Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

TREK METALS LIMITED Capital/Financing Update 2012

Mar 19, 2012

65923_rns_2012-03-19_a98969ba-94e6-4228-bf21-ff9fa00d2573.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [216 x 121] intentionally omitted <==

ZAMBEZI RESOURCES LIMITED ARBN: 124 462 826 BERMUDA ZAMBIA AUSTRALIA CANON’S COURT PLOT 5697 LEVEL 1, 17 ORD STREET 22 VICTORIA STREET BEU CRESCENT WEST PERTH, WESTERN AUSTRALIA HAMILTON HM12 KALUNDU AUSTRALIA 6005 LUSAKA TEL: +61 8 6555 1879 TEL: +260 211 292101 FAX: +61 8 9398 4104 EMAIL: [email protected] PO BOX 1796, WEST PERTH WWW.ZAMBEZIRESOURCES.COM WESTERN AUSTRALIA, 6872

ASX Announcement Tuesday, 20 March 2012

Robust Kan aluwi Co er Pro ect Results g pp j

==> picture [13 x 13] intentionally omitted <==

  • Latest assay results continue to support both the continuity and tenor of the mineralisation observed at the Kangaluwi Copper project.

==> picture [13 x 13] intentionally omitted <==

  • All outstanding primary copper assay results have been received and reported from the 2011 resource development drilling program.

==> picture [13 x 13] intentionally omitted <==

  • Results to date point towards substantial increases in resource tonnage estimates.

==> picture [13 x 13] intentionally omitted <==

New assay results received at the 100% owned Kangaluwi Copper Project include:-

==> picture [394 x 78] intentionally omitted <==

----- Start of picture text -----

Kangaluwi Prospect Chisawa Prospect
 5m @ 1.13% TCu from 189m  4m @ 1.05% TCu from 262m
 5m @ 1.00% TCu from 319m  4m @ 1.36% TCu from 240m
 12m @ 1.01% TCu from 361m  5m @ 1.96% TCu from 169m
 4m @ 1.54% TCu from 337m  5m @ 0.73% TCu from 337m
 4m @ 1.17% TCu from 335m
----- End of picture text -----

==> picture [399 x 293] intentionally omitted <==

Figure 1: Project Location Map

1

==> picture [112 x 63] intentionally omitted <==

The directors of Zambezi Resources Limited ( ZRL ) are pleased to provide further assay results from the DD program from its Kangaluwi, Chisawa and Kalulu Prospects, part of the 100% owned Kangaluwi Copper Project ( the Project ) in Zambia (Figure 2).

==> picture [446 x 346] intentionally omitted <==

Figure 2: Mining Licence 15547

1.0 Kalulu Prospect

Mineralisation at Kalulu is currently interpreted over a strike length >1.2 km, within a complex northeast-southwest trending shear zone.

Previous exploration drilling along strike of the dominant geochemical anomaly has been selectively in-filled between and along section lines, resulting in drill coverage sufficient to begin the Resource Classification process (Figure 3).

==> picture [112 x 63] intentionally omitted <==

==> picture [468 x 370] intentionally omitted <==

Figure 3: Kalulu 2011 Drilled Holes

Assay results are reported from 7 diamond holes. These holes were drilled along sections 9800E, 10550E, 10650E, 10700E, 10750E and 10950E, with all significant intersections tabulated herewith.

Assay results to date reveal that mineralisation is still open down dip and across strike, requiring further development drilling to evaluate the resource potential to the east and at depth.

Table 1: Kalulu Prospect – DD Drilling Assay Results

EOH
Depth
Intercepts calculated above
0.5% TCu
Hole_ID Northing Easting RL Inclination Azimuth mFrom mTo mWidth Cu% **Intercept **
KLUDD0039 8289740 784128 659 400.0 -60.0 320.0 89.0 93.0 4.0 0.37 [email protected]%TCu [email protected]%TCu from 91m
KLUDD0039 8289740 784128 659 400.0 -60.0 320.0 99.0 109.0 10.0 0.20 [email protected]%TCu
KLUDD0039 8289740 784128 659 400.0 -60.0 320.0 150.0 153.0 3.0 0.25 [email protected]%TCu
KLUDD0039 8289740 784128 659 400.0 -60.0 320.0 157.0 159.0 2.0 0.62 [email protected]%TCu [email protected]%TCu from 157m
KLUDD0039 8289740 784128 659 400.0 -60.0 320.0 163.0 164.0 1.0 0.10 [email protected]%TCu
KLUDD0039 8289740 784128 659 400.0 -60.0 320.0 303.0 305.0 2.0 0.57 [email protected]%TCu
KLUDD0039 8289740 784128 659 400.0 -60.0 320.0 354.0 368.0 14.0 0.28 [email protected]%TCu
KLUDD0040 8290111 784654 633 231.0 -60.0 320.0 61.0 63.0 2.0 0.14 [email protected]%TCu
KLUDD0040 8290111 784654 633 231.0 -60.0 320.0 66.0 66.8 0.8 0.20 [email protected]%TCu
KLUDD0040 8290111 784654 633 231.0 -60.0 320.0 167.0 168.0 1.0 0.22 [email protected]%TCu
KLUDD0040 8290111 784654 633 231.0 -60.0 320.0 199.0 200.0 1.0 0.12 [email protected]%TCu
KLUDD0040 8290111 784654 633 231.0 -60.0 320.0 220.0 223.7 3.7 0.31 [email protected]%TCu
KLUDD0041 8290250 784730 660 231.8 -60.0 320.0 52.0 53.0 1.0 0.18 [email protected]%TCu
KLUDD0041 8290250 784730 660 231.8 -60.0 320.0 65.0 70.6 5.6 0.22 [email protected]%TCu
KLUDD0041 8290250 784730 660 231.8 -60.0 320.0 76.0 82.0 6.0 0.35 [email protected]%TCu [email protected]%TCu from 80m
KLUDD0042 8290181 784722 659 234.0 -60.0 320.0 55.0 56.0 1.0 0.32 [email protected]%TCu

==> picture [112 x 63] intentionally omitted <==

EOH
Depth
Intercepts calculated above
0.5% TCu
Hole_ID Northing Easting RL Inclination Azimuth mFrom mTo mWidth Cu% **Intercept **
KLUDD0042 8290181 784722 659 234.0 -60.0 320.0 72.2 73.0 1.0 0.13 [email protected]%TCu
KLUDD0042 8290181 784722 659 234.0 -60.0 320.0 95.0 118.0 23.0 0.40 23.0m @ 0.40%TCu 2.2m @ 1.93% TCu from 100m
1.8m @ 1.03% TCu from
115.2m
KLUDD0042 8290181 784722 659 234.0 -60.0 320.0 163.0 167.0 4.0 0.28 [email protected]%TCu
KLUDD0043 8290386 784958
680
240.0 -60.0 320.0 101.0 110.0 9.0 0.20 [email protected]%TCu
KLUDD0043 8290386 784958 680 240.0 -60.0 320.0 113.8 141.0 27.2 0.50 27.2m @ 0.50%TCu 9.0m @ 0.77%TCu from 116m
[email protected]%TCu from 131m
KLUDD0043 8290386 784958 680 240.0 -60.0 320.0 149.0 162.0 13.0 0.42 13.0m @ 0.42%TCu 2.0m @ 1.06%TCu from 152m
[email protected]%TCu from 159m
KLUDD0043 8290386 784958 680 240.0 -60.0 320.0 192.0 193.0 1.0 0.50 [email protected]%TCu
KLUDD0044 8290320 784874 697 300.0 -60.0 320.0 57.0 58.0 1.0 0.11 [email protected]%TCu
KLUDD0044 8290320 784874 697 300.0 -60.0 320.0 90.0 92.0 2.0 0.16 [email protected]%TCu
KLUDD0044 8290320 784874 697 300.0 -60.0 320.0 108.0 108.5 0.5 0.27 [email protected]%TCu
KLUDD0044 8290320 784874 697 300.0 -60.0 320.0 124.0 125.0 1.0 0.15 [email protected]%TCu
KLUDD0044 8290320 784874 697 300.0 -60.0 320.0 132.0 137.0 5.0 0.71 [email protected]%TCu [email protected]% TCu from 134m
KLUDD0044 8290320 784874 697 300.0 -60.0 320.0 144.0 150.0 6.0 0.35 [email protected]%TCu
KLUDD0044 8290320 784874 697 300.0 -60.0 320.0 174.0 178.0 4.0 0.11 [email protected]%TCu
KLUDD0044 8290320 784874 697 300.0 -60.0 320.0 218.0 227.0 9.0 0.23 [email protected]%TCu
KLUDD0044 8290320 784874 697 300.0 -60.0 320.0 234.0 235.0 1.0 0.13 [email protected]%TCu
KLUDD0044 8290320 784874 697 300.0 -60.0 320.0 239.0 240.0 1.0 0.13 [email protected]%Tcu
KLUDD0044 8290320 784874 697 300.0 -60.0 320.0 270.0 276.0 6.0 0.11 [email protected]%TCu
KLUDD0044 8290320 784874 697 300.0 -60.0 320.0 281.0 282.0 1.0 0.12 [email protected]%Tcu
KLUDD0046 8290299 784776 658 250.0 -60.0 320.0 38.0 40.4 2.4 0.34 [email protected]%TCu
KLUDD0046 8290299 784776 658 250.0 -60.0 320.0 50.0 51.0 1.0 0.15 [email protected]%TCu
KLUDD0046 8290299 784776 658 250.0 -60.0 320.0 59.1 63.1 4.0 0.56 [email protected]%TCu [email protected]%TCu from 62m
KLUDD0046 8290299 784776 658 250.0 -60.0 320.0 75.0 77.0 2.0 0.18 [email protected]%TCu
KLUDD0046 8290299 784776 658 250.0 -60.0 320.0 81.0 82.0 1.0 0.12 [email protected]%TCu
KLUDD0046 8290299 784776 658 250.0 -60.0 320.0 110.0 112.0 2.0 0.20 [email protected]%TCu
KLUDD0046 8290299 784776 658 250.0 -60.0 320.0 114.0 116.0 2.0 0.30 [email protected]%TCu
KLUDD0046 8290299 784776 658 250.0 -60.0 320.0 153.0 158.0 5.0 0.24 [email protected]%TCu
KLUDD0046 8290299 784776 658 250.0 -60.0 320.0 166.0 167.0 1.0 0.13 [email protected]%TCu
Note:

Intercepts calculated @ 0.10% TCu with 2m maximum internal dilution off down-hole width.

2.0 Chisawa Prospect

Previous exploration drilling along strike of the principal geochemical anomaly has been selectively in-filled between and along RC and DD drill sections to a 100m x 100m grid.

In total, 40 diamond holes have been drilled for 8,632m over a 3 km mineralised corridor.

Updated assay results have confirmed the mineralised system is still open along strike and down dip.

Further resource development drilling at depth, down dip and along strike, will be required to evaluate its full potential.

==> picture [112 x 63] intentionally omitted <==

==> picture [468 x 428] intentionally omitted <==

Figure 4: Chisawa Drilled Holes

Assay results received are reported from 6 diamond holes. These were drilled along sections 11400E to 12600E, with significant intersections tabulated below:

Table 2: Chisawa Prospect – DD Drilling Assay Results

EOH
Depth
Intercepts calculated above
0.5% Tcu
Hole_ID Easting Northing RL Inclination Azimuth mFrom mTo mWidth Cu% Intercepts@ 0.1%TCu
CHSDD0035 789322 8285682 684 342.2 -50 43.00 212.9 213.7 0.73 0.14 [email protected]%TCu
CHSDD0035 789322 8285682 684 342.2 -50 43.00 229.0 229.6 0.55 0.24 [email protected]%TCu
CHSDD0035 789322 8285682 684 342.2 -50 43.00 234.0 236.0 2.00 0.37 [email protected]%TCu
CHSDD0035 789322 8285682 684 342.2 -50 43.00 257.0 257.2 0.22 0.10 [email protected]%TCu
CHSDD0035 789322 8285682 684 342.2 -50 43.00 262.0 266.0 4.00 1.05 [email protected]%TCu [email protected]%TCu from 262m
CHSDD0036 788324 8287020 681 400.0 -50 49.00 46.0 55.0 9.00 0.19 [email protected]%TCu
CHSDD0036 788324 8287020 681 400.0 -50 49.00 65.0 69.0 4.00 0.24 [email protected]%TCu
CHSDD0036 788324 8287020 681 400.0 -50 49.00 73.0 74.0 1.00 0.18 [email protected]%TCu
CHSDD0036 788324 8287020 681 400.0 -50 49.00 95.0 96.6 1.60 0.16 [email protected]%TCu
CHSDD0036 788324 8287020 681 400.0 -50 49.00 140.0 146.0 6.00 0.15 [email protected]%TCu
CHSDD0036 788324 8287020 681 400.0 -50 49.00 239.0 240.0 1.00 0.76 [email protected]%TCu [email protected]%TCu from 239m
CHSDD0037 789091 8285970 692 350.0 -50 43.00 178.0 181.0 3.00 0.20 [email protected]%TCu
CHSDD0037 789091 8285970 692 350.0 -50 43.00 183.0 185.0 2.00 0.15 [email protected]%TCu
CHSDD0037 789091 8285970 692 350.0 -50 43.00 190.0 193.0 3.00 0.24 [email protected]%TCu
CHSDD0037 789091 8285970 692 350.0 -50 43.00 210.0 211.0 1.00 0.11 [email protected]%TCu
CHSDD0037 789091 8285970 692 350.0 -50 43.00 214.0 217.3 3.30 0.10 [email protected]%TCu
CHSDD0037 789091 8285970 692 350.0 -50 43.00 236.0 244.0 8.00 0.76 [email protected]%TCu [email protected]%TCu from 240m
CHSDD0037 789091 8285970 692 350.0 -50 43.00 294.0 295.0 1.00 0.13 [email protected]% TCu

==> picture [112 x 63] intentionally omitted <==

EOH
Depth
Intercepts calculated above
0.5% Tcu
Hole_ID Easting Northing RL Inclination Azimuth mFrom mTo mWidth Cu% Intercepts@ 0.1%TCu
CHSDD0037 789091 8285970 692 350.0 -50 43.00 306.0 306.7 0.70 0.18 [email protected]% TCu
CHSDD0038 788545 8286968 672 276.6 -50 43.00 16.0 19.0 3.00 0.13 [email protected]% TCu
CHSDD0038 788545 8286968 672 276.6 -50 43.00 70.0 71.0 1.00 0.28 [email protected]% TCu
CHSDD0038 788545 8286968 672 276.6 -50 43.00 80.0 81.0 1.00 0.10 [email protected]% TCu
CHSDD0038 788545 8286968 672 276.6 -50 43.00 110.0 111.0 1.00 0.14 [email protected]% TCu
CHSDD0038 788545 8286968 672 276.6 -50 43.00 157.0 175.0 18.00 0.71 [email protected]% TCu [email protected]% TCu from 169m
CHSDD0038 788545 8286968 672 276.6 -50 43.00 189.2 190.0 0.80 0.69 [email protected]% TCu
CHSDD0039 788578 8286362 700 400.6 -50 43.00 204.0 207.8 3.80 0.12 [email protected]%TCu
CHSDD0039 788578 8286362 700 400.6 -50 43.00 248.0 249.0 1.00 0.45 [email protected]%TCu
CHSDD0040 787702 8287340 713 400.2 -50 43.00 191.0 198.0 7.00 0.18 [email protected]%TCu
CHSDD0040 787702 8287340 713 400.2 -50 43.00 204.0 205.0 1.00 0.14 [email protected]%TCu
CHSDD0040 787702 8287340 713 400.2 -50 43.00 219.0 224.0 5.00 0.16 [email protected]%TCu
CHSDD0040 787702 8287340 713 400.2 -50 43.00 227.0 228.0 1.00 0.17 [email protected]%TCu
CHSDD0040 787702 8287340 713 400.2 -50 43.00 241.0 243.0 2.00 0.19 [email protected]%TCu
CHSDD0040 787702 8287340 713 400.2 -50 43.00 336.0 343.0 7.00 0.57 [email protected]%TCu [email protected]% Cu from 337m
Note:

Intercepts calculated @ 0.10% TCu with 2m maximum internal dilution off down-hole width.

3.0 Kangaluwi Prospect

A total 10 diamond holes were drilled for 4,021m.

These were drilled on selected sections along strike, to test the mineralisation at depth and down dip of the defined resource.

Mineralisation is currently interpreted over a strike length > 4.1 km, and lies within a series of complex regional structures, incorporating a number of sub parallel-mineralised zones.

Results received to date confirm mineralisation is still open down dip and at depth.

Additional development drilling will be required at depth to evaluate the full potential of down dip, across strike and plunge continuity of multiple sub parallel-mineralised zones currently identified at Kangaluwi.

==> picture [112 x 63] intentionally omitted <==

==> picture [436 x 330] intentionally omitted <==

Figure 5: Kanagaluwi Drilled Holes

Assay results received to date are reported from 10 DD holes. These holes were drilled along sections 787 800E to 786 800E, with significant intersections tabulated below:

Table 3: Kanagaluwi Prospect – DD Drilling Assay Results

EOH
Depth
Intercepts above
0.1% Tcu
Hole_ID Northing Easting RL Inclination Azimuth mFrom mTo mWidth Cu% Intercepts calculated above 0.5% TCu
KNGDD0039 8289769 787092 714 291.0 -50.0 360.0 147.0 163.0 16 0.58 16.00m @ 0.61%TCu 1.00m @ 1.11% TCu from 148m
1.00m @ 0.70%TCu from 151m
[email protected]%TCu from 155m
KNGDD0039 8289769 787092 714 291.0 -50.0 360.0 166.0 167.0 1 0.24 1.00m@ 0.24%TCu
KNGDD0039 8289769 787092 714 291.0 -50.0 360.0 177.0 184.0 7 0.21 [email protected]%TCu
KNGDD0039 8289769 787092 714 291.0 -50.0 360.0 263.0 264.0 1 0.60 [email protected]%TCu
KNGDD0039 8289769 787092 714 291.0 -50.0 360.0 273.0 278.0 5 0.89 5.00m@ 0.89%TCu [email protected]%TCufrom 274m
KNGDD0040 8289717 787093 712 450.3 -50.0 360.0 183.0 205.4 22.4 0.62 2240 062 %TC 8.00m @ 0.88% TCu from 183m,
including 5.00m @ 1.13%TCu from 186m
7.60m @ 0.83 %TCu from 195.40m,
including 3.00m@ 0.98%TCufrom 199m
.m @ . u
KNGDD0040 8289717 787093 712 450.3 -50.0 360.0 209.0 216.5 7.5 0.18 [email protected]%TCu
KNGDD0040 8289717 787093 712 450.3 -50.0 360.0 231.0 233.0 2 0.10 2.00m@ 0.10 %TCu
KNGDD0040 8289717 787093 712 450.3 -50.0 360.0 253.0 256.0 3 0.10 [email protected] %TCu
KNGDD0040 8289717 787093 712 450.3 -50.0 360.0 319.0 327.0 8 0.70 8.00m @ 0.70 %TCu 5.00m @ 0.99 % TCu from 319m,
including [email protected]%TCu,
KNGDD0040 8289717 787093 712 450.3 -50.0 360.0 337.0 352.0 15 0.32 [email protected] %TCu [email protected]%TCu from 343m
KNGDD0040 8289717 787093 712 450.3 -50.0 360.0 358.0 360.0 2 1.03 [email protected]%TCu [email protected]%TCufrom358m
KNGDD0040 8289717 787093 712 450.3 -50.0 360.0 374.0 375.0 1 0.12 1.00m@ 0.12%TCu
KNGDD0040 8289717 787093 712 450.3 -50.0 360.0 388.0 389.0 1 0.12 [email protected]% TCu
KNGDD0040 8289717 787093 712 450.3 -50.0 360.0 391.0 393.0 2 0.14 2.00m@ 0.14%TCu
KNGDD0040 8289717 787093 712 450.3 -50.0 360.0 395.0 396.0 1 0.16 1.00m@ 0.16%Cu
KNGDD0040 8289717 787093 712 450.3 -50.0 360.0 403.0 406.0 3 0.10 [email protected]% TCu
KNGDD0041 8289607 786780 708 410.4 -60.0 360.0 361.0 373.0 12 1.08 [email protected]% TCu [email protected]% TCu from 363.45m
KNGDD0041 8289607 786780 708 410.4 -60.0 360.0 380.0 388.0 8 0.17 [email protected]% TCu
KNGDD0041 8289607 786780 708 410.4 -60.0 360.0 395.0 397.0 2 0.19 2.00m@ 0.19%TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 131.0 132.0 1 0.23 [email protected]% TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 154.0 155.0 1 0.35 1.00m@ 0.35%TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 165.0 168.0 3 0.12 [email protected]% TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 208.0 215.0 7 0.15 [email protected]% TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 227.0 235.0 8 0.38 8.00m@ 0.38%TCu [email protected]%TCufrom 228m
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 238.0 239.0 1 0.10 [email protected]% TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 242.0 249.0 7 0.64 [email protected]% TCu [email protected]% TCu from 244m

==> picture [112 x 63] intentionally omitted <==

EOH
Depth
Intercepts above
0.1% Tcu
Hole_ID Northing Easting RL Inclination Azimuth mFrom mTo mWidth Cu% Intercepts calculated above 0.5% TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 258.0 261.0 4 0.13 3.00m@ 0.13%TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 266.0 268.0 2 0.13 [email protected]% TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 271.0 271.6 0.6 0.50 0.06m@ 0.50%TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 277.0 279.8 2.8 0.29 [email protected]% TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 284.0 285.0 1 0.19 [email protected]% TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 305.0 315.0 10 0.35 10.00m@ 0.35%TCu [email protected]%TCufrom309m
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 319.0 323.0 4 0.25 [email protected]% TCu
KNGDD0042 8289720 787233 710 416.2 -60.0 360.0 366.0 370.0 4 0.20 [email protected]% TCu
KNGDD0043 8289598 787380 694 450.0 -60.0 360.0 250.0 254.0 4 0.38 [email protected]%TCu
KNGDD0043 8289598 787380 694 450.0 -60.0 360.0 257.0 262.0 5 0.14 [email protected]%TCu
KNGDD0043 8289598 787380 694 450.0 -60.0 360.0 265.0 266.0 1 0.10 1.00m@ 0.10%TCu
KNGDD0043 8289598 787380 694 450.0 -60.0 360.0 269.0 270.0 1 0.18 [email protected]%TCu
KNGDD0043 8289598 787380 694 450.0 -60.0 360.0 279.0 285.0 6 0.10 [email protected]%TCu
KNGDD0043 8289598 787380 694 450.0 -60.0 360.0 336.0 348.0 12 0.68 12.00m@ 0.68%TCu [email protected]%TCufrom337m
KNGDD0043 8289598 787380 694 450.0 -60.0 360.0 359.0 361.6 2.6 0.13 [email protected]%TCu
KNGDD0044 8289622 787090 703 450.0 -60.0 360.0 214.0 215.0 1 0.10 1.00m@ 0.10%TCu
KNGDD0044 8289622 787090 703 450.0 -60.0 360.0 220.0 224.0 4 0.10 [email protected]%Tcu
KNGDD0044 8289622 787090 703 450.0 -60.0 360.0 234.0 239.0 5 0.47 [email protected]%TCu [email protected]% TCu from 235m
KNGDD0044 8289622 787090 703 450.0 -60.0 360.0 311.0 316.0 5 0.18 5.00m@ 0.18%TCu
KNGDD0044 8289622 787090 703 450.0 -60.0 360.0 365.0 366.4 1.41 0.18 [email protected]%TCu
KNGDD0044 8289622 787090 703 450.0 -60.0 360.0 393.0 398.0 5 0.26 [email protected]%TCu
KNGDD0044 8289622 787090 703 450.0 -60.0 360.0 402.0 403.0 1 0.10 1.00m@ 0.10%TCu
KNGDD0044 8289622 787090 703 450.0 -60.0 360.0 406.0 408.0 2 0.16 [email protected]%TCu
KNGDD0044 8289622 787090 703 450.0 -60.0 360.0 417.0 418.0 1 0.15 [email protected]%TCu
KNGDD0044 8289622 787090 703 450.0 -60.0 360.0 420.0 421.0 1 0.13 1.00m@ 0.13%TCu
KNGDD0045 8289600 787577 703 399.0 -60.0 360.0 237.0 238.0 1 0.16 [email protected]%TCu
KNGDD0045 8289600 787577 703 399.0 -60.0 360.0 253.0 255.0 2 0.12 2.00m@ 0.12%TCu
KNGDD0045 8289600 787577 703 399.0 -60.0 360.0 265.0 271.0 6 0.27 [email protected]%TCu
KNGDD0045 8289600 787577 703 399.0 -60.0 360.0 275.0 276.0 1 0.10 [email protected]%TCu
KNGDD0045 8289600 787577 703 399.0 -60.0 360.0 288.0 289.0 1 0.16 1.00m@ 0.16%TCu
KNGDD0045 8289600 787577 703 399.0 -60.0 360.0 302.0 308.0 6 0.14 [email protected]%TCu
KNGDD0046 8289526 787682 691 353.6 -60.0 360.0 257.0 262.0 5 0.20 5.00m@ 0.20%TCu
KNGDD0046 8289526 787682 691 353.6 -60.0 360.0 276.0 278.0 2 0.11 [email protected]%TCu
KNGDD0046 8289526 787682 691 353.6 -60.0 360.0 282.0 291.0 9 0.32 9.00m@ 0.32%TCu
KNGDD0046 8289526 787682 691 353.6 -60.0 360.0 294.0 313.0 19 0.30 19.00m@ 0.30%TCu
KNGDD0046 8289526 787682 691 353.6 -60.0 360.0 323.0 328.0 5 0.14 [email protected]%TCu
KNGDD0047 8289359 787791 679 350.4 -60.0 360.0 307.0 309.0 2 0.14 2.00m@ 0.135%Tcu
KNGDD0047 8289359 787791 679 350.4 -60.0 360.0 324.0 325.0 1 0.10 [email protected]%TCu
KNGDD0047 8289359 787791 679 350.4 -60.0 360.0 329.0 332.0 3 0.12 3.00m@ 0.12%TCu
KNGDD0047 8289359 787791 679 350.4 -60.0 360.0 334.0 342.0 21 0.33 21.00m@ 0.33 %TCu [email protected]%TCufrom336m
KNGDD0048 8289574 786932 703 450.0 -60.0 360.0 205.0 206.0 1 0.11 [email protected]%TCu
KNGDD0048 8289574 786932 703 450.0 -60.0 360.0 292.0 293.0 1 0.17 1.00m@ 0.17%TCu
KNGDD0048 8289574 786932 703 450.0 -60.0 360.0 310.0 311.0 1 0.16 1.00m@ 0.16%TCu
KNGDD0048 8289574 786932 703 450.0 -60.0 360.0 315.0 316.0 1 0.29 [email protected]%TCu
KNGDD0048 8289574 786932 703 450.0 -60.0 360.0 324.0 325.0 1 0.20 [email protected]%TCu
KNGDD0048 8289574 786932 703 450.0 -60.0 360.0 340.0 344.0 4 0.32 [email protected]%TCu
KNGDD0048 8289574 786932 703 450.0 -60.0 360.0 358.0 368.0 10 0.26 10.00m@ 0.26%Tcu [email protected]%TCufrom362m
KNGDD0048 8289574 786932 703 450.0 -60.0 360.0 367.0 368.0 1 0.11 1.00m@ 0.11%TCu
KNGDD0048 8289574 786932 703 450.0 -60.0 360.0 376.0 378.0 2 0.13 [email protected]%TCu
KNGDD0048 8289574 786932 703 450.0 -60.0 360.0 381.0 384.5 3.5 0.57 [email protected]%TCu [email protected]%TCu from 385m

Note:

Intercepts calculated @ 0.10% TCu with 2m maximum internal dilution off down-hole width.

4.0 Multi Element Analysis

==> picture [10 x 10] intentionally omitted <==

  • Assay results received from the re-sampling (2011) of diamond core have identified anomalous titanium and silver mineralisation in zones marginal to the main copper zones.

==> picture [10 x 10] intentionally omitted <==

Early intersections of interest include:-

  • CHSDD0039: 27.90m @ 1.1% Ti from 34.8m to 62.7m and 1m @ 2.08 g/t Ag from 4.0m

  • KLUDD0034: 20m @ 1.2% Ti from 133m to 153m and 27m @ 0.9g/t Ag from 133m to 160m

==> picture [112 x 63] intentionally omitted <==

  • KLUDD0041: 17.8m @ 1.36% Ti from 214m to 231.8m and 35m @ 0.9g/t Ag from 136m to 171m; and 1m @ 0.48 Ag g/t from 230m including 2m @ 1.8 g/t Ag from 229m.

Note: Intercepts were calculated using 0.5g/t Ag and 1.0% Ti cut-off’s with 1m maximum internal dilution off down-hole width

==> picture [10 x 10] intentionally omitted <==

Semi-Quantitative XRD and QEMSCAN mineral analysis to be undertaken of the diamond core to identify the Titanium and Silver species and other elements not previously identified.

Requirements for further metallurgical test work associated with titanium and silver for beneficiation testwork will be governed by outcomes from the mineral analysis.

==> picture [10 x 10] intentionally omitted <==

Approximately 7,500 samples to date, submitted for multi-element analysis at ALS analytical laboratories in Johannesburg South Africa. Further results are anticipated over the next 4-6 weeks.

5.0 Activities

==> picture [10 x 10] intentionally omitted <==

  • A multi-element sampling program of drill core from 2011 resource development drilling is expected to be completed early April.

==> picture [10 x 10] intentionally omitted <==

  • Pre-2011, sample pulps have been re-submitted to ALS laboratories in Perth (WA) as part of an umpire quality assurance, analytical program.

==> picture [10 x 10] intentionally omitted <==

  • Sample pulps from 2011 resource development drilling program are to be collected from A. Knight Laboratory and prepared for despatch to ALS Laboratory in Johannesburg (SA), as part of an additional umpire (quality assurance) analytical program.

==> picture [10 x 10] intentionally omitted <==

  • Selected check assay repeats of sample pulps from ZRL’s 2008 RC drilling at Kalulu have been submitted to Genalysis laboratories in Perth (WA). Results will be cross referenced to data in 2008 database as part of a historical database audit.

==> picture [10 x 9] intentionally omitted <==

  • Prior to a resource estimate update, a field check of all drill hole collars coordinates is to be undertaken. This survey program will employ high precision DGPS instrumentation.

==> picture [10 x 10] intentionally omitted <==

  • All outstanding sample analysis, relevant QA/QC and data audits are scheduled for completion by late April. AMC Consultants have been engaged to create an auditable database, which will meet JORC Code reporting requirements.

==> picture [112 x 63] intentionally omitted <==

6.0 Corporate

Sunbird Resources Limited

Zambezi Resources Limited has entered into a Share Purchase Agreement with Sunbird Resources Limited (Sunbird) to divest its uranium interests in Zambia in order to focus on its Kangaluwi Copper Project.

The consideration for the disposal is $500,000 payable in scrip in Sunbird by 2.5 million ordinary shares at an issue price of 20¢ per share conditional upon various terms and conditions including listing. Zambezi shareholders shall receive a priority offer under their Prospectus.

7.0 Project Background

The Kangaluwi, Chisawa and Kalulu prospects are three high quality prospects within the 100% owned Kangaluwi Copper Project. The Project is covered by a 245 km[2] Mining Licence, 180 km east of Lusaka, Zambia. Numerous geophysical targets in the Project area are yet to be evaluated, with only one quarter of the 28 km strike length drill tested to date.

Current Mineral Resource estimates for the Project stands at 23.4 Mt grading 0.85% Cu for approximately 200 Kt contained copper from the Kangaluwi and Chisawa prospects. Additional resource is anticipated from the Kalulu prospect.

Prospect Measured Measured Indicated Indicated Inferred Inferred Totals Totals
Tonnes
(t)
Grade
(% Cu)
Tonnes
(t)
Grade
(% Cu)
Tonnes
(t)
Grade
(% Cu)
Tonnes
(t)
Grade
(% Cu)
Kangaluwi
Chisawa
-
-
-
-
8,907,000
-
0.78
-
-
14,535,983
-
0.90
8,907,000
14,535,983
0.78
0.90
Totals - - 8,907,000 0.78 14,535,983 0.90 23,442,983 0.85

The current 22,000 m drilling program will form the basis of a revised Mineral Resource estimate for copper and gold, as a basis for a future Bankable Feasibility Study.

==> picture [112 x 63] intentionally omitted <==

8.0 Competent Persons Statement

The information in this announcement that relates to Exploration Results and Mineral Resources is based on information compiled by Ms Chiedza Nematadzira and Borniface Nquni, of Caracle Creek Consulting Zambia. Both are members of the Australian Institute of Geoscientists and have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as Competent Persons as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves and who consent to the inclusion in this report of the matters based on the information in the form and context in which it appears.

The information in this announcement that relates to Exploration Results is based on information compiled by Robert McPherson, Country Manager, Geology Zambia. Robert McPherson is employed as a Geologist for Zambezi Resources and is also a member of the Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Robert McPherson consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Zambezi Resources Limited Frank Vanspeybroeck CEO