Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

TESORO GOLD LTD Interim / Quarterly Report 2023

Jul 25, 2023

65957_rns_2023-07-25_59302c9b-c0c6-4802-ad56-92e883b65151.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

Sign up HERE to our Investor Hub

==> picture [136 x 95] intentionally omitted <==

----- Start of picture text -----

ASX: TSO OTCQB: TSORF
----- End of picture text -----

ASX ANNOUNCEMENT 26 JULY 2023

QUARTERLY ACTIVITIES AND CASHFLOW REPORT

FOR THE PERIOD ENDED 30 JUNE 2023

Tesoro Gold Limited (ASX: TSO, OTCQB: TSORF) ( Tesoro or the Company ) is pleased to report on its activities for the quarter ended 30 June 2023 (the Quarter ).

HIGHLIGHTS

  • El Zorro Gold Project Phase 1 Scoping Study outcomes confirmed a technically and financially robust initial stand-alone open pit mining and processing operation[1] .

  • Assays returned from the January 2023 drilling program confirmed further extensional mineralisation at Ternera.

  • Results indicated shallow, high-grade gold mineralisation extending along the Dorado Fault Zone ( DFZ ) and open to the south and extended west of Ternera.

  • Mapping and channel sampling results returned from Kitsune and Calderillas confirmed a mineralised fault corridor stretching north from Ternera.

  • Results indicated a vast >10km continuous mineralised system extending south of Ternera at Buzzard, north to Kitsune and continuing towards Calderillas.

  • Drilling commenced at the Kitsune target, approximately 2.5km north of the Ternera Deposit targeting a large surface gold anomaly.

  • Tesoro’s underlying ownership in the El Zorro Project increased to approximately 89.1% via recognition of historical aggregate capital contribution of approximately A$22.4 million since March 2021.

  • Cash balance of A$2.82 million and zero debt at 30 June 2023.

Tesoro Gold Managing Director, Zeff Reeves commented :

“Extremely promising El Zorro Project results were received through the Quarter from recent drilling, mapping and sampling activities which strongly indicate the presence of a vast, near-continuous, outcropping gold system over more than 10km which appears continuous to the north and south.

“We are also particularly excited to have commenced the maiden drilling program at Kitsune, testing a large 3.2km by 1.5km anomalous gold zone. Kitsune and other regional targets possess strong potential to be large high-grade extensions of the existing Ternera Resource and offer exceptional exploration and resource growth potential.”

  1. Refer to Tesoro ASX releases dated 4 April 2023. Tesoro is not aware of any new information or data that materially affects the information included in these ASX releases, and the Company confirms that, to the best of its knowledge, all material assumptions and technical parameters underpinning the estimates in these releases continue to apply and have not materially changed.

ASX ANNOUNCEMENT 26 JULY 2023

EL ZORRO GOLD PROJECT, CHILE

Completion of Phase 1 Scoping Study

On 4 April 2023, the Company presented the outcomes of a Phase 1 Scoping Study, demonstrating the potential development of an initial, gold mining and processing operation at the Ternera Gold Deposit within the El Zorro Gold Project in Chile. The Scoping Study was assessed on a 100% basis (Tesoro 85%) which confirmed that an initial starter open pit at the El Zorro Gold Project presents a technically and commercially viable development opportunity.

For the full details on the Phase 1 Scoping Study, refer to the ASX Announcement dated 4 April 2023.

Further extensional mineralisation intercepted at Ternera

On 11 May 2023, Tesoro announced it had received initial assay results from 10 of the 17 drill holes completed in the January 2023 drilling program. These initial assay results confirmed the location of the mineralised DFZ and associated gold-bearing structures.

The DFZ is a 20m to 100m wide zone of faulting and associated brecciation, quartz veining and alteration that has been mapped over 10km from south to north (refer Figure 2). Best results include:

  • 7.80m @ 2.78g/t Au from 16m (ZDDH0317), including;

  • 5.00m @ 3.76g/t Au from 18m.

  • 1.36m @ 9.00g/t Au from 54m (ZDDH0317).

  • 4.60m @ 3.35g/t Au from 14m (ZDDH0319A), including;

  • 2.50m @ 5.48g/t Au from 14m.

  • 11.10m @ 0.86g/t Au from 104m (ZDDH0320), including;

  • 2.00m @ 3.00g/t Au from 113m.

  • 1.00m @ 44.00g/t Au from 215m (ZDDH0320).

  • 7.00m @ 2.04g/t Au from 306m (ZDDH0320), including;

  • 1.00m @ 7.43g/t Au from 306m.

Assays returned from hole ZDDH0313 approximately 300m to the north of the Ternera MRE included 1.40m @ 3.39g/t Au from 146m.

Several holes failed to intercept the DFZ and returned no significant intercepts. The main host rock for gold at Ternera is the intrusive El Zorro Tonalite ( EZT ), however significant results from holes ZDDH0313, ZDDH0317, ZDDH0319A and ZDDH0320 reported within the DFZ, are hosted within sedimentary rocks, indicating the potential for extension of the Ternera Gold Deposit across all rock types.

TESOROGOLD.COM.AU

2

ASX ANNOUNCEMENT 26 JULY 2023

Southern Ternera extension

Tesoro received the final seven assay results from the January 2023 drilling program on 21 June 2023. Best results included:

  • 0.40m @ 8.81g/t Au from 156.60m (ZDDH0322).

  • 1.10m @ 1.28g/t Au from 24.30m (ZDDH0323), and;

  • 9.30m @ 0.98g/t Au from 42.20m, including;

  • 2.50m @ 1.93g/t Au from 42.20m; and

  • 1.85m @ 2.05g/t Au from 48.80m.

  • 13.73m @ 0.76g/t Au from 53.90m (ZDDH0324A), including;

  • 1.50m @ 1.77g/t Au from 54.50m;

  • 1.30m @ 4.07g/t Au from 65.00m; and

  • 0.50m @ 3.18g/t Au from 112.00m.

  • 4.50m @ 1.32g/t Au from 215m (ZDDH0325).

Continuous shallow gold mineralisation also extended to the west of the Ternera Gold Deposit, providing further target zones for resource growth drilling:

  • 3.00m @ 2.70g/t Au from 16m (ZDDH0321), including;

  • 1.00m @ 7.63g/t Au from 9m.

Holes ZDDH0322 to ZDDH0325 all targeted the southern extension of the DFZ and confirmed the continuity of gold mineralisation within the DFZ up to 420m south of the existing Ternera 1.3Moz MRE boundary (refer ASX announcement 9 March 2023).

Hole ZDDH0321 was drilled targeting the southern extension of a high-grade shallow gold zone in the west of the Deposit. The hole returned a positive result, confirming the location and continuity of gold mineralisation over 400m and sitting outside the existing MRE.

Vast continuous gold anomalism confirmed at El Zorro

On 24 May 2023, the Company announced new assay results were received for 261 samples collected from detailed channel sampling and mapping programs at the Kitsune and Calderillas targets. The field mapping and sampling programs were intended to build upon promising results from previously conducted sampling programs and to define additional Ternera look-alike targets.

The new results have confirmed a >10km anomalous gold zone stretching from the Buzzard target south of Ternera, through Ternera, Kitsune and Calderillas in the north.

The channel sample assays returned from individual intrusive dykes at Kitsune exhibit continuous gold anomalism along 930m of strike, with significant results including:

• 18.00m @ 1.59g/t Au (EZTR003853), including;

TESOROGOLD.COM.AU

3

ASX ANNOUNCEMENT 26 JULY 2023

  • 6.00m @ 4.14g/t Au.

  • 66.00m @ 0.32g/t Au (EZTR003842), including;

  • 9.00m @ 1.22g/t Au.

  • 3.00m @ 6.25g/t Au (EZTR003850).

The channel sampling at Calderillas returned very high-gold grades, including:

  • 2.00m @ 15.90g/t Au (EZTR003752); and

  • 2.00m @ 3.01g/t Au (EZTR003753).

Gold mineralisation is strongly controlled by the location of the DFZ, particularly where it crosses the favourable EZT intrusive rocks. At Kitsune, a >500m wide prospective corridor has been defined, characterised by brittle deformation and strong alteration with surface gold anomalism.

Numerous secondary structures branching off the DFZ, also host gold mineralisation with new results of up to 15.90g/t Au being reported at the Calderillas Target, approximately 7.5km north of Ternera. Additional work is planned to further delineate future drill targets at Calderillas.

Samples were collected as continuous rock chips, with prospective rock types outcropping at surface as fresh or weakly oxidised outcrops. This provides a high level of geological information about the nature and controls of gold mineralisation throughout the sampled areas.

Drilling commenced at the Kitsune and Toro Blanco targets

During the Quarter, Tesoro commenced drilling at the Kitsune Target, located approximately 2.5km north of the Ternera MRE. The Kitsune Target is approximately 2.2km wide, with continuous sampling along individual EZT dykes demonstrating continuous gold anomalism of up to 930m of strike.

The drilling program is designed to target the large surface gold anomaly where the DFZ crosses the favourable EZT lithologies. To date, the drilling of two holes of a planned six-hole program has been completed.

One hole has also been completed at the Toro Blanco Target, located approximately 1km north of Ternera with assays pending.

Increased ownership interest in El Zorro

Post Quarter end, Tesoro announced that its 95%-owned Chilean subsidiary Tesoro Mining Chile SpA (TMC), had increased its ownership stake in El Zorro to approximately 93.8%.

At a Shareholder Meeting held on 7 June 2023, El Zorro S.C.M resolved to increase the capital base via contribution on a pro-rated basis. TMC subscribed its pro-rata shares for

TESOROGOLD.COM.AU

4

ASX ANNOUNCEMENT 26 JULY 2023

CLP12,120,334,847 (Chilean pesos), an amount approximately equivalent to A$22.4 million. This sum reflects the funding of exploration and development activities at El Zorro since March 2021.

Wanaco SpA (Wanaco), the minority shareholder in El Zorro S.C.M. declined to participate in the capital increase, resulting in TMC increasing its ownership in El Zorro S.C.M. to approximately 93.8%.

Update on Wanaco dispute

Tesoro provided an update regarding a notice of dispute initiated by Wanaco and lodged with the 7th Civil Court de Santiago de Chile on August 2021 (ASX Announcement dated 26 August 2021). Wanaco is disputing the valuation and procedure followed for the capital increase approved in the Shareholders Meeting of El Zorro S.C.M. held on 11 February 2021.

Tesoro maintains its position (as stated in its ASX Announcement dated 26 August 2021) that all capital increases were properly valued and duly approved under Chilean Corporate Regulations and that Wanaco’s claim is spurious.

CORPORATE

Expenditure and payments to related parties

During the Quarter, the Company spent approximately A$2.04 million on exploration activities as summarised above, which comprised primarily of diamond drilling programs and surface mapping and sampling programs.

As outlined in the Appendix 5B for the Quarter ending 30 June 2023 (Sections 6.1 and 6.2), approximately A$192,232 in payments were made to related parties and/or their associates as remuneration (inc. superannuation) for the Managing Director, Non-Executive Director fees and Consulting fees.

Cash

Tesoro’s cash balance at 30 June 2023 was A$2.82 million and the Company had zero debt (excluding typical trade creditors).

Authorised by the Board of Tesoro Gold Ltd.

For more information:

Company :

Zeff Reeves, Managing Director Tesoro Gold Limited [email protected]

TESOROGOLD.COM.AU

5

ASX ANNOUNCEMENT 26 JULY 2023

==> picture [418 x 599] intentionally omitted <==

Figure 1 – Ternera Gold Deposit Drilling Plan on geology and results reported during the June 2023 quarter (ASX Announcement 21 June 2023). The map also shows the approximate position of the Dorado Fault Zone and associated open mineralised zone to the south of Ternera. Datum PSAD56 19S

TESOROGOLD.COM.AU

6

ASX ANNOUNCEMENT 26 JULY 2023

==> picture [433 x 654] intentionally omitted <==

Figure 3 – El Zorro Gold Project surface sampling results for the Ternera to Calderillas mineralised trend. Diamond symbols show the results locations for this report. Circle symbols denote previously announced results.

TESOROGOLD.COM.AU

7

ASX ANNOUNCEMENT 26 JULY 2023

Table 1 - Constrained Ternera MRE.

Area Au g/t
cut off
Indicated
Mt
Aug/t
Koz
Inferred
Mt
Aug/t
Koz
Total
Mt
Aug/t
Koz
Open Pit
Resource
Underground
Resource
0.30
1.50
22.5
1.10
795
0.1
2.64
7
10.0
1.18
379
1.2
2.64
100
32.5
1.13
1,175
1.3
2.64
107
Total Resources 22.6
1.11
802
11.2
1.34
479
33.7
1.18
1,282

The updated MRE has been constrained to a US$1,800/oz optimised pit shell, with the underground resource reported at a 1.50 g/t Au cut-off. The underground resource is reported at a cut-off where gold mineralisation is consistently well-developed below the optimised pit shell.

Table 2: Significant intercepts table for results reported 24 May 2023.

Table 2:Si gnificant interce pts tabl e for res ults reporte d 24 May 202 3.
Hole_ID **From(m) ** **To(m) ** **Interval ** Au(g/t) Comments Hole_ID **From(m) ** **To(m) ** **Interval ** Au(g/t) Comments
ZDDH0312 0.00 NSI ZDDH0319A 14.00 18.60 4.60 3.35
ZDDH0313 112.00 113.00 1.00 0.33 ZDDH0319A 14.50 17.00 2.50 5.48 including
ZDDH0313 146.00 147.40 1.40 3.39 ZDDH0319A 42.00 43.00 1.00 2.55
ZDDH0313 169.00 170.00 1.00 0.29 ZDDH0319A 81.00 82.00 1.00 0.46
ZDDH0313 179.00 180.00 1.00 0.34 ZDDH0319A 140.51 141.16 0.65 0.49
ZDDH0314 0.00 NSI ZDDH0320 103.90 115.00 11.10 0.86
ZDDH0315 0.00 NSI ZDDH0320 103.90 105.00 1.10 2.44 including
: ZDDH0316
ZDDH0317
16.20 24.00 0.00
7.80
2.78 NSI ZDDH0320
ZDDH0320
113.00
190.00
115.00
191.00
2.00
1.00
3.00
0.72
including
ZDDH0317 18.00 23.00 5.00 3.76 ZDDH0320 193.70 194.00 0.30 1.32
ZDDH0317 53.00 55.80 2.80 4.76 ZDDH0320 215.00 216.00 1.00 44.40
ZDDH0317 54.00 55.36 1.36 9.00 ZDDH0320 297.00 332.00 35.00 0.66
ZDDH0318 0.00 NSI ZDDH0320 298.00 313.00 15.00 1.20 including
ZDDH0319 11.00 12.00 1.00 0.40 ZDDH0320 306.00 313.00 7.00 2.04 including
ZDDH0319 14.80 15.60 0.80 0.70 ZDDH0320 306.00 307.00 1.00 7.43 including
ZDDH0319 19.00 20.00 1.00 0.56 ZDDH0320 318.50 319.25 0.75 1.62 including
ZDDH0320 331.00 332.00 1.00 1.46 including

Table 3: Significant intercepts table for results reported 21 June 2023. Results are uncut, no top cut has been applied. Refer Appendix 1 - JORC Tables for data aggregation criteria. Significant intercept is any intercept with grade x width >0.30.

Hole_ID
ZDDH0321
ZDDH0321
ZDDH0321
ZDDH0321
ZDDH0322
ZDDH0322
ZDDH0322
ZDDH0322
ZDDH0323
ZDDH0323
ZDDH0323
ZDDH0323
ZDDH0323
ZDDH0323
ZDDH0323
**From(m) ** **To(m) ** **Interval ** Au(g/t) Comments Hole_ID
ZDDH0324
**From(m) ** **To(m) ** **Interval ** Au(g/t) Comments
8.00 11.00 3.00 2.70 0.00 NSI(Abandoned)
9.00 10.00 1.00 7.63 including ZDDH0324A
ZDDH0324A
ZDDH0324A
53.90 67.63 13.73 0.76
28.00 39.00 11.00 0.32 54.50 56.00 1.50 1.77 including
32.71 33.47 0.76 1.38 including 65.00 66.30 1.30 4.07 including
156.60 157.00 0.40 8.81 ZDDH0324A 92.00 93.00 1.00 0.79
168.00 169.00 1.00 0.99 ZDDH0324A 112.00 112.50 0.50 3.18
173.00 173.90 0.90 0.72 ZDDH0325
ZDDH0325
ZDDH0325
ZDDH0325
95.50 97.00 1.50 0.43
182.60 183.00 0.40 0.51 110.00 114.50 4.50 1.32
24.30 25.40 1.10 1.28 110.00 112.80 2.80 1.98 including
42.20 51.50 9.30 0.98 213.00 214.00 1.00 0.54
42.20 44.70 2.50 1.93 including ZDDH0326
ZDDH0326
ZDDH0326
ZDDH0326
ZDDH0326
47.00 49.47 2.47 0.44
48.80 50.65 1.85 2.05 including 122.00 123.00 1.00 0.87
90.00 91.00 1.00 0.63 135.00 136.00 1.00 0.46
121.00 122.00 1.00 2.34 173.00 174.00 1.00 2.59
128.00
129.00 1.00 0.71 200.25 201.75 1.50 1.29

TESOROGOLD.COM.AU

8

ASX ANNOUNCEMENT 26 JULY 2023

Table 4: El Zorro Drill Hole location details for holes reported in this announcement. Datum PSAD56 19S.

Hole ID Hole Location Hole Location Hole Location Hole Orientation Hole Orientation Drill Depth
(m)
Northing Easting Elevatio
n
Dip Azimuth
ZDDH00312 341912 7035497 511 -60 240 336.70
ZDDH00313 341795 7036832 660 -60 350 263.13
ZDDH00314 341909 7035560 519 -60 240 200.00
ZDDH00315 341901 7035626 529 -60 240 250.10
ZDDH00316 341883 7035693 520 -60 240 213.60
ZDDH00317 341850 7035674 518 -60 240 100.07
ZDDH00318 341857 7035605 516 -60 240 100.00
ZDDH00319 341797 7035903 586 -60 240 47.40
ZDDH00319A 341799 7035907 589 -60 240 331.90
ZDDH00320 341850 7036000 631 -60 240 354.05
ZDDH00321 341561 7035926 575 -60 240 200.00
ZDDH00322 341884 7035899 603 -60 240 280.00
ZDDH00323 341830 7035825 581 -60 240 250.03
ZDDH00324 341865 7035735 548 -60 240 44.90
ZDDH00324A 341867 7035735 548 -60 240 150.00
ZDDH00325 341881 7035799 589 -60 240 264.00
ZDDH00326 341574 7035680 500 -60 60 249.00

Table 5: Significant intercepts Results above 0.30 g/t Au.

Table 5:Sign ificant interc epts Res ults abov e 0.3 0 g/t Au.
TARGET **TRENCH_ID ** **UTM_E ** UTM_N **dip ** **Azimuth ** **from(m) ** **to(m) ** **width_(m) ** **Auppm ** Comments
CALDERILLA EZTR003283 341665 7043881 0 65 0.00 1.00 1.00 0.57
CALDERILLA EZTR003751 343126 7043910 5 280 0.00 2.00 2.00 1.25
CALDERILLA EZTR003752 343343 7043809 10 65 0.00 2.00 2.00 15.90
CALDERILLA EZTR003753 343304 7043968 0 70 0.00 2.00 2.00 3.01
CALDERILLA EZTR003829 342225 7041411 0 80 0.00 1.00 1.00 0.73
Kitsune EZTR003842 341022 7039922 -5 60 0.00 66.00 66.00 0.32
Kitsune EZTR003842 341022 7039922 -5 60 15.00 18.00 3.00 1.27 including
Kitsune EZTR003842 341022 7039922 -5 60 42.00 66.00 24.00 0.59 including
Kitsune EZTR003842 341022 7039922 -5 60 57.00 66.00 9.00 1.22 including
Kitsune EZTR003850 340550 7039361 30 50 15.00 18.00 3.00 6.25
Kitsune EZTR003852 340583 7039397 10 73 6.00 12.00 6.00 1.20
Kitsune EZTR003853 340600 7039403 -12 48 6.00 24.00 18.00 1.59
Kitsune EZTR003853 340600 7039403 -12 48 6.00 12.00 6.00 4.14 including

TESOROGOLD.COM.AU

9

ASX ANNOUNCEMENT 26 JULY 2023

About Tesoro

Tesoro Gold Limited was established with a strategy o acquiring, exploring, and developing mining project in the Coastal Cordillera region of Chile. The Coasta Cordillera region is host to multiple world-class coppe and gold mines, has well-established infrastructure service providers and an experienced minin workforce. Large areas of the Coastal Cordiller remain unexplored due to the unconsolidated natur of mining concession ownership, but Tesoro, via its in country network and experience has been abl secure rights to a district scale gold project in-line wit the Company’s strategy. Tesoro’s 95% owned Chilea subsidiary owns 85% of the El Zorro Gold Project.

Competent Persons Statements

The information in this report that relates to Exploration Results is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of Geoscientists and a Director and shareholder of the Company. Mr Reeves has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.

The information in this report that relates to Mineral Resources is based on information compiled by Mr Lynn Widenbar, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Widenbar is acting as an independent consultant to Tesoro Gold Limited. Mr Widenbar has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The Company confirms that the form and context in which the results are presented and all material assumptions and technical parameters underpinning the estimates in the original market announcement continue to apply and have not materially changed have not been materially modified from the original announcements and that the form and context in which the Competent Person’s findings

are presented have not been materially modified from the original announcement on 9 March 2023.

Future Performance

This announcement may contain certain forwardlooking statements and opinions. Forward-looking statements, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and involve known and unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of the Company and which are subject to change without notice and could cause the actual results, performance or achievements of the Company to be materially different from the future results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or reasonableness of any forward-looking statements or other forecast. Nothing contained in this announcement, nor any information made available to you is, or and shall be relied upon as, a promise, representation, warranty or guarantee as to the past, present or the future performance of Tesoro.

==> picture [175 x 260] intentionally omitted <==

INVESTOR HUB

If you have any questions about this announcement, check out our Investor Hub. Like, comment, ask a question and view video summaries on important announcements. To sign up click here: HERE

TESOROGOLD.COM.AU

10

ASX ANNOUNCEMENT 26 JULY 2023

APPENDIX 1: CONCESSION SCHEDULE AS AT 30 JUNE 2023

EL ZORRO GOLD PROJECT EXPLORATION CONCESSIONS (85%* Tesoro Mining Chile SpA)

Concession Name Date of Expiration Size
(ha)
Concession
type
ZORRO1B 10-august-2026 200 Exploration
ZORRO2B 10-august-2026 200 Exploration
ZORRO 3B 10-august-2026 200 Exploration
ZORRO4B 10-august-2026 100 Exploration
ZORRO 5B 10-august-2026 200 Exploration
ZORRO 6B 10-august-2026 200 Exploration
PUNTA DE DIAMENTE 1A 17-august-2025 200 Exploration
PUNTA DE DIAMENTE 2A 06-august-2025 300 Exploration
PUNTA DE DIAMENTE3A 28-september-2025 300 Exploration
LA NEGRACOJA 1A 10-august-2025 200 Exploration
LA NEGRACOJA 2A 06-august-2025 300 Exploration
LA NEGRACOJA3A 10-august-2025 300 Exploration
LA NEGRACOJA 4A 06-august-2025 200 Exploration
LA NEGRACOJA5A 09-august-2025 300 Exploration
LA NEGRACOJA6A 11-august-2025 200 Exploration
LA NEGRACOJA7A 09-august-2025 300 Exploration
LA NEGRACOJA8A 11-august-2025 300 Exploration
LA NEGRACOJA9A 09-august-2025 200 Exploration
LA NEGRACOJA 10A 11-august-2025 300 Exploration
LA NEGRACOJA 11A 10-august-2025 300 Exploration
LA NEGRACOJA 12A 11-august-2025 200 Exploration
LA NEGRACOJA 13A 10-august-2025 300 Exploration
LA NEGRACOJA 14A 11-august-2025 300 Exploration
LA NEGRACOJA 15A 10-august-2025 300 Exploration
LA NEGRACOJA 16A 18-august-2025 200 Exploration
LA NEGRACOJA 17A 17-august-2025 300 Exploration
LA NEGRACOJA 18A 18-august-2025 300 Exploration
LA NEGRACOJA 19A 11-august-2025 200 Exploration
NICE BARREL 1 05-august-2025 200 Exploration
NICE BARREL 2 05-august-2025 300 Exploration
NICE BARREL3 06-august-2025 200 Exploration
NICE BARREL 4 05-august-2025 200 Exploration
NICE BARREL5 06-august-2025 200 Exploration
NICE BARREL6 05-august-2025 200 Exploration
NICE BARREL7 10-august-2025 200 Exploration
NICE BARREL 13 28-september-2025 300 Exploration
NICE BARREL 12 28-september-2025 200 Exploration
NICE BARREL 11 28-september-2025 300 Exploration
NICE BARREL 10 28-september-2025 200 Exploration
NICE BARREL9 28-september-2025 300 Exploration
NICE BARREL8 28-september-2025 200 Exploration
SIERRA PATACONES1 Replaced by SIERRA PATACONES 1A in process 300 Exploration

TESOROGOLD.COM.AU

11

ASX ANNOUNCEMENT 26 JULY 2023

Concession Name Date of Expiration Size
(ha)
Concession
type
SIERRA PATACONES2 Replaced by SIERRA PATACONES 2A in process 300 Exploration
SIERRA PATACONES 3 Replaced by SIERRA PATACONES 3A in process 300 Exploration
SIERRA PATACONES4 Replaced by SIERRA PATACONES 4A in process 300 Exploration
SIERRA PATACONES 5 Replaced by SIERRA PATACONES 5A in process 300 Exploration
SIERRA PATACONES 6 Replaced by SIERRA PATACONES 6A in process 300 Exploration
SIERRA PATACONES 7 Replaced by SIERRA PATACONES 7A in process 300 Exploration
SIERRA PATACONES 8 Replaced by SIERRA PATACONES 8A in process 300 Exploration
SIERRA PATACONES 9 Replaced by SIERRA PATACONES 9A in process 300 Exploration
SIERRA PATACONES10 Replaced by SIERRA PATACONES 10A in process 300 Exploration
SIERRA PATACONES11 Replaced by SIERRA PATACONES 11A in process 300 Exploration
SIERRA PATACONES12 Replaced by SIERRA PATACONES 12A in process 300 Exploration
SIERRA PATACONES13 Replaced by SIERRA PATACONES 13A in process 300 Exploration
SIERRA PATACONES14 Replaced by SIERRA PATACONES 14A in process 300 Exploration
SIERRA PATACONES15 Replaced by SIERRA PATACONES 15A in process 300 Exploration
SIERRA PATACONES20 Replaced by SIERRA PATACONES 20A in process 300 Exploration
SIERRA PATACONES19 Replaced by SIERRA PATACONES 19A in process 300 Exploration
SIERRA PATACONES18 Replaced by SIERRA PATACONES 18A in process 300 Exploration
SIERRA PATACONES17 Replaced by SIERRA PATACONES 17A in process 300 Exploration
SIERRA PATACONES16 Replaced by SIERRA PATACONES 16A in process 300 Exploration
SIERRA PATACONES21 Replaced by SIERRA PATACONES 21A in process 300 Exploration
SIERRA PATACONES22 Replaced by SIERRA PATACONES 22A in process 300 Exploration
SIERRA PATACONES23 Replaced by SIERRA PATACONES 23A in process 300 Exploration
SIERRA PATACONES24 Replaced by SIERRA PATACONES 24A in process 300 Exploration
SIERRA PATACONES25 Replaced by SIERRA PATACONES 25A in process 300 Exploration
SIERRA PATACONES26 Replaced by SIERRA PATACONES 26A in process 300 Exploration
SIERRA PATACONES27 Replaced by SIERRA PATACONES 27A in process 300 Exploration
SIERRA PATACONES28 Replaced by SIERRA PATACONES 28A in process 300 Exploration
SIERRA PATACONES29 Replaced by SIERRA PATACONES 29A in process 300 Exploration
SIERRA PATACONES 30 Replaced by SIERRA PATACONES 30A in process 300 Exploration
SIERRA PATACONES 31 Replaced by SIERRA PATACONES 31A in process 300 Exploration
SIERRA PATACONES 32 Replaced by SIERRA PATACONES 32A in process 300 Exploration
SIERRA PATACONES 33 Replaced by SIERRA PATACONES 33A in process 300 Exploration
SIERRA PATACONES 34 Replaced by SIERRA PATACONES 34A in process 300 Exploration
SIERRA PATACONES 35 Replaced by SIERRA PATACONES 35A in process 300 Exploration
SIERRA PATACONES42 Replaced by SIERRA PATACONES 42A in process 300 Exploration
SIERRA PATACONES41 Replaced by SIERRA PATACONES 41A in process 300 Exploration
SIERRA PATACONES40 Replaced by SIERRA PATACONES 40A in process 300 Exploration
SIERRA PATACONES 39 Replaced by SIERRA PATACONES 39A in process 300 Exploration
SIERRA PATACONES 38 Replaced by SIERRA PATACONES 38A in process 300 Exploration
SIERRA PATACONES 37 Replaced by SIERRA PATACONES 37A in process 300 Exploration

TESOROGOLD.COM.AU

12

ASX ANNOUNCEMENT 26 JULY 2023

Concession Name Date of Expiration Size
(ha)
Concession
type
SIERRA PATACONES 36 Replaced by SIERRA PATACONES 36A in process 300 Exploration
SIERRA PATACONES43 Replaced by SIERRA PATACONES 43A in process 300 Exploration
SIERRA PATACONES44 Replaced by SIERRA PATACONES 44A in process 300 Exploration
SIERRA PATACONES45 Replaced by SIERRA PATACONES 45A in process 300 Exploration
SIERRA PATACONES46 Replaced by SIERRA PATACONES 46A in process 300 Exploration
SIERRA PATACONES47 Replaced by SIERRA PATACONES 47A in process 300 Exploration
SIERRA PATACONES48 Replaced by SIERRA PATACONES 48A in process 300 Exploration
SIERRA PATACONES49 Replaced by SIERRA PATACONES 49A in process 300 Exploration
SIERRA PATACONES 50 Replaced by SIERRA PATACONES 50A in process 300 Exploration
SIERRA PATACONES 51 Replaced by SIERRA PATACONES 51A in process 300 Exploration
SIERRA PATACONES 53 Replaced by SIERRA PATACONES 53A in process 300 Exploration
SIERRA PATACONES 54 Replaced by SIERRA PATACONES 54A in process 300 Exploration
SIERRA PATACONES 55 Replaced by SIERRA PATACONES 55A in process 300 Exploration
SIERRA PATACONES 56 Replaced by SIERRA PATACONES 56A in process 300 Exploration
SIERRA PATACONES 57 Replaced by SIERRA PATACONES 57A in process 300 Exploration
SIERRA PATACONES 62 Replaced by SIERRA PATACONES 62A in process 300 Exploration
SIERRA PATACONES 61 Replaced by SIERRA PATACONES 61A in process 300 Exploration
SIERRA PATACONES 60 Replaced by SIERRA PATACONES 60A in process 300 Exploration
SIERRA PATACONES 59 Replaced by SIERRA PATACONES 59A in process 300 Exploration
SIERRA PATACONES 58 Replaced by SIERRA PATACONES 58A in process 300 Exploration
SIERRA PATACONES 63 Replaced by SIERRA PATACONES 63A in process 300 Exploration
SIERRA PATACONES 64 Replaced by SIERRA PATACONES 64A in process 300 Exploration
SIERRA PATACONES 65 Replaced by SIERRA PATACONES 65A in process 300 Exploration
SIERRA PATACONES 66 Replaced by SIERRA PATACONES 66A in process 300 Exploration
SIERRA PATACONES 67 Replaced by SIERRA PATACONES 67A in process 300 Exploration
SIERRA PATACONES 68 Replaced by SIERRA PATACONES 68A in process 300 Exploration
SIERRA PATACONES 69 Replaced by SIERRA PATACONES 69A in process 300 Exploration
SIERRA PATACONES 70 Replaced by SIERRA PATACONES 70A in process 300 Exploration
SIERRA PATACONES 71 Replaced by SIERRA PATACONES 71A in process 300 Exploration
SIERRA PATACONES 72 Replaced by SIERRA PATACONES 72A in process 300 Exploration
SIERRA PATACONES 73 Replaced by SIERRA PATACONES 73A in process 300 Exploration
SIERRA PATACONES 74 Replaced by SIERRA PATACONES 74A in process 300 Exploration
SIERRA PATACONES 75 Replaced by SIERRA PATACONES 75A in process 300 Exploration
SIERRA PATACONES 76 Replaced by SIERRA PATACONES 76A in process 300 Exploration
SIERRA PATACONES 77 Replaced by SIERRA PATACONES 77A in process 300 Exploration
SIERRA PATACONES 84 Replaced by SIERRA PATACONES 84A in process 300 Exploration
SIERRA PATACONES 83 Replaced by SIERRA PATACONES 83A in process 300 Exploration
SIERRA PATACONES 82 Replaced by SIERRA PATACONES 82A in process 300 Exploration
SIERRA PATACONES 81 Replaced by SIERRA PATACONES 81A in process 300 Exploration
SIERRA PATACONES 80 Replaced by SIERRA PATACONES 80A in process 300 Exploration

TESOROGOLD.COM.AU

13

ASX ANNOUNCEMENT 26 JULY 2023

Concession Name Date of Expiration Size
(ha)
Concession
type
SIERRA PATACONES 79 Replaced by SIERRA PATACONES 79A in process 300 Exploration
SIERRA PATACONES 78 Replaced by SIERRA PATACONES 78A in process 300 Exploration
SIERRA PATACONES 52 Replaced by SIERRA PATACONES 52A in process 300 Exploration
GOLDSTORE72 Replaced by GOLD STORE 72A in process 300 Exploration
GOLDSTORE71 Replaced byGOLD STORE 71A inprocess 300 Exploration
GOLDSTORE70 Replaced byGOLD STORE 70A inprocess 300 Exploration
GOLDSTORE69 Replaced byGOLD STORE 69A inprocess 300 Exploration
GOLDSTORE68 Replaced byGOLD STORE 68A inprocess 300 Exploration
GOLDSTORE67 Replaced byGOLD STORE 67A inprocess 300 Exploration
GOLDSTORE66 Replaced byGOLD STORE 66A inprocess 300 Exploration
GOLDSTORE 1 Replaced byGOLD STORE 1A inprocess 300 Exploration
GOLDSTORE 2 Replaced byGOLD STORE 2A inprocess 300 Exploration
GOLDSTORE3 Replaced byGOLD STORE 3A inprocess 300 Exploration
GOLDSTORE 4 Replaced byGOLD STORE 4A inprocess 300 Exploration
GOLDSTORE5 Replaced byGOLD STORE 5A inprocess 300 Exploration
GOLDSTORE6 Replaced byGOLD STORE 6A inprocess 300 Exploration
GOLDSTORE7 Replaced byGOLD STORE 7A inprocess 300 Exploration
GOLDSTORE8 Replaced byGOLD STORE 8A inprocess 300 Exploration
GOLDSTORE9 Replaced byGOLD STORE 9A inprocess 300 Exploration
GOLDSTORE 10 Replaced byGOLD STORE 10A inprocess 300 Exploration
GOLDSTORE 11 Replaced byGOLD STORE 11A inprocess 300 Exploration
GOLDSTORE 12 Replaced byGOLD STORE 12A inprocess 300 Exploration
GOLDSTORE 13 Replaced byGOLD STORE 13A inprocess 300 Exploration
GOLDSTORE 14 Replaced byGOLD STORE 14A inprocess 300 Exploration
GOLDSTORE 15 Replaced byGOLD STORE 15A inprocess 300 Exploration
GOLDSTORE 16 Replaced byGOLD STORE 16A inprocess 300 Exploration
GOLDSTORE 17 Replaced byGOLD STORE 17A inprocess 300 Exploration
GOLDSTORE 18 Replaced byGOLD STORE 18A inprocess 300 Exploration
GOLDSTORE 19 Replaced byGOLD STORE 19A inprocess 300 Exploration
GOLDSTORE 20 Replaced byGOLD STORE 20A inprocess 300 Exploration
GOLDSTORE 21 Replaced byGOLD STORE 21A inprocess 300 Exploration
GOLDSTORE 22 Replaced byGOLD STORE 22A inprocess 300 Exploration
GOLDSTORE 23 Replaced byGOLD STORE 23A inprocess 300 Exploration
GOLDSTORE 24 Replaced byGOLD STORE 24A inprocess 300 Exploration
GOLDSTORE 25 Replaced byGOLD STORE 25A inprocess 300 Exploration
GOLDSTORE 26 Replaced byGOLD STORE 26A inprocess 300 Exploration
GOLDSTORE 27 Replaced byGOLD STORE 27A inprocess 300 Exploration
GOLDSTORE 28 Replaced byGOLD STORE 28A inprocess 300 Exploration
GOLDSTORE 29 Replaced byGOLD STORE 29A inprocess 300 Exploration
GOLDSTORE30 Replaced byGOLD STORE 30A inprocess 300 Exploration
GOLDSTORE36 Replaced byGOLD STORE 36A inprocess 300 Exploration
GOLDSTORE35 Replaced byGOLD STORE 35A inprocess 300 Exploration
GOLDSTORE34 Replaced byGOLD STORE 34A inprocess 300 Exploration
GOLDSTORE33 Replaced byGOLD STORE 33A inprocess 300 Exploration
GOLDSTORE37 Replaced byGOLD STORE 37A inprocess 300 Exploration
GOLDSTORE38 Replaced byGOLD STORE 38A inprocess 300 Exploration

TESOROGOLD.COM.AU

14

ASX ANNOUNCEMENT 26 JULY 2023

Concession Name Date of Expiration Size
(ha)
Concession
type
GOLDSTORE39 Replaced byGOLD STORE 39A inprocess 300 Exploration
GOLDSTORE 40 Replaced byGOLD STORE 40A inprocess 300 Exploration
GOLDSTORE 41 Replaced byGOLD STORE 41A inprocess 300 Exploration
GOLDSTORE 42 Replaced byGOLD STORE 42A inprocess 300 Exploration
GOLDSTORE 43 Replaced byGOLD STORE 43A inprocess 300 Exploration
GOLDSTORE 44 Replaced byGOLD STORE 44A inprocess 300 Exploration
GOLDSTORE 45 Replaced byGOLD STORE 45A inprocess 300 Exploration
GOLDSTORE 46 Replaced byGOLD STORE 46A inprocess 300 Exploration
GOLDSTORE 47 Replaced byGOLD STORE 47A inprocess 300 Exploration
GOLDSTORE 48 Replaced byGOLD STORE 48A inprocess 300 Exploration
GOLDSTORE 49 Replaced byGOLD STORE 49A inprocess 300 Exploration
GOLDSTORE50 Replaced byGOLD STORE 50A inprocess 300 Exploration
GOLDSTORE51 Replaced byGOLD STORE 51A inprocess 300 Exploration
GOLDSTORE52 Replaced byGOLD STORE 52A inprocess 300 Exploration
GOLDSTORE53 Replaced byGOLD STORE 53A inprocess 300 Exploration
GOLDSTORE54 Replaced byGOLD STORE 54A inprocess 300 Exploration
GOLDSTORE55 Replaced byGOLD STORE 55A inprocess 300 Exploration
GOLDSTORE56 Replaced byGOLD STORE 56A inprocess 200 Exploration
GOLDSTORE57 Replaced byGOLD STORE 57A inprocess 300 Exploration
GOLDSTORE58 Replaced byGOLD STORE 58A inprocess 300 Exploration
GOLDSTORE59 Replaced byGOLD STORE 59A inprocess 300 Exploration
GOLDSTORE60 Replaced byGOLD STORE 60A inprocess 300 Exploration
GOLDSTORE61 Replaced byGOLD STORE 61A inprocess 300 Exploration
GOLDSTORE62 Replaced byGOLD STORE 62A inprocess 300 Exploration
GOLDSTORE63 Replaced byGOLD STORE 63A inprocess 300 Exploration
GOLDSTORE64 Replaced byGOLD STORE 64A inprocess 300 Exploration
GOLDSTORE65 Replaced byGOLD STORE 65A inprocess 300 Exploration
VACASFLACAS1 26-October-2026 300 Exploration
VACASFLACAS2 26-October-2026 300 Exploration
VACASFLACAS 5 26-October-2026 300 Exploration
VACASFLACAS 6 26-October-2026 300 Exploration
VACASFLACAS 7 26-October-2026 300 Exploration
VACASFLACAS 8 26-October-2026 300 Exploration
VACASFLACAS 9 26-October-2026 300 Exploration
VACASFLACAS10 26-October-2026 300 Exploration
VACASFLACAS11 26-October-2026 300 Exploration
VACASFLACAS12 26-October-2026 300 Exploration
VACASFLACAS13 26-October-2026 300 Exploration
VACASFLACAS14 26-October-2026 300 Exploration
VACASFLACAS15 26-October-2026 300 Exploration
VACASFLACAS16 26-October-2026 300 Exploration
VACASFLACAS17 26-October-2026 300 Exploration
VACASFLACAS18 26-October-2026 300 Exploration
VACASFLACAS19 26-October-2026 300 Exploration
VACASFLACAS20 26-October-2026 300 Exploration
VACASFLACAS21 26-October-2026 300 Exploration

TESOROGOLD.COM.AU

15

ASX ANNOUNCEMENT 26 JULY 2023

Concession Name Date of Expiration Size
(ha)
Concession
type
VACASFLACAS22 26-October-2026 300 Exploration
VACASFLACAS23 26-October-2026 300 Exploration
VACASFLACAS24 26-October-2026 300 Exploration
VACASFLACAS25 26-October-2026 300 Exploration
VACASFLACAS28 26-October-2026 300 Exploration
VACASFLACAS27 26-October-2026 300 Exploration
VACASFLACAS26 26-October-2026 300 Exploration
VACASFLACAS 3 26-October-2026 300 Exploration
VACASFLACAS4 26-October-2026 300 Exploration
Bloody Good Shot 13A 27-September-2026 200 Exploration
Bloody Good Shot 12A 27-September-2026 200 Exploration
Bloody Good Shot 11A 27-September-2026 200 Exploration
Bloody Good Shot 10A 27-September-2026 300 Exploration
Bloody Good Shot9A 28-September-2026 300 Exploration
Bloody Good Shot8A 5-October-2026 200 Exploration
Bloody Good Shot7A 28-September-2026 100 Exploration
Bloody Good Shot6A 5-October-2026 200 Exploration
Bloody Good Shot5A 29-September-2026 200 Exploration
Bloody Good Shot 4A 29-September-2026 300 Exploration
Bloody Good Shot3A 3-October-2026 300 Exploration
Bloody Good Shot 2A 3-October-2026 300 Exploration
Bloody Good Shot 1A 3-October-2026 300 Exploration
Buzzard1,1al300 NA-Constituted 300 Exploitation
Buzzard2,1al300 NA-Constituted 300 Exploitation
Buzzard 3,1al300 NA-Constituted 300 Exploitation
Buzzard4,1al300 NA-Constituted 300 Exploitation
LEON DOS1-30 NA-Constituted 300 Exploitation
LEONUNO1-30 NA-Constituted 300 Exploitation
LAS COQUETAS1/10 NA-Constituted 100 Exploitation
PATON DOS1/29 NA-Constituted 230 Exploitation
PATONUNO1/29 NA-Constituted 240 Exploitation
CALDERILLA 1,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA 2,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA3,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA 4,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA5,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA6,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA7,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA8,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA9,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA 10,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA 11,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA 12,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA 13,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA 14,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA 15,1 AL 10 NA-Constituted 100 Exploitation

TESOROGOLD.COM.AU

16

ASX ANNOUNCEMENT 26 JULY 2023

Concession Name Date of Expiration Size
(ha)
Concession
type
CALDERILLA 16,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA 17,1 AL 10 NA-Constituted 76 Exploitation
CALDERILLA 18,1 AL 10 NA-Constituted 36 Exploitation
CALDERILLA 19,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA 20,1 AL 10 NA-Constituted 91 Exploitation
CALDERILLA 21,1 AL 10 NA-Constituted 76 Exploitation
CALDERILLA 22,1 AL 10 NA-Constituted 100 Exploitation
CALDERILLA 23,1 AL 10 NA-Constituted 100 Exploitation
TAKEO SEGUNDA 1 AL 20 NA-Constituted 100 Exploitation
TAKEOTERCERA 1 AL 20 NA-Constituted 100 Exploitation

Notes :

  1. All concessions noted as “application” are moving through the application process and there is no legal impediment to them being granted.

  2. Concessions noted as in process are being converted from exploration concessions to exploitation concessions and there is no legal impediment to them being granted.

  3. Concessions noted as being in renewal process are exploration concessions under a renewal for a second term of two years and there is no legal impediment to them being renewed.

  4. Constituted exploitation concessions have no expiry.