Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

VANADIUM RESOURCES LIMITED Investor Presentation 2018

Mar 26, 2018

66018_rns_2018-03-26_23b6b86e-e742-47f7-b30c-89a620697cdf.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [472 x 255] intentionally omitted <==

ACQUISTION OF WORLD CLASS SPD VANADIUM PROJECT

March 2018

Transaction Highlights

==> picture [732 x 373] intentionally omitted <==

2

High Grade Vanadium in Drilling

==> picture [393 x 201] intentionally omitted <==

Significant Whole Rock Results include[1] :

  • 9m at 1.34% V2O5 + 10.5% TiO2 from 9m (SFR019)

  • 14m at 1.08% V2O5 + 7.07% TiO2 from 9m (SFR013)

  • 13m at 1.13% V2O5 + 7.43% TiO2 from 10m (SFR017)

  • 26.9m at 0.80% V O 2 5 from 43.1m

  • & 12.2m at 0.90% V2O5 from 127.2m (SFDD001)

  • 15m at 0.92% V2O5 + 6.44% TiO2 from 8m (SFR018)

  • 44m at 0.66% V2O5 + 4.24% TiO2 from 35m (SFR008)

  • 34m at 0.65% V2O5 + 4.58% TiO2 from 23m (SFR009)

Concentrates from above intersections return[1] :

  • 9m at 2.03% V2O5 + 14.2% TiO2 from 9m (SFR019)

  • 14m at 2.36% V2O5 + 12.8% TiO2 from 9m (SFR013)

  • 13m at 2.28% V2O5 + 12.9% TiO2 from 10m (SFR017)

  • 26.9m at 1.93% V O 2 5 from 43.1m

  • & 12.2m at 2.10% V2O5 from 127.2m (SFDD001)

  • 15m at 2.28% V2O5 + 12.1% TiO2 from 8m (SFR018)

  • 44m at 2.26% V2O5 + 11.8% TiO2 from 35m (SFR008)

  • 34m at 2.20% V2O5 + 12.3% TiO2 from 23m (SFR009)

==> picture [83 x 51] intentionally omitted <==

----- Start of picture text -----

1
Refer ASX
Announcement
22 March 2018
----- End of picture text -----

==> picture [7 x 9] intentionally omitted <==

----- Start of picture text -----

3
----- End of picture text -----

Simple, magnetite-hosted mineralisation

  • Two magnetite units averaging 23m thick

  • Upper Magnetite Layer (UML)

  • Lower Magnetite Layer (LML)

  • Both units outcrop in project area => near surface mineralisation

  • Located at base of Upper Zone of Bushveld Complex

  • 42 holes drilled for

2398.6 metres (RC & DD)

1 Refer ASX Announcement 22 March 2018

==> picture [387 x 421] intentionally omitted <==

4

SAMREC Inferred Resource

Reef Avge
Thickness
(m)
Tonnes (Mt) Whole Rock
V2O5%
Mt% Magnetite
Tonnes
V2O5%
in Magnetite
Upper Layer 24 184.2 0.73 42.4 78.1 1.99
Lower Layer 22 329.1 0.81 41.6 136.0 2.20
Averages & Totals 23 513.3 0.78 41.9 215.0 2.09

While this foreign resource is not reported in compliance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code), it is the Company’s opinion (and the opinion of the Competent Person for this document), that the data quality and validation criteria, as well as the resource methodology and check procedures, are reliable and consistent with criteria as defined by the JORC Code. All tabulated data has been rounded to one decimal place for tonnage and two decimal places for grades.

  • The resource for the SPD Project as shown in Table 1 is estimated in accordance with the SAMREC Code (2007) and is therefore a “qualifying foreign resource estimate” as defined in the ASX Listing Rules. Further information regarding the qualifying foreign resource is presented in the ASX Announcement of 22 March 2018 utilising the template prescribed by the JORC Code (2012).

  • Bill Oliver, Managing Director of Tando, is acting as the Competent Person for the Mineral Resource and has reviewed reports and data compiled by GEMECS Pty Ltd, independent geological consultants. GEMECS implemented the 2010 drill programme for Vanadium Resources (Pty) Ltd and the estimation of the resource presented here, including supervision of all drilling and sampling. GEMECS has confirmed that there are no material changes to the resource or underlying data since it was estimated in June 2010, and has confirmed that the information presented in this announcement is consistent with the data it reported to Vanadium Resources (Pty Ltd)

  • The Competent Person has not yet completed sufficient review on the qualifying foreign resource estimate to classify it in accordance with the JORC Code at this time and consequently it is uncertain that, following evaluation and/or further exploration work that the qualifying foreign resource estimate will be able to be reported as a Mineral Resource in accordance with the JORC Code.

  • The Company plans to carry out further assessment and due diligence on the Mineral Resource, and then to implement a drilling programme to verify the Mineral Resource and, provided results are consistent with previous drilling, aim to increase the confidence in the Mineral Resource.

5

Site visit in progress

==> picture [412 x 187] intentionally omitted <==

==> picture [319 x 173] intentionally omitted <==

==> picture [132 x 233] intentionally omitted <==

==> picture [120 x 213] intentionally omitted <==

==> picture [475 x 198] intentionally omitted <==

6

Forward Plan

  • Complete due diligence

  • Carry out drilling to define a Mineral Resource under JORC Code (refer notes on slide 5)

  • Collect diamond core drill samples for metallurgical sampling and testwork

  • Feed into Scoping Study and progress towards production

  • Continue Vanadium Resources’ positive community and stakeholder engagement

==> picture [207 x 267] intentionally omitted <==

==> picture [333 x 195] intentionally omitted <==

7

Globally Significant Project

==> picture [619 x 415] intentionally omitted <==

----- Start of picture text -----

One of the highest
- in situ grades
- grade in concentrate
----- End of picture text -----

8

Commodity Thematic – Vanadium

==> picture [301 x 177] intentionally omitted <==

  • Future demand forecast to rise due to usage in energy storage, principally Vanadium Redox Flow Batteries (VRFBs):

  • substantially longer lifespan than most batteries (up to 20 years)

  • able to hold charge for a significant time (up to 12 months)

==> picture [228 x 189] intentionally omitted <==

  • able to discharge 100% charge without damage

  • scalability allowing large scale facilities to be constructed

  • greater chemical stability as only a single element is present in the electrolyte (ie safer)

  • Requires high purity product > 98% V2O5

Image source:

https://www.aiche.org/academy/videos/ conferencepresentations/component-and-performance-analysis-vanadiumredox-flow-batteries-experimental-and-modeling-studies

9

Commodity Thematic – Vanadium

==> picture [368 x 212] intentionally omitted <==

==> picture [293 x 220] intentionally omitted <==

  • Over 90% of the current demand for vanadium arises from its use to strengthen steel.

  • Demand increasing due to more stringent regulations

Over 85% of the worlds vanadium is produced from China, Russia and South Africa

  • Deposit types:

  • Titaniferous magnetite – predominant style being mined globally

  • Phosphate rock – used for production of fertilizers and produces vanadium as a by product. Not a major source of commercial vanadium

  • Uraniferous sandstones / siltstones – no current commercial production

10

Established Vanadium Production Hub

  • Active vanadium mining and processing operations:

  • Rhovan (Glencore)

  • Vametco (Bushveld)

  • SPD Project adjacent to dormant Mapochs vanadium operation (formerly Evraz, now private)

==> picture [308 x 174] intentionally omitted <==

----- Start of picture text -----

Mapochs Mine
----- End of picture text -----

==> picture [416 x 409] intentionally omitted <==

11

==> picture [313 x 176] intentionally omitted <==

==> picture [311 x 185] intentionally omitted <==

==> picture [313 x 128] intentionally omitted <==

Infrastructure rich region dominated by majors

View of the De Hoop Dam from the SPD Project

==> picture [404 x 140] intentionally omitted <==

12

Overview of Acquisition

  • Significant High Grade Vanadium Project to be acquired

  • Numerous drill intersections > 1% V O 2 5

  • Grade in concentrate averages 2% V2O5 and 13% TiO2

  • Resource > 500Mt (Note: resource estimated under the SAMREC Code, therefore a qualifying resource under the ASX Listing Rules. Further details and disclosures on slide 5)

  • Work programme to rapidly advance project following DD period

  • Infill and confirmatory drilling which, if successful, will enable resource to be converted into a Mineral Resource under the JORC Code

  • Metallurgical testwork to assess hydrometallurgical processing options

  • Culminating in a Scoping Study to determine economic viability

  • Staged Acquisition as project reaches milestones:

    • Total consideration 35 million TNO shares
  • Martin Pawlitschek to join the board as a Non-Executive Director

13

Terms of the Acquisition

  • 35 million TNO shares to be paid at following milestones:

  • At completion of due diligence (45 days) = 12.5% (4,250,000 shares)

  • Delineation of a Measured Resource of at least 75Mt at 0.78% V O 2 5

  • or 2% V O 2 5 in concentrate = 25% (7,500,000 shares)

  • Completion of a Scoping Study= 12.5% (4,250,000 shares)

  • Completion of a Pre Feasibility Study = 20% (8,000,000 shares)

  • Completion of a Feasibility Study = 30% (11,000,000 shares)

All milestones as defined in the JORC Code

  • Tando to acquire 73.95% of Vanadium Resources (Pty) Ltd

  • Balance held by community trust and BEE entities

14

Capital Structure Post Acquistion

  • Current Issued Shares 30.5M

  • 24.5M tradeable (6.35M escrowed)

  • 12.1M listed options (25c strike)

  • Placement of 5M shares to raise $2M at 40cps

  • Enterprise Value at 40c = $8.9M

Shares $
Current Shares 30,500,001 $3,300,000
Placement @ 40c 5,000,000 $2,000,000
Consideration Shares 9,000,000
Total 44,500,001 $4,500,000
  • EV inclusive of all consideration shares = $12.6M

  • Share split to increase liquidity

(actual split to be determined based on prevailing share price and LR7.25)

15

Peer Comparison

==> picture [684 x 422] intentionally omitted <==

16

Management Team

  • Bill Oliver, Managing Director

  • Geologist with over 19 years wide ranging exploration experience in a range of commodities and jurisdictions.

  • Enviable track record in project identification and evaluation.

  • Jeremy King, Non-Executive Chairman

  • Corporate advisor with over 15 years’ experience in domestic and international legal, financial and corporate matters.

  • Extensive corporate experience and substantial global network.

• Pat Burke, Non-Executive Director

  • Lawyer with extensive legal, commercial and corporate advisory experience for ASX listed companies.

  • Has acted as a director for a number of ASX and AIM listed small to mid-cap resources companies over the past 10 years.

  • Martin Pawlitschek, Proposed Non-Executive Director

  • currently serves as Senior Vice President of Geology for a mining focussed Private Equity fund, responsible for undertaking technical due diligence on mining projects.

  • Non-executive director of Raiden Resources (ASX.RDN) and Jadar Lithium (ASX.JDR).

17

www.tandoresources.com.au [email protected]

6559 1792

Disclaimer & Competent Person Statement

  • This presentation has been prepared by Tando Resources Limited (“the Company” or “Tando”). The information contained in this presentation is a professional opinion only and is given in good faith.

  • The information contained herein is confidential and proprietary to the Company and is provided to recipients on the terms and conditions set out in this disclaimer. The document, in whole or in part, is not to be distributed, copied or reproduced, in any form, without the prior written consent of the Directors of the Company.

  • Certain information in this presentation has been derived from third parties and though Tando has no reason to believe that it is not accurate, reliable or complete, it has not been independently audited or verified by Tando.

  • Any forward looking statements included in this presentation involve subjective judgement and analysis and are subject to uncertainties, risks and contingencies, many of which are outside the control of, and maybe unknown to, Tando. In particular they speak only to the date of this presentation, they assume the success of Tando’s strategies, and they are subject to significant regulatory, business, competitive and economic uncertainties and risks. Actual future events may vary materially from the forward looking statements and the assumptions on which these assumptions are based. Recipients of this presentation are cautioned not to place undue reliance on such forward looking statements.

  • Tando makes no representation or warranty as to the accuracy, reliability or completeness of information in this document and does not take responsibility for updating any information or correcting any errors or omissions which may become apparent after this presentation is released.

  • To the extent permitted by law, Tando and its officers, employees, related bodies corporate and agents disclaim all liability, direct, indirect or consequential (and whether or not arising out of the negligence, default or lack of care of Tando and/or any of its agents) for any loss or damage suffered by a recipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information.

  • All amounts in A$ unless stated otherwise.

  • The information in this report that relates to Exploration Results and other technical information for the Company’s Projects complies with the JORC Code and has been compiled by Mr Bill Oliver, a Competent Person who is a Member of The Australasian Institute of Geoscientists and the Australasian Institute of Mining and Metallurgy. Mr Oliver is the Managing Director of Tando Resources Limited. He has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the JORC Code. Mr Oliver consents to the inclusion in this document of the matters based on his information in the form and context in which it appears. The Exploration Results are based on standard industry practices for drilling, logging, sampling, assay methods including quality assurance and quality control measures as detailed in the ASX Announcement of 22 March 2018.

19