VRX SILICA LIMITED Capital/Financing Update 2012

Oct 30, 2012

66022_rns_2012-10-30_e5d9dbc6-700f-4151-a0d9-c19cea15b644.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [148 x 66] intentionally omitted <==

31 October 2012

ASX ANNOUNCEMENT

Ventnor announces maiden JORC resource at Thaduna/Green Dragon Copper Project

Highlights:

ASX: VRX

  • Maiden JORC Resource 100,000 tonnes contained copper

  • Resource open along strike and down dip

  • 10 deep holes with sulphide intersections and assays pending not included in Resource estimate

  • Drilling continuing which will contribute to a later Resource update

  • Deep drilling planned for Q4 2012

Capital Structure

Shares on Issue 69.6 million Unlisted Options 25.1 million Market Cap @ 60 ¢ $50 million (Fully Diluted) Cash on hand $4.6 million (at 30 September 2012)

Australian base metals company Ventnor Resources Limited ( ASX: VRX ) (“Ventnor” or ‘”the Company”) announces a maiden JORC compliant Resource estimate for its flagship Thaduna/Green Dragon Copper Project, located 170km north of Meekatharra, Western Australia, in the Doolgunna district, and 40km east of Sandfire’s DeGrussa project.

“This is a milestone event for the project and will allow the Company to progress to a scoping study for the open cut potential of this Resource” said Ventnor Managing Director Bruce Maluish.

Corporate Directory

Paul Boyatzis

Non-Executive Chairman

Bruce Maluish

Managing Director

John Geary

Executive Director

Peter Pawlowitsch

“This allows the project to advance while drilling is underway to continue to investigate the underground potential below an open pit”, Maluish said.

Non-Executive Director

“We have completed in excess of 38,000 metres of drilling on the project since listing last February and the bulk of this drilling has contributed to the Resource estimate”, he said.

In addition to the drilling included in this resource there are 10 more diamond holes awaiting assays, or to be drilled, at Thaduna and 2 diamond holes at Green Dragon awaiting assays.

The Company will commence the drilling of 2 deep diamond holes targeting possible depth extensions as reported in the announcement 25 October 2012. It is planned an updated JORC Resource will be completed early in 2013 to incorporate this extra drilling.

Company Projects

Thaduna/Green Dragon Copper project in the Doolgunna district, WA

Kumarina exploration project north of Meekatharra, WA

Warrawanda/Nickel Hills nickel project south of Newman, WA

Georgina Basin IOCG Project western Queensland

==> picture [470 x 53] intentionally omitted <==

==> picture [148 x 66] intentionally omitted <==

Resource Estimation

A JORC Compliant Resource estimate has been completed on the Thaduna/Green Dragon copper deposits. The estimation was undertaken by Cube Consulting based on data and geological interpretations provided by Ventnor Resources.

A total Indicated and Inferred Resource of 6.33 Mt @ 1.60% Copper (Cu) and 2.77 g/t Silver (Ag) for 101,413 tonnes of contained copper and 563koz of silver has been estimated for both deposits at a nominal 0.5% cut off grade, see Table below for the breakdown.

Project Type Category Tonnage Cu Ag Cu metal Ag metal
(Kt) (%) (g/t) (Kt) ('000 oz)
Green Dragon Oxide/ Secondary Sulphide Indicated 347 1.10 1.5 38 17
Inferred - - - -
Sulphide Indicated 1,290 1.40 2.4 181 100
Inferred 254 1.37 2.2 35 18
SubTotal Green Dragon 1,891 1.34 2.2 254 134
Thaduna Oxide/ Secondary Sulphide Indicated 417 1.45 2.0 60 27
Inferred 175 1.36 3.1 24 18
Sulphide Indicated 3,083 1.64 2.9 506 285
Inferred 679 2.23 4.5 151 99
SubTotal Thaduna 4,355 1.70 3.1 742 429
Stockpiles Oxide Indicated 82 2.25 - 18 -
Inferred 3 1.08 - 0 -
SubTotal Stockpiles 85 2.21 - 19 -
Total Indicated 5,219 1.5 2.6 80 428
Total Inferred 1,111 1.9 3.8 21 135
Grand Total 6,331 1.6 2.8 101 563

Added to the Cube estimated resource is some of the historic stockpiled material which remains from the open cut mining operation which concluded in 1971. The estimate is based on an estimate by Barrack Mines Ltd who in November 1989 conducted RC drilling, grab sampling and auger drilling over the various stockpiles at Thaduna to estimate the summary included in the Resource table above. This estimate repeated earlier work by Ferrovanadium in 1974 which compares favorably.

Thaduna

A total of 136 RC and Diamond holes have been used in the Resource estimation for the Thaduna deposit. Six wireframe domains were created to constrain the mineralisation which has a total drilled strike length of 1,650 metres to a maximum vertical depth of 360 metres.

Below are a series of images showing various attributes of the Resource model.

==> picture [470 x 53] intentionally omitted <==

==> picture [148 x 66] intentionally omitted <==

==> picture [426 x 267] intentionally omitted <==

Thaduna Longsection showing the Resource modeled outline

==> picture [426 x 237] intentionally omitted <==

Thaduna block model coloured by grade, Green = +0.2% Cu, Yellow = +0.5% Cu Red = +1% Cu

==> picture [470 x 53] intentionally omitted <==

==> picture [148 x 66] intentionally omitted <==

==> picture [426 x 237] intentionally omitted <==

Thaduna block model coloured by Resource category; Red = Indicated, Green = Inferred

==> picture [319 x 341] intentionally omitted <==

Thaduna Section 1000m showing drill hole traces and blocks coloured by grade, Green = +0.2% Cu, Yellow = +0.5% Cu Red = +1% Cu

==> picture [470 x 53] intentionally omitted <==

==> picture [148 x 66] intentionally omitted <==

Green Dragon

A total of 70 RC holes have been used in the Resource estimation for the Green Dragon deposit. Eight wireframe domains were created to constrain the mineralisation which has a total drilled strike of 500 metres to a maximum vertical depth of 220 metres. Below are a series of images showing various attributes of the Resource model.

==> picture [426 x 253] intentionally omitted <==

Green Dragon block model coloured by grade, Green = +0.2% Cu, Yellow = +0.5% Cu Red = +1% Cu

==> picture [426 x 254] intentionally omitted <==

Green Dragon block model coloured by resource category; Red = Indicated, Green = Inferred, Blue = Unclassified

==> picture [470 x 53] intentionally omitted <==

==> picture [148 x 66] intentionally omitted <==

==> picture [426 x 254] intentionally omitted <==

Green Dragon Section 774860mE showing drill hole traces and blocks coloured by grade, Green = +0.2% Cu, Yellow = +0.5% Cu Red = +1% Cu

Resource Estimation Summary – Thaduna and Green Dragon

The resource estimate is based on a compilation of 303 Reverse Circulation drill holes completed to date by Ventnor Resources Ltd. Of these drill holes, 208 belong to the Thaduna Deposit (of which 49 have Diamond tails) and 95 belong to the Green Dragon Deposit (of which 2 have Diamond tails). An additional Diamond drill hole was also completed on the Green Dragon Deposit from the surface.

Drill spacing is nominally 40m X 40m spaced sections for the bulk of the deposit. All drilling has been geologically logged with samples collected by either riffle splitting of RC chips on 1m intervals down hole or NQ-sized half core split samples for diamond drilling. Samples were submitted to Genalysis Laboratories in Perth and analysed for Cu and Ag by ICP. When Cu results were higher than the detection limit of the analytical method, an ICP ore grade method was used. All assays were required to conform to Ventnor Resources QA/QC guidelines as well as internal laboratory QA/QC guidelines. All holes have been located by RTK GPS on surface. Down hole survey has been measured predominantly by single shot instrument, with 45 drill holes in Green Dragon also measured by FlexIT MultiSmart. For 37 drill holes no down hole survey data was available and was therefore assigned according to surrounding drilling.

Several grade domains have been interpreted from the geological and assay data received. These domains were based on a nominal 0.2% Cu grade boundary and include mineralised areas identified as supergene, secondary, and primary. A total of 6 domains were interpreted for Thaduna whilst 8 domains were modeled for Green Dragon. A minimum down hole length of 2m was interpreted. All domains were interpreted in 3-dimensions utilising

==> picture [470 x 53] intentionally omitted <==

==> picture [148 x 66] intentionally omitted <==

Surpac Software, and wire-framed into either solid 3dm’s for grade domains, or dtm surfaces for weathered domains.

Statistical analysis, grade interpolation and block modelling were undertaken by Cube Consulting, in consultation with Ventnor staff. Grade domain data were extracted from the database as 2m down-hole composites for all domains. Data were statistically analysed for the selection of appropriate top cuts, with a 7% Cu top-cut applied to all domains. Geostatistical analysis using semi-variograms generated from the composite data was undertaken to provide both search neighbourhood as well as kriging parameters for grade interpolation.

Block models were created for the Thaduna and Green Dragon projects. Qualitative Kriging Neighbourhood Analysis was used to identify the optimal block size, with a block size of 2m x 20m x 20m (x, y, z) being assigned to Thaduna and a size of 20m x 20m x 2m (x, y, z) to Green Dragon. Bulk density values were assigned to the model based on weathering domains. Appropriate bulk density values were estimated based on historic measurements taken at the old Thaduna mine.

Grade was interpolated by 3-dimensional Ordinary Kriging for all domains. Several check grade estimates were completed utilising different estimation parameters as validation for the final grade estimate. The models were also validated by visual inspection of both the block model fill against the raw assay data, as well as the generation and inspection of grade-tonnage curves, and swath plots by easting, northing, and elevation through the deposit. Model classification for both Indicated and Inferred (in accordance with the JORC Code 2004) was based on data density, impact of down hole deviation, geological continuity, as well as analysis of slope of regression block statistics throughout the model.

Grade Tonnage Thaduna Copper

==> picture [422 x 239] intentionally omitted <==

----- Start of picture text -----

4.5 6000000
4
5000000
3.5
3 4000000
2.5
3000000
2
1.5 2000000
1
1000000
0.5
0 0
0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 2.2 2.4 2.6 2.8 3 3.2 3.4
Cut-Off
Grade: cu Tonnes
Tonnes
Grade: cu
----- End of picture text -----

==> picture [470 x 53] intentionally omitted <==

==> picture [148 x 66] intentionally omitted <==

Competent Person’s Statement

The information in this announcement that relates to Mineral Resources is based on information compiled by David Reid and Patrick Adams. Both Mr Reid and Mr Adams are Members of the Australasian Institute of Mining and Metallurgy. Mr Reid is an employee of Ventnor Resources Ltd, whilst Mr Adams is a Director of Cube Consulting. Mr Reid and Mr Adams have sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity which they are undertaking, to qualify them as “Competent Persons” as defined in the 2004 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Reid takes responsibility for the exploration data, geological interpretation and stockpiles reporting, whilst Mr Adams takes responsibility for the estimation and classification of the resource.

Mr Reid and Mr Adams consent to the inclusion of information in this announcement in the form and context in which it appears.

For further information please contact:

Bruce Maluish, Managing Director Media: Warrick Hazeldine/Karen Oswald [email protected] Purple Communications Tel: 0423 602 353 www.ventnorresources.com.au [email protected]

==> picture [470 x 53] intentionally omitted <==

==> picture [148 x 66] intentionally omitted <==

ABOUT VENTNOR

Ventnor Resources is a base-metals focused explorer with copper targets at the historic Thaduna/Green Dragon project 170 km north of Meekatharra in Western Australia. Also in Western Australia, 40 km south of Newman, are the Warrawanda and Nickel Hills nickel projects and the extensive Kumarina exploration project 200 km north of Meekatharra. In Western Queensland, the Georgina Basin project lies within the Mt Isa Inlier which is well endowed with Iron Oxide Copper Gold (“IOCG”) systems and sulphide base-metal deposits. Ventnor also has holdings in the NT.

Known Copper and Nickel Mineralisation

The Thaduna/Green Dragon copper project has historic mine production; copper mineralisation has been confirmed with three phases of exploration drilling, with a fourth phase underway. The prospectivity of the Warrawanda and Nickel Hills nickel projects was increased when nickel copper gossans were identified in recent years. Further work is planned for late 2012.

Proven Management

The Ventnor directors have extensive experience in the management of publicly listed mining and exploration companies.

PROJECT LOCATIONS

==> picture [351 x 320] intentionally omitted <==

==> picture [470 x 53] intentionally omitted <==