TREK METALS LIMITED Capital/Financing Update 2011

Aug 7, 2011

65923_rns_2011-08-07_ba79abb0-a408-41fe-b147-4b3b35b732ac.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ZAMBEZI RESOURCES LIMITED

Entitlement Offer Booklet

DETAILS OF A 1 FOR 5 NON-RENOUNCEABLE PRO RATA ENTITLEMENT OFFER OF ORDINARY SHARES IN ZAMBEZI AT AN OFFER PRICE OF $0.02 PER NEW SHARE

THIS ENTITLEMENT OFFER CLOSES AT 5.00PM (PERTH TIME) ON 2 SEPTEMBER 2011. VALID ACCEPTANCES MUST BE RECEIVED BEFORE THAT TIME.

This is an important document which is accompanied by an Entitlement and Acceptance Form for you to subscribe for new ordinary shares in Zambezi Resources Limited. Please read this document carefully and call your professional adviser or the Zambezi Share Registry if you have any queries.

NOT FOR DISTRIBUTION OR RELEASE IN THE UNITED STATES OR TO, OR FOR THE ACCOUNT OR BENEFIT OF, U.S. PERSONS

Table of contents

Chairman’s letter 2
Key dates for the Entitlement Offer 4
Investor Presentation 5
How to Apply 27
Important Information 32

1

Chairman’s letter

8 August 2011

Dear Shareholder

On behalf of Zambezi Resources Limited ( Zambezi ), I am pleased to invite you to participate in a 1 for 5 pro rata non-renounceable entitlement offer of new Zambezi ordinary shares ( New Shares ) at an issue price of A$0.02 per New Share ( Entitlement Offer ).

Funding Package

On 25 July 2011, Zambezi announced that it had accepted an offer from LinQ Capital Limited as responsible entity of the LinQ Resources Fund for the provision of a secured A$10 million convertible note facility ( Facility ).

Zambezi also announced plans to undertake an equity raising to raise up to a further A$5 million by way of the Entitlement Offer. This offer booklet ( Offer Booklet ) pertains to the Entitlement Offer.

The funds raised by the Facility and the Entitlement Offer will be applied by Zambezi towards working capital and exploration and development costs associated predominantly with its Kangaluwi Copper Project. The funding package will provide the Company with valuable funding for the following:

  • Additional step out and infill drilling for resource expansion and definition at Chisawa, Kangaluwi and Kalulu deposits (Kangaluwi Project);

  • Deeper drilling of the structures for stratigraphic control as well as to determine the down dip extent of the mineralisation;

  • Testing additional oxide potential above the mineralised sulphide material with a shallow drilling program; and

  • Finalising the feasibility study for the development of the Kangaluwi Project

Zambezi anticipates that the funding will be sufficient to finalise the above activities over the ensuing 12 – 18 months.

Entitlement Offer

The Entitlement Offer is non-renounceable, which means that entitlements to take up New Shares ( Entitlements ) are non-transferable and will not be tradeable on ASX or otherwise transferable. Shareholders who do not take up all or any part of their Entitlements will not receive any payment or value in respect of those Entitlements not taken up and their equity interest in Zambezi will be diluted.

The Entitlement Offer is not subject to shareholder approval and will go ahead regardless of whether or not the Facility is approved by shareholders. An Entitlement Offer was considered an

2

appropriate structure to raise funds and allow all eligible shareholders to participate in the Funding Package.

Other information

This Offer Booklet contains important information about the Entitlement Offer under the following headings:

  • Key dates for the Entitlement Offer;

  • Investor Presentation;

  • How to Apply; and

  • Important Information.

With this booklet you will also find your personalised Entitlement and Acceptance Form which details your Entitlement, to be completed in accordance with the instructions provided on the form and the instructions on “How to Apply”.

The Entitlement Offer closes at 5.00pm (Perth time) on 2 September 2011. To participate, you need to ensure that you have completed the Entitlement and Acceptance Form and paid all monies before this time and date. For further information regarding the Entitlement Offer, please call 08 6555 1879 (from within Australia) or +61 8 6555 1879 (from outside Australia) between 8.30am and 5pm (Perth time) Monday to Friday, or visit our website at www.zambeziresources.com.

You should also consult your stockbroker, accountant or other independent professional adviser to evaluate whether or not to participate in the Entitlement Offer.

On behalf of the Board of Zambezi, I thank you for your support of our company.

Yours faithfully,

==> picture [95 x 45] intentionally omitted <==

David Vilensky Chairman Zambezi Resources Limited

3

Key dates for the Entitlement Offer

Event
Date
Record Date for the Entitlement Offer
5:00pm (Perth time), 16 August 2011
Entitlement Offer opens
18 August 2011
Entitlement Offer closes
5:00pm (Perth time), 2 September 2011
Allotment of New Shares under the Entitlement Offer
12 September 2011
Despatch of holding statements
12 September 2011
Normal trading of New Shares expected to commence on ASX
13 September 2011

Important Note: Zambezi reserves the right, subject to the Corporations Act 2001 (Cth) ( Corporations Act ), ASX Listing Rules and other applicable laws, to vary the dates of the Entitlement Offer, including extending the Entitlement Offer or accepting late applications, either generally or in particular cases, without notice. You cannot, in most circumstances, withdraw the application once it has been accepted. No cooling off rights apply to the Entitlement Offer.

4

==> picture [134 x 115] intentionally omitted <==

Zambezi Resources Limited

Kangaluwi Copper Project Investor Presentation

August 2011

==> picture [207 x 156] intentionally omitted <==

==> picture [206 x 117] intentionally omitted <==

==> picture [211 x 159] intentionally omitted <==

Australian Stock Exchange Error! Unknown document property name. ASX : ZRL

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Disclaimer

Summary information

This presentation contains summary information about Zambezi and its subsidiaries and their activities current as at the date of this presentation. The information in this presentation is of general background and does not purport to contain all the information necessary to fully evaluate any transaction or investment. It should be read in conjunction with Zambezi’s other periodic and continuous disclosure announcements lodged with the ASX, which are available at www.asx.com.au.

Not financial product advice

This presentation is for information purposes only. It is not financial product or investment advice or a recommendation to acquire Zambezi shares, and has been prepared without taking into account the objectives, financial situation or needs of individuals. Before making an investment decision, prospective investors should consider the appropriateness of the information having regard to their own objectives, financial situation and needs and seek professional advice appropriate to them.

Not an offer

This presentation does not constitute an offer, invitation or recommendation to subscribe for or purchase any security and neither this presentation nor anything contained in it shall form the basis of any contract or commitment.

In particular, this presentation does not constitute an offer to sell, or a solicitation of an offer to buy, securities in the United States or to any person that is, or is acting for the account or benefit of any "U.S. person" (as defined in Regulation S under the Securities Act of 1933, as amended (the "U.S. Securities Act")) (“US Person”). This document may not be distributed or released in the United States or to any U.S. Person. The securities in the proposed offering have not been and will not be registered under the U.S. Securities Act, or under the securities laws of any state or other jurisdiction of the United States. Accordingly, the securities in the proposed offering may not be offered or sold, directly or indirectly, within the United States or to, or for the account or benefit of, U.S. Persons, except in a transaction exempt from, or not subject to, the registration requirements of the U.S. Securities Act and applicable U.S. state securities laws.

Risks

An investment in shares is subject to investment and other known and unknown risks, some of which are beyond the control of Zambezi. Zambezi does not guarantee any particular rate of return or the performance of Zambezi. Prospective investors should have regard to the ‘key risks’ section of this presentation which outlines some of these risks.

Financial data

All dollar values are in Australian dollars (A$) unless stated otherwise and financial data is presented within the financial year ended 31 March 2011 unless stated otherwise.

6

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Investment Highlights

  • Current resource for Kangaluwi Copper Project (KCP) stands at 23.4 Mt grading 0.85% Cu for 200,575 tonnes of contained copper

  • Anticipated additional resources from Kalulu Prospect of 11 Mt @ 0.89% Cu for 98,000 tonnes of contained copper

  • The Company has agreed to enter into a Convertible Note facility of A$10 million in two tranches of A$5 million each carrying a coupon of 10% pa (See p27 for conditions)

  • The Company is raising $5 million by way of a 1:5 Rights Issue through the issue of approximately 251,601,381 fully paid ordinary shares at a price of 2 cents per share

  • Funds raised expected to be sufficient to finalise drilling programmes, hydrological, geotechnical, metallurgical, and eventually a Bank Feasibility Study over the ensuing 1218 months

  • Company is aiming for construction in 2013

Corporate Snapshot

Capital Structure (as at 1/08/2011)

Directors and Senior Management

Capital Structure (as at 1/08/2011) Directors and Se nior Managemen
Share Price AUD 2.4 cents David Vilensky Non-Exec Chairman
Market Cap AUD $30 million Frank Vanspeybroeck Chief Executive Officer
Ordinary Shares 1.2 billion Pierre Malherbe Chief Financial Officer
Options (unlisted) 155 million Richard Procter Non-Exec Director
Cash AUD $2.2 million Emmanuel Heyndrickx Non-Exec Director
Debt Nil Simon Durack Non-Exec Director
Marinko Vidovich Project Manager
Geoff Booth Consultant Geologist

Top Shareholders (as at 01/08/2011)

RBC Dexia Investor Services Australia Nominees 271,486,334 21.6 %
Lando Pty Ltd 51,555,555 4.1 %
JP Morgan Nominees Australia Ltd 37,900,900 3.0 %
JP Morgan Nominees Australia Ltd 33,513,169 2.7 %
Glencore Investments BV 29,162,062 2.3 %
Astron Limited 29,000,000 2.3 %

7

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Corporate Structure

ZAMBEZI RESOURCES LIMITED (ZRL) Public Company Registered In Bermuda Listed On ASX

GLENCORE INTERNATIONAL AG CAPE RESOURCES LIMITED (CRL) Incorporated in Bermuda 49% OWNED BY ZRL 51% OWNED BY GLENCORE

==> picture [387 x 354] intentionally omitted <==

----- Start of picture text -----

ZAMBEZI RESOURCES
MWEMBESHI RESOURCES SOUTHERN AFRICAN
AUSTRALIA PTY LIMITED
(BERMUDA) LIMITED RESOURCES LIMITED
(ZRAPL)
(MRBL) (SARL)
Registered in Australia
100% OWNED BY ZRL Registered in Bermuda Incorporated in Bermuda
100% OWNED BY ZRL 100% OWNED BY ZRL
LISTED ON ASX
MWEMBESHI RESOURCES CHALIMBANA RESOURCES
LIMITED LIMITED
(MRL) (CHARL)
Incorporated in Zambia Incorporated in Zambia
100% OWNED BY MRBL 100% OWNED BY SARL
Tenements: Tenements:
 1 large scale Mining Licence:  5 Prospecting Licences:
- Kangaluwi 15547-HQ-LML - Sinjela 13138-HQ-LPL
for a period of 25 years (exp. 11/03/13)
 3 Prospecting Licences: - Mvula 13093-HQ-LPL (exp.
- Shamifwe 13147-HQ-LPL 13/05/13)
(exp. 23/11/11) - Lwimba 13137-HQ-LPL
- Mulungushi/Kamona (exp. 11/01/13)
8145-HQ-LPL - Chilanga 13094-HQ-LPL
(exp. 09/03/12) (exp 11/03/13)
- Rufunsa 8327-HQ-LPL - Mwomboshi 13140-HQ-
(exp. 30/01/13) LPL (exp. 20/01/13)
----- End of picture text -----

==> picture [101 x 83] intentionally omitted <==

----- Start of picture text -----

CHEOWA JV (with Glencore)
Operating as
CHEOWA RESOURCES
LIMITED
(CHERL)
Incorporated in Zambia
100% OWNED BY CRL
----- End of picture text -----

Tenements:  5 Prospecting Licences: - Sinjela 13138-HQ-LPL Tenements: (exp. 11/03/13)  3 Prospecting Licences: - Mvula 13093-HQ-LPL (exp. - Chalimbana 13170-HQ-LPL 13/05/13) - Chayinda 13171-HQ-LPL - Lwimba 13137-HQ-LPL - Cheowa 8573-HQ-LPL (exp. 11/01/13) - Chilanga 13094-HQ-LPL (exp 11/03/13) - Mwomboshi 13140-HQLPL (exp. 20/01/13)

  • MPANDE LIMESTONE LIMITED (MLL)

  • Incorporated in Zambia 100% OWNED BY MRL Tenements:

  • 2 Prospecting Licences: - Mpande A 13172-HQ-LPL (exp. 19/03/13)

    • Mpande B 13173-HQ-LPL (exp. 18/03/13)

8

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Tenement Map

==> picture [451 x 351] intentionally omitted <==

FIG 1: TENEMENT PLAN

Zambia

Mining Culture

  • Long history of mining and exploration, back to early part of 20[th] century

  • Mining and exploration well understood by the Government and encouraged by authorities

  • Excellent permitting system based on Cadastral system

  • Relatively Low sovereign risk

  • Favourable tax laws that allow write-off of capital mining plants and pre-production expenses in the year the costs were incurred

  • Zambia is ranked as the world's seventh largest producer of copper, generating 3.3% of the western world’s production

9

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Infrastructure

  • Kariba Hydroelectric scheme 1800MW, reticulated directly to Copperbelt

  • Excellent supplies from major rivers – Kafue, Luangwa, Zambezi plus Kariba Dam

  • Sealed roads and key rail links through Lusaka and the Copperbelt

  • Major international airport in Lusaka serviced regularly by a number of international airlines, local airline services regional routes and domestic charter companies support air travel within Zambia

  • Zambia has a well-established infrastructure of domestic and international telecommunications

==> picture [469 x 344] intentionally omitted <==

FIG 2: PROJECT LOCATION

10

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Kangaluwi Project Overview

Introduction

The Kangaluwi Copper Project (100% owned) comprises of a 245 km[2] granted Mining Licence 15547-HQ-LPL located approximately 180 km east of Lusaka.

==> picture [453 x 322] intentionally omitted <==

FIG 3: MINING LICENCE 15547

Extensive soil geochemical sampling programs carried out from 2005 to 2007 covering an area of 180 km[2] identified six prospects.

Two main trends of continuous copper anomalies above 100 ppm have been delineated over a strike length of 28 km. The Kangaluwi – Kalulu – Chisawa trend occurs over a strike length of 19 km and the Chisawa – Imboo trend covers a strike length of 9 km.

11

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

==> picture [437 x 302] intentionally omitted <==

FIG 4: MAP OF GEOCHEM ANOMALIES

Geological Setting

Mineralisation at the Kangaluwi Copper Project is hosted by intensely deformed and foliated metasedimentary rocks. These form part of the Zambezi supracrustal sequence located within the Zambezi belt of southern Zambia and are of Neoproterozoic age (~830 Ma). They occur north of the Zimbabwe Archean Craton and form sections of the Irumide belt. The licence falls south east of the celebrated Lufilian Arc which is host to deposits of the Zambian copper belt.

Mineralisation is structurally controlled in a sheared, east plunging regional synform, with Kangaluwi and Chisawa deposits located on the limbs of the fold and Kalulu in its nose. The metasedimentary rocks of the Kangaluwi-Chisawa copper prospects trend roughly east-southeast and dip shallowly south-west, between 30-40 degrees.

At Kangaluwi the host rocks for copper mineralisation are biotitic schist, muscovite schists, biotite- muscovite schists, garnet-biotite-muscovite schists, amphibolites, epidosites, quartzite, pegmatite and graphitic shale. These lithological units are often interbedded and in places may display gradational contacts.

At Chisawa the host rocks for copper mineralisation are biotitic schist, muscovite schists, biotite muscovite schists, garnet biotite muscovite schists, amphibolites, epidosites quartzite, quartz and pegmatite veins and graphitic shales. These lithological units are often interbedded and in places may display gradational contacts.

Mineralisation at Kangaluwi and Chisawa consists of chalcopyrite, bornite, malachite, azurite and secondary chrysocolla an upper oxide zone.

12

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Exploration History

During 2006 24 RC holes were completed at Kangaluwi over an 800 m strike length and at Chisawa over a strike length of 2,600 m.

During 2007, 15,459 m of RC drilling and 4,469 m of diamond drilling were completed at Kangaluwi over a 3 km strike length.

RC drilling returned significant copper mineralisation over substantial width in multiple zones which broaden at depth including 18 m at 1.42% Cu from 114 m, 17 m at 1.2% Cu from 49 m, 10 m at 1.97% Cu from 30 m.

Diamond drilling confirmed down dip continuity of mineralisation with results including 19.2 m at 1.14% Cu from 92 m, 8.07 m at 2.98% Cu from 145.34 m, 6.14 m at 1.29% Cu from 157.68 m, 7.32 m at 1.4% Cu from 161 m.

==> picture [452 x 310] intentionally omitted <==

FIG 5: KANGALUWI

During 2008 71 RC holes for 17,058 m and 18 DD holes for 5,372 m were completed at Kangaluwi, 63 RC holes for 10,011 m at Chisawa and 20 RC holes for 2,560 m at Kalulu over a strike length of 1.3 km.

13

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

==> picture [394 x 214] intentionally omitted <==

FIG 6: CROSS SECTION CHISAWA 12000E

In May 2008 the Company completed a major regional Versatile Time Domain Electromagnetic Survey (VTEM) over the Kangaluwi Project area. Some 1,810 line kilometres were flown at a line spacing of 150 m, with further infill at 75 m in the Kangaluwi – Chisawa – Kalulu area.

Interpretation of data from the VTEM survey in conjunction with assay results providing confidence in a strong correlation between distinct trends in the VTEM data and the location of higher grade copper mineralisation.

==> picture [404 x 282] intentionally omitted <==

FIG 7: KANGALUWI LIMB WITH VTEM ANOMOLY EXTENDING TO SE

14

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Mineral Resource Estimate

Based on previous exploration an Indicated Mineral Resource has been estimated of 8.9 Mt grading 0.78% Cu for 69,000 tonnes of contained copper at Kangaluwi prospect and at Chisawa an Inferred Mineral Resource has been estimated at 14.5 Mt grading 0.90% Cu for 130,824 tonnes of contained Cu.

TABLE 1: GLOBAL INDICATED AND INFERRED MINERAL RESOURCE ESTIMATE

– KANGALUWI COPPER PROJECT

Prospect Measured Measured Indicated Indicated Inferred Inferred Totals Totals
Tonnes
(t)
Grade
(% Cu)
Tonnes
(t)
Grade
(% Cu)
Tonnes
(t)
Grade
(% Cu)
Tonnes
(t)
Grade
(% Cu)
Kangaluwi
Chisawa
-
-
-
-
8,907,000
-
0.78
-
-
14,535,983
-
0.90
8,907,000
14,535,983
0.78
0.90
Totals - - 8,907,000 0.78 14,535,983 0.90 23,442,983 0.85

The JORC compliant resources estimates for Kangaluwi and Chisawa is 23.4 Mt grading 0.85% Cu for 200,575 tonnes of contained copper.

At this stage the resource estimates do not include any resources from the Kalulu prospect and so far only about 27% of the 28 km strike length has been drill tested.

15

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Current Exploration at Kalulu & Chisawa

Zambezi’s current DD drilling campaign of 13,000 m focuses on Chisawa and Kalulu Prospects.

At Chisawa prospect a total of 32 DD holes for some 6,400 m will be drilled over a 3 km mineralised zone. This program will increase the resource confidence and advance classification to an Indicated category.

==> picture [406 x 475] intentionally omitted <==

FIG 8: SHOWING PLANNED DRILLED HOLES AT CHISAWA

16

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

At Kalulu prospect a total of 38 DD holes for 6,640 m was drilled over a 1.2 km mineralised strike length. This phase of drilling should advance the Kalulu resource from Inferred to Indicated category.

==> picture [452 x 531] intentionally omitted <==

FIG 9: MAP SHOWING DRILLED DD HOLES AT KALULU

17

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Assay Results Received To-date From the Current Diamond Drilling Program

Kalulu Prospect

All budgeted 38 DD holes for 6,640 m were drilled at Kalulu. Kalulu is interpreted to lie at the nose of the east-plunging fold. Sulphide mineralisation is structurally controlled in a sheared, regional east-plunging syncline. Kalulu’s strike length of 1.2 km was drilled at 100 m intervals, both between and along RC drill sections. This will result in a 50 m x 50 m grid drill coverage and should advance the Kalulu resource to Indicated Mineral Resource category.

Results received are from 6 DD holes drilled along sections 10100E, 10150E and 10200E and significant intersections are shown below.

TABLE 1: KALULU PROSPECT – DD DRILLING ASSAY RESULT

Hole_ID Northing Easting RL EOH Depth Inclination Azimuth From
(m)
To
(m)
Width
(m)
Cu% **Intercept **
KLUDD0003 8289900 784362 683 200.72 -60 320 72.6 73.8 1.2 0.44 1.2m@ 0.44 % TCu
KLUDD0003 8289900 784362 683 200.72 -60 320 75.5 77 1.50 1.51 1.5m@ 1.51 % TCu
KLUDD0003 8289900 784362 683 200.72 -60 320 109 111 2.00 0.54 2m@ 0.54%TCu
KLUDD0003 8289900 784362 683 200.72 -60 320 157 159 2.00 0.78 2m@ 0.78%TCu
KLUDD0004 8289873 784406 687 207.00 -60 320 88.60 91.00 2.40 1.69 2.4m@ 1.69 % TCu
KLUDD0004 8289873 784406 687 207.00 -60 320 124.00 127.00 3.00 0.35 3.0m@ 0.35 % TCu
KLUDD0004 8289873 784406 687 207.00 -60 320 183.00 184.00 1.00 0.36 1m@ 0.36 % TCu
KLUDD0005 8289850 784290 682 200 -60 320 87.00 101.00 14.00 0.99 14.0m@ 0.99 % TCu
KLUDD0005 8289850 784290 682 200 -60 320 184.00 185.00 1.00 0.42 1m@ 0.42% TCu
KLUDD0005 8289850 784290 682 200 -60 320 187.00 188.00 1.00 0.35 1m@ 0.35% TCu
KLUDD0006 8289894 784320 687 214 -60 320 78.00 88.00 10.00 1.13 10m@ 1.13 % TCu
KLUDD0006 8289894 784320 687 214 -60 320 98.00 99.00 1.00 0.48 1m@ 0.48 %TCu
KLUDD0006 8289894 784320 687 214 -60 320 110.00 111.00 1.00 0.46 1m@ 0.46 %TCu
KLUDD0006 8289894 784320 687 214 -60 320 125.00 126.00 1.00 0.64 1m@ 0.64 %TCu
KLUDD0006 8289894 784320 687 214 -60 320 138.00 139.00 1.00 0.30 1m@ 0.30 %TCu
KLUDD0006 8289894 784320 687 214 -60 320 164.00 165.00 1.00 0.48 1m@ 0.48 %TCu
KLUDD0006 8289894 784320 687 214 -60 320 167.00 168.00 1.00 0.40 1m@ 0.40 %TCu
KLUDD0007 8289981 784310 687 168 -60 320 44.00 65.00 21.00 0.79 21m@ 0.79 % TCu
KLUDD0007 8289981 784310 687 168 -60 320 88.00 89.00 1.00 0.44 1m@ 0.44 %TCu
KLUDD0007 8289981 784310 687 168 -60 320 90.00 91.00 1.00 0.51 1m@ 0.51 %TCu
KLUDD0007 8289981 784310 687 168 -60 320 92.00 94.00 2.00 0.42 2m@ 0.42 %TCu
KLUDD0007 8289981 784310 687 168 -60 320 110.00 111.00 1.00 0.44 1m@ 0.44 %TCu
KLUDD0007 8289981 784310 687 168 -60 320 135.00 136.00 1.00 0.96 1m@ 0.96 %TCu
KLUDD0009 8289922 784216 654 144 -60 320 13.00 19.00 6.00 0.41 6m@ 0.39 % TCu
KLUDD0009 8289922 784216 654 144 -60 320 24.00 29.00 5.00 0.61 5m@ 0.61 % TCu
KLUDD0009 8289922 784216 654 144 -60 320 79.00 80.00 1.00 0.48 1m@ 0.48 % TCu
KLUDD0009 8289922 784216 654 144 -60 320 87.00 88.00 1.00 0.48 1m@ 0.48 % TCu
KLUDD0009 8289922 784216 654 144 -60 320 95.76 96.50 0.74 2.41 0.74m@ 2.41% TCu
KLUDD0009 8289922 784216 654 144 -60 320 103.00 104.00 1.00 1.04 1m@ 1.04 % TCu

Note: Intercepts were calculated @ 0.30%Cu minimum cut off downhole width Co-ordinate System Arc 1950 UTM Zone 355

18

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Hole KLUDD005 drilled on section 10100E displayed both chalcopyrite and bornite sulphide mineralisation. KLUD009 was drilled through biotite-muscovite-quartz schist and confirmed malachite mineralisation intersected in KLURL0017.

==> picture [272 x 274] intentionally omitted <==

FIG 10:

Hole KUDD006 drilled on section 10150E intersected quartz-biotite schist, garnet-chloritebiotite schist and quartz-biotite-muscovite schist.

==> picture [256 x 260] intentionally omitted <==

FIG 11

19

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Holes KLUDD003, KLUDD004 and KLUDD007 were drilled on section 10200E (Figure 12). Mineralisation in KLUDD003 & KLUDD004 holes was predominantly chalcopyrite, while KLUD007 exhibited a 20 m thick mineralised zone of azurite and malachite.

==> picture [270 x 274] intentionally omitted <==

==> picture [31 x 8] intentionally omitted <==

----- Start of picture text -----

FIG 12
----- End of picture text -----

Assay results at Kalulu so far confirm the wider intersections normally associated with the hinge zone of folds, where low pressure zones are conductive to metal deposition. It is comforting to note that all 6 holes intercepted mineralisation at multiple depths suggesting several more ore chutes than previously interpreted.

Chisawa Prospect

A total of 5,063 m have been drilled at Chisawa or 25 DD holes from a total of 32 DD holes budgeted for a Phase I drilling program, across a 3 km mineralised zone. With collars designed at 200 m intervals, a 100 m x 100 m grid drill coverage will be realised when combined with existing RC drilling. The principal aim of this infill program is to increase mineral resource confidence and advance the resource classification, ideally to an Indicated category.

TABLE 2: CHISAWA PROSPECT – DD DRILLING ASSAY RESULTS

Hole_ID Easting Northing RL EOH Depth Inclination Azimuth From
(m)
To
(m)
Width
(m)
Cu% **Intercept **
CHSDD0001 8287961 787550 707 180.00 -50 42.5 145.00 152.00 7.00 1.14 7.0m@ 1.14% TCu
CHSDD0002 8287718 787872 702 123.80 -50 42.5 98.00 101.00 3.00 0.80 3.0m@ 0.80% TCu
CHSDD0003 8287814 787444 703 300.20 -50 42.5 250.00 255.00 5.00 0.72 5.0m@ 0.72% TCu
CHSDD0004 8287892 787482 692 251 -50 42.5 195 197 2.00 0.63 2.0m@ 0.63% TCu
CHSDD0005 8287690 787607 697 251 -50 40 219 223 4.00 0.87 4.0m@ 0.87% TCu
CHSDD0005 8287690 787607 697 251 -50 40 235 239 4.00 1.09 4.0m@ 1.09% TCu

Note: Intercepts were calculated @ 0.30%Cu minimum cut off downhole width. Co-ordinate System Arc 1950 UTM Zone 355

20

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Results received are from 5 DD holes drilling along sections 10200E, 10400E and 10600E, and significant intersections are indicated herewith.

Collectively these assay sample results for Chisawa and Kalulu Prospects confirm the strike and down-dip extension of mineralisation as indicated in previous assays of drilling samples.

Planned Exploration at Kangaluwi Project

The Company plans to drill 10,000 m of deep DD holes over the Kangaluwi Project to test the down dip/plunge continuation of the three prospects (Figures 13 & 14 Kangaluwi and Chisawa).

==> picture [383 x 254] intentionally omitted <==

FIGURE 13: MAP SHOWING PROPOSED PHASE II KANGALUWI DD DRILL HOLES

==> picture [375 x 253] intentionally omitted <==

FIGURE 14: MAP SHOWING PROPOSED PHASE II CHISAWA DD DRILL HOLES

21

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

At Kalulu 40 RC holes are planned for 5,000 m over the prospect to explore the presence of copper oxide mineralisation and strike continuity.

A further limited diamond program of 4 holes are planned to test for down dip continuity especially over peak soil (>1,000 ppm Cu) anomalies.

==> picture [449 x 396] intentionally omitted <==

FIGURE 15: MAP SHOWING PROPOSED PHASE II KALULU RC AND DD DEEP DRILL HOLES

22

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Use of Funds and Anticipated Timeline

Current cash on hand, the funds from Tranche 1 of the Convertible Note Facility and the Rights Issue proceeds will be used as follows:

Q3 2011 – Q3 2012
Drilling RC and DD Program
Resource Estimates
Feasibility Drilling Program
Hydrological, Geotechnical and Metallurgical
Test-work
Q2 2012 – Q4 2012
Bankable Feasibility Study
Q1 2013
Capital Raising and Development
$10 million
$2 million

The company’s convertible note facility with LinQ Resources Fund (LRF) includes a condition that the Rights Issue raise at least $4 million.

The company intends to secure underwriting commitments for the Rights Issue to take up any shortfall not taken up by eligible shareholders.

If the company is unable to secure underwriting commitments for the entire shortfall, the directors have reserved the right to place the shortfall to any eligible shareholders whose acceptance exceeds their entitlement as shown on their acceptance form for the Rights Issue, or to any other parties selected by the directors.

If the company is still unable to raise the $4 million required by the convertible note facility, then it may not have access to the funds that would otherwise be provided under that facility. This will materially impact on its ability to implement its plans in the manner set out above.

Other Assets

The Company intends to spin out its uranium prospects held by its wholly owned subsidiary Chalimbana Resources Limited into a new ASX listing and Zambezi shareholders may get a preferential allocation of IPO subscription shares.

Mpande Limestone Limited, a wholly owned subsidiary of Mwembeshi Resources Limited (MRL) holds two tenements with a high quality limestone resource, close to the town of Chilanga, a wellknown limestone and cement producing area. The aim is to quarry the limestone to produce high quality metallurgical lime and other industrial commodity chemicals to supply Zambia’s Copperbelt and construction industry.

The Company has a 49% interest in Cheowa Resources Limited (Cheowa), a joint venture company with Glencore International AG (Glencore) who owns 51% (after spending $16 million on the tenements). Cheowa has three prospects, Cheowa (6 Mt @ 1% Cu), Chayinda (3.3 Mt @ 2.1% Cu) and Chalimbana (5.3 Mt @ 0.8% Cu). Glencore is currently planning drilling programs and budgets to further the project development.

23

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Summary

  • The Company drilled some 45,000 m RC and 10,000 m DD holes based on geochemical and geophysical studies

  • The resource to date is estimated at 23.4 Mt grading 0.85% Cu for 200,000 t of contained copper from Kangaluwi and Chisawa, not including Kalulu estimated at 11 Mt @ 0.89% Cu for 98,000 tonnes of contained copper

  • The current and planned drilling program of +/- 28,000 m will establish a new resource estimate for Cu and gold as a base for the Bankable Feasibility Study

  • Proceeds from the Rights Issue and the Convertible Note facilities will provide the Company with sufficient funding to finalise the Feasibility Study for the development of the Kangaluwi Copper Project over the ensuing 12 - 18 months.

Key Risks

The principal risks associated with an investment in Zambezi include, but are not limited to, those detailed below.

Exploration and development risk

Exploration is a high risk activity that requires large amounts of expenditure over extended periods of time. Currently, there are no defined mineral reserves on Zambezi’s projects. Zambezi intends to use funds raised under the Rights Issue to fund exploration programs to confirm the drilling results set out in this presentation. There can be no guarantee that the planned exploration programs will lead to the discovery of a commercial deposit or a commercial mining operation.

While Zambezi’s estimates comply with the JORC Code, the exploration results presented are expressions of judgment based on knowledge, experience and industry practice, and may require revisions following further exploration and future production experience. Estimates valid when made may change significantly when new information becomes available.

Sovereign risk

Zambezi is pursuing projects in Africa and so is subject to the risks associated with operating in that region of the world. These risks may include economic, social or political instability or change, hyperinflation, currency convertibility or instability and changes of law affecting foreign ownership, government participation, taxation, working conditions, rates of exchange, exchange control, exploration licensing, export duties, repatriation of income or return of capital, environmental protection, mine safety, labour relations as well as government control over mineral properties or government regulations that require the employment of local staff or contractors or require other benefits to be provided to local residents.

Any future material adverse changes in government policies or legislation in African countries that affect foreign ownership, mineral exploration, development or mining activities may affect the viability and profitability of Zambezi and its projects.

No profit to date

It is not possible to evaluate Zambezi’s prospects based on past performance. Since Zambezi intends to continue investing in its exploration and development program, the board anticipates that Zambezi may make losses in the foreseeable future.

24

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

While the board has confidence in Zambezi’s future revenue-earning potential, there can be no certainty that Zambezi will achieve or sustain profitability or achieve or sustain positive cash flow from its operating activities.

Title risk

The tenements in which Zambezi has an interest are subject to various conditions, obligations and terms. If renewal is required this may be at the discretion of the relevant government minister or official. In addition, Zambezi will have to receive regulatory and environmental approval to convert its prospecting licences into production tenements. There is a risk that these approvals may not be obtained. If approval for renewal or conversion is refused, Zambezi will suffer a loss of the opportunity to undertake further exploration and/or exploitation of the tenement.

Commodity price and exchange rate risk

The revenue Zambezi may derive through the sale of copper and other commodities, should it be successful through its exploration activities, exposes its potential income to commodity price and exchange rate risks. Commodity prices fluctuate and are affected by many factors beyond the control of Zambezi. These factors include, among others, supply and demand fluctuations for precious metals, technological advancements, forward selling activities and other macroeconomic factors. Further, international prices of various commodities are denominated in United States dollars, whereas the income and expenditure of Zambezi are and will be taken into account in United States dollars, exposing Zambezi to the fluctuations and volatility of the rate of exchange.

Operational risk

Zambezi’s operations may be affected by various factors which are beyond its control. These include a failure to locate or identify mineral deposits, failure to achieve predicted grades in exploration or mining, operational and technical difficulties encountered in mining, commissioning or operating plant, adverse weather conditions, industrial and environmental accidents, industrial disputes, fire, explosions and other incidents beyond its control. These risks could also result in damage to production facilities, personal injury, environmental damage, business interruption, and possible legal liability.

Future capital needs

Further funding of projects may be required by Zambezi to support its on-going activities and operations. There can be no assurance that such funding will be available on satisfactory terms or at all. Any inability to obtain funding will adversely affect the business and financial condition of Zambezi and, consequently, its performance. A failure to meet cash calls would result in default in joint venture obligations which, if not remedied, could result in forfeiture of permits or concessions.

Share price variations

The shares offered under the Rights Issue are to be quoted on ASX, where their price may rise or fall in relation to the Offer Price. The shares issued under the Rights Issue carry no guarantee in respect of profitability, dividends, return of capital, or the price at which they may trade on ASX. The value of the shares will be determined by the market and will be subject to a range of factors beyond the control of Zambezi and its directors and officers. Such factors include, but are not limited to, the demand for and availability of shares, movements in domestic interest rates, exchange rates, fluctuations in stock markets and general domestic and economic activity. Returns from an investment in the shares may also depend on general stock market conditions as well as the performance of Zambezi. There can be no guarantee that an active market in the shares will develop or that the market price of the shares will not decline below the Offer Price.

Economic factors

Changes in economic and business conditions or government policies in Australia, Bermuda, Zambia or internationally may affect the fundamentals which underpin the projected growth of

25

Zambezi Resources Limited Kangaluwi Copper Project

==> picture [52 x 50] intentionally omitted <==

Zambezi’s target markets or its costs structure and profitability. Adverse changes in such things as the level of inflation, interest rates, exchange rates, government policy (including fiscal, monetary and regulatory policies), consumer spending and employment rates, among others, are outside the control of Zambezi and may result in material adverse impacts on the business or its operating results.

Regulatory risk

Changes in relevant taxes, legal and administrative regimes and government policies both in Bermuda and overseas may adversely affect the financial performance of Zambezi. Any change to the current rate of company income tax in jurisdictions where Zambezi operates will impact on shareholder returns. Any change to the current rates of income tax applying to individuals and trusts will similarly impact on shareholder returns. In addition, any change in tax arrangements between jurisdictions could have an adverse impact on profit margins and any future dividends.

Competent Persons Statement

The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Ms Chiedza Nematadzira BSc Hon Geology and Borniface Nquni, MAIG, of Caracle Creek Consulting Zambia who are both Competent Persons as defined by the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code 2004 Edition) and who consent to the inclusion in this report of the matters based on the information in the form and context in which it appears.

The information in this announcement that relates to Exploration Results is based on information compiled by Geoff Booth, Consulting Geologist. Geoff Booth is employed as a consultant for Zambezi Resources and is also a Fellow of the Australasian Institute of Mining and Metallurgy and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Geoff Booth consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Qualifying Statement

‐ ‐ This release may include forward looking statements. These forward looking statements are based onZambezi’s expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Zambezi, which could cause actual results to differ materially from such statements. Zambezi makes no undertaking tosubsequently update or revise the forward looking statements made in this release, to reflect the circumstances or events after the date of this release.

The Convertible Note Facility is subject to due diligence and legal documentation entered into within 60 days from 25 July 2011.

The second tranche of the Convertible Note is subject to Shareholders approval.

The company’s convertible note facility with LinQ Resources Fund (LRF) includes a condition that the Rights Issue raise at least $4 million.

26

How to Apply

1 Overview of the Equity Raising

Zambezi intends to raise approximately A$15 million through the Funding Package, which comprises the Entitlement Offer and the Facility.

New Shares issued under the Entitlement Offer will be issued on a fully paid basis and will rank equally in all respects with existing ordinary Zambezi shares from their date of issue.

2 The Entitlement Offer

Eligible Shareholders (as defined in the “Important Information” section below) are being offered the opportunity to subscribe for 1 New Share for every 5 Zambezi ordinary shares ( Shares ) held at 5:00pm (Perth time) on 16 August 2011 ( Entitlement ), at the offer price of $0.02 per New Share ( Offer Price ).

Eligible Shareholders may also apply for New Shares in excess of their Entitlement ( Additional New Shares ). Please note that Additional New Shares will only be allocated to Eligible Shareholders, if and to the extent that Zambezi so determines in its absolute discretion, having regard to the circumstances as at the time of the close of the Entitlement Offer. Any Additional New Shares will be limited to the extent that there are sufficient New Shares from Eligible Shareholders who do not take up their full Entitlements or from New Shares that would have been offered to Ineligible Shareholders if they had been entitled to participate in the Entitlement Offer. Zambezi may apply any scale-back (in its absolute discretion).

The Entitlement Offer is being made pursuant to provisions of the Corporations Act which allow rights issues to be offered without a prospectus. As a result, it is important for Eligible Shareholders to read and understand the information on Zambezi and the Entitlement Offer made publicly available before taking up all or part of their Entitlement or applying for Additional New Shares.

In particular, please refer to this booklet, Zambezi’s interim and annual reports and other announcements made available at the ASX website, www.asx.com.au (including the Zambezi Quarterly Report for the quarter ending 30 June 2010 that was released to ASX on 29 July 2011).

Your Entitlement is set out on the accompanying Entitlement and Acceptance Form and has been calculated as 1 New Share for every 5 Shares you held as at the Record Date of 5:00pm (Perth time) on 16 August 2011. If you have more than one holding of Shares, you will be sent more than one personalised Entitlement and Acceptance Form and you will have separate Entitlements for each separate holding. All New Shares (including any Additional New Shares) issued under the Entitlement Offer will rank equally with issued Shares.

3 Consider the Entitlement Offer in light of your particular investment objectives and circumstances

Please consult with your stockbroker, accountant or other independent professional adviser if you have any queries or are uncertain about any aspects of the Entitlement Offer.

27

You should also refer to the “Key Risks” section of the investor presentation released to ASX on 8 August 2011 and included in this Offer Booklet.

4 Timing of acceptance

To participate in the Entitlement Offer, your payment must be received no later than the close of the Entitlement Offer at 5:00pm (Perth time) on 2 September 2011.

In this Offer Booklet, the period between the Entitlement Offer opening date and closing date is referred to as the Entitlement Offer Period .

5 Complete and return the accompanying Entitlement and Acceptance Form with your Application Monies or make a payment by BPAY

If you decide to take up all or part of your Entitlement or apply for Additional New Shares, please complete and return the Entitlement and Acceptance Form with the requisite Application Monies OR pay your Application Monies via BPAY by following the instructions set out on the Entitlement and Acceptance Form.

Zambezi will treat you as applying for as many New Shares as your payment will pay for in full, subject to any scale-back it may determine to implement, in its absolute discretion, in respect of Additional New Shares. Amounts received by Zambezi in excess of your Entitlement ( Excess Amount ) may be treated as an application to apply for as many Additional New Shares as your Excess Amount will pay for in full. If you are paying by BPAY, please make sure to use the specific Biller Code and unique Customer Reference Number ( CRN ) on the back of your personalised Entitlement and Acceptance Form. If you receive more than one personalised Entitlement and Acceptance Form, please only use the CRN specific to the Entitlement on that Form. If you inadvertently use the same CRN for more than one of your Entitlements, you may be deemed to have applied only for Additional New Shares on the Entitlement to which that CRN applies.

Entitlements cannot be traded or otherwise transferred on the ASX or any other exchange or privately.

If you take no action, you will not be allocated New Shares and your Entitlement will lapse. Your Entitlement to participate in the Entitlement Offer is non-renounceable and will not be tradeable or otherwise transferable. Shareholders who do not take up their Entitlements in full will not receive any payment or value for those Entitlements they do not take up.

If you take up and pay for all or part of your Entitlement before the close of the Entitlement Offer, you will be allotted your New Shares on 12 September 2011. If you apply for Additional New Shares then, subject to Zambezi’s absolute discretion to scaleback your application for Additional New Shares (in whole or part), you will be issued these on 12 September 2011. Zambezi’s decision on the number of New Shares to be allocated to you will be final.

Zambezi also reserves the right (in its absolute discretion) to reduce the number of New Shares allocated to Eligible Shareholders, or persons claiming to be Eligible Shareholders, if their claims prove to be overstated or if they or their nominees fail to provide information to substantiate their claims.

28

6 Acceptance of the Entitlement Offer

The method of acceptance of the Entitlement Offer will depend on your method of payment, being either:

  • by BPAY; or

  • by cheque, bank draft or money order.

By completing and returning your personalised Entitlement and Acceptance Form with the requisite Application Monies or making a payment by BPAY, you:

  • a) agree to be bound by the terms of this booklet and the rules of Zambezi’s constitution;

  • b) authorise Zambezi to register you as the holder(s) of the New Shares allotted to you;

  • c) declare that all details and statements made in the Entitlement and Acceptance Form are complete and accurate;

  • d) declare that you are over 18 years of age and have full legal capacity and power to perform all your rights and obligations under the Entitlement Offer;

  • e) acknowledge that once Zambezi receives the Entitlement and Acceptance Form or your payment by BPAY, you may not withdraw it except as allowed by law;

  • f) agree to apply for, and be issued with up to, the number of New Shares that you apply for at the Offer Price of $0.02 per New Share;

  • g) authorise Zambezi and its officers or agents to do anything on your behalf necessary for the New Shares to be issued to you, including to act on instructions of Zambezi’s Share Registry upon using the contact details set out in the Entitlement and Acceptance Form;

  • h) declare that you are the current registered holder(s) of the Shares in your name at the Record Date;

  • i) acknowledge that the information contained in this booklet is not investment advice or a recommendation that New Shares are suitable for you, given your investment objectives, financial situation or particular needs;

  • j) represent and warrant that the law of any other place does not prohibit you from being given this booklet or making an application for New Shares; and

  • k) represent and warrant that you are an Eligible Shareholder and have read and understood this Offer Booklet and the Entitlement and Acceptance Form and that you acknowledge the matters, and make the warranties and representations and agreements contained in this booklet and the Entitlement and Acceptance Form.

In addition, by completing and returning your personalised Entitlement and Acceptance Form with the requisite Application Monies or making a payment by BPAY, you will be deemed to have acknowledged, represented and warranted on behalf of each person on whose account you are acting that:

29

  • a) you are not in the United States and are not a U.S Person, and are not acting for the account or benefit of, a U.S. Person and are not otherwise a person to whom it would be illegal to make an offer or issue New Shares under the Entitlement Offer;

  • b) you acknowledge that the Entitlements and the New Shares have not been, and will not be, registered under the Securities Act or the securities laws of any state or other jurisdictions in the United States, or in any other jurisdiction outside Australia or New Zealand and accordingly, the New Shares may not be offered, sold or otherwise transferred except in accordance with an available exemption from, or in a transaction not subject to, the registration requirements of the Securities Act and any other applicable securities laws; and

  • c) you have not and will not send any materials relating to the Entitlement Offer to any person in the United States or that is a U.S. Person, or is acting for the account or benefit of a U.S. Person.

Payment by BPAY

For payment by BPAY please follow the instructions on the personalised Entitlement and Acceptance Form. You can only make a payment via BPAY if you are the holder of an account with an Australian financial institution that supports BPAY transactions.

Please note that should you choose to pay by BPAY:

  • you do not need to submit the personalised Entitlement and Acceptance Form but are taken to make the declarations on that Entitlement and Acceptance Form; and

  • if you do not pay for your full Entitlement, you are deemed to have taken up your Entitlement in respect of such whole number of New Shares which is covered in full by your Application Monies.

It is your responsibility to ensure that your BPAY payment is received by the Zambezi Share Registry by no later than 5:00pm (Perth time) on 2 September 2011. Practically, given that BPAY closes at 4:00pm (Perth time), you will need to ensure that your payment is received by that time. You should be aware that your financial institution may implement earlier cut-off times with regards to electronic payment, and you should therefore take this into consideration when making payment.

Any Application Monies received for more than your final allocation of New Shares and Additional New Shares will be refunded as soon as practicable after the close of the Entitlement Offer. No interest will be paid to Applicants on any Application Monies received or refunded.

Payment by cheque, bank draft or money order

For payment by cheque, bank draft or money order, you should complete your Entitlement and Acceptance Form in accordance with the instructions on the Form and return it accompanied by a cheque, bank draft or money order in Australian currency for the amount of the Application Monies, payable to “Zambezi Resources Limited” and crossed “Not Negotiable”.

30

Your cheque, bank draft or money order must be:

  • for an amount equal to A$0.02 multiplied by the number of New Shares (including any Additional New Shares) that you are applying for; and

  • in Australian currency drawn on an Australian branch of a financial institution.

You should ensure that sufficient funds are held in relevant account(s) to cover the Application Monies as your cheques will be processed on the day of receipt. If the amount of your cheque for Application Monies (or the amount for which the cheque clears in time for allocation) is insufficient to pay in full for the number of New Shares you have applied for in your personalised Entitlement and Acceptance Form, you will be taken to have applied for such lower number of whole New Shares as your cleared Application Monies will pay for (and to have specified that number of New Shares on your Entitlement and Acceptance Form). Alternatively, your application will not be accepted.

Any Application Monies received for more than your final allocation of New Shares and Additional New Shares will be refunded as soon as practicable after the close of the Entitlement Offer. No interest will be paid to Applicants on any Application Monies received or refunded.

Cash payments will not be accepted. Receipts for payment will not be issued.

7 Mail

To participate in the Entitlement Offer, your payment must be received no later than the close of the Entitlement Offer at 5:00pm (Perth time) on 2 September 2011. Shareholders who make payment via cheque, bank draft or money order should mail their completed personalised Entitlement and Acceptance Form together with Application Monies to:

Zambezi Share Registry C/- Computershare Investor Services Pty Limited PO Box D182 Perth WA 6840

31

Important Information

This booklet (including the ASX announcements reproduced in it) and enclosed personalised Entitlement and Acceptance Form have been prepared by Zambezi. The information in this booklet is dated 8 August 2011 (other than the ASX announcements reproduced in it).

No party other than Zambezi has authorised or caused the issue of the information in this booklet, or takes any responsibility for, or makes, any statements, representations or undertakings in the information in this booklet.

The information in this booklet is important and requires your immediate attention.

You should read the information in this booklet carefully and in its entirety before deciding whether to invest in New Shares. In particular, you should consider the risk factors outlined in “Key Risks” section of the investor presentation released to ASX on 8 August 2011, any of which could affect the operating and financial performance of Zambezi or the value of an investment in Zambezi.

Zambezi has applied for the grant by ASX of official quotation of the New Shares. It is expected that normal trading will commence in relation to New Shares issued under the Entitlement Offer on 13 September 2011. Zambezi disclaims all liability (to the maximum extent permitted by law) to persons who trade New Shares before the New Shares are listed on the official list of ASX or receiving their confirmation of issue, whether on the basis of confirmation of the allocation provided by Zambezi or the Zambezi Share Registry.

1 Not a prospectus

The Entitlement Offer complies with the requirements of section 708AA of the Corporations Act as notionally modified by ASIC Class Orders [CO 07/571] and [CO 08/35]. Neither this Offer Booklet nor the Entitlement and Acceptance Form is a prospectus for the purposes of the Corporations Act. Accordingly, these documents do not contain all of the information which a prospective investor may require to make an investment decision. They do not, and are not required to, contain all of the information which would otherwise be required to be disclosed in a prospectus. They are not required to be, and will not be, lodged with ASIC. This Offer Booklet should be read in conjunction with Zambezi’s other periodic and continuous disclosure announcements to the ASX available at www.asx.com.au.

The New Shares being offered under this booklet are being offered to Eligible Shareholders with registered addresses in New Zealand in reliance on the Securities Act (Overseas Companies) Exemption Notice 2002 (NZ). This booklet is not an investment statement or prospectus under New Zealand law, and may not contain all the information that an investment statement or prospectus under New Zealand law is required to contain.

32

2 Continuous disclosure

Zambezi is a ‘disclosing entity’ under the Corporations Act and is subject to regular reporting and disclosure obligations under the Corporations Act and the ASX Listing Rules, including the preparation of annual reports and half-yearly reports.

Zambezi is required to notify the ASX of information about specific events and matters as they arise for the purposes of the ASX making that information available to the stock markets conducted by the ASX. In particular, Zambezi has an obligation under the ASX Listing Rules (subject to certain exceptions) to notify the ASX immediately of any information of which it is or becomes aware which a reasonable person would expect to have a material effect on the price or value of its shares. That information is available to the public from the ASX.

3 Eligible Shareholders

The information in this booklet contains an offer of New Shares to Eligible Shareholders in Australia or New Zealand and has been prepared in accordance with section 708AA of the Corporations Act as notionally modified by ASIC Class Orders [CO 07/571] and [CO 08/35].

Eligible Shareholders are those holders of Shares who:

  • are registered as a holder of Shares as at 5:00pm (Perth time) on 16 August 2011;

  • have a registered address in Australia or New Zealand;

  • are not in the United States and are neither a U.S. Person nor acting for the account or benefit of a U.S. Person; and

  • are eligible under all applicable securities laws to receive an offer under the Entitlement Offer.

4 Additional New Shares

Zambezi reserves the right to allot any Additional New Shares to the extent that Zambezi so determines in its absolute discretion, having regard to the circumstances as at the time of the close of the Entitlement Offer. Any New Shares in excess of Entitlements will be limited to the extent that there are sufficient New Shares from Eligible Shareholders who do not take up their full Entitlements or from New Shares that would have been offered to Ineligible Shareholders if they had been entitled to participate in the Entitlement Offer.

If you apply for Additional New Shares then, subject to Zambezi’s absolute discretion to scale-back your application for Additional New Shares (in whole or part), you will be issued these on 13 September 2011. Zambezi’s decision on the number of Additional New Shares to be allocated to you will be final.

5 No cooling off rights

Cooling off rights do not apply to an investment in New Shares. You cannot, in most circumstances, withdraw your application for New Shares once it has been accepted.

33

6 No Entitlements trading

Entitlements are non-renounceable and cannot be traded on ASX or any other exchange, nor can they be privately transferred.

7 Not investment advice

The information in this booklet is not a prospectus under the Corporations Act and has not been lodged with ASIC. Neither is it financial product advice, and it has been prepared without taking into account your investment objectives, financial circumstances or particular needs. Zambezi is not licensed to provide financial product advice in respect of the New Shares. The information in this booklet does not purport to contain all the information that you may require to evaluate a possible application for New Shares.

Before deciding whether to apply for New Shares, you should consider whether they are a suitable investment for you in light of your own investment objectives and financial circumstances and having regard to the merits or risks involved. If, after reading the information in this booklet, you have any questions about the Entitlement Offer, you should contact your stockbroker, accountant or other independent professional adviser.

8 Taxation

Taxation implications will vary depending on the individual circumstances of individual investors. You should obtain your own professional advice before deciding whether to invest.

9 Rounding of Entitlements

Where fractions arise in the calculation of Entitlements, they will be rounded up to the nearest whole number of New Shares.

10 Information availability

Eligible Shareholders in Australia and New Zealand can obtain a copy of this booklet during the period of the Entitlement Offer on the ASX website at www.asx.com.au or by calling the Zambezi Share Registry. Persons who access the electronic version of this booklet should ensure that they download and read the entire booklet. The electronic version of this booklet on the ASX website will not include an Entitlement and Acceptance Form. A replacement Entitlement and Acceptance Form can be requested by calling the Zambezi Share Registry on 08 9323 2000 (within Australia) or +61 (0) 8 9323 2000 (from outside Australia) at any time from 8.30am to 5pm (Perth time) Monday to Friday during the Entitlement Offer Period.

Neither the information in this booklet nor the accompanying Entitlement and Acceptance Form constitutes an offer of securities for sale in the United States or to persons that are, or are acting for the account or benefit of, a U.S. Person. Neither this information nor the accompanying Entitlement and Acceptance Form may be distributed to or relied upon by persons in the United States or that are, or are acting on behalf of or for the account or benefit of, a U.S. Person, or otherwise distributed in the United States.

34

11 Future performance and forward-looking statements

Neither Zambezi nor any other person warrants or guarantees the future performance of the New Shares or any return on any investment made pursuant to the Entitlement Offer. Forward-looking statements, opinions and estimates provided in the information in this booklet are based on assumptions and contingencies which are subject to change without notice, as are statements about market and industry trends, which are based on interpretations of current market conditions.

Forward-looking statements including forecasts, projections, guidance on future earnings and estimates are provided as a general guide only and should not be relied upon as an indication or guarantee of future performance. They are subject to known and unknown risks, uncertainties and assumptions, many of which are outside the control of Zambezi and the Board, which could cause actual results, performance or achievements to differ materially from future results, performance or achievements expressed or implied by any forward-looking statements in this booklet.

12 Past performance

Investors should note that the past share performance of Zambezi shares provides no guidance as to future price performance.

13 Governing law

This booklet, the Entitlement Offer and the contracts formed on acceptance of the Entitlement and Acceptance Forms are governed by the laws applicable in Western Australia, Australia. Each applicant for New Shares submits to the non-exclusive jurisdiction of the courts of Western Australia, Australia.

14 Foreign jurisdictions

The information in this booklet has been prepared to comply with the requirements of the securities laws of Australia and New Zealand.

The New Shares being offered under the information in this booklet are being offered to Eligible Shareholders with registered addresses in New Zealand in reliance on the Securities Act (Overseas Companies) Exemption Notice 2002 (New Zealand). The information in this booklet is not an investment statement or prospectus under New Zealand law, and may not contain all the information that an investment statement or prospectus under New Zealand law is required to contain.

The information in this booklet does not constitute an offer in any jurisdiction in which, or to any person to whom, it would not be lawful to make such an offer. No action has been taken to register or qualify the Entitlement Offer, the Entitlements or the New Shares, or otherwise permit the public offering of the New Shares, in any jurisdiction other than Australia and New Zealand. Shareholders who are nominees, trustees or custodians are therefore advised to seek independent advice as to how to proceed.

The distribution of the information in this booklet (including an electronic copy) outside Australia and New Zealand is restricted by law. If you come into possession of the information in this booklet, you should observe such restrictions and should seek your own advice on such restrictions.

35

Any non-compliance with these restrictions may contravene applicable securities laws. The Entitlements and the New Shares have not been, or will not be, registered under the Securities Act or the securities laws of any state or other jurisdiction of the United States. The Entitlements may not be taken up by persons in the United States or by persons who are, or are acting for the account or benefit of a U.S. Person, and the New Shares may not be offered, sold or resold in the United States or to, or for the account or benefit of, a U.S. Person, except in a transaction exempt from, or not subject to, the registration requirements of the Securities Act and the applicable securities laws of any state or other jurisdiction in the United States. Accordingly, the New Shares may constitute “restricted securities” within the meaning of Rule 144(a)(3) under the Securities Act and, for so long as the New Shares remain restricted securities, the New Shares may not be deposited in any unrestricted American Depositary Receipt facility with respect to the securities of Zambezi.

15 Underwriting

The Rights Issue is not currently underwritten, but the Company will seek underwriters for the Rights Issue before it closes.

16 Option holders

Existing option holders will not be entitled to participate in the Entitlement Offer unless they:

  • have become entitled to exercise their existing options under the terms of their issue and do so prior to the Record Date; and

  • participate in the Entitlement Offer as a result of being a holder of Shares registered on the register of Zambezi on the Record Date.

17 Disclaimer of representations

No person is authorised to give any information, or to make any representation, in connection with the Entitlement Offer that is not contained in this booklet.

Any information or representation that is not in this booklet may not be relied on as having been authorised by Zambezi, or its related bodies corporate in connection with the Entitlement Offer. Except as required by law, and only to the extent so required, none of Zambezi, or any other person, warrants or guarantees the future performance of Zambezi or any return on any investment made pursuant to the information in this booklet.

36

Directory

Registered Australian Office

17 Ord Street West Perth WA 6005 Telephone: +61 (0) 8 6555 1879

Stock Exchange Listing

Zambezi ordinary shares are listed on the Australian Securities Exchange ( ASX ) (code: ZRL)

Website

To view annual reports, shareholder and company information, news announcements, background information on Zambezi’s businesses and historical information, visit Zambezi’s website at www.zambeziresources.com

Zambezi Share Registry

Computershare Investor Services Pty Limited Level 2, Reserve Bank Building 45 St Georges Terrace Perth, Western Australia 6000

Telephone: 08 9323 2000 (within Australia) and +61 (0)8 9323 2000 (outside Australia) open between 8.30am and 5pm (Perth time) Monday to Friday during the Entitlement Offer Period.

Shareholders who make payment via cheque, bank draft or money order should mail their completed personalised Entitlement and Acceptance Form together with Application Monies to: Zambezi Share Registry C/- Computershare Investor Services Pty Limited PO Box D182 Perth, Western Australia 6840

37