Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

WA1 RESOURCES LTD Capital/Financing Update 2024

Feb 1, 2024

66031_rns_2024-02-01_6fe90548-4182-4298-b478-7ad6ee7adc9f.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX RELEASE

==> picture [142 x 84] intentionally omitted <==

2 FEBRUARY 2024

WEST ARUNTA PROJECT

HIGH-GRADES CONTINUE IN THE WEST AT LUNI

Highlights

  • Latest assay results provide both extension and infill of high-grade mineralisation across the western portion of Luni

  • Best new RC intersections from 100m-spaced drillholes include:

LURC23-231 from 63m: 9m at 3.7% Nb2O5

LURC23-232 from 45m: 12m at 3.4% Nb2O5

LURC23-234 from 86m: 17m at 2.2% Nb2O5

LURC23-235 from 86m: 80m at 1.5% Nb2O5 (to EOH)

LURC23-236 from 52m: 120m at 1.0% Nb2O5 (to EOH)

LURC23-239 from 32m: 74m at 1.4% Nb2O5

including from 38m: 17m at 3.1% Nb2O5

LURC23-240 from 46m: 17m at 3.8% Nb2O5

LURC23-241 from 41m: 11m at 3.1% Nb2O5

  • Extension of mineralisation from broad 200m-spaced step-out drilling in the west including:

LURC23-007 from 36m::

LURC23-007 from 36m:: 72m at 0.9% Nb2O5 (to EOH)

including from 44m: 13m at 1.9% Nb2O5

LURC23-052 from 30m: 90m at 0.9% Nb2O5 (to EOH)

including from 42m: 12m at 1.9% Nb2O5

  • Additional assays from 2023 drilling are expected over the coming weeks with diamond drilling scheduled to recommence this month

WA1 Resources Ltd (ASX: WA1) ( WA1 or the Company ) is pleased to announce further exploration results from drilling at the 100% owned West Arunta Project in Western Australia.

WA1’s Managing Director, Paul Savich, commented:

“These latest assay results further consolidate the southwestern zone of Luni by closing the gap between previously reported 200m spaced step-outs. Further step-out holes have also extended the mineralised footprint to the west.

“Detailed planning and preparation for this year’s activities are being finalised with diamond drilling planned to recommence later this month. In parallel, our metallurgical testwork programs are now underway at leading laboratories both locally and internationally.”

==> picture [56 x 66] intentionally omitted <==

WA1 RESOURCES LTD | ABN: 51 646 878 631 | ASX: WA1 LEVEL 2, 55 CARRINGTON ST, NEDLANDS WA 6009 | +61 8 6478 7866 | WWW.WA1.COM.AU

==> picture [594 x 93] intentionally omitted <==

==> picture [483 x 387] intentionally omitted <==

Figure 1: Western Luni plan view with drill collar locations and selected new intersections

Geological Discussion - Luni Carbonatite (Sambhar Prospect Area)

Assay results within this release relate to further reverse circulation ( RC ) drillholes (refer to Table 2) completed at the Luni carbonatite. A total of 200 RC drillholes, 30 diamond drillholes and five diamond tails have been completed at Luni with assay results from 125 drillholes now reported.

New significant drill intersections within this announcement (refer to Figure 1, Figure 3 and Table 1) predominantly relate to broad 200m-spaced step-out and 100m spaced infill RC drillholes in the western area of the Luni carbonatite complex.

Drillholes LURC23-231 to 241 infill previously reported broad 200m-spaced holes in the western portion of Luni where high-grade mineralisation was previously discovered (refer to ASX announcement dated 26 October 2023). The results provide evidence for the continuity of shallow, high-grade niobium mineralisation in this area and enhances the geological understanding of this part of the carbonatite complex and supports ongoing resource definition work.

Drillhole LURC23-052 is located on the most western line of the planned 200m grid drillhole coverage (refer to Figure 3) and intersected high-grade mineralisation, providing expansion of

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

the footprint to the west. LURC23-055 was drilled 200m east of 052, however the hole was terminated after it failed to penetrate through the cover sequence due to the suspected presence of a localised deeper channel. Further broad spaced drilling is being planned in this western zone for this year to better constrain the mineralisation intersected in this area.

==> picture [481 x 282] intentionally omitted <==

Figure 2: Simplified section A-A’ looking west

LURC23-050 was designed to test a separate gravity anomaly to the southwest of Luni and to better understand the geology of this area. The hole intersected ultramafic and gneissic units.

The orientation of enriched, oxide mineralisation (true width) intersected to date is generally interpreted to be sub-horizontal and coincident with the flat lying transition between intensely and moderately weathered carbonatite. Drilling to date has focussed on outlining the mineralisation in the weathered zone of the Luni carbonatite. The potential for primary mineralisation in the deeper, unweathered zone is considered significant and will be tested at the appropriate time.

Current & Upcoming Activities

Drilling activities are anticipated to recommence this month, with the diamond drill rig and WA1 site infrastructure currently in place at Luni to allow for an efficient restart. Other key personnel and equipment is currently being remobilised.

There remains a significant backlog of samples from both RC and diamond drilling that are progressing through data capture processes and laboratory analysis. It is expected the remaining results will progressively be reported over the coming months and will form the basis for an initial Mineral Resource estimate anticipated during calendar Q2-2024.

Following receipt of diamond core samples in December, the Company has now commenced targeted metallurgical testwork programs at select laboratories both locally and internationally.

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

==> picture [759 x 427] intentionally omitted <==

Figure 3: Luni carbonatite plan view of completed and planned drilling with grade by width intersections to date For previously released results refer to ASX announcements dated 6 February, 1 May, 5 June, 29 June, 21 August, 28 August, 26 September, 26 October, 8 November and 11 December 2023

==> picture [594 x 93] intentionally omitted <==

Niobium Overview

Niobium is a critical metal with unique properties that make it essential as the world transitions to a low carbon economy.

The primary niobium product is Ferroniobium (FeNb, ~65% Nb) which accounts for approximately 90% of a 100,000tpa[1] market. Ferroniobium is utilised as a micro alloy in the steel industry to improve the mechanical properties of steel.

Niobium pentoxide (Nb2O5) represents a key growth market, with significant recent developments in lithium-ion battery technology to utilise niobium to substantially reduce charge times down to six minutes while enhancing battery life by up to 20,000 cycles, an increase of up to 10x compared to existing technologies[2] .

==> picture [276 x 235] intentionally omitted <==

Figure 4: Key Niobium Resources Globally Source: See table 3 for full details

Whilst global supply is concentrated in Brazil (90% of global production), global demand for niobium products is widespread. There are many end users and a growing number of applications.

==> picture [483 x 241] intentionally omitted <==

Figure 5: Major suppliers and consumers of global niobium Source: Adapted from CBMM data and Australian critical mineral list (2023)

Note 1. Mordor Intelligence: Global Niobium Market Report 2023 2 https://www.batterydesign.net/niobium-in-batteries/ accessed on 18 August 2023

==> picture [595 x 93] intentionally omitted <==

ENDS

This Announcement has been authorised for market release by the Board of WA1 Resources Ltd.

For further information, please contact:

Investors

Media

Paul Savich Michael Vaughan Managing Director Fivemark Partners T: +61 8 6478 7866 T: +61 422 602 720 E: [email protected] E: [email protected]

Or visit our website at www.wa1.com.au

Competent Person Statement

The information in this announcement that relates to Exploration Results is based on information compiled by Ms. Stephanie Wray who is a Member of the Australian Institute of Geoscientists. Ms. Wray is a full-time employee of WA1 Resources Ltd and has sufficient experience which is relevant to the style of mineralisation under consideration to qualify as a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Ms. Wray consents to the inclusion in the announcement of the matters based on her information in the form and context in which it appears.

Disclaimer: No representation or warranty, express or implied, is made by the Company that the material contained in this announcement will be achieved or proved correct. Except for statutory liability which cannot be excluded, each of the Company, its directors, officers, employees, advisors and agents expressly disclaims any responsibility for the accuracy, fairness, sufficiency or completeness of the material contained in this presentation and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any effort or omission therefrom. The Company will not update or keep current the information contained in this presentation or to correct any inaccuracy or omission which may become apparent, or to furnish any person with any further information. Any opinions expressed in the presentation are subject to change without notice.

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

About WA1

WA1 Resources Ltd is based in Perth, Western Australia and was admitted to the official list of the Australian Securities Exchange (ASX) in February 2022. WA1’s shares are traded under the code WA1.

WA1’s objective is to discover Tier 1 deposits in Western Australia’s underexplored regions and create value for all stakeholders. We believe we can have a positive impact on the remote communities within the lands on which we operate. We will execute our exploration using a proven leadership team which has a successful track record of exploring in WA’s most remote regions.

Forward-Looking Statements

This ASX Release may contain certain “forward-looking statements” which may be based on forward-looking information that are subject to a number of known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those presented here. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. For a more detailed discussion of such risks and other factors, see the Company’s Prospectus and Annual Reports, as well as the Company’s other ASX Releases. Readers should not place undue reliance on forward-looking information. The Company does not undertake any

==> picture [314 x 415] intentionally omitted <==

obligation to release publicly any revisions to any forward-looking statement to reflect events or circumstances after the date of this ASX Release, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws.

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Table 1: Drilling Results - Significant Intercepts

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TREO Nd+Pr NdPr:TREO Sc₂O₃ Ta₂O₅ SrO Th U P₂O₅ TiO₂
(%)
(%) (ppm) (%) (ppm) (ppm) (%) (ppm) (ppm) (%)
LURC23007 incl
and
36 108 72 0.87 0.58 1,316 23 27 77 0.6 38 28 15.3 1.1
44 57 13 1.90 0.82 1,797 22 37 123 1.1 49 44 19.4 2.2
74 84 10 1.68 0.65 1,514 23 21 36 0.6 26 36 21.0 0.9
LURC23008 and 44 74 30 0.30 0.29 618 22 10 65 0.2 44 53 2.2 0.7
84 91 7 0.26 0.61 1,240 20 12 266 0.3 51 82 15.7 1.8
LURC23052 incl
and
and
and
and
30 120 90 0.87 0.23 514 22 7 53 0.3 24 20 1.4 0.8
42 54 12 1.91 0.44 1,024 23 7 129 0.7 61 36 1.9 1.2
60 67 7 2.02 0.46 1,092 24 5 70 0.8 38 36 2.5 0.9
78 89 11 1.40 0.35 808 22 6 37 0.5 19 20 1.3 0.7
97 98 1 2.21 0.88 1,985 23 11 120 1.0 38 44 8.0 1.0
119 120 1 1.85 0.54 1,201 22 14 136 1.3 43 54 4.3 0.9
LURC23063 and
incl
and
incl
103 111 8 0.39 0.70 1,533 22 28 213 1.2 56 92 20.8 1.4
118 126 8 0.48 0.27 625 23 22 50 0.5 43 39 23.1 0.4
123 124 1 1.33 0.33 809 24 28 54 0.7 105 28 30.3 0.3
134 148 14 0.50 0.28 642 22 14 141 0.3 66 77 15.5 0.5
136 137 1 1.23 0.27 596 22 19 131 0.6 72 119 24.2 0.2
LURC23231 incl 63 115 52 0.96 0.52 1,242 24 14 12 0.6 18 24 10.6 0.7
63 72 9 3.69 1.69 4,024 24 40 29 1.9 66 70 6.7 2.4
LURC23232 incl
and
and
and
44 80 36 1.52 0.48 1,156 24 9 33 0.4 14 20 10.2 0.6
45 57 12 3.45 0.98 2,398 24 18 66 0.7 28 46 14.6 1.6
71 72 1 1.05 0.26 663 25 3 17 0.3 13 6 10.0 0.1
85 93 8 0.29 0.16 369 24 2 3 0.1 3 2 2.9 0.1
97 106 9 0.31 0.12 281 24 2 14 0.1 3 4 3.0 0.1

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TiO₂
(%)
TREO Nd+Pr NdPr:TREO Sc₂O₃ Ta₂O₅ SrO Th U P₂O₅
(%) (ppm) (%) (ppm) (ppm) (%) (ppm) (ppm) (%)
and
incl
and
incl
110 118 8 0.35 0.16 410 26 2 9 0.2 3 6 6.1 0.0
117 118 1 1.03 0.28 725 26 2 25 0.3 7 16 11.0 0.1
122 148 26 0.62 0.13 309 24 2 33 0.1 6 17 4.1 0.2
125 126 1 1.46 0.20 495 25 2 109 0.3 11 91 6.3 0.8
LURC23233 incl 75 148 73 0.55 0.37 881 24 7 9 0.3 7 14 13.7 0.3
76 81 5 1.31 0.77 1,837 24 13 16 0.7 12 19 18.6 0.6
LURC23234 incl
and
84 124 40 1.19 0.45 1,039 23 6 17 0.7 13 21 11.9 0.6
86 103 17 2.19 0.79 1,850 23 7 17 1.0 21 31 19.2 1.0
128 151 23 0.32 0.20 467 23 3 13 0.3 4 21 5.7 0.2
LURC23235 and
incl
and
62 63 1 0.21 0.08 135 17 32 15 0.0 34 9 0.1 4.3
86 166 80 1.54 0.55 1,318 24 12 65 0.7 31 43 16.4 0.3
86 102 16 2.04 0.94 2,187 23 24 146 1.2 84 78 17.0 0.7
112 166 54 1.55 0.48 1,145 24 9 46 0.6 19 37 16.2 0.3
LURC23236 incl
and
incl
and
and
30 45 15 0.43 0.14 253 18 15 56 0.1 23 37 0.4 0.8
37 38 1 2.00 0.24 400 17 12 275 0.3 32 190 0.8 2.2
52 172 120 0.95 0.57 1,322 23 9 13 0.5 8 28 12.4 0.5
58 60 2 1.44 0.56 1,285 23 18 21 0.7 17 18 11.9 1.6
64 102 38 1.56 0.67 1,585 23 12 21 0.7 11 22 15.3 0.6
145 146 1 1.06 0.71 1,609 23 8 12 0.5 8 55 18.4 0.3
LURC23237 and
and
and
incl
29 32 3 0.35 0.24 484 19 28 31 0.3 62 8 1.1 2.9
45 46 1 0.24 0.31 720 23 9 26 0.3 78 33 15.3 0.3
52 53 1 0.24 0.50 1,169 23 10 29 0.2 59 21 16.0 2.3
68 107 39 0.72 0.21 501 23 11 34 0.3 20 11 6.9 0.4
72 73 1 1.03 0.13 290 22 16 74 0.7 24 20 3.8 0.3

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TiO₂
(%)
TREO Nd+Pr NdPr:TREO Sc₂O₃ Ta₂O₅ SrO Th U P₂O₅
(%) (ppm) (%) (ppm) (ppm) (%) (ppm) (ppm) (%)
and
and
79 89 10 1.22 0.21 486 23 7 15 0.3 16 6 6.7 0.6
99 101 2 1.14 0.35 815 23 16 63 0.3 42 26 10.7 0.8
LURC23238 and
and
and
incl
34 56 22 0.28 0.72 1,633 23 36 98 0.8 65 52 13.4 2.0
60 68 8 0.21 0.34 724 22 17 42 0.4 32 55 7.7 1.3
74 75 1 0.24 0.14 305 22 5 7 0.2 19 23 4.3 0.1
79 124 45 0.64 0.42 930 22 16 147 0.4 51 62 10.2 0.6
96 103 7 1.90 0.63 1,349 22 28 100 0.6 89 78 11.4 0.6
LURC23239 incl
and
and
and
and
and
and
incl
and
32 106 74 1.37 0.60 1,426 24 18 97 0.6 36 39 11.2 0.9
33 34 1 1.80 0.71 1,460 21 75 41 0.5 84 44 2.0 0.9
38 55 17 3.08 1.25 3,012 24 37 219 1.2 93 87 4.8 2.0
62 77 15 1.31 0.55 1,323 24 6 122 0.6 20 34 20.8 0.4
81 82 1 1.62 0.39 956 24 4 12 0.5 23 20 25.4 0.9
86 87 1 1.29 0.39 987 25 5 47 0.5 23 21 21.3 0.2
97 100 3 1.54 0.47 1,148 25 8 46 0.5 28 26 14.9 0.2
111 130 19 1.13 0.29 655 23 3 22 0.3 11 22 6.8 0.4
113 114 1 1.29 0.20 488 24 2 12 0.3 10 24 6.0 0.4
120 128 8 1.81 0.39 882 23 3 25 0.3 16 33 9.6 0.5
LURC23240 incl
and
and
35 76 41 2.21 0.79 1,838 23 19 134 0.9 37 57 12.1 1.4
35 39 4 1.66 0.85 2,040 24 29 100 0.7 41 64 3.7 1.6
46 63 17 3.80 1.27 2,912 23 26 258 1.5 63 100 11.1 2.1
67 72 5 2.01 0.69 1,624 24 6 13 0.8 22 14 23.3 0.6
LURC23241 incl
and
41 76 35 1.24 0.42 981 23 8 23 0.7 15 28 8.6 1.1
41 52 11 3.12 1.05 2,497 24 16 27 1.7 28 43 16.3 1.8
70 71 1 1.48 0.27 618 23 4 4 0.5 11 33 14.4 0.6

==> picture [595 x 64] intentionally omitted <==

==> picture [594 x 93] intentionally omitted <==

Hole ID From
(m)
To
(m)
Interval
(m)
Nb₂O₅
(%)
TiO₂
(%)
TREO Nd+Pr NdPr:TREO Sc₂O₃ Ta₂O₅ SrO Th U P₂O₅
(%) (ppm) (%) (ppm) (ppm) (%) (ppm) (ppm) (%)
and
and
incl
and
and
81 84 3 0.29 0.10 242 23 4 24 0.2 8 19 5.3 0.4
89 130 41 0.44 0.18 405 23 1 12 0.3 6 6 5.7 0.2
99 100 1 1.61 0.65 1,526 23 5 10 0.6 21 12 21.7 0.5
106 107 1 1.23 0.17 405 23 1 34 0.4 15 13 6.2 0.4
114
115
1
1.09
0.17
405
23 1 18 0.5 13 3 5.2 0.3

Note 2: 'TREO’ is an abbreviation of Total Rare Earth Oxides, representing a combined group of 16 elements (La, Ce, Pr, Nd, Sm, Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu, Y, Sc).

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

Table 2: Collar locations for drillhole results within this release

Hole ID Drill
Type
Easting Northing RL Dip Azimuth Depth
(m) (Degrees) (Degrees) (m)
LURC23007 RC 435800 7540798 381 -60 180 108
LURC23008 RC 435800 7540998 382 -60 180 114
LURC23050 RC 434800 7540400 380 -90 0 124
LURC23052 RC 434800 7541004 385 -60 180 120
LURC23055 RC 435000 7540998 385 -90 0 52
LURC23063 RC 435402 7540798 385 -60 180 150
LURC23231 RC 435900 7540058 383 -90 0 118
LURC23232 RC 435900 7540158 383 -90 0 148
LURC23233 RC 435900 7540258 383 -90 0 148
LURC23234 RC 435900 7540358 383 -90 0 154
LURC23235 RC 435900 7540458 383 -90 0 166
LURC23236 RC 435900 7540558 383 -90 0 172
LURC23237 RC 435900 7540658 383 -90 0 124
LURC23238 RC 435900 7540758 383 -90 0 124
LURC23239 RC 435700 7540158 383 -90 0 130
LURC23240 RC 435700 7540258 383 -90 0 76
LURC23241 RC 435700 7540358 383 -90 0 130

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

Table 3: Key niobium resources globally

Deposit Size Nb2O5 Contained Nb2O5
CBMM (Araxa) (Mt) (%) (kt)
Measured
Indicated
Inferred
Unknown
Unknown

Unknown*
Unknown
Unknown

Unknown*
Unknown
Unknown

Unknown*
Total 462 2.48% 11,458
Source: US Geological Survey published 2017 available at https://pubs.usgs.gov/pp/1802/m/pp1802m.pdf
*Measured, Indicated and Inferred resource notpublicly available to due CBMMprivate ownership
Lynas Rare Earths (Mt Weld) (Mt) (%) (kt)
Measured
Indicated
Inferred
0
2
36
0
1.40%
1.06%
0
21
384
Total 38 1.07% 405
Source: Lynas Corporation Ltd 2023 Annual Report, https://wcsecure.weblink.com.au/pdf/LYC/02724575.pdf
Resource as at 30 June 2023(JORC 2012 Compliant)
Magris Resources (Niobec) (Mt) (%) (kt)
Measured
Indicated
Inferred
286
344
68
0.44%
0.40%
0.37%
1,252
1,379
252
Total 698 0.41% 2,883
Source: IAMGOLD NI 43-101 Report available at https://www.miningdataonline.com/reports/Niobec_12102013_TR.pdf
Resource as at 31 December 2012(NI 43-101 Compliant)
CMOC (Catalao II) (Mt) (%) (kt)
Oxide
Measured
Indicated
Inferred
0.3
0.1
1.3
0.86%
0.74%
0.83%
2
1
11
Total 1.7 0.83% 14
Fresh Rock (Open Pit)
Measured
Indicated
Inferred
0
27
13
0.00%
0.95%
1.06%
0
258
138
Total 40 0.99% 396
Fresh Rock (Underground)
Measured
Indicated
Inferred
0.0
0.2
6.3
0.00%
0.89%
1.24%
0
2
78
Total 6.5 1.23% 80
Total (All) 48.4 1.01% 490
Source: China Molybdenum Co. Ltd: Major Transaction Acquisition of Anglo American PLC's Niobium and Phosphate
Businesses available at https://www1.hkexnews.hk/listedco/listconews/sehk/2016/0908/ltn20160908840.pdf
Resource as at 30 June 2016(JORC 2012 Compliant)

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

CRITERIA COMMENTARY
Sampling
techniques

Geological information referred to in this ASX Announcement is
derived from a Reverse Circulation (RC) drill rig.

From every RC metre drilled a 2-3kg sample (split) was sampled
into a calico bag via the rig mounted cone splitter. Samples
submitted to the laboratory were determined by the rig geologist.

Every RC metre interval was analysed with an Evident Vanta
handheld XRF (pXRF) to aid in identifying zones of interest.

All samples were submitted to ALS Laboratories in Perth for
elemental analyses via Lithium Borate Fusion (ME-MS81D) with
overlimit determination via ALS method ME-XRF30.
Drilling techniques  RC drillingwas completed at all holes with a diameter of 146mm.
Drill sample
recovery
 Sample recoveries are visually estimated for each metre with poor
or wet samples recorded in the sample table.
 The sample cyclone was routinely cleaned at the end of each 6m
rod, when sample was wet or moist, or when deemed necessary.
 No relationship has been determined between sample recovery and
the mineralisation returned.
 Samples were moist for the majority of the intersections and
recoverywas moderate through the significant intervals reported.
Logging  The RC chips were logged for geology, alteration, and mineralisation
by the Company’s geological personnel. Drill logs were recorded
digitally and have been verified.
 Logging of drill chips is qualitative and based on the presentation of
representative chips retained for all 1m sample intervals in the chip
trays.
 The metre intervals were analysed on the drill pad by pXRF,
magnetic susceptibility and scintillometer to assist with logging and
the identification of mineralisation.
Sub-sampling
techniques and
sample
preparation
 RC samples were collected from the drill rig splitter into calico bags.
 In all holes the 1m samples within the upper cover sequence were
composited into 4m intervals from spoil piles using a scoop by the
site geologist.
 Single metre samples were collected and assayed from
approximately16m or as determined bythe sitegeologist.
Quality of assay
data and
laboratory tests
 All samples were submitted to ALS Laboratories in Perth for select
element analyses via Lithium Borate Fusion (ME-MS81D) with
overlimit determination via ALS method ME-XRF30.
 Standard laboratory QAQC was undertaken and monitored by the
laboratory and then by WA1 geologists upon receipt of assay results.
 Certified Reference Materials (CRMs) were inserted at a rate of one
for every 20 samples. The CRM results have passed an internal
QAQC review. Blanks were inserted to identify any contamination.
Some minor contamination has been noted with ongoing
investigation by the Company and the laboratory to identify and
mitigate any potential sources.
 The laboratory standards have been reviewed by the company and
havepassed internalQAQC checks.

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

CRITERIA COMMENTARY
Verification of
sampling and
assaying
 Analytical QC is monitored by the laboratory using standards and
repeat assays.
 Mineralised intersections have been verified against the downhole
geology.
 Logging and sampling data was recorded digitally in the field.
 Significant intersections are inspected by senior Company
geologists.
 Previously selected samples have been sent to Intertek for umpire
laboratory analysis with results showing a strong correlation to the
primarylaboratory.
Location of data
points
 Drillhole collars were surveyed and recorded using a handheld GPS.
Drill collars are then surveyed with DGPS at appropriate stages of
the program.
 All co-ordinates are provided in the MGA94 UTM Zone 52 co-
ordinate system with an estimated accuracy of +/-5m.
 Azimuth and dip of the drillholes is recorded after completion of the
hole using a gyro. A reading is taken every 30m with an accuracy of
+/-1 degree azimuth and +/-0.3 degree dip.
Data spacing and
distribution
 See drillhole table for hole position and details.
 Data spacing is actively being assessed and will be considered for its
suitabilityin Mineral Resource estimation.
Orientation of data
in relation to
geological
structure
 The orientation of the oxide-enriched mineralisation is interpreted
to be sub-horizontal. The orientation of primary mineralisation is
poorly constrained due to the limited number of drillholes that have
penetrated to depth.
 See drillhole table for hole details and the text of this
announcement for discussion regarding the orientation of holes.
 Drillholes were designed based on interpretation from modelled
geophysical data and results from drillholes to date.
 Oxide mineralisation is currently interpreted as a sub horizontal
oxide unit. Modelling of the mineralisation is underway to constrain
the true and apparent width of the enriched zone.
Sample security  Sample security is not considered a significant risk with WA1 staff
present during collection.
 All geochemical samples were collected, bagged and sealed by WA1
staff,and delivered to ALS Laboratories either in Perth or Adelaide.
Audits or reviews  The program and data is reviewed on an ongoing basis by senior
WA1personnel.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

CRITERIA COMMENTARY
Mineral tenement
and land tenure
status
 All work completed and reported in this ASX Announcement was
completed on E80/5173 which is 100% owned by WA1 Resources Ltd.
 The Company also currently holds two further granted Exploration
Licences and nine Exploration Licence Applications within the area
of the West Arunta Project.

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

CRITERIA COMMENTARY
Exploration done
by other parties
 The West Arunta Project has had limited historic work completed
within the Project area, with the broader area having exploration
focused on gold, base metals, diamonds and potash.
 Significant previous explorers of the Project area include Beadell
Resources and Meteoric Resources. Only one drill hole (RDD01) had
been completed within the tenement area by Meteoric in 2009, and
more recently a second hole proximate to the Project by Encounter
Resources Ltd in 2020.
 Most of the historic work was focused on the Urmia and Sambhar
Prospects with historic exploration (other than RDD01) being limited
to geophysical surveys and surface sampling.
 Historical exploration reports are referenced within the WA1
Resources Ltd Prospectus dated 29 November 2021 which was
released by ASX on 4 February 2022.
 Encounter Resources are actively exploring on neighbouring
tenements and have reported intersecting similar geology,
includingcarbonatite rocks.
Geology  The West Arunta Project is located within the West Arunta Orogen,
representing the western-most part of the Arunta Orogen which
straddles the Western Australia-Northern Territory border.
 Outcrop in the area is generally poor, with bedrock largely covered
by Tertiary sand dunes and spinifex country of the Gibson Desert. As
a result, geological studies in the area have been limited, and a
broader understanding of the geological setting is interpreted from
early mapping as presented on the MacDonald (Wells, 1968) and
Webb (Blake, 1977 (First Edition) and Spaggiari et al., 2016 (Second
Edition)) 1:250k scale geological map sheets.
 The West Arunta Orogen is considered to be the portion of the
Arunta Orogen commencing at, and west of, the Western Australia-
Northern Territory border. It is characterised by the dominant west-
north-west trending Central Australian Suture, which defines the
boundary between the Aileron Province to the north and the
Warumpi Province to the south.
 The broader Arunta Orogen itself includes both basement and
overlying basin sequences, with a complex stratigraphic, structural
and metamorphic history extending from the Paleoproterozoic to
the Paleozoic(Jolyet al.,2013).
Drill hole
Information
 Refer to Table 2 for drill hole details.
Data aggregation
methods
 Selected significant intercepts are weight averaged by length and
calculated using a 0.2% Nb₂O₅ lower cut off, with a maximum of 3m
of consecutive internal dilution. The_Including_intersections were
calculated using a 1% Nb2O5lower cut off, with a maximum of 3m of
consecutive internal dilution.
 No metal equivalents have been reported.
Relationship
between
mineralisation
widths and
intercept lengths
 The true thickness of the mineralisation intersected in the drill holes
has not yet been estimated due to limited data.

==> picture [595 x 64] intentionally omitted <==

==> picture [595 x 93] intentionally omitted <==

CRITERIA COMMENTARY
Diagrams  Refer to figuresprovided within this ASX announcement.
Balanced
reporting
 All meaningful information has been included in the body of the
text.
Other substantive
exploration data
 All data and information considered material has been included in
the body of this ASX Announcement.
 A preliminary mineralogical assessment has been undertaken on a
select number of samples. Refer to bodyof text for further details.
Further work  Further interpretation of drill data and assay results will be
completed over the coming months, including detailed
petrographic and mineralogical analysis.
 Planning for additional exploration drilling is in progress and
analysis of existingdrill samples is ongoing.

==> picture [595 x 64] intentionally omitted <==