill Samples analyzed by Fire Assays
130
Table 11.2: Statistical Parameters for Duplicates of RC Drill Samples analyzed by Fire Assays
136
Table 11.3: Statistical Parameters for termite mounds Samples Standards
137
Table 11.4: Statistical Parameters for Duplicates of Diamond Drill Samples analyzed by Fire Assays
149
Table 11.5: Statistical Parameters for Fokolore RC Drill Sampling Standards Analyzed by Fire Assay
140
Table 11.6: Statistical Parameters for Fokolore RC Duplicate Samples analyzed by Fire Assays
143
Table 11.7: Statistical Parameters for Fokolore Auger Drill Sampling Standards Duplicates analyzed by Fire Assays
144
Table 11.8: Statistical Parameters for Fokolore Auger Drill Sample Duplicates analyzed by Fire Assays
146
Table 24.1. Diakha - Siribaya Project - Mineral Resource Estimates as of December 31, 2018
156
Table 26.1 Recommended 2021 Exploration Budget for the Maligonga-East permit
182

Independent Technical Report on the Maligonga-East Gold Project

SUMMARY

1.1. EXECUTIVE SUMMARY

The Maligonga-East gold project consists of an exploration license for gold and associated minerals covering a surface area of 100 km² in the Kedougou-Kenieba Inlier of Western Mali – West Africa.

The Malian Ministry of Mine granted the Maligonga –East license to Fokolore Mining Sarl on October 11[th] 2019 by decree No 2019-3557/MMP-SG.

On December 20[th] 2020. Fokolore Mining Sarln 1273795 BC Limited and Gonka Mali Sarl entered into an agreement to

  • Establish Gonka Gold Mali Sarl as a joint venture between 1273795 BC Limited (holding 75% of the issued share capital) and Fokolore (holding 25% of the issued share capital) and

  • Transfer Fokolore’s interest in the Maligonga East-gold property to Gonka Gold Mining Sarl.

On August 17[th] 2021, the permit was transferred to Gonka Gold Mali Sarl by decree No 20213047/MMEE/MG-SG.

On January 6[th] 2021, Waraba Gold Limited (formerly Zenith Exploration Inc.) entered into a three-cornered amalgamation agreement pursuant to which 1278820 BC Limited (wholly owned by Waraba Gold Limited) and 1273795 BC Limited were amalgamated into a new wholly owned subsidiary of Waraba Gold Limited named 1285074 BC Limited.

On January 24[th] 2022 the permit was renewed by decree No 2022-028/MME-SG-DU for a further two-year period.

Pursuant to the transactions noted above, Gonka Gold Mali Sarl is now a joint venture between Waraba Gold Limited and Fokolore Mining Sarl. Waraba Gold Limited holds 75% of the issued share capital (through a wholly owned subsidiary, 1285074 BC Limited) and Fokolore Mining Sarl holds 25% of the issued share capital.

Fokolore Mining Sarl (Fokolore) is a Malian private limited exploration and development company focused primarily on mining, mine development and exploration in Mali. The company is based in Bamako, Mali. Fokolore is represented by Mr. Amadou Baouro Cisse, General Manager.

Waraba Gold Limited is a Canadian public exploration and development company listed on the CSE and OTC and is based at 789 West Pender Street, Suite 1080, Vancouver, British Colombia, Canada. Waraba trades on the CSE under the symbol “WBGD” and the OTC under the symbol “WARAF”. The company is represented by Carl J. Esprey, Chief Executive Officer and Director.

This Independent Technical Report NI 43 101 summarizes the available technical information on the Maligonga-East gold project. This report concludes that the Maligonga-East property has high potential to host economic gold mineralization and therefore, merits and warrants additional exploration expenditures. An exploration work program is recommended, which comprises of Reverse Circulation (RC) and Air Core drilling programs, to assess the gold potential resources and reserves of the project. These recommended

Page 1 of 193

Independent Technical Report on the Maligonga-East Gold Project

work programs will advance the project to a resource estimation and a Preliminary Economic Assessment (PEA) stage. BGR-Consult believes that Waraba can deliver the recommended work programs prior to the expiry of the Maligonga-East license.

Birima Gold Resources Consulting (BGR-Consult) has been mandated by Waraba to prepare an Independent Technical Report on the Maligonga-East gold project consistent with the Canadian Securities Administrators National Instrument 43-101, Companion Policy 43-101CP, and Form 43-101F1 (“NI 43101”). The Qualified Person responsible for the preparation of this report is Mr. Olufemi Ajayi, (MAIG), Consulting Geologist with BGR-Consult, the main author and responsible for the overall preparation of this Independent Technical Report. Mr. Ajayi visited the Maligonga-East gold project from September 26 to October 2, 2021.

Page 2 of 193

Independent Technical Report on the Maligonga-East Gold Project

1.2. CONCLUSIONS

The Maligonga-East gold project consists of an exploration license covering a surface area of 100 km² in the Kofi Formation of the Daléma Basin, Western Mali – West Africa. Successive exploration works completed by BGRM (1987-1002), Ressources Robex Inc (2007-2008), Cluff Gold Plc (2012) and Fokolore Mining Sarl (2015-2018) were professionally managed and procedures were consistent with generally accepted industry best practices. The exploration data from termite mounds, soils and rock-chip geochemistry sampling, geophysical survey, trenches and drilling are sufficiently reliable to confidently allow interpretation of the gold mineralization in the Maligonga-East property and planning of an extensive drilling program over existing gold deposits and in areas that have not been drill-tested.

Early termite mounds geochemistry survey and trenches from BRGM in 1992, geophysical survey and RC drilling south of the Mamadouya target zone completed by Robex between 2007 and 2008, infill termite mounds geochemistry sampling, geophysical survey and extensive RC drilling by Cluff in the Mamadouya zone in 2012 and geological and structural mapping and interpretations, Auger and RC drilling completed by Fokolore between 2015 and 2018 resulted in the identification of the Mamadouya gold mineralization of the Maligonga-East property and numerous others anomalous zones of gold mineralization targets. Drilling programs completed by Cluff and Fokolore intercepted high grade gold mineralization over the Mamadouya mineralization including [email protected]/t Au, [email protected]/t Au, 6m@16,43/t, 7m@6,06g/t Au, 7m@4,51g/t Au and 13m@2,7g/t Au.

Additional geological and structural interpretations by BRG-Consult in 2020 determined the geological and structural setting of the area and the style of the gold mineralization, established a conceptual geological and structural model for the gold mineralization and identified the Mamadouya brittle-ductile shear zone that has a strong spatial correlation with the gold mineralization. The NNE-striking and steeply ENEdipping reverse-sinistral strike-slip shear zone system controls the gold mineralization of the Mamadouya gold mineralization and is identical to structures that host the nearby Siribaya (Iamgold Corp.), Kabaya (Roscan), Soro and Seko (Oklo Resources) gold deposits.

Geological and structural interpretations by BRG-Consult demonstrated that the Mamadouya gold mineralization is hosted in faulted and sheared contact between sedimentary successions of sandstone and siltstone of the Daléma Basin and suggested that the gold mineralization is structurally controlled and occurs in deformed zones of large and highly hydrothermally altered, NNE-striking, ENE-steeply-dipping, structural corridors that contain a complex network of extensional dilation fracture systems. New highgrade gold mineralization (including [email protected]/t Au and [email protected]/t Au) in RC drilling by Fokolore in 2018 over the Mamadouya mineralization show a possible northern extension of the deposit over 800 meters.

SAGAX AFRIQUE S.A carried out Induced polarization and Resistivity survey in the Mamadouya and Kabafing area of the permit and identified some anomalous zones which correlate with already identified structures and is good indication for mineralization.

Page 3 of 193

Independent Technical Report on the Maligonga-East Gold Project

The Maligonga-East permit is part to the Paleoproterozoic rocks of the Daléma Basin of the KedougouKenieba Inlier, in the Birimian Super group of West Africa that hosts several multi-million-ounce gold deposits (examples include Tabakoto, Gounkoto, Fekola, Diakha and Siribaya, Kabaya, Sory and Seko gold deposits). Geological and structural relationships demonstrate that the Mamadouya gold mineralization is a Mesothermal shear-zone-controlled, Intrusive related, Orogenic-type gold mineralization, hosted in greenstone folded and faulted sedimentary successions. The deposit structural evolution and the gold mineralization style is identical to the nearby Siribaya (Iamgold Corp.), Kabaya (Roscan), Soro and Seko (Oklo Resources) gold deposits. The Maligonga-East property can therefore, be considered as very prospective terrane to host economic gold deposit, considering that aggressive additional exploration works including extensive drilling programs will continue to further define and delineate additional gold mineralization.

Based on BGR-Consult’s site visit and subsequent review of available historical exploration information, BGR-Consult offers the following general comments and conclusions:

  • Historical exploration results on the Maligonga-East property indicate the presence of significant, near-surface gold mineralization with potential for economic gold discovery higher than previously expected. The Mamadouya gold mineralization is the highest priority exploration target within the Maligonga-East concession. Additional drilling and geochemical analysis are required to evaluate the resource and the economic potential of the prospect.

  • The assessment of and conclusions made in this report on the exploration potential of the MaligongaEast property is based on the historical exploration results, particularly the gold results obtained from historical geochemistry sampling and the RC and Auger drilling programs from BGRM, Robex, Cluff and Fokolore.

  • BGR-Consult concludes that the type of and amount of historical exploration works completed by BGRM, Robex, Cluff and Fokolore and data generated by this work for the Maligonga-East property provides an adequate basis for the review and assessment of exploration potential provided in this technical report, and the recommendations made herein.

  • Any significant variations of the reported historical results could impact the conclusions and work recommendations made in this report.

  • The normal risk associated with exploration project exists, so there is no guarantee that the proposed exploration work will identify economically viable gold mineralization on the property.

1.3. RECOMMENDATIONS

The Maligonga-East property is a relatively advanced exploration project and significant detailed works have led to the identification of the Mamadouya gold mineraliation with potential for containing an economic gold mineralization. BGR-Consult considers that the character and extent of the gold mineralization delineated is of sufficient merit to warrant additional exploration expenditures. BGRConsult recommends an exploration work program that - if implemented - will advance the project to a resource and reserve estimations and a pre-feasibility study stage.

Page 4 of 193

Independent Technical Report on the Maligonga-East Gold Project

The following recommendations for additional exploration work on the Maligonga-East property are proposed. Phase I Reverse Circulation (RC) and Air Core (AC) drilling programs and Phase II Reverse Circulation (RC) and Air Core (AC) drilling programs are recommended to advance the project and to test new anomalies identified by the Induced Polarization and Resistivity survey in areas that have not been test drilled previously in the Mamoudouya and Kabafing areas respectively. The budget is estimated for each drilling phase and is for the proposed field and administrative costs, logistics and contractors, but do not include any corporate management fees.

1.3.1. DRILLING

1.3.1.1. Recommended Phase I Drilling Program

a. RC Drilling Program

The detailed structural, geological interpretation and modelling on the Mamadouya gold mineralization resulted in a coherent and comprehensive new geological and structural model that gives a better understanding of the structural setting and the style of the gold mineralization. This has formed the basis for to re-orient further drilling programs. The proposed Phase I RC drill program will test and expand the Mamadouya gold mineralization and its immediate northern extension. It will also test the interpreted structural and geological model of the mineralization. The recommended Phase I RC Drilling Program in relation to the modelled ore zone is shown in Figure 1.1 to 1.3.

The objectives are therefore, to:

  • Test the proposed geological and structural model of the gold mineralization

  • Test a strike length of 2.3 km over the interpreted mineralized structure

  • Define and delineate the lateral and down dip dimensions of the gold mineralization within the interpreted structure

  • Drill 178 holes cutting across 19 cross sectional lines across the mineralized zone, amount to 21,360m of drilling in total

  • Holes to be drilled with Azimuth = 90[o] , Dip = 90[o] and an average depth of 120 meters.

b. Air Core Drilling Program

The Phase I Air Core drilling program is based on the positive termite mounds geochemistry results. These anomalies appear to be aligned with interpreted structures in the area and have not been test-drilled in previous drilling programs. The objectives of the Air Core drilling Program will be to enable high confident in-situ anomalies and to identify additional target zones of gold mineralization which may warrant further drilling programs.

BGR-Consult recommends 206 Air Core drill holes with an average of 20m depth making a total of 4120m to be drilled at 90[o] dip.

Page 5 of 193

Independent Technical Report on the Maligonga-East Gold Project

1.3.1.2. Recommended Phase II RC and AC Drilling Program

The Phase II RC and AC drilling program is a follow up on identified targets that have been picked up by geochem and the recently concluded Induced Polarization and Resistivity surveys over the Kabafing area of the Gonka Gold Permit. It is aimed at testing the newly identified un-tested anomalies, to develop potential zones of gold mineralization, resource expansion and discovery of new deposits beyond the Mamoudouya area.

The RC drilling in phase II would be 27 drill holes across 8 cross sectional lines with an average depth of 120m making a total of 3350m.

152 Air Core drill holes are recommended to test the chargeability and resistivity anomalies from the Induced Polarization and Resisitivity survey across 8 cross sectional lines at an average depth of 20m and 90[o ] dip angle. A total of 3040m depth is targeted at this phase.

==> picture [415 x 411] intentionally omitted <==

Figure 1.1: Recommended Phase 1 RC drill program in Mamoudouya gold mineralization

Page 6 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [434 x 244] intentionally omitted <==

Figure 1.2: Long section view of Recommended Phase I RC drilling Mamodouya gold mineralization

==> picture [438 x 358] intentionally omitted <==

Figure 1.3: Recommended Phase II drill program in Kabafing prospect

Page 7 of 193

Independent Technical Report on the Maligonga-East Gold Project

1.3.2. RECOMMENDED BUDGET

Detailed costs were provided by Waraba and were applied to the various categories in the estimated budget in Table 1.2. BGR-Consult considers these costs to be reasonable and in line with current costs in the region. Costs for the recommended work program are based on an estimated completion time of 12 months.

An approximate 1-year recommended exploration budget of approximately 3M US$ is outlined in the following Table based on a systematic exploration program as recommended above.

==> picture [448 x 126] intentionally omitted <==

Table 1.1: Recommended Exploration Budget for the Maligonga-East permit

Page 8 of 193

Independent Technical Report on the Maligonga-East Gold Project

1.4. TECHNICAL SUMMARY

1.4.1 PROPERTY LOCATION

The Maligonga-East property is located within the Region of Kayes, in the southwest of the Republic of Mali (Figure 1.3). The Region of Kayes shares borders with Senegal to the west and Guinea to the south

The property is located approximately 50 km south of the city of Kéniéba, the southernmost sections of the Region of Kayes. It is approximately 400 km west of Bamako, Mali’s capital city.

==> picture [464 x 278] intentionally omitted <==

Figure 1.4: Location of the Maligonga-East gold property in southwest Mali, West Africa

1.4.2. PROPERTY DESCRIPTION AND LAND TENURE

The Maligonga-East property consists of an exploration license for gold and associated minerals covering a surface area of 100 km² within the Kéniéba prefecture of the Kayes Region, some 400 km west of Bamako, the capital of Mali (Figures 1.3). The center point of the project area is at approximately 275000mE, 1378000mN (WGS84, UTM Zone 29 N). The Malian State is the owner of all mineral rights in the country, and the mines minister has responsibility for the administration of mining and exploration activities.

On June 10[th] 2016, The Malian State granted the Maligonga-East permit to Fokolore Mining Sarl by decree N[o] 2016-2006/MM-SG. The Permit covered a surface area of 109 km². On October 11[st] 2019, the Maligonga-East permit was renewed by decree N[o] 2019-3557/MMP-SG for a further two-year period. The Permit area was reduced at 100 km² (Appendix 1).

On December 1[st] , 2020, Waraba Gold Limited signed a joint-venture earn-in agreement with Fokolore to acquire 75% interest in the Fokolore’s Maligonga-East property. On August 17[th] 2021 the permit was

Page 9 of 193

Independent Technical Report on the Maligonga-East Gold Project

transferred to Gonka Gold Mali Sarl by decree No 2021-3047/MMEE/MG-SG. On January 24th 2022 the permit was renewed by decree No 2022-0028/MMEE-SG-DU for a further two-year period.

1.4.3. REGIONAL GEOLOGY

The Maligonga-East gold project is located in southern Mali within the Leo-Man Shield of the West African Craton. At a regional scale, the property is hosted within the Kofi Series of the Kedougou-Kenieba Inlier (KKI). The stratigraphy of the KKI from west to east consists of: 1) bimodal volcanic intruded by numerous plutonic complexes in the Mako Volcanite Belt; 2) detrital sedimentary rocks of the Dialé-Daléma basin, which are intruded by the Saraya batholith; 3) calc-alkaline volcaniclastic rocks of the Faleme Volcanites Belt (FVB) and; 4) siliciclastic sediments of the Kofi Series, unconformably overlain by Neoproterozoic sedimentary rocks to the east (Figure 1.4).

The plate-scale NS-trending Senegal-Mali Shear Zone separates the Kofi Series from the FVB (Figure 1.4). The Kofi Series is made up of detrital sediments dominantly wackes, with end member sandstone (rare) and argillite (common). The igneous rocks that intruded the Kofi Series include dolerite to monzodiorite dykes and small stocks of quartz feldspar porphyry. The age of deposition in the Kofi Series is constrained by detrital zircons and intrusive plutonic rocks by Pb-Pb at 2093 ± 7 Ma (Boher et al., 1992).

==> picture [468 x 357] intentionally omitted <==

----- Start of picture text -----

LEGEND
----- End of picture text -----

Figure 1.5: Regional geology map of the KKI showing the location of the Maligonga-East gold project

Page 10 of 193

Independent Technical Report on the Maligonga-East Gold Project

1.4.4. PROPERTY GEOLOGY

Interpretation of the drill sections and the integrated geophysical lineaments, the geological and structural modeling of the Mamadouya gold mineralization (Figure 1.5) suggest that the area is composed of three lithological units:

  • (1) Early Paleoproterozoic greenschist facies turbidite sedimentary sequences belonging to the Kofi Formation and composed of:

  • alternating layers of sandstone (greywacke) and siltstone that hosts the gold mineralization, locally interbedded with graphitic shales to the west

  • alternating layers of siltstone and argillite to the east (Figure 1.5)

The turbidite sequence forms the main component of the sedimentary rocks. The rock is generally quite massive and composed of alternating centimetric to metric coarse-grained sandstone (greywacke) and fine-grained siltstone layers but show penetrative foliation and fractures in zone of deformation.

  • (2) Concordant Eburnean NNE-striking, Steeply ENE-dipping (80-85[0] ) pink granite intrusive dykes intruding the Early Paleoproterozoic sedimentary rocks (Figure 1.5). The intrusive dyke is interpreted as granodiorite of felsic to intermediate in composition. The rock seems to be a pink granodiorite with abundant pink frequent feldspar phenocrysts as well as amphibole pheno’s in a fine-grained ferromagnesian groundmass. The granodiorite has locally a heterogeneous texture reflecting a compositional heterogeneity due to hydrothermal alteration.

  • (3) Late dolerite dikes form a swarm crosscutting all previous rocks. They are undeformed, strike northnorth-east, are concordant to the main direction of the sedimentary unit and form a prominent high relief in the northern portion of the Maligonga-East permit (Figure 1.5). The dolerite dikes are interpreted to extrude the Basin during the Mesozoic at ca. 200 Ma and are probably related to far field tectonic events during global-scale rifting and breakup of the Pangea supercontinent leading to opening of the Atlantic Ocean.

1.4.5. STRUCTURES

The major structure within the project area is the Senegal-Mali Shear Zone (SMSZ). The SMSZ is a regional-scale reverse-sinistral brittle-ductile shear zone that forms a 1-10 km wide NS trending corridor of varying deformation styles, and separates the Kofi Series from the Faleme Volcanite Belt (FVB). Secondary and higher order splays off the SMSZ host the major Au deposits in the Kofi Series, including Gara, Yalea, Sadiola, Tabakoto Fekola Segala Yatela and Gounkoto. Field relationships suggest that gold mineralization in the region is probably coeval with latter stages of shear zone development. Major gold deposits are spatially associated with generally NE-SW subsidiary structures splaying off the main SMSZ.

The main structure that controls the gold mineralization in the Mamadouya prospect is interpreted as a splay off the SMSZ. It strikes NNE, steeply dips ENE and is concordant with the trend of the lithological bedding. The structure deformed both the intrusive rocks and the sedimentary unit. The gold mineralization is contained into the hanging-wall side of the fault structure and occurs in zone extensional and dilation fracture systems.

Page 11 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 618] intentionally omitted <==

Page 12 of 193

Independent Technical Report on the Maligonga-East Gold Project

Cross-Section A

==> picture [468 x 125] intentionally omitted <==

Cross-Section B

==> picture [467 x 102] intentionally omitted <==

----- Start of picture text -----

LEGEND
Geology Structure
Main Shear Zone
Sandstone - Siltstone
Late Fault System
Argillite - Siltstone Faulted Lithological Contact
Birimian Granite Gold Mineralization
Dolerite Dyke Gold Mineralized Structure
----- End of picture text -----

Figure 1.6.: Interpreted Geological and Structural Map of the Mamadouya Gold mineralization showing geological units, structural elements and the interpreted gold mineralized structure.

1.4.6. MINERALIZATION

Gold mineralization at Maligonga-East is a mesothermal, shear-zone-controlled, intrusive-related, orogenic -type mineralization, hosted in greenstone folded and faulted sediments, consistent with the majority of Proterozoic terrains, including the Birimian Series of West Africa. This style of mineralization is generally associated with regionally metamorphosed and deformed terrains. As such, the gold mineralization is structurally, rather than lithologically controlled. At Maligonga East, gold is developed along a high-angle NNE-striking, steeply ENE-dipping sinistral-reverse fault (Figure 1.5) and preferentially hosted in the more permeable, coarser-grained greywacke rocks and in a lesser extend in the siltstone and the granodiorite rocks. Gold occurs in deformed zones of large and hydrothermally altered, structural corridors that contain a complex network of extensional dilation fracture systems (Figure 1.5). Gold occurs as dissemination into the host rocks and is associated with pyrite, pyrrhotite, and arsenopyrite. Key alteration associated with the gold mineralization are silicification, calcite and chlorite suggesting low temperature formation during gold deposition typical of shear zone type orogenic gold mineralization in greenstone belts.

Page 13 of 193

Independent Technical Report on the Maligonga-East Gold Project

1.4.7. EXPLORATION HISTORY

Successive exploration works were completed by BGRM, Resources Robex Inc, Cluff Gold Plc and Fokolore Mining Sarl between 1987 to 2022 in the Maligonga-East property. The following Table summarizes exploration works competed in the Maligonga-East permit from 1987 to 2018.

PROGRAM BRGM Robex Cluff Fokolore TOTAL
1 987
1 992
2005 - 2006 2 012 2 016
2 017
2 018
Regional Soil SamplingSurvey 440 473 913
Infill Termite SamplingSurvey 4 828 4 828
Rock chips Sampling 98 98
Geophysical Survey Ground Induced
Polarization(IP)
Ground Induced
Polarization(IP)
Trench Num
Meters
6
1 410
1
150
7
1 560
Auger Drilling Num
Meters
586
4 748
586
4 748
RC Drilling Num
Meters
17
1 614
99
12 276
61
4 920
177
18 810

Table 1.2: Exploration works completed in the Maligonga-East permit from 1987 to 2018

1.4.7.1. Exploration Programs Completed by BRGM between 1987 and 1992

In 1987, BGRM completed the first regional termite mounds survey on the Maligonga-East permit. The sampling grid covered the southern and eastern portion of the permit. A total of 440 termite mounds samples were collected. Results of this sampling program outlined a pronounced gold anomaly in the Mamadouya zone extending up to 5 km long and trending NNE. In 1992, BRGM completed 6 trenches in the Mamoudouya zone totaling 1410 m. Best results included: [email protected]/t Au, [email protected]/t Au, [email protected]/t Au, and [email protected]/t Au.

1.4.7.2. Exploration Programs Completed by Ressources Robex Inc. between 2005 and 2007

The first exploration works including drilling and geophysical survey on the Maligonga-East permit were carried out by Ressources Robex Inc. in the Wili Wili gold concession that encompassed the south portion of the Maligonga-East permit. Exploration works carried out by Robex from 2006 to 2007 consisted of a ground Induced Polarization (IP) geophysical survey over the Mamoudouya anomaly zone followed by a program of reverse circulation drilling (RC). 17 RC holes totaling 1,614 m were drilled in the Mamoudouya target: Results of this first drilling program in the Mamoudouya anomaly zone were not encouraging

1.4.7.3. Exploration Programs Completed by Cluff Gold Plc in 2012

In 2012, Cluff Gold Plc completed a follow-up termite mounds geochemical survey focused on the Maligonga-East permit. The program covered most of the permit on a grid pattern of 200x50m. A total of 4858 termite mounds samples were collected. Results of this infill sampling survey delineated a strong gold anomaly centered on the Mamadouya target, extending up to 10 km and trending in the north-north-east direction. Many other clusters of gold anomalies were also outlined throughout the permit.

Page 14 of 193

Independent Technical Report on the Maligonga-East Gold Project

Following positive results from the follow-up geochemical survey, Cluff contracted Terra Tec to complete a ground IP (Induced Polarization) geophysical survey on the Maligonga-East permit. The survey covered the Mamadouya anomaly zone. The objective of the ground Induced Polarization and Resistivity survey was to investigate the geological structures in the Mamoudouya target that control the gold mineralization. A strong IP anomaly trending in the north-north-east direction and spatially associated with the surface gold anomaly was defined.

Cluff, completed a RC drilling program consisting of 99 RC holes totaling 12,276 m on a grid pattern of 100x60m centered on the Mamadouya gold target. The objectives were to test the large Mamadouya gold anomaly. Holes were inclined -55° with an azimuth of 280°. RC holes were 125 to 60 meters deep. Best results of the RC drilling program included: 3m@8,77g/t Au, 4m@5,37g/t Au, 4m@1,52g/t Au, 13m@2,66g/t Au, 3m@4,31g/t Au, 7m@6,06g/t Au, 4m@3,58g/t Au, 5m@3,11g/t Au, 7m@4,51g/t Au, and 6m@16,43g/t Au.

1.4.7.4. Exploration Programs Completed by Fokolore from 2015 to 2018

In 2016, Fokolore carried out a detailed compilation, analysis, and interpretation of previous exploration data. Fokolore completed a detailed field geological, structural and regolith mapping over the Mamadouya gold target and a litho-geochemistry sampling. 98 rock chip samples were collected and analyzed. The results of the grab sampling program were considered as encouraging by Fokolore. A black shale sample containing quartz stockwork veins returned results of 95 g/t Au (with visible gold grains). 10 others samples returned high gold grades with values > 0.5 g/t Au including 3,5g/t Au, 3,84g/t Au, 1,18g/t Au, 1,23g/t Au, 1,37g/t Au, and 1,19g/t Au.

Fokolore completed an extensive Auger drilling program consisting of 586 holes totaling 4,748 m on a grid pattern of 200x50m. Auger drill holes were vertical and depth varying from 10 to15 m. The objectives were to test the lateral and depth extensions of the gold anomalies at surface and the gold mineralization in rock chip samples. Best results from the Auger drilling included [email protected]/t Au and [email protected] g/t Au.

Following positive results from detailed structural and geological field mapping, Auger drilling program, lithogeochemistry sampling and the detailed data compilation and re-interpretation completed in the Maligonga-East permit between 2016 and 2017, Fokolore completed in 2018, 4,920 meters RC drilling program totaling 61 RC holes. RC holes were drilled with various azimuth and inclined -50[o] with depth varying between 50 and 120 meters, 5,725 samples were collected. The objectives were to test the spatial close relationships between the surface gold anomalies and interpreted shear zone systems in the area.

The drilling results was encouraging and confirmed the depth and lateral extension of the mineralization previously intercepted by Cluff. The RC drill holes intercepted large zones of alteration that affect the sediments that generally contain abundant stockwerk of quartz veins. The best gold values intercepted in drill holes included: [email protected] g/t Au (Incl. [email protected]/t Au), [email protected] g/t Au, [email protected] g/t Au., [email protected] g/t Au, [email protected] g/t Au and suggested a possible northern extension of the Mamadouya deposit over 800 meters.

The first-pass exploration works carried out by BGRM, Resources Robex Inc, Cluff Gold Plc and Fokolore Mining Sarl in the Maligonga-East permit returned encouraging results and suggests that the permit has

Page 15 of 193

Independent Technical Report on the Maligonga-East Gold Project

high potential to host very significant gold deposits. Gold mineralization is hosted within highly prospective, Birimian-deformed metasedimentary rocks. This potential should be subjected to future exploration works to outline and delineate gold resources that can be mined with profit

Page 16 of 193

Independent Technical Report on the Maligonga-East Gold Project

2 INTRODUCTION

2.1. Preparation

This Independent Technical Report has been prepared at the request of Waraba Gold Ltd. This report has been prepared in conformance with the Canadian Securities Administrator National Instrument 43-101, Companion Policy 43-101CP and form 43-101F1 (NI 43101) for the Maligonga-East gold project in the Kéniéba prefecture and the Kayes Region of western Mali, West Africa.

The Qualified Person responsible for the preparation of this report is Olufemi Ajayi, the main author and responsible for the overall preparation of this report. Mr. Ajayi is a consulting geologist with 13 years’ experience in the mining sector. Mr. Ajayi is a registered member of the “The Australian Institute of Geoscientists” (MAIG 7790).

The Qualified Person of this report does not have any material interest in Waraba Gold Ltd or related entities or interests. His relationship with Waraba Gold Ltd is solely one of professional association between client and independent consultant. This report is prepared in return for fees based upon agreed commercial rates and the payment of these fees is in no way contingent on the results of this report,

2.2. Purpose of the Report

Significant exploration work has been completed on the Maligonga-East property by different companies since 1987. Early soil geochemistry survey and trenches from BRGM in 1992, geophysical survey and RC drilling south of the permit completed by Robex between 2007 and 2008, geophysical survey and extensive RC drilling by Cluff in 2012 and Auger and RC drilling completed by Fokolore between 2017 and 2018 resulted in the identification of the Mamadouya gold mineralization and numerous others clusters of gold mineralization targets. Additional geological and structural interpretations and modelling by BRG-Consult in 2020 determined the geological and structural setting of the area and the style and control of the gold mineralization, established a conceptual geological and structural model for the gold mineralization and demonstrate that the Maligonga-East property is a very prospective terrane and has a high potential for hosting an economic gold mineralization.

The purpose of this report is to compile and update all the technical information in a text format compliant to the NI43-101 of the Canadian Commission Securities in order to evaluate the gold potential in the Maligonga-East gold property and to provide recommendations for future exploration works.

2.3. Source of Information and Data

Information in this report was provided to BGR-Consult by Waraba Gold Ltd. The data set consists of company information, exploration results and associated assays, company exploration reports along with information collected by BGR-Consult during a site visit from September 26 to October 02, 2021. BGRConsult has no reason to doubt the reliability of the information provided by Waraba Gold Ltd. The following are sources of information:

  • Discussions with Mamadou Coulibaly, Exploration Manager for Waraba Gold Ltd in Mali

Page 17 of 193

Independent Technical Report on the Maligonga-East Gold Project

  • Inspection of the Maligonga-East property during the site visit. The purpose of the visit was to confirm the local geological setting and identify any factors which might affect the project.

  • Review of exploration data including technical reports from BRGM, Robex, Cluff and Fokolore

  • Additional information from Waraba Gold Ltd’s public domain sources

  • The Legal opinion issued to Waraba Gold Limited by SCPA JFC Avocats Mali, dated 27 April 2022.

BGR-Consult has reviewed the data provided and utilized it to develop independent opinions and interpretations. The author has been diligent in checking and verifying much of the data through field studies. No discrepancies or significant errors have been identified; therefore, BGR-Consult assumes and believes the rest of the project data provided is similarly accurate and correct and is therefore relied upon for preparation of this report.

BGR-Consult’s interpretations and opinions expressed in this report are based on the original information from the company’s exploration, trenching, drilling and sampling programs along with his extensive experience in West Africa and, in particular in Mali. In addition, the author spent 3 days on site inspecting artisanal mining activities, geological and structural relationships on outcrops and RC chipboard from recent drilling programs.

Page 18 of 193

Independent Technical Report on the Maligonga-East Gold Project

3. RELIANCE UPON OTHER EXPERTS

This report has been prepared by BGR-Consult for Waraba Gold Ltd. The information, conclusions, opinions, and estimates contained herein are based on:

  • Information available to BGR-Consult at the time of preparation of this report,

  • Assumptions, conditions, and qualifications as set forth in this report,

  • Data, reports, and other information supplied by Waraba Gold Ltd including several internal technical exploration reports and datasheet prepared by BRGM in 1992, Robex between 2007 and 2008, Cluff in 2012 and by Fokolore between 2017 and 2018 and Excel spreadsheet assay results from the SGS, PROSLAB and Analab laboratories in Mali,

  • Tenure documents were provided by Mamadou Coulibaly, Exploration Manager for Waraba Gold Ltd in Mali, and

  • The Legal opinion issued to Waraba Gold Limited by SCPA JFC Avocats Mali, dated 27 April 2022.

For the purpose of this report, BGR-Consult has relied on ownership information, both historical and recent, provided by Waraba Gold Ltd. BGR-Consult has not researched property title or mineral rights for the Maligonga East project and expresses no opinion as to the ownership status of the property. BGR-Consult has not independently investigated the legal title of the license and reclamation status of the property.

The author visited the Maligonga-East Property from September 26 to October 2, 2021. This site visit was undertaken to obtain independent observation of the geological and structural setting of the permit and to locate evidence of the historical exploration drilling and trenching activities completed by various exploration companies. The author did not take any samples during the site visit

Page 19 of 193

Independent Technical Report on the Maligonga-East Gold Project

4. PROPERTY DESCRIPTION AND LOCATION

4.1. Location

The Maligonga-East project is located within the Region of Kayes, in the southwest of the Republic of Mali (Figure 4.1). The Region of Kayes shares borders with Senegal to the west and Guinea to the south. The property is located approximately 50 km south of the city of Kéniéba, in the prefecture of Kéniéba, the southernmost Cercle in the Region of Kayes. It is approximately 400 km west of Bamako, Mali’s capital city.

NORTH

==> picture [468 x 282] intentionally omitted <==

Figure 4.1: Location of the Maligonga-East gold property in southwest Mali, West Africa

4.2. Property Description and Ownership, Ownership Obligations. Government Participation, Royalties and Encumbrances

The Maligonga-East property consists of an exploration license (“Permis de Recherche Minière”) for gold and associated minerals covering a surface area of 100 km² in western Mali (Figures 4.1). The center point of the project area is at approximately 275000mE and 1378000mN (WGS84, UTM Zone 29 N) (Figure 4.2). The Malian State is the owner of all mineral rights in the country, and the mines minister has responsibility for the administration of mining and exploration activities. The Malian Ministry of Mine granted the Maligonga-East license to Fokolore Mining Sarl on October 11 2019 by decree N[o] 20193557/MMP-SG.

On August 17[th] 2021, the permit was transferred to Gonka Gold Mali Sarl by decree No 20213047/MMEE/MG-SG.

Page 20 of 193

Independent Technical Report on the Maligonga-East Gold Project

On January 24[th] 2022 the permit was renewed by decree No 2022-0028/MMEE-SG-DU for a further twoyear period.

Pursuant to agreements dated December 20[th] 2020 and January 6[th] 2021(as described above) Gonka Gold Mali Sarl is a 75:25 joint venture between Waraba Gold Limited (through its wholly owned subsidiary,1285074 BC Limited) and Fokolore Mining Sarl.

==> picture [360 x 530] intentionally omitted <==

Figure 4.2: Maligonga-East permit (white outline) in southwest Mali and existing mines and advanced projects

Page 21 of 193

Independent Technical Report on the Maligonga-East Gold Project

Issuer’s title to/interest in the property

According to Waraba Gold Limited and the shares certificate of Gonka Gold Mali Sarl, the shareholding of the Maligonga-East permit is as follows:

  • 75% to 1285074 BC Limited (a wholly owned subsidiary of Waraba Gold Limited)

  • 25% to Fokolore Mining Sarl

Since acquisition Waraba Gold Limited spent 804 445 USD in exploration expenditure on the property.

Details of the exploration expenditures are shown on the following table.

Description Expenditure (CAD$)
Human resources and Administration 194 834
Accomodation and Logistics 184 873
Sample tools and Analysis 201 241
Geophysics aeromagnetics survey 78 352
IP SurveyPhase_1 91 037
Data Compilation and interpretation 54 109
Total 804 445

Table 4.1: Summary of exploration expenditure on the property by Waraba Gold Limited

In order to maintain the Maligonga East Permit, Gonka Gold Mali Sarl is required to submit

  • Work program and budgets for the permit within thirty days of the granting of the exploration permit and yearly before 1 December for the following year;

  • Brief quarterly reports must be submitted in the first two weeks of the quarter, detailing the previous quarter's activities;

  • An annual report, submitted in the first quarter of the following year, detailing the year’s completed exploration activities; and

  • Details of the reporting structure on exploration activities and reporting of sampling and exploration results are given in the Arretes.

No further payments are required to maintain the Maligonga East Permit other than periodic surface taxes snd additional consideration payable to Folkore Mining Sarl contingent upon results of exploration. A production royalty (1.5% of the gross sales price of product sold) has also been granted by Gonka Gold Mali Sarl to African Minerals Exploration Resources-Mali Sarl, its services and logistic contractor/partner in Mali.

Page 22 of 193

Independent Technical Report on the Maligonga-East Gold Project

The Maligonga-East Permit was granted under the 2012 Mining Code adopted to supercede the 1999 Mining Code and regulate all prospecting, exploration and mining activities. And subsequently superceded by the 2019 Mining code (enacted into the Malian law by way of a Government ordinance No 2019-022/PRM dated 27[th] September 2019. Published in the Malian official Gazette on 30[th] October, 2019, the “Mining Code)

The key changes introduced by the 2019 Mining code include

  • Reduction of the initial validity period of large-scale exploitation permits from 30 to 10 years.

  • Reduction of tax and customs stability period granted to exploitation title holders from 30 years to 10 years to reflect the new initial validity period of large-scale exploitation permit.

  • More stringent obligations in relation to the protection of the environment (in particular during the exploration phase) and local content.

  • Obligation for exploitation titleholders to contribute to 2 newly created mining funds, namely a Local Development Mining Fund and a Fund for the Financing of Geological and Mining Research.

  • Removal of the prospection authorization and a new distinction between small scale exploitation permit versus large scale exploitation permit (instead of exploitation authorization of small mines versus exploitation permits under the previous mining legislation).

  • The ability for the Government to launch tenders for the issuance of exploration permits.

On the tax and customs front, the 2019 Mining Code introduced a number of provisions which increase the mining company’s financial burden, among those:

  • Capital gains tax applicable to direct and indirect transfers of mining titles or shares.

  • Progressive royalty in case of a significant increase in the sale price of mining commodities.

  • The reduced tax rate of 25% on industrial and commercial profits and corporate tax would only apply for 3 years after production starts (instead of 15 years under the previous mining legislation).

  • Removal of the 3-year VAT exemption for exploitation titleholders.

An Exploration Permit (Permis de recherche Minière) may be granted under the Mining Code by order of the Minister of Mines and covers an area of up to 250 km[2] for specified commodities with an initial period of up to three years. The permit may be renewed twice for two years, with a final renewal period of up to one year to finalize a feasibility study (eight years in total). Permit holders are obliged to report regularly to the Department of Mines on their exploration programs. An Exploration Permit grants its holder the exclusive right to explore for the commodity group specified within the boundary of the permit and to unlimited depth. In the event of the discovery of minerals not specified on the permit, the holder may request the extension of the permit providing it is free of any mining permit relating to this mineral.

AS regards relationship between mining title holders and land owners, according to the Mining Code:

  • No research or exploitation rights deriving from mining titles are valid without the consent of the owner of the land with regard to activities involving the surface or having an effect on it.

  • The title holder of a mining title and owner(s) of the land are free to agree the terms and conditions of occupation or use of the land necessary from mining activities (including research) as well as

Page 23 of 193

Independent Technical Report on the Maligonga-East Gold Project

the terms and conditions of passage over the land, but in the absence of reaching such an agreement regulations in force from time to time prescribe the “fair and prior” compensation which must be paid to the land owner(s) in return for which the land owner(s) must allow mining activities to proceed without interference. Accordingly, there are no circumstances in which Gonka Gold can be excluded from the land subject to the Maligonga East Permit.

  • After completion of mining activities, the title holder of a mining title is required to restore the land under cultivation to its previous state, restoring topsoil and roads.

  • The holder of a mining title shall identify the person concerned and determine the nature and extent of his right to the land whose occupation or use is envisaged in accordance with procedures specified by a joint order of the Minister responsible for Mines and the Minister in charge of land regulation.

An Exploration Permit may be awarded to any applicant that can provide proof of the technical and financial capacity to complete the exploration and meet with health, safety and environmental standards. The application must include the commodities to be explored for and a report detailing the proposed exploration program and budget. A Mining Permit (Permis d’exploitation Minière) may be granted for 30 years and is renewable for further periods of ten years until the mineral reserves have been exhausted.

A Mining Permit may be granted to the holder of an Exploration Permit or a Prospecting License. Holders of a Mining Permit are required to enter an agreement referred to as a “Convention d’Établissement” or “Mining Convention Agreement” with the Malian government prior to the commencement of exploration or mining activities and must begin work within three years.

A Mining Permit grants the holder the exclusive right to mine the specified commodities within the perimeter of the permit and to an unlimited depth. Proof of a mineable deposit must be provided by submission of a feasibility study. In addition, community development and mine closure plans must be submitted. A license can be transferred to third parties by inheritance or cession under certain conditions established by the Code.

In the event of the subsequent granting of an “operating license ” to the holder of an Exploration Permit, the Malian State have the right to a priority dividend (once the company is profit making) and have the right to acquire an equity participation of up to 10% subject to payment in cash for such additional participation.

4.2.1. Exploration Permit

The Maligonga-East permit was part of the Wili-Wili permit which, was first granted to Malian Goldfield Ltd Sarl for gold and associated minerals by decree N°05-2159/MMEE/SG on August 14[th] , 2005. The permit covered a surface area of 112 km² and was valid for two years renewable. In 2006, Malian Goldfield Ltd Sarl signed an agreement with Ressources Robex Inc to finance mineral exploration on the Wili-Wili project. This agreement lasted for two years at which time Robex withdrew from the partnership. Malian Goldfield Ltd Sarl maintained 100% ownership of the Wili-Wili Permit but relinquished the northern portion of the permit.

Page 24 of 193

Independent Technical Report on the Maligonga-East Gold Project

On May 9[th] 2011, the relinquished northern portion of the permit area was extended to 109 km[2] and granted as a new permit (Maligonga-East permit) to Cluff Gold Plc by Arrete No. 2011-1696/MM-SG. The Permit was renewed twice for two consecutive terms of two years each.

On June 10[th] 2016, The Malian State granted the Maligonga-East permit to Fokolore Mining Sarl by decree N[o] 2016-2006/MM-SG. The Permit covered a surface area of 109 km². On October 11[st] 2019, the Maligonga-East permit was renewed by decree N[o] 2019-3557/MMP-SG for a further two-year period. The permit area was reduced to 100 km². As of the date of this report, this license is valid and is renewable for another period of three years. On December 1st, 2020, Waraba Gold Limited signed a joint-venture earn-in agreement with Fokolore to acquire 75% interest in the Fokolore’s Maligonga-East property. On August 17th 2021 the permit is transferred to GONKA GOLD MALI Sarl by decree No 2021-3047/MMEE/MG-SG.

The Maligonga-East permit is valid and its correct outline is recoded on the “Direction Nationale de la Géologie et des Mines’s Mineral Cadastral of the Ministry of Mines under registration N[o] PR 15/797 1BISPermis de recherche de Maligonga-East (Cercle de Kéniéba).

Table 4.2 and Figure 4.3 show the corner points of the permit as of the effective date of this report.

Points Lat/Long Coordinates Lat/Long Coordinates UTM Coordinates WGS
84
Longitudes Latitudes UTM-X
UTM-Y
Degrees
Minutes
Seconds
Degrees
Minutes
Seconds
Point A
Point B
Point C
Point D
Point E
Point F
Point G
Point H
Point I
Point J
Point K
Point L
Point M
Point N
Point O
Point P
Point Q
Point R
Point S
Point T
11°
10'
02''
11°
05'
54''
11°
05'
54''
11°
04'
00''
11°
04'
00''
11°
02'
00''
11°
02'
00''
11°
00'
20''
11°
00'
20''
11°
00'
51''
11°
10'
51''
11°
01'
48''
11°
01'
48''
11°
02'
13''
11°
02'
13''
11°
03'
05''
11°
03'
05''
11°
04'
00''
11°
04'
00''
11°
10'
02''
12°
27'
03''
12°
27'
03''
12°
29'
28''
12°
29'
28''
12°
31'
27''
12°
31'
27''
12°
26'
00''
12°
26'
00''
12°
23'
02''
12°
23'
02''
12°
23'
57''
12°
23'
57''
12°
25'
42''
12°
25'
42''
12°
26'
00''
12°
26'
00''
12°
23'
52''
12°
23'
52''
12°
25'
16''
12°
25'
16''
264426
1377368
271952
1377368
271952
1381764
275396
1381764
275396
1385395
279048
1385395
279048
1375316
281950
1375316
281950
1369823
281014
1369823
281014
1371520
279304
1371520
279304
1374760
278574
1374760
278574
1375319
277007
1375319
277007
1371397
275396
1371397
275396
1373992
264426
1373992

Table 4.2: Corner coordinates for the Maligonga-East gold project (Coordinates are expressed in UTM-WGS 84 Map Datum Zone 29 North)

Page 25 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 419] intentionally omitted <==

----- Start of picture text -----

E F
1 3 85 0 00 mN 1385000 mN
C D
1 3 80 0 00 mN 1380000 mN
A B
P O G H
1375000 mN
1 3 75 0 00 mN
N
M
T S
L
R Q K
1370000 mN
1 3 70 0 00 mN
J I

3 km
mE
260000 265000 mE 270000 mE 275000 mE 280000 mE
mE mE mE mE mE
00 00 00 00 00
0 0 0 0 0
60 65 70 75 80
2 2 2 2 2
----- End of picture text -----

Figure 4.3: Maligonga-East “Permit de Recherche Minière” (black outline) as displayed in the Mining Cadastral records. UTM-WGS 84 Map Datum Zone 29 North

4.3 Environmental Liabilities

There are no known environmental liabilities relating to the Maligonga-East permit.

4.4 Other significant factors and risks

There is no reason to believe that there are any factors or risks that may affect the title, or the ability to perform work on the property. Access to the Maligonga-East property is sometimes difficult during the months of August and September, at the height of the rainy season, However, access is generally possible as there are no rivers or streams on or near the property that are subject to major flooding during the rainy season.

Page 26 of 193

Independent Technical Report on the Maligonga-East Gold Project

5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY

5.1. Accessibility

The Maligonga-East property is located within the Kéniéba District, an administrative sub-area of the Kayes Region, approximately 400 km by road west of Bamako, the capital of Mali and 80 km from the town city of Kéniéba (Figure 5.1). The Permit is located in the Dabia district prefecture. It can be easily accessed year-round by following the main paved highway connecting Bamako –Kita– Kéniéba (National Highway 7 or RN 7) or by air (aerodromes by Kéniéba and Dabia). From Bamako, Dabia can be reached in approximately 7 hours. From Diaba, the area is accessible by various bush and gravel roads passable to 4WD vehicles. Kéniéba has its own regional airport while a private airstrip, which can be used for emergency purposes, lies mid-way between Dabia and Diabarou.

==> picture [489 x 295] intentionally omitted <==

Figure 5.1: Main Access Road from Bamako to the Maligonga-East Gold Project

5.2. Climate

The Maligonga-East property is located in the Soudan-Sahel climatic region and has a continental subtropical climate characterized by two distinct seasons: a rainy season from July to October and a dry season from October to June. It is generally hot and dry from February to June (35°C to 45°C), humid and hot from June to November (30°C to 40°C), and relatively mild and dry from December to February (20°C to 25°C) (Figure 5.2). The annual Harmattan is a dry wind that blows from the north during the dry season. The average temperature is 28.6°C (83.5°F). Average monthly temperatures vary by 7.4°C (13.3°F). This indicates that the continentality type is hyperoceanic, subtype barely hyperoceanic. Total annual

Page 27 of 193

Independent Technical Report on the Maligonga-East Gold Project

precipitation averages 1152.5 mm (45.4 inches) which is equivalent to 1152.5 Liters/m² (28.27 Gallons/ft²). Kéniéba has a tropical wet and dry/ savanna climate with a pronounced dry season in the low-sun months, no cold season, wet season is in the high-sun months.

Drilling is generally not possible during the rainy season, due to high rainfall creating impassable rivers and roads. General fieldwork tasks tend to be restricted to the period from July to late October.

==> picture [468 x 293] intentionally omitted <==

Source: https://cdn.hikb.at/charts/meteo-average-weather/Kenieba-meteo-average-weather.png

Figure 5.2: Average monthly temperatures and Average yearly precipitation at Kenieba, Mali

5.3. Local Resources

The local population are essentially “orpailleurs” (artisanal gold miners) (Photo 5.1), shopkeepers, motorcycle repair mechanics and subsistence farmers who raise cattle and goats and carry out dry land grain, vegetable (including gourds) and fruit tree (mango) farming. The cultivation of gourds is for both cooking and gold panning activities, which is the principal economic activity in west and southwest Mali.

A large, experienced pool of local labor and a certain amount of heavy equipment is available in the nearby Dabia village. Heavy equipment such as bulldozers and trucks are available in Kéniéba, a further 27 km northwest along the RN24 and modern telephone communications, government offices, wholesalers and a small regional airport are also available there. Diabarou village hosts two mobile phone mast stations (Orange and Malitel), a primary school, a Community Health Centre (Centre de Santé Communautaire de Diabarou) and a pharmacy plus many mechanical workshops and several small trader stalls.

Page 28 of 193

Independent Technical Report on the Maligonga-East Gold Project

Artisanal mining location looking east from 277911E, 1379076N

==> picture [327 x 246] intentionally omitted <==

Mechanized artisanal mining site looking west from 277900E, 1379100N

==> picture [328 x 246] intentionally omitted <==

Figure 5.3: Typical artisanal mining area over the Maligonga-East property (photos taken during September 2021 site visit)

Page 29 of 193

Independent Technical Report on the Maligonga-East Gold Project

5.4. Infrastructure

Local infrastructure in the Kéniéba District is poor, with few supplies or support services available. There is some gravity-fed public water supply in Kéniéba and the surrounding villages are supplied by boreholes. Mines are responsible for their own water supplies. There is no available national electrical power grid near the permit area and mines are responsible for their own power supply. Electricity is supplied by diesel power generators in many of the villages. The closest potential source of hydro-electrical power is the Manantali Dam located about 100 km to the northeast of the property on the Bafing River, a tributary of the Senegal River which flows northwest to the Atlantic Ocean.

The power produced is split between Mali, Senegal and Mauritania and is very unreliable. The state telephone company, SOTELMA, operates a telephone service in the village of Kéniéba. Cellular telephones are connected to the national grid and communication around the permit is possible by cellular phones. Health services are poor with the nearest basic health services found in Kayes and Kéniéba with more advanced services limited to Bamako. Serious medical conditions would require evacuation to Europe. Other than the Project will rely on use of the existing road infrastructure.

5.5. Physiography

The relatively low-lying and gently rolling countryside is made up of several plateau or erosional peneplains, which are capped with in-situ lateritic crusts or carapaces, while some deposits of eroded laterites also occur. The high clay content of the termite mounds provides a suitable substrate for retaining any gold that may be present in the soil profile. The permitted region is generally flat and characterized by gentle, flat-topped to gently-rolling laterite hills.

The Falémé river flows from east to west at, or close to the boundary with the southern permits and drains to the northwest where it forms a natural border with Senegal. Numerous moderately well-developed rivers and drainage channels are fed in the wet season by run-off from the lateritic plateaus. The Permit area is situated in a relatively low-lying savannah cut by intermittent streams. Elevations within the project ranges from 340 m ASL (above sea level) along the flood basins of the main rivers to 811 m ASL in the northwestern corner of the permit which is the summit of late dolerite dikes intrusion

Page 30 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [467 x 315] intentionally omitted <==

Figure 5.4: Summary of Project Physiography

The vegetation is generally composed of open grasslands (savannah-type) with arable fields, and large areas of open woodland consisting of small trees and shrubs (acacia, shea, ficus, baobab). Larger trees are found closer to drainages areas (palm trees and liana) and flood plains (bombax, mango trees). There is very little local wildlife, but the region has warthogs, monkeys, antelopes and snakes (vipers, mambas).

Page 31 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [303 x 8] intentionally omitted <==

----- Start of picture text -----

Access road into the permit area showing surrounding vegetation at 278621E, 1379406N
----- End of picture text -----

==> picture [435 x 200] intentionally omitted <==

==> picture [135 x 8] intentionally omitted <==

----- Start of picture text -----

Typical vegetative cover within permit
----- End of picture text -----

==> picture [435 x 221] intentionally omitted <==

Figure 5.5: Typical Vegetation within the Maligonga-East Permit (photo taken during September 2021 site visit)

Page 32 of 193

Independent Technical Report on the Maligonga-East Gold Project

6. HISTORY

6.1 Summary of the gold exploration history in the Maligonga-east permit from 1992 to 2018

The Maligonga-East gold project is situated in a region that is well known for artisanal mining for decades. There is visible evidence of artisanal mine workings throughout the permit and mainly along paleo-placers. Gold panning has been practiced for centuries in the Kéniéba area. The French colonizers were only able to develop the mineral resources of the area from the turn of the century by starting dredging in the Faleme.

Between the period 1230 and 1600, extensive artisanal mining in western Mali supported the Kanka Moussa Empire. Nowadays it is the main revenue for thousands of orpailleurs (artisanal miners). Their nonmechanized production is estimated at some 2 tonnes of gold per year.

Dredging in Mali dates back to 1910 when the Compagnie des Mines de la Falémé exploited gold on the Falémé River from the years before the First World War up to 1955 (McLane, 1977). Concessions at the time included 100 m of bank on either side of the river. Today Chinese alluvial miners continue this practice west of the ford, which crosses the Falémé River in the south of the Maligonga-East permit. Artisanal mining has been historically conducted on alluvial, lateritic soils and quartz vein deposits in the area with evidence of artisanal mining from immediately west of Dabia village at the north of the permits to the far west at the crossing of the Falémé River.

In the 1960s, SONAREM undertook a vast exploration campaign, especially alluvial, in western Mali. From 1960 to 1996 regional exploration program were carried out over the larger Kéniéba area by the French Bureau de Recherches Géologiques et Minières (BRGM) in cooperation with the DNGM, a department of the Ministry of Mines (BRGM, 1978 and 1982). These program targeted gold and base metal mineralization in the Paleoproterozoic and consisted of satellite image interpretation (Landsat) and regional geological field mapping and outcrop sampling, combined with regional soil geochemistry surveys. In the early to mid-2000’s detailed exploration work was focused on the Medinandi permit, 40 km southwest of Kéniéba.

From mid-1970 the Syndicat or (BRGM + Government of Mali) undertook a regional geochemical survey of western Mali. This geochemical survey was carried out at a 1600 x 500 m grid pattern, combined with geological mapping at a scale of 1: 50,000 over a large part of the Kéniéba region including the MaligongaEast permit. By the 1980s Klockner, with Funds from the European Union, undertook a large geochemical sampling which led to the discovery of the Sadiola and Yatéla gold deposits in western Mali. The same year, BRGM carried out a regional airborne geophysical survey combining magnetism and radiometry. BRGM's work led to the discovery of the Medinandi-Fekola deposit. In the early 1990s, several other junior companies explored in the province of Kéniéba, and near Maligonga-Est.

From 2001 to 2006 the SYSMIN program, with technical the assistance from Kevron / ECL, Fugro and BRGM / Map Geosystems, carried out airborne electromagnetic and radiometric surveys at a scale of 1/200,000 mapping the Malian Birimian. The Wili-Wili eluvial-alluvial place which extended for more than 1.5 km just south of the Maligonga-East permit has been described. The gold is localized in quartz veins, in meta-sediments containing sulphides (box works). Finally, several geological prospecting studies (trenches, regolith mapping, and RC drilling) had previously been carried out in this field by several

Page 33 of 193

Independent Technical Report on the Maligonga-East Gold Project

companies. In 1987, BGRM completed the first regional termite mounds survey on the Maligonga-East permit. The sampling grid covered the southern and eastern portion of the permit. A total of 440 termite mounds samples were collected. Results of this sampling program outlined a pronounced gold anomaly in the Mamadouya zone extending up to 5 km long and trending NNE. In 1992, BRGM completed 6 trenches in the Mamoudouya zone totaling 1410 m. Best results included: [email protected]/t Au, [email protected]/t Au, [email protected]/t Au, and [email protected]/t Au.

The first exploration works including drilling and geophysical survey on the Maligonga-East permit were carried out by Ressources Robex Inc. in the Wili Wili gold concession that encompassed the south portion of the Maligonga-East permit. Exploration works carried out by Robex from 2006 to 2007 consisted of a ground Induced Polarization (IP) geophysical survey over the Mamoudouya anomaly zone followed by a program of reverse circulation drilling (RC). 17 RC holes totaling 1,614 m were drilled in the Mamoudouya target: Results of this first drilling program in the Mamoudouya anomaly zone were not encouraging

In 2012, Cluff Gold Plc completed a follow-up termite mounds geochemical survey focused on the Maligonga-East permit. The program covered most of the permit on a grid pattern of 200x50m. A total of 4858 termite mounds samples were collected. Results of this infill sampling survey delineated a strong gold anomaly centered on the Mamadouya target, extending up to 10 km and trending in the north-north-east direction. Many others clusters of gold anomalies were also outlined throughout the permit. Following positive results from the follow-up geochemical survey, Cluff contracted Terra Tec to complete a ground IP (Induced Polarization) geophysical survey on the Maligonga-East permit. The survey covered the Mamadouya anomaly zone. Cluff, completed a RC drilling program consisting of 99 RC holes totaling 12,276 m on a grid pattern of 100x60m centered on the Mamadouya gold target. The objectives were to test the large Mamadouya gold anomaly. Best results of the RC drilling program included: 3m@8,77g/t Au, 4m@5,37g/t Au, 4m@1,52g/t Au, 13m@2,66g/t Au, 7m@6,06g/t Au, 5m@3,11g/t Au, 7m@4,51g/t Au, and 6m@16,43g/t Au.

In 2016, Fokolore carried out a detailed compilation, analysis, and interpretation of previous exploration data. Fokolore completed a detailed field geological, structural and regolith mapping over the Mamadouya gold target and a litho-geochemistry sampling. 98 rock chip samples were collected and analyzed. The results of the grab sampling were encouraging. A black shale sample containing quartz stockwork veins returned results of 95 g/t Au (with visible gold grains). 10 others samples returned high gold grades with values > 0.5 g/t Au including 3,5g/t Au, 3,84g/t Au, 1,18g/t Au, 1,23g/t Au, 1,37g/t Au, and 1,19g/t Au. Fokolore completed an extensive Auger drilling program consisting of 586 holes totaling 4.748 m on a grid pattern of 200x50m. Best results from the Auger drilling included [email protected]/t Au and [email protected] g/t Au. Following positive results, Fokolore completed in 2018, 4.920 meters RC drilling program totaling 61 RC holes. The drilling results was encouraging and confirmed the depth and lateral extension of the mineralization previously intercepted by Cluff. The RC drill holes intercepted large zones of alteration that affect the sediments that generally contain abundant stockwerk of quartz veins. The best gold values intercepted in drill holes included: [email protected] g/t Au (Incl. [email protected]/t Au), [email protected] g/t Au, [email protected] g/t Au., [email protected] g/t Au, [email protected] g/t Au and suggested a possible northern extension of the Mamadouya mineralization over 800 meters.

Page 34 of 193

Independent Technical Report on the Maligonga-East Gold Project

The following table summarizes historical exploration works competed in the Maligonga-East permit.

Program BRGM Robex Cluff Fokolore Total
1 987
1 992
2005 - 2006 2 012 2 016
2 017
2 018
Regional Soil Sampling Survey 440 473 913
Infill Termite Sampling Survey 4 528 4 528
Rock chips Sampling 98 98
Geophysical Survey Ground Induced
Polarization(IP)
Ground Induced
Polarization(IP)
Trench Num
Meters
6
1 410
1
150
7
1 560
Auger Drilling Num
Meters
586
4 748
586
4 748
RC Drilling Num
Meters
17
1 614
99
12 276
61
4 920
177
18 810

Table 6.1 Exploration works completed in the Maligonga-East permit from 1987 to 2018

6.2 Exploration Programs Completed by BRGM (1987 - 1992)

6.2.1 Soil sampling geochemical survey in 1987

BGRM completed the first regional soil survey on the Maligonga-East permit, between January and July 1987, on an irregular grid pattern (Figure 6.1). The sampling grid covered the southern and eastern portion of the Maligonga-East permit. A total of 440 soil samples were collected on this grid (Figure 6.1). The samples were analyzed by SGS Laboratory in Bamako, Mali.

Samples collected from termite mounds returned assay values ranging between below detection limit of 0.001 ppb to 1600 ppb gold (Figure 6.2). Gold values > 0,045 ppm generally define continuous zones that trend NE to NNE and are co-linear with the main Mamadouya orpaillage zone (Figure 6.2). Higher soil values tend to be relatively spotty in distribution. The gold anomalies at Mamadouya suggests that the mineralized gold structure may extend up to 10 km long (Figure 6.2)

Page 35 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [350 x 294] intentionally omitted <==

Figure 6.1.: Regional soil geochemical sampling within the Maligonga-East permit in 1987

==> picture [368 x 307] intentionally omitted <==

Figure 6.2: Regional soil geochemical sampling results within the Maligonga-East permit in 1987.

Page 36 of 193

Independent Technical Report on the Maligonga-East Gold Project

6.2.2. Trenches Completed by BRGM in 1992

BRGM completed 6 trenches in the Mamoudouya zone totaling 1410 meters (Table 6.2). The following table illustrate the location and technical parameters of the trenches

Hole ID X-UTM Y-UTM X-UTM2 Y-UTM2 Azimuth Dip Depth
Trench 12 277643 1378796 277979 1378723 110 0 240
Trench 13 277597 1378596 277982 1378510 110 0 300
Trench 14 277555 1378401 277801 1378345 110 0 180
Trench 15 277558 1378209 277757 1378159 110 0 140
Trench 16 277224 1377857 277712 1377745 110 0 388
Trench 17 277430 1377613 277627 1377574 110 0 162

Table 6.2: Location and technical parameters of the trenches completed by BRGM in 1992

The location map of the trenches completed by BRGM in 1992 is shown in Figure 6.3.

Best results from the trenches included:

  • Trench 12: 1.37 g/t Au over 8 meters,

  • Trench 13: 1.07 g/t Au over 14 meters,

  • Trench 14: 1.39 g/t Au over 8 meters,

  • Trench 15: 2.13 g/t Au over 12 meters,

  • Trench 16: 2.30 g/t Au over 6 meters,

  • Trench 17: 2.35 g/t Au over 24 meters.

==> picture [454 x 313] intentionally omitted <==

Figure 6.3: Location of the trenches completed by BRGM in the Maligonga-East permit in 1992

Page 37 of 193

Independent Technical Report on the Maligonga-East Gold Project

6.3 Exploration Programs Completed by Ressources Robex Inc. (between 2005 and 2006)

The first exploration works including drilling, trenching and geophysical survey on the Maligonga-East area were carried out by Ressources Robex Inc. and Malian Goldfield Ltd Sarl on the Wili Wili gold concession that encompassed the south portion of the Maligonga-East permit.

6.3.1. Exploration programs completed from September 2005 to September 2006

Exploration work on the Wili Wili permit in 2005 were focused on data compilation on existing termite mounds geochemistry surveys, processing and interpretation of regional magnetic and radiometric airborne geophysical data from the entire area in order to characterize the geology and outline important structures. Robex processed a Landsat-TM image for topographical, geomorphological and regolitic interpretation.

6.3.1.1. Geomorphology / regolith

Geomorphological and regolith mapping by Robex covered the entire Wili Wili permit on a grid pattern of 40km x 35km using regional aerial ortho-photos and satellite images to assess the relevance of existing surface geochemistry surveys and to acquire a topographical background of the permit. This mapping covered the southern portion of the actual Maligonga-East permit. The geomorphology and regolith mapping in the Wili Wili permit identified by four main types of regolith (Figure 6.4).

Page 38 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [444 x 507] intentionally omitted <==

Figure 6.4: Geomorphological and regolith mapping and soil sampling survey of the Wili Wili Permit

  • The lateritic plateaus (called TF) cover nearly 40% of the permit. The lateritic plateaus have a shallow dipping and are composed of consolidated, ferrugenized and homogeneous materials. They are generally thick and show evidence of transported materials that covers the underlying lithological units. The material shows evidence of proximal transportation over a short distance.

  • The second type of regolith, (called “TA’) fairly widespread on the permit is composed of alluvial plain of the Falémé River. It is composed of very thick layers of fine distal sediments. The alluvial plain completely masks the geochemistry of the underlying rock. It represents about 20% of the permit area.

Page 39 of 193

Independent Technical Report on the Maligonga-East Gold Project

  • The third major regolith are the plateau slope and low hill areas. These, called “E”, constitute zones of active erosion and residual units in place (mottled-zone and possibly saprolite). These areas, which are very favorable for soil sampling, are however quite narrow and only cover 10% of the permit area.

  • The last significant regolith type in the area, known as “CP”, is made up of small and inhomogeneous plains between the high and low lateritic plateaus zones. The latter generally consist of an incomplete lateritic profile with layer of variable thickness of proximal origin. These facies are good sampling medium and represents approximately 25 to 30% of the permit area.

Robex reconsidered the relevance and significance of the pre-existing soil surveys completed in this area and interpreted the BRGM strategic soil survey of 1987 (1000m x 500m) as unreliable. Robex suggested that many anomalies outlined by BRGM strategic soil survey and subsequently re-sampled in detail, are clearly associated with placers located in low alluvial zones.

Robex explained that most of the exploration works carried out by BRGM subsequent to the soil sampling results, namely pits, trenches and boreholes returned negative results and proposed a new, more selective and targeted regional soil geochemistry program.

6.3.1.2. Pits sampling

Following these positive results from the soil sampling, a dozen exploration pits was completed in order to verify the gold geochemistry of the underlying rocks. Pit samples were collected at one-meter intervals from the side of the wells between depths of 2 to 7 meters. Pit sampling returned positive results. Almost all of the samples returned gold values close to or greater than 1g/t Au. Gold values derived from silicified and sericitized metasediments and locally associated with important networks of quartz veins.

6.3.2. Exploration programs completed from September 2006 to September 2007

Exploration works carried out by Robex from September 2006 to September 2007 consisted of:

  • An Induced Polarization (IP) ground geophysical survey over the Mamoudouya zones,

  • A program of reverse circulation drilling (RC) in the Mamoudouya areas.

6.3.2.1. Geophysical surveys

Two Gradient IP geophysical surveys were completed on March 6, 2007 on the Mamoudouya areas of the Wili Wili property. These ground geophysical surveys of IP/resistivity gradient were carried out with lines spacing of 100 meters and covered an area of 1.5 km by 3.0 km (linear distance of 48 km) in the Mamoudouya area (Figure 6.5).

The IP Resistivity gradient survey on the Mamoudouya Zone (Figure 6.5) shows a very structured set of resistive axes-oriented N15° with sub-axes oriented from NS to N45°, probably linked to secondary faults oriented N45°. This set of resistive axes is framed on each side by two very clear conductive zones, oriented N15°, the direction of which coincides with those of the major regional structures.

Page 40 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [401 x 631] intentionally omitted <==

Figure 6.5.: Geophysical IP resistivity survey on the Mamoudouya zone by Robex from 2006 to 2007

Page 41 of 193

Independent Technical Report on the Maligonga-East Gold Project

6.3.2.2. Drilling

4,245 meters RC drilling program was carried out at Wili-Wili from April 20 to May 25, 2007. The drilling was completed over the Mamoudouya gold zones (Figures 6.6): 17 holes totaling 1,614 meters were drilled at Mamoudouya (Tables 6.3 and 6.4, Figures 6.6 to 6.9).

The objective was to test gold anomalies in soil geochemistry. The RC holes were inclined at -50[o] . Deviation tests were performed at the end of the holes. The RC drill samples, collected by metric interval, were analyzed in three-meter composites and representative samples of 1.5 to 3 kg were sent to Analab Laboratory in Kayes, Mali, where they were analyzed by Fire Assay. The detection threshold was 0.005 g/t Au. The Table 6.3 shows the location and technical parameters of the RC Drill holes.

Hole ID
X-UTM
Y-UTM
Z-UTM
Azimuth
Dip
Depth
Source
Type
Year
Hole ID
X-UTM
Y-UTM
Z-UTM
Azimuth
Dip
Depth
Source
Type
Year
Hole ID
X-UTM
Y-UTM
Z-UTM
Azimuth
Dip
Depth
Source
Type
Year
Hole ID
X-UTM
Y-UTM
Z-UTM
Azimuth
Dip
Depth
Source
Type
Year
Hole ID
X-UTM
Y-UTM
Z-UTM
Azimuth
Dip
Depth
Source
Type
Year
Hole ID
X-UTM
Y-UTM
Z-UTM
Azimuth
Dip
Depth
Source
Type
Year
Hole ID
X-UTM
Y-UTM
Z-UTM
Azimuth
Dip
Depth
Source
Type
Year
Hole ID
X-UTM
Y-UTM
Z-UTM
Azimuth
Dip
Depth
Source
Type
Year
Hole ID
X-UTM
Y-UTM
Z-UTM
Azimuth
Dip
Depth
Source
Type
Year
WR122 277278 1377685 400 110 -50 102 Robex RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
RC
2007
WR123 277344 1377661 400 110 -50 102 Robex
WR124 277410 1377637 400 110 -50 96 Robex
WR125 277476 1377613 400 110 -50 102 Robex
WR126 277541 1377589 400 110 -50 96 Robex
WR127 277607 1377565 400 110 -50 96 Robex
WR128 277673 1377541 400 110 -50 96 Robex
WR129 276886 1377402 400 110 -50 90 Robex
WR130 276952 1377378 400 110 -50 96 Robex
WR131 277018 1377354 400 110 -50 84 Robex
WR132 277084 1377330 400 110 -50 90 Robex
WR133 277150 1377306 400 110 -50 90 Robex
WR134 277215 1377282 400 110 -50 102 Robex
WR135 277281 1377258 400 110 -50 102 Robex
WR136 277347 1377234 400 110 -50 90 Robex
WR137 277413 1377210 400 110 -50 90 Robex
WR138 277478 1377187 400 110 -50 90 Robex

Table 6.3: Location and technical parameters of the RC Drill Holes completed by Robex in 2007

The main lithology encountered in the drill holes is a medium to coarse-grained granite. It is generally grayish to pinkish locally epidotized and greenish. A few passes of chloritized aplite, less than 10 m, were intercepted. Sediments were intersected east of the north profile and west of the south profile. They are greywackes, graphitic shale, silts and shales. Gold is associated with quartz veins. A large N010[o] striking shear zone located immediately east of the drill hole appears to control the gold mineralization. Results of the first drilling campaign at Mamoudouya were not encouraging. The best gold intersects from the RC drilling program in the Mamoudouya Zone are presented in the following Table.

Hole ID From To Interval Au ppb
WR125 24 33 9 401
WR130 0 39 39 413,7
WR130 63 81 18 555,7
WR131 6 21 15 555,3
WR132 39 75 36 261,5
WR135 12 24 12 554,7
WR136 0 18 18 489,6

Table 6.4: Best gold intersects from the RC drilling program in the Mamoudouya Zone by Robex in 2007

The location of the RC Drill holes is shown in Figure 6.6.

Page 42 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [465 x 412] intentionally omitted <==

----- Start of picture text -----

Trench 12
Trench 13
Trench 14
Trench 15
Trench 16
RC L1
Trench 17
RC L2
----- End of picture text -----

Figure 6.6: Location map of the RC Drill holes completed by Robex in the Mamadouya zone in 2007

The RC drill geological cross-sections are presented in Figures 6.7 and 6.8.

==> picture [469 x 120] intentionally omitted <==

Figure 6.7: Cross-section L1 of the RC Drill holes completed by Robex in the Mamadouya zone in 2007

Page 43 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 120] intentionally omitted <==

Figure 6.8: Cross-section L2 of the RC Drill holes completed by Robex in the Mamadouya zone in 2007

==> picture [360 x 492] intentionally omitted <==

Figure 6.9: Geophysical IP resistivity survey on the Mamadouya zone showing trenches and drilling location.

Page 44 of 193

Independent Technical Report on the Maligonga-East Gold Project

6.3.2.2.1. Conclusion

The exploration work carried out at Wili Wili from September 2006 to September 2007, consisting of geophysical surveys, trenching and drilling, convinced Robex of the significant gold potential of this permit. The drilling intersected many mineralized zones and allowed Robex to better understand the geological, structural and metallogeny context of this property.

6.4 Exploration Programs Completed by Cluff Gold Plc in 2012

6.4.1. Follow-up termite mounds geochemical survey

Cluff Gold Plc completed a follow-up termite mounds geochemical survey focused on the Maligonga-East permit (Figure 6.10). The program covered most of the permit on a grid pattern of 200x50m. A total of 4858 samples of termite mounds were collected (Figure 6.10).

==> picture [463 x 381] intentionally omitted <==

Figure 6.10: Follow-up termite mounds geochemical survey within the Maligonga-East permit in 2012

Page 45 of 193

Independent Technical Report on the Maligonga-East Gold Project

6.4.2. Results of the Follow-up geochemical survey

Termite mound samples ranged in grade from below detection limit to 7.5 parts per million (ppm) gold. Gold values > 0,045 ppm generally define continuous zones that trend NE to NNE and are co-linear with the main Mamadouya orpaillage zone. Higher soil values tend to be relatively spotty in distribution. The gold anomalies at Mamadouya suggests that the mineralized gold structure may extend up to 10 km long (Figure 6.11). The survey program revealed many other clusters of gold anomalies throughout the permit.

==> picture [457 x 378] intentionally omitted <==

Figure 6.11: Follow-up termite mounds geochemical results within the Maligonga-East permit in 2012

6.4.3. Geophysical Survey

Cluff contracted Terra Tec to complete an IP (Induced Polarization) and Resistivity geophysical survey on the Maligonga-East permit. The survey covered the Mamadouya anomaly zone (Figure 6.12) revealed from the previous geochemical sampling. The objective of the ground Induced Polarization and Resistivity survey was to investigate the geological structures in the Mamoudouya zone that control the gold mineralization. The field work was performed in two campaigns, the first started on the 16/07/11 with the arrival of the terra tec team in the field and ended on the 04/08/201. The second campaign started on the 16/11/2011 and ended on the 09/12/11.

Page 46 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [438 x 618] intentionally omitted <==

Figure 6.12: Sitemap - Aera of investigation. The red outlined area was measured in the first campaign and the data recorded in the second campaign are outlined blue.

Page 47 of 193

Independent Technical Report on the Maligonga-East Gold Project

6.4.3.1. Gradient Array

For the Gradient survey a line distance between 100 m line lengths between 450 m and 1275 m AB spacing between 2600 -3300 m and a RX dipole spacing of 50 m (point-to- point distance 25m) were fixed. The gradient measurements were performed on ENE-WSW orientated lines. Two-time domain induced polarization receiver (Elreo 6 and GDD Grx8-3I) were used parallel to acquire the data.

6.4.3.2. Gradient Resistivity

Low to intermediate resistive areas with a larger areal extent occur in the south-west, the south-east and in the north-eastern part of the surveyed grid. A broad high resistive zone can be seen in the middle of the grid (Figure 6.13). This zone strikes with approx. 17 degrees in the south and turns to approx. south-northdirection with a strike of about 5 degrees. That Resistivity zone visible in the east of Block 1, Block 2, Block 3 and partly in Block 4 shows a good correlate to the bordering Blocks 14, 13, 8 and Block 9.

Further to the north the highest resistivity values can be found, in the west of Block 10 and Block 11 (Figure 6.13) between a northing of 1378435 and 1379731 but cannot be confirmed in the east of Block 4.5 and 6 (Figure 6.13). The very hilly area, especially the positioning of the injection point in relation to the surveyed lines, embedded in a very complex geological environment could be one possible explanation. A sharp increase from very low resistivity values in the east of Block 9. 10 and 11 (Figure 6.13) to extreme high values in the west of Block 9, 10 and 11 are observable. Due to the sudden increase these very high resistivity anomaly could be possibly interpreted as a surface near laterite /lateritic unit plateau.

6.4.3.3. Gradient Chargeability

Contours of the chargeability anomalies are also plotted on the interpretation map (Figure 6.13). The limits of the different chargeability anomaly levels were fixed using the statistics of the measured chargeability.

IP data situation is very poor, which makes interpretation very difficult. It is remarkable that in low resistivity dominated areas mostly negative IP value were observed. Negative Chargeability anomalies have not been considered in the Chargeability Map (Figure 6.13). The intermediate between the northern of 1378140 and 1378800 corresponding to the high resistivity axis could be interpreted as a laterite effect.

6.4.3.4. Gradient Interpretation maps

On the interpreted map, the gradient resistivity is shown in color zones (Figures 6.14 to 6.16) with the following limits

  • conductive < 750 Ohm *m

  • intermediate 750 -1750 Ohm*m

  • resistive 1750 3500 Ohm*m

  • high resistivity >3500 Ohm*m

The anomalous areas and axes of the gradient chargeability are plotted on the simplified resistivity Map (Figures 6.14 to 6.16)

Page 48 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [425 x 538] intentionally omitted <==

==> picture [422 x 92] intentionally omitted <==

Figure 6.13: Gradient Chargeability Interpretation Map showing geological and structural elements

Page 49 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [431 x 618] intentionally omitted <==

----- Start of picture text -----

Block_7
Block_6
Block_5
Block_4
Block_3
Block_2
Block_1
Scale 1:20000
250 0 250 500 750
(meters)
Legend WGS 84 / UTM zone 29N
conductive axis Cluf f Gold Mali Sarl
high resistive axis
Permit of Mamoudouya, Mali
Mamoudouya - B15-B16
Gradient Survey - Apparent Resistivity
App. Resistivity
[Ohmm] line length: 950 m - 1275 m
AB distance: 2600m - 3500 m
17 33 99 160 188 195 204 220 255 334 633 Project-N°: F124-11 Date 7/2011
www.terratec-geoservices.com Map 1_b
B7-L in e_50 300 N
B7-L in e_50 _300 N
B6-L in e_36
-40 0 N
B6-L in e_36 -40 0 N
B2-L in e_10 _0_r em N
B2-L in e_10 _0_r em N
B5-L in e_36 _300 N
B5-L in e_36 _300 N
B7-L in e_51 _400 _rem N
B7-L in e_51 _400 _rem N
B7-L in e_49 _200 _rem N
B7-L in e_49 _200 _rem N
B6-L in e_41 _100 _rem N
B6-L in e_39
-10 0 N
B6-L in e_41 100 _rem N
B6-L in e_39
-10 0 N
B5-L in e_32 -10 0_r em N
B5-L in e_32
-10 0_r em N
B3-L in e_17 -30 0 N
B3-L in e_17
-30 0 N
B1-L in e_4_ 0_re m N
B1-L in e_3_ -100 re m N
B1-L in e_4
0_re m N
B1-L in e_3_ -100 re m N
B7-L in e_46
-10 0 N
B6-L in e_43 300 NB7-L in e_43 -40 0 N
B7-L in e_46 -10 0 N
B7-L in e_43
-40 0 N
B6-L in e_43 300 N
B1-L in e_2
-200 GDD N
B1-L in e_1
-300 GDD N
B1-L in e_1
-300 GDD NB1-L in e_2 -200 GDD N
B7-L in e_52 _500 _rem N
B7-L in e_52 _500 _rem N
B6-L in e_37
-30 0 N
B6-L in e_37 -30 0 N
B5-L in e_29
-40 0 N B5-L in e_31 -20 0_r em N
B4-L in e_24
-20 0_r em N
B5-L in e_31 -20 0_r em N
B5-L in e_29
-40 0 N
B3-L in e_22 200 N
B4-L in e_24
-20 0_r em N
B3-L in e_22 200 N
B1-L in e_5
100_ rem N
B1-L in e_5_ 100_ rem N
B6-L in e_42 200 _rem N
B6-L in e_40 _0_r em N
B6-L in e_42 _200 _rem N
B5-L in e_35 _200 N B6-L in e_40 _0_r em N
B4-L in e_29 _300 N
B4-L in e_28 _200 N B5-L in e_35 _200 N
B4-L in e_23
-30 0 N
B3-L in e_21 100 _rem NB4-L in e_22 -40 0 N B4-L in e_28 200 NB4-L in e_29 _300 N
B4-L in e_23
-30 0 N
B4-L in e_22 -40 0 N
B3-L in e_21 _100 _rem N
B2-L in e_12 _200 _rem N
B2-L in e_11 _100 _rem N
B2-L in e_8
-200 re m N
B2-L in e_7
-300 N
B2-L in e_6_ OL_- 400 N B2-L in e_12 200 _rem N
B1-L in e_6
200 N B2-L in e_11 100 _rem N
B2-L in e_8
-200 re m N
B2-L in e_7
-300 N B 12 -Line_6_ 200 NOL_- 400 N
B7-L in e_45 -20 0 N
B7-L in e_45
-20 0 N
B6-L in e_38 -20 0 N
B5-L in e_34 _100 _rem N
B6-L in e_38
-20 0 N
B5-L in e_34 100 _rem N
B4-L in e_25
-10 0_r em N
B3-L in e_20 0_r em N
B3-L in e_19
-10 0_r em N
B3-L in e_18 -20 0_r em N B4-L in e_25 -10 0_r em N
B3-L in e_16 OL -400 N
B2-L in e_16 600 N
B2-L in e_15 _500 N
B3-L in e_20 _0_r em N
B3-L in e_19
-10 0_r em N
B3-L in e_18 -20 0_r em N
B2-L in e_16 _600 NB3-L in e_16 _OL
-400 N
B2-L in e_15 500 N
B7-L in e_44
-30 0 N
B7-L in e_44 -30 0 N
B5-L in e_33 _0_r em N
B4-L in e_26 _0_r em N B5-L in e_33 _0_r em N
B4-L in e_26 _0_r em N
B2-L in e_14 _400 N
B2-L in e_14 _400 N
B7-L in e_48 _100 _rem N
B7-L in e_48 _100 _rem N
B2-L in e_13 _300 _rem N
B2-L in e_13 _300 _rem N
B4-L in e_27 _100 _rem N
B4-L in e_27 _100 _rem N
B5-L in e_30
-30 0 N
B5-L in e_30 -30 0 N
B7-L in e_47 _0_r em N
B7-L in e_47 _0_r em N
B2-L in e_9
-100 re m N
B2-L in e_9
-100 _re m N 200
200
100
0
03
004
----- End of picture text -----*

Figure 6.14: Interpreted structures from the Gradient Survey-Apparent resistivity

Page 50 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [439 x 629] intentionally omitted <==

----- Start of picture text -----

Block_7
Block_6
Block_5
Block_4
Block_3
Block_2
Block_1
Scale 1:20000
250 0 250 500 750
(meters)
Legend WGS 84 / UTM zone 29N
conductive axis Cluf f Gold Mali Sarl
high resistive axis
Permit of Mamoudouya, Mali
Mamoudouya - B15-B16
Gradient Survey - Apparent Resistivity
App. Resistivity
[Ohmm] line length: 950 m - 1275 m
AB distance: 2600m - 3500 m
17 33 99 160 188 195 204 220 255 334 633 Project-N°: F124-11 Date 7/2011
www.terratec-geoservices.com Map 1_b
B7-L in e_50 300 N
B7-L in e_50 _300 N
B6-L in e_36
-40 0 N
B6-L in e_36 -40 0 N
B2-L in e_10 _0_r em N
B2-L in e_10 _0_r em N
B5-L in e_36 _300 N
B5-L in e_36 _300 N
B7-L in e_51 _400 _rem N
B7-L in e_51 _400 _rem N
B7-L in e_49 _200 _rem N
B7-L in e_49 _200 _rem N
B6-L in e_41 _100 _rem N
B6-L in e_39
-10 0 N
B6-L in e_41 100 _rem N
B6-L in e_39
-10 0 N
B5-L in e_32 -10 0_r em N
B5-L in e_32
-10 0_r em N
B3-L in e_17 -30 0 N
B3-L in e_17
-30 0 N
B1-L in e_4_ 0_re m N
B1-L in e_3_ -100 re m N
B1-L in e_4
0_re m N
B1-L in e_3_ -100 re m N
B7-L in e_46
-10 0 N
B6-L in e_43 300 NB7-L in e_43 -40 0 N
B7-L in e_46 -10 0 N
B7-L in e_43
-40 0 N
B6-L in e_43 300 N
B1-L in e_2
-200 GDD N
B1-L in e_1
-300 GDD N
B1-L in e_1
-300 GDD NB1-L in e_2 -200 GDD N
B7-L in e_52 _500 _rem N
B7-L in e_52 _500 _rem N
B6-L in e_37
-30 0 N
B6-L in e_37 -30 0 N
B5-L in e_29
-40 0 N B5-L in e_31 -20 0_r em N
B4-L in e_24
-20 0_r em N
B5-L in e_31 -20 0_r em N
B5-L in e_29
-40 0 N
B3-L in e_22 200 N
B4-L in e_24
-20 0_r em N
B3-L in e_22 200 N
B1-L in e_5
100_ rem N
B1-L in e_5_ 100_ rem N
B6-L in e_42 200 _rem N
B6-L in e_40 _0_r em N
B6-L in e_42 _200 _rem N
B5-L in e_35 _200 N B6-L in e_40 _0_r em N
B4-L in e_29 _300 N
B4-L in e_28 _200 N B5-L in e_35 _200 N
B4-L in e_23
-30 0 N
B3-L in e_21 100 _rem NB4-L in e_22 -40 0 N B4-L in e_28 200 NB4-L in e_29 _300 N
B4-L in e_23
-30 0 N
B4-L in e_22 -40 0 N
B3-L in e_21 _100 _rem N
B2-L in e_12 _200 _rem N
B2-L in e_11 _100 _rem N
B2-L in e_8
-200 re m N
B2-L in e_7
-300 N
B2-L in e_6_ OL_- 400 N B2-L in e_12 200 _rem N
B1-L in e_6
200 N B2-L in e_11 100 _rem N
B2-L in e_8
-200 re m N
B2-L in e_7
-300 N B 12 -Line_6_ 200 NOL_- 400 N
B7-L in e_45 -20 0 N
B7-L in e_45
-20 0 N
B6-L in e_38 -20 0 N
B5-L in e_34 _100 _rem N
B6-L in e_38
-20 0 N
B5-L in e_34 100 _rem N
B4-L in e_25
-10 0_r em N
B3-L in e_20 0_r em N
B3-L in e_19
-10 0_r em N
B3-L in e_18 -20 0_r em N B4-L in e_25 -10 0_r em N
B3-L in e_16 OL -400 N
B2-L in e_16 600 N
B2-L in e_15 _500 N
B3-L in e_20 _0_r em N
B3-L in e_19
-10 0_r em N
B3-L in e_18 -20 0_r em N
B2-L in e_16 _600 NB3-L in e_16 _OL
-400 N
B2-L in e_15 500 N
B7-L in e_44
-30 0 N
B7-L in e_44 -30 0 N
B5-L in e_33 _0_r em N
B4-L in e_26 _0_r em N B5-L in e_33 _0_r em N
B4-L in e_26 _0_r em N
B2-L in e_14 _400 N
B2-L in e_14 _400 N
B7-L in e_48 _100 _rem N
B7-L in e_48 _100 _rem N
B2-L in e_13 _300 _rem N
B2-L in e_13 _300 _rem N
B4-L in e_27 _100 _rem N
B4-L in e_27 _100 _rem N
B5-L in e_30
-30 0 N
B5-L in e_30 -30 0 N
B7-L in e_47 _0_r em N
B7-L in e_47 _0_r em N
B2-L in e_9
-100 re m N
B2-L in e_9
-100 _re m N 200
200
100
0
03
004
----- End of picture text -----*

Figure 6.15: Gradient Survey-Apparent resistivity Map showing structural elements

Page 51 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [440 x 631] intentionally omitted <==

----- Start of picture text -----

Block_7
Block_6
Block_5
Block_4
Block_3
Block_2
Block_1
Scale 1:20000
250 0 250 500 750
(meters)
Legend WGS 84 / UTM zone 29N
conductive axis Cluf f Gold Mali Sarl
high resistive axis
Permit of Mamoudouya, Mali
Mamoudouya - B15-B16
Gradient Survey - Apparent Resistivity
App. Resistivity
[Ohmm] line length: 950 m - 1275 m
AB distance: 2600m - 3500 m
17 33 99 160 188 195 204 220 255 334 633 Project-N°: F124-11 Date 7/2011
www.terratec-geoservices.com Map 1_b
B7-L in e_50 300 N
B7-L in e_50 _300 N
B6-L in e_36
-40 0 N
B6-L in e_36 -40 0 N
B2-L in e_10 _0_r em N
B2-L in e_10 _0_r em N
B5-L in e_36 _300 N
B5-L in e_36 _300 N
B7-L in e_51 _400 _rem N
B7-L in e_51 _400 _rem N
B7-L in e_49 _200 _rem N
B7-L in e_49 _200 _rem N
B6-L in e_41 _100 _rem N
B6-L in e_39
-10 0 N
B6-L in e_41 100 _rem N
B6-L in e_39
-10 0 N
B5-L in e_32 -10 0_r em N
B5-L in e_32
-10 0_r em N
B3-L in e_17 -30 0 N
B3-L in e_17
-30 0 N
B1-L in e_4_ 0_re m N
B1-L in e_3_ -100 re m N
B1-L in e_4
0_re m N
B1-L in e_3_ -100 re m N
B7-L in e_46
-10 0 N
B6-L in e_43 300 NB7-L in e_43 -40 0 N
B7-L in e_46 -10 0 N
B7-L in e_43
-40 0 N
B6-L in e_43 300 N
B1-L in e_2
-200 GDD N
B1-L in e_1
-300 GDD N
B1-L in e_1
-300 GDD NB1-L in e_2 -200 GDD N
B7-L in e_52 _500 _rem N
B7-L in e_52 _500 _rem N
B6-L in e_37
-30 0 N
B6-L in e_37 -30 0 N
B5-L in e_29
-40 0 N B5-L in e_31 -20 0_r em N
B4-L in e_24
-20 0_r em N
B5-L in e_31 -20 0_r em N
B5-L in e_29
-40 0 N
B3-L in e_22 200 N
B4-L in e_24
-20 0_r em N
B3-L in e_22 200 N
B1-L in e_5
100_ rem N
B1-L in e_5_ 100_ rem N
B6-L in e_42 200 _rem N
B6-L in e_40 _0_r em N
B6-L in e_42 _200 _rem N
B5-L in e_35 _200 N B6-L in e_40 _0_r em N
B4-L in e_29 _300 N
B4-L in e_28 _200 N B5-L in e_35 _200 N
B4-L in e_23
-30 0 N
B3-L in e_21 100 _rem NB4-L in e_22 -40 0 N B4-L in e_28 200 NB4-L in e_29 _300 N
B4-L in e_23
-30 0 N
B4-L in e_22 -40 0 N
B3-L in e_21 _100 _rem N
B2-L in e_12 _200 _rem N
B2-L in e_11 _100 _rem N
B2-L in e_8
-200 re m N
B2-L in e_7
-300 N
B2-L in e_6_ OL_- 400 N B2-L in e_12 200 _rem N
B1-L in e_6
200 N B2-L in e_11 100 _rem N
B2-L in e_8
-200 re m N
B2-L in e_7
-300 N B 12 -Line_6_ 200 NOL_- 400 N
B7-L in e_45 -20 0 N
B7-L in e_45
-20 0 N
B6-L in e_38 -20 0 N
B5-L in e_34 _100 _rem N
B6-L in e_38
-20 0 N
B5-L in e_34 100 _rem N
B4-L in e_25
-10 0_r em N
B3-L in e_20 0_r em N
B3-L in e_19
-10 0_r em N
B3-L in e_18 -20 0_r em N B4-L in e_25 -10 0_r em N
B3-L in e_16 OL -400 N
B2-L in e_16 600 N
B2-L in e_15 _500 N
B3-L in e_20 _0_r em N
B3-L in e_19
-10 0_r em N
B3-L in e_18 -20 0_r em N
B2-L in e_16 _600 NB3-L in e_16 _OL
-400 N
B2-L in e_15 500 N
B7-L in e_44
-30 0 N
B7-L in e_44 -30 0 N
B5-L in e_33 _0_r em N
B4-L in e_26 _0_r em N B5-L in e_33 _0_r em N
B4-L in e_26 _0_r em N
B2-L in e_14 _400 N
B2-L in e_14 _400 N
B7-L in e_48 _100 _rem N
B7-L in e_48 _100 _rem N
B2-L in e_13 _300 _rem N
B2-L in e_13 _300 _rem N
B4-L in e_27 _100 _rem N
B4-L in e_27 _100 _rem N
B5-L in e_30
-30 0 N
B5-L in e_30 -30 0 N
B7-L in e_47 _0_r em N
B7-L in e_47 _0_r em N
B2-L in e_9
-100 re m N
B2-L in e_9
-100 _re m N 200
200
100
0
03
004
----- End of picture text -----*

Figure 6.16: IP Map showing structural elements

Page 52 of 193

Independent Technical Report on the Maligonga-East Gold Project

6.4.4. RC Drilling Program

In 2012, Cluff, completed 99 RC holes totaling 12,276 meters on a grid pattern of 100x60m in the Mamadouya zone (Figure 6.17). The objectives were to test the large Mamadouya gold anomaly.

Holes were inclined -55° with an azimuth of 280° (Figure 6.17). RC holes were 125 to 60 meters deep. Samples were sent to SGS Laboratory in Kayes for gold geochemical analysis by Fire Assays (FAA505) over 50 g pulp with a detection limit of 0,01 ppb

==> picture [469 x 419] intentionally omitted <==

Figure 6.17: Location of the RC drill holes completed by Cluff in the Mamoudouya zone in 2012

The location and technical parameters of the RC drilling program are shown in the following Table

Hole ID X-UTM Y-UTM Z-UTM Azimuth Dip Depth Source Type Year
MRC0001 277445 1378032 150 280 -55 125 Cluff RC 2012
MRC0002 277515 1378020 150 280 -55 125 Cluff RC 2012
MRC0003 277586 1378007 150 280 -55 125 Cluff RC 2012
MRC0004 277656 1377995 150 280 -55 125 Cluff RC 2012
MRC0005 277727 1377983 150 280 -55 125 Cluff RC 2012

Page 53 of 193

Independent Technical Report on the Maligonga-East Gold Project

Hole ID X-UTM Y-UTM Z-UTM Azimuth Dip Depth Source Type Year
MRC0006 277797 1377971 150 280 -55 125 Cluff RC 2012
MRC0007 277867 1377959 150 280 -55 125 Cluff RC 2012
MRC0008 277938 1377946 150 280 -55 125 Cluff RC 2012
MRC0009 277944 1378047 150 280 -55 125 Cluff RC 2012
MRC0010 277873 1378059 150 280 -55 125 Cluff RC 2012
MRC0011 277803 1378071 150 280 -55 125 Cluff RC 2012
MRC0012 277732 1378084 150 280 -55 125 Cluff RC 2012
MRC0013 277662 1378096 150 280 -55 125 Cluff RC 2012
MRC0014 277591 1378108 150 280 -55 125 Cluff RC 2012
MRC0015 277521 1378120 150 280 -55 125 Cluff RC 2012
MRC0016 277450 1378133 150 280 -55 125 Cluff RC 2012
MRC0017 277457 1378235 150 280 -55 125 Cluff RC 2012
MRC0018 277528 1378223 150 280 -55 125 Cluff RC 2012
MRC0019 277598 1378210 150 280 -55 125 Cluff RC 2012
MRC0020 277669 1378198 150 280 -55 125 Cluff RC 2012
MRC0021 277739 1378186 150 280 -55 125 Cluff RC 2012
MRC0022 277809 1378174 150 280 -55 125 Cluff RC 2012
MRC0023 277880 1378162 150 280 -55 125 Cluff RC 2012
MRC0024 277950 1378149 150 280 -55 125 Cluff RC 2012
MRC0025 277953 1378255 150 280 -55 125 Cluff RC 2012
MRC0026 277882 1378267 150 280 -55 125 Cluff RC 2012
MRC0027 277812 1378279 150 280 -55 125 Cluff RC 2012
MRC0028 277741 1378292 150 280 -55 125 Cluff RC 2012
MRC0029 277671 1378304 150 280 -55 125 Cluff RC 2012
MRC0030 277600 1378316 150 280 -55 125 Cluff RC 2012
MRC0031 277530 1378328 150 280 -55 125 Cluff RC 2012
MRC0032 277459 1378341 150 280 -55 125 Cluff RC 2012
MRC0033 277475 1378440 150 280 -55 125 Cluff RC 2012
MRC0034 277545 1378427 150 280 -55 125 Cluff RC 2012
MRC0035 277616 1378415 150 280 -55 125 Cluff RC 2012
MRC0036 277686 1378403 150 280 -55 125 Cluff RC 2012
MRC0037 277757 1378391 150 280 -55 125 Cluff RC 2012
MRC0038 277827 1378378 150 280 -55 123 Cluff RC 2012
MRC0039 277898 1378366 150 280 -55 125 Cluff RC 2012
MRC0040 277968 1378354 150 280 -55 125 Cluff RC 2012
MRC0041 277820 1378482 150 280 -55 125 Cluff RC 2012
MRC0042 277749 1378494 150 280 -55 125 Cluff RC 2012
MRC0043 277679 1378506 150 280 -55 125 Cluff RC 2012
MRC0044 277608 1378519 150 280 -55 125 Cluff RC 2012
MRC0045 277538 1378531 150 280 -55 125 Cluff RC 2012
MRC0046 277467 1378543 150 280 -55 125 Cluff RC 2012
MRC0047 277483 1378640 150 280 -55 125 Cluff RC 2012
MRC0048 277553 1378627 150 280 -55 125 Cluff RC 2012
MRC0049 277624 1378615 150 280 -55 125 Cluff RC 2012
MRC0050 277694 1378603 150 280 -55 125 Cluff RC 2012
MRC0051 277765 1378591 150 280 -55 125 Cluff RC 2012
MRC0052 277835 1378579 150 280 -55 125 Cluff RC 2012
MRC0053 277906 1378566 150 280 -55 125 Cluff RC 2012
MRC0054 277976 1378554 150 280 -55 125 Cluff RC 2012
MRC0055 278011 1378649 150 280 -55 125 Cluff RC 2012
MRC0056 277940 1378661 150 280 -55 125 Cluff RC 2012
MRC0057 277870 1378673 150 280 -55 125 Cluff RC 2012
MRC0058 277799 1378685 150 280 -55 125 Cluff RC 2012
MRC0059 277729 1378697 150 280 -55 125 Cluff RC 2012
MRC0060 277658 1378710 150 280 -55 125 Cluff RC 2012
MRC0061 277588 1378722 150 280 -55 125 Cluff RC 2012
MRC0062 277517 1378734 150 280 -55 125 Cluff RC 2012
MRC0063 277975 1378470 150 280 -55 125 Cluff RC 2012
MRC0064 277869 1378489 150 280 -55 93 Cluff RC 2012
MRC0065 277579 1377902 150 280 -55 125 Cluff RC 2012
MRC0066 277650 1377890 150 280 -55 125 Cluff RC 2012
MRC0067 277720 1377878 150 280 -55 60 Cluff RC 2012
MRC0068 277676 1377788 150 280 -55 125 Cluff RC 2012
MRC0069 277606 1377800 150 280 -55 125 Cluff RC 2012
MRC0070 277535 1377813 150 280 -55 125 Cluff RC 2012
MRC0071 277465 1377825 150 280 -55 125 Cluff RC 2012
MRC0072 277456 1377723 150 280 -55 125 Cluff RC 2012
MRC0073 277527 1377711 150 280 -55 125 Cluff RC 2012
MRC0074 277424 1377519 150 280 -55 125 Cluff RC 2012
MRC0075 277494 1377507 150 280 -55 125 Cluff RC 2012
MRC0076 277565 1377495 150 280 -55 125 Cluff RC 2012
MRC0077 277658 1377582 150 280 -55 125 Cluff RC 2012
MRC0078 277587 1377594 150 280 -55 125 Cluff RC 2012
MRC0079 277535 1377611 150 280 -55 125 Cluff RC 2012
MRC0080 277597 1377699 150 280 -55 125 Cluff RC 2012
MRC0081 277668 1377687 150 280 -55 125 Cluff RC 2012
MRC0082 277747 1377776 150 280 -55 125 Cluff RC 2012
MRC0083 277791 1377865 150 280 -55 125 Cluff RC 2012
MRC0084 277861 1377853 150 280 -55 125 Cluff RC 2012
Page 54 of 193

Independent Technical Report on the Maligonga-East Gold Project

Hole ID X-UTM Y-UTM Z-UTM Azimuth Dip Depth Source Type Year
MRC0085 277446 1377618 150 280 -55 125 Cluff RC 2012
MRC0086 277376 1377630 150 280 -55 125 Cluff RC 2012
MRC0087 277305 1377643 150 280 -55 125 Cluff RC 2012
MRC0088 277235 1377655 150 280 -55 125 Cluff RC 2012
MRC0089 277164 1377667 150 280 -55 125 Cluff RC 2012
MRC0090 277174 1377772 150 280 -55 125 Cluff RC 2012
MRC0091 277245 1377760 150 280 -55 125 Cluff RC 2012
MRC0092 277315 1377748 150 280 -55 125 Cluff RC 2012
MRC0093 277386 1377735 150 280 -55 125 Cluff RC 2012
MRC0094 277394 1377837 150 280 -55 125 Cluff RC 2012
MRC0095 277324 1377849 150 280 -55 125 Cluff RC 2012
MRC0096 277253 1377861 150 280 -55 125 Cluff RC 2012
MRC0097 277368 1377939 150 280 -55 125 Cluff RC 2012
MRC0098 277439 1377927 150 280 -55 125 Cluff RC 2012
MRC0099 277509 1377914 150 280 -55 125 Cluff RC 2012

Table 6.5: Technical parameters of the RC Drill Holes completed by Cluff in the Mamoudouya zone in 2012

The drill holes cross-sections showing the mineralized zones are shown in the following figures.

==> picture [463 x 120] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1378 450 N
----- End of picture text -----

Figure 6.18: Geological Cross-section of Cluff RC Drill holes Line 1378 450 N

==> picture [463 x 119] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1378 350 N
----- End of picture text -----

Figure 6.19: Geological Cross-section of Cluff RC Drill holes Line 1378 350 N

==> picture [467 x 121] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1378 250 N
----- End of picture text -----

Figure 6.20: Geological Cross-section of Cluff RC Drill holes Line 1378 250 N

Page 55 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 121] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1378 150 N
----- End of picture text -----

Figure 6.21: Geological Cross-section of Cluff RC Drill holes Line 1378 150 N

==> picture [469 x 121] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1378 050 N
----- End of picture text -----

Figure 6.22: Geological Cross-section of Cluff RC Drill holes Line 1378 050 N

==> picture [469 x 121] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1377 950 N
----- End of picture text -----

Figure 6.23: Geological Cross-section of Cluff RC Drill holes Line 1377 950 N

==> picture [470 x 139] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1377 850 N
Figure 6.24: Geological Cross-section of Cluff RC Drill holes Line 1377 850 N
----- End of picture text -----

Page 56 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 120] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1377 750 N
----- End of picture text -----

Figure 6.25: Geological Cross-section of Cluff RC Drill holes Line 1377 750 N

==> picture [469 x 121] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1377 650 N
----- End of picture text -----

Figure 6.26: Geological Cross-section of Cluff RC Drill holes Line 1377 650 N

==> picture [469 x 121] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1377 550 N
----- End of picture text -----

Figure 6.27: Geological Cross-section of Cluff RC Drill holes Line 1377 550 N

==> picture [469 x 120] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1377 450 N
----- End of picture text -----

Figure 6.28: Geological Cross-section of Cluff RC Drill holes Line 1377 450 N

Page 57 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [462 x 119] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1377 350 N
----- End of picture text -----

Figure 6.29: Geological Cross-section of Cluff RC Drill holes Line 1377 350 N

==> picture [462 x 119] intentionally omitted <==

----- Start of picture text -----

X-Section Line 1377 250 N
----- End of picture text -----

Figure 6.30: Geological Cross-section of Cluff RC Drill holes Line 1377 250 N

LEGEND

==> picture [195 x 148] intentionally omitted <==

Interpretation of the RC Drilling Results

To the south, holes MRC0074, MRC0079 and MRC0080 intercepted the mineralization respectively [email protected]/t Au from 9m: [email protected] g/t Au from 8m, 5m@3,11g/t Au from 19m and [email protected]/t Au from 21m following the NW direction which remains open to the south. This mineralized zone occurs in zone of active gold washing by orpailleurs

To the North, holes MRCO051 and MRCO058; MRC0052 and MRCO057 intercepted the gold mineralization respectively [email protected]/t Au and [email protected]/t Au: [email protected] g/t Au and 3m@1,13g/t Au following the direction N15 to N20 which remains open to the North,

In the West, holes MRC0001, MRCO015, MRCO017, MRC0018, MRCO030 and MRC0047 intercepted the gold mineralization respectively [email protected]/t Au, [email protected]/t Au: [email protected] g/t Au, [email protected] g/t Au, [email protected]/t Au; [email protected]/t Au.

Page 58 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [413 x 467] intentionally omitted <==

Figure 6.31: Location Map of the RC Drill Line in the Mamadouya target

The best results of the RC drilling program are shown in Table 6.6. The most significant gold mineralization is intercepted in hole MRC0051 ([email protected]/t Au) and MRC0097 ([email protected]/t Au). Gold mineralization seems to be associated with the greywacke sedimentary sequence associated with graphite shales probably linked to a fault and shear zone.

The following table shows the significant gold intersections obtained from the RC drilling completed in the Mamadouya target.

Page 59 of 193

Independent Technical Report on the Maligonga-East Gold Project

Hole ID From To Interval Au ppm Gold Intercepts (Au g/t
Au)
MRC0001 111 115 4 0,61 4m@0,61g/t
MRC0002 32 35 3 2,71 3m@2,71g/t
MRC0002 123 125 2 0,56 2m@0,56g/t
MRC0004 0 2 2 0,4 2m@0,4g/t
MRC0005 14 16 2 0,51 2m@0,51g/t
MRC0006 86 89 3 8,77 3m@8,77g/t
MRC0015 116 120 4 0,97 4m@0,97g/t
MRC0017 90 94 4 5,37 4m@5,37g/t
MRC0018 86 90 4 1 4m@1g/t
MRC0019 7 9 2 4,5 2m@4,5g/t
MRC0020 0 4 4 0,59 4m@0,59g/t
MRC0021 18 20 2 5,99 2m@5,99g/t
MRC0021 76 79 3 0,86 3m@0,86g/t
MRC0022 94 98 4 0,82 4m@0,82g/t
MRC0028 0 2 2 0,41 2m@0,41g/t
MRC0030 92 96 4 0,81 4m@0,81g/t
MRC0033 20 22 2 3,37 2m@3,37g/t
MRC0035 0 3 3 0,44 3m@0,44g/t
MRC0041 24 26 2 0,86 2m@0,86g/t
MRC0043 28 32 4 1,52 4m@1,52g/t
MRC0047 115 117 2 0,52 2m@0,52g/t
MRC0051 13 26 13 2,66 13m@2,66g/t
MRC0051 49 54 5 0,45 5m@0,45g/t
MRC0051 88 91 3 0,77 3m@0,77g/t
MRC0051 96 98 2 0,48 2m@0,48g/t
MRC0052 7 11 4 0,64 4m@0,64g/t
MRC0052 32 35 3 4,31 3m@4,31g/t
MRC0052 45 52 7 0,46 7m@0,46g/t
MRC0057 33 38 5 0,79 5m@0,79g/t
MRC0057 78 80 2 0,71 2m@0,71g/t
MRC0057 99 111 12 0,77 12m@0,77g/t
MRC0057 114 117 3 1,04 3m@1,04g/t
MRC0058 104 107 3 1,13 3m@1,13g/t
MRC0064 18 25 7 0,43 7m@0,43g/t
MRC0065 87 89 2 0,79 2m@0,79g/t
MRC0066 6 10 4 0,99 4m@0,99g/t
MRC0066 19 23 4 0,51 4m@0,51g/t
MRC0066 109 111 2 0,64 2m@0,64g/t
MRC0069 30 32 2 1,01 2m@1,01g/t
MRC0069 93 95 2 0,4 2m@0,4g/t
MRC0070 15 17 2 0,4 2m@0,4g/t
MRC0073 16 23 7 6,06 7m@6,06g/t
MRC0073 53 55 2 0,43 2m@0,43g/t
MRC0074 9 15 6 0,48 6m@0,48g/t
MRC0079 8 12 4 3,58 4m@3,58g/t
MRC0079 19 24 5 3,11 5m@3,11g/t
MRC0079 30 33 3 0,47 3m@0,47g/t
MRC0080 21 28 7 4,51 7m@4,51g/t
MRC0080 96 99 3 1,28 3m@1,28g/t
MRC0081 36 38 2 0,92 2m@0,92g/t
MRC0083 72 75 3 0,67 3m@0,67g/t
MRC0094 53 55 2 1,54 2m@1,54g/t
MRC0095 14 18 4 1,51 4m@1,51g/t
MRC0097 0 6 6 16,43 6m@16,43g/t

Table 6.6: Significant gold intercepts from the Cluff RC drilling program in 2012

Page 60 of 193

Independent Technical Report on the Maligonga-East Gold Project

6.5. Exploration Programs Completed by Fokolore from 2016 to 2018

6.5.1. Exploration Programs Completed by Fokolore in 2016

In 2016, Fokolore carried out the following work:

  • Compilation, analysis, processing, and interpretation of data from previous exploration works including interpretation of geophysics, satellite images, ground geochemistry, and drilling data.

  • Sampling and description of local gold mining areas “orpaillage zones”.

  • GPS prospecting of gold mining sites along the main Mamadouya anomalous zone.

  • Field mapping of geological structures along the main Mamadouya shear zone

  • Field visit and location of pre-existing RC drill holes.

  • Field monitoring of the gold intercepts resulting from previous drilling.

  • Rock chips sampling coupled with geological and regolith mapping of the main anomalous zone.

  • GPS survey and visits to historic trenches.

  • Completion of an Auger drilling program totaling 4,748 meters, 586 holes and 1,620 samples.

Fokoloré used expertise of independent geological consultants based in Mali for a geological audit of the project in order to generate new potential zones that can warrant to further exploration works.

6.5.1.1. Geological and structural mapping of the Mamadouya gold anomaly

The Mamadouya gold anomaly was the subject of detailed mapping in 2016. Outcrops was scarce or even absence in many places along the main anomaly zone (except rock fragments from the orpaillage pits where few units of intrusive and sedimentary rocks could be observed). This mapping made it possible to understand the geological setting of the region and to measure existing geological and structural elements.

The structural analysis of the Maligonga-East sector revealed the existence of fault structures in the southern portion of the permit that are supposed to be of same age as the Senegal-Malian Shear Zone (SMSZ) located further west of the permit. Second-order structures striking north-east and north-west were mapped. These faults appear to control the gold mineralization. The intersections of these faults with the north-southstriking structures appear to be potential zones for hydrothermal fluid circulation and gold mineralization.

The last group of faults strike east-west and others in various directions. These faults are not significant in the region, but they are interpreted to play a key role in the formation of the gold mineralization. They are spatially associated with the formation of schistosity and breccias zones and a permeability favorable for mineralized hydrothermal fluids flow and alteration.

Geomorphology and regolith mapping were completed in the most promising anomalous zones of the permit. Different regolith regimes were identified including: the lateritic, erosional, residual, alluvial and depositional regimes.

The northern portion of the permit, which had not been previously sampled and detailed mapped, was covered during this phase on a grid pattern of 500x100 m. This area has a good potential associated with several occurrences of extensive orpaillage activities in the sedimentary units containing numerous stockwerks of quartz veins. Gold occurrence in this area demonstrated that the main structure at

Page 61 of 193

Independent Technical Report on the Maligonga-East Gold Project

Mamadouya could extend over 1,200 km northward. The Figure 6.32 shows the geological and structural map interpreted from drill holes and geological units mapped during the field mapping.

==> picture [464 x 506] intentionally omitted <==

Figure 6.32: Geological and structural map of the Mamadouya target of the Maligonga-East permit

The targeted areas are those located to the north, south and west of the main anomaly zone. Analysis of geophysical data (Induced Polarization, Resistivity and Magnetic) helped outline conductive, resistive and magnetic areas as well as those related to hydrothermal alteration and delineate intrusion zones associated with silicification. From these geophysical anomalies, major structural systems (faults and shears) of various directions (with dextral or sinistral slip movements) could be interpreted.

Page 62 of 193

Independent Technical Report on the Maligonga-East Gold Project

The Figure 6.33 illustrates the resulting interpreted structural map.

==> picture [456 x 612] intentionally omitted <==

Figure 6.33: Correlation between RC anomaly, conductive, resistive and magnetic zones

Page 63 of 193

Independent Technical Report on the Maligonga-East Gold Project

6.5.1.2. Auger Drilling Program

Results obtained from the geological and structural field mapping and interpretations were encouraging and justified the implementation of an Auger drilling program. The objective was to test the depth and lateral extensions of the gold anomalies at surface and the gold mineralization in rock chip samples.

Service (TSM), a specialized Auger Drilling Company in Mali - was contacted by Fokolore to carry out this program. Auger drill holes were vertical and depth varied from 10 to15 meters in the saprolite or the fresh rock. 586 Auger holes totaling 4,748 meters were drilled on a grid pattern of 200x50m. In some places, drill holes were spaced 25 meters apart. Drill lines were oriented east-west (Figure 6.34).

==> picture [469 x 417] intentionally omitted <==

Figure 6.34: Location Map of the Auger Drill holes completed by Fokolore in the Mamadouya target in 2016

Results of the Auger drilling program were encouraging and suggested continuity of the main gold anomaly identified in the Mamadouya target. Best results included [email protected]/t Au and [email protected] g/t Au (Table 6.7).

Page 64 of 193

Independent Technical Report on the Maligonga-East Gold Project

The best mineralized intersections from the Auger drilling program are reported in the following Table.

==> picture [412 x 337] intentionally omitted <==

==> picture [412 x 277] intentionally omitted <==

Table 6.7: Best gold intercepts from the Fokolore Auger drilling program in 2016

Page 65 of 193

Independent Technical Report on the Maligonga-East Gold Project

Interpretation of the Auger drilling results and the intercepted gold mineralization:

Analysis of the Auger drilling results and the intercepted gold mineralization in the Maligonga-East permit identified different gold corridors-oriented NW, NE and possibly EW. This corroborates that the mineralization is structurally controlled. Second-order structures probably those faults striking north-east, north-west and east-west are present in the permit and appear to control the gold mineralization. The intersections of these faults with structures striking north-south seem to be structural site favorable for hydrothermal fluid flow and gold mineralization.

The Auger drilling results map was superimposed with the regolith map with the aim of placing each sample in its geological context in order to understand the relations between mineralization and the geological units. The gold anomaly correlates with resistivity and magnetic anomalies. According to the results obtained, the anomaly in the north and south areas is open while the one in the west remained to be better defined.

6.5.1.3. Gold panning

A systematic gold panning of a few rock chip samples was completed by Fokolore in order to understand the type of gold in the area and to avoid any nugget effect. 2 to 3 kg of rock sample were collected at 1- meter interval and washed (photos from left to right). Samples containing visible gold are scored as positive. This sample was then panned and the reject was crushed and grounded to 1 mm and finally paned.

==> picture [310 x 118] intentionally omitted <==

==> picture [155 x 115] intentionally omitted <==

The gold was weighed and its g/t Au equivalent calculated. This slice was observed under the microscope,

==> picture [468 x 114] intentionally omitted <==

The gold panning results were plotted on the resistive geophysical map (Figure 6.36). The map shows that the high gold grades are coincident with areas of high resistivity.

Three anomalous zone have been outlined as shown on the following map.

Page 66 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [368 x 514] intentionally omitted <==

Figure 6.35: Grab sampling results on the Maligonga-East permit

6.5.1.4. Rock chips sampling

98 rock chip samples were collected and analyzed. The results of the grab sampling were encouraging. Sample C13004 returned gold value of 95.4 and 100 ppm (Figure 6.35). In addition, other anomalous values have been obtained as indicated in the table below (Table 6.8). A black shale sample containing quartz stockwork veins returned results of 100 g/t Au (with visible gold grains) in the quartz float and in the artisan pits. Ten (10) samples returned high gold grades with values > 0.5 g/t Au from the 98 samples (Table 6.8).

Page 67 of 193

Independent Technical Report on the Maligonga-East Gold Project

Sample Number Aug/t Descriptions
C13004 100 Black sediment (shale) with quartz-stockwork veins
C13010 0,91 Saprolite of black sediment (shale) from an orpaillage pit
C13012 3,52 Quartz veins from an orpaillage pit
C13013 3,84 Quartz veins in contact with sediment
C13014 1,18 Quartz veins in contact with a felsic intrusive rock
C13477 1,23 Altered and oxidized black sediment (shale) with quartz-stockwork veins
C13482 1,37 Sediment with quartz-stockwork veins and Kaolinite alteration
C13487 1,19 Sediment with quartz-stockwork veins
C13494 0,85 Oxidized smoky quartz veins
C13498 0,53 Quartz veins

Table 6.8: Grab sample descriptions and analytical results

Complete results from the rock chips sampling are illustrated in the following Table

Sample UTM-X UTM-Y
Au-ppm
Comments Year
C13001 277899 1379060 0,26 Yellow saprolite ferruginous, within QV (NE strike) vuggy and oxide taints 2015
C13002 277900 1379060 0,19 Vuggy and oxide taints along, QV, NE strike, subvertical 2015
C13004 277900 1379062 95,4 Bleached, mottled coarser grained shale with crosscutting stringer QV 2015
C13005 277900 1379080 0,29 Pinkish saprolite from artisanal shaft 2015
C13008 277900 1379093 0,35 Black shale, N220°stricke 2015
C13009 277908 1379148 0,31 Black shale, N220°stricke 2015
C13010 277994 1379092 0,91 Strongly weathered black shale from 8 m depth of artisanal pit 2015
C13012 277514 1377611 3,52 QV in artisan pit 2015
C13013 277514 1377611 3,84 QV, contact with sediment 2015
C13014 277514 1377611 1,18 QV, contact with sediment and felsic dyke, large open pit 2015
C13016 277514 1377611 0,43 Altered felsic dyke, crosscutting by QV, strongly silicified and kaolinitised, from artisan pit 2015
C13017 277627 1377777 0,23 Altered felsic dyke with Fe stains, within QV (15 m depth) 2015
C13018 277627 1377777 0,15 Vuggy and smoky QV spoils from artisanal pit, some Fe-oxide stained 2015
C13024 277577 1377783 0,3 Reddish saprolite from historic trench (T16), pinkish granite/granodiorite? 2015
C13027 277130 1378617 0,47 Saprolite of granite arena, pink color, some coarser quartz veins 2015
C13030 277582 1377783 0,34 Saprolite of granodiorite/granite with QV stockwork, 2015
C13031 277773 1378300 0,1 Intermediate small termite mound, with Fe-oxide, medium grained, at hill slope 2015
C13032 277631 1378318 0,28 Diorite and little QV 2015
C13033 277560 1378318 0,35 Saprolite of granodiorite/granite with QV, oxidized near art's pits 2015
C13034 277586 1378323 0,28 Intermediate termite mound, wet, pink color 2015
C13044 277292 1377700 0,26 QV, within chlorite stains 2015
C13046 277341 1377610 0,36 Laterite with QV fragments from art's scratching (2 m depth) 2015
C13049 277486 1377605 0,1 Pink granite saprolite with stringer Quartz veinlets from historic trench (T 17) 2015
C13456 277525 1377602 0,1 QV N50°/70°E, 5 cm wide within saprolite of granite 2015
C13459 277596 1377740 0,39 N50°/70°E QV within granite saprolite and quartz fragments, Fe-oxide taints 2015
C13465 278011 1379430 0,1 Intermediate yellow brown termite mound located on hill slope (east) 2015
C13466 278000 1378615 0,12 QV (E-W) contact with granodiorite 2015
C13474 277905 1379281 0,16 Sediment black shale, alluvium, Fe-oxide, coarser grain 2015
C13477 278029 1379255 1,23 Black shale at 5 m depth, pisolite and Fe-oxide 2015
C13479 277364 1377070 0,19 QV, granodiorite and sediment contact (working area) 2015
C13482 277344 1377077 1,37 QV and sediment, black and white color in artisan terrain 2015
C13486 277894 1379059 0,21 Bedded black shale, with Fe oxide Quart veinlets, 2015
C13487 277889 1379060 1,19 Saprolite sediment with QV stockwerk, face to south, in Mamadouya art's 2015
C13488 277892 1379060 0,2 Saprolite sediment with QV stockwerk, face to west, in Mamadouya art's 2015
C13489 277891 1379062 0,26 Saprolite sediment with QV veinlets stockwerk, face to west, in Mamadouya art's 2015
C13490 277890 1379064 0,29 Saprolite sediment with QV stockwerk, face to west, in Mamadouya art's 2015
C13492 277890 1379068 0,11 3 cm wide QV, N70°/50°W, contact with strongly chloritized sediment 2015
C13493 277890 1379075 0,12 QV in lateritic saprolite, face west, in Mamadouya art's 2015
C13494 277398 1377602 0,85 Smoky QV, Fe-oxide from artisan pit 2015
C13498 277947 1378917 0,53 50 cm wide QV hillock with Fe-oxide in cuirasse plateau slope 2015
G0014 277854 1379742 0,11 Yellow, rich limonite intermediate termite mound, hill slope 2015
G0018 276538 1376618 0,1 Yellow green intermediate termite mound 2015
G0028 277020 1376195 0,1 Red Intermediate termite mound 2015
G0037 277725 1376574 0,73 Weathered black shale, spoils from art's shaft 2015
G0041 277521 1379523 0,21 Undifferentiated sediment along N200°/70°W quartz veins, Fe-oxide stains 2015
G0043 278175 1380312 0,34 Outcrop sediment weathered, Fe-oxide stains 2015
G0044 277764 1378900 0,46 Cuirasse plateau (scratching area) 2015
G0045 277830 1378968 3,98 Termite mound on laterite plateau 2015
G0046 277819 1379082 0,1 Cuirasse withquartz veins onplateau 2015

Table 6.9: Grab sample Descriptions and analytical results

Page 68 of 193

Independent Technical Report on the Maligonga-East Gold Project

6.5.1.5. Conclusions

These encouraging results, the prospective geological and structural settings of the permit and the trend of the surface gold anomaly that is parallel to known anomaly trends in the Kédougou-Kéniéba window demonstrate that the Maligonga-East permit has a significant potential for economic gold discovery. Fokolore recommended additional work to improve understanding of the permit geological and structural setting and the style of the gold mineralization. Fokoloré decided to continue exploration on the MaligongaEast permit. For the central zone that was previously drill-tested by Cluff gold plc, Fokolore objective was to test the lateral and deep extension of the gold mineralization. Fokolore proposed:

  • RC drilling to test the deep extension of the gold structure.

  • Drilling to test fault intersection in areas that have a good potential for high grade gold mineralization.

  • Drilling intrusion zones that are interpreted to be associated with the gold mineralization.

  • Drilling interpreted fold zones.

Previous results shown that high gold grades in soil and termite mounds are located in the center, northern and southern portion of the permit. The potential of the area to the west remains to be determined.

6.5.2. Exploration Programs Completed by Fokolore in 2017

Works carried out by Fokolore during the 2017 exploration program consisted of:

  • Detailed RC drilling planning followed by a field visit from April 10 to 15, 2017.

  • Assessment of the locations of the proposed RC drill holes

A work program was established during the reconnaissance field visit and location of the proposed RC drill holes. Approximately, 70 RC drill holes with depths varying between 50 to 160 meters were planned and their feasibility verified in the field in the first quarter of 2017. This planned drill program (approximately 5,000 meters of drilling) has not been executed that year due to road and field access conditions.

Previous exploration data processing and compilation works were carried out on the permit resulting in the definition of an Auger program for the coming year. Exploration works completed by BRGM and Cluff were re-interpreted resulting in a better understanding of the geological and structural settings and their relations with the surface gold anomalies. 75 Auger drilling holes were planned totaling 450 linear meters. The proposed Auger drilling based on previous results that identified different gold corridors striking NW, NE and EW.

Fokolore suggested that the mineralization was open to the north and south of the deposit and indicated that that gold is disseminated in porous units such as the carbonate sandstones and / or the quartz veins located within the granodiorite intrusive unit. Gold occurs as disseminations associated with pyrite, pyrrhotite, arsenopyrite and a strong silicification alteration.

Page 69 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [465 x 445] intentionally omitted <==

Figure 6.36: Interpretation by Fokolore of the gold mineralization intercepted in RC drill holes

6.5.3. Exploration Programs Completed by Fokolore in 2018

Following recommendations from detailed structural and geological field mapping, Auger drill results, grab sampling and detailed data compilation and re-interpretation completed in the Maligonga-East permit between 2016 and 2017, Fokolore and DCS MALI Drilling SERVICE (Drilling contractor) completed in 2018, 4,920 meters RC drilling totaling 61 RC holes (Figure 6.37). RC holes were drilled with various azimuth and were inclined -50[o] with depth varying between 50 and 120 meters, 5725 samples were collected and analyzed by PROSLAB CONSULTING in Bamako, Mali.

The objectives of the RC drilling program were to test the spatial close relationships between the surface gold anomalies and interpreted shear zone systems.

The location and technical parameters of the RC drilling program are shown in the following Table

Page 70 of 193

Independent Technical Report on the Maligonga-East Gold Project

Hole ID X-UTM Y-UTM Z-UTM Azimuth Dip Depth Source Type Year
MRC-18-001 277771 1378744 184 120 -50 120 Fokolore RC 2018
MRC-18-002 277725 1378758 185 120 -50 80 Fokolore RC 2018
MRC-18-003 277694 1378778 176 120 -50 75 Fokolore RC 2018
MRC-18-004 277654 1378875 183 120 -50 100 Fokolore RC 2018
MRC-18-005 277963 1379145 167 300 -50 75 Fokolore RC 2018
MRC-18-006 277951 1379179 153 215 -50 90 Fokolore RC 2018
MRC-18-007 277932 1379153 150 215 -50 80 Fokolore RC 2018
MRC-18-008 277888 1379201 156 120 -50 84 Fokolore RC 2018
MRC-18-009 277834 1379235 155 120 -50 90 Fokolore RC 2018
MRC-18-010 277590 1379274 167 120 -50 80 Fokolore RC 2018
MRC-18-011 277548 1379301 168 120 -50 80 Fokolore RC 2018
MRC-18-012 277506 1379325 166 120 -50 80 Fokolore RC 2018
MRC-18-013 277456 1379349 169 120 -50 80 Fokolore RC 2018
MRC-18-014 277418 1379375 169 120 -50 80 Fokolore RC 2018
MRC-18-015 277909 1379306 170 120 -50 100 Fokolore RC 2018
MRC-18-016 277560 1379769 197 120 -50 110 Fokolore RC 2018
MRC-18-017 277521 1379784 189 120 -50 80 Fokolore RC 2018
MRC-18-018 277476 1379810 184 120 -50 80 Fokolore RC 2018
MRC-18-019 278075 1379873 161 120 -50 120 Fokolore RC 2018
MRC-18-020 278020 1379902 163 120 -50 90 Fokolore RC 2018
MRC-18-021 278124 1379837 160 120 -50 80 Fokolore RC 2018
MRC-18-022 278226 1379790 172 300 -50 97 Fokolore RC 2018
MRC-18-023 278281 1379998 175 300 -50 80 Fokolore RC 2018
MRC-18-024 278320 1379966 174 300 -50 80 Fokolore RC 2018
MRC-18-025 278350 1380169 178 300 -50 80 Fokolore RC 2018
MRC-18-026 278383 1380146 180 300 -50 80 Fokolore RC 2018
MRC-18-027 278295 1380198 175 300 -50 80 Fokolore RC 2018
MRC-18-028 278255 1380223 177 300 -50 80 Fokolore RC 2018
MRC-18-029 278175 1380294 177 120 -50 75 Fokolore RC 2018
MRC-18-030 278136 1380321 175 120 -50 75 Fokolore RC 2018
MRC-18-031 278091 1380349 183 120 -50 80 Fokolore RC 2018
MRC-18-032 278053 1380376 176 120 -50 80 Fokolore RC 2018
MRC-18-033 278217 1380807 191 120 -50 80 Fokolore RC 2018
MRC-18-034 278258 1380785 120 120 -50 85 Fokolore RC 2018
MRC-18-035 278296 1380770 188 120 -50 80 Fokolore RC 2018
MRC-18-036 278335 1380746 174 120 -50 80 Fokolore RC 2018
MRC-18-037 278331 1380751 174 215 -50 80 Fokolore RC 2018
MRC-18-038 277284 1377461 164 215 -50 70 Fokolore RC 2018
MRC-18-039 277259 1377426 154 215 -50 72 Fokolore RC 2018
MRC-18-040 277272 1377427 159 90 -50 70 Fokolore RC 2018
MRC-18-041 276984 1377444 161 215 -50 72 Fokolore RC 2018
MRC-18-042 276956 1377407 168 215 -50 90 Fokolore RC 2018
MRC-18-043 276945 1377395 170 270 -50 80 Fokolore RC 2018
MRC-18-044 277103 1377672 120 215 -50 75 Fokolore RC 2018
MRC-18-045 277126 1377708 166 215 -50 75 Fokolore RC 2018
MRC-18-046 277106 1377688 168 90 -50 80 Fokolore RC 2018
MRC-18-047 277117 1377061 164 215 -50 75 Fokolore RC 2018
MRC-18-048 277093 1377024 152 215 -50 75 Fokolore RC 2018
MRC-18-049 277094 1377024 151 90 -50 80 Fokolore RC 2018
MRC-18-050 277253 1376595 169 215 -50 75 Fokolore RC 2018
MRC-18-051 277239 1376576 168 215 -50 90 Fokolore RC 2018
MRC-18-052 277240 1376587 171 270 -50 75 Fokolore RC 2018
MRC-18-053 276972 1376640 151 215 -50 80 Fokolore RC 2018
MRC-18-054 276955 1376612 161 215 -50 75 Fokolore RC 2018
MRC-18-055 276935 1376585 169 215 -50 75 Fokolore RC 2018
MRC-18-056 276935 1376587 167 90 -50 80 Fokolore RC 2018
MRC-18-057 277069 1375980 161 215 -50 70 Fokolore RC 2018
MRC-18-058 277068 1375981 161 270 -50 50 Fokolore RC 2018
MRC-18-059 277515 1377235 161 215 -50 70 Fokolore RC 2018
MRC-18-060 277500 1377208 162 215 -50 70 Fokolore RC 2018
MRC-18-061 277489 1377180 120 215 -50 50 Fokolore RC 2018

Table 6.10: Location and technical parameters of the RC Drill holes completed by Fokolore in 2018

Page 71 of 193

Independent Technical Report on the Maligonga-East Gold Project

The location of the RC holes is shown in the following figure

==> picture [469 x 418] intentionally omitted <==

Figure 6.37: Location map of the RC Drill holes completed by Fokolore at Mamadouya in 2018

The RC holes encountered the sedimentary units intruded by granodiorite rocks. From this drilling program Fokolore outlined numerous regional structures and local deformation zones and interpreted them to be associated with the gold mineralization.

Interpretation of the RC drilling results indicated that the mineralization remained open laterally and at depth. The drilling results was encouraging and confirmed the depth and lateral extension of the gold mineralization previously intercepted by Cluff. The RC drill holes intercepted large zones of alteration (mainly silicification) that affect the sedimentary units (locally interbedded with black graphite units) that generally contain abundant stockwerk of quartz veins. The most promising gold values were intercepted in drill holes MRC-18-001 ([email protected] g/t Au Incl. [email protected]/t Au) and MRC-18-007 ([email protected] g/t Au and [email protected] g/t Au).

Page 72 of 193

Independent Technical Report on the Maligonga-East Gold Project

The best results from the RC drilling program are shown below:

MRC-18-052 : 3.0m @ 4.51 g/t Au

MRC-18-043 : 3.0m @ 20.97 g/t Au Incl. 2.0m @ 31.25g/t Au - MRC-18-017 1.0m @ 3.22 g/t

MRC-18-003 : [email protected] g/t Au - MRC-18-009 : [email protected] g/t Au - MRC-18-015 : [email protected] g/t Au

MRC-18-031 : [email protected] g/t Au - MRC-18-054 : [email protected] g/t Au - MRC-18-047 : [email protected] g/t Au MRC-18-038 : [email protected] g/t Au - MRC-18-015 : [email protected] g/t Au - MRC-18-003 : [email protected] g/t Au MRC-18-003 : [email protected] g/t Au - MRC-18-003 : [email protected] g/t Au

The sections below show the best results in the northern portion of the permit

==> picture [463 x 401] intentionally omitted <==

Figure 6.38: Best results in the northern portion of the permit (Sections 1378744N (120) et 1379150 N (215))

The Figure 6.39 shows the location map of the Fokolore RC drilling program and the most significant results in the northern portion of the permit.

Page 73 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [448 x 621] intentionally omitted <==

Figure 6.39: Location map and the best results of the Fokolore RC drilling program in the northern part of the permit

Page 74 of 193

Independent Technical Report on the Maligonga-East Gold Project

In the southern zone, the RC drilling program shows a very significant intersection [email protected] g/t Au Incl. [email protected]/t Au). Figures 6.40 and 6.41 show the location section and map of the Fokolore RC drilling program and the most significant results in the southern portion of the permit.

==> picture [464 x 283] intentionally omitted <==

Figure 6.40: Best results in the southern portion of the permit (Section 1377407N (EW)

The various lithologies observed in the RC drilling program are summarized as follows:

  • Metric to pluri-metric thick Intrusive dyke of granodiorite to felsic diorite in composition.

  • Sedimentary units (siltites and greywackes) intruded by the intrusive dyke.

  • Abundant stockwork of quartz veins associated with the sedimentary rocks.

  • Lateritic formations and alluvium at the surface.

Mineralized units are associated with disseminated sulphides including pyrite and arsenopyrite (1% up to 15% locally). Occasionally, fine gold grains are visible disseminated in the deformed and altered rock.

Interpretation of the gold mineralization intercepted in the RC drill holes demonstrated that the main structure that control the mineralization in the Mamadouya prospect is NNE (Figure 6.41) and extends over 3 km.

Page 75 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [456 x 615] intentionally omitted <==

Figure 6.41: Map showing the location and the best results of the Fokolore RC drilling program in the southern part of the permit

Page 76 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [408 x 629] intentionally omitted <==

Figure 6.42: Map showing the gold contours interpreted from the Fokolore and Cluff RC drilling

Page 77 of 193

Independent Technical Report on the Maligonga-East Gold Project

6.6. Historical drilling descriptions

In 2012, Cluff Gold Plc. Completed a RC drilling program of 12,276 meters totaling 99 RC holes and 13,648 samples in the Maligonga East permit.

In 2018, Folkolore Mining Sarlcompleted two drilling programs. An Auger drilling program totaling 4,748 meters, 586 holes and 1,620 samples in 2016 and and a RC drilling program of 4,920 meters making a total of 61 holes.

The location, azimuth and dip of these drill holes are shown.

The supervision and training of personel involved with drilling, sampling and logging routines was undertaken by experienced personel with many years experience, in drilling procedures. Direct supervision for the onsite drilling operations was conducted by Malian national geologists who remained with their assigned rigs at all times.

6.6.1. Reverse Circulation (RC) Drilling

Fokolore completed the RC drilling program under contract to DSC Mali Drilling Service, utilizing a KWL880H drill rig that have universal (RC drilling) capacity. This rig is equipped with a standard air capacity of 350 psi, complemented by an auxiliary booster providing 750 psi. RC drilling is undertaken on two 12 hour shifts. The rig was operated by experienced drillers while the remaining crew was comprised of experienced Malian national personel. RC drilling was compled using a 4.5’ diameter rod string, fitted with a 5.25’ diameter face sampling hammer to maximize sample volume and limit the potential for contamination.

1 meter samples were collected using via cyclone passing through a 12.5% rotating splitter before collection into sample bags. The cyclone was manually cleaned at the completion of each six meter rod and more thoroughly cleaned at the completion of each hole.Folkolore drilled with an irregular drill pattern targeting the most promiosing gold anomaly zone and fault intersections. During this drill program, RC holes were drilled with various azimuth (between 90[o] and 300[o] ) and inclined at -50[o ] with depth varying between 50 and 120 meters. Cluff drilled wityh a drill pattern of 100m x 60m holes which were inclined -55[o] with an azimuth of 280[o ] typically typically to a depth of 60 to 125 meters.

6.6.2. Folkolore Auger Drilling

Folkolore completed the Auger program under contract by TSM (Travaux de Sondage Mali) using truck mounted Houllote mounted rig with onboard 9 bars compressor capacity. Drilling was done on a 10 hour single shift daily under the supervision of experienced drillers and executed by trained Malian national trained geologists.

Samples were collectred at 1 metrer intervals downhole via a cyclone mounted on the side of the rig. Composited of 3m were systematically sampled for gold analysis. Auger holes were vertical varying from 1.5m to 1.65m. All holes were logged and sampled by national geologists under the supervision of experienced geologists.

Page 78 of 193

Independent Technical Report on the Maligonga-East Gold Project

6.6.3. Drilling Quality

Current drilling practices at the Maligonga – East property can be considered to be of a high quality, broadly consistent with international industry standards. Drilling services are also benefitting from closer supervision of more experienced exploration management, complimented by periodic review of the exploration procedures. The quality of drilling can be considered as excellent.

All drill holes completed in the Maligonga-East property were planned to intersect the mineralized structures at right angles but in some situations, this was not possible due to field condition leading to some holes to have not been drilled with the most optimum dip or azimuth.

Samples were collected systematically every meter in all RC drill and 3meters composite in the Auger drill.

Some technical parameters of the drill operation are recording by the on-site geologist. These include:

  • Verify that the rig is aligned properly (drill collar, azimuth, inclination are correct.)

  • Measurement of the position of the collar using high precision GPS.

Materials required by the geologist during drilling operation include:

  • Compass (with clinometer) corrected for magnetic declination

  • GPS for positioning the drill collar (1- minute average measurement if field model is available)

  • 3 meter long metallic measuring tape (metric) and felt marker

  • Logging Forms: Field transport, daily drilling report, driller instruction, induction form

6.6.4. RC and Auger drill hole logging

Once homogenized to some degree by splitting, a representative sample is collected from each one-meter and wet screened to provide to provide chips for logging by national geologist.

Representative one-meter washed chips from each RC and Auger drill samples are stored in partitioned and consecutively numbered hard plastic chip trays which are stored to provide a permanent record of the geology of the hole for later reference.

Logging is recorded directly into Excel software on handheld recording device by geologist

  • Hole number

  • Interval (depth)

  • Sample number

  • Lithology

  • Color

  • Fabric style (texture and structures)

  • Alteration mineralogy style and intensity

  • Quartz veining and fracturing

  • Sulphide mineralization if present

  • Oxidation state (saprolite, transition or fresh rock)

Page 79 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 247] intentionally omitted <==

Figure 6.43: One-meter interval screened chips for logging

These data are directly downloaded or transferred into an Excel database by national geologists and validated by the senior geologist manager before being accepted into the Excel Master Driller Database to await analytical results from the Laboratory

6.6.5. Logging Quality

All logging was conducted within within suitable industry standards. Similar to the system set up used regularly in the major gold exploration companies.

Page 80 of 193

Independent Technical Report on the Maligonga-East Gold Project

7.0 GEOLOGICAL SETTING AND MINERALISATION

7.1. REGIONAL GEOLOGICAL AND STRUCTURAL SETTING

The Maligonga-East gold project is located in southern Mali within the Leo-Man Shield of the West African Craton (Figure 7.1). At a regional scale, the property is hosted within the Birimian Supergroup of the Baoulé-Mossi Domain. Gold mineralization in southern Mali is restricted to rocks of the Birimian Supergroup of this domain. The Birimian Supergroup is also a significant host for gold mineralization in Burkina Faso, Côte Ivoire and Ghana.

7.1.1. Geology of the Birimian of West Africa

The West African Craton (WAC) consists of Archaean and Paleoproterozoic terranes; stable since ~2 Ga, they provide a valuable record of crustal growth processes and contain notable mineral wealth. The WAC is divided into three domains (Figure 7.1): 1) The Reguibat Rise in northern Africa; 2) The Leo-Man Rise in sub-Saharan West Africa and, 3) The Kayes and Kédougou-Kéniéba Inliers in the Sahel region, North West of the Leo-Man Rise. The Reguibat and Leo-Man rises both share contacts with Archaean continental nuclei and are collectively referred to as the Baoulé-Mossi Domain.

==> picture [468 x 300] intentionally omitted <==

----- Start of picture text -----

AFRICA
Location Map
Project Location
----- End of picture text -----

Figure 7.1: Geological Map of the West African Shield showing location of the Maligonga-East permit and the main litho-structural domains. 1. Archean, 2. Birimian, 3. Late Paleoproterozoic Basins, 4. Mobile zones, 5. Neoproterozoic terranes, 6. Post Paleoproterozoic terranes, 7 Towns. ( Modified from Dabo, 2014)

Page 81 of 193

Independent Technical Report on the Maligonga-East Gold Project

The Birimian terranes consist of narrow, linear to arcuate, N to NNE trending volcanic belts, separated by broad sedimentary basins (Figure 7.2). The volcanic rocks are interpreted to be the base of the sequence, with coeval to slightly younger metasedimentary rocks (Roddaz et al., 2007). The terranes were accreted and cratonised during a period of SE to NW directed crustal shortening, metamorphism and magmatic accretion from 2120 to 2080 Ma known as the Eburnean orogeny (Feybesse et al., 2006). Peak metamorphic conditions are widely reported as amphibolite facies (500–600°C; 4–6 kbar), although greenschist facies assemblages are dominant across the region (Hirdes et al., 1996). The volcanic belts consist of tholeiitic lavas and associated mafic intrusions interbedded with minor sequences of immature sedimentary, volcaniclastic and carbonate rocks. The sedimentary basins comprise isoclinally folded and deformed sequences of greywacke, argillite and arkose with calc-alkaline volcanic sequences. Extensive suites of plutonic rocks have intruded both units, and range in composition from tholeiitic gabbro to high-K calcalkaline granite (Hirdes et al., 1992).

==> picture [470 x 326] intentionally omitted <==

----- Start of picture text -----

Maligonga-East
Gold Project
AFRICA
Location Map
----- End of picture text -----

Figure 7.2: Simplified geological map of West African craton showing settings of main gold deposits (yellow dots) and location of the Maligonga-East Gold Project

The Birimian terranes formed over a period of ~180 Ma, between 2266 and 2088 Ma (White et al., 2014). In South western Ghana the Eburnean I (2266-2150 Ma) precede the Eburnean II (2216-2088 Ma) (Allibone et al., 2002). In northern Ghana, the earlier event is referred to as the Eoeburnean (2195–2150 Ma) and the latter as the Eburnean (2148–2090 Ma) (de Kock et al., 2011). In Burkina Faso the Eburnean (2130 – 1980 Ma) is preceded by the Tangaean event (2170-2130 Ma) (Tshibubudze et al., 2009). Broadly speaking, the

Page 82 of 193

Independent Technical Report on the Maligonga-East Gold Project

earlier event, in each case, consists of volcanism, granitoid emplacement and fold, thrust tectonics. This is followed by emplacement of younger granitoids, strike-slip deformation and mineralization in the latter event. U-Pb zircon ages show that the Eburnean I encompass early volcanism, between 2266 ± 2 and 2132 ± 3 Ma (Loh et al., 1999), and early plutonism, from 2213 ± 3 to 2151 ± 7 Ma (Gueye et al., 2007). U-Pb dating of detrital zircons shows that sedimentation was coeval with magmatism in the volcanic belts, from 2135 ± 5 Ma in Ghana (Davis et al., 1994). Though there are variations, models for crustal growth in the Birimian largely involve the development of juvenile volcanic arc magmas in an oceanic setting (Dia et al., 1997; Pawlig et al., 2006). Recent P-T-t reconstructions in metasedimentary rocks record blueschist-facies metamorphic conditions diagnostic of subduction environments (Ganne et al., 2011).

7.1.2. Lithostratigraphy of the Kedougou-Kenieba Inlier (KKI)

The stratigraphy of the KKI from west to east consists of: 1) bimodal volcanics intruded by numerous plutonic complexes in the MVB; 2) detrital sedimentary rocks of the Dialé-Daléma basin, which are intruded by the Saraya batholith; 3) calc-alkaline volcaniclastic rocks of the FVB and; 4) siliciclastic sediments of the Kofi Series, unconformably overlain by Neoproterozoic sedimentary rocks to the east.

7.1.2.1. The Mako Volcanic Belt (MVB)

The MVB is an NNE trending ~20-40 km wide band of bimodal volcanic rocks which crop out in the west of the KKI (Figure 7.3). They are overlain to the west by the Pan-African Mauritanides belt. The Main Transcurrent Shear Zone (MTZ) marks the eastern edge of the MVB, with the Dialé-Daléma basin to the east. The lowermost units in the west consist of thick flows of massive and pillowed tholeiitic basalt. These are associated with dolerites and gabbros and intercalated with thin felsic tuffs, pyroclastites, rhyolites and minor clastic and carbonaceous sedimentary rocks (Dioh et al., 2006), which become more prominent to the east. The age of the Mako tholeiitic basalts is poorly constrained. Dia (1988) reported a whole-rock PbPb age of 2195 ± 118 Ma. Given this large error, the upper age limit for the Sandikounda amphibolitegneiss complex is interpreted to be the younger age limit for their eruption as it intrudes the lava sequences. The volcanic sequence is capped by andesitic lava, tuff and pyroclastic rocks (Ngom et al., 2009). An andesite flow in the east of the MVB yielded a Sm-Nd whole-rock age of 2160 ± 16 Ma (Boher et al., 1992). The MVB is intruded by a plutonic complex known as the Kakadian batholith (Gueye et al., 2007). The batholith is composed of three units in the north (Figure 1); 1) the Sandikounda amphibolite-gneiss complex (SAG); 2) the Sandikounda Layered Plutonic Complex (SLPC); and 3) the Laminia-Kaourou Plutonic Complex (LKPC). The south of the batholith is known as the Badon batholith. The SAG consists of tonalitic to dioritic gneiss containing amphibolite enclaves. This is the oldest unit in the north of the batholith. The SLPC crystallised between 2171 ± 9 (Dia et al., 1997), and is composed of layered hornblende-gabbro, diorite, migmatite and hornblendite, with xenoliths of wherlite and pyroxenite. Elements of the SLPC intruded the SAG (Gueye et al., 2008). The LKPC consists of the Laminia and Kaourou plutons. Tonalite and granodiorite of the Laminia pluton were emplaced at 2138 ± 12 (Gueye et al., 2008).

The porphyritic monzogranite of the Kaourou pluton is younger at 2079 ± 6 Ma (Pb-Pb zircon data; Dia et al., 1997). Both plutons contain xenoliths of Mako volcanic rocks and the SLPC (Dia et al., 1997). The Badon batholith is composed of biotite-granodiorite; magmatic emplacement occurred at a similar time to

Page 83 of 193

Independent Technical Report on the Maligonga-East Gold Project

the SAG at 2198 ± 2 Ma (Gueye et al., 2007). To the south east of the Badon batholith, the Mako belt was intruded by the Soukouta granite-granodiorite complex at 2142 ± 7 Ma (Delor et al., 2010).

The minor Mamakono and Tinkoto plutons intruded the MVB at 2076 ± 3 Ma and 2074 ± 5 Ma, respectively (Gueye et al., 2007). Ar-Ar and K-Ar studies on hornblende by Gueye et al. (2007) showed that the SAG and Tinkoto plutons cooled to ~550 °C by 2112 ± 12 Ma and 2051 ± 16 Ma, respectively. The Badon batholith cooled to below ~300°C at 2098 ± 20 Ma (Gueye et al., 2007).

==> picture [463 x 517] intentionally omitted <==

----- Start of picture text -----

LEGEND
 YATELA
 SADIOLA
SENEGAL
MALI
SABODALA   MAKABINGUI  YALEA
 LOULO
 MASSAWA  TABAKOTO
MAKO
  SARAYA
       KENIEBA
BEMBOU GOUNKOTO 
FEKOLA
  SEKO
  KEDOUGOU BOTO  SORY
  
BANDAFASSI KABAYA Maligonga East
FOKOLOREFOKOLOREFOKOLOREFOKOLOREFOKOLOREFOKOLOREFOKOLOREFOKOLOREFOKOLORE 
Gold Project
DIAKHA 

SIRIBAYA
GUINEA

50km
MTSZ
MTSZMTSZ
SMSZ
SMSZ
----- End of picture text -----

Figure 7.3: Geological and structural map of the Kedougou-Kenieba Inliers showing the location of the Maligonga-East gold project and the major gold deposits

Page 84 of 193

Independent Technical Report on the Maligonga-East Gold Project

7.1.2.2. The Dialé-Daléma series

Cropping out to the east of the MVB, the Dialé-Daléma series consists of a thick sequence of isoclinally folded volcanoclastic, siliciclastic and minor carbonate rocks centrally intruded by the Saraya Batholith (Gueye et al., 2008). The dominant volcanoclastic component of the Dialé-Daléma sediments suggests that they represent a lateral facies equivalent of the MVB. Subordinate basalts are interbedded in the westernmost sequence (Diallo, 2001), where the youngest detrital zircons yield a maximum U-Pb age of 2165 ± 0.9 Ma (Hirdes and Davis, 2002). The Saraya batholith consists of several plutonic bodies, composed of biotite-muscovite-adamellite granite. These bodies were emplaced between 2079 ± 2 Ma and 2061 ± 15 Ma and place a lower limit on sedimentation in the Dialé-Daléma Basin (Delor et al., 2010).

7.1.2.3. The Falémé Volcanic Belt

The Falémé Volcanic Belt crops out to the east of the Daléma basin (Hirdes and Davis, 2002). The FVB is a ~16 km wide NNE trending belt of volcanic and intrusive rocks. Outcrop is dominated by plutonic rocks, consisting of two plutonic complexes: 1) the Balangouma pluton in the north; and 2) the Boboti pluton in the center and south of the belt. Several smaller plutons crop out in the southern and eastern regions of the FVB, including the South Falémé (Hirdes and Davis, 2002) and Garaboureya plutons. The volcanic sequences comprise pillowed andesite flows, subordinate rhyodacite lavas and pyroclastic rocks. These are interbedded with volcanoclastic rocks, wackes and carbonate rocks (Schwartz and Melcher, 2004). Magnetite skarn deposits are hosted in several of the smaller plutons and carbonate rocks (Schwartz and Melcher, 2004). U-Pb zircon ages date a several volcanic and sub-volcanic rhyolite units at 2099 ± 4 Ma, 2082 ± 8 Ma and 2064 ± 30 Ma, with inheritance at 2155 ± 34 Ma (Hirdes and Davis, 2002).

7.1.2.4. The Kofi Series

The Senegal-Mali Shear Zone (SMSZ) is a sinistral brittle-ductile shear zone that forms a 1-10 km wide NS trending corridor of varying deformation styles, and separates the Kofi Series from the FVB. Secondary and higher order splays off the SMSZ host the major Au deposits in the Kofi Series, including Gara, Yalea, Sadiola, Yatela and Gounkoto (Lawrence et al., 2013a). The Kofi Basin is made up of detrital sedimentary and carbonate rocks and breccias intruded by minor mafic dykes and small intermediate to felsic stocks. The sedimentary rocks in the Kofi Series are dominantly wackes, with end member sandstone (rare) and argillite (common). Wackes and argillites are typically interbedded on a small scale (10s cm), although both rock types occur as thicker units, with gradational changes from quartz wacke through to argillite common. The siliciclastic component of wackes varies between quartz and feldspar rich, with clasts showing a large range in size and shape. Certain packages of quartz wacke, particularly in the west of the series have been intensely tourmalinised (Lawrence et al., 2013a), while others have been albitised.

The Kofi Series is carbonate-rich to the west, with proximity to the Falémé Volcanic Belt. These carbonate rocks are dominantly dolomitic marls. Silicic clasts are composed of fine grained and sub angular quartz and feldspar. All sedimentary lithologies in the Kofi Series show poly-phase deformation generated during the Eburnean orogeny (Dabo and Aïfa, 2010). The igneous rocks that intruded the Kofi Series include dolerite to monzodiorite dykes and small stocks of quartz feldspar porphyry. Two larger plutons of monzogranite composition also intruded the Kofi Series, namely the Gamaye and Yatea plutons. The age

Page 85 of 193

Independent Technical Report on the Maligonga-East Gold Project

of deposition in the Kofi Series is constrained by detrital zircons and intrusive plutonic rocks. Tourmalinized quartz wacke at the Gara deposit are dated by Pb-Pb at 2093 ± 7 Ma (Boher et al., 1992). An older, deltaic deposit on the margin of the FVB yields an age of 2125 ± 27 Ma (Boher et al., 1992), though it is unclear whether this belongs to the Kofi Series or the FVB. The Gamaye pluton has been dated at 2045 ± 27 Ma, providing a broad lower age limit for sedimentation (Bassot and Cean-Vachette, 1984).

7.1.3. Structural Setting of the Kedougou-Kenieba Inlier

The West Africa shield was affected by a polycyclic deformation resulting of a compressional tectonism D1 followed by a transcurrent deformation D2 and D3 described as regional senestral and dextral shears zones postdating eburnean granitoids (Milesi et al., 1992). The first phase of deformation D₁ was compressive followed by a later transcurrent movement and deformation D₂-D₃. (Dabo et Aïfa, 2010) Major crustal shear zones regionally bound, and influence the overall north-northeast lithologic grain in the region. These include a north-northeast trending shear zone that forms a boundary between the Mako and DialeDalema groups called the Main Transcurrent Shear Zone (MTZ) (Pons et al., 1989; Gueye et al., 2008).

The MTZ converges with, and may join to the north in Mali with the major northerly trending SenegalMali Shear Zone, which is spatially associated with several major gold deposits, including Sadiola and Loulo in Mali. The structures wrap around major intrusions, and NW trending linking structures between major shear zones are also present, all of which form potentially prospective sites for gold deposit. The transcurrent deformation has been interpreted as being synchronous with the gold mineralization and the emplacement of several calc-alkaline granites. The regionally developed foliation trending 030° appears to be related to folding on all scales throughout the KKI during the Eburnean Orogeny (Ledru et al. 2002). Field relationships suggest that gold mineralization in the region is probably coeval with latter stages of shear zone development. Major gold deposits including Yalea, Gounkoto, Tabakoto, Segala and Fekola are spatially associated with generally NE SW subsidiary structures splaying off the main SMSZ.

7.1.4. Metamorphism of the Kedougou-Kenieba Inlier

Regional greenschist metamorphism has also been interpreted as being associated with both compressive and transcurrent phases of deformation. The regional metamorphism within the Kedougou-Kenieba Inliers is of lower greenschist facies conditions whereas contact metamorphism of hornblende-hornfels occurs near the intrusions. Higher-grade rocks form a small domain within the Mako volcanic belt and are referred to as the ‘complexes amphibole-gneissic de Sonfara-Sandikounda’ (Gueye et al. 2007, 2008).

7.1.5. Regional Surficial Geology of the Kedougou-Kenieba Inlier

Lateritic weathering combined with duricrust formation is active in the region. Apart from local hills and resistant lithologies, much of the terrain is covered by laterite and ferricrete resulting in limited rock outcrop. Oxidation depth in the region is highly variable, but is generally several tens of meters. Thick soils and colluvial materials cover large land. Close to the Faleme River lenses of lateritized alluvial deposits can be observed.

Page 86 of 193

Independent Technical Report on the Maligonga-East Gold Project

7.2. Permit Geological and Structural Setting

The Project is hosted in early Proterozoic Birimian metamorphic rocks bordered to the east and southwest by late Proterozoic generally unmetamorphosed clastic sedimentary rocks. The Birimian rocks of the project area belong to the Kofi Formation, which generally trends north-northeast. According to Lawrence et al. (2013), the Kofi Formation comprises a sequence of shelf carbonates and calcareous clastic rocks, turbiditic sedimentary rocks, tourmalinized quartzwackes, feldspathic sandstones, and calcareous greywackes with argillite intercalations.

In the project area, the general strike is around N025°E with a steep dip of about 70° to 80° eastward. Rocks of the region have experienced regional brittle and ductile strike-slip deformations and have been metamorphosed to greenschist facies with development of chlorite, calcite, albite, sericite, and epidote (Milési et al., 1989; Dommanget et al., 1993; Feybesse et al., 2006).

Within the Maligonga-East project area (Figure 7.4), the Paleoproterozoic supracrustal metasedimentary rocks strike predominantly NNE and dip steeply eastwards. These sediments include:

  • Flyshoïd formation dominated fine sediment (argillites and siltites) with intercalations of feldspathic sandstone and quartzites (Figure 7.4)

  • Siltites formation and epiclastic sandstone, with intercalations of dacites and coarse-grained sandstone

  • Conglomerates, coarse-grained sandstone and pelite with abundant intercalations of carbonatous sandstone and/or carbonates, volcanites et intermediaries epiclastic sandstone, and acids volcanites. Meta-greywacke Formations

This sequence is intruded by concordant Birimian granitoid stocks comprising:

  • Granit and/or monzonitic granite with biotite concordant to stratification (Figure 7.4).

  • Dacites (lava – pyroclastites)

Late Mesozoic dolerite dikes and beds intersect all lithological units and appear interfere with pre-existing structures (Figure 7.4). These dolerite dykes cross cut all lithologies in the KKI and show no clear evidence of deformation or hydrothermal alteration. These are more continuous than the Birimian dykes and vary in thickness from 2 to 200 m.

Quaternary alluvium formations occur along the main river

The structural framework, interpreted from regional geological and geophysical maps, includes three major directions of lineaments in the Maligonga-East permit (Figure 7.4): north-east, north-northeast and northsouth. The north-northeast trending faults are similar to the Siribaya major shear zone structure and appear to be second order Fault systems and the most prospective structures for controlling the gold mineralization in the permit.

Page 87 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [463 x 362] intentionally omitted <==

==> picture [471 x 259] intentionally omitted <==

----- Start of picture text -----

LEGEND
STRUCTURES
Recent Formations (Quaternary)
Major crustal-scale Fault system
Alluvium
Mesozoic Second Ordre Fault systems
Dolerite Faulted Lithological Contact
Paleoproterozoic Formations Siribaya Structure
Intrusive rocks River
Granit and/or monzonitic Granit with biotite
Gold deposits
Dacites (lava – pyroclastites)
Feldspathic Sandstone
Supracrustal Metavolcano-sedimentary Birimian Formations
Flyshoïd Formation dominated fine sediment (argillites and siltites) with
intercalations of feldspathic sandstone and quartzites
Siltites Formation and epiclastic sandstone, with intercalations of dacites and coarse-
grained sandstone
Discordance
Conglomerates, coarse-grained sandstone and pelite with abundant intercalations of carbonatous sandstone and/or carbonates,
volcanites et intermediaries epiclastic sandstone, and acids volcanites. metagrauwackes Formations
----- End of picture text -----

Figure 7.4: Geological map of the Maligonga-East permit showing the main lithological units, the structural elements and the gold deposits

Page 88 of 193

Independent Technical Report on the Maligonga-East Gold Project

7.3. GOLD MINERALISATION

Primary gold mineralization within the Paleoproterozoic Birimian terrain has been sub-divided by Milési et al. (1992) into pre-orogenic, syn-orogenic, and late-orogenic. The late orogenic gold mineralization is typically associated with brittle-ductile deformation and is associated with Au, B, W, As, Sb, Se, Te, Bi, Mo, with traces of Cu, Pb, Zn. Gold commonly occurs as native gold or as fine inclusions within the sulphides or the gangue, which consists of quartz, albite, carbonate, muscovite, pyrite, and tourmaline.

Gold mineralization at Maligonga-East is a mesothermal shear-zone-controlled, intrusive related, orogenic -type mineralization, hosted in greenstone folded and faulted sediments, consistent with the majority of Proterozoic terrains, including the Birimian Series of West Africa. This style of mineralization is generally associated with regionally metamorphosed and deformed terrains. As such, the gold mineralization is structurally, rather than lithologically controlled. At Maligonga East, gold is developed along a high-angle NNE-striking, steeply ENE-dipping sinistral-reverse fault (Figure 7.5) and preferentially hosted in the more permeable, coarser-grained greywacke rocks. Gold occurs in deformed zones of large and hydrothermally altered, structural corridors that contain a complex network of extensional dilation fracture systems. Gold is dissemination into the host rocks and associated with pyrite, pyrrhotite, and arsenopyrite. Key alteration associated with the gold mineralization are silicification, calcite and chlorite suggesting low temperature formation during gold deposition typical of the shear zone type orogenic gold mineralization.

==> picture [464 x 119] intentionally omitted <==

==> picture [463 x 122] intentionally omitted <==

==> picture [465 x 89] intentionally omitted <==

Figure 7.5: Geological and structural section of the Mamadouya gold mineralization showing the relationship between geology, structures and gold mineralization in the Maligonga-East property

Page 89 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [448 x 591] intentionally omitted <==

Figure 7.6: Interpreted geological and structural Map of the Mamadouya Gold mineralization showing geological units, structural elements and the interpreted gold mineralized structure.

8. DEPOSIT TYPES

Page 90 of 193

Independent Technical Report on the Maligonga-East Gold Project

The deposit type identified in western Mali region is a Mesothermal shear-zone hosted orogenic-type gold deposits that are a distinctive class of gold deposit and form an integral part of the tectono-metamorphic evolution of the West African Shield. Orogenic gold deposits are almost exclusively associated with auriferous quartz-carbonate veins indicating veining in the presence of supra-lithostatic fluid pressures (Ridley and Diamond, 2000). Quartz veining testifies to the structurally controlled fluid infiltration over a broad range of upper- to mid-crustal pressures and temperatures, between about 200 - 650°C and 1-5 kbar (Goldfarb et al., 2001) emphasizing the significance of deformation, most commonly in the form of shear zones. These structures control fracture-controlled fluid-flow and gold mineralization, focusing large volumes of hydrothermal fluids required for an economic-grade mineralization (Sibson and Scott., 1998).

Formation of mesothermal orogenic-type gold deposits involves structural and regional tectonic conditions that allow the accumulation of fluids over-pressured to near-lithostatic values and their intermittent release through fault-valve action (Sibson and Scott, 1998). The deformation of rocks creates regional hydraulic gradients that may trigger fluid migration. Fluid movement in the largely impermeable wall-rocks is largely determined by fracture permeability. Veining is recorded over a wide range of metamorphic conditions, but is favored under brittle-ductile and commonly greenschist-facies conditions (Goldfarb et al., 2005). The relationship between deformation in brittle-ductile terrains and fluid flow explains the close spatial association between auriferous vein systems and shear zones in volcano-sedimentary terrains (Robert and Poulsen, 2001). Fluid flow and mineralization are commonly localized around second- and higher-order shear or fault zones adjacent to first-order structures (Groves et al., 1998). These structures developed late in the overall tectono-metamorphic evolution of the host terrain and commonly involve a compressional or transpressional component. High-angle reverse faults are regarded as particularly important targets (Sibson and Scott, 1998), favoring the development of temporarily supra-lithostatic fluid pressures leading to fracturing and associated destabilization of gold complexes from the hydrothermal fluid.

Gold mineralization at Maligonga-East is associated with mesothermal shear-zone hosted gold mineralization, entirely consistent with the majority of Proterozoic terrains worldwide, including the Birimian Series of West Africa. This style of mineralization is generally associated with regionally metamorphosed terrains that have experienced considerable deformation. As such, the deposits are invariably strongly structurally, rather than lithologically controlled.

At Maligonga-East, gold mineralization is preferentially developed in the more permeable, altered, coarser grained sediments successions, within north northeast trending structures. Mineralization is localized by a combination of lithological and structural controls and, the latter is predictably the more dominant. In the project area the dip and strike of mineralized zones, and to a lesser extent the style of mineralization, varies considerably between deposits. Generally, gold is dominantly associated chlorite-quartz–carbonate– sulphides assemblage, stockwork of quartz-carbonate-sulphide veinlets, or skarn magnetite-epidote-pyrite and arsenopyrite mineralization. Deep weathering of primary shear-hosted gold mineralization enhanced the economic viability of some of the gold deposits currently being mined in West Africa.

9. EXPLORATION

Page 91 of 193

Independent Technical Report on the Maligonga-East Gold Project

9.1. Exploration Programs Completed by Waraba Gold Limited in 2021

Works carried out by Waraba Gold Limited during the 2021 exploration program consisted of:

  • A compilation and interpretation of existing termite mound and soil geochemistry data

  • A geomorphological mapping of the entire permit at a scale of 1/10000

  • A lithogeochemistry sampling of altered outcrops during field mapping

  • A detailed geological and structural mapping

9.1.1. Compilation and interpretation of existing termite mound and soil geochemistry data

In 2021, Waraba Gold Limited undertook a reinterpretation of the surface geochemistry survey data and a lineament interpretation map from geological and structural data over the Maligonga-East Permit. Overlay of the geochemical values greater than 25 ppb with the structural lineaments delineate five gold targets that formed the basis for Waraba further exploration works (Figure 9.1).

==> picture [456 x 404] intentionally omitted <==

Figure 9.1: Overlay of the geochemical values greater than 25 ppb with the structural lineaments

9.1.2. Geomorphology / Regolith Mapping

Page 92 of 193

Independent Technical Report on the Maligonga-East Gold Project

Waraba Gold Limited completed a geomorphological and regolith mapping campaign that covered the entire permit. (Figure 9.2). The mapping indicates that the permit area is covered by more than 70% of lateritite formation. Laterites develop by intensive and prolonged weathering of the underlying parent rock. Laterization is a process of chemical weathering which produces a wide variety in the thickness, chemistry and mineralogy of the resulting soils. Laterites are rusty-red colored and composed of clay and iron hydroxides minerals. The regolith mapping revealed the occurrence of 4 types of regoltith units:

9.1.2.1. High Laterite plateau

High plateaus are the oldest laterite formation and are characterized by plateaus and hilltop carapaces formed from ferricrete with little overburden. The high lateritic plateaus cover nearly 10% of the permit. The laterite is brown or light brown, porous and more permeable, usually vermicular. In places it can be massive embedding pisolites. This High plateau is present in the southern part of the mapped area (Figure 9.2).

9.1.2.2. Low Laterite plateau

The Low plateau are fairly widespread in the Maligonga-East Permit and presents some features of an evident tranport. It is essentially made up of lateritic crusts, locally bearing a poorly developed silty-clay soil enclosing some laterite rock chip pebbles and blocks. It is very hard, dark consisting mainly of hematite and goethite and composed of pisolites with abundant rounded rock fragments. The low lateritic plateau nearly covers 20% of the permit (Photo 3, Figure 9.2).

9.1.2.3. Erosional regime

These are areas where rocks outcrop and are generally the plateau slope and low hill areas. The origin of the regolith materials in this regime is in-situ. These areas constitute zones of active erosion and residual units in place (mottled-zone and possibly saprolite). These areas, which are very favorable for soil sampling, are however quite narrow and only cover 10% of the permit area (Figure 9.2).

9.1.2.4. Depositional regime of alluvium and colluvium

Alluvium occurs along main rivers and is composed of fine-grained white to gray clayey material. The alluvium unit is fairly widespread in the permit and is composed of alluvial plain along major and secondary rivers. It is composed of thick layers of fine distal sediments. The alluvial plain completely masks the geochemistry of the underlying rock.

Colluvium accumulate at the base of plateau slope by mass wasting or sheet erosion. It represents about 60% of the permit area (Figure 9.2)

Page 93 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 469] intentionally omitted <==

Figure 9.2: Regolith map of the Maligonga-East Permit showing the main regolith units

9.1.3. Lithogeochemical sampling

Waraba Gold Limited initiated a field mapping program to create litho-geomorphological maps at a scale of 1/5,000. The survey involved east - west traverses over the areas on 200m spaced lines using handheld GPSs set to UTM co-ordinates WGS84, zone 29N datum. Twenty-six traverse lines were completed and 564 samples of 2.5 to 3 kg weight collected of which 176 were rock chip samples, 95 samples collected from abandoned artisanal mining pits and 25 from channel samples over exposed bedrock. The samples were packaged in plastic bags on which the sample numbers are marked. Samples were sent to the SGS laboratory for analysis. Thirty of the rock chip samples returned values greater that 400 ppb (Table 9.1).

Page 94 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 455] intentionally omitted <==

Figure 9.3: Interpreted geological and structural map of the Mamadouya Prospect showing the main geological units, the structural elements, the lithogeochemical sampling results and, the interpreted structures that control the gold mineralization

The following table show the best results returned from the lithogeochemical sampling

Sample ID X-UTM Y-UTM Au ppm Au ppm Rpt Descriptions
MAD_0008 277812 1378560 2,03 1,41 meta-pelite intensely sheared
MAD_0018 278052 1379319 0,41 - artisanal pit depth 4m in the sap-siltstone
MAD_0056 275846 1374858 1,05 0,83 meta-sediments + QV+sulphide
MAD_0090 276663 1377336 0,96 1,41 orpaillage pit
MAD_0096 276648 1377348 0,62 - quartz vein in the metagraywacke depth about 18 or 20m
MAD_0099 277308 1377222 0,49 - Metagraywacke with sulphide, contact with granodiorite

Page 95 of 193

Independent Technical Report on the Maligonga-East Gold Project

MAD_0100 277557 1377629 1,01 0,96 fragment of gold panning
MAD_0108 276858 1377389 5,44 5,82 metapelite breccia, matrices silicified (quartz)
MAD_0109 276862 1377374 12,10 14,3 greywacke with fragments of quartz, sample of gold panning
MAD_0110 276862 1377374 1,08 - fragments of gold panning
MAD_0116 277312 1377229 1,29 - graphitous pelite
MAD_0117 277312 1377229 5,00 4,91 quartz veins with pelite in the zone excavation (traditional excavation)
MAD_0118 277646 1377751 7,20 6,15 QV length about 20m in the zone excavation (traditional excavation)
MAD_0125 278747 1378331 0,93 - sandstone with quartz
MAD_0206 271070 1375382 0,70 1,06
MAD_0396 278235 1380845 0,80 SLT + QV
MAD_0435 277470 1379310 5,35 zone de shear N90/78
MAD_0447 277600 1378350 0,61 zone de shear
MAD_0449 277548 1377756 0,85 + QV
MAD_0450 277528 1377735 0,55
MAD_0451 277528 1377735 1,74 + QV
MAD_0454 277058 1377276 0,68 Intrusive + SLT
MAD_0456 277055 1377291 4,05 QV + Intrusive
MAD_0458 277054 1377313 2,75 SLT + QV
MAD_0508 277300 1376210 1,62
MAD_0509 277300 1376210 0,66
MAD_0547 276765 1376419 0,87 4 m; AZ:115
MAD_0549 276639 1377364 0,51 4 m; AZ:270 GWK shale
MAD_0551 277290 1377215 0,66 4 m; AZ:270
MAD_0554 277054 1377303 1,01 2 m; AZ:270 graphite

Table 9.1.: Best gold values from pits litho-geochemical sampling

9.1.4. Geological and structural mapping

Waraba Gold Limited cross-checked and verified the existing geological and structural information from previous works with physical observations during the field visit. Location and technical parameters of boreholes on the ground were in conformity with data in the Excel Spreadsheet database. Rock types, structures, alterations and mineralization were also consistent.

Two major types of rock are mapped in the permit area (Figure 9.4):

  • A dominant sedimentary unit host rock

  • a granitic intrusive rock

The granite is locally foliated extending over 800m by 400m with significant kaolinite alteration

The sediments vary from coarse-grained greywackes to the west to fine-grained pelite (blue shale and organic sediments) to the east of the permit area. The fine-grained sediments show in places small tight disharmonic folds.

Page 96 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [461 x 308] intentionally omitted <==

Figure.9.4: Interpreted geology and structural map of the Maligonga-East permit

9.1.4.1. Quartz veins in shear

Both the sediments and the granitic rocks are affected by a shearing deformation complained with a network of quartz veinlets. The mineralization can be classified as shear-type associated with an anastomosed network of quartz veinlets. The shear-type geological model seems to be most consistent with this style of mineralization. The shear corridor is affected by thin anastomosed quartz structures more or less discontinuous with various direction forming stockwerks.

9.1.4.2. Stereographic representation of structures:

Figure 9.6 displays the stereographic projection images using the ``Dips''software of the structures identified in the Mamoudouya target.

The points and structural data measurements are presented in the table below:

Coordinates
UTM E_29N_WGS84 UTM N29N_WGS84 Dip Direction Dip Direction
277312 1377846 40 228 318
277371 1377876 30 214 304
277420 1377901 70 218 308
277536 1378047 40 217 307
277510 1378080 58 226 316
276719 1377308 40 185 275
276751 1376410 80 26 116
277817 1379150 64 210 300
277902 1379090 55 200 290

Page 97 of 193

Independent Technical Report on the Maligonga-East Gold Project

277937 1379111 70 195 285
277961 1378720 80 210 300
277856 1379121 85 280 370
277878 1378652 50 185 275
277727 1378766 70 210 300
277643 1377746 85 55 145
277818 1378774 65 197 287
277816 1378670 75 200 290

Table 9. 2: Points and structural data measurements within the Mamadouya prospect

a) Stratification

The bedding is located at the limit between two different lithological formations: coarse-grained sedimentary rock (greywackes) and the argillite with graphite intercalation. The figure 9.6. shows that the stratification is inclined towards the west suggesting a monoclinal structural pattern in contact with the granitic intrusive rock.

b) Lithological contact

The contact structures in the region that play a key role in the mineralization system are preferentially located between the sedimentary sequence and the intrusive granitic rock. These lithological contacts are preexisting structural weak zones that can be easily deformed providing pathways for hydrothermal mineralizing flow circulation.

c) Schistosity-foliation

The general foliation is subparallel to the stratification and strikes NS. It dips steeply to the east or the west. This might be affected by isoclinal folding.

==> picture [268 x 256] intentionally omitted <==

Figure 9.5: Profile of the stereonet of all pole: bedding, contact, foliation and shear at Mamoudouya

9.1.4.3. Fault description

Page 98 of 193

Independent Technical Report on the Maligonga-East Gold Project

a. Reverse faults

These faults are the most important in the mapped area. They affect the meta-sedimentary rocks at the contact with the massive intrusive rocks. In places, these reverse faults intersect shears zones to form fish breccias (Figure 9.7). These breccias display graphitic and silicified surfaces. Reverse faults are interpreted as the main conduit for hydrothermal mineralizing fluids.

b. The overlap faults

These faults strike N220° to 230° and a dip 30° to 45° W, SW and NW. These faults affect the sediments in contact with the intrusive felsic rocks. Mineralization is often hosted within these structures.

c. Vertical to subvertical faults

These structures postdate previous faults and affect both the metasediments and the intrusive rocks. These faults have an NS strike and dip vertically. They are marked by normal slip movement and can also be interpreted as sigmoid structures. These are fish-shaped structures that individualize in shear bands (Figure 9.6)

d. Transforming faults (detachment)

These are late structures that strike N155 ° to N350 ° and a dip 80° SW to 90° SE. These faults acrosscut and displace previous structures with both sinistral and dextral movements separation.

This directional diagram or "Rose des Vents" (Figure 9.8) shows the preferred direction of these structures: The diagram displays three main directions in the Mamoudouya north area.

==> picture [258 x 250] intentionally omitted <==

Figure 9.6: Pink diagram of all the faults in Mamoudouya

e. Fish breach

Page 99 of 193

Independent Technical Report on the Maligonga-East Gold Project

Fish breach are found along vertical structures that postdate reverse faults (Photo 9.1) and along parallel micro shears and schistosity. The size of blocks varies from a few centimeters to a meter. The blocks are of different nature, consisting of competent sedimentary fragments, quartz veins and ductile materials. Blocks are locally laminated, fusiform, lenticular, sausage or sigmoid in form. Breccias are good host for gold mineralization and are highly oxidized at the surface. These rocks are mainly located between the hanging wall and the footwall of the main fault systems that control the gold mineralization.

f. Diaclases

These are discontinuities late mafic rocks that crosscut all previous rocks and structures in this area.

==> picture [468 x 194] intentionally omitted <==

==> picture [468 x 194] intentionally omitted <==

Figure 9.7: Granodiorite-Metasediment contact, brecciated fault fishand shear structures

9.1.4.4. Interpreted geological and structural sections of the northern part of Mamoudouya.

Field observations and structural mapping suggest that the control of the gold mineralization is mainly structural but not lithological. There is a strong spatial relationship between gold, structures and intrusive rocks indicating that the intrusive rocks may have played a key role in the mineralization

Page 100 of 193

Independent Technical Report on the Maligonga-East Gold Project

process in the Mamoudouya gold target.Gold mineralization corridors are located along shear and fault structures associated with syntectonic intrusive rocks.

Figures 9.8 to 9.11 show various interpreted cross-sections across the Mamadouya gold prospect.

==> picture [422 x 253] intentionally omitted <==

Figure 9.8: Geological cross section in target 1 north of Mamoudouya

==> picture [408 x 259] intentionally omitted <==

Figure 9.9: Geological cross section in target 1 north of Mamoudouya

Page 101 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [432 x 401] intentionally omitted <==

Figure 9.10: Geological cross section in target 1 north of Mamoudouya

9.1.4.5. Structural interpretation of the gold mineralization

The mineralized structure strikes N20[o] and dips 80° WNW. The foliation that affected both the sediments and the granite strikes in the same direction, suggesting that all these rocks have undergone the same regional compressional stress field responsible for the deformation. The foliation has a general direction NNE and dips steeply in the northern part of the granite, but gradually changes to the NE direction and becomes shallowly dipping (35°) south of the granite (Figure 9.5).

The sulphide mineralization consists of pyrite and arsenopyrite. Unstrained grains of pyrite and arsenopyrite in the host greywacke rock indicate they were not affected by the deformation. This suggests that the gold mineralization takes place during a late tectonic event that occurred after peak of deformation.

The gold mineralization at Mamoudouya is controlled by regional structures: faults and shears (Figure 9.5). These large structures deformation competent rocks that host most of the gold mineralization. The

Page 102 of 193

Independent Technical Report on the Maligonga-East Gold Project

mineralization dips 55 to 65[o] W, parallel to the faulted contact between the sediments and the granite. Most

of the ore bodies are surrounded by faults developed in graphitic horizons interbedded with the graywackes.

==> picture [404 x 394] intentionally omitted <==

Figure9.11: Interpreted geological and structural map of the Mamadouya Prospect

9.1.6. Airborne Geophysical survey completed in 2021 by Waraba Gold Limited

NRG carried out a high resolution XPlorer magnetic and radiometric survey for Waraba Gold Ltd in the Maligonga East property between the 27[th] and 30[th] of June 2021. NRG produced a report that summarizes the results of the survey.

9.1.6.1. Survey Description

A high-resolution digital terrain model (DTM) of the survey area, illustrated in Figure 2, suggests that the terrain is undulating. The horizontal gradient of the DTM has been included in Figure 3 to gauge the required climb/descent rates in areas with steeper topography. The climb and descent rate of a highperformance helicopter, such as the AS350B2, will under most conditions, be in the order of 250 m/km. Parts of the survey where the gradient exceeds 200m/km have been flagged in color (yellow – magenta). In these areas survey height may be compromised in the interest of safety.

Page 103 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [447 x 202] intentionally omitted <==

==> picture [441 x 23] intentionally omitted <==

----- Start of picture text -----

Digital Terrain Model Horizontal gradient of the Digital Terrain Model
----- End of picture text -----

Figure 9.12. Digital terrain model and horizontal gradient of the digital terrain model of the Maligonga permit

9.1.6.2. Survey specifications

A summary of the survey line kilometers and parameters of the survey are provided in Figure 9.12 and Table 9.3.

Survey Name Country Line kms Line spacing Line direction UTM zone Ground
Fokolore Block Mali 1316 100m x 1000m 90 29N moderate

Table 9.3: Summary of helimag surveys parameters at Maligonga Gold

The coordinates of the survey boundaries are provided in the following table.

UTM Zone 29N, WGS84 Longitude Latitude
X Y degrees degrees
Fokolore Block
1 264426 1377368 -11.167224 12.450837
2 271952 1377368 -11.098020 12.451383
3 271952 1381764 -11.098339 12.491109
4 275396 1381764 -11.066665 12.491354
5 275396 1385395 -11.066926 12.524168
6 279048 1385395 -11.033333 12.524424
7 279048 1375316 -11.032622 12.433337
8 281950 1375316 -11.005937 12.433536
9 281950 1369823 -11.005557 12.383893
10 281014 1369823 -11.014162 12.383829
11 281014 1371520 -11.014280 12.399166
12 279304 1371520 -11.030002 12.399048
13 279329 1374760 -11.029999 12.428331
14 278574 1374766 -11.036942 12.428333
15 278578 1375319 -11.036944 12.433331
16 277007 1375331 -11.051391 12.433331
17 276977 1371397 -11.051388 12.397776
18 275315 1371410 -11.066669 12.397777
19 275335 1373992 -11.066669 12.421113
20 264399 1374079 -11.167226 12.421113

Page 104 of 193

Independent Technical Report on the Maligonga-East Gold Project

Table 9.4: Coordinates of the helimag surveys boundaries

==> picture [426 x 409] intentionally omitted <==

Figure 9.13: Helimag survey grid lines over the Maligonga-East gold permit

9.1.6.3. Magnetic data

A figure of merit is performed by carrying out a series of rolls, pitches and yaws while flying parallel to both traverse and tie-line orientations at high altitude in the same magnetic latitude as the survey area. A high pass filter is used to remove long-wavelength geological response leaving the magnetic response which is primarily due to the residual response of the aircraft after compensation. Several lines flown over a wellcontrolled magnetic feature are used to establish the lag and relationship between GPS and magnetic readings (parallax).

9.1.6.4. Radiometric data

A thorium source test is carried out daily. A comparison of the background corrected count rates in the thorium window verifies that sensitivity of the system has remained the same for the survey duration. The variation of the daily source tests shall not vary by more than 8 percent from the survey average.

Page 105 of 193

Independent Technical Report on the Maligonga-East Gold Project

9.1.6.5. Altimeter

The radar altimeter is calibrated at the start of every survey.

9.1.6.6. Results of the Survey

The following products have been included in the accompanying archive:

  • Total field gradient enhanced magnetics

  • First vertical derivative magnetics

  • Reduced to pole magnetics

  • Analytic signal

  • 4 Channel NASVD processed radiometric data (total count, potassium, uranium and thorium)

  • Calculated digital terrain

a. Total field gradient enhanced magnetics

The horizontal magnetic gradient is calculated using the difference between magnetic sensors. By adding the gradient in gridding algorithms, a better spatial representation of magnetic features is obtained. This in turn improves the resolution of line parallel features and discrete targets effectively equivalent to flying the survey at a tighter line spacing. The final gradient enhanced data has been used for product generation (Figure 9.13).

==> picture [388 x 331] intentionally omitted <==

Figure 9.14: Gradient enhanced magnetics

Page 106 of 193

Independent Technical Report on the Maligonga-East Gold Project

b. First vertical derivative magnetics

The first vertical derivative of the magnetic data is calculated either in space or frequency domains (Figure 9.14). This is a standard filter which accentuates shallow features and structures. It is also useful for discriminating textural changes which characterize different lithologies.

==> picture [467 x 398] intentionally omitted <==

Figure 9.15: Magnetic derivative first vertical

c. Reduced to pole magnetic

Reduction to pole is a mathematical function applied in the total magnetic field data in the frequency domain. The resultant product is the equivalent total magnetic field situated at the magnetic pole thus replacing the dipolar magnetic response with a simple peak positioned above the magnetic source (Figure 9.15). There are a number of limitations to this filter:

  • The filter assumes the magnetic response is due to induced magnetization and ignores the effect of magnetic remanence. This results in incorrect solutions where the remanent magnetic contribution is

Page 107 of 193

Independent Technical Report on the Maligonga-East Gold Project

large and differs in orientation from the induced magnetic contribution (often manifested as a smearing of anomalies).

  • The filter is unstable at low magnetic latitudes resulting in a smearing and exaggeration of NS trending features. This is corrected to some degree by using an amplitude correction although at the expense of under-correcting NS trending features.

==> picture [469 x 400] intentionally omitted <==

Figure 9.16: Reduced to pole magnetics:

d. Analytic signal

The analytic signal is defined as the square-root of the sum of the square of derivates of the total magnetic field. The analytic signal is useful in locating the edges of magnetic source bodies, particularly where remanence and/or low magnetic latitude complicates interpretation. The filter accentuates shallow features at the expense of deeper (or longer wavelength) features (Figure 9.16)

Page 108 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [467 x 398] intentionally omitted <==

Figure 9.17: Analytic signal:

e. Digital terrain model:

The digital terrain is calculated by subtracting the aircraft altitude from GPS height. Results reference the EGM96 Geoid (Figure 9.17).

Page 109 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [466 x 398] intentionally omitted <==

Figure 9.18: Computed Digital Terrain Model.

f. Final radiometric data:

Potassium, thorium and uranium data has been reduced to ground concentrations using standards recommended by IAEA (1991) and AGSO (1995). NASVD processing has been carried out using proprietary software (Figure 9.18).

Page 110 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [464 x 396] intentionally omitted <==

Figure 9.19: Radiometric data processed by 4-channel NASVD (total count, K, U Th) Radiometric data

9.1.6.7. Structural interpretation by Waraba Gold

Targets were identified in the permit for monitoring their sulphide chargeability using the IP methodology, following the interpretation of the various geophysical maps, particularly the magnetic gradients and especially the radiometric data; add to the various geological, structural and geochemical information.

Page 111 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [402 x 312] intentionally omitted <==

Figure 9.20: Inferred structures from Gradient Enhanced magnetics RTPLL.

==> picture [395 x 308] intentionally omitted <==

Figure 9.21: Inferred structures from Gradient Enhanced magnetics TDR.

Page 112 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [384 x 298] intentionally omitted <==

==> picture [365 x 10] intentionally omitted <==

----- Start of picture text -----

Figure 9.22: Inferred structures from Gradient Enhanced magnetics Analytic Signal.
----- End of picture text -----

==> picture [348 x 325] intentionally omitted <==

Figure 9.23: Identified targets for ground IP follow up over geophysics anomalies defined.

Page 113 of 193

Independent Technical Report on the Maligonga-East Gold Project

9.2. Exploration Programs Completed by Waraba Gold Limited in 2022

Induced Polarisation / Resisitivity survey

Waraba Gold Limited followed up the anomalies picked by the preciously carried out Geochemical sampling exercice by the acquisition of induced polarization and resisitivity surveys in the Mamouduya and Kabafing areas of the permit (Figure 9.24). This exercise was carried out by SAGAX AFRIQUE S.A and the objective was to detect and delineate geophysical anomalies that may inmdicate geological and structural feautures that may indicate the mineralization of precious metals. It was also an opportunity to test if the sutrvey would correllate and extend the areas of gold anomalies that have been identified by the previous Geochemical and Rock chip sampling exercises. This would help define potential targets for future drilling programs.

A station spacing of 25m and line spacing of 100m was used for the survey. 42 lines of gradient array covering a total of 150.150km length was acquired in the Mamouduya area and 32 lines covering a total of 151.175 km length of data was acquired in the Kabafing area. The survey was carried out between September 2021 and March 2022.

The results of the survey identified some anomalies that needs to be followed up in order to identify their mineralization potential. The main interpreted structures were found to be oriented in NW and NE direction in Mamadouya area and NW and NNE in Kabafing area. A summary of the interpreted data are presentented in Figures 9.25 to 9.40.

==> picture [468 x 238] intentionally omitted <==

Figure 9.24: Map of surveyed area showing Mamoudouya and Kabafing

Page 114 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [476 x 439] intentionally omitted <==

Figure 9.25: Resistivity Map of Mamouduya

Page 115 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 433] intentionally omitted <==

Figure 9.26: Residual Resisitivity Map of Mamoudouya

Page 116 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 430] intentionally omitted <==

Figure 9.27: Chargeability Map of Mamoudouya

Page 117 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 433] intentionally omitted <==

Figure 9.28: Induced polarisation_Resistivity Map of Mamoudouya

Page 118 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 431] intentionally omitted <==

Figure 9.29: Conductivity Map of Momoudouya

Page 119 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 432] intentionally omitted <==

Figure 9.30: Residual Conductivity Map of Mamoudouya

Page 120 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 432] intentionally omitted <==

Figure 9.31: Contact resistance map of Mamoudouya

Page 121 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 433] intentionally omitted <==

Figure 9.32: Lithology_Resistivity_Induced Polarisation map of Mamoudouya

Page 122 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 278] intentionally omitted <==

Figure 9.33: Resistivity Map of Kabafing

==> picture [468 x 279] intentionally omitted <==

Figure 9.34: Residual Resistivity Map of Kabafing

Page 123 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 278] intentionally omitted <==

Figure 9.35: Chargeability Maf of Kabafing

==> picture [468 x 279] intentionally omitted <==

Figure 9.36: Induced Polarisation_Resistivity Map of Kabafing

Page 124 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 278] intentionally omitted <==

Figure 9.37: Conductivity Map of Kabafing

==> picture [468 x 280] intentionally omitted <==

Figure 9.38: Residual Conductivity Map of Kabafing

Page 125 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [468 x 279] intentionally omitted <==

Figure 9.39: Contact Resistance Map of Kabafing

==> picture [492 x 293] intentionally omitted <==

Figure 9.40: Lithology_Induced Polarization_Resistivity Map of Kabafing

Page 126 of 193

Independent Technical Report on the Maligonga-East Gold Project

10. DRILLING

As of the date of this report, Waraba Gold Limited had not completed any drilling programs of its own on the recently granted Maligonga property. Consequently, there is nothing to report under this section.

Page 127 of 193

Independent Technical Report on the Maligonga-East Gold Project

11. SAMPLE PREPARATION, ANALYSIS AND SECURITY

As of the date of this report, Waraba Gold Limited has not as yet undertaken any drill sampling on the Maligonga property. The author reviewed and has outlined the sample preparation process that were implemented during the historical drilling campaigns. The author is satisfied with the sample preparation, analysis and security procedures reviewed.

Historical sample preparation analysis and security

11.1. RC Sampling

The one-meter RC field samples were reported to have been collected into plastic sampling bags, after passing through a rotating cone splitter clearly labelled with the sample number in indelible marking pen. The field residue of nominal 20 to 40 kg weight were laid out on the ground in rows of 10 samples. The assay samples were collected into a labelled plastic bag with the pre-numbered sample ticket stapled inside. The bag was securely tied and segregated into larger plastic bags (by hole number), in preparation for delivery to the laboratory at the end of each shift. Approximately 5% (1:20) of samples were duplicated in the field via the collection of a second 3 kg split. Standards and blanks were inserted every 20 samples. The cone splitter can collect two equal samples at the same time, which necessitates the need for re-handling the sample material. The cone splitter was cleaned thoroughly with a compressed air gun between each sample run during the dry season.

According to historical reports, the RC samples were prepared and collected from the drill rig, then, were delivered to the camp yard facility for sample pre-preparation before before shipment to the SGS pulpo [preparation laboratory in Bamako every time a sufficient number of samples were collected and bagged. The entire procedure was undertaken by national geologists and was closely supervised by experienced geological personel. Reference material for all samples were appropriately retained and stored, including chip trays derived from RC drilling, duplicate pulps and residue of all submitted samples.

11.2. Auger Sampling

The one-meter Auger field samples were collected off the cyclone and laid out on the ground in consecutive rows of 10 samples. Field technicians poured the entire sample and collected a representative 3 m sample, providing 2 to 3 kg for laboratory submission. Pre-numbered sample ticket books were used to manually record the hole number and sample interval, the sample number was written on the plastic sample bag, and the ticket stapled to the inside of the bag. In the situation where field samples were over-saturated and spear sampling is not practical, manual scoop sampling was adopted. Approximately 1 in 20 samples were duplicated in the field via the collection of a second 2 to 3 kg composite sample, in order to monitor potential field sampling bias. Standards and blanks were inserted every 20 samples. Quality Assurance/Quality Control standard samples were also added and recorded for internal standards of the contract laboratory performance.

Page 128 of 193

Independent Technical Report on the Maligonga-East Gold Project

11.3. Sample Recovery

DCS MALI Drilling Service used 77 mm diameter RC holes that yielded a volume recovery of dry samples near 20kg/m in saprolite and 30 kg/m in fresh rock indicating acceptable recoveries of approximately 100%.

11.4. Analytical Laboratories

Cluff used the analytical services of the SGS Laboratory in Kayes, Mali, for the samples from the 2012 RC drilling program. Fokolore used the analytical services of the SGS Laboratory in Bamako for the samples from the 2016 Auger drilling program and PROSLABS Laboratory in Bamako, Mali, for the 2018 RC drilling program. The SGS Laboratories in Mali are internationally recognized independent laboratories certified by National Association of Testing Authorities (NATA), and under ISO 9000. PROSLABS Laboratory in Bamako is a quality analysis laboratory certified ISO 9001 since 2015, and ISO 17025 accredited.

At the SGS Laboratory in Bamako, Auger samples were prepared in accordance with SGS code PRP86. The samples were dried and crushed , if necessary to obtain 75% of the fraction – 2mm, split if necessary, to obtain 1.5 kg.This quantity was ground entirely with LM2 to obtain 85% of the fraction < 75 micrometer. The samples were then split up to 200 grams. 50 grams of this material was analysed by Lead Fusion DIBK wit AAS finish which has a detection limit of 0.001 ppm. The SGS code for the analysis is FAE505. All equipments were thoroughly cleaned with barren material before moving on to another sample.

11.5. QA/QC Procedures

Control of the Laboratory quality sample preparation and analytical porocedure was done via the use of blanks, duplicates and “standards” amounting 20% of the total samples shipped to the laboratory.

  • DUPLICATES: The original sample is homogenized and divided into two equal samples by splitting

  • Blanks: These are certified balank samples

  • Standards: Commercial pulp stadards have been inserted into sample batches

11.6. QAQC Program Quality Control Procedures

Folkolore and Cluff’s assay files include field blanks, commercial reference standard material and duplicate samples to provide Quality Assurance and Control.(QA/QC) on drill sample results. Cluff used 9 different standards for its RC drilling program with a range of gold grades from 0.084 g/t Au to 5.909 g/t Au. Folkolore used 4 different standards for its RC drilling program with a range of gold grades from 0.599 g/t Au to 5.829 g/t Au. Folkolore and cluff also obtained and reviewed atleast some of the internal blank, standard and duplicate control results used by the different laboratories.

11.7. Sample Preparation and Analytical procedures by SGS

Cluff RC drilling samples and Folkolore Auger drill samples were assayed at the SGS laboratory in Bamako. The SGS sample preparation and analytical approaches are summarized as follows (Figures 11.1 to 11.3)

Page 129 of 193

Independent Technical Report on the Maligonga-East Gold Project

11.8. Cluff sampling quality assurance and quality control (QA/QC)

Certified Reference Material (standard): Std OXL93, Std Si42, Std SI54, Std OXN92, Std SL51, Std Oxl78, Std OXJ80, Std Oxj68, Std OXA89 (Table 11.1.) were used by Cluff to monitor accuracy of the laboratory. Duplicate samples: the original sample is homogenized and divided into two equal samples by splitting for the RC drilling and the termite mounds samples.

Blank: Cluff used barren material

Each type of check sample was inserted every twenty (20) samples.

11.8.1: Cluff RC drilling Quality Assurance and Quality Control

11.8.1.1: Cluff RC drilling Standard Samples

Commercial certified standards were inserted into sample batches and sent to the SGS Lab in Mali to determine the accuracy of the analytical process. A total of 393 standard samples from 9 different standards were used: The standards used included:

  • Std OXL93 with grade of 5,841 g/t Au and a standard deviation of 0,10

  • Std Si42 with grade of 1,761 g/t Au and a standard deviation of 0,15

  • Std SI54 with grade of 1,780 g/t Au and a standard deviation of 0,17

  • Std OXN92 with grade of 7,643 g/t Au and a standard deviation of 0,15

  • Std SL51 with grade of 5,909 g/t Au and a standard deviation of 0,09

  • Std Oxl78 with grade of 5,876 g/t Au and a standard deviation of 0,12

  • Std OXJ80 with grade of 2,331 g/t Au and a standard deviation of 0,09

  • Std Oxj68 with grade of 2,342 g/t Au and a standard deviation of 0,06

  • Std OXA89 with grade of 0,084 g/t Au and a standard deviation of 0,01

The statistical parameters for the standards used are presented in the following Table

Standard
Code
Count of
assays
Certified
Value
Min
Ma
x
Mean
STADE
V
1 High
SD
1 Low
SD
2 High
SD
2 Low
SD
3 High
SD
3 Low
SD
Std OXL93
37
Std Si42
26
Std SI54
135
Std OXN92
24
Std SL51
35
Std Oxl78
26
Std OXJ80
63
Std Oxj68
22
Std OXA89
25
5,841
5,63
6,04
1,761
1,76
2,37
1,780
0,08
2,33
7,643
7,5
8,1
5,909
5,73
6,04
5,876
5,677 6,12
2,331
1,79
2,54
2,342
2,24
2,45
0,084
0,08
0,1
5,900
0,10
5,94
1,852
0,15
1,91
1,792
0,17
1,95
7,704
0,15
7,79
5,878
0,09
6,00
5,848
0,12
6,00
2,378
0,09
2,42
2,343
0,06
2,40
0,090
0,01
0,09
5,74
6,04
5,64
6,14
5,54
1,61
2,07
1,45
2,22
1,30
1,61
2,12
1,44
2,28
1,28
7,50
7,93
7,35
8,08
7,21
5,82
6,08
5,73
6,17
5,65
5,75
6,12
5,63
6,24
5,51
2,24
2,52
2,14
2,61
2,05
2,28
2,46
2,23
2,51
2,17
0,08
0,10
0,07
0,11
0,06

Table 11.1. Statistical Parameters for Standards of RC Drill Samples analyzed by Fire Assays

To determine whether an analytical result for a particular standard lies within acceptable limits, data was inserted into an Excel spreadsheet dedicated to that standard. A standard control sheet, unique for each standard was generates based on control limits. The control limits are defined as 3xSD (Standard Deviation) above and below the mean. The "SD (Standard Deviation)" is the Standard Deviation based on the Median Moving Range and provides a robust estimate for accuracy.

Page 130 of 193

Independent Technical Report on the Maligonga-East Gold Project

The Standard Control Sheet shows the standard assay results and Control Limits in graph format, as shown in the following figures. Standards that fall outside the defined tolerance 3 SD High or Low are considered as failed.

a. Cluff Standard Std OXL93 Control Chart

The standard Sample Std OXL93 displays a good correlation to the recommended values and therefore a good accuracy in the sample analysis (Figure 11.1). In this Control Chart all samples can be seen to plot inside the Control Limits indicating a good analysis accuracy.

==> picture [480 x 262] intentionally omitted <==

Figure 11.1: Standard Std OXL93 Control Chart. Fire Assays Analysis of Cluff RC Drill Samples

b. Cluff Standard Std Si42 Control Chart

The standard Sample Std Si42 display a good correlation to the recommended values and therefore a good accuracy in the sample analysis (Figure 11.2). In this Control Chart only two samples fall outside the Control Limits but the majority of the samples are below the 1 SD High limit indicating a good accuracy.

Page 131 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [481 x 263] intentionally omitted <==

Figure 11.2: Standard Std Si42 Control Chart. Fire Assays Analysis of Cluff RC Drill Samples

c. Cluff Standard Std SI54 Control Chart

The standard Sample Std SI54 displays a good correlation to the recommended values and therefore a good accuracy in the sample analysis (Figure 11.3). All samples are below the 1 SD High Control limit.

==> picture [485 x 263] intentionally omitted <==

Figure 11.3: Standard Std SI54 Control Chart. Fire Assays Analysis of Cluff RC Drill Samples

Page 132 of 193

Independent Technical Report on the Maligonga-East Gold Project

d. Cluff Standard Std OXN92 Control Chart

In this Control Chart (Figure 11.4) only one sample fall outside the Control Limits 3 SD High but the majority of the samples are within the 3 SD High Control Limit indicating a good accuracy.

==> picture [455 x 242] intentionally omitted <==

Figure 11.4: Standard Std OXN92 Control Chart. Fire Assays Analysis of Cluff RC Drill Samples

e. Cluff Standard Std SL51 Control Chart

In this Control Chart all samples fall inside the Control Limit 2 SD High indicating a good accuracy.

==> picture [469 x 248] intentionally omitted <==

Figure 11.5: Standard Std SL51 Control Chart. Fire Assays Analysis of Cluff RC Drill Samples

Page 133 of 193

Independent Technical Report on the Maligonga-East Gold Project

f. Cluff Standard Std Oxl78 Control Chart

In this Control Chart all samples fall inside the Control Limits 2 SD High indicating a good accuracy.

==> picture [461 x 243] intentionally omitted <==

Figure 11.6: Standard Std Oxl78 Control Chart. Fire Assays Analysis of RC Drill Samples

  • g. Cluff Standard Std Oxj80 Control Chart

In this Control Chart all samples fall inside the Control Limits 3 SD indicating a good accuracy. Only one sample fall outside the 3 SD Low Control Limit (Figure 11.7)

==> picture [459 x 242] intentionally omitted <==

Figure 11.7: Standard Std Oxj80 Control Chart. Fire Assays Analysis of RC Drill Samples

Page 134 of 193

Independent Technical Report on the Maligonga-East Gold Project

h. Cluff Standard Std Oxj68 Control Chart

In this Control Chart all samples fall inside the Control Limits 2 SD indicating a good accuracy.

==> picture [461 x 243] intentionally omitted <==

Figure 11.8: Standard Std Oxj68 Control Chart. Fire Assays Analysis of RC Drill Samples

i. Cluff Standard Std OxA89 Control Chart

In this Control Chart all samples fall inside the Control Limit 3 SD indicating a good accuracy.

==> picture [469 x 248] intentionally omitted <==

Figure 11.9: Standard Std OxA89 Control Chart. Fire Assays Analysis of RC Drill Samples

Page 135 of 193

Independent Technical Report on the Maligonga-East Gold Project

11.8.1.2. Cluff RC drilling Standard Samples

A total of 490 pulps (Table 11.2) from RC samples have been duplicated. The analysis of duplicated assays (“duplicates”) was used to check precision of the assay process.

The Table 11.2. Shows the statistical parameters of the Cluff RC drill duplicate samples

Sample Set Count of assays Mean Min Max Standard Deviation
Original Assay 490 0,01 0,006 6,81 0,33
Duplicate Assay 490 0,01 0,003 6,81 0,32

Table 11.2: Statistical Parameters for Duplicates of RC Drill Samples analyzed by Fire Assays

The plot of original and duplicate RC samples (Figure 11.10) indicates that the majority of samples (92%) have good correlation with samples pairs. Only 2 samples fall out of the 10% error line, probably due to nugget effect usually associated with free gold in samples.

==> picture [469 x 224] intentionally omitted <==

Figure 11.10: Duplicate Control Chart for Cluff RC Drilling Samples

11.8.1.3. Cluff RC drilling Blank Samples

Theoretically a blank will have a gold content below the analytical detection limit, which at most laboratories is 0.01 g/t Au (10 ppb) for a standard Fire Assay with a 50 g charge. However, instrumental and analytical errors may occur, and accidental contamination by gold-bearing material is possible, any of which, may give a result above the detection limit.

For this report, an upper limit of 0.05 g/t Au (50 ppb) Au (5 x the Detection Limit) was used for blanks i.e., results >0.05 g/t Au are considered as failed.

A total of 490 blanks were assayed with Fire Assays by SGS Lab in Bamako to monitor gold contamination. From these 490 blanks, only 3 samples returned results greater than the detection limit 0.01g/t Au. The rest

Page 136 of 193

Independent Technical Report on the Maligonga-East Gold Project

of the samples fall below the tolerance detection limit of 0.05 g/t Au defined as less than 5 times the Analytical Detection Limit. The inserted blanks indicate no issue regarding significant contamination.

==> picture [469 x 255] intentionally omitted <==

Figure 11.11: Blank Sample Control Chart Fire Assays for Cluff RC Drill Samples

11.8.2. Cluff Termite Mounds Sample Quality Assurance and Quality Control (QA/QC)

A total of 247 check samples were analyzed with Fire Assays by SGS Lab in Kayes, Mali. Three sets of QA/QC were plotted: Standard: 66 samples, Duplicates: 91 samples and Blanks: 90 samples.

11.8.2.1. Cluff Soil Standard

The standards (SI42=1760 and oxc88 = 200) were used for the termite mounds sample standards (Table 11.3). The Table 11.3. shows the statistical parameters of the Cluff termite mounds Duplicate samples.

Standard
Code
Count of
assays
Certified
Value ppb

Min
Max Mean
STADEV

High
SD
Low
SD
2 High
SD
2 Low
SD
3 High
SD
3 Low
SD
SI42=1760 23 1 760 1 612 1 828 1 761 46 1 806,26
1 713,74
1 852,52 1 667,48 1 898,78
1 621,22
Oxc88 = 215 43 200 176 425 215 55 254,98 145,02 309,96 90,04 364,94 35,06

Table 11.3: Statistical Parameters for termite mounds Samples Standards

a. Cluff Standard Std SI42 Control Chart

The Standard Std SI42 Control Chart is shown in Figure 11.14. In this Control Chart all samples fall inside the Control Limits 3 SD indicating a good accuracy. Only one sample fall outside the 3 SD Low Control Limit (Figure 11.12).

Page 137 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 258] intentionally omitted <==

Figure 11.12: Standard Std SI42=1760 Control Chart. Fire Assays Analysis of Cluff termite mounds Samples

b. Cluff Standard Std oxc88 Control Chart

The Standard Std oxc88 Control Chart is shown in Figure 11.13. In this Control Chart only three samples over 55 samples fall outside the 3 SD Low Control Limit indicating a good accuracy.

==> picture [469 x 259] intentionally omitted <==

Figure 11.13: Standard Std oxc88 Control Chart. Fire Assays Analysis of Cluff soil Samples

Page 138 of 193

Independent Technical Report on the Maligonga-East Gold Project

11.8.2.2. Cluff termite mounds Blank Samples

A total of 90 blanks were assayed with Fire Assays by SGS Lab-Kayes in Mali to monitor gold contamination. From these 90 blanks, only 3 samples returned results greater than the 5 x Detection Limit (TL) 0.05g/t Au representing 3.33%. All samples fall below the Tolerance Detection Limit of 0.05 g/t Au defined as less than 5 times the Analytical Detection Limit. The inserted blanks indicate no issue regarding significant contamination.

==> picture [469 x 253] intentionally omitted <==

Figure 11.14: Blank Sample Control Chart. Fire Assays for Cluff termite mounds Samples

11.8.2.3. Cluff termite mounds Duplicate Samples

A total of 91 repeat assays (“duplicates”) was used to check precision of the assay process. The Table 11.4. illustrates the statistical parameters of the Cluff termite mounds Duplicate samples

Sample Set Count of assays Mean Min Max Standard
Deviation
Original Assay 91 11,00 0,00 646,00 70,12
Duplicate Assay 91 13,00 0,00 790,00 100,16

Table 11.4: Statistical Parameters for Duplicates of Diamond Drill Samples analyzed by Fire Assays

The plot of original and duplicate termite mounds samples indicates that majority of samples (92%) have good correlation with samples pairs. Only 3 samples fall out of the 10% error line, probably due to nugget effect usually associated with free gold in the sample

Page 139 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [465 x 254] intentionally omitted <==

Figure 11.15: Duplicate Control Chart for Cluff termite mounds Samples

11.9 Fokolore sampling Quality Assurance and Quality Control (QA/QC)

Fokolore used SGS Laboratory in Bamako for the analysis of the Auger drilling samples and PROLAB in Bamako for the RC drilling samples.

11.9.1. Fokolore RC sampling Quality Assurance and Quality Control

A total of 757 RC check samples were analyzed with Fire Assays by SGS Laboratory in Bamako. Three sets of QA/QC were plotted: Standard: 187 samples, Duplicates: 285 samples and Blanks: 285 samples.

11.9.1.1. Fokolore RC Sample Standards

The standard (Standard SP 5,828, Standard SP 2,365, Standard SP 0,607, Standard SP 0,599) were used for the RC samples Standard (Figure 11.16). The Table 11.5 illustrates the statistical parameters of the Fokolore RC Standard samples.

Standard Code Count of
assays
Certified
Value ppb

Min
Max
Mean

STADEV

High
SD
Low
SD
2 High
SD
2 Low
SD
2 High
SD
2 Low
SD
Standard SP 5,828 44 5,828 2,660
6,500
5,617 0,522 6,35 5,31 6,87 4,78 7,39 4,26
Standard SP 2,365 47 2,365 2,280
2,450
2,364 0,042 2,41 2,32 2,45 2,28 2,49 2,24
Standard SP 0,607 53 0,607 0,580
0,620
0,599 0,013 0,62 0,59 0,63 0,58 0,65 0,57
Standard SP 0,599 43 0,599 0,290
0,620
0,586 0,053 0,65 0,55 0,70 0,49 0,76 0,44

Table 11.5: Statistical Parameters for Fokolore RC Drill Sampling Standards Analyzed by Fire Assay

Page 140 of 193

Independent Technical Report on the Maligonga-East Gold Project

a. Fokolore Standard SP 5828 Control Chart

The Standard SP 5828 Control Chart is shown in Figure 11.16. In this Control Chart only one sample falls outside the 3 SD Low Control Limit, all others check samples fall inside the 3 SD Control Limit indicating excellent accuracy.

==> picture [432 x 236] intentionally omitted <==

Figure 11.16: Standard SP 5828 Control Chart. Fire Assays Analysis of Fokolore RC Samples

b. Fokolore Standard SP 2335 Control Chart

The Standard SP 2335 Control Chart is shown in Figure 11.17. In this Control Chart all check samples fall inside the 3 SD Control Limit indicating good accuracy.

==> picture [425 x 230] intentionally omitted <==

Figure 11.17: Standard SP 2335 Control Chart. Fire Assays Analysis of Fokolore RC Samples

Page 141 of 193

Independent Technical Report on the Maligonga-East Gold Project

c. Fokolore Standard SP 0607 Control Chart

The Standard SP 0607 Control Chart is shown in Figure 11.18. In this Control Chart In this Control Chart all check samples fall inside the 3 SD Control Limit indicating good accuracy.

==> picture [438 x 237] intentionally omitted <==

Figure 11.18: Standard SP 0607 Control Chart. Fire Assays Analysis of Fokolore RC Samples

d. Fokolore Standard SP 0599 Control Chart

The Standard SP 0599 Control Chart is shown in Figure 11.19. In this Control Chart only one sample falls outside the 3 SD Low Control Limit, all others check samples fall inside the 3 SD Control Limit indicating excellent accuracy.

==> picture [423 x 230] intentionally omitted <==

Figure 11.19: Standard SP 0599 Control Chart. Fire Assays Analysis of Fokolore RC Samples

Page 142 of 193

Independent Technical Report on the Maligonga-East Gold Project

11.9.1.2. Fokolore RC Sample Duplicates

A total of 285 RC samples have been duplicated. The analysis of repeat assays (“duplicates”) was used to check precision of the assay process.

The Table 11.6. Illustrates the statistical parameters of the Fokolore RC Duplicate samples

Sample Set Count of assays Mean Min Max Standard
Deviation
Original Assay 285 0,02 0,00 5,88 0,38
Duplicate Assay 285 0,02 0,00 2,02 0,16

Table 11.6: Statistical Parameters for Fokolore RC Duplicate Samples analyzed by Fire Assays

The plot of original and duplicate RC samples (Figure 11.20) indicates that majority of samples (99%) have good correlation with samples pairs. Only 2 samples fall out of the 10% error line, probably due to nugget effect usually associated with free gold in the sample.

==> picture [469 x 257] intentionally omitted <==

Figure 11.20: Duplicate Control Chart for Fokolore RC Drilling Samples

11.9.1.3. Fokolore RC Sample Blanks

A total of 285 blanks were assayed with Fire Assays by SGS Lab-in Kayes to monitor gold contamination.

The Blank Sample Control Chart is shown in Figure 11.21. All samples fall below the Tolerance Detection Limit of 0.05 g/t Au defined as less than 5 times the Analytical Detection Limit. The inserted blanks indicate no issue regarding possible contamination.

Page 143 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 255] intentionally omitted <==

Figure 11.21: Blank Sample Control Chart. Fire Assays for Fokolore RC Drilling Samples

11.9.2. Fokolore Auger Sample sampling quality assurance and quality control

A total of xxx check samples were analyzed with Fire Assays by PROLAB in Bamako, Mali. Two sets of QA/QC were plotted: Standard: 32 samples, Duplicates: 76 samples.

11.9.2.1. Fokolore Auger Drill Sample Standards

The standards (STD 2,65, STD 0,6) were used for the Auger samples (Figure 11.22). All standards show a 99% correlation to the recommended values and a very good accuracy (Figures 11.22 to Figure 11.24).

The Table 11.7. illustrates the statistical parameters of the Fokolore RC Drill Sampling Standards

Standard
Code

Count of
assays

Certified
Value ppb

Min
Max Mean
STADEV

High SD
Low SD
2 High
SD
2 Low
SD
2 High
SD
2 Low
SD
STD 2,65
32
2,65 2,57 2,73 2,65 0,0433 2,69 2,61 2,74 2,56 2,78 2,52
STD 0,6 32 0,6 0,58 0,64 0,61 0,0171 0,62 0,58 0,63 0,57 0,65 0,55

Table 11.7: Statistical Parameters for Fokolore Auger Drill Sampling Standards Analyzed by Fire Assays

a. Fokolore Standard STD 2,65 Control Chart

The Standard SP 2,65 Control Chart is shown in Figure 11.22. In this Control Chart all Standard check samples fall inside the 3 SD Control Limit indicating excellent accuracy.

Page 144 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 258] intentionally omitted <==

Figure 11.22: Standard SP 2,65 Control Chart. Fire Assays Analysis of Fokolore Auger Samples

b. Fokolore Standard SP 0,6 Control Chart

The Standard SP 0,6 Control Chart is shown in Figure 11.23. In this Control Chart all Standard check samples fall inside the 3 SD Control Limit indicating excellent accuracy.

==> picture [462 x 266] intentionally omitted <==

Figure 11.23: Standard SP 0,6 Control Chart. Fire Assays Analysis of Fokolore Auger Samples

Page 145 of 193

Independent Technical Report on the Maligonga-East Gold Project

11.9.2.2. Fokolore Auger Drill Sample Duplicates

A total of 285 Auger samples have been duplicated. The analysis of repeat assays (“duplicates”) was used to check precision of the assay process.

The Table 11.8. illustrates the statistical parameters of the Fokolore Auger Drill Sample Duplicates

Sample Set Count of assays Mean Min Max Standard
Deviation
Original Assay 285 0,028 0,000 0,51 0,06
Duplicate Assay 285 0,029 0,000 0,54 0,07

Table 11.8: Statistical Parameters for Fokolore Auger Drill Sample Duplicates analyzed by Fire Assays

The Duplicate Samples Control Chart is shown in Figure 11.24. The plot of original and duplicate Auger samples indicates that the majority of samples (99%) have good correlation with samples pairs. Only 1 sample fall out of the 10% error line, probably due to nugget effect usually associated with free gold in the sample

==> picture [469 x 264] intentionally omitted <==

Figure 11.24: Duplicate Samples Control Chart for Fokolore Auger Drilling Samples

The QP was satisfied with the amount of verifiable information available and finds the level of verification undertaken adequate for the purpose of this technical report.

Page 146 of 193

Independent Technical Report on the Maligonga-East Gold Project

12. DATA VERIFICATION

Waraba Gold Limited has as yet not generated any new drilling data for their newly granted Maligonga property.

Only QA/QC of historical exploration drilling data from work completed between 1987 and 2018 is available for this property. The historical drilling activities were completed by a several companies. Waraba Gold Limited has been able to obtain the drilling database compiled by Fokolore Mining as well as some data presentation figures and short internal memorandum. Waraba Gold Limited was also able to supply BGR-Consult with electronic files of analytical data; these files included a mixture of analytical results for soils, rocks and drill-hole samples. BGR-Consult did not verify if Waraba Gold Limited had obtained signed assay certificates for all of the drill-hole assays, but did verify a representative portion of the previous drillhole assay databases using certified control samples inserted in the database

The author upon review of the available databases, review of QAQC procedures, together with the site visit activities discussed in this section, is of the opinion that the project data verified was adequate for the purposes of this report.

INDEPENDENT VALIDATION OF HISTORICAL DRILL DATABASE ASSAYS

BGR-Consult verified the Quality Assurance/Quality Control (QA/QC) sample used by Cluff and Fokolore for their RC drilling and soil geochemistry sampling programs. A review of the standard assay results reveals no apparent bias. The different standards used by Cluff and Fokolore display a 99% correlation to the recommended values and duplicate samples have good correlation with paired-samples. The blank assaying returned acceptable results.

Cluff and Fokolore established a program of Quality Assurance/Quality Control (QA/QC) to monitor accuracy and precision of the assay results from the laboratory. All samples from Cluff RC drilling and termite mounds geochemistry sampling were analyzed by SGS Laboratory in Kayes, Mali. Fokolore used SGS Laboratory in Bamako for the analysis of the Auger drilling samples and PROSLAB in Bamako for the RC drilling samples. SGS and PROSLAB in Bamako are independent and internationally recognized commercial laboratories.

From data presented in the following sections it can be concluded that the historical exploration data reviewed was a reasonably reliable guide and can be used with confidence to interpret gold anomalies from the drilling program and the termite mounds geochemistry sampling.

Page 147 of 193

Independent Technical Report on the Maligonga-East Gold Project

Site Visit Activities

A site visit was undertaken by Mr. Olufemi Ajayi between the 26[th] of September to the 2[nd] of October as part of the requirements in the compilation of the technical report to review available project data and make site observations pertaining to the project. Traverses were undertaken to the most accessible portions of the permit to observe outcropping geology, ascertain the nature of access through the permit, observe the nature of artisanal mining present, and any evidence of historical work completed. Figure 12.1 is a summary of the total traverses undertaken during the site visit and some significant site observations.

==> picture [467 x 389] intentionally omitted <==

Figure 12.1: Summary of Traverses Undertaken During Site Visit in 2021

Outcrops were rarely observed during the site visit. The few outcrops observed were quartz veins and graphitic schist with a pelitic schist contact within an excavated artisanal trench as shown in Figure 12.2 below.

Page 148 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [227 x 8] intentionally omitted <==

----- Start of picture text -----

Graphitic Schist and Pelitic Schist Contact at 277900E, 1379100N
----- End of picture text -----

==> picture [337 x 239] intentionally omitted <==

Sample from Quartz Vein Observed at 276757E, 1376390N

==> picture [334 x 289] intentionally omitted <==

Photo 12.2: Rock Exposures Observed During Site Visit 2021

Page 149 of 193

Independent Technical Report on the Maligonga-East Gold Project

One historical trench was observed in the field. The location of the trench observed ties well with historical Trench 13, which according to historical reports, was completed by BRGM in 1992. The trench had an azimuth of 110[o] and a length of 300m. Figure 9.24 below is a summary location map showing the historical Trench 13 observed.

==> picture [468 x 356] intentionally omitted <==

Figure 12.3: Summary Map Showing Historical Trench Observed During Site Visit 2021

Figure 12.4 below shows the historical trench 13 as observed during the site visit.

Page 150 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [366 x 275] intentionally omitted <==

Photo 12.4: Historical Trench Observed During Site Visit 2021

A single historical drill collar was observed during the site visit. The location of the drill collar observed was 276940E, 1376591N. This location corresponded with the historical drill hole number MRC-18-056 as reported by historical reports to have been undertaken by Fokolore Mining Sarl in 2018. The azimuth and dip values recorded on the PVC collar marker was consistent with the values reported. The collar observed is shown in Figure 12.5 below.

==> picture [404 x 217] intentionally omitted <==

Figure 12.5: Historical Drill Collar Observed During Site Visit 2021

Page 151 of 193

Independent Technical Report on the Maligonga-East Gold Project

Significant artisanal mining activity was observed within the project area during the site visit. Fully mechanized activities comprising the use many excavators and haulage trucks was observed along with manual artisanal mining activities. There were sections where previous artisanal mining activities have left behind large mined out pits and huge tailings stockpiles as shown in Figure 12.6 below.

==> picture [128 x 8] intentionally omitted <==

----- Start of picture text -----

Mined-out pit at 277896E, 1379096N
----- End of picture text -----

==> picture [369 x 267] intentionally omitted <==

Significant tailings pile Observed at 277913E, 1379108N

==> picture [387 x 215] intentionally omitted <==

Photo 12.6: Artisanal Mining Pit and Tailings Pile Observed During Site Visit 2021

The QP was satisfied with the amount of verifiable information available and observations made during the site visit adequate for the purpose of this technical report.

Page 152 of 193

Independent Technical Report on the Maligonga-East Gold Project

13. MINERAL PROCESSING ET METALLURGICAL TESTING

This section is not applicable to this report.

14. MINERAL RESOURCE ESTIMATES

This section is not applicable to this report.

15. MINERAL RESERVE ESTIMATES

This section is not applicable to this report.

16. MIMING METHOD

This section is not applicable to this report.

17. RECOVERY METHOD

This section is not applicable to this report.

18. PROJECT INFRASTRUCTURE

This section is not applicable to this report.

19. MARKET STUDIES ET CONTRACTS

This section is not applicable to this report.

20. ENVIRONMENTAL STUDIES, PERMITTING AND SOCIAL OR COMMUNITY IMPACTS

Waraba Gold Ltd has not carried out any environmental studies, Permitting or social or community impact studies.

21. CAPITAL AND OPERATING COST

This section is not applicable to this report.

22. ECONOMIC ANALYSIS

This section is not applicable to this report.

Page 153 of 193

Independent Technical Report on the Maligonga-East Gold Project

23. ADJACENT PROPRITIES

There are numerous gold deposits in the Malian Kedougou-Kenieba Inlier, both at the mining and advanced exploration stages. Gold mining operations include Fekola, Sadiola, Gounkoto, Yatela and Loulo (Figure 23.1)

==> picture [443 x 464] intentionally omitted <==

----- Start of picture text -----

Siribaya Fault system
Seko-Kabaya Fault system
Second order Fault system
Mamadouya Fault system
Major crustal-scale Fault system
----- End of picture text -----

Figure 23.1: Adjacent gold properties to the Maligonga-East Project

In addition, exploration projects similar to the Maligonga-East Project are on-going and producing significant results. Example include the Seko, Sory, Kabaya, Siribaya and Diakha advanced projects. The projects in the proximity to Maligonga-East are described below and shown on Figure 23.1 and information on these deposits was extracted from several documents on the company websites including Fact Sheet and their reserve and resource reports.

Page 154 of 193

Independent Technical Report on the Maligonga-East Gold Project

23.1. Siribaya and Diakha Gold Deposits

The Siribaya and Diakha projects are wholly owned by Iamgold Corporation and consists of 8 contiguous exploration permits covering a total area of 596.5 square kilometers. The Siribaya project which includes the Siribaya Zone 1B and Taya-Ko gold deposits is located approximately 5 km southwest of the Maligonga East property and the Diakha project arounds 25 km southwest of the property.

23.1.1. Siribaya Gold Deposit

The Siribaya Zone 1B and Taya Ko occur within the north-northeast trending Siribaya structural trend, which has been traced by geophysics and geochemistry for over 10 km along strike, with a width of up to 1.0 km to 1.5 km. The Siribaya trend is located in the generally fine grained, back-arc to for-arc, median to distal detritic and carbonated sediments of the Kofi Formation approximately 20 km east of the SMSZ. The general structure and morphology of the trend is defined by a ground induced polarization (IP) gradient survey, which shows a very well-defined 010° to 015° trend that is approximately 600 m to 1,000 m wide.

Hydrothermal carbonate occurs as pervasive alteration and vein-associated alteration-mineralization styles whereas silicification is mainly represented by veining with subtle wall-rock alteration, particularly in the area surrounding quartz stockwork veins and breccia, or as patches of quartz in the cement of the polymictic

breccia. Intensive bleaching with talc-carbonate alteration is also common at Zone 1B; bleaching is sometimes so intense that it has led to misinterpreting greywacke as felsic volcanite

==> picture [456 x 237] intentionally omitted <==

Sources https://www.sec.gov/Archives/edgar/data/1203464/000119312516495238/d102642dex991.htm AMGOLD Corporation and Merrex Gold Inc. – Siribaya Project Technical Report NI 43-101 – January 25, 2016

Figure 23.2: Geological and structural cross-section showing the style of mineralization at Siribaya

23.1.2. Diakha Gold Deposit

At Diakha, the largest deposit discovered to date on the property, gold mineralization occurs within an albitized and locally brecciated sandstone unit similar to that hosting mineralization at Iamgold's Boto gold Project located in Senegal approximately 10 km to the north along strike. The subsurface geology at Diakha

Page 155 of 193

Independent Technical Report on the Maligonga-East Gold Project

is known from drill holes, observations from artisanal trenches, and a few outcrops scattered around the area. Geologically, the Diakha area can be broadly divided into two north-northeast trending litho-structural domains that are separated by an interpreted west-dipping thrust fault coinciding with a thin limestone layer intersected by drilling. The western domain is made of fine-grained detrital sediments, mainly shales, few argillites, pelites, and some fine sandstones lenses and limestone (Figure 23.3).

The eastern domain is comprised of albitized pink and massive sandstones that are cherty locally and greywacke sandstone. A few dikes of mafic and intermediate intrusive rocks occur within the sediments. The three main alteration phases are: Pervasive Albite (-/+hematite impregnation): sodic pervasive alteration that has turned the rock pinkish.

==> picture [444 x 246] intentionally omitted <==

Sources: https://www.sec.gov/Archives/edgar/data/1203464/000119312516495238/d102642dex991.htm AMGOLD Corporation and Merrex Gold Inc. – Siribaya Project Technical Report NI 43-101 – January 25, 2016

Figure 23.3: Geological and structural cross-section showing the style of mineralization at Diakha

A press release on IAMGOLD’s website dated 30[th] January 2019 includes the Mineral Resource Estimates shown in Table 24.1. Cut-off grades range from 0.35 to 0.45 g/t Au. Effective December 31, 2018, the Siribaya and Diakha projects host Mineral Resources comprising Indicated Resources of 18.0 million tonnes averaging 1.28 grams of gold per tonne for 744,000 ounces and Inferred Resources of 23.2 million tonnes averaging 1.58 grams of gold per tonne for 1.2 million ounces.

Deposit Indicated
Tonnes
Indicated
Tonnes
Resources
g/t Au

oz Au
Inferred Resources
Tonnes
g/t Au
Inferred Resources
Tonnes
g/t Au
oz Au
Siribaya
Zone 1B
2,102,000
1.90 128,500 4,094,000 1.52 199,700
Taya Ko 882,000 1.02 28,900
Diakha 15,929,000 1.20 615,300 18,203,000 1.62 947,500
Total 18,031,000 1.28 743,800 23,179,000 1.58 1,176,100
Data source; https://www.sec.gov/Archives/edgar/data/1203464/000106299319000415/exhibit99-1.pdf

Table 24.1. Diakha - Siribaya Project - Mineral Resource Estimates as of December 31, 2018

Page 156 of 193

Independent Technical Report on the Maligonga-East Gold Project

24. OTHER RELEVANT DATA AND INFORMATION

No additional information or explanation is necessary to make this Technical Report understandable and not misleading.

Page 157 of 193

Independent Technical Report on the Maligonga-East Gold Project

25. INTERPRETATION AND CONCLUSIONS

25.1 Geological and structural interpretation of the Mamadouya Gold Mineralization

Interpretation of drill sections and the integrated geophysical lineaments, geological and structural modeling of the Mamadouya gold mineralization (Figures 25.1, 25.2 and 25.3) suggest that the area is composed of three lithological units:

  • (1) Steeply-eastward-dipping, north-northeast-trending early paleoproterozoic greenschist facies turbidite sedimentary sequences (Figure 25.1) belonging to the Kofi Formation and composed of:

  • alternating layers of sandstone (greywacke) and siltstone that hosts the gold mineralization, locally intercalated with graphitic shales to the west

  • alternating layers of siltstone and argillite to the east

The turbidite sequence forms the main component of the sedimentary rocks. The rock is generally quite massive and composed of alternating centimetric to metric coarse-grained sandstone (greywacke) and finegrained siltstone layers but show penetrative foliation and fractures in zone of deformation.

==> picture [468 x 189] intentionally omitted <==

----- Start of picture text -----

EAST WEST
----- End of picture text -----

Figure 25.1: Photograph showing the steeply-ENE-dipping turbidite sequence composed of Interbedded siltstones and fine-grained greywackes. (Photo taken during December 2020 site visit)

  • (2) Concordant Eburnean NNE-striking, Steeply-ENE-dipping (80-85◦) pink granite intrusive dykes intruding the Early Paleoproterozoic sedimentary rocks. The intrusive dyke is interpreted as granodiorite of felsic to intermediate in composition. The rock seems to be a pink granodiorite with abundant pink frequent feldspar phenocrysts as well as amphibole phenocrysts in a fine-grained ferromagnesian groundmass. The dyke’s strike is similar to the regional NNE-trending of the thrust fault systems crossing-over the area and interpreted from the regional geological map.

  • (3) Late dolerite dikes form a swarm crosscutting all previous rocks. They are undeformed, strike northnorth-east, are concordant to the main direction of the sedimentary unit and form a prominent high relief in the northern portion of the Maligonga-East permit. The dolerite dikes are interpreted to extrude the Basin during the Mesozoic at ca. 200 Ma and are probably related to far field tectonic events during global-scale rifting and breakup of the Pangea supercontinent leading to opening of the Atlantic Ocean.

Page 158 of 193

Independent Technical Report on the Maligonga-East Gold Project

The main structure that controls the gold mineralization in the Mamadouya gold prospect strikes in a general NNE direction and steeply dips towards ENE (Figure 25.4, Figures 25.1, 25.2 and 25.3) and is concordant with the trend of the lithological bedding. The structure deformed both the intrusive rocks and the sedimentary unit (Figures 25.2, 25.3, and 25.4). The gold mineralization is contained into the hanging-wall side of the fault structure and occurs in zone of extensional and dilation fracture systems.

==> picture [446 x 176] intentionally omitted <==

Figure 25.2: Photograph showing highly sheared black fine-grained siltstone rock with penetrative foliation and quartz-filled fractures within the Mamadouya shear zone. Highly mineralized rock mined by local miners. (Photo taken during December 2020 site visit)

==> picture [446 x 251] intentionally omitted <==

Figure 25.3: Photograph showing stockwerk of extensional dilation quartz veins in sandstone layer showing hydrothermal alteration and high-grade gold mineralization within the Mamadouya shear zone. (Photo taken during December 2020 site visit) The gold mineralization is therefore, structurally controlled and is contained into parallel corridors of deformation and hydrothermal alteration, hosted preferentially in the more brittle greywacke rock (Photo 25.4) and in a lesser extend in the siltstone (Photo 25.2) and the granodiorite intrusive unit.

Page 159 of 193

Independent Technical Report on the Maligonga-East Gold Project

The brittle-ductile shear zone displays a foliation (S1) and elongation lineation (L1) defined by stretched, elongated (Photo 26.2) and rotated features (Photo 26.4) within the turbidite sequence. The brittle-ductile deformation fabric is heterogeneously developed within the sediment likely due to the difference of rheology. The more competent rocks have a more brittle response (Photo 26.3) to the stress field while the least competent rocks display a more ductile response (Photo 26.2). The brittle features include brecciation and veining (Photo 26.3). The brecciated rock is strongly hydrothermally altered, host high-grade gold mineralization, show evidence of fluid/rock interaction and is in place invaded by a stockwork of quartz veins (Photo 26.3 and 26.3).

==> picture [469 x 372] intentionally omitted <==

----- Start of picture text -----

EAST WEST
----- End of picture text -----

Figure 25.4: Photograph of the Mamadouya Shear Zone in vertical section (Looking toward the south) showing the steeply easterly-dipping shear zone that affects highly mineralized turbidite sequence composed of alterning sandstone and siltstone. The Shear zone is concordant and shows typical kinematic indicator such as S-shaped Sigmoidal structure within the sandstone layer that indicates a reverse displacement during deformation. (Photo taken during December 2020 site visit)

Gold occurs as dissemination into the host rocks and is associated with pyrite, pyrrhotite, and arsenopyrite. The key alteration associated with the gold mineralization are silicification, calcite and chlorite alteration suggesting low temperature formation during gold deposition typical of the shear zone-type orogenic gold mineralization in greenstone belts.

Page 160 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 610] intentionally omitted <==

Figure 25.5: Structural Interpretation: Overlay of the IP structures with interpreted gold structure showing the relationship between structures and the gold mineralization in the Mamadouya Gold prospect

Page 161 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 609] intentionally omitted <==

Figure 25.6: Structural Interpretation: Overlay of the Gradient Chargeability Interpreted structures with geological, structural and interpreted gold structure showing the relationship between structures and the gold mineralization in the Mamadouya Gold Prospect

Page 162 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 618] intentionally omitted <==

Figure 25.7: Interpreted geological and structural Map of the Mamadouya Gold mineralization showing geological units, structural elements and the interpreted gold mineralized structure.

Page 163 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 615] intentionally omitted <==

Figure 25.8: Interpreted geological and structural map of the Mamadouya gold mineralization showing the completed exploration works

Page 164 of 193

Independent Technical Report on the Maligonga-East Gold Project

Geology
Gold Mineralization
LEGEND
Sandstone - Siltstone
Argillite - Siltstone
Birimian Granite
Gold Mineralized Structure
Dolerite Dyke

Structure
Main Shear Zone
Late Fault System
Faulted Lithological Contact

==> picture [469 x 302] intentionally omitted <==

Figure 25.9: Geological and structural cross-section Line 1378 950 N showing the gold mineralized structure

Page 165 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 301] intentionally omitted <==

Figure 25.10: Geological and structural cross-section Line 1378 475 N showing the gold mineralized structure

==> picture [465 x 301] intentionally omitted <==

Figure 25.11: Geological and structural cross-section Line 1378 450 N showing the gold mineralized structure

Page 166 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 302] intentionally omitted <==

Figure 25.12: Geological and structural cross-section Line 1378 350 N showing the gold mineralized structure

==> picture [469 x 302] intentionally omitted <==

Figure 25.13: Geological and structural cross-section Line 1378 250 N showing the gold mineralized structure

Page 167 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 302] intentionally omitted <==

Figure 25.14: Geological and structural cross-section Line 1378 150 N showing the gold mineralized structure

==> picture [469 x 302] intentionally omitted <==

Figure 25.15: Geological and structural cross-section Line 1378 050 N showing the gold mineralized structure

Page 168 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [467 x 301] intentionally omitted <==

Figure 25.16: Geological and structural cross-section Line 1377 950 N showing the gold mineralized structure

==> picture [468 x 302] intentionally omitted <==

Figure 25.17: Geological and structural cross-section Line 1377 850 N showing the gold mineralized structure

Page 169 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 302] intentionally omitted <==

Figure 25.18: Geological and structural cross-section Line 1377 750 N showing the gold mineralized structure

==> picture [469 x 301] intentionally omitted <==

Figure 25.19: Geological and structural cross-section Line 1377 650 N showing the gold mineralized structure

Page 170 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 302] intentionally omitted <==

Figure 25.20: Geological and structural cross-section Line 1377 550 N showing the gold mineralized structure

==> picture [477 x 307] intentionally omitted <==

Figure 25.21: Geological and structural cross-section Line 1377 450 N showing the gold mineralized structure

Page 171 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [469 x 302] intentionally omitted <==

Figure 25.22: Geological and structural cross-section Line 1377 350 N showing the gold mineralized structure

==> picture [469 x 302] intentionally omitted <==

Figure 25.23: Geological and structural cross-section Line 1377 250 N showing the gold mineralized structure

Page 172 of 193

Independent Technical Report on the Maligonga-East Gold Project

25.2. Regional Overview: Geological and Structural Evolution of the Mamadouya Gold Mineralization

Geological and structural relationships, alteration assemblage and the style of gold mineralization within the Maligonga-East permit demonstrate that the Mamadouya mineralization is a classic example of a mesothermal shear-zone-controlled, intrusive related, orogenic-type gold mineralization, hosted in greenstone folded and deformed sedimentary successions of sandstone and siltstone. Kinematic analysis relationships along the Mamadouya shear zone indicates that rocks in the Maligonga-East area have been deformed by at least two major plate-scale ductile and brittle-ductile trans-compressional episode of deformation that was the prominent mode of deformation responsible for the formation of the shear zone systems. The structural evolution of the Mamadouya East gold mineralization can be summarized as followed (Figures 26.21):

25.2.1. Basin Formation

Following global-scale tectonic extension and intra-continental rifting during the Early Paleoproterozoic sediments of the Kofi Formation of the Daléma Group were deposited in a tectonically active extensional fault-bounded deep to moderately shallow basin at ca 2.3-2.2 Ga and rest on ca. 3.0 Ga Archean granitic rocks (Milési et al., 1989; Thieblemont et al., 2001).

25.2.2. The first Deformation D1

The first deformation D1 that affected the Daléma Basin occurred at ca 2.1 Ga and involved a regional NESW-directed collisional crustal shortening transpressional deformation attributed to the Early Eburnean Orogeny (Feybesse et al. 2006). This deformation was accompanied by massive folding, thrusting and faulting across the Basin. The D1 tectonic event was likely associated with extensive calc-alkaline granite intrusions (e.g., Egal et al., 2002) that are widespread throughout the area. These calc-alkaline granites likely formed from local melting of the metasedimentary rocks in the deep part of the Basin during peak metamorphism compressional tectonism (Egal et al., 2002).

In the Maligonga-East area, the syn-tectonic pink granite intrusive rock may have been formed during the episode of D1 deformation following dextral strike slip movement along the fault.

25.2.3. The second Deformation D2

The second deformation D2 is associated with the formation (or reactivation) of the brittle-ductile NNEstriking, ENE-steeply-dipping strike-slip shear zone systems that affected contacts between the sedimentary sequence and the granitic rocks. Kinematic analysis along the shear zones at Mamadouya (Figure 26.21) and orientation of the regional-scale NW-SE compressional stress field indicate that the Mamadouya Shear Zone experimented a Reverse-Sinistral Strike-Slip movement accommodating the NW-SE compression of the D2 deformation. The D2 deformation is likely associated with the ca. 2.0 Ga regional-scale anticlockwise block rotation compressional tectonism of the Late Eburnean Orogen (Feybesse and Milési, 1994). The brittle component of the fault, which ‘brittly’ deformed competent lithologies such as the greywacke of the sedimentary sequence created dilation and extension areas (at fault jogs, bends, bumps or branches etc.) along the Mamadouya Fault Zone during sinistral-slip movement (Figure 26.21), which are

Page 173 of 193

Independent Technical Report on the Maligonga-East Gold Project

favorable enhanced permeability structural traps for hydrothermal mineralizing fluid flow, fluid/rock interaction, hydrothermal alteration, and gold mineralization that formed the Maligonga-East gold mineralization.

==> picture [495 x 568] intentionally omitted <==

----- Start of picture text -----

D2 Restriction
Dilation
Restriction
D2
D2
Restriction
Dilation
LEGEND
Geology
Sandstone - Siltstone
Argillite - Siltstone D2
Restriction
Birimian Granite
Dolerite Dyke
Structure
Main Shear Zone
Late Fault System
Faulted Lithological Contact
Gold Mineralization
Gold Mineralized Structure
----- End of picture text -----

Figure 25.24: Geological and Structural interpretation of the Mamadouya Gold Mineralization

Page 174 of 193

Independent Technical Report on the Maligonga-East Gold Project

The gold mineralization at Maligonga-East is therefore structurally controlled and occurs in brittle-ductile shear zones that deformed competent layers of greywacke and in a lesser extend the siltstone and the granit rocks, creating structural traps along the shear zone that were sites for hydrothermal alteration by Au– bearing mineralizing fluids.

25.2.4. Mesozoic tectonism and dolerite intrusion

During the Mesozoic at ca 200 Ma, faults reactivation, concomitant with the opening of the Atlantic Ocean, created pathways for dolerite magma ascension and emplacement (Hirdes et al., 1996). These dolerite dykes cross-cut all lithology and are the youngest geological events that affected the area (Figure 26.21). These dolerite dykes outcrop northwest of the Mamadouya mineralization (Figure 26.21)

25.2.5. Late faulting

The Maligonga-East area is overprinted by numerous NE-striking late fault systems that offset earlier structures and the sedimentary sequence (Figure 26.21). These faults are likely produced by far field tectonic event and fault reactivation during the neo-tectonic deformation events.

25.2.6. Origin of the mineralizing fluids

The Mamadouya shear zone displays evidence for hydration and fluid flow evidenced by the presence of numerous quartz-filled breccias and quartz-calcite veins that occur within the shear. These evidences suggest that hydration associated with hydrothermal fluid circulation prevailed during the development of the shear zone and played a key role in the hydrothermal alteration and ore-forming processes.

The hydrothermal mineralizing fluids likely derived from metamorphic fluids generated during metamorphism associated with the thermal Orogen. These fluids were derived from dehydration of hydrous minerals and flow toward deep and large fracture systems and dilatant jogs that resulted from brittle reactivation of the early ductile shear zone. Magmatic hydrothermal fluids derived from fluid degassing from the syn-orogenic calk-alkaline magmas associated with the D2 thermo-tectonism can also play an important role in the hydrothermal ore-forming processes. Goldfarb et al. (2010) demonstrated that in orogenic greenstone belt terrane gold deposits can be formed from mixing between metamorphic hydrothermal fluids and magmatic-derived hydrothermal fluids.

25.2.7 Gold Potential of the Maligonga-East permit

Results of the geological, structural and geophysical interpretations demonstrate that the Maligonga-East permit has a high potential to host economic gold deposits. The 4-km long, high-angle Mamadouya NWstriking, steeply-ENE-dipping shear zone system has the highest potential to host mineable gold deposit as the shear formed dilatational jogs along the fault zone that can host large and high-grade god mineralization.

Lithologies that host the gold mineralization in the Mamadouya prospect are highly altered, sheared, and brecciated sandstone rocks of the Daléma Basin, similar to those containing the Siribaya, Kabaya, Seko and Sory deposits located immediately west of the permit. The Mamadouya prospect can therefore be considered high priority target within the permit and is recommended for future aggressive exploration programs. There are other spots of high anomalous values and areas of broad lower soil and termite mounds

Page 175 of 193

Independent Technical Report on the Maligonga-East Gold Project

values throughout the remaining of the permit (Figure 26.22) that should be considered second priority areas for future investigations consisting of shallow RAB drilling and detailed lithological and structural mapping aimed at identifying the geological source of the anomalies. Specifically, mapping will concentrate on delineating major fault structures similar to those identified in the Mamadouya Prospect.

In regards with the gold exploration strategy in the Maligonga-East area, attention must be paid to the NEstriking shear zones associated with the D2 tectonic event of the Late Eburnean. Similar structures control the gold mineralization in the nearby deposits (Siribaya, Sory and Seko) (Figure 26.22) and represent high potential targets for gold exploration. BGR-Consul strongly recommends detailed analysis of the remaining area of the Maligonga-East permit, in order to map the detailed structural framework and to put it in relationship with the regional tectonic features revealed during this report. This would provide a specific structural context for the whole Maligonga-East permit in regards with the regional tectonic setting.

==> picture [451 x 352] intentionally omitted <==

==> picture [470 x 60] intentionally omitted <==

----- Start of picture text -----

Argillite - Siltstone Main Shear Zone
Sandstone - Siltstone Late Fault System
Faulted Lithological Contact
Dolerite Dyke River
----- End of picture text -----

Figure 25.25: Overlay of the geological, gold geochemical and structural data showing the relationship between interpreted regional structures, lithological domains and the surface gold mineralization

Page 176 of 193

Independent Technical Report on the Maligonga-East Gold Project

25.3. CONCLUSIONS

The Maligonga-East gold project consists of an exploration license covering a surface area of 100 km² in the Kofi formation of the Daléma Basin, Western Mali – West Africa. Successive exploration works completed by BGRM, Ressources Robex Inc, Cluff Gold Plc and Fokolore Mining Sarl were professionally managed, and procedures were consistent with generally accepted industry best practices. The exploration data from termite mounds, soils and rocks geochemistry sampling, geophysical survey, trenches and drilling are sufficiently reliable to confidently allow interpretation of the gold anomalies in the Maligonga-East property and planning of an extensive drilling program over existing gold anomalies and in areas that have not been drill-tested.

Early soil geochemistry survey and trenches from BRGM in 1992, geophysical survey and RC drilling south of the Mamadouya target zone completed by Robex between 2007 and 2008, infill termite mounds geochemistry sampling, geophysical survey and extensive RC drilling by Cluff in the Mamadouya zone in 2012 and geological and structural mapping and interpretations, Auger and RC drilling completed by Fokolore between 2015 and 2018 resulted in the identification of the Mamadouya gold mineralization of the Maligonga-East property and numerous others anomalous zones of gold mineralization targets. Drilling programs completed by Cluff and Fokolore intercepted high grade gold mineralization over the Mamadouya prospect including [email protected]/t Au, [email protected]/t Au, 6m@16,43/t, 7m@6,06g/t Au, 7m@4,51g/t Au and 13m@2,7g/t Au.

Additional geological and structural interpretations by BRG-Consult in 2020 determined the geological and structural setting of the area and the style of the gold mineralization, established a conceptual geological and structural model for the gold mineralization and identified the Mamadouya brittle-ductile shear zone that has a strong spatial correlation with the gold mineralization. The NNE-striking and steeply ENEdipping reverse-sinistral shear zone system controls the gold mineralization within the Mamadouya prospect and is identical to structures that host the nearby Siribaya (Iamgold Corp.), Kabaya (Roscan), Soro and Seko (Oklo Resources) gold deposits.

Geological and structural interpretations by BRG-Consult demonstrated that the Mamadouya gold mineralization is hosted in faulted and sheared contact between sedimentary successions of sandstone and siltstone of the Daléma Basin and suggested that the gold mineralization is structurally controlled and occurs in deformed zones of large and highly hydrothermally altered, NNE-striking, ENE-steeply-dipping, structural corridors that contain a complex network of extensional dilation fracture systems. New highgrade gold mineralization (including [email protected]/t Au and [email protected]/t Au) in RC drilling by Fokolore in 2018 over the Mamadouya mineralization show a possible northern extension of the mineralization over 800 meters.

The Maligonga-East permit is part to the Paleoproterozoic rocks of the Daléma Basin of the KedougouKenieba Inlier, in the Birimian Super group of West Africa that hosts several multi-million-ounce gold deposits (example include Tabakoto, Gounkoto, Fekola, Diakha and Siribaya, Kabaya, Sory and Seko gold deposits). Geological and structural relationships demonstrate that the Mamadouya gold deposit is a

Page 177 of 193

Independent Technical Report on the Maligonga-East Gold Project

mesothermal shear-zone-controlled, intrusive-related, orogenic-type gold mineralization, hosted in greenstone faulted sedimentary successions. The deposit structural evolution and the gold mineralization style is identical to the nearby Siribaya (Iamgold Corp.), Kabaya (Roscan), Soro and Seko (Oklo Resources) gold deposits. The Maligonga-East property can therefore, be considered as very prospective terrane to host economic gold deposit, considering that aggressive additional exploration works including extensive drilling programs will continue to further define and delineate additional gold mineralization.

Based on BGR-Consult’s site visit and subsequent review of available historical exploration information, BGR-Consult offers the following general comments and conclusions.

  • Historical exploration results on the Maligonga-East property indicate the presence of significant, nearsurface gold mineralization with potential for economic gold discovery higher than previously expected. The Mamadouya gold mineralization is the highest priority exploration target within the Maligonga-East concession. Additional drilling and geochemical analysis are required to evaluate the resource and economic potential of the target.

  • The assessment of and conclusions made in this report on the exploration potential of the MaligongaEast property is based on the historical exploration results, particularly the gold results obtained from historical geochemistry sampling and the RC and Auger drilling programs from BGRM, Robex, Cluff and Fokolore.

  • BGR-Consult concludes that the type of and amount of historical exploration works completed by BGRM, Robex, Cluff and Fokolore and data generated by this work for the Maligonga-East property provides an adequate basis for the review and assessment of exploration potential provided in this technical report, and the recommendations made herein.

  • Any significant variations of the reported historical results could impact the conclusions and work recommendations made in this report.

  • The normal risk associated with exploration project exists, so there is no guarantee that the proposed exploration work will identify economically viable gold mineralization on the property.

Page 178 of 193

Independent Technical Report on the Maligonga-East Gold Project

26. RECOMMENDATIONS

The Maligonga-East property is a relatively advanced exploration project and significant detailed works have led to the identification of the Mamadouya gold mineralization with potential for containing an economic gold mineralization. BGR-Consult considers that the character and extent of the gold mineralization delineated is of sufficient merit to warrant additional exploration expenditures. BGRConsult recommends an exploration work program that - if implemented - will advance the project to a resource and reserve estimations and a pre-feasibility study stage.

The following recommendations for additional exploration work on the Maligonga-East property are proposed. A Phase I Reserve Circulation (RC) drilling and Air Core (AC) drilling programs over the Mamoudouya area and a Phase II RC and AC drilling programs over the Kabafing prospect are recommended to increase the potential for economic gold mineralisazation within the permit. The budget is estimated for each drilling phase and is for the proposed field and administrative costs, logistics and contractors, but do not include any corporate management fees.

26.1.DRILLING

26.1.1. Recommended Phase I Drilling Program

Recommended RC Drilling Program

The detailed structural, geological interpretation and modelling on the Mamadouya gold mineralization resulted in a coherent and comprehensible new geological and structural model that gives a better understanding of the structural setting and the style of the gold mineralization of the deposit which has nesecitated re-oriented further drilling programs. The proposed Phase I RC drill program will test and expand the Mamadouya gold mineralization and its immediate northern extension where positive geochem results have been obtained in the past. The Phase I RC drilling program will test the interpreted structural and geological model of the deposit. The objectives are therefore, to:

  • Test the proposed geological and structural model of the gold deposit

  • Test a strike length of 2.3 km over the interpreted mineralized structure

  • Define and delineate laterally and down dip the gold deposit within the interpreted structure

  • 178 drill holes cutting across 19 cross sectional lines across the ore body with an average depth of 120m totaling 23000m depth

  • Holes are oriented East-West, with an azimuth 0f 90[ o] and dip of -90[o] .

The Phase I RC drilling program maps are shown in Figures 26.1 and 26.2.

Recommended Air Core Drilling Program

The Phase I Air Core drilling program is designed to test the chargeability and Resistivity anomalies that were picked up during the Induced Polarization and Resistivity survey. The objective of the Air Core drilling program is to enhance confidence in in-situ anomalies and to identify additional target zones of gold mineralization which may warrant further drilling programs.

BGR-Consult recommends 206 drill holes with an average depth of 20m making a total of 4120m.

Page 179 of 193

Independent Technical Report on the Maligonga-East Gold Project

26.1.2 Recommended Phase II RC and AC Drilling Program

The Phase II RC and AC drilling programs is aimed at testing the chargeability and resistivity anomalies identified in the Kabafing area and to extend the prospective area for potential economic mineralization beyond the Mamadouya area of the permit.

27 RC drill holes with an average depth of 120m making a total of 3240m depth with an azimuth of 90 and dip -90 is proposed and 152 AC drill holes with an average depth of 20m making a total of 3040m with a dip of -90 are proposed for the phase II drilling program.

==> picture [464 x 459] intentionally omitted <==

Figure 26.1: Recommended Phase 1 RC drill program in Mamoudouya gold mineralization

Page 180 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [434 x 244] intentionally omitted <==

Figure 26.2: Long section view of Recommended RC drill program in Mamoudouya gold mineralization

==> picture [431 x 352] intentionally omitted <==

Figure 26.3: Recommended Phase II drill program in Kabafing prospect

Page 181 of 193

Independent Technical Report on the Maligonga-East Gold Project

26.2. RECOMMENDED BUDGET

Detailed costs were provided by Waraba and were applied to the various categories in the estimated budget in Table 27.2. BGR-Consult considers these costs to be reasonable and in line with current costs in the region. Costs for the recommended work program are based on an estimated completion time of 12 months. An approximate 1-year recommended exploration budget of approximately 3M US$ is outlined in the following Table based on a systematic exploration program as recommended above.

==> picture [448 x 126] intentionally omitted <==

Table 26.1: Recommended Exploration Budget for the Maligonga-East permit

Page 182 of 193

Independent Technical Report on the Maligonga-East Gold Project

27. REFERENCES

Abouchami W. & Boher M. 1990. A major 2.1 Ga event of mafic magmatism in West Africa: an early stage of crustal accretion, Journal of Geophysical Research, volume 95, N°B11, 17605-17629

  • Boher, M., Abouchami, W., Michard, A., Albarede, F. and Arndt, N. T. 1992. Crustal growth in West Africa at 2.l Ga. Journal of Geophysical Research 97, 345-369.

  • BRGM (1999): Notice explicative de la carte géologique à 1/200 000, Feuille No. 6, Siguiri, Projet de cartographie géologique du Nord-Est de la Répubique de la Guinée, 22 pages.

  • Deckart, K., Feraud, G., Bertrand, H., 1997. Age of Jurassic continental tholeiites of French Guyana, Suriname, and Guinea: implications for the initial opening of the Central Atlantic Ocean. Earth Planet. Sci. Lett. 150, 205–220.

  • Egal, E., Thiéblemont, D., Lahondère, D., Guerrot, C., Costea, C.A., Iliescu, D., Delor, C., Goujou, J.C., Lafon, J.M., Tegyey, M., Diaby, S. and Kolié,´ P. (2002) Late Eburnean granitization and tectonics along the western and northwestern margin of the Archean Kénéma–Man domain (Guinea, West African Craton), Precambrian Research 117, pp. 57-84

  • Feybesse, J.L. and Milesi, J.P. (1994) The Archaean/Proterozoic Contact Zone in West Africa: A Mountain Belt of Décollement Thrusting and Folding on a Continental Margin Related to 2,1 Ga Convergence of Archaean Cratons? Precambrian Research, 69, 199-227. https://doi.org/10.1016/0301-9268(94)90087-6

  • Feybesse J. L., Millési J. P., Ouédraogo M. F et al. 1990. La ceinture protérozoïque inférieure de BoromoGoren (Burkina Faso): un exemple d’interférence entre deux phases transcurrentes éburnéennes, Comptes Rendus de l'Académie des Sciences Paris, t 310, II, 1353-1360.,

  • Feybesse J., Billa M., Costea A., et al., 1999: Carte Geologique au 1:200000. Feuille KANKAN NC-29XV et Notice Explicative. In: Mamedov et al.: Geologie de la Republique de Guinee. VOLUME I; 103-111.

  • Feybesse, J.L., Billa, B., Guerrot, C., Duguey, E., Lescuyer, J.L., Milési J.P. and Bouchot, V. (2006) The Paleoproterozoic Ghanaian province: Geodynamic model and ore controls, including regional stress modelling, Precambrian Research 149, pp. 149-196

  • Goldfarb, R.J., Groves, D.I. and Gardoll, S. (2001) Orogenic gold and geologic time: a global synthesis, Ore Geology Reviews 18, pp. 1-75

  • Goldfarb, R.J., Baker, T., Dube, B., Groves, D.I., Hart, C.J.R., Craig, J.R., Gosselin, P. (2005) Distribution, character and genesis of gold deposits in metamorphic terranes, Economic Geology 100th Anniversary Volume, pp. 407-250.

  • Groves, D.I., Goldfarb, R.J., Gebre-Mariam, M., Hagemann S.G. and Robert, F. (1998) Orogenic gold deposits: A proposed classification in the context of their crustal distribution and relationship to other gold deposit types, Ore Geology Reviews 13, pp. 7–27

  • Hirdes, W., Davis, D.W., Lüdtke, G., Konan, G. (1996) Two generations of Birimian (Paleoproterozoic) volcanic belts in North-eastern Côte d‟Ivoire (West Africa): consequences for the „Birmimian controversy‟, Precambrian Research 80, pp. 173-191

  • Lompo, M. (2010) Paleoproterozoic structural evolution of the Man-Leo Shield (West Africa). Key structures for vertical to transcurrent tectonics, Journal of African Earth Sciences 58, pp. 19-36

  • Mamedov V.I; Boufeev Y.V & Nikitine Y.A., 2010: Geologie de la Republique de Guinee. Volume I. Geosprospects Ltd. Universite d'Etat de moscou Lomonossov M. (Faculté géologique).

  • Milési, J. P., Feybesse, J. L., Ledru, P., Dommanget, A., Ouedraogo, M. F., Marcoux, E., Prost, A., Vinchon, Ch., Sylvain, J. P., Johan, V., Tegyey, M., Calvez, J. Y., Lagny, P., (1989). West African gold deposits, in their lower Proterozoic lithostructural setting. Chronique de la Recherche Miniere, 497, 3–98.

Page 183 of 193

Independent Technical Report on the Maligonga-East Gold Project

  • Paranhos, C. (2008) Siguiri Gold Mine - State of knowledge of the main geological controls of gold mineralization, Company Report, pp. 1-40

  • Ridley, J.R. and Diamond, L.W. (2000) Fluid chemistry of orogenic lode-gold deposits and implications for genetic models, Society of Economic Geologist Reviews, Vol. 13, pp. 141-162

  • Robert, F. and Poulsen, K.H. (2001) Vein formation and deformation in greenstone gold deposits, Society of Economic Geologist Reviews, Vol. 14, pp. 111-155

  • Sibson, R.H. and Scott, J. (1998) Stress/fault controls on the containment and release of over-pressured fluids: Examples from gold-quartz vein systems in Juneau, Alaska; Victoria, Australia and Otago, New Zealand, Ore Geology Reviews 13, pp. 293–306.

  • Simon Meadows Smith FIMMM 2017 Technical Report on the Tomboko Gold Project

  • Thieblemont, D., Delor, C., Cocherie, A., Lafon, J. M., Goujou, J. C., Balde, A., Bah, M., Sane, H and Fanning, C. M., 2001. A 3.5 Ga granite gneiss basement in Guinea: further evidence for early archean accretion within the West African Craton, Precambrian Research, v. 108, p. 179-194.

Page 184 of 193

Independent Technical Report on the Maligonga-East Gold Project

28. DATE AND SIGNATURE PAGE

The effective date of this Technical Report, entitled “Independent Technical Report on the Maligonga-East Gold Project - Kéniéba –Mali West – West Africa”, is 18[th] November, 2022

For

BIRIMA GOLD RESOURCES CONSULTING

S09/Hann Mariste II - Dakar Senegal N.I.N.E.A 007 054 521 - Register No SN DKR 2018 A 27289

  • /S/ Signed and Sealed Olufemi Ajayi

Olufemi Ajayi

MAIG (Membership Number 7790) Consulting Geologist for BGR-Consult BSc. Geology, Federal University of Technology, Minna, Nigeria Tel +2348033668482 Email. [email protected]

Page 185 of 193

Independent Technical Report on the Maligonga-East Gold Project

29. CERTIFICATE OF QUALIFIED PERSON

Olufemi Ajayi, Bsc. (Geo), MAIG

I, Olufemi Ajayi BSC. (Geo) as a qualified person for this report entitled “Independent Technical Report on the Maligonga, East Gold Project” prepared for WARABA Gold Limited and dated 18 November, 2022, do hereby certify that

  1. I am a senior consulting Geologist with Birima Gold Resources, S09/Hann Mariste II Dakar Senegal, N.I.N.E.A. 007 054 521 – Register No SN DKR 2018 A 27289

  2. I am a graduate of the Federal University of Technology, Minna, Nigeria, with a Bsc. In Geology (2007).

  3. I am registered as a member of the Australian Institute of Geoscientists (MAIG) #7790. I have worked as an Exploration Geologist for a total of 14 years since my graduation My relevant experience for the purpose of the Technical Report includes: -Review and report as a geology consultant involved in numerous consulting and mineral exploration assignments including project technical evaluations, technical report preparation for the purposes of project financing and fund raisings, regulatory reporting, IPO and due diligence reviews on projects in West Africa..

  4. I have read the definition of ‘Qualified Person’ as set out in NI43-101 and certify that by reason of my education and affiliation with a professional association (as defined in NI43-101), I fulfil the requirements to be a ‘Qualified Person’ for the purposes of NI43-101.

  5. I have visited the Maligonga East Gold Project between 26 September and 2 October 2021

  6. I am responsible for all Sections of the Technical Report entitled ‘National Instrument 43-101 Independent Technical Report on the Maligonga East Gold Project

  7. I am independent of the issuer, the Maligonga East Gold Project and any/ all former owners applying the tests in Section 1.5 of NI43-101; and

  8. I have had no prior involvement with the property that is the subject of the Technical Report.

  9. I have read NI43-101, and the Technical Report has been prepared in compliance with NI43-101and Form 43-101F1

  10. At the effective date of the Technical Report, to the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading.

Dated 18[th] November, 2022. Accra, Ghana

SIGNED BY Olufemi Ajayi

Page 186 of 193

Independent Technical Report on the Maligonga-East Gold Project

APPENDIX

Appendix 1: Land Tenure Documents

Here in are copies of the Arêtes granted to GONKA GOLD MALI SARL for the Maligonga-East permit

==> picture [375 x 537] intentionally omitted <==

Page 187 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [464 x 469] intentionally omitted <==

Page 188 of 193

Independent Technical Report on the Maligonga-East Gold Project

Included herein are copies of the Arêtes granted to FOKOLORE MINING SARL for the Maligonga-East

==> picture [424 x 606] intentionally omitted <==

permit

Page 189 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [394 x 633] intentionally omitted <==

Page 190 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [455 x 649] intentionally omitted <==

Page 191 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [438 x 602] intentionally omitted <==

Page 192 of 193

Independent Technical Report on the Maligonga-East Gold Project

==> picture [441 x 389] intentionally omitted <==

Page 193 of 193