18 October 2012

The Manager Company Announcements Office ASX Ltd

Carnarvon Project Update

Perth-based clean power company Enerji Limited (ASX:ERJ) is nearing completion of construction of its waste heat to power Opcon Powerbox system at Horizon Power’s Carnarvon Power Station.

The roof of the noise reducing canopy, required to keep Enerji’s waste to power system (WHPS) within DEC limits, has been completed following the arrival of the roof sheeting last week. This noise reducing canopy is required due to the WHPS being located in a town site and is not expected to be used at mine sites.

Pressure testing of the hot water piping is completed and all necessary rectification will be completed within a week. Some of the cooling water piping has arrived on site and some sections have been installed. The remaining pipes will be on site by the end of this week.

With the cable trays completed, the running of the control systems cables between the Opcon Powerbox and the heat recovery units is now complete and awaiting loop testing and termination also over the next week. A small amount of short distance control cabling remains to be completed along with the high voltage cables that will connect the Opcon Powerbox to the power station. The latter is awaiting return of the appropriate Horizon Power staff to site next week before proceeding.

Opcon engineers are on standby to commence commissioning. They will travel to Carnarvon when the high voltage connection is made to the power station that will provide power to the hot and cold water pumps. These in turn will then be able to supply the required heating and cooling to the Opcon Powerbox.

Along with the cooling water piping, other tasks to be completed are final installations of the electrical cabling, electronic control system and the remaining lagging.

Enquiries: Greg Pennefather Enerji Limited +61 8 9268 3800

Rudi Michelson Monsoon Communications +61 3 9620 3333

www.enerji.com.au

==> picture [127 x 53] intentionally omitted <==

10 Ord Street, West Perth WA 6005. PO Box 1933, West Perth WA 6872 Telephone: +618 9268 3800 Facsimile: +618 9226 2018

About Enerji

Enerji Limited is a Perth-based clean power company focussed on delivering waste heat to power systems, based on the Opcon Powerbox, in Australia.

The Opcon Powerbox cogeneration technology transforms waste heat into electricity and therefore creates significant energy cost savings and reduced CO2 emissions for its customers.

Enerji has exclusive sales and distribution rights for the Opcon Powerbox in Australia.

The Opcon Powerbox, manufactured in Sweden by Opcon, represents a significant commercial opportunity through application to industrial, mining and power generation operation