WA1 RESOURCES LTD Capital/Financing Update 2023

Feb 5, 2023

66031_rns_2023-02-05_493e03e1-9c83-46ce-9fd3-0e25a317f6d8.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [596 x 84] intentionally omitted <==

----- Start of picture text -----

ASX RELEASE
----- End of picture text -----

6 FEBRUARY 2023

WEST ARUNTA PROJECT

SIGNIFICANT ENRICHMENT IDENTIFIED AT LUNI

Highlights

  • Single metre assay results from the three holes drilled confirm significant near surface niobium enrichment is present at the Luni carbonatite

  • Shallow, high-grade niobium mineralisation occurs in the previously unreported near surface weathered zone at Luni

  • Key high-grade niobium intersections include:

LURC003 from 40m: 7m at 3.5% Nb2O5

within an overall interval from 40m of

19m at 2.0% Nb2O5

LURC002 from 31m: 6m at 2.3% Nb2O5

within an overall interval from 31m of

28m at 1.0% Nb2O5

LURC001 from 167m: 3m at 3.1% Nb2O5

within an overall interval from 153m of

26m at 0.9% Nb2O5

  • Results also confirm high-grade niobium mineralisation is present at depth in the carbonatite system

  • First indication of potential mineralised zonation with elevated Rare Earths values up to 2.4% TREO[1] (LURC001: 2m from 35m) and Tantalum up to 814ppm Ta2O5 (LURC001: 1m from 36m) in previously unassayed portion of LURC001

  • Luni will now be the focus of early exploration activities in 2023

WA1 Resources Ltd (ASX: WA1) ( WA1 or the Company ) is pleased to announce single metre assay results from drilling at the Luni discovery during the maiden West Arunta Project drilling program completed in August 2022. This announcement follows on from the Luni 4m composite assays released to the ASX on 16 November 2022.

==> picture [596 x 11] intentionally omitted <==

WA1 RESOURCES LTD | ABN: 51 646 878 631 | WWW.WA1.COM.AU | ASX: WA1 WA1 RESOURCES LTD | ABN: 51 646 878 631 | WWW.WA1.COM.AU | ASX: WA1 A: L2 55 CARRINGTON ST NEDLANDS WA 6009 P: +61 8 6478 7866 E: [email protected] A: 2C LOCH ST, NEDLANDS WA 6009 P: +61 8 6478 7866 E: [email protected]

==> picture [206 x 75] intentionally omitted <==

==> picture [596 x 9] intentionally omitted <==

WA1’s Managing Director, Paul Savich, commented:

“Our 2022 drill program set out to determine the source of three significant geophysical anomalies in a truly greenfields belt and included three holes at the Luni discovery. However, rather than simply determining the source of the geophysical anomalies, all three holes at Luni have returned very high-grade niobium drill intersections.

"Our exploration planning is now very well advanced and will in the first instance be focused on determining the significance of the Luni carbonatite discovery. In addition, follow-up drilling at the P2 mineralised carbonatite discovery and several other untested regional geophysical anomalies is planned.

“We look forward to commencing our on-ground exploration activities and currently anticipate drilling will commence in late March.

Technical Discussion - Luni Discovery (Sambhar Prospect Area)

The results provided in this announcement relate to three reverse circulation ( RC ) drill holes for 803m at the Luni discovery (LURC001, LURC002 and LURC003). All holes were drilled vertically (with LURC001 deviating during drilling) to test the source of the east-west gravity anomaly. The Luni gravity target covers an area of approximately 3km x 1km.

Table 1: RC Collar Locations (GDA94 Zone 52)

Hole ID Target Easting Northing RL
(m)
Azimuth
(Degrees)
Dip
(Degrees)
Depth
(m)
LURC001 Sambhar - Luni 435613 7540737 395 - -90* 288
LURC002 Sambhar - Luni 436819 7540777 393 - -90 299
LURC003 Sambhar - Luni 436812 7540574 394 - -90 216
  • Hole planned as vertical and deviated during drilling (see Figure 1)

All one metre assays from the Luni discovery have now been received and reported, except for Phosphorus assays (for both Luni and P2), which are yet to be reported by the laboratory.

Assay results have confirmed that a mineralised carbonatite unit has been intersected, with highly elevated niobium, TREO, tantalum and phosphorus mineralisation encountered in the drill holes (phosphorus confirmed from initial composite assays). Downhole intersections, coupled with available geophysics, suggest the intrusion is present over a lateral extent of at least 1.3km. For full details of key intersections refer to the highlights, annotated images and Table 2. Orientation of the mineralisation (true and apparent width) is not able to be determined at this stage.

The Luni discovery is characterised by a discrete, high amplitude gravity anomaly with limited but semi-coincident magnetic responses occurring to the west and east of the anomaly, and between the west and east drill locations. Luni is located at the intersection of a north-west trending lineament and a regionally significant north-east trending bounding structure (a structural trend which also occurs at the P2 mineralised carbonatite).

==> picture [596 x 10] intentionally omitted <==

Note 1. 'TREO’ is an abbreviation of Total Rare Earth Oxides, representing a combined group of 17 elements (La, Ce, Pr, Nd, Pm, Sm, Eu, Gd, Tb, Dy, Ho, Er, Tm, Yb, Lu, Y, Sc)

==> picture [206 x 75] intentionally omitted <==

==> picture [596 x 9] intentionally omitted <==

==> picture [449 x 241] intentionally omitted <==

Figure 1: Plan View of Luni Drill Collar Locations Combined gravity (resUC200m, colour) and magnetic (residual contours) anomaly images

The significant gravity anomaly at Luni is interpreted and modelled to reflect the denser carbonatite intrusion. No specific gravity data was able to be determined from the RC chip material to verify this hypothesis.

An infill gravity survey was completed at Luni in December 2022 and increased gravity station coverage to 100m x 50m. Passive seismic data was also recorded on a 200m x 50m grid. Processing of the passive seismic data is underway, with initial findings suggesting that this geophysical method may be mapping the clay weathering to competent bedrock boundary across the Luni discovery area. The passive seismic results will be integrated with the ground gravity survey results to assist with informing and constraining the gravity interpretation, as well as modelling to assist with target generation and drill planning.

==> picture [449 x 191] intentionally omitted <==

Figure 2: Long section with drillhole traces and residual gravity 2.68g/cc density shell

==> picture [596 x 10] intentionally omitted <==

==> picture [206 x 75] intentionally omitted <==

==> picture [596 x 9] intentionally omitted <==

In all three drillholes, the geology profile from surface to end of hole consists of shallow (~15m thick) tertiary cover, before intersecting the progressively weathered carbonatite.

==> picture [449 x 245] intentionally omitted <==

==> picture [449 x 245] intentionally omitted <==

Figures 3 & 4: Cross sections illustrating LURC001, LURC002 and LURC003, residual gravity 2.68g/cc density shell and downhole zonation

The upper extent of the carbonatite is intensely weathered. It consists of an initial leached clay zone depleted in mineralisation (~8-25m thick). This zone transitions sharply into a second moderate to highly weathered zone significantly enriched in niobium, TREO, tantalum and phosphorus, generally representing the best mineralised grades intersected in the drilling to date (from ~34m and 30m in LURC001 and LURC002 respectively, from ~40m in LURC003). This enriched zone transitions into a less weathered and more

==> picture [596 x 10] intentionally omitted <==

==> picture [206 x 75] intentionally omitted <==

==> picture [596 x 9] intentionally omitted <==

competent unit in the weathering sequence. Within this unit there is potential evidence of compositional and mineralogical zonation within the primary carbonatite.

Both LURC001 (299m) and LURC003 (216m) terminate in moderately weathered bedrock, which suggests a deep weathering profile across the Luni carbonatite.

West Arunta Project – Upcoming Exploration Activity

Priority follow-up exploration includes analysis of the regolith geochemistry, along with modelling and interpretation of the gravity and passive seismic data from surveys undertaken in December 2022.

The 2023 exploration drill program is planned to initially focus on drilling the Luni discovery on a regular grid spacing to define the carbonatite's lateral extent and to identify any zonation of the mineralisation. Samples will also be collected for preliminary metallurgical testwork. Further drill testing of the mineralised P2 carbonatite, and potentially initial drill testing of some regional targets, is also under assessment. More details will be announced once planning is finalised.

Carbonatite Overview

Carbonatites are a type of igneous rock defined by their composition which is rich in carbonate minerals, typically calcite or dolomite. They often occur as plugs within alkali intrusive complexes, or as dykes, sills, breccias or veins. They are generally associated with major crustal scale features in rift-related tectonic settings. Carbonatites may be mineralised with rare earth elements ( REE ), niobium, phosphorus, tantalum, uranium, thorium, copper, iron, titanium, vanadium, barium, fluorine and zirconium.

==> picture [359 x 269] intentionally omitted <==

Figure 5: Example Schematic of Carbonatite Formation, Weathering and Enrichment[ 2]

==> picture [596 x 10] intentionally omitted <==

Note 2. Adapted from Lynas Corporation Ltd – Investor Presentation January 2010

==> picture [206 x 75] intentionally omitted <==

==> picture [596 x 9] intentionally omitted <==

The identification of mineralised carbonatite intrusions is a significant finding for the West Arunta region. The Company has multiple untested targets within the region and the potential for further discovery with future exploration efforts has been greatly enhanced by the first results from Luni and P2.

Carbonatite deposits are an important source of REE and niobium production. There are approximately 600 carbonatites that have been discovered globally.[3 ] Of these, around 20% contain a mineral resource and approximately 10% of carbonatites have been mined.[4 ] This includes the world’s largest REE mine, Bayan Oho in Inner Mongolia, Lynas Rare Earths’ Mt Weld deposit and the world’s three major operating niobium mines (see Outline of Global Niobium Deposits and Operating Mines Section and Figure 6).

Niobium Overview

Niobium (Nb) is a transitional metal with properties that make it favourable for use within a wide variety of applications.

The main niobium product sold is in the form of ferroniobium (~65% Nb) which makes up approximately 90% of the market. Niobium prices range from US$45,000/t[5] per tonne for standard ferroniobium metal and over US$50,000/t[5] per tonne for niobium pentoxide (Nb2O5).

Ferroniobium is primarily used as a micro-alloy (<1%) in steelmaking to significantly increase the strength, decrease the weight, reduce corrosion and improve the heat resistance of steel products including in cast iron, and low and high alloy steel.

The addition of >300g of niobium can reduce the weight of a mid-size car by 200kg and increase fuel efficiency by 5%.[6]

Niobium is a superconductor at very low temperatures, and as an alloy with titanium (NbTi) or tin (Nb3Sn) it produces superconducting magnets used in magnetic resonance imaging (MRI) scanners, nuclear magnetic resonance (NMR) equipment and particle accelerators.

Niobium is important for advanced technologies with rapidly increasing uses in gas and wind turbines as well as in the manufacture of rechargeable batteries for electric vehicles.

As an additive to battery manufacturing processes, niobium can increase the energy density of batteries, reduce charging time and increase stability, resulting in a battery that can undertake more charging cycles.

The metal has been identified by Australia, the United States and the European Union, among other governments, as a critical mineral.

==> picture [596 x 10] intentionally omitted <==

4. Woolley. A and Kjarsgaard. B: Carbonatites of the World: Map and Database

Note 3. Gregory M. Yaxley, Michael Anenburg, Sebastian Tappe, Sophie Decree, and Tibor Guzmics: Carbonatites: Classification, Sources, Evolution, and Emplacement

5. NioBay Metals, Investors – Presentations, retrieved from http://niobaymetals.com/wp/wp-content/uploads/2021/05/202105_Niobay_Corporate_Presentation_.pdf on 25 October 2022 6. NioCorp Investor Presentation – retrieved from https://secureservercdn.net/198.71.233.156/gx0.d43.myftpupload.com/wpcontent/uploads/NioCorp_Investor_Presentation.pdf on 3 February 2023

==> picture [206 x 75] intentionally omitted <==

==> picture [596 x 9] intentionally omitted <==

Outline of Global Niobium Deposits and Operating Mines

There are currently three dominant niobium producers globally:

  • CBMM, Araxa, Brazil (80% of global production, +500Mt at 2.5% Nb2O5 resource, cost <$10/kg Nb)[5]

  • China Molybdenum Co., Catalao, Brazil (10% of global production, +50Mt at 1% Nb2O5 resource, cost <$10/kg Nb)[5] ; and

  • Magris Resources Inc., Niobec, Canada (8% of global production, +75Mt at 0.56% Nb2O5 resource, cost <$19/kg Nb)[5] .

Below is a chart showing niobium occurrence / deposit grades from around the world (inclusive of Australia).

==> picture [433 x 248] intentionally omitted <==

Figure 6: Global Niobium Occurrence/Deposit Grades

Source: Euroz Hartleys Research

West Arunta Project – Overview (100% owned)

The West Arunta Project is located approximately 490km south of Halls Creek in WA. It comprises the Pachpadra , Sambhar and Urmia prospect areas , which are contained within a granted Exploration Licence .

Prior to WA1 acquiring the West Arunta Project in 2021, the tenement had extremely limited historical exploration for gold and copper largely in the form of reconnaissance airborne geophysics, limited ground geophysical surveys, and surface sampling. Drilling on the West Arunta Project tenement was limited to a single historic diamond hole drilled in 2010.

In WA1’s maiden exploration drill program completed in August 2022 the Luni and P2 targets were successfully identified as being mineralised carbonatites with high grade niobium, elevated REE’s and tantalum drill intercepts.

==> picture [596 x 10] intentionally omitted <==

Note 5. NioBay Metals, Investors – Presentations, retrieved from http://niobaymetals.com/wp/wp-content/uploads/2021/05/202105_Niobay_Corporate_Presentation_.pdf on 25 October 2022

==> picture [206 x 75] intentionally omitted <==

==> picture [596 x 9] intentionally omitted <==

==> picture [451 x 361] intentionally omitted <==

Figure 7: Location of the West Arunta Project

ENDS

For further information, please contact:

Investors

Media

Paul Savich Michael Vaughan Managing Director Fivemark Partners T: +61 8 6478 7866 T: +61 422 602 720 / +61 410 276 744 E: [email protected] E: [email protected]

Or visit our website at www.wa1.com.au

Authorised for market release by the Board of WA1.

==> picture [596 x 10] intentionally omitted <==

==> picture [206 x 75] intentionally omitted <==

==> picture [596 x 9] intentionally omitted <==

Competent Person Statement: The information in this announcement that relates to Exploration Results is based on information compiled by Ms. Stephanie Wray who is a Member of the Australian Institute of Geoscientists. Ms. Wray is a full-time employee of WA1 Resources Ltd and has sufficient experience which is relevant to the style of mineralisation under consideration to qualify as a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Ms. Wray consents to the inclusion in the announcement of the matters based on her information in the form and context in which it appears.

Disclaimer: No representation or warranty, express or implied, is made by the Company that the material contained in this announcement will be achieved or proved correct. Except for statutory liability which cannot be excluded, each of the Company, its directors, officers, employees, advisors and agents expressly disclaims any responsibility for the accuracy, fairness, sufficiency or completeness of the material contained in this presentation and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any effort or omission therefrom. The Company will not update or keep current the information contained in this presentation or to correct any inaccuracy or omission which may become apparent, or to furnish any person with any further information. Any opinions expressed in the presentation are subject to change without notice.

==> picture [596 x 10] intentionally omitted <==

==> picture [596 x 84] intentionally omitted <==

----- Start of picture text -----

ASX RELEASE
----- End of picture text -----

Table 2: Luni Discovery RC Drilling Results – Significant Intersections (results not displayed below are considered to contain no significant anomalism)

Hole ID From To Interval **Nb2O5 ** TREO Nd + Pr NdPr: TREO Ta2O5
(m) (m) (m) (%) (%) (ppm) (%) (ppm)
LURC001 34 288 254 0.29 0.24 572 23% 29
Incl. 35 49 14 0.38 0.99 2353 24% 176
35 37 2 1.13 2.36 5835 25% 706
36 37 1 1.18 2.37 5780 24% 814
141 185 44 0.67 0.20 465 23% 51
153 179 26 0.92 0.24 573 24% 67
167 170 3 3.07 0.33 793 24% 9
169 170 1 3.43 0.28 655 23% 6
235 240 5 1.26 0.38 935 25% 73
LURC002 30 299 269 0.41 0.17 370 22% 21
Incl. 30 79 49* 0.79 0.30 653 22% 27
31 59 28* 1.02 0.34 769 22% 30
31 37 6 2.31 0.58 1347 23% 29
33 36 3 3.54 0.89 2088 24% 24
35 36 1 5.18 1.16 2709 23% 3
117 121 4 1.00 0.23 574 25% 11
169 179 10 0.87 0.19 437 23% 69
167 173 6 1.00 0.19 433 23% 82
170 172 2 1.85 0.23 541 23% 179
170 171 1 2.03 0.26 610 23% 186
LURC003 40 216 176 0.48 0.12 271 23% 2
Incl. 40 82 42* 1.10 0.09 165 18% 3
40 59 19* 2.00 0.19 336 18% 6
40 47 7 3.47 0.37 674 18% 11
41 46 5 4.38 0.47 844 18% 13
44 45 1 7.50 0.69 1153 17% 17
80 82 2 1.26 0.02 34 17% 1
140 144 4 0.94 0.31 762 24% 4
141 144 3 1.13 0.31 755 25% 5
151 155 4 0.76 0.12 309 25% 4
162 165 3 0.81 0.09 219 24% 7
168 175 7 0.90 0.17 424 25% 5

* Decreased sample recovery due to wet sample, refer to JORC Table 1 for intervals.

==> picture [596 x 11] intentionally omitted <==

WA1 RESOURCES LTD | ABN: 51 646 878 631 | WWW.WA1.COM.AU | ASX: WA1 WA1 RESOURCES LTD | ABN: 51 646 878 631 | WWW.WA1.COM.AU | ASX: WA1 A: L2 55 CARRINGTON ST NEDLANDS WA 6009 P: +61 8 6478 7866 E: [email protected] A: 2C LOCH ST, NEDLANDS WA 6009 P: +61 8 6478 7866 E: [email protected]

==> picture [596 x 84] intentionally omitted <==

----- Start of picture text -----

ASX RELEASE
----- End of picture text -----

About WA1

WA1 Resources Ltd is based in Perth, Western Australia and was admitted to the official list of the Australian Securities Exchange (ASX) in February 2022. WA1’s shares are traded under the code WA1.

WA1’s objective is to discover a Tier 1 deposit in Western Australia’s under explored regions and create value for all stakeholders. We believe we can have a positive impact on the remote communities within the lands on which we operate. We will execute our exploration using a proven leadership team which has a successful track record of exploring in WA’s most remote regions.

Forward-Looking Statements

This ASX Release may contain certain “forward-looking statements” which may be based on forward-looking information that are subject to a number of known and unknown risks, uncertainties, and other factors that may cause actual results to differ materially from those presented here. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. For a more detailed discussion of such risks and other factors, see the Company’s Prospectus and Annual Reports, as well as the Company’s other ASX Releases. Readers should not place undue reliance on forward-looking information. The Company does not undertake any obligation to release publicly any revisions to any forward-looking statement to reflect events or circumstances after the date of this ASX Release, or to reflect the occurrence of unanticipated events, except as may be required under applicable securities laws.

==> picture [596 x 11] intentionally omitted <==

WA1 RESOURCES LTD | ABN: 51 646 878 631 | WWW.WA1.COM.AU | ASX: WA1 WA1 RESOURCES LTD | ABN: 51 646 878 631 | WWW.WA1.COM.AU | ASX: WA1 A: L2 55 CARRINGTON ST NEDLANDS WA 6009 P: +61 8 6478 7866 E: [email protected] A: 2C LOCH ST, NEDLANDS WA 6009 P: +61 8 6478 7866 E: [email protected]

==> picture [206 x 75] intentionally omitted <==

==> picture [596 x 9] intentionally omitted <==

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

Criteria Commentary
Sampling techniques
All geological information referred to in this ASX Announcement
was derived from a Reverse Circulation (RC) drill program.

From every metre drilled a 2-3kg sample (split) was sampled into a
calico bag via the rig mounted cone splitter. Samples submitted to
the laboratory were determined by the rig geologist.
• All samples were submitted to ALS Laboratories in Perth for
Niobium and Rare Earth Oxide analyses via Lithium Borate Fusion
(ME-MS81) with overlimit determination via ALS method ME-
XRF30.
Drilling techniques
RC drilling was completed at all holes with a diameter of 114mm.
Drill sample recovery
Sample recoveries are visually estimated for each metre with poor
or wet samples recorded in sample log sheets.

The sample cyclone was routinely cleaned at the end of each 6m
rod and when deemed necessary.

No relationship has been determined between sample recovery
and the mineralisation returned.

At Luni sample recovery was poor in the cover sequence where
water was abundant. This was recorded on the sample sheet.

Samples were dry and recovery was at 100% through significant
intervals reported.

Wet sample and reduced recovery was noted in the boarder
intercepts for LURC002 and LURC003.

LURC002 – Wet sample and poor recovery was recorded from
48m - 53m and from 144m - 184m.

LURC003 – Wet sample & poor recovery was recorded from 51m -
57m.
Logging
The RC rock chips were logged for geology, alteration, and
mineralisation by the Company’s geological personnel. Drill logs
have been verified.

Logging of drill chips is qualitative and based on the presentation
of representative chips retained for all 1m sample intervals in the
chip trays.
Sub-sampling
techniques and sample
preparation

RC samples were collected from the drill rig splitter into calico
bags.

The 1m samples were composited into 4m intervals from spoil
piles by the site geologist.

Single metre samples were collected and assayed as determined
by the site geologist.
Quality of assay data
and laboratory tests

All samples were submitted to ALS Laboratories in Perth for
Niobium and Rare Earth Oxide analyses via Lithium Borate Fusion
(ME-MS81) with overlimit determination via ALS method ME-
XRF30.

Standard laboratory QAQC was undertaken and monitored by the
laboratory and then by WA1 geologists upon receipt of assay
results.

The laboratory standards have been reviewed by the company
and have passed internal ALS QAQC checks.
• Lab QAQC protocol for XRF analysis includes a quartz blank at the
beginning of every run, whilst the XRF is calibrated using internal
lab standards.

==> picture [596 x 10] intentionally omitted <==

==> picture [206 x 75] intentionally omitted <==

==> picture [596 x 9] intentionally omitted <==

Criteria Commentary
Verification of sampling
and assaying

Analytical QC is monitored by the laboratory using standards and
repeat assays.

Mineralised intersections have been verified against the downhole
geology.

Independent petrographic analysis of selected drill chips was
completed by A&A Crawford Geological Research Consultants Pty
Ltd.

Logging and sampling was completed manually in the field and
then recorded digitally.

Significant intersections are inspected by senior Company
geologists.

No twinned holes have been drilled at this time.
Location of data points
Drill hole collars were surveyed and recorded using a DGPS.

All co-ordinates are provided in the MGA94 UTM Zone 52 co-
ordinate system with an estimated accuracy of +/-5m.

Azimuth and dip of the drill hole was recorded after completion of
the hole using a gyro. A reading was taken every 50m with an
accuracy of +/-1 degree azimuth and +/-0.3 degree dip.
Data spacing and
distribution

See drill hole table for hole position and details.

Data spacing at this stage is not suitable for Mineral Resource
Estimation.
Orientation of data in
relation to geological
structure

The orientation of mineralisation is poorly constrained with only
three RC holes having been drilled at the Luni discovery.

See drill hole table for hole details and the text of this
announcement for discussion regarding the orientation of holes.

Drill holes were designed based on interpretation from modelled
geophysical data.

True and apparent widths have not been interpreted from the
available data.
Sample security
Sample security is not considered a significant risk with WA1 staff
present during collection.

All geochemical samples were collected, bagged and sealed by
WA1 staff, and delivered to Port Hedland for haulage directly to
ALS Laboratories in Perth.

1m splits were stored in a secure location.
Audits or reviews
The program is reviewed on an ongoing basis by senior WA1
personnel.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria Commentary
Mineral tenement and
land tenure status

All work completed and reported in this ASX Announcement was
completed on E80/5173 which is 100% owned by WA1 Resources
Ltd.

The Company also currently holds two further granted Exploration
Licences and eight Exploration Licence Applications within the
area of the West Arunta Project.
Exploration done by
other parties

The West Arunta Project has had limited historic work completed
within the Project area with the broader area having exploration
focused on gold, base metals, diamonds and potash.

Significant previous explorers of the Project area include Beadell
Resources and Meteoric Resources. Onlyone drill hole(RDD01)

==> picture [596 x 10] intentionally omitted <==

==> picture [206 x 75] intentionally omitted <==

==> picture [596 x 9] intentionally omitted <==

Criteria Commentary
had been completed within the tenement area by Meteoric in
2009, and more recently a second hole proximate to the Project by
Encounter Resources Ltd in 2020.

Most of the historic work was focused on the Urmia and Sambhar
Prospects with historic exploration (other than RDD01) being
limited to geophysical surveys and surface sampling.

Historical exploration reports are referenced within the WA1
Resources Ltd Prospectus dated 29 November 2021 which was
released by ASX on 4 February 2022.
Geology
The West Arunta Project is located within the West Arunta
Orogen, representing the western-most part of the Arunta Orogen
which straddles the Western Australia-Northern Territory border.

Outcrop in the area is generally poor, with bedrock largely covered
by Tertiary sand dunes and spinifex country of the Gibson Desert.
As a result, geological studies in the area have been limited, and a
broader understanding of the geological setting is interpreted
from early mapping as presented on the MacDonald (Wells, 1968)
and Webb (Blake, 1977 (First Edition) and Spaggiari et al., 2016
(Second Edition)) 1:250k scale geological map sheets.

The West Arunta Orogen is considered to be the portion of the
Arunta Orogen commencing at, and west of, the Western
Australia-Northern Territory border. It is characterised by the
dominant west-north-west trending Central Australian Suture,
which defines the boundary between the Aileron Province to the
north and the Warumpi Province to the south.

The broader Arunta Orogen itself includes both basement and
overlying basin sequences, with a complex stratigraphic, structural
and metamorphic history extending from the Paleoproterozoic to
the Paleozoic (Joly et al., 2013).
Drill hole Information
Refer to Table 1 for drill hole details.
Data aggregation
methods

Significant intercepts are weight averaged by length..

No metal equivalents have been reported.
Relationship between
mineralisation widths
and intercept lengths

The true thickness of the mineralisation intersected in the drill
hole is not currently able to be calculated due to limited data.
Diagrams
Refer to figures provided within this ASX Announcement.
Balanced reporting
All meaningful information has been included in the body of the
text.
Other substantive
exploration data

All material data and information has been included in the body of
this ASX Announcement.

No metallurgical assessments have been completed.
Further work
Further interpretation of drill data and assay results will be
completed over the coming months, including detailed
petrographic analysis.

Additional geophysical surveys are planned to be completed to aid
interpretation and future work programs.

Additional exploration drilling is in the final stages of planning.

==> picture [596 x 10] intentionally omitted <==