Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

TREK METALS LIMITED Capital/Financing Update 2018

Jun 19, 2018

65923_rns_2018-06-19_4c7dd1fc-97b2-4a38-aaed-dd913f1ab4b6.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [97 x 99] intentionally omitted <==

Drilling Commences at Kroussou Targeting Open Pit, Near Surface Zinc – Lead Mineralisation

Potential to deliver a significant exploration target following completion

==> picture [197 x 198] intentionally omitted <==

----- Start of picture text -----

ASX ANNOUNCEMENT
20 June 2018
ASX: TKM
ARBN: 124 462 826
Board of Directors
Mr Greg Bittar
Non‐Executive Chairman
Mr Bradley Drabsch
Managing Director
Ms Sonja Neame
Non‐Executive Director
----- End of picture text -----

==> picture [197 x 198] intentionally omitted <==

----- Start of picture text -----

Mr Michael Bowen
Non‐Executive Director
Issued Capital
Shares – 322.9 M
Options – 120.2 M
Share Price – A$0.020
Market Cap. – A$6.48M
Registered Office – Australia
Suite 5/56 Kings Park Rd
----- End of picture text -----

==> picture [197 x 198] intentionally omitted <==

----- Start of picture text -----

WEST PERTH WA 6005
Registered Office – Bermuda
Trinity Hall
43 Cedar Avenue
HAMILTON HM12
Postal Address
P.O. Box 1796
WEST PERTH WA 6872
T +61 8 6555 1879
E [email protected]
W trekmetals.com.au
----- End of picture text -----

HIGHLIGHTS

  • Approximately 2,000m of diamond drilling to be undertaken at Kroussou during this programme

  • Up to 50 holes to be drilled to an average depth of around 40m, up to 100m (Open Pit Targets)

  • Drilling planned is to confirm and extend known mineralisation and target new previously undrilled areas

  • Several targets outside the Dikaki Channel including Niambokamba, Bimbome, Bouamba South and Bouamba East

Trek is delighted to announce that drilling at its flagship Kroussou Project in Gabon has now commenced. Trek has been diligently preparing for this programme since the confirmation drilling completed last year provided confidence that the potential for the Company to present the market with a highly significant zinc – lead resource, from surface, was very real.

Trek’s team has collected approximately 8,000 soil samples, several hundred rock chips, mapped tens of square kilometres of geology, cut hundreds of kilometres of geophysical survey lines and is now ensuring access to drill sites.

Trek's Managing Director Bradley Drabsch said that “ Our dedicated team has been preparing for this drill programme over the past 10 months to ensure we have the best possible chance of delivering the best possible results. We are hopeful that upon completion of this drilling programme we will be well on the way to presenting the market with a maiden resource and very much look forward to a successful campaign. The team here on the ground have done a fantastic job to get the Company set for success.”

COMPETENT PERSONS STATEMENT

The information in this report that relates to exploration results is based on information compiled by Mr Bradley Drabsch, Member of the Australian Institute of Geoscientists (“AIG”) and Managing Director of Trek Metals Limited. Mr Drabsch has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity that is being undertaken to qualify as a competent person as defined in the JORC Code 2012. Mr Drabsch consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.

==> picture [553 x 89] intentionally omitted <==

==> picture [553 x 88] intentionally omitted <==

==> picture [553 x 88] intentionally omitted <==

==> picture [553 x 88] intentionally omitted <==

==> picture [553 x 89] intentionally omitted <==

Figure 1: Kroussou Project Location Plan showing Key Infrastructure

==> picture [33 x 33] intentionally omitted <==

P a g e | 2

==> picture [606 x 84] intentionally omitted <==

==> picture [606 x 83] intentionally omitted <==

==> picture [606 x 84] intentionally omitted <==

==> picture [606 x 84] intentionally omitted <==

==> picture [606 x 84] intentionally omitted <==

Figure 2: The Dikaki Channel showing historic drilling and some of the prospects that emerged from that work. Potential connectivity of zones along strike within the channel is clearly demonstrated.

==> picture [33 x 33] intentionally omitted <==

P a g e | 3

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
Trek Drilling
Drill core has been cut in half using a coresaw.
No assaying has been undertaken as yet and none has been discussed in
this document.
Historic Drilling
Due to the historic nature of the drilling results reported herein, it is not
possible to comment on the quality of the sampling used to produce the
results described. It is known from the historic reports that the drillcore was
sawn.
Results were obtained from historic reports produced by the Bureau de
Recherches Géologiques et Minières (BRGM, French Geological Survey)
during the late 1970’s and early 1980’s.
Rock Samples
Samples collected at surface using a geological hammer where necessary
Drilling
techniques
Drill type (eg core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc).
Trek Drilling
Drilling is either HQ diamond or NQ diamond.
Historic Drilling
Drilling was completed using a Winkie style diamond drill rig producing drill
core of approximately 25mm diameter.
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries
and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gainof fine/coarse material.
Trek Drilling
Core recoveries are measured using industry standard methods for each
metre of core drilled.
The use of HQ diamond core ensures the best recovery under the
conditions experienced in the project area.
No relationship between recovery and grade has been established.

==> picture [33 x 33] intentionally omitted <==

P a g e | 4

Criteria JORC Code explanation Commentary
Historic Drilling
Due to the historic nature of the drilling results reported herein, it is not
possible to comment on the recoveries achieved at the time.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the relevant intersections logged.
Trek Drilling
Field logging to industry standard has been conducted on the drill core in its
full condition. The core will be re-logged once cut. All observations are
handwritten before being digitised into the company database. This method
will allow the logging to support Mineral Resource Estimations if/when
required.
Geological observations such as lithology, alteration, mineralisation etc are
qualitative whereas recovery, RQD etc are quantitative.
100% of the drill core has been fully logged.
Historic Drilling
All drill core was logged in detail, however, due to the age of the drilling and
the inability to check-log the core due to its destruction, these logs can be
used as a guide only and will not be suitable for use in a Mineral Resource
estimation.
Qualitative: Lithology, alteration, mineralisation etc.
All holes for their entire length appear to have been logged.
Sub-
sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
Trek Drilling
The drill core has been cut in half using a standard petrol-powered core
saw.
Sampling half core is industry standard.
Core has been cut to ensure that both sides approximate one another to
ensure representivity of each length.
The sample size collected is appropriate for this stage of exploration.
Historic Drilling
Due to the historic nature of the drilling results reported herein, it is not
possible to comment on the method of sampling, sampling techniques and
sample preparation methodology.
It is known that the core was sawn prior to assay.

==> picture [33 x 33] intentionally omitted <==

P a g e | 5

Criteria JORC Code explanation Commentary
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their
derivation, etc.
Nature of quality control procedures adopted (eg standards, blanks,
duplicates, external laboratory checks) and whether acceptable levels
of accuracy (ie lack of bias) and precision have been established.
Trek Drilling

Samples were processed in Gabon by Setpoint laboratories. Samples were:
o
Dried
o
Crushed to 80% passing 2mm
o
Pulverised to 80% passing 80 microns
o
Packaged and sent to Intertek Genalysis in Perth

Samples were assayed by Intertek Genalysis in Perth using a 4 acid digest
(considered a total digest) with an ICP-OES or ICP-MS (element
dependant) finish. Analytes included:

Au, Ag, Al, As, Ba, Be, Bi, Ca, Cd, Ce, Co, Cr, Cs, Cu, Fe, Ga, Ge, Hf, In, K,
La, Li, Mg, Mn, Mo, Na, Nb, Ni, P, Pb, Rb, Re, S, Sb, Sc, Se, Sn, Sr, Ta, Te,
Th, Ti, Tl, U, V, W, Y, Zn

Laboratory and Trek submitted QAQC samples returned results within
acceptable limits.
Historic Drilling

Due to the historic nature of the drilling results reported herein, it is not
possible to confirm the method of assay or analytical technique however
historical reports indicate the drill samples were analysed using atomic
absorption methods but the digestion method is not clear.

No description of QAQC protocols is provided in the historic reports.
Geophysical Parameters

Gradient Array IP:
Receiver: Zonge GGT32II 10 Channel
Transmitter: GDD 5kVA
Transmitter Frequency: 0.125Hz
Line Spacing : 100m oriented North-South
Dipole Spacing : 50m

Dipole Dipole IP:
Receiver: Zonge GGT32II 10 Channel
Transmitter: GDD 5kVA
Transmitter Frequency: 0.125Hz
Dipole Spacing : 50m recording to N=8

Natural Source Audio Magnetotellurics (NSAMT):
Receiver: ANT6 Coils

==> picture [33 x 33] intentionally omitted <==

P a g e | 6

Criteria JORC Code explanation Commentary
Ex/Ey dipole spacing : 50m
Hy/Hx sample interval : 50m
Rock Samples

Samples assayed using a NITON XL3t GOLDD+ portable XRF
Verification
of sampling
and
assaying
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Trek Drilling
All logging observations are handwritten before being digitised into the
company database.
Assays have been presented as zinc equivalent (Zn eq) using the following
assumptions:
Zinc Equivalent Formula (ZnEq) = Zn% + (Pb x 0.76) based
upon a zinc (Zn) price of US$3,150 / tonne and a lead (Pb)
price of US$2,400 / tonne
Historic Drilling
Due to the historic nature of the drilling results reported herein, it is not
possible to verify any of the results.
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Trek Drilling
A handheld GPS was used to locate each sample.
Sample locations are provided as UTM co-ordinates within Zone 32,
southern hemisphere using WGS 84 datum.
Historic Drilling
Drillholes were located according to topography on maps produced at the
time of drilling. A process is underway to attempt to accurately locate these;
however, this process is incomplete at this stage. Location accuracies are
approximately +/- 10m but may be less accurate.
Rock Samples

Samples located using a handheld GPS
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
_classifications applied. _
Trek Drilling
Samples have been collected at regular 1m intervals unless a specific
geological boundary of significance is within an interval. Samples are then
adjusted to reflect that boundary.

Samplingis being conductedtoindustry standardmethods and assays

==> picture [33 x 33] intentionally omitted <==

P a g e | 7

Criteria JORC Code explanation Commentary
Whether sample compositing has been applied. would be able to be used for Resource/Reserve calculations if/when
required.
Historic Drilling
Drillhole collars described in historical reports are spaced at various
intervals including random locations and on grids of 50m x 100m and 25m x
50m.
Due to the historic nature of the drilling results reported herein, they will not
be suitable for use in a Mineral Resource estimation.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known, considering
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
Trek Drilling and Historic Drilling
Drillholes are vertical. Due to the shallow dipping nature of the known
geology in the project area, this orientation is considered appropriate.
Sample
security
The measures taken to ensure sample security. Trek Drilling

Samples were transported from the field to the processing laboratory by
company field personnel and then from the processing laboratory to the
assaying laboratory via DHL.
Historic Drilling

Due to the historic nature of the drilling results reported herein, it is not
possible to comment on sample security.
Audits or
reviews
The results of any audits or reviews of sampling techniques and data. Trek Drilling

No reviews or audits have been undertaken at this stage.
Historic Drilling

No audits are possible on the results but a full review of the historic data
package is underway.

Recently completed drilling, the subject of this release has indicated that
the historic assays are useful for targeting purposes and approximate
modern findings.

==> picture [33 x 33] intentionally omitted <==

P a g e | 8

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
BAT acquired the Kroussou Project in Gabon from Select Exploration Limited
(ASX:SLT) in March 2014. BAT has 100% equity in these projects. Havilah
Consolidated Resources (HCR) holds a 0.75% NSR. This royalty may be
bought back from HCR by MTA for US$250,000
The Kroussou tenure is an Exploration License (G4-569) renewable each
year for a further 3-year period beginning the 02ndof July 2015 and a
Prospecting Licence (G4-588) which is convertible to an Exploration Licence
should TKM elect to convert after 03rdMarch 2018.
The Company is not aware of any impediments relating to the licenses or
area.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by other parties. Intermittent historical exploration as conducted by French Bureau de
Recherches Géologiques et Minières (BRGM) at Kroussou from 1962 - 1963,
the project was then later re-examined in 1979-1981 by the BRGM in joint
venture with Comilog which is a Gabonese government owned mining
company.
BRGM discovered the Kroussou Pb-Zn-(Ag) mineral occurrences as well as
others along various river systems on the Kroussou license.
BRGM conducted drilling on the project in 1962, 1977-1980.
BAT has obtained historical reports and drill logs relating to BRGM’s field
program.
Geology Deposit type, geological setting and style of mineralisation. The deposit style reported in BRGM historical files is Mississippi Valley Type
(MVT) sedimentary mineralisation of Pb-Zn-(Ag) where mineralisation is
similar to the Laisville (Sweden) style with deposition within siliciclastic
horizons in a reducing environment.
On a regional scale, the Pb-Zn mineral concentrations are distributed at the
edge of the continental shelf which was being eroded during Lower
Cretaceous time.
Mineralisation is located within the Gamba Formation part of the N’Zeme
Asso Series and was deposited during the Cretaceous as part of the
Cocobeach Complex deposited during formation of the Cotier Basin.
Mineralisation is hosted by conglomerates, sandstones and siltstones
deposited in laguno-deltaic reducing conditions at the boundary of the Cotier
Basin onlapping continental basement rocks.

Large scaleregionalstructures are believedtohaveinfluenced

==> picture [33 x 33] intentionally omitted <==

P a g e | 9

Criteria JORC Code explanation Commentary
mineralisation deposition.
BAT’s field reconnaissance identified mineralisation within coarse-grained
arkosic sandstone and conglomerate and observedlocalsilicification.
Drill hole
Information
A summary of all information material to the understanding of the
exploration results including a tabulation of the following
information for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o
hole length.
See table 1 within the document.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be
stated.
Where aggregate intercepts incorporate short lengths of high grade
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples
of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
Trek Drilling
Intervals reported using a minimum assay of 0.2% Zn eq and a maximum of
2m internal dilution except as indicated for hole DKDD005 (see table 1 in the
document)
Zn eq calculated as follows: Pb + (0.84 x Zn) (Assuming a Zn price of
US$2,600/tonne, Pb price of US$2,200/tonne)
Relationship
between
mineralisation
widths and
intercept
lengths
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length,
true width not known’).
Trek Drilling and Historic Drilling
Mineralisation is understood to be within shallowly dipping horizons and
therefore vertical drillholes should intersect zones at approximately right
angles and approximate true widths.
Diagrams Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
Refer to figures and tables in report.
Balanced
reporting
Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
_Exploration Results. _
See table 1 within the document.
Other
substantive
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
All meaningful and material information is reported.

==> picture [33 x 33] intentionally omitted <==

P a g e | 10

Criteria JORC Code explanation Commentary
exploration
data
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test results;
bulk density, groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
Further work The nature and scale of planned further work (eg tests for lateral
extensions or depth extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive.
This current work is likely to be followed by geophysical surveys,
geochemical surveys and geological mapping to generate and further
delineate drill targets within existing mineralised zones and within the
broader project area.

==> picture [33 x 33] intentionally omitted <==

P a g e | 11