Texmaco Rail & Engineering Limited Capital/Financing Update 2025

Oct 29, 2025

61835_rns_2025-10-29_de8e5632-109f-45d0-8b93-e8899cb680a0.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [595 x 95] intentionally omitted <==

29[th] October, 2025

National Stock Exchange of India Ltd. Exchange Plaza, C-1, Block G, Bandra Kurla Complex Bandra (E), Mumbai – 400051 Symbol – TEXRAIL

BSE Limited P. J. Towers, Dalal Street, Mumbai – 400001 Scrip Code – 533326

Dear Sirs,

Pursuant to Regulation 30, we wish to inform you that Central Railway has awarded an order of Rs. 33.89 crores for Design, manufacture, supply of associated equipments, erection, testing & commissioning of 132kV/55kV (2*25kV System) Scott Connected transformer along with sectioning & Paralleling Post (SP) and Sub-sectioning & Paralleling Post (SSP) in Beed-Parli section in connection with Ahmadnagar-Beed-Parli New BG Line of Central Railway.

The details as required under the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015 read with SEBI Circular No. SEBI/HO/CFD/PoD2/CIR/P/0155 dated 11[th] November, 2024 are provided hereunder:

Sl. No Particulars Details
1. Name of the entity awarding the Central Railway
order(s)/contract(s)
2. significant terms and conditions of Design, manufacture, supply of associated
order(s)/contract(s) awarded in brief equipments,erection,testing&
commissioning of 132kV/55kV (2*25kV
System) Scott Connected transformer along
with sectioning & Paralleling Post (SP) and
Sub-sectioning & Paralleling Post (SSP) in
Beed-Parli section in connection with
Ahmadnagar-Beed-Parli New BG Line of
Central Railway.
3. whether order(s) / contract(s) have Domestic
beenawarded by domestic/
international entity
4. nature of order(s) / contract(s) Design, manufacture, supply of associated
equipments,erection,testing&
commissioningof 132kV/55kV(2*25kV

==> picture [595 x 95] intentionally omitted <==

==> picture [595 x 95] intentionally omitted <==

System) Scott Connected transformer alongwith sectioning & Paralleling Post (SP) andSub-sectioning & Paralleling Post (SSP) inBeed-Parli section in connection withAhmadnagar-Beed-Parli New BG Line ofCentral Railway.
5. whether domestic or international Domestic
6. time period by which the order(s) /contract(s) is to be executed To be completed within 12 months from thedate of issuance of the letter of acceptance.
7. broad consideration or size of theorder(s)/contract(s) Rs. 33.89 crores
8. whether the promoter/ promotergroup / group companies have anyinterest in the entity that awarded theorder(s)/ contract(s)? If yes, nature ofinterest and details thereof No
9. whethertheorder(s)/contract(s)would fall within related partytransactions? If yes, whether the sameis done at “arm’s length” No

This is for your information and record.

Yours faithfully,

For Texmaco Rail & Engineering Limited

SANDEEP KUMAR Digitally signed by SANDEEP KUMAR SULTANIA SULTANIA Date: 2025.10.29 17:41:12 +05'30'

Sandeep Kumar Sultania Company Secretary & Compliance Officer