VANADIUM RESOURCES LIMITED Investor Presentation 2018

Nov 11, 2018

66018_rns_2018-11-11_52508684-33c6-49de-b24b-4ca9d540b2fb.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

1

PROJECT HIGHLIGHTS
2
World-class
Vanadium Asset

SPD Vanadium Project is a globally significant, high-grade Vanadium deposit located in an established producing region.

Numerous drill intersections greater than 1% V2O5

Concentrate grade averaging 2%+.
Substantial Resource

Existing inferred resource of 513Mt at 0.78% V2O5(foreign resource under SAMREC).

Drilling program completed to convert resource to JORC Code.

Numerous high grade results received.

Significant diamond hole & RC drill database to draw upon.
Unmatched Grade
Profile Versus Peers

SPD Vanadium Project grade profile is one of the highest of all ASX-listed vanadium projects.

Grade in concentrate averaging 2% V2O5and 13% TiO2.

Shallow mineralisation coupled with simple geology.
Fast Track
Production Option

High grade +2% V2O5returned from surface sampling of vanadium pipes.

Potential for mine gate or direct shipping style operation being investigated.

Aggressively pursuing opportunities to enter production in near term, either vanadium pentoxide or precursor products.
Located Near To Existing
Infrastructure

Significant regional infrastructure surrounding SPD Vanadium Project including road, rail & power.

Nearby existing vanadium processing operations – Glencore (Rhovan) & Vametco (Bushveld).
Attractive Terms

Tando has the right to earn 73.95% of the SPD Vanadium Project.

Staged acquisition (primarily back-ended) via project milestone completion.

See “Terms of Acquisition” slide for further details.
Well Funded With Balance
Sheet Flexibility

Tando has cash reserves of circa ~A$3million.

Fully funded to carry out planned drilling along with resource, mining and metallurgical studies.

Unencumbered resource off-take opportunities

==> picture [420 x 325] intentionally omitted <==

----- Start of picture text -----

Vanadium (V2O5) Price Chart
US$/lb
f.o.b. China
----- End of picture text -----

==> picture [30 x 188] intentionally omitted <==

----- Start of picture text -----

US$/lb
V2O5 98% f.o.b. China
US$/t
f.o.b. China
Iron Ore 62% Fe
----- End of picture text -----

  • Vanadium prices have increased 200% since Jan 2018

  • ▪ Prices in uptrend since Jan 2016

  • For the first time vanadium price has decoupled from iron ore price as a result of :

  • Changes in vanadium content of steel

  • Usage of vanadium in Vanadium Redox Flow Batteries (VRFBs)

  • Price decreases improve economics of VRFBs

  • ▪ Price increases reflect demand in steel making

  • ▪ Marks a structural change in the sector

Source: Metal Bulletin

  • Energy storage is key factor in global change to renewable energy

Vanadium Redox Flow Batteries

==> picture [370 x 307] intentionally omitted <==

  • “the wind doesn’t always blow, the sun doesn’t always shine”

  • “you might have an electronic vehicle but you’ll be charging it from a coal fired power station”

  • VRFBs have characteristics key to providing grid scale energy storage solutions:

  • substantially longer lifespan than most batteries (up to 20 years)

  • able to hold charge for a significant time

    • (up to 12 months)
  • able to discharge 100% charge without damage

  • scalability allowing large scale facilities to be constructed

  • greater chemical stability as only a single element is present in the electrolyte (ie safer)

▪ Requires high purity product > 98% V2O5

Vanadium Intensity of Use in Steel (2017)

  • Over 90% of the current demand for vanadium arises from its use to strengthen steel.

  • Demand increasing due to more stringent regulations in China for rebar and other steel products used in construction.

  • New Chinese standards forecast to increase vanadium consumption in rebar by 20%.

Vanadium Consumption by Application 2017 Total: 85,818 Metric Tons V

==> picture [75 x 8] intentionally omitted <==

----- Start of picture text -----

Source: TTP Squared
----- End of picture text -----

  • Strengthened steel also used in EVs and other applications where weight of steel needs to be decreased.

  • Actual demand for steel is steady, so demand for vanadium is not being fed by increased iron ore production (“co-production”).

Vanadium Production by Raw Material

  • Over 85% of the worlds vanadium is produced from China, Russia and South Africa

  • Production from primary sources (i.e. new mines such as SPD) increasing due to environmental issues with production from slag

  • Primary deposit types:

  • Titaniferous magnetite – predominant style being mined globally

World Vanadium Reserve Total: 15 million metric tonnes

Source: TTP Squared

  • Phosphate rock – used for production of fertilizers and produces vanadium as a by product. Not a major source of commercial vanadium

  • Uraniferous sandstones / siltstones – no current commercial production

==> picture [416 x 409] intentionally omitted <==

▪ Active vanadium mining and processing operations: ▪ Rhovan (Glencore)

▪ Vametco (Bushveld)

▪ SPD Project adjacent to dormant Mapochs vanadium operation (formerly Evraz, now private)

==> picture [365 x 206] intentionally omitted <==

----- Start of picture text -----

Mapochs Mine
----- End of picture text -----

INFRASTRUCTURE RICH REGION

==> picture [404 x 134] intentionally omitted <==

Electricity sub station 15km from SPD

==> picture [318 x 191] intentionally omitted <==

De Hoop Dam, 15km from SPD

Steelpoort Rail Siding, 25km from SPD

8

SPD has one of the highest: ▪ whole rock / pre-concentrate grades ▪ grade in concentrate

Chart compares resources reported under different codes and companies at different stages of development as detailed in slide 23.

Reef Avg
Thickness (m)
Tonnes (Mt) Whole Rock
V2O5%
Mt% Magnetite
Tonnes
V2O5%
in Magnetite
Upper Layer 24 184.2 0.73 42.4 78.1 1.99
Lower Layer 22 329.1 0.81 41.6 136.0 2.20
Averages & Totals 23 513.3 0.78 41.9 215.0 2.09

While this foreign resource is not reported in compliance with the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code), it is the Company’s opinion (and the opinion of the Competent Person for this document), that the data quality and validation criteria, as well as the resource methodology and check procedures, are reliable and consistent with criteria as defined by the JORC Code. All tabulated data has been rounded to one decimal place for tonnage and two decimal places for grades.

  • The resource for the SPD Project as shown in Table 1 is estimated in accordance with the SAMREC Code (2007) and is therefore a “qualifying foreign resource estimate” as defined in the ASX Listing Rules. Further information regarding the qualifying foreign resource is presented in the ASX Announcement of 22 March 2018 utilising the template prescribed by the JORC Code (2012).

  • Bill Oliver, Managing Director of Tando, is acting as the Competent Person for the Mineral Resource and has reviewed reports and data compiled by GEMECS Pty Ltd, independent geological consultants. GEMECS implemented the 2010 drill programme for Vanadium Resources (Pty) Ltd and the estimation of the resource presented here, including supervision of all drilling and sampling. GEMECS has confirmed that there are no material changes to the resource or underlying data since it was estimated in June 2010, and has confirmed that the information presented in this announcement is consistent with the data it reported to Vanadium Resources (Pty Ltd)

  • The Competent Person has not yet completed sufficient review on the qualifying foreign resource estimate to classify it in accordance with the JORC Code at this time and consequently it is uncertain that, following evaluation and/or further exploration work that the qualifying foreign resource estimate will be able to be reported as a Mineral Resource in accordance with the JORC Code.

  • The Company plans to carry out further assessment and due diligence on the Mineral Resource, and then to implement a drilling programme to verify the Mineral Resource and, provided results are consistent with previous drilling, aim to increase the confidence in the Mineral Resource.

==> picture [394 x 201] intentionally omitted <==

==> picture [394 x 209] intentionally omitted <==

Significant Whole Rock Results include[1] :

  • 9m at 1.34% V O 2 5 + 10.5% TiO2 from 9m (SFR019)

  • 14m at 1.08% V O 2 5 + 7.07% TiO2 from 9m (SFR013)

  • 13m at 1.13% V O 2 5 + 7.43% TiO2 from 10m (SFR017)

  • 26.9m at 0.80% V O 2 5 from 43.1m

  • & 12.2m at 0.90% V O 2 5 from 127.2m (SFDD001)

  • 15m at 0.92% V O 2 5 + 6.44% TiO2 from 8m (SFR018)

  • ▪ 44m at 0.66% V O 2 5 + 4.24% TiO2 from 35m (SFR008)

  • ▪ 34m at 0.65% V O 2 5 + 4.58% TiO2 from 23m (SFR009)

Concentrates from above intersections return[1] :

  • 9m at 2.03% V O 2 5 + 14.2% TiO2 from 9m (SFR019)

  • 14m at 2.36% V O 2 5 + 12.8% TiO2 from 9m (SFR013)

  • 13m at 2.28% V O 2 5 + 12.9% TiO2 from 10m (SFR017)

  • 26.9m at 1.93% V O 2 5 from 43.1m

  • & 12.2m at 2.10% V O 2 5 from 127.2m (SFDD001)

  • 15m at 2.28% V O 2 5 + 12.1% TiO2 from 8m (SFR018)

  • 44m at 2.26% V O 2 5 + 11.8% TiO2 from 35m (SFR008)

  • ▪ 34m at 2.20% V O 2 5 + 12.3% TiO2 from 23m (SFR009)

  • 1 Refer ASX Announcement 22 March 2018

==> picture [364 x 432] intentionally omitted <==

▪ Near surface mineralisation

▪ Both units outcrop in project area

  • Two magnetite units averaging 23m thick ▪ Upper Magnetite Layer (UML)

  • ▪ Lower Magnetite Layer (LML)

  • ▪ Both units outcrop in project area are near surface mineralisation

▪ Located at base of Upper Zone of Bushveld Complex

▪ 42 historical RC & DD holes drilled for 2398.6m

  • Phase 1 drilling completed providing data for estimation of maiden JORC resource.

  • Drilling has successfully intersected mineralised units and is consistent (to date) with historical results.

  • 3 rigs in operation on site – RC and diamond core.

  • Samples from diamond core drilling collected for metallurgical testwork.

  • Numerous high grade results > 1.0% V2O5.

  • 1 Refer to ASX Announcements 12 October 2018 and 25 October 2018

==> picture [132 x 217] intentionally omitted <==

==> picture [269 x 217] intentionally omitted <==

==> picture [414 x 217] intentionally omitted <==

==> picture [394 x 228] intentionally omitted <==

==> picture [394 x 205] intentionally omitted <==

  • High grade results from initial assays

  • Shallow near surface mineralisation

  • 34m at 1.03%V2O5 from 22m

  • 8m at 1.02%V2O5 from 108.6m

  • 24m at 0.73% V2O5 from 0m / surface ▪ including 12m at 1.00% V2O5 from 12m

  • ▪ including 2m at 1.72% V2O5 from 22m

  • ▪ 1m at 1.31% V2O5 from 0m / surface

  • ▪ 16m at 0.82% V2O5 from 10m ▪ including 2m at 1.54% V2O5 from 24m

  • 8m at 1.10% V2O5 from 42m

  • 7m at 0.84% V2O5 from 3m

  • Results are whole-rock, or pre-concentrate grades.

▪ Adjacent drilling returned magnetic concentrate grades above 2.2% V2O5

1 Refer to ASX Announcements 12 October 2018 and 25 October 2018

==> picture [354 x 420] intentionally omitted <==

▪ Estimation of Mineral Resource under JORC Code (refer to Slide 10)

▪ Complete infill drilling aiming to increase confidence in Mineral Resource to Indicated level ▪ Metallurgical testwork in progress ▪ Feed into Scoping Study which will consider potential for near term, fast track production via simple beneficiation as well as larger, long life project ▪ Continue Vanadium Resources’ positive community and stakeholder engagement

==> picture [566 x 234] intentionally omitted <==

----- Start of picture text -----

Magnetite Pipe
----- End of picture text -----

==> picture [268 x 165] intentionally omitted <==

==> picture [285 x 164] intentionally omitted <==

  • Potential for fast-track to production

  • High grade pipes identified at surface

  • Investigating simple, low cost production start-up

  • ▪ Potential to sell at mine gate or direct ship to customer

  • ▪ Drilling identifying higher grade zones within resource

==> picture [367 x 417] intentionally omitted <==

  • 6 clusters of pipes have now been mapped and sampled on the SPD Project

  • Average of 20 samples = 1.87% V2O5

  • 7 samples above 2% V2O5

▪ High resolution magnetic survey delineates scale:

  • Cluster 5 600m x 600m

  • New target 400m x 400m

▪ Drill testing to commence

Shares
Current Shares 193,587,061
Listed Options 52,237,043
Unlisted Options 23,100,000
Vendor Options 41,580,001
  • Current Issued Shares 193.6M

▪ Enterprise Value at 12c ~ $23M

  • Cash at bank ~ $3M

Fully funded for all upcoming drilling, resource work, metallurgical testwork, and mining studies.

: Further shares to be issued to enable Tando to earn up to 73.95% of the SPD Project

  • 25.8M shares on delineation of a Measured Resource

  • 19.6M shares on completion of a Scoping Study

  • 4.6M shares & 32.3M options on successful completion of a Pre-Feasibility Study

  • 30.3M shares & 20.6M options on successful completion of a Feasibility Study

==> picture [647 x 400] intentionally omitted <==

Chart compares resources reported under different codes and companies at different stages of development as detailed in slide 23.

▪ Bill Oliver Geologist with over 20 years wide ranging exploration experience in a Managing Director range of commodities and jurisdictions.

▪ Enviable track record in project identification and evaluation.

Jeremy King

  • Jeremy King Corporate advisor with over 15 years’ experience in domestic and Non-Executive Chairman international legal, financial and corporate matters.

  • Extensive corporate experience and substantial global network.

Pat Burke

Non-Executive Director

  • Lawyer with extensive legal, commercial and corporate advisory experience for ASX listed companies.

  • Has acted as a director for a number of ASX and AIM listed small to mid-cap resources companies over the past 10 years.

Tando Resources (ASX: TNO)

W: www.tandoresources.com.au

E: [email protected]

T: +61 8 6559 1792

A: Suite 2 / 1 Altona St, West Perth, WA

21

  • This presentation has been prepared by Tando Resources Limited (“the Company” or “Tando”). The information contained in this presentation is a professional opinion only and is given in good faith.

  • The information contained herein is confidential and proprietary to the Company and is provided to recipients on the terms and conditions set out in this disclaimer. The document, in whole or in part, is not to be distributed, copied or reproduced, in any form, without the prior written consent of the Directors of the Company.

  • Certain information in this presentation has been derived from third parties and though Tando has no reason to believe that it is not accurate, reliable or complete, it has not been independently audited or verified by Tando.

  • Any forward looking statements included in this presentation involve subjective judgement and analysis and are subject to uncertainties, risks and contingencies, many of which are outside the control of, and maybe unknown to, Tando. In particular they speak only to the date of this presentation, they assume the success of Tando’s strategies, and they are subject to significant regulatory, business, competitive and economic uncertainties and risks. Actual future events may vary materially from the forward looking statements and the assumptions on which these assumptions are based. Recipients of this presentation are cautioned not to place undue reliance on such forward looking statements.

  • Tando makes no representation or warranty as to the accuracy, reliability or completeness of information in this document and does not take responsibility for updating any information or correcting any errors or omissions which may become apparent after this presentation is released.

  • To the extent permitted by law, Tando and its officers, employees, related bodies corporate and agents disclaim all liability, direct, indirect or consequential (and whether or not arising out of the negligence, default or lack of care of Tando and/or any of its agents) for any loss or damage suffered by a recipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information.

  • All amounts in A$ unless stated otherwise.

  • The information in this report that relates to Exploration Results and other technical information for the Company’s Projects complies with the JORC Code and has been compiled by Mr Bill Oliver, a Competent Person who is a Member of The Australasian Institute of Geoscientists and the Australasian Institute of Mining and Metallurgy. Mr Oliver is the Managing Director of Tando Resources Limited. He has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the JORC Code. Mr Oliver consents to the inclusion in this document of the matters based on his information in the form and context in which it appears. The Exploration Results are based on standard industry practices for drilling, logging, sampling, assay methods including quality assurance and quality control measures as detailed in the ASX Announcements stated in the text.

  • In relying on the above mentioned ASX announcements, the Company confirms that it is not aware of any new information or data that materially affects the information included in the above mentioned announcements

APPENDIX: APPENDIX: PEER COMPARISON INFORMATION COMPARISON INFORMATION COMPARISON INFORMATION COMPARISON INFORMATION COMPARISON INFORMATION
Company Code Project Stage Resource Category Resource Resource Concentrate Information Source
Tonnes Grade Grade
Largo LGO.TSX Maracas Production Measured, Indicated & 49.25 0.99 3.10 43-101 Technical Report dated 26/10/2017
Inferred (43-101) largoresources.com/operations/maracas-
menchen
-mine
Bushveld BMN.LSE Vametco Production Indicated & Inferred 142 0.57 1.96 bushveldminerals.com/bushveld-vametco/
bushveldminerals.com/presentations/
Mokopane Development Indicated & Inferred 285 0.68 1.75 Mokopane PFS Study Report Jan 2016
bushveldminerals.com/technical-reports/
TNG TNG.ASX Mt Peake Development Measured, Indicated & 160 0.28 1.20 ASX Announcement 26/03/2013
Inferred
King River KRC.ASX Speewah Development Measured, Indicated & 4,712 0.30 2.11 ASX Announcement 02/11/2018
Inferred 21/03/2018
Aust Vanadium AVL.ASX Gabanintha Development Measured, Indicated & 176 0.77 1.39 ASX Announcement 26/09/2018
Inferred
Technology Metals TMT.ASX Gabaninth Development Indicated & Inferred 120 0.8 1.39 – ASX Announcement 21/06/2018
1.53 21/06/2018
23