VANADIUM RESOURCES LIMITED Interim / Quarterly Report 2024

Apr 28, 2024

66018_rns_2024-04-28_35fdc25a-4bfe-4e00-baaa-3aca9b8d9716.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

29 APRIL 2024

QUARTERLY ACTIVITIES REPORT – MARCH 2024

HIGHLIGHTS

  • Significant offtake interest received from Chinese, Japanese, Korean and European end-users and traders and the Company is in discussions with several groups around offtake MOUs and agreements

  • FEED workstreams continued with a focus on re-design of parts of the plant, Capex reassessments, preparation of overall site plans, engineering documentation and technical specifications for tender packages on an EPC basis for each part of the project

  • Environmental Authorisation granted for the Tweefontein SRL site, Social and Labour Plan feedback received from DMRE, remaining environmental and water applications progressing through approval processes

  • Project readiness workstreams progressed with fencing work commenced at Steelpoortdrift, completion of Rope Conveyor PFS, ESKOM application advances, interface risk assessments and investigations into complete power solutions

POST-QUARTER HIGHLIGHT

  • Entered into Memorandum of Understanding (“MOU”) with Panjin Hexiang New Materials Technology Co., Ltd. (“Hexiang”) for offtake of 4,000 tonnes per annum of vanadium pentoxide (V2O5) for an initial 5-year term, with option to extend for a further 5 years[1]

Vanadium Resources Limited (ASX: VR8; DAX: TR3) (the “Company”) (ASX: VR8, DAX: TR3) is pleased to provide an update on its activities for the March 2024 quarter.

1 Refer to ASX Announcement dated 10 April 2024 “Off-take MOU with large vanadium nitride producer”

Vanadium Resources Limited (ASX.VR8) 7/63 Shepperton Road, Victoria Park, WA 6100 Australia [email protected] • (+61) 08 6158 9990 www.VR8.global

OVERVIEW

During the Quarter, the Company continued to focus solely on the advancement of its world-class Steelpoortdrift Vanadium Project (the “ Project ”) in South Africa, consisting of the Steelpoortdrift Mine and Concentrator (“ Steelpoortdrift” ) and the planned Tweefontein Salt Roast Leach (“ SRL ”) operation (“ Tweefontein ”).

During and following the end of the March quarter, the Company has experienced a significant increase in the number of parties that have expressed an interest in the Project. These interested parties comprise a range of potential offtake partners, strategic equity investors and debt financiers. Increased momentum on this front has stemmed from the Company’s continued engagement with its financial adviser, GC Partners, and debt adviser, HCF International Advisers. When assessing the suitability of interested parties, the Company continues to prioritise the maximisation of the Project’s Net Present Value (“ NPV ”) for existing shareholders, while also considering further value-adding opportunities.

The Company benefits from its leadership’s extensive background of developing funding solutions for natural resource projects of a similar scale and nature to the Steelpoortdrift Vanadium Project. Although it cannot be guaranteed that a favourable outcome will be reached within any particular time frame, the Company is currently satisfied that it has implemented an optimal process for the funding of the Project with the aim of reaching production during 2H CY2026.[2]

Presently, it is envisaged that the funding process for the Project will involve a series of interrelated steps, which includes the recently announced Offtake MOU with Hexiang[3] . Further, the Company has commenced a process of assessing debt funding appetite of non-bank lenders by making use of the services of a major European Investment Bank, with associated workstreams commencing in Q2 CY2024.

In addition to the offtake, strategic equity and debt financing processes during the Quarter, the Company also continued to make progress across multiple aspects of the Project, including Front-End Engineering Design, Environmental Approvals and other workstreams. It is anticipated that these works will be completed on schedule and will enable a Final Investment Decision (“ FID ”) for the Project during 2H CY2024.[4 ]

STEELPOORTDRIFT AND TWEEFONTEIN VANADIUM PROJECT

Front-End Engineering Design (FEED) & Project Delivery Model

During the Quarter, the Company progressed work on the FEED packages with a focus on re-design of some parts of the concentrator and SRL plants (taking into account relevant vanadium operations experience from the VR8 management team), preparation of overall site plans to assist with managing interface risks across the operations and engineering documentation and technical specifications for relevant tender packages for each part of the Project.

2 Refer to ASX Announcement dated 18 April 2024 “Corporate Presentation – April 2024” for indicative timetable

3 Refer to ASX Announcement dated 10 April 2024 “Off-take MOU with large vanadium nitride producer”

4 Refer to ASX Announcement dated 18 April 2024 “Corporate Presentation – April 2024” for indicative timetable

Page 2 of 12

The work undertaken as part of the FEED during the Quarter, included:

  • Review of DFS – a review of the DFS designs and re-design of parts of the plant and equipment including:

  • Improved kiln and leach tank specifications have been established and a trade-off study is underway to ensure an optimum kiln off gas system;

  • Materials handling in the plant was revised and improved designs are underway;

  • Awarded design and equipment selection package for the onsite laboratories;

  • Design changes in the precipitation plant to produce high quality V2O5 product;

  • Project scope – continued work on the consolidation of design packages across the Project including overall layout plans across both operations (refer to Figure 1, 2 and 3, below), associated infrastructure and relevant interface aspects between each of the packages;

  • Engineering documentation – continued preparation of engineering documents, technical specifications and equipment selection; and

  • Project schedules – commenced the development of an overall project schedule across all work packages and met with several potential Project Managers with respect to the appointment of a Project Construction Manager.

The key engineering firms involved in the Project included:

  • Steelpoortdrift Mine and Concentrator:

  • Geology and mining engineering – Sound Mining;

  • Concentrator – UMS Group; and

  • Infrastructure, water and power – UMS Group, CEMS Consult, GLPS, Kadoma and Nurizon.

  • Tweefontein Salt, Roast Leach (SRL) Plant:

  • Kiln, leach tanks and boiler – MetalX;

  • De-silication plant, AMV precipitation, de-ammoniator, fusion furnace and evaporator – PPTech;

  • Waste disposal – Nurizon; and

  • Infrastructure, water and power – GLPS, CEMS, Kadoma and Nurizon.

  • Rope Conveyor: Kuka Mining Logistics and Rula Bulk Materials Handling.

During the next quarter, the Company plans to issue each of the above packages to relevant engineering firms to obtain revised capital and operating costs and then prepare detailed design and construction tender packages for each part of the Project. Once this work has been completed, the Company will implement a series of EPC / EPCM contracts across the Project, with a view to ensuring that the appropriate engineering firm and/or equipment manufacturer has the necessary expertise, experience and ability to provide relevant performance guarantees and liquidated damages for that part of the plant. To reduce the number of construction packages, several sections of the equipment will be combined to be managed as a mini-projects within the wider construction scope. In line with this delivery strategy, the Company held early discussions during the Quarter with several potential Project Management groups and some of the key engineering firms and equipment manufacturers to prepare for the impending tender process.

Page 3 of 12

Figure 1: Layout Plan of Steelpoortdrift

==> picture [428 x 298] intentionally omitted <==

Figure 2: Layout Plan of Tweefontein

==> picture [429 x 294] intentionally omitted <==

Page 4 of 12

Figure 3: Layout Plan of Steelpoortdrift and Tweefontein

==> picture [496 x 343] intentionally omitted <==

Additional Project Development Workstreams

During the Quarter, the Company commenced, progressed or completed the following additional workstreams:

  • Fencing: On-site excavation work commenced in preparation for the installation of a boundary fence around the Steelpoortdrift mine site (as shown in Figure 4 below);

  • Power : Progress continued with ESKOM and feedback on power applications are expected in the June quarter. The Company also progressed discussions with several groups for the design and development of complete power solutions;

  • Rope Conveyor : A Pre-Feasibility Study for the rope conveyor was completed; and

  • Site Access Road : Several proposals received for the initial design of a more efficient and safer site access road to Steelpoortdrift.

Page 5 of 12

Figure 4: Site preparation for installation of boundary fence

==> picture [111 x 167] intentionally omitted <==

==> picture [360 x 166] intentionally omitted <==

Environmental Authorisation & Water Use Licence Applications

Tweefontein SRL plant

During the Quarter, the Environmental Authorisation (“ EA ”) was granted for the SRL Plant at the Tweefontein site, with relevant parties notified and a 20-day appeal period was provided. Shortly after the Quarter ended, on 8 April 2024, the appeal period expired with no appeals lodged, meaning the EA for Tweefontein has been formalised.

Preparations are being undertaken for the submission of the final phase (including finalising design details of stockpiles and dams) of the Water Use Licence Application (“ WULA ”) for the SRL with the Department of Water and Sanitation (“ DWS ”) which is expected to be approved by the end of December quarter.

Since the issuance of the EA, air quality specialists have been appointed to undertake the Air Emissions Licence (“ AEL ”) application for the SRL Plant. The AEL application is underway, with the specialists collating the required information for the application submission.

During the Quarter, a heritage specialist was appointed to undertake the required Mitigation Permit application for the Heritage Resources identified at the Tailings Storage Facility (“ TSF ”).

Steelpoortdrift mine and concentrator

The final Environmental Impact Assessment (“ EIA ”) and Environmental Management Program (“ EMPr ”) Report for the Steelpoortdrift site were submitted to the Department of Mineral Resources & Energy (“ DMRE” ) in the December quarter, with approvals anticipated in the following quarter. In February 2024, the DMRE advised the Company that there was an administrative delay in processing of these approvals, with a decision on granting the EA for the Steelpoortdrift site now expected by the end of the June quarter.

The final phase of the WULA process for Steelpoortdrift was submitted on 12 April 2024, following which the DWS has 90 days to finalise its decision which is expected by the end of September quarter.

Page 6 of 12

Ropeway

Red Kite Environmental Solutions (Pty) Ltd (“ Red Kite ”), the Company’s environmental consultant, has been appointed for the EIA and WULAs for the Ropeway. Red Kite will commence the application once the final details of the PFS have been completed including final ropeway route, details of access and maintenance roads, anchor stations and related activities.

Social and Labour Plan, Community Engagement & Re-Zoning Applications

A revised Social and Labour Plan (“ SLP” ) was completed and provided to the DMRE for review in the September quarter, with the review expected to take approximately four months. During the Quarter the DMRE provided feedback to the Company and has requested amendments or further detail on a number of sections. The Company is reviewing the directive from the DMRE and will update the SLP for re-submission.

While the Mining Right has been granted over the entire Steelpoortdrift site, several rezoning applications are in progress to ensure the site areas are appropriately zoned for the activities that will take place including mining, concentrating and installing the photovoltaic (“ PV” ) solar plant and vanadium flow battery unit. The Company continues to work with the relevant stakeholders as well as the municipal and provincial authorities to ensure that all of the criteria for rezoning approval are met. The EA for Steelpoortdrift will assist with finalising a number of these applications.

CORPORATE

Offtake Process

The Company has been running an offtake and strategic equity process which has yielded significant interest from a range of parties including Chinese, Japanese, Korean, European and North American end-users and traders. The Company has received multiple indicative term sheets and continued or commenced discussions and negotiations with potential parties during the Quarter with a view to securing Offtake MOUs / Agreements and potential strategic equity investment.

Funding Process

The debt financing process continues with several financing streams such as conventional bank project financing, non-bank lending and customer/offtake financing. Further, the Company has commenced with a process of assessing debt funding appetite of non-bank lenders by making use of the services of a major European Investment Bank, with associated workstreams commencing in Q2 CY2024.

Kadoma Option Agreement

The option agreement with Kadoma Investments Pty Ltd (“Kadoma”) afforded VanRes an option to purchase part of portion 15 of the Farm Tweefontein for a total consideration of ZAR33.5M (approximately A$2.73M). The option agreement was conditional on VanRes securing sufficient funding for the construction of the Project, all environmental permissions having been procured to operate the SRL plant and Kadoma having procured the rezoning of the site prior to 31 August 2023 (Kadoma was granted the rezoning on 29 August 2023). The original option agreement remained valid up to 30 September 2023. Since that date, the

Page 7 of 12

Company and Kadoma have continued to roll forward the option agreement on a regular basis, given the mutual interest of developing the Project and the fact that Kadoma are building a 35MW solar plant immediately adjacent to the Tweefontein SRL operations which has been earmarked to supply power the operation.

Appointments

In January, Leon Repsold joined the Group as Project Manager. Leon has over 35 years’ industry experience across the project, engineering and maintenance sectors, with a proven track record in the engineering and maintenance of vanadium and steel making operations. He holds a Bachelor of Engineering (Electrical) degree. In the early 1990s he was part of the Columbus Stainless expansion project followed by the greenfield Duferco Steel Processing facility on the west coast of South Africa. After the successful commissioning of the facility, he was the Engineering Manager until he joined Vanchem Vanadium Products as Maintenance and Projects Manager prior to its acquisition by Bushveld Minerals. In 2015 he was the Project Manager at Lesedi and Letsatsi, two 75MW solar PV power facilities in the Free State province of RSA. Most recently he was Engineering and Project Manager at Bushveld Minerals for its Vanchem operations situated within the same geological and mineralogical terrain as the Steelpoortdrift Project.

In February 2024, Ilze-Mari Wentzel joined the Group as Contracts Manager. She has over nine years of experience in mining infrastructure projects, of which three years were as part of the management team for a R3.3 billion Greenfields Mega project (coal) and the other six years in SIB projects and was involved with mining operations the last two years. Ilze-Mari holds a Bachelor of Commerce (Honours) in Econometrics and is a registered Project Management Professional with PMI International. Her principal areas of expertise are procurement, contract management and project management and the setup of projects to ensure all controls are in place with a focus on continuous improvement and streamlining processes. Most recently she was Contracts Manager at Bushveld Minerals where she helped to establish the contracts department.

Both Leon and Ilze-Mari report to Alex Oehmen, General Manager.

Executive Chairman Remuneration

The employment contract of Mr Jurie Wessels, Executive Chairman, was updated during the Quarter with a retrospective date of 1 July 2023[5] . Mr Wessels had served the Company in an Executive Capacity since April 2022 with no changes to remuneration.

Performance Rights

During the Quarter 3,000,000 performance rights to Mr John Ciganek lapsed.

5 Refer to ASX Announcement dated 1 March 2024 “Formalisation of Executive Chairman employment contract”

Page 8 of 12

POST QUARTER

Offtake MOU with Hexiang

As announced on 10 April 2024[6] , the Company has entered into a Memorandum of Understanding (“ MOU ”) with Panjin Hexiang New Materials Technology Co., Ltd. (“ Hexiang ”) for production from the Steelpoortdrift and Tweefontein vanadium operations.

The non-binding MOU provides for the supply of 4,000tpa of V2O5 flake over a period of five years with an option for Hexiang to extend a further five years. This represents approximately 37% of VR8’s planned annual V2O5 flake production capacity of ~11,000tpa[7] from the initial Phase 1 operation. The MOU with Hexiang provides a framework for further negotiations in relation to price, product quality and other offtake parameters.

Summary of Expenditure for the Quarter

During the Quarter, a total of $724,817 was spent on activities related to the exploration and development of the Project. The Company did not incur any expenditure for mining production activities during the Quarter.

Payments totaling approximately $65,304 were made to related parties of the Company with respect to the Quarter, being director and consulting fees (see section 6.1 and 6.2 of the Accompanying 5B).

Cash Position

As at the end of March 2024 quarter, VR8 and its subsidiaries held total cash and cash equivalents of $2,978,262.

This announcement has been authorised for release by the directors of Vanadium Resources Limited.

For and on behalf of the board:

Kyla Garic

Company Secretary

VANADIUM RESOURCES LIMITED [email protected]

6 Refer to ASX Announcement dated 10 April 2024 “Off-take MOU with large vanadium nitride producer”

7 Refer to ASX Announcement dated 4 October 2022 “DFS delivers A$1.9Bn NPV confirming World Class Project”

Page 9 of 12

For further information, please visit https://vr8.global or contact:

Jurie H. Wessels John Ciganek Executive Chairman Managing Director and Chief Executive Officer VANADIUM RESOURCES LIMITED VANADIUM RESOURCES LIMITED E: [email protected] E: [email protected]

Erik Bergseng Investor Relations P: (612) 8350 0882

E: [email protected]

APPENDIX 1 – MINERAL RESOURCE ESTIMATE

The Mineral Resource statement as reported on the 4 October 2022[8] was updated and is as follows:

Table 1: Mineral Resource Estimate (as at 30 April 2022)

CLASSIFICATION VOLUME
**(M m3) **
QUANTITY
(Mt)
QUALITY
% V2O5
(In-situ)
CONTAINED
V2O5
(Mt)
QUALITY
% Fe2O
(In-Situ)
CONTAINED
Fe2O
(Mt)
Measured 43.77 145.46 0.72 1.05 22.47 32.68
Indicated 98.75 327.29 0.70 2.29 22.80 74.62
Inferred 63.41 207.38 0.68 1.40 22.90 47.49
Total Mineral Resource 205.93 680.13 0.70 4.74 22.76 154.80

Source: Sound Mining, 2022

Notes:

  • Stated at a cut-off grade of 0.45% V2O5;

  • The Mineral Resources are stated on a 100% attributable basis for VanRes, of which VR8 owns 86.49%;

  • The Mineral Resources are inclusive of Ore Reserves; and

  • Reported in-situ with any apparent computational errors due to rounding not considered significant.

8 Refer to ASX Announcement 4 October 2022 “VR8 Updates Mineral Resource and Ore Reserve for the Steelpoortdrift Vanadium Project”

Page 10 of 12

APPENDIX 2 – ORE RESERVE

The updated Ore Reserve statement as at 30 September 2022.

Table 2: Ore Reserves as at 30 September 2022

CLASSIFICATION QUANTITY
(Mt)
QUALITY
(% V2O5 RoM)
CONTAINED V2O5
(Mt)
Proved Ore Reserves 30.23 0.70% 0.21
Probable Ore Reserves 46.62 0.72% 0.34
Total Ore Reserves 76.86 0.72% 0.55

Source: Sound Mining, 2022

Notes:

  • The Ore Reserves are stated at a price of USD9.50/lb;

  • The Ore Reserves are stated on a 100% attributable basis for VanRes, of which VR8 is owns 86.49%;

  • The LoM was restricted to a production forecast of 25 years whereafter the mining licence will need to be renewed.

  • The Ore Reserves are reported at the point of delivery for processing;

  • The Quantity is reported in metric tonnes and the Grade reported as a percentage of contained V2O5;

  • Any apparent computational errors due to rounding are not considered significant;

  • The Ore Reserves may be subject to legal, political, environmental or other risks;

  • Losses that could occur as a result of transportation of content or Flake are considered to be negligible; and

  • 39% of the Ore Reserves are in the Proved category and no Inferred Mineral Resources included in the Ore Reserve estimate.

APPENDIX 3 - Tenement Table: ASX Listing Rule 5.3.3

Table 3: Mining tenement interests held at the end of the Quarter and their location

PERMIT
NAME
PERMIT
NUMBER
REGISTERED HOLDER
/ APPLICANT
AREA
IN km2
PERMIT
STATUS
PERMIT
EXPIRY
INTEREST /
CONTRACTUAL
RIGHT
Pilbara Region, Western Australia
Quartz Bore E47/3352 VMS Resources Pty
Ltd
15 Granted 21/12/2026 100%
Limpopo Region, South Africa
Steelpoortdrift
KT365
10095MR Vanadium Resources
(Pty) Ltd
24.6 Granted 04/09/2048 86.49%

Mining tenement interests relinquished or acquired during the Quarter and their location

Nil

Beneficial percentage interests held in farm-in or farm-out agreements at the end of the Quarter

Nil

Page 11 of 12

Competent Person’s Statement and Compliance Statements

The information in the referenced announcements footnoted below that relates to Exploration Results, including the Mineral Resources contained within the Production Target (and forecast financial information derived from the production targets) at the Steelpoortdrift project has previously been released to the ASX. The Company confirms that it is not aware of any information or data that materially affects the information included in the market announcement, and that all material assumptions and technical parameters underpinning the announcement continue to apply. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.

Mineral Resources

The Company confirms it is not aware of any new information or data that materially affects the information included in the 4 October 2022 (VR8 updated mineral resource and ore reserve for the Steelpoortdrift Vanadium Project) Vanadium Resource estimate and all material assumptions and technical parameters underpinning the estimate continue to apply and have not materially changed when referring to its resource announcement made on 04 October 2022. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.

Ore Rese rves

The Company confirms that it is not aware of any new information or data that materially affects the information included in the Ore Reserves Statement and that all material assumptions and technical parameters underpinning the estimates in the Ore Reserves Statement continue to apply and have not materially changed. The Information that has been presented in this report has been extracted from the announcement dated 4 October 2022 (VR8 updated mineral resource and ore reserve for the Steelpoortdrift Vanadium Project). The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.

ASX announcements referenced to directly, or in commentary of, this quarterly activities release 1,3,6 ASX Announcement 10 April 2024 “Off-take MOU with large vanadium nitride producer” 2,4 ASX Announcement 18 April 2024 “Corporate Presentation – April 2024”

5 ASX Announcement 1 March 2024 “Formalisation of Executive Chairman employment contract”

7 ASX Announcement 4 October 2022 “DFS delivers A$1.9Bn NPV confirming World Class Project”

8ASX Announcement dated 4 October 2022 “VR8 Updates Mineral Resource and Ore Reserve for the Steelpoortdrift Vanadium Project”

Disclaimer

Some of the statements appearing in this announcement may be in the nature of forward looking statements. You should be aware that such statements are only predictions and are subject to inherent risks and uncertainties. Those risks and uncertainties include factors and risks specific to the industries in which VR8 operates and proposes to operate as well as general economic conditions, prevailing exchange rates and interest rates and conditions in the financial markets, among other things. Actual events or results may differ materially from the events or results expressed or implied in any forward looking statement. No forward looking statement is a guarantee or representation as to future performance or any other future matters, which will be influenced by a number of factors and subject to various uncertainties and contingencies, many of which will be outside VR8’s control.

VR8 does not undertake any obligation to update publicly or release any revisions to these forward looking statements to reflect events or circumstances after today's date or to reflect the occurrence of unanticipated events. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the information, opinions or conclusions contained in this announcement. To the maximum extent permitted by law, none of VR8, its Directors, employees, advisors or agents, nor any other person, accepts any liability for any loss arising from the use of the information contained in this announcement. You are cautioned not to place undue reliance on any forward looking statement. The forward looking statements in this announcement reflect views held only as at the date of this announcement.

This announcement is not an offer, invitation or recommendation to subscribe for, or purchase securities by VR8. Nor does this announcement constitute investment or financial product advice (nor tax, accounting or legal advice) and is not intended to be used for the basis of making an investment decision. Investors should obtain their own advice before making any investment decision.

Page 12 of 12

Rule 5.5

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Name of entity Vanadium Resources Limited ABN Quarter ended (“current quarter”) 47 618 307 887 31 March 2024

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(9 months)
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
-
-
-
(143)
(257)
-
31
-
-
-
-
-
-
-
(453)
(877)
-
109
-
-
-
-
(369) (1,221)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
-
-
-
(725)
-
-
-
-
(2)
(1,897)
-
-

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 1

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(9 months)
$A’000
2.2
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
(725) (1,899)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
-
-
-
-
-
-
-
-
-
-
-
1
-
-
-
-
-
-
- 1
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
4,072
(369)
(725)
-
6,097
(1,221)
(1,899)
1

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 2

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(9 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
- -
2,978 2,978
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,978
-
-
-
4,072
-
-
-
2,978 4,072
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
(50)
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
(15)
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
6.1 CEO and consulting fees to Directors of A$50,353
6.2 Director and consulting fees to Directors of A$14,951
(50)
(15)

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 3

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

7.
7.1
7.2
7.3
7.4
7.5
7.6
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
Loan facilities
-
-
Credit standby arrangements
-
-
Other (please specify)
-
-
Total financing facilities
-
-
Unused financing facilities available at quarter end
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
- -
- -
- -
- -
8. Estimated cash available for future operating activities $A’000
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
Net cash from / (used in) operating activities (item 1.9)
(369)
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(725)
Total relevant outgoings (item 8.1 + item 8.2)
(1,094)
Cash and cash equivalents at quarter end (item 4.6)
2,978
Unused finance facilities available at quarter end (item 7.5)
-
Total available funding (item 8.4 + item 8.5)
2,978
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2.7
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
(369)
(725)
(1,094)
2,978
-
2,978
Answer:N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 4

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Compliance statement

  • 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

  • 2 This statement gives a true and fair view of the matters disclosed.

Date: 29 April 2024

Authorised by: The Board Of Directors

(Name of body or officer authorising release – see note 4)

Notes

  1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.

  2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

  3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

  4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [ name of board committeeeg Audit and Risk Committee ]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee”.

  5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations , the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 5