May 28, 2013.

MAIDEN JORC RESOURCE

OF 1.3 MILLION TONNES AT 0.6% WO3, WITHIN 5.0 Mt RESOURCES AT KILBA PROJECT

Highlights

  • Resource modelling defines Indicated and Inferred Resource of 1.3Mt @ 0.57% WO3 within a much larger resource of 5.0 million tonnes at 0.27% WO3 in Zones 8 and 11 at Kilba.

  • Excellent potential identified to define additional high-grade tungsten mineralisation within the prospective target horizon that circles the Kilba Granite.

Tungsten Mining NL (ASX:TGN) (“the Company”) is pleased to announce a maiden JORC Mineral Resource estimate of 1.3Mt @ 0.57% WO3, which is located within a much larger resource of 5.0 million tonnes at 0.27% WO3 from Zone 8 and Zone 11 of the Kilba Project (Table 1). The Mineral Resource is located on the Company’s 100%-owned Mining Lease 08/314 situated in the Gascoyne Region of Western Australia (Figure 1).

Zone Category Tonnes
'000 t
WO3
%
WO3
t
8 Inferred 230 0.56 1,300
Total 230 0.56 1,300
11 Indicated 1,300 0.30 4,000
Inferred 3,500 0.24 8,500
Total 4,800 0.26 13,000
Total Indicated 1,300 0.30 4,000
Inferred 3,700 0.26 9,800
Total 5,000 0.27 14,000

Table 1: Kilba Mineral resource estimate based on a 0.10% WO3 cut-off grade.

Note: Totals may differ from sum of individual numbers as numbers have been rounded to two significant figures in accordance with the Australian JORC code 2012 guidance on Mineral Resource reporting.

The Mineral Resource estimate has been completed in accordance with the guidelines of the Joint Ore Reserve Committee (JORC) Code – 2012 Edition. CSA Global was engaged to audit data integrity and conduct the resource model, as described in the back of this announcement. Since commencing

Tungsten Mining NL | Maiden JORC Resource May 2013 ASX: TGN

1

drilling in November 2012, the Company has drilled 24 diamond holes and 42 reverse circulation (“RC”) holes over 1200 metres of mineralised strike at Zone 11. Collar locations are displayed in Figure 2.

==> picture [456 x 334] intentionally omitted <==

----- Start of picture text -----

350,000 351,000 352,000 353,000
Kilba Project Summary
§ May 2013 ^_ Kilba
G G
G
G G Zone 12
M 08/314
G!(G!(!( !(!( Mineral ResourceZone 8 Zone 9
!( !( !( G G
Zone 11 !( !(!(G!(!(G !( !( !( !(!(!(!(!(!(!(!(!(!(!(!(G!(!( G ! ( G!(!( !( !( !(!(!( !( Zone 11 !(!(!( !(!( !( !(!(!(!(G!(GG!(GG !( !(!(G!(G !(!(G !(!( G !(!( G G G GG G G MINERAL RESOURCEZone 8 LITHOLOGIES
Mineral Resource Outline Skarn
DRILLING Calc-silicate
G
!( TGN Holes Greisen
G Union Carbide Hole Granite
0 500 1,000 E 08/2139 TENEMENTS Morrisey Metamorphic Suite
m
Exploration Licence
Coordinate - MGA Zone 50 Mining Lease
Projected continuation of target horizon
7,481,000 7,481,000
7,480,000 7,480,000
----- End of picture text -----

Figure 1 – plan displaying location of Zone 8 and Zone 11 at the Kilba Project.

Tungsten Mining Managing Director, Paul Berndt, said the release of a maiden JORC Mineral Resource represents a major step towards the Company achieving its objective of the rapid evaluation and development of the Kilba Project.

“This milestone result provides us with confidence as we move to the feasibility study phase of the Kilba Project,” Mr Berndt said.

“The higher-grade section of 1.3Mt @ 0.57% WO3 identified in this initial estimate, is a figure that meets our expectations, and importantly it is contained within a much larger resource of 5.0 million tonnes at 0.27% WO3, which provides us with significant upside potential.

These results keep Tungsten Mining on target to fast-track Kilba into development in 2014.”

Tungsten Mining’s recent activities have focused on Zone 11 where previous drilling by Union Carbide Corporation intersected high-grade tungsten mineralisation in the 1970s/1980s. Union Carbide’s work also defined significant mineralisation at Zone 8 and results from this historic drilling have been used in the Mineral Resource estimate.

A range of lower cut-offs have been used to report grades and tonnages, as shown in Table 2 and Figure 3. This demonstrates that within the overall resource there are significant high-grade zones of tungsten mineralisation.

Tungsten Mining NL | Maiden JORC Resource May 2013 ASX: TGN

2

At Zone 11 tungsten mineralisation dips at 30 to 70 degrees toward the south to southwest and is associated with skarns and calc-silicate units. Typically high-grade mineralisation is associated with retrograde skarn units which are often surrounded by low to medium grade disseminated scheelite mineralisation in calc-silicate and sedimentary units.

Toward the east of the prospect tungsten mineralisation tends to occur in a single high-grade zone, as shown in Figure 4. In the central and western domains mineralisation is associated with multiple shallow dipping low to medium-grade units, as shown by Figure 5.

Union Carbide drilled diamond holes targeting high-grade tungsten mineralisation associated with skarns at Zone 8. Mineralisation dips steeply towards the north-northwest, as shown in Figure 6. A number of these holes have been used to estimate an Inferred Resource of 230,000 tonnes at 0.56% WO3. Surface mapping has identified numerous skarn units at Zone 8 that have not been adequately drill tested and future exploration will focus on evaluating these targets.

Tungsten Mining NL | Maiden JORC Resource May 2013 ASX: TGN

3

==> picture [654 x 459] intentionally omitted <==

----- Start of picture text -----

350,000 350,500 351,000 351,500
!(
!( LEGEND
Zone12
MINERAL RESOURCE
Outline
SKARN UNITS
§
5 Outline
ALL DRILLING
Grade_x_M
!( >0.10
!( 0.10 - 0.50
!( 0.50 - 1.00
!( 1.00 - 2.50
!( >2.50
G Not Assayed
TOPOGRAPHY
5m contours
!( !( !(
G !( Zone 8 Resource
!( !( Inferred 230,000 tonnes at 0.56% WO3 "F"
!( !( !(!( "B" L !( !( !(
!( Zone 11 Resource G !(
!( !( !( !(!( !( !( !( !( Indicated 1,300,000 tonnes at 0.30% WOInferred 3,500,000 tonnes at 0.24% WO33 "E"
!( !( !( !(!( !( !( !( !( Total 4,800,000 tonnes at 0.26% WO3 G G
" A " !(!( !( !( !(!( !( !(!( !( !( !( !(!( ! ( !( !( !( !( !(!( "D" G G G
!( !( L !( !( !(!(!(!( !( !(!(!(!(!(!( !( !( !(!( G !( !(!(LG !( !( G !(
!(
G
"C"
Tungsten Mining NL Kilba Project - Zone 8 and 11
Gascoyne Region 0 250 500 750 Mineral Resource Estimate
May 2013 m Coordinates - MGA Zone 50
7 5
0
1 5 0
7
7 5
1
1
5
1
1
7,481,000 7,481,000
7,480,500 7,480,500
7,480,000 7,480,000
----- End of picture text -----

Figure 2 – plan showing location of Mineral Resource outlines, TGN drilling, skarn outcrops and historic Union Carbide drill holes. The cross section “A – B”, “C – D” and “E – F” shown in blue are displayed in Figure 4, 5 and 6 below.

Tungsten Mining NL | Maiden JORC Resource May 2013 ASX: TGN 4

Cut Off Tonnes WO3 WO3
Zone Class
W03(%) '000 t % t
0.050 8 Inferred 230 0.56 1,300
Total 230 0.56 1,300
11 Indicated 1,600 0.27 4,200
Inferred 5,200 0.19 9,800
Total 6,800 0.21 14,000
Total Indicated 1,600 0.27 4,200
Inferred 5,400 0.20 11,000
Total 7,000 0.22 15,000
0.100 8 Inferred 230 0.56 1,300
Total 230 0.56 1,300
11 Indicated 1,300 0.30 4,000
Inferred 3,500 0.24 8,500
Total 4,800 0.26 13,000
Total Indicated 1,300 0.30 4,000
Inferred 3,700 0.26 9,800
Total 5,000 0.27 14,000
0.200 8 Inferred 200 0.61 1,200
Total 200 0.61 1,200
11 Indicated 790 0.41 3,200
Inferred 1,500 0.38 5,700
Total 2,300 0.39 8,900
Total Indicated 790 0.41 3,200
Inferred 1,700 0.40 7,000
Total 2,500 0.41 10,000
0.300 8 Inferred 160 0.72 1,100
Total 160 0.72 1,100
11 Indicated 450 0.53 2,400
Inferred 640 0.56 3,600
Total 1,100 0.55 6,000
Total Indicated 450 0.53 2,400
Inferred 800 0.59 4,700
Total 1,300 0.57 7,100
0.400 8 Inferred 160 0.73 1,100
Total 160 0.73 1,100
11 Indicated 280 0.64 1,800
Inferred 310 0.80 2,500
Total 590 0.72 4,300
Total Indicated 280 0.64 1,800
Inferred 460 0.77 3,600
Total 750 0.72 5,400

Table 2: Kilba Mineral Resource reported out at various lower cut-off grades.

Note: Totals may differ from sum of individual numbers as numbers have been rounded to two significant figures in accordance with the Australian JORC code 2012 guidance on Mineral Resource reporting.

Tungsten Mining NL | Maiden JORC Resource May 2013 ASX:TGN

5

==> picture [487 x 31] intentionally omitted <==

==> picture [487 x 30] intentionally omitted <==

==> picture [487 x 31] intentionally omitted <==

==> picture [487 x 30] intentionally omitted <==

==> picture [487 x 31] intentionally omitted <==

==> picture [487 x 30] intentionally omitted <==

==> picture [487 x 31] intentionally omitted <==

==> picture [487 x 30] intentionally omitted <==

==> picture [487 x 30] intentionally omitted <==

Figure 3 – Grade tonnage curve for Kilba Mineral Resource showing Indicated and Inferred tonnes and grade.

==> picture [487 x 168] intentionally omitted <==

==> picture [487 x 168] intentionally omitted <==

Figure 4 – cross section showing block model and drilling for Zone 11 at the Eastern domain.

Tungsten Mining NL | Maiden JORC Resource May 2013 ASX:TGN

6

==> picture [487 x 168] intentionally omitted <==

==> picture [487 x 168] intentionally omitted <==

Figure 5 – cross section showing block model and drilling for Zone 11 at the Western domain.

==> picture [485 x 168] intentionally omitted <==

==> picture [485 x 167] intentionally omitted <==

Figure 6 – cross section showing block model and drilling for Zone 8.

Tungsten Mining NL | Maiden JORC Resource May 2013 ASX:TGN

7

For further information contact

Paul Berndt
Managing Director Tel: +61 8 9477 3031
Colin Hay
PPR Public Relations Tel: +61 8 9388 0944
[email protected]
[email protected]

Further information about the company's activities may be found at www.tungstenmining.com .

About Tungsten Mining: Tungsten Mining NL was admitted to ASX on 13 December, 2012. The Company is focused on development and exploitation of tungsten deposits. The management and Board of the company have previous experience in tungsten mine development and operations . Tungsten is the right sector to be in, with sound fundamental drivers giving strong demand and firm pricing.

Competent Person’s Statement

The information in this report that relates to Mineral Resources is based on information compiled by Serikjan Urbisinov, a Competent Person who is a Member of the Australian Institute of Geoscientists. Mr Urbisinov is not a full-time employee of the company. Mr Urbisinov is employed by the resource industry consultancy CSA Global Pty Ltd. Mr Urbisinov has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Urbisinov consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Exploration Targets and Exploration Results is based on information compiled by Peter Bleakley, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Bleakley is not a full-time employee of the company. Mr Bleakley is a consultant to the mining industry. Mr Bleakley has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Bleakley consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Tungsten Mining NL | Maiden JORC Resource May 2013 ASX:TGN

8

JORC Code Reporting Criteria

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC-Code Explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific specialised
industry
standard
measurement
tools
appropriate
to
the
minerals
under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as limiting
the broad meaning of sampling.
The deposit is sampled using Reverse Circulation (RC), Diamond Drilling (DD) and
trenches over several drilling campaigns. The latest drilling campaign was
completed by Tungsten Mining utilising both RC and DD drilling.
A total of 104 workings were completed in the area with the following breakdown: 5
historic trenches (350m), 32 historic diamond drillholes (2,656m), 24 Tungsten
Mining diamond drillholes (2,807m) and 43 Tungsten Mining RC drillholes
(4,355m). The majority of the holes were drilled at approximately 60_⁰._
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Tungsten Mining drillhole collar locations were picked-up by a licensed surveyor
using a Topcon HiPer II RTK GPS.
Downhole surveying was initially measured by the drill contractors using either a
Reflex EZ-Shot Downhole Survey Instrument for DD holes or the Pathfinder survey
instrument for RC drilling. Tungsten Mining completed additional downhole
surveys on open holes using a gyroscopic probe. Approximately 80% of recent
drilling has gyroscopic surveys.
Certified standard and blanks samples were inserted into the sample sequences in
according to Tungsten Mining QAQC procedures. Duplicate samples for RC and
diamond samples were collected to check repeatability of sampling and variability
or nugget effect for tungsten mineralisation. Results from this QAQC sampling were
considered excellent.
Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed information.
The RC drilling crew collected 1 metre intervals from the cyclone and then riffle
split the bulk sample to produce two representative 2 – 4 kilogram samples in calico
bags. The riffle splitter was cleaned by mechanical vibration and hosing with
pressurised air to eliminate sample contamination. One of the calico samples is for
analysis and the second duplicate sample is retained as a reference sample for
possible reanalysing / QAQC activities.
For HQ diamond holes the mineralised and adjacent material was split using a
diamond saw produce a half core sample. Sample intervals were defined by
geological intervals and range from 0.3 – 1.2m. Core was orientated and the same
side of the core was submitted for analysis. One half of the cut core is left in core
boxes and retained in core storage. Sampling was extended 5 – 10 metres in both
directions from mineralized zones. The core that is not sampled is kept uncut.
Tungsten Mining samples were submitted to Ultra Trace Laboratories of Perth for
analysis by XRF Tungsten and Molybdenum Ore -Extended Suite.
Drilling techniques Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).
32 historic NQ and BQ diamond drillholes were drilled in 3 campaigns from 1975 to
1981 by the previous operator (ANZECO). Holes ranged from 24 to 170 m,
averaging 83 m.
Tungsten Mining completed 24 diamond drillholes and 43 RC drillholes. RC holes
depths ranged from 52 to 174 m, averaging 115 m. RC drilling used a face-sampling
hammer that produced a nominal 140m diameter hole.
Tungsten Mining diamond holes were HQ/HQ3 with the exception of 1 PQ
metallurgical holes. Diamond holes were drilled from 55 to 179m, averaging 114m.
Tungsten Mining diamond drill holes were surveyed at six metre intervals with a
Reflex EZ-Shot Downhole Survey Instrument. RC holes were surveyed at 30 meter
intervals using a Pathfinder survey instrument. Open holes were later surveyed
utilizing a gyroscopic probe.

Tungsten Mining NL | Error! No text of specified style in document. 9

Criteria JORC-Code Explanation Commentary
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Diamond core recovery is logged and recorded in the database. No significant core
loss issue exists. The average core recovery is 99% and over 99% for the samples
from the mineralised zones.
RC recovery was visually assessed, recorded on drill logs and considered to be
acceptable within the mineralized zones.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
Diamond core was reconstructed into continuous runs for orientation marking,
depths being checked against the depth marked on the core blocks.
RC samples were visually checked for recovery, moisture and contamination. A
cyclone and splitter were used to provide a uniform sample and these were routinely
cleaned. The drill contractor blew out the hole at the beginning of each drill rod to
remove excess water and maintain dry samples.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
Sample Recovery for diamond holes is generally very high (over 99%) within the
mineralised zones. Ground conditions for RC drilling were good and drilling
returned consistent size samples.
No significant bias is expected, and any potential bias is not considered material at
this stage of resource development.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Tungsten Mining uses specially designed drill logs for skarn type deposits to capture
the geological data. The modified log sheet lists percentages of various important
skarn minerals.
During logging part of the RC sample is washed, logged and placed into chip trays.
The chip trays are stored in a designated building at site.
Diamond core was geotechnically logged for recovery and RQD. Information on
structure, lithology and alteration zones are recorded. Diamond core trays are
stored on the site for future reference.
All drill data is digitally captured and stored in a central database.
Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
Diamond core and RC chips logging included records of lithology, mineralogy,
textures, oxidation state and colour. Visual estimates of percentages of key minerals
associated with tungsten mineralization and veining are made. Core was
photographed in both daylight and UV light to estimate scheelite content.
The total length and percentage of the relevant
intersections logged.
All drill holes were logged in full
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
All HQ diamond drill core was cut in half by an Almonte diamond saw. PQ
metallurgical core was crushed to 10mm and riffle split.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
RC samples were collected on the rig using a cyclone and put through a riffle
splitter to produce two 2 – 4 kg samples..
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Samples were dried, crushed to 3mm using Boyd jaw crushers to achieve a nominal
90% passing – 3mm. Sieve check on 1 in 50 samples.
After crushing and splitting the samples are sent for pulverisers to be ground to 75
microns. Grind check on 1 in 50 samples.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
Field QAQC procedures included the insertion of field duplicates, blanks and
commercial standards. Standards were inserted at intervals of 30.
If a duplicate or blank falls on the 30th sample, the standard sample number may be
changed to suit.
All laboratory QC data is reported within the structure of the final reports. A blank
is included at the start of every job and then after every 90 samples. One duplicate
and one CRM are included at random within each set of 24 analysed. One sample
preparation split is performed in 25 samples. Wet sieving of at least one sample in
every batch to confirm % -75um.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including
for
instance
results for
field
duplicate/second-half sampling.
Approximately 1 in 30 RC field duplicates were taken from 1m riffle split samples at
the rig. Repeatability in RC duplicate samples was found to be excellent.
Approximately 1 in 11 half core samples were duplicated by quarter core samples.
Repeatability of these samples was considered good, but demonstrated the
particulate nature or nuggety of the scheelite mineralization.

Tungsten Mining NL | Error! No text of specified style in document.

10

Criteria JORC-Code Explanation Commentary
Three diamond holes were drilled to twin RC drilling. These holes intersected
similar zones of mineralization at target depths and again showed the particulate or
nuggety nature of tungsten mineralization. Contained metal was similar.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Sample sizes are considered to be appropriate to accurately represent the tungsten
mineralisation at Kilba based on the thickness and consistency of the intersections,
the sampling methodology and the percent value assay ranges for the primary
elements.
Quality of assay
data and laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
XRF has proven to be a very accurate analytical technique for a wide range of base
metals, trace elements and major constituents found in rocks and mineral materials.
Glass fusion XRF is utilised for assaying, since it provides good accuracy and
precision; it is suitablefor analysisfrom very low levels up to very high levels
For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
A handheld magnetic susceptibility meter (KT-10) was used to measure magnetic
susceptibility for every sample. Data is stored in the database.
Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
Field QAQC procedures included the insertion of field duplicates, blanks and
commercial standards. External laboratory checks were performed on samples from
different rock types. Assay results have been generally satisfactory demonstrating
acceptable levels of accuracy and precision.
Verification
of
sampling
and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
Several independent personnel visually verified intersections in both diamond core
and RC chips as well as in trenches and outcrops. UV lamping was used to visually
estimate scheelite content.
The use of twinned holes. RC holes that intercepted high grades zones were verified by closely drilled diamond
holes.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Logging takes place at the drilling site. Panasonic Toughbook computers are used
to record the logging.
A set of standard Excel templates are used to capture the data. Data were then sent
to CSA Globalfor validation and storage into a relational database.
Discuss any adjustment to assay data. No adjustments were made, other than for values below the assay detection limit
which have been entered as the negative of the detection limit
Location of data
points
Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Once each drillhole is drilled to the targeted depth, it is routinely downhole
surveyed. Downhole surveying was initially measured by the drill contractors using
either a Reflex EZ-Shot Downhole Survey Instrument for DD holes or the Pathfinder
survey instrument for RC drilling. All drillholes had measurements covering the
length of the hole with the reported accuracy of ±2 degrees. The instrument
measures magnetic azimuth and dip. The correction for magnetic azimuth (0.8
degrees) is applied when the drillhole database is processed for resource estimation.
Tungsten Mining completed additional downhole surveys on open holes using a
gyroscopic probe. Due to hole blockages, only 80% of recent drilling has gyroscopic
surveys with reported accuracy of ± 1.0 degrees for azimuth and ± 0.1 degrees for
dip.
All Tungsten Mining collar locations could be found easily and are clearly marked.
Holes are initially picked up using a Carlson Surveyor + DGPG unit to sub-metre
accuracy. Periodically drillhole collar locations are picked-up by a licensed
surveyor using a Topcon HiPer II RTK GPS with an accuracy of +/- 10mm
Horizontally and +/-15mm Vertically.
In contrast, only limited number of historic drillholes can be located, since they were
drilled over 30 years ago. Hole locations are estimated from drill plans, sections
and located historic drill pads.
Specification of thegrid system used. Thegrid system is MGA_GDA94 Zone 50.
Quality and adequacy of topographic control. AAM Pty Limited (AAM) was commissioned to fly aerial photography of the area in
November of 2012 to obtain detailed topographic surface. AAM provided Tungsten
Mining with a surface Digital Terrain Model (DTM) with 0.15 m vertical accuracy,
0.5 m contours and a 15 centimetre (cm) resolution digital orthophoto.
All collar locations have been picked up by means of a Topcon HiPer II RTK GPS
an accuracy of +/- 10mm Horizontally and +/-15mm Vertically.
Data spacing and
distribution
Data spacing for reporting of Exploration
Results.
Drill holes were generally drilled using 80 x 40 m grid.

Tungsten Mining NL | Error! No text of specified style in document. 11

Criteria JORC-Code Explanation Commentary
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
The data spacing and distribution is sufficient to demonstrate spatial and grade
continuity of the mineralised horizon to support the definition of Inferred/Indicated
Mineral Resources under the 2012 JORC code.
Whether sample compositing has been applied. 1 m samples were composited into 5m composite samples for RC. Any anomalous
composite samples had the 1m riffle split samples submitted for analysis.
Orientation of data
in relation to
geological structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
The majority of drilling sections are approximately orientated North to South with
respect to grid north. This orientation is perpendicular to the strike of the
mineralised skarn units observed at Kilba. Holes are dominantly drilled at -60º
towards skarn units to return intervals with thickness as true as possible. Diamond
core observations confirmed that lithological units intersect drilling between 50 – 90
degrees to core axis.
If the relationship between the drilling
orientation
and
the
orientation
of
key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Diamond drilling confirmed that drilling orientation did not introduce any bias
regarding the orientation of the skarn units.
Sample security The measures taken to ensure sample security. All sample numbers are generated in the site office. Once samples intervals are
selected, the numbers are assigned to each sample. The sample numbers are not left
in the core box (where the sample was taken from), but the core is marked for the
taken sample intervals so it would be possible to reconcile the laboratory results
against the particular intervals of core. The sample number, drillhole name and
sampled interval are recorded in the sampling sheets. All sample bags are properly
sealed and transported to Nanutarra roadhouse where they are couriered by Toll
IPEC to the Ultra Trace laboratory in Perth
Audits or reviews The results of any audits or reviews of sampling
techniques and data.
Sampling techniques are consistent with industry standards. Consistency of data was
validated by CSA Global while loading into the database (Depth from < Depth to;
interval is within hole depth, check for overlapping samples or intervals, etc.). Any
data which fails the database constraints and cannot be loaded is returned to
Tungsten Mining for validation, etc.). Global consistency was also checked later on
by plotting sections using the database and reconciling assays.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC-Code Explanation Commentary
Mineral tenement
and land tenure
status


i

i


r
Type, reference name/number, location and
ownership including agreements or material
ssues with third parties such as joint ventures,
partnerships, overriding royalties, native title
nterests, historical sites, wilderness or national
park and environmental settings.
Kilba prospect comprises one Mining Lease and one Exploration License covering
an area of approximately 35 km2 (3,548 hectares). Current registered holders of the
tenements are SM3-W Pty Ltd and BRL Exploration Pty Ltd.
The Buurabalayji Thalanyji Aboriginal Corporation is entitled to a production fee of
0.75% plus GST of the sale price realised by the tenement holder for all minerals or
commodities recovered and sold. The normal Western Australian state royalties
apply.
Tungsten Mining has 100% interest in all tenements. The prospect has a current
expenditure commitment of $90,500 per reporting year.
The security of the tenure held at the time of
eporting along with any known impediments to
obtaining a licence to operate in the area.
The tenement is in good standing
Exploration done
by other parties

Acknowledgment and appraisal of exploration by
other parties.
There are 32 historic drillholes and 5 trenches in the area that were drilled in 3
campaigns from 1975 till 1981 by the previous operator (ANZECO / Union Carbide).

Tungsten Mining NL | Error! No text of specified style in document.

12

Criteria JORC-Code Explanation Commentary
Geology Deposit type, geological setting and style of
mineralisation.
Mineralization is associated with scheelite tungsten skarns The mineralogy of the
Kilba skarns consist dominantly of wollastonite, grossularite garnet (Ca, up to mole
97% grossular component), and pyroxene intermediate in composition between
diopside and hedenbergite (salite).
This assemblage is altered to dark green to black amphiboles (dominantly actinolite
to ferroactinolite), vesuvianite, epidote and clinozoisite. This garnet mineralogy is
most typical of oxidised rather than reduced skarns (i.e. oxidised ore fluids). Higher
temperature prograde and lower-temperature retrograde assemblages can be
recognized. Most scheelite is reportedly associated with the retrograde assemblage
Drill hole
Information
A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:

easting and northing of the drill hole
collar

elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
In the company’s opinion this material has been adequately reported in previous
announcements and the detail is not relevant for reporting of Mineral Resources

dip and azimuth of the hole

down hole length and interception depth

hole length.
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
Data aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or minimum
grade truncations (eg cutting of high grades) and
cut-off grades are usually Material and should be
stated.
Not reporting exploration results.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown in
detail.
Not applicable.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Not applicable.
Relationship
between
mineralisation
widths and
intercept lengths
These relationships are particularly important in
the reporting of Exploration Results.
Drill hole angles of -60° toward the Northeast are adequate to drill mineralised
skarn units
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
Not reporting exploration results.
If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (eg ‘down hole length, true width not
known’).
Not reporting exploration results.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate
sectional views.
Refer to diagrams in body of text
Balanced
reporting
Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high grades and/or widths should
be practiced to avoid misleading reporting of
Exploration Results.
Not reporting exploration results

Tungsten Mining NL | Error! No text of specified style in document.

13

Criteria JORC-Code Explanation Commentary
Other substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical
test
results;
bulk
density,
groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating substances.
In the company’s opinion this material has been adequately reported in previous
announcements and the detail is not relevant for reporting of Mineral Resources
Further work The nature and scale of planned further work (eg
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
Drilling is planned to upgrade the resources and check the extent of the mineralised
zones.
Diagrams clearly highlighting the areas of
possible extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
Not applicable.

Section 3 Estimation and Reporting of Mineral Resources

(Criteria listed in section 1, and where relevant in section 2, also apply to this section.)

Criteria JORC-Code Explanation Commentary
Database integrity Measures taken to ensure that data has not been
corrupted by, for example, transcription or
keying errors, between its initial collection and
its use for Mineral Resource estimation purposes.
Data used in the Mineral Resource estimate is sourced from a database dump,
provided in the form of an MS Access database, from the Datashed relational
database hosted by CSA Global. Relevant tables from the data base are exported to
Micromine dat format for import into Micromine 2011 software for use in the
Mineral Resource estimate. Validation protocols for the data entered to the
Datashed database are described in Section 1
Data validation procedures used. Validation of the data import include checks for overlapping intervals, missing
survey data, missing and incorrectly recorded assay data, missing lithological data
and missing collars.
Site visits Comment on any site visits undertaken by the
Competent Person and the outcome of those
visits.
Serikjan Urbisinov, Principal Resource Geologist for CSA Global Pty Ltd,
conducted a site visit to the Kilba project area in March 2013. A site visit report was
compiled and attached the resource estimation report.
If no site visits have been undertaken indicate
why this is the case.
Not applicable
Geological
interpretation
Confidence in (or conversely, the uncertainty of )
the geological interpretation of the mineral
deposit.
There is a reasonable level of confidence in the geological interpretation of scheelite
skarn that is traceable over numerous drill holes and drill sections and in surface
mapping of the outcrops and trench exposures. Additional work is required to better
define exact geometry and the extents of the interpreted mineralised skarn.
Further work is also needed to better define the mineralogical control of the
scheelite content. Any additional work is expected to have a reasonable prospect of
increasing the interpreted total mineralised volumes in the tenement as significant
areas that have not yet been drill tested along the granitic intrusion contact.
Nature of the data used and of any assumptions
made.
Surface mapping of mineralised outcrop, drill hole intercept logging and assay
results haveformed basisfor thegeological interpretation.
The effect, if any, of alternative interpretations on
Mineral Resource estimation.
The precise limits and geometry cannot be absolutely defined due to the limitations
of the current drill coverage. Further work is required to better define the geometry
and limits of the mineralised skarn zones, but no significant downside changes to the
interpreted mineralised volume are anticipated.
The use of geology in guiding and controlling
Mineral Resource estimation.
The grade and lithological interpretation forms the basis for the modelling.
Lithological envelopes defining the prospective skarns within which the grade
estimation has been completed.
The factors affecting continuity both of grade and
geology.
Contact metamorphism, skarn alteration and tungsten mineralisation are also linked
to the intrusion of the Kilba granite. The continuity of the mineralised zones is
closely relate to the contact with the central monzogranite stock that has a form of
an elliptical dome. The scheelite content depends on the type of skarn present. Most
scheelite is reportedly associated with the retrograde assemblage.

Tungsten Mining NL | Error! No text of specified style in document.

14

Criteria JORC-Code Explanation Commentary
Dimensions The extent and variability of the Mineral
Resource expressed as length (along strike or
otherwise), plan width, and depth below surface
to the upper and lower limits of the Mineral
Resource.
The currently interpreted skarns of zone 11 extend for approximately 1.4 km along
300° NW strike. The width of the zone 11 varies from 2m to 40m with maximum 10m
thickness for individual mineralised envelopes. The dip angle of the zone varies from
-60 degrees at the eastern side to -25 degrees on the western side. The zone extends
from the surface to the 150m below the surface.
Skarns of zone 8 extend for approximately 150 m at 52° NE direction and dip at -70
degrees. The maximal depth here is approximately 70m below surface.
Estimation and
modelling
techniques
The nature and appropriateness of the estimation
technique(s) applied and key assumptions,
including treatment of extreme grade values,
domaining,
interpolation
parameters
and
maximum distance of extrapolation from data
points. If a computer assisted estimation method
was chosen include a description of computer
software and parameters used.
CSA made a decision that the model and sample composite files should be unfolded
before geostatistical analysis and grade interpolation. Without unfolding the deposit
would have to be domained according to the general dipping of different parts of the
structures. In that case every structural domain would have to be estimated
separately, and that would downgrade the reliability of the estimate.
Grade estimation was by Multiple Indicator Kriging (MIK) using Micromine 2011
software. The interpretation was extended perpendicular to the corresponding first
and last interpreted cross section to the distance equal to a half distance between the
adjacent exploration lines which is approximately 40m;
If a mineralised envelope did not extend to the adjacent drillhole section, it was
projected half way to the next section and terminated. The general direction and dip
of the envelopes was maintained.
The availability of check estimates, previous
estimates and/or mine production records and
whether the Mineral Resource estimate takes
appropriate account of such data.
No previous estimates have been completed for this deposit, and no mining has taken
place.
The MIK estimate was completed concurrently with two check Inverse Distance
Weighting (IDW) estimates. The MIK estimate used the parameters obtained from
the modelled variograms. The results of the check estimates correlate well.
The assumptions made regarding recovery of by-
products.
No assumption have been made.
Estimation of deleterious elements or other non-
grade variables of economic significance (eg
sulphur for acid mine drainage characterisation).
No other elements were estimated
In the case of block model interpolation, the block
size in relation to the average sample spacing
and the search employed.
The block model was constructed using a 20mE x 10mN x 10mRL parent block size,
with subcelling to 2mE x 1mN x 1mRL for domain volume resolution. The parent cell
size was chosen on the basis of the general morphology of mineralised bodies and in
order to avoid the generation of too large block models. The subcelling size was
chosen to maintain the resolution of the mineralised bodies. The subcells were
optimised in the models where possible to form larger cells.
The search radii were determined by means of the evaluation of the semivariogram
parameters, which determined the kriging weights to be applied to samples at
specified distances. The first search radii for all lodes were selected to be equal to
two thirds of the semivariogram long ranges in all directions. Model cells that did
not receive a grade estimate from the first interpolation run were used in the next
interpolation with greater search radii equal to full long semivariogram ranges in
all directions. The model cells that did not receive grades from the first two runs
were then estimated using radii incremented by the full long semivariogram ranges.
When model cells were estimated using radii not exceeding the full semivariogram
ranges, a restriction of at least three samples from at least two drillholes was
applied to increase the reliability of the estimates.
Any assumptions behind modelling of selective
mining units.
No selective mining units were assumed in this estimate
Any assumptions about correlation between
variables.
No strong correlations were found between the grade variables
Description of how the geological interpretation
was used to control the resource estimates.
The 0.025% WO3 grade envelopes were defined. Hard boundaries between the grade
envelopes used to select sample populations for grade estimation.
Discussion of basis for using or not using grade
cutting or capping.
No grade cutting was applied, because MIK was used for the grade interpolation.
The last bin defined for MIK is likely to contain occasional very high values, the
estimate for this bin only is calculated using the median, which gives a more
conservative valueforpositively skewed data than the mean.
The process of validation, the checking process
used, the comparison of model data to drill hole
data, and use of reconciliation data if available.
Validation of the block model consisted of comparison of the block model volume to
the wireframe volume. Grade estimates were validated by statistical comparison
with the drill data, visual comparison of grade trends in the model with the drill data
trends. No reconciliation data is available at this early stage of the project.

Tungsten Mining NL | Error! No text of specified style in document. 15

Criteria JORC-Code Explanation Commentary
Moisture Whether the tonnages are estimated on a dry
basis or with natural moisture, and the method of
determination of the moisture content.
The tonnages are estimated on a dry basis
Cut-off
parameters
The basis of the adopted cut-off grade(s) or
quality parameters applied.
Statistical analysis showed natural breaks in the WO3 grade population distribution
at approximately 0.025% which formed the basis for the decision regarding
determination of mineralisation envelope cut-off grade. The Mineral Resource is
quoted from estimated blocks above this cut-off grade.
Mining factors or
assumptions
Assumptions made regarding possible mining
methods, minimum mining dimensions and
internal (or, if applicable, external) mining
dilution. It is always necessary as part of the
process of determining reasonable prospects for
eventual
economic
extraction
to
consider
potential mining methods, but the assumptions
made regarding mining methods and parameters
when estimating Mineral Resources may not
always be rigorous. Where this is the case, this
should be reported with an explanation of the
basis of the mining assumptions made.
The potential resource development scenario is based on open pit mining methods. It
has been assumed that the full explored strike length, width and depth of the
modelled mineralisation can be economically mined. To test this assumption a
preliminary pit design using average 55_⁰_pit walls slopes was modeled and gave a
stripping ratio of 5.6:1.
Metallurgical
factors or
assumptions
The basis for assumptions or predictions
regarding metallurgical amenability. It is always
necessary as part of the process of determining
reasonable prospects for eventual economic
extraction to consider potential metallurgical
methods,
but
the
assumptions
regarding
metallurgical
treatment
processes
and
parameters
made when
reporting
Mineral
Resources may not always be rigorous. Where
this is the case, this should be reported with an
explanation of the basis of the metallurgical
assumptions made.
Metallurgical testwork is currently being conducted on PQ core to indicate the
percentage recovery of tungsten, liberation sizes and potential concentrate grade.
Environmental
factors or
assumptions
Assumptions made regarding possible waste and
process residue disposal options. It is always
necessary as part of the process of determining
reasonable prospects for eventual economic
extraction to consider the potential environmental
impacts of the mining and processing operation.
While at this stage the determination of potential
environmental
impacts,
particularly
for
a
greenfields project, may not always be well
advanced, the status of early consideration of
these potential environmental impacts should be
reported. Where these aspects have not been
considered this should be reported with an
explanation of the environmental assumptions
made.
No detailed assumption regarding possible waste and process residue disposal
options have been made at this stage. Some environmental surveys across the project
area encompassing sites of potential mining activities and related infrastructure
have been completed and to date no significant issues have been identified. Heritage
clearance surveys have been completed prior to each round of drilling and no
heritage site as defined by Section 5 of the Aboriginal Heritage Act 1972 was
identified during any of the surveys.
Bulk density Whether assumed or determined. If assumed, the
basis for the assumptions. If determined, the
method used, whether wet or dry, the frequency of
the
measurements,
the
nature,
size
and
representativeness of the samples.
Bulk density measurement were collected every metre where possible using the
following simple buoyancy method: For competent core the dry bulk density is
calculated as the mass of sample in air divided by the difference between the mass of
the sample in air and the mass of the sample in water.
The bulk density for bulk material must have been
measured by methods that adequately account for
void spaces (vugs, porosity, etc), moisture and
differences between rock and alteration zones
within the deposit.
Some porosity can be expected however the bulk density assigned is considered to be
reasonable.
Discuss assumptions for bulk density estimates
used in the evaluation process of the different
materials.
The same bulk density has been applied to all material in the model.

Tungsten Mining NL | Error! No text of specified style in document.

16

Criteria JORC-Code Explanation Commentary
Classification The basis for the classification of the Mineral
Resources into varying confidence categories.
The Inferred Mineral Resource classification is based on the evidence from the
available drill sampling and surface mapping. This evidence is sufficient to imply
but not verify geological and grade continuity. However, the areas with the denser
drilling and robust continuation of the mineralised zones were classified as
Indicated Mineral Resource
Whether appropriate account has been taken of
all relevant factors (ie relative confidence in
tonnage/grade estimations, reliability of input
data, confidence in continuity of geology and
metal values, quality, quantity and distribution of
the data).
The Inferred and Indicated classification has taken into account all available
geological and sampling information, and the classification level is considered
appropriate for the current stage of this project.
Whether the result appropriately reflects the
Competent Person’s view of the deposit.
The Mineral Resource estimate appropriately reflects the view of the Competent
Person.
Audits or reviews. The results of any audits or reviews of Mineral
Resource estimates.
No audits of the Mineral Resource estimate have been undertaken at this time
Discussion of
relative accuracy/
confidence
Where appropriate a statement of the relative
accuracy and confidence level in the Mineral
Resource estimate using an approach or
procedure deemed appropriate by the Competent
Person.
For
example,
the
application
of
statistical or geostatistical procedures to quantify
the relative accuracy of the resource within stated
confidence limits, or, if such an approach is not
deemed appropriate, a qualitative discussion of
the factors that could affect the relative accuracy
and confidence of the estimate.
The relative accuracy of the Mineral Resource estimate is reflected in the reporting
of the Mineral Resource to an Inferred and Indicated classification as per the
guidelines of the 2012 JORC Code
The statement should specify whether it relates to
global or local estimates, and, if local, state the
relevant tonnages, which should be relevant to
technical
and
economic
evaluation.
Documentation should include assumptions made
and theprocedures used.
The statement refers to global estimation of tonnes and grade
These statements of relative accuracy and
confidence of the estimate should be compared
with production data, where available.
No production data is available

Tungsten Mining NL | Error! No text of specified style in document.

17