POSITIVE METALLURGICAL TEST WORK RESULTS FROM MOUNT PEAKE (NT) CONTINUE TO IMPROVE PROJECT POTENTIAL

HIGHLIGHTS

  • Test work confirms that Mount Peake ore is amenable to upgrading via low-cost magnetic separation

  • Significant improvement in vanadium head grade from 0.3% V2O5 up to 1.2% V2O5 achieved by magnetic separation and minimal regrinding

  • Test work achieves high V205 recovery of 85-97% in 40% of the mass

  • Maximum iron head grade of 66% Fe achieved from upgrading original head grade of 32% Fe

  • The titanium grade also showed an upgrade from a head grade of 9.4% TiO2 to 16% TiO2

  • Positive initial results from assessment of low-cost processing options

  • Recovery of all three components, vanadium, titanium and iron currently being explored

Australian resources company TNG Limited (ASX: TNG) is pleased to report further encouraging results from ongoing metallurgical test work being carried out at the Company‟s 100%-owned Mount Peake Vanadium Project in the Northern Territory ( see Figure 1 ).

The updated test work results – which follow the recent 30% increase the Inferred Resource for the Mount Peake Project to 140 Mt @ 0.30 % V2O5, 5.9 % TiO2, 29% Fe – represent another positive development for the Project, highlighting the potential to recover a high-grade vanadium pentoxide (V2O5) concentrate, as well as to extract the other metals, iron and titanium.

ASX: Mount Peake Results

TNG‟s metallurgical consultants, Mineral Engineering Technical Services Pty Ltd (“METS”), have designed and managed the metallurgical test work program. METS has in-depth experience with vanadium deposits, particularly with Australian projects, and is well suited to evaluate the Mount Peake mineralisation.

Initial test work confirmed that a high-grade vanadium pentoxide (V2O5) concentrate can be produced from the Mount Peake mineralisation. Further test work has been aimed at optimising the grade and recovery, and exploring processing options.

Results from new magnetic separation beneficiation test work have been highly encouraging. The ore responded well to coarse cobbing, giving an upgrade from 0.3% V2O5 to 0.5-0.8% V2O5. High V2O5 recovery at 85-97% was obtained ( see Table 1 below ). This high rejection of barren material at a coarse size reduces the load on the downstream processing and therefore reduces the processing cost.

Drill
Hole
Grind size
(mm)
Fe Grade
(%)
V2O5Grade
(%)
TiO2Grade
(%)
Stream
MPRC001 -3.35 Mags 30.8 0.6 10.8
-1.0 Mags 34.8 0.7 12.8
-0.5 Mags 31.1 0.6 10.9
Feed Grade 18.4 0.3 5.0
MPRC002 -3.35 Mags 34.4 0.7 10.6
-1.0 Mags 38.5 0.8 12.6
-0.5 Mags 40.3 0.8 13.0
Feed Grade 23.4 0.3 6.4
MPRC003 -3.35 Mags 34.3 0.5 8.0
-1.0 Mags 35.4 0.5 8.6
-0.5 Mags 39.3 0.7 10.2
Feed Grade 29.3 0.3 5.6
MPRC004 -3.35 Mags 29.5 0.5 7.8
-1.0 Mags 33.8 0.6 9.8
-0.5 Mags 35.8 0.6 10.5
Feed Grade 23.6 0.3 5.5
MPRC006 -3.35 Mags 32.0 0.6 10.3
-1.0 Mags 33.9 0.6 11.1
-0.5 Mags 31.6 0.6 9.9
Feed Grade 20.1 0.3 5.3

Table 1: Course cobbing results

Re-grinding the cobbing magnetic concentrate to P100 75 m resulted in a further upgrade in the magnetic concentration. The V2O5 grade was increased to 0.9-1.2%, a grade that is suitable for both pyrometallurgical and hydrometallurgical processing. Again, a high recovery of V2O5 at 80-94% was achieved.

Davis tube recovery tests performed on additional samples from a recent drilling campaign in November 2009 have improved on the previous results, producing a vanadium-rich titanomagnetite grading 1.0-1.3% V2O5. This work has confirmed that the Mount Peake ores exhibit good potential to be upgraded by low-cost magnetic separation processing.

ASX: Mount Peake Results

Preliminary test work showed that the samples are amenable to conventional pyrometallurgical processing (salt roasting followed by water leaching), giving an initial V2O5 extraction efficiency of 70%. This value aligned well with the typical values achieved from other titanomagnetite type ore.

As an alternative to the conventional salt roasting, the magnetic concentrate was also found to be amenable to hydrometallurgical processing. A high vanadium extraction of 98% was achieved using acid leaching. About 83-99% of the iron was also co-extracted with the vanadium.

Preliminary test results showed that the iron can be separated from the vanadium by solvent extraction, generating an iron solution with purity of 99.6% FeCl3. Optimisation of the solvent extraction test work programme is underway and will be reported at the completion of the sighter test.

Overall, the test work completed to date has demonstrated that the Mount Peake deposit has no mineralogical issues that would inhibit the response of the ore to magnetic separation beneficiation. The ore is not refractory and is highly amenable to hydrometallurgical processing. The hydrometallurgical test route allows more than a single product to be generated, which could have a positive impact on the project economics.

Solvent extraction tests are in progress to generate high purity vanadium, iron and titanium products. The results and interpretations will be reported at the completion of the metallurgical programme.

In addition, the beneficiation potential of the low grade materials (<0.3% V2O5) by magnetic separation at coarse size and/or screening are currently being investigated.

Yours faithfully TNG LIMITED Paul Burton Director & CEO.

March 4[th] 2010.

Competent Person’s Statement

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Paul Burton who is a Member of The Australasian Institute of Mining and Metallurgy and a Director of TNG Limited. Paul Burton has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the „Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves‟. Paul Burton consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Mineral Resources is based on information compiled by Michael Andrew who is a Member of The Australasian Institute of Mining and Metallurgy and a full time employee of Snowden Mining Industry Consultants Pty Ltd. Michael Andrew has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the „Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves‟. Michael Andrew consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Mr Damian Connelly, MAAusIMM, Chartered Processional (MET), MMICA, MSME, MSAIMM was responsible for the preparation of the metallurgical test work results reported herein. Mr Connelly has sufficient experience to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for

ASX: Mount Peake Results

Reporting of the Exploration Results, Mineral Resources and Ore Reserves. Mr Connelly consents to the inclusion in the report of the matters based on his information in the form and context in which is appears.

Forward-Looking Statements

This report contains „forward-looking information‟ that is based on the Company‟s expectations, estimates and projections as of the date on which the statements were made. This forward-looking information includes, among other things, statements with respect to the Company‟s business strategy, plans, objectives, performance, outlook, growth, cash flow, earnings per share and shareholder value, projections, targets and expectations, mineral reserves and resources, results of exploration and related expenses, property acquisitions, mine development, mine operations, drilling activity, sampling and other data, grade and recovery levels, future production, capital costs, expenditures for environmental matters, life of mine, completion dates, and currency exchange rates. Generally, this forward-looking information can be identified by the use of forward-looking terminology such as „outlook‟, „anticipate‟, „project‟, „target‟, „likely‟, „believe‟, „estimate‟, „expect‟, „intend‟, „may‟, „would‟, „could‟, „should‟, „scheduled‟, „will‟, „plan‟, „forecast‟ and similar expressions. Persons reading this report are cautioned that such statements are only predictions, and that the Company‟s actual future results or performance may be materially different.

Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the Company‟s actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking information. Forward-looking information is developed based on assumptions about such risks, uncertainties and other factors set out herein, including but not limited to the risk factors set out in the Company‟s Annual Information Form.

This list is not exhaustive of the factors that may affect our forward-looking information. These and other factors should be considered carefully and readers should not place undue reliance on such forward-looking information. The Company disclaims any intent or obligations to update or revise any forward-looking statements whether as a result of new information, estimates or options, future events or results or otherwise, unless required to do so by law.

Enquiries: Paul E Burton Director & CEO + 61 (0) 8 9327 0900 Nicholas Read Read Corporate + 61 (0) 419 929 046

ASX: Mount Peake Results

==> picture [488 x 381] intentionally omitted <==

Figure 1: Project Location Map

ASX: Mount Peake Results