Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

TESORO GOLD LTD Capital/Financing Update 2021

May 24, 2021

65957_rns_2021-05-24_72e16a57-63ff-4b26-b46f-e7886f8f303e.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

A S X A N N O U N C E M E N T

2 5 M A Y 2 0 2 1

ASX: TSO | ACN 106 854 175

==> picture [168 x 103] intentionally omitted <==

New Gold Zone Identified from Extensional Drilling

▪ Results received for 11 holes from infill and extensional drilling at the Ternera Deposit.

▪ Multiple high-grade intercepts returned from five extensional drillholes, further expanding Ternera to the east and identifying additional gold zones, including:

  • ZDDH0115

  • 7.00m @ 1.00g/t Au from 312.00m including:

  • 1.00m @ 3.33g/t Au from 312.00m.

  • ZDDH0116

  • 1.00m @ 5.76g/t Au from 59.00m.

  • ZDDH0117

  • 10.20m @ 0.65g/t Au from 190.80m including:

  • 0.70m @ 5.03g/t Au from 190.80m; and

  • 13.00m @ 0.88g/t from 268.00m including:

  • 1.00m @ 4.12g/t Au from 280.00m.

  • ZDDH0119

  • 19.00m @ 1.22g/t Au from 355.00m including:

  • 4.50m @ 2.97g/t Au from 355.00m; and

  • 1.00m @ 4.22g/t Au from 373.00m.

  • ZDDH0120

  • 3.00m @ 1.57g/t Au from 229.00m; and

  • 1.00m @ 15.30g/t Au from 317.00m.

  • ZDDH0121

  • 0.70m @ 3.27g/t Au from 72.50m

  • 1.50m @ 2.31g/t Au from 86.50m; and

  • 1.00m @ 2.94g/t Au from 230.00m.

Consistent results continue to be returned for infill drilling which continue to confirm continuity of mineralisation through the Ternera Deposit; results include:

  • ZDDH0112

1.00m @ 11.90g/t Au from 154.00m.

  • ZDDH0114

  • 6.00m @ 2.29g/t Au from 223.00m including:

  • 3.00m @ 4.36g/t Au from 280.00m.

  • ZDDH0123

  • 28.00m @ 0.87g/t Au from 70.00m including:

  • 2.93m @ 5.38g/t Au from 84.07m;

  • 6.00m @ 1.51g/t Au from 215.00m; and

  • 1.00m @ 3.55g/t Au from 360.00m.

1

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

  • In total, Tesoro has drilled 150 diamond drillholes at El Zorro for 47,208 metres.

  • Assays remain outstanding for 35 holes.

  • Geological modelling is well advanced in preparation for calculation of a Maiden Resource Estimate ( MRE ) for the Ternera Deposit in the coming months.

  • Ternera gold mineralisation remains open in all directions and drilling continues with six drill rigs operating 24/7.

  • Detailed metallurgical testwork samples have been dispatched to the laboratory for advanced testwork.

Tesoro Resources Limited ( Tesoro or the Company ) (ASX:TSO) is pleased to announce assay results from extensional and resource definition drilling from the Ternera Gold Deposit ( Ternera ) at the Company’s El Zorro Gold Project ( El Zorro ) in Chile.

Assays have been received for eleven (11) drillholes at Ternera, six (6) extensional holes targeting the eastern margin of the deposit and five (5) infill/resource definition holes.

Significant intercepts are presented in Table 1. All significant intercepts from El Zorro are presented in Appendix 1 of this announcement.

Tesoro Managing Director, Zeff Reeves commented:

“Drilling continues to expand the mineralised zones at Ternera. These latest set of results confirm our interpretation that gold mineralisation continues from the main Ternera Deposit to the recently discovered Ternera East Prospect. Infill results continue to add gold grade to the Ternera model which is in preparation for a MRE in the coming months.”

Commentary

Holes ZDDH0112, ZDDH0114, ZDDH0118, ZDDH0120, ZDDH 0122 and ZDDH0123 were all drilled to further test and extend the eastern margin of the Ternera Deposit.

Hole ZDDH0115 in particular, is significant as it has extended the Ternera mineralised zone approximately 150m east and 100m south with gold mineralisation associated with a controlling north-south fault.

Hole ZDDH0118 did not return any significant gold mineralisation confirming that the Ternera Deposit host lithology is not present in this area. Current interpretation and recent drilling suggest the main mineralised zone continues in a north-east direction.

All other holes returned positive results with strongest zones of gold mineralisation associated with north-south faults intersecting the main host rock, the El Zorro Tonalite. It is interpreted that gold mineralisation will continue at least a further 200m-300m east where surface mineralisation has been identified at the Ternera East target.

Holes ZDDH0115, ZDDH0116, ZDDH0117, ZDDH0119 and ZDDH0121 were drilled as resource definition/infill holes and continue to build upon the up and down dip continuity of gold mineralisation throughout the deposit. Results confirm continuity of gold grade and continue to add new data to the advancing Maiden Resource Estimate.

2

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

==> picture [525 x 467] intentionally omitted <==

----- Start of picture text -----

Hole_ID From (m) To (m) Interval Au (g/t) Comments Hole_ID From (m) To (m) Interval Au (g/t) Comments
ZDDH0112 130.00 132.00 2.00 0.47 ZDDH0120 229.00 232.00 3.00 1.47
ZDDH0112 154.00 155.00 1.00 11.90 ZDDH0120 317.00 318.00 1.00 15.30
ZDDH0112 240.00 241.00 1.00 1.08 ZDDH0120 351.00 352.00 1.00 1.16
ZDDH0114 26.50 27.20 0.70 0.40 ZDDH0120 371.00 378.00 7.00 0.61
ZDDH0114 47.20 53.00 5.80 0.47 ZDDH0120 376.00 377.00 1.00 1.39 including
ZDDH0114 49.00 51.00 2.00 0.85 ZDDH0120 383.00 384.00 1.00 1.03
ZDDH0114 69.00 71.00 2.00 0.44 ZDDH0120 387.00 388.00 1.00 1.27
ZDDH0114 97.00 106.90 9.90 0.57 ZDDH0120 396.00 397.00 1.00 1.02
ZDDH0114 103.00 105.00 2.00 1.74 including ZDDH0120 412.00 415.00 3.00 0.41
ZDDH0114 164.00 165.00 1.00 1.00 ZDDH0121 35.00 41.00 6.00 0.47
ZDDH0114 223.00 229.00 6.00 2.29 ZDDH0121 35.00 36.00 1.00 1.07 including
ZDDH0114 224.00 227.00 3.00 4.36 including ZDDH0121 60.00 91.50 31.50 0.34
ZDDH0115 235.00 236.00 1.00 0.43 ZDDH0121 66.00 73.50 7.50 0.59 including
ZDDH0115 311.00 318.00 7.00 1.00 ZDDH0121 66.00 67.00 1.00 1.11 including
ZDDH0115 312.00 313.00 1.00 3.33 ZDDH0121 72.50 73.20 0.70 3.27 including
ZDDH0116 59.00 60.00 1.00 5.76 ZDDH0121 79.00 80.00 1.00 1.40 including
ZDDH0116 65.88 67.27 1.39 0.49 ZDDH0121 86.50 88.00 1.50 2.31 including
ZDDH0117 162.00 163.00 1.00 1.20 ZDDH0121 230.00 231.00 1.00 2.94 including
ZDDH0117 190.80 201.00 10.20 0.65 ZDDH0122 3.00 7.10 4.10 0.38
ZDDH0117 190.80 191.50 0.70 5.03 including ZDDH0122 36.50 37.39 0.89 0.87
ZDDH0117 198.00 201.00 3.00 1.00 including ZDDH0122 43.00 44.00 1.00 0.87
ZDDH0117 225.00 227.00 2.00 0.46 ZDDH0122 85.00 85.65 0.65 1.11
ZDDH0117 261.00 285.00 24.00 0.58 ZDDH0122 155.00 156.00 1.00 0.84
ZDDH0117 268.00 281.00 13.00 0.88 including ZDDH0123 70.00 98.00 28.00 0.87
ZDDH0117 268.00 270.00 2.00 1.50 including ZDDH0123 76.00 77.00 1.00 1.93 including
ZDDH0117 280.00 281.00 1.00 4.12 including ZDDH0123 84.07 87.00 2.93 5.38 including
ZDDH0118 No Significant intercept ZDDH0123 200.00 204.00 4.00 0.85
ZDDH0119 4.60 6.60 2.00 0.52 ZDDH0123 203.00 204.00 1.00 1.48 including
ZDDH0119 20.00 26.00 6.00 0.50 ZDDH0123 215.00 221.00 6.00 1.51
ZDDH0119 20.00 21.00 1.00 1.69 ZDDH0123 242.60 243.20 0.60 1.16
ZDDH0119 261.00 262.00 1.00 1.18 ZDDH0123 360.00 361.00 1.00 3.55
ZDDH0119 269.00 270.00 1.00 1.48 ZDDH0123 383.00 384.00 1.00 0.78
ZDDH0119 326.00 374.00 48.00 0.53
ZDDH0119 350.00 374.00 24.00 1.02 including
ZDDH0119 355.00 374.00 19.00 1.22 including
ZDDH0119 355.00 359.50 4.50 2.97 including
ZDDH0119 365.00 366.00 1.00 2.64 including
ZDDH0119 373.00 374.00 1.00 4.22 including
----- End of picture text -----

Table 1 – Significant drill results for holes ZDDH0112, ZDDH0114, ZDDH0115, ZDDH0116, ZDDH0117, ZDDH0118, ZDDH0119, ZDDH0120, ZDDH0121, ZDDH0122, ZDDH0123, results are uncut, no top cut has been applied. A table of significant intercepts for previously reported holes is presented in Appendix 1.

3

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

==> picture [484 x 694] intentionally omitted <==

Figure 1 – Ternera Drilling – collar locations on geology with selected significant intercepts. Results reported in this announcement are noted in gold highlight. PSAD56/19S datum.

4 +61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

Authorised by the Board of Tesoro Resources Limited.

For more information:

Company:

Zeff Reeves Managing Director Tesoro Resources Limited +61 8 9322 1587

Investors:

Peter Taylor NWR Communications +61 (0) 412 036 231 [email protected]

About Tesoro

Tesoro Resources Limited was established with a strategy of acquiring, exploring, and developing mining projects in the Coastal Cordillera region of Chile. The Coastal Cordillera region is host to multiple world class copper and gold mines, has well established infrastructure, service providers and an experienced mining workforce. Large areas of the Coastal Cordillera remain unexplored due to the unconsolidated nature of mining concession ownership, but Tesoro, via its in-country network and experience has been able secure rights to a district scale gold project in-line with the Company’s strategy. Tesoro’s 95% owned Chilean subsidiary owns 85% of the El Zorro Gold Project.

==> picture [125 x 223] intentionally omitted <==

Competent Persons Statement

The information in this report that relates to Exploration Results is based on information compiled by Mr Zeffron Reeves (B App Sc (Hons) Applied Geology) MBA, MAIG). Mr Reeves is a member of the Australian Institute of Geoscientists and a Director and major shareholder of the Company. Mr Reeves has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Reeves consents to the inclusion in this report of the matters based on this information in the form and context in which it appears.

Future Performance

This announcement may contain certain forward-looking statements and opinion. Forward-looking statements, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and involve known and unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of the Company and which are subject to change without notice and could cause the actual results, performance or achievements of the Company to be materially different from the future results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or reasonableness of any forward-looking statements or other forecast. Nothing contained in this announcement nor any information made available to you is, or and shall be relied upon as, a promise, representation, warranty or guarantee as to the past, present or the future performance of Tesoro.

5

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

APPENDIX 1 – SIGNIFICANT INTERCEPT TABLE

Hole_ID From(m) To(m) Interval Au(g/t) Comments Hole_ID **From(m) ** To(m) **Interval ** Au(g/t) Comments
ZDDH0001 5.00 119.00 114.00 0.35 ZDDH0009 4.00 6.00 2.00 1.39
ZDDH0001 5.00 15.00 10.00 0.55 including ZDDH0009 12.55 38.00 25.45 0.51
ZDDH0001 5.00 51.30 46.30 0.45 including ZDDH0009 21.00 26.00 5.00 1.09 including
ZDDH0001 12.00 13.00 1.00 1.64 including ZDDH0009 48.00 48.50 0.50 2.19
ZDDH0001 14.30 15.00 0.70 2.35 including ZDDH0009 78.00 83.00 5.00 0.59
ZDDH0001 33.64 39.00 5.36 0.97 including ZDDH0010 31.00 33.00 2.00 2.47
ZDDH0001 44.30 51.30 7.00 0.67 including ZDDH0010 60.00 61.00 1.00 1.16
ZDDH0001 64.00 65.00 1.00 2.50 including ZDDH0010 66.00 67.00 1.00 1.04
ZDDH0001 75.50 79.00 3.50 0.89 including ZDDH0010 75.00 159.30 84.30 1.30
ZDDH0001 75.50 76.00 0.50 4.82 including ZDDH0010 75.00 104.00 29.00 2.95 including
ZDDH0001 107.00 112.00 5.00 1.11 including ZDDH0010 82.50 86.45 3.95 4.97 including
ZDDH0001 117.00 119.00 2.00 2.05 including ZDDH0010 91.00 102.00 11.00 4.70 including
ZDDH0002 5.70 68.00 62.30 0.54 ZDDH0010 93.00 97.00 4.00 8.50 including
ZDDH0002 8.80 24.30 15.50 1.15 including ZDDH0010 120.00 126.00 6.00 1.11 including
ZDDH0002 8.80 14.00 5.20 1.96 including ZDDH0010 149.00 159.00 10.00 1.07 including
ZDDH0002 51.70 68.00 16.30 0.78 including ZDDH0011 176.00 274.30 98.30 1.58
ZDDH0002 58.00 61.00 3.00 3.62 including ZDDH0011 181.70 212.00 30.30 3.03 including
ZDDH0003 21.00 77.30 56.30 0.50 ZDDH0011 196.40 212.00 15.60 3.87 including
ZDDH0003 21.00 27.00 6.00 1.96 including ZDDH0011 203.00 203.70 0.70 21.70 including
ZDDH0003 21.00 22.83 1.83 5.24 including ZDDH0011 203.00 212.00 9.00 5.07 including
ZDDH0003 37.20 43.00 5.80 1.27 including ZDDH0011 217.00 222.00 5.00 4.13 including
ZDDH0003 47.30 48.00 0.70 2.00 including ZDDH0011 246.60 256.40 9.80 2.28 including
ZDDH0003 64.00 77.30 13.30 0.41 including ZDDH0012 0.00 58.80 58.80 1.70
ZDDH0003 90.00 91.00 1.00 1.53 ZDDH0012 1.70 22.00 20.30 4.50 including
ZDDH0004 5.00 66.00 61.00 0.97 ZDDH0012 1.70 8.40 6.70 12.21 including
ZDDH0004 56.00 66.00 10.00 4.53 including ZDDH0012 2.30 4.70 2.40 33.35 including
ZDDH0004 57.00 61.00 4.00 9.60 including ZDDH0012 17.60 22.00 4.40 2.00 including
ZDDH0005 4.00 42.65 38.65 0.65 ZDDH0012 17.60 20.00 2.40 2.82 including
ZDDH0005 4.00 32.00 28.00 0.84 including ZDDH0012 53.20 58.80 5.60 0.95
ZDDH0005 9.80 28.00 18.20 1.17 including ZDDH0012 53.20 56.00 2.80 1.42 including
ZDDH0005 9.80 10.15 0.35 20.10 including ZDDH0012 151.80 152.20 0.40 2.29
ZDDH0005 51.60 52.00 0.40 2.03 ZDDH0013 0.00 3.00 3.00 0.83
ZDDH0005 65.00 67.00 2.00 1.03 ZDDH0013 9.00 14.30 5.30 0.41
ZDDH0005 72.00 85.90 13.90 0.52 ZDDH0013 25.00 29.80 4.80 0.72
ZDDH0005 72.00 75.00 3.00 1.90 including ZDDH0013 28.55 29.80 1.25 2.14 including
ZDDH0005 72.00 73.00 1.00 4.32 including ZDDH0013 46.30 70.00 23.70 0.85
ZDDH0005 100.60 102.00 1.40 2.07 ZDDH0013 46.30 51.50 5.20 1.24 including
ZDDH0005 130.00 132.60 2.60 0.66 ZDDH0013 51.25 65.35 14.10 1.08 including
ZDDH0005 135.80 136.80 1.00 12.20 ZDDH0013 58.00 65.35 7.35 1.65 including
ZDDH0005 0.00 88.00 88.00 0.15 ZDDH0013 102.00 104.00 2.00 0.79
ZDDH0006 2.40 3.00 0.60 0.75 including ZDDH0013 136.00 137.30 1.30 4.97
ZDDH0006 22.60 25.95 3.35 2.14 including ZDDH0013 165.00 173.60 8.60 1.60
ZDDH0006 24.00 25.00 1.00 6.10 including ZDDH0013 170.40 173.00 2.60 2.80 including
ZDDH0006 46.70 50.30 3.60 0.32 including ZDDH0014 15.30 70.60 55.30 1.01
ZDDH0006 61.10 64.02 2.92 0.42 including ZDDH0014 15.30 34.00 18.70 2.19 including
ZDDH0006 108.30 116.00 7.70 0.30 including ZDDH0014 15.30 26.30 11.00 3.40 including
ZDDH0006 133.50 135.60 2.10 1.30 including ZDDH0014 23.00 26.30 3.30 6.18 including
ZDDH0006 148.00 151.80 3.80 0.59 including ZDDH0014 64.60 70.60 6.00 2.03 including
ZDDH0006 180.10 244.00 63.90 0.23 including ZDDH0014 64.60 67.35 2.75 5.00 including
ZDDH0006 180.10 181.10 1.00 0.55 including ZDDH0014 112.00 122.50 10.50 0.52
ZDDH0006 184.00 186.00 2.00 1.06 including ZDDH0014 115.00 117.00 2.00 1.75 including
ZDDH0006 207.00 212.00 5.00 0.77 including ZDDH0014 177.20 179.00 1.80 2.37
ZDDH0006 226.00 227.00 1.00 0.55 including ZDDH0015 37.90 39.70 1.80 1.11
ZDDH0006 236.00 244.00 8.00 0.66 including ZDDH0015 91.90 132.70 40.80 0.37
ZDDH0007 1.00 4.00 3.00 4.75 ZDDH0015 91.90 94.60 2.70 1.64 including
ZDDH0007 39.00 66.20 27.20 0.70 ZDDH0015 112.00 116.00 4.00 1.13 including
ZDDH0007 39.00 58.00 19.00 0.80 including ZDDH0015 240.60 242.00 1.40 8.46
ZDDH0007 104.85 110.00 5.15 0.34 ZDDH0015 265.90 269.00 3.10 0.64
ZDDH0007 117.40 118.00 0.60 2.75 ZDDH0016 125.00 131.72 6.72 1.47
ZDDH0008 35.00 41.10 6.10 0.28 ZDDH0016 152.00 204.60 52.60 0.62
ZDDH0008 58.00 59.00 1.00 1.43 ZDDH0016 188.10 194.00 5.90 3.30 including
ZDDH0016 188.58 188.90 0.32 31.30 including
ZDDH0016 203.60 204.60 1.00 3.00 including
ZDDH0016 281.00 290.00 9.00 0.36
ZDDH0016 287.50 290.00 2.50 0.77 including

6

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

Hole_ID From(m) To(m) Interval Au(g/t) Comments Hole_ID From(m) To(m) Interval Au(g/t) Comments
ZDDH0017 44.00 74.00 30.00 0.94 ZDDH0028 14.00 14.75 0.75 3.23
ZDDH0017 44.00 60.10 16.10 1.05 including ZDDH0028 21.00 28.00 7.00 0.85
ZDDH0017 44.00 47.00 3.00 4.27 including ZDDH0028 25.00 25.90 0.90 5.03 including
ZDDH0017 70.00 74.00 4.00 4.26 including ZDDH0028 42.00 49.00 7.00 0.61
ZDDH0017 103.46 105.60 2.14 1.76 ZDDH0028 43.90 45.00 1.10 1.10 including
ZDDH0017 167.55 254.00 86.45 2.29 including ZDDH0029 29.50 243.00 213.50 0.73
ZDDH0017 182.70 233.20 50.50 3.63 including ZDDH0029 29.50 93.00 63.50 1.81 including
ZDDH0017 183.22 206.22 23.00 7.20 including ZDDH0029 29.50 31.20 1.70 1.20 including
ZDDH0017 190.00 205.00 15.00 10.82 including ZDDH0029 43.00 48.00 5.00 2.76 including
ZDDH0017 197.00 202.30 5.30 25.31 including ZDDH0029 56.64 61.84 5.20 3.36 including
ZDDH0017 200.00 202.30 2.30 46.41 including ZDDH0029 72.00 80.00 8.00 1.24 including
ZDDH0018 187.27 222.00 34.73 2.94 ZDDH0029 91.00 93.00 2.00 33.00 including
ZDDH0018 187.27 211.00 23.73 4.09 including ZDDH0029 121.00 130.70 9.70 0.53
ZDDH0018 197.00 199.70 2.70 22.21 including ZDDH0029 121.00 122.00 1.00 3.20 including
ZDDH0018 189.00 204.00 15.00 5.99 including ZDDH0029 166.30 195.00 28.70 0.82
ZDDH0019 21.00 89.52 68.52 0.47 ZDDH0029 180.00 195.00 15.00 1.33 including
ZDDH0019 36.00 45.00 9.00 1.34 including ZDDH0030 5.20 6.40 1.20 0.74
ZDDH0019 74.00 79.00 5.00 1.23 including ZDDH0030 50.00 76.00 26.00 0.69
ZDDH0020 87.30 87.60 0.30 3.33 ZDDH0030 66.00 76.00 10.00 1.54 including
ZDDH0021 100.92 116.50 15.58 0.95 ZDDH0030 66.00 71.10 5.10 2.64 including
ZDDH0021 107.50 112.00 4.50 1.24 including ZDDH0030 66.00 67.00 1.00 6.89 including
ZDDH0021 100.92 101.70 0.78 8.44 including ZDDH0030 70.00 71.10 1.10 5.73 including
ZDDH0021 189.25 208.50 19.25 2.86 open downhole ZDDH0030 101.00 102.50 1.50 1.13
ZDDH0021 189.25 201.30 12.05 4.25 including ZDDH0030 117.00 120.00 3.00 3.23
ZDDH0021 189.25 195.40 6.15 7.37 including ZDDH0030 117.00 119.13 2.13 4.15 including
ZDDH0021 193.90 195.40 1.50 20.82 including ZDDH0030 165.00 167.00 2.00 4.05
ZDDH0022 30.00 31.00 1.00 3.16 ZDDH0030 195.40 199.00 3.60 1.41 open downhole
ZDDH0022 78.00 119.17 41.17 1.38 ZDDH0030 202.95 203.90 0.95 5.12 open downhole
ZDDH0022 94.40 95.45 1.05 2.98 including ZDDH0031 72.00 303.00 231.00 0.83
ZDDH0022 105.00 119.17 14.17 3.25 including ZDDH0031 72.00 126.00 54.00 1.69
ZDDH0022 105.00 110.32 5.32 6.54 including ZDDH0031 72.00 75.60 3.60 1.27 including
ZDDH0023 146.70 151.00 4.30 7.25 ZDDH0031 100.00 104.44 4.44 1.04 including
ZDDH0023 146.70 149.00 2.30 13.30 including ZDDH0031 100.00 125.00 25.00 3.36 including
ZDDH0023 273.00 277.00 4.00 1.06 ZDDH0031 118.30 125.00 6.70 11.57 including
ZDDH0023 276.00 277.00 1.00 3.32 including ZDDH0031 146.40 154.00 7.60 0.79 including
ZDDH0024 6.00 9.00 3.00 1.63 ZDDH0031 171.60 173.00 1.40 1.40 including
ZDDH0024 41.00 78.00 37.00 0.86 ZDDH0031 193.30 217.60 24.30 2.43 including
ZDDH0024 41.00 45.50 4.50 2.12 including ZDDH0031 193.30 208.00 14.70 3.77 including
ZDDH0024 44.10 45.50 1.40 5.93 including ZDDH0031 193.30 197.00 3.70 4.16 including
ZDDH0024 54.50 57.00 2.50 1.87 including ZDDH0031 204.34 217.60 13.26 3.25 including
ZDDH0024 56.50 69.50 13.00 1.12 including ZDDH0031 204.34 208.00 3.66 10.76 including
ZDDH0024 66.00 69.50 3.50 2.53 including ZDDH0031 228.00 229.00 1.00 2.17 including
ZDDH0024 155.00 169.00 14.00 3.06 ZDDH0031 248.00 263.90 15.90 1.04 including
ZDDH0024 162.20 163.50 1.30 19.72 including ZDDH0031 291.00 295.00 4.00 1.00 including
ZDDH0024 161.80 167.00 5.20 6.97 including ZDDH0032 3.20 6.00 2.80 1.23
ZDDH0025 49.00 170.55 121.55 1.32 ZDDH0032 17.30 18.30 1.00 7.09
ZDDH0025 73.10 84.00 10.90 4.57 including ZDDH0032 43.50 44.00 0.50 5.70
ZDDH0025 75.00 82.00 7.00 6.14 including ZDDH0032 75.00 76.00 1.00 5.02
ZDDH0025 104.00 118.00 14.00 1.63 including ZDDH0032 128.00 204.00 76.00 0.93
ZDDH0025 110.00 113.60 3.60 4.97 including ZDDH0032 128.00 140.00 12.00 1.39 including
ZDDH0025 148.00 160.27 12.27 4.98 including ZDDH0032 132.63 135.00 2.37 4.30 including
ZDDH0025 148.00 170.55 22.55 2.98 including ZDDH0032 157.00 162.00 5.00 2.41 including
ZDDH0025 155.20 159.90 4.70 10.69 including ZDDH0032 171.00 174.80 3.80 1.92 including
ZDDH0026 92.00 110.00 18.00 1.36 ZDDH0032 178.30 197.00 18.70 1.57 including
ZDDH0026 105.40 110.00 4.60 4.99 including ZDDH0032 178.30 179.40 1.10 5.15 including
ZDDH0026 233.00 242.00 9.00 1.85 ZDDH0032 191.00 197.00 6.00 2.58 including
ZDDH0026 240.00 242.00 2.00 7.31 including ZDDH0033 40.00 68.00 28.00 1.22
ZDDH0027 176.00 206.50 30.50 0.40 ZDDH0033 57.00 67.00 10.00 3.17 including
ZDDH0027 176.00 202.00 26.00 0.44 including ZDDH0033 59.00 63.00 4.00 5.96 including
ZDDH0027 176.00 188.00 12.00 0.64 including ZDDH0033 100.00 104.00 4.00 1.51
ZDDH0027 176.00 182.00 6.00 1.21 including ZDDH0033 134.70 137.00 2.30 1.27
ZDDH0033 143.00 144.00 1.00 1.45

7

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

Hole_ID From(m) To(m) Interval Au(g/t) Comments
ZDDH0034 17.00 28.00 11.00 0.79
ZDDH0034 23.00 24.00 1.00 4.59 including
ZDDH0034 27.00 28.00 1.00 1.77 including
ZDDH0034 62.22 63.34 1.12 2.85
ZDDH0034 87.00 92.84 5.84 1.12
ZDDH0034 89.00 91.00 2.00 2.45
ZDDH0034 105.40 106.00 0.60 1.15
ZDDH0034 116.00 117.00 1.00 1.17
ZDDH0034 172.00 173.00 1.00 1.68
ZDDH0034 180.40 181.50 1.10 6.58
ZDDH0034 193.00 194.00 1.00 2.73
ZDDH0034 202.00 203.00 1.00 2.12
ZDDH0035 67.00 68.00 1.00 2.67
ZDDH0035 81.10 110.34 29.24 1.05
ZDDH0035 89.00 94.00 5.00 4.11 including
ZDDH0035 84.00 106.00 22.00 1.34 including
ZDDH0035 144.00 155.00 11.00 1.15
ZDDH0035 153.00 155.00 2.00 4.41 including
ZDDH0035 162.00 164.00 2.00 1.03
ZDDH0035 199.00 200.00 1.00 1.76
ZDDH0035 192.00 238.00 46.00 0.72
ZDDH0035 224.00 238.00 14.00 1.86 including
ZDDH0035 224.00 233.00 9.00 2.59 including
ZDDH0035 277.00 278.00 1.00 1.63
ZDDH0036 74.00 125.00 51.00 1.07
ZDDH0036 74.00 96.00 22.00 2.16 including
ZDDH0036 88.30 96.00 7.70 5.04 including
ZDDH0036 104.00 105.00 1.00 2.33 including
ZDDH0036 114.00 115.00 1.00 2.84 including
ZDDH0036 165.00 166.00 1.00 1.11
ZDDH0036 215.00 216.00 1.00 1.60
ZDDH0037 42.00 65.00 23.00 0.40
ZDDH0037 42.00 42.68 0.68 1.55 including
ZDDH0037 56.00 65.00 9.00 0.70 including
ZDDH0037 56.00 57.00 1.00 2.47 including
ZDDH0037 62.00 64.00 2.00 1.32 including
ZDDH0037 149.00 172.00 23.00 0.82
ZDDH0037 149.00 154.00 5.00 1.47 including
ZDDH0037 162.00 172.00 10.00 0.92 including
ZDDH0037 162.00 168.00 6.00 1.04 including
ZDDH0038 23.00 24.00 1.00 3.12
ZDDH0038 74.20 113.00 38.80 0.49
ZDDH0038 74.20 77.00 2.80 2.06 including
ZDDH0038 92.00 93.00 1.00 4.39 including
ZDDH0038 105.00 106.00 1.00 2.11 including
ZDDH0038 148.00 152.00 4.00 1.17 including
ZDDH0038 178.00 186.00 8.00 0.50
ZDDH0038 185.00 186.00 1.00 2.48 including
ZDDH0038 200.00 208.10 8.10 1.12 including
ZDDH0038 202.00 204.00 2.00 3.72 including
ZDDH0039 2.50 5.60 3.10 0.39
ZDDH0039 78.70 81.00 2.30 1.43
ZDDH0039 188.00 252.50 64.50 0.47
ZDDH0039 212.00 232.00 20.00 0.84 including
ZDDH0039 212.00 218.00 6.00 1.49 including
ZDDH0039 226.00 227.00 1.00 3.86 including
ZDDH0039 237.00 238.00 1.00 2.30 including
ZDDH0039 268.00 269.00 1.00 1.62 including
ZDDH0040 136.00 197.00 61.00 0.75
ZDDH0040 136.00 152.00 16.00 1.96 including
ZDDH0040 136.00 146.00 10.00 2.61 including
ZDDH0040 142.00 146.00 4.00 5.34 including
ZDDH0040 160.00 164.00 4.00 0.95 including
ZDDH0040 161.00 162.00 1.00 2.84 including
ZDDH0040 182.00 188.00 6.00 0.72 including
ZDDH0040 195.00 197.00 2.00 2.75 including
ZDDH0040 288.00 291.00 3.00 1.24 including
ZDDH0041 2.00 12.00 10.00 0.55
ZDDH0041 6.00 8.00 2.00 1.33 including
ZDDH0041 23.50 52.00 28.50 0.38
ZDDH0041 23.50 32.00 8.50 0.48 including
ZDDH0041 29.00 32.00 3.00 0.99 including
Hole_ID From(m) To(m) Interval Au(g/t) Comments
ZDDH0041 40.00 46.00 6.00 0.61
ZDDH0041 106.20 108.00 1.80 3.49
ZDDH0041 127.50 128.00 0.50 29.90
ZDDH0041 140.00 145.00 5.00 5.91
ZDDH0041 141.65 143.50 1.85 15.22 including
ZDDH0042 112.00 127.00 15.00 0.68
ZDDH0042 126.00 127.00 1.00 5.64 including
ZDDH0043 5.30 56.00 50.70 0.45
ZDDH0043 5.30 22.50 17.20 0.94 including
ZDDH0043 9.50 13.00 3.50 3.44 including
ZDDH0043 80.00 105.00 25.00 0.41
ZDDH0043 81.00 85.00 4.00 0.87 including
ZDDH0043 103.00 105.00 2.00 1.60 including
ZDDH0043 241.00 242.00 1.00 1.02
ZDDH0044 104.00 107.00 3.00 0.92
ZDDH0044 104.00 105.00 1.00 2.25 including
ZDDH0045 23.00 50.00 27.00 0.59
ZDDH0045 36.00 46.20 10.20 1.07 including
ZDDH0045 36.00 40.00 4.00 1.80 including
ZDDH0045 97.00 98.00 1.00 1.91
ZDDH0045 196.30 203.00 6.70 1.10
ZDDH0045 197.00 198.50 1.50 3.21 including
ZDDH0045 196.30 199.00 2.70 2.70 including
ZDDH0046 17.60 39.00 21.40 1.17
ZDDH0046 26.00 31.00 5.00 3.75 including
ZDDH0046 28.00 31.00 3.00 5.71 including
ZDDH0046 180.00 181.00 1.00 1.11
ZDDH0046 223.00 224.00 1.00 1.45
ZDDH0046 248.60 250.00 1.40 1.35
ZDDH0047 30.00 134.50 104.50 0.56
ZDDH0047 35.00 36.00 1.00 2.98 including
ZDDH0047 74.00 75.00 1.00 2.03 including
ZDDH0047 97.00 134.80 37.80 1.23 including
ZDDH0047 97.00 109.00 12.00 2.68 including
ZDDH0047 97.00 99.00 2.00 11.00 including
ZDDH0047 130.00 134.80 4.80 2.71 including
ZDDH0047 210.00 211.00 1.00 1.78
ZDDH0047 288.00 289.00 1.00 1.19
ZDDH0048 45.00 90.00 45.00 0.54
ZDDH0048 53.50 54.50 1.00 3.15 including
ZDDH0048 47.00 55.00 8.00 1.02 including
ZDDH0048 80.00 83.00 3.00 4.18 including
ZDDH0049 124.00 235.50 111.50 1.25
ZDDH0049 124.00 182.00 58.00 2.04 including
ZDDH0049 154.00 181.50 27.50 3.57 including
ZDDH0049 124.00 141.00 17.00 1.11 including
ZDDH0049 124.00 125.00 1.00 10.25 including
ZDDH0049 159.00 172.00 13.00 5.32 including
ZDDH0049 159.00 165.00 6.00 4.17 including
ZDDH0049 177.00 182.00 5.00 5.14 including
ZDDH0049 213.00 235.50 22.50 0.89 including
ZDDH0049 215.00 218.00 3.00 1.39 including
ZDDH0049 227.00 235.50 8.50 1.81 including
ZDDH0049 231.00 235.50 4.50 3.07 including
ZDDH0049 245.00 246.00 1.00 1.66
ZDDH0049 285.00 286.00 1.00 3.81
ZDDH0049 290.00 291.00 1.00 1.12
ZDDH0050 6.00 16.00 10.00 1.56
ZDDH0050 7.00 8.00 1.00 10.65 including
ZDDH0050 92.00 93.00 1.00 2.55
ZDDH0050 157.00 222.00 65.00 0.84
ZDDH0050 183.00 185.00 2.00 2.02 including
ZDDH0050 192.00 193.00 1.00 2.35 including
ZDDH0050 202.00 209.00 7.00 5.84 including
ZDDH0050 205.00 207.50 2.50 15.92 including
ZDDH0050 220.00 221.00 1.00 1.27 including

8

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

Hole_ID From(m) To(m) Interval Au(g/t) Comments Hole_ID From(m) To(m) Interval Au(g/t) Comments
ZDDH0051 249.00 347.00 98.00 0.95 ZDDH0058 34.00 35.00 1.00 1.29
ZDDH0051 251.00 282.00 31.00 1.55 including ZDDH0058 237.00 250.00 13.00 0.47
ZDDH0051 251.00 265.00 14.00 2.71 including ZDDH0058 237.00 241.00 4.00 0.69 including
ZDDH0051 258.00 264.00 6.00 4.86 including ZDDH0058 248.00 250.00 2.00 1.49 including
ZDDH0051 260.00 261.00 1.00 27.60 including ZDDH0059 61.00 62.00 1.00 1.02
ZDDH0051 264.00 265.00 1.00 9.85 including ZDDH0059 194.50 282.00 87.50 0.72
ZDDH0051 303.00 320.00 17.00 1.03 including ZDDH0059 196.00 244.50 48.50 1.02 including
ZDDH0051 317.00 318.00 1.00 5.99 including ZDDH0059 207.00 241.60 34.60 1.29 including
ZDDH0051 317.00 332.50 15.50 1.19 including ZDDH0059 229.00 241.60 12.60 2.21 including
ZDDH0051 328.00 347.00 19.00 1.25 including ZDDH0059 196.00 198.00 2.00 1.76 including
ZDDH0051 345.00 346.00 1.00 8.25 including ZDDH0059 207.00 212.00 5.00 1.58 including
ZDDH0052 10.00 11.00 1.00 1.35 ZDDH0059 236.00 241.60 5.60 4.37 including
ZDDH0052 25.00 67.00 42.00 0.44 ZDDH0059 276.00 282.00 6.00 1.48
ZDDH0052 25.50 26.50 1.00 2.25 including ZDDH0060 156.00 168.00 12.00 0.44
ZDDH0052 64.00 68.00 4.00 2.37 ZDDH0060 163.00 166.00 3.00 0.78 including
ZDDH0052 154.00 157.00 3.00 3.27 ZDDH0060 215.00 220.95 5.95 0.37
ZDDH0052 177.00 178.00 1.00 1.51 ZDDH0061 157.00 158.00 1.00 2.31
ZDDH0053 7.70 87.00 79.30 0.72 ZDDH0061 194.00 195.00 1.00 0.83
ZDDH0053 15.00 16.00 1.00 1.20 including ZDDH0062 8.00 70.00 62.00 0.46
ZDDH0053 36.00 37.00 1.00 1.12 including ZDDH0062 8.00 31.00 23.00 0.88 including
ZDDH0053 64.00 87.00 23.00 2.04 including ZDDH0062 8.00 21.50 13.50 1.12 including
ZDDH0053 64.00 71.00 7.00 4.47 including ZDDH0062 13.00 15.50 2.50 2.01 including
ZDDH0053 66.00 69.00 3.00 7.89 including ZDDH0062 18.00 21.50 3.50 1.94 including
ZDDH0053 64.00 80.50 16.50 2.50 including ZDDH0062 68.00 70.00 2.00 2.40 including
ZDDH0053 134.50 136.86 2.36 1.13 ZDDH0062 110.00 111.00 1.00 1.18
ZDDH0053 146.00 147.00 1.00 1.87 ZDDH0062 119.00 120.00 1.00 2.36
ZDDH0053 188.00 191.00 3.00 0.58 ZDDH0062 108.00 201.00 93.00 0.37
ZDDH0053 240.00 241.00 1.00 1.09 ZDDH0062 129.00 173.00 44.00 0.53 including
ZDDH0053 274.00 281.00 7.00 0.77 ZDDH0062 134.00 141.00 7.00 0.76 including
ZDDH0053 274.00 275.00 1.00 3.65 including ZDDH0062 162.20 172.00 9.80 1.30 including
ZDDH0053 280.00 281.00 1.00 1.11 including ZDDH0062 225.00 226.00 1.00 1.40
ZDDH0054 91.00 110.00 19.00 0.46 ZDDH0062 256.00 280.00 24.00 0.66
ZDDH0054 104.00 108.00 4.00 1.48 including ZDDH0062 256.00 261.00 5.00 2.29 including
ZDDH0054 118.50 119.20 0.70 1.72 ZDDH0063 0.00 3.00 3.00 2.26
ZDDH0054 252.00 253.00 1.00 1.23 ZDDH0063 166.00 332.00 166.00 0.57
ZDDH0054 280.00 281.00 1.00 8.75 ZDDH0063 169.00 171.00 2.00 1.20 including
ZDDH0054 336.00 337.00 1.00 1.23 ZDDH0063 180.00 210.00 30.00 0.90 including
ZDDH0055 20.00 241.20 221.20 0.62 ZDDH0063 180.00 182.00 2.00 7.52 including
ZDDH0055 21.00 22.00 1.00 3.19 including ZDDH0063 197.00 210.00 13.00 0.75 including
ZDDH0055 48.00 122.00 74.00 1.05 including ZDDH0063 277.00 316.00 39.00 1.22 including
ZDDH0055 48.00 88.50 40.50 1.51 including ZDDH0063 300.00 316.00 16.00 2.96 including
ZDDH0055 48.00 60.12 12.12 4.83 including ZDDH0063 311.00 316.00 5.00 9.09 including
ZDDH0055 77.00 80.00 3.00 16.88 including ZDDH0064 102.00 103.70 1.70 1.43
ZDDH0055 105.00 109.00 4.00 3.04 including ZDDH0064 188.00 202.00 14.00 0.55
ZDDH0055 168.00 169.00 1.00 2.00 including ZDDH0064 192.00 196.00 4.00 1.33 including
ZDDH0055 200.00 241.20 41.20 1.13 including ZDDH0064 243.00 244.00 1.00 1.11
ZDDH0055 200.00 233.00 33.00 1.36 including ZDDH0064 309.00 317.00 8.00 0.78
ZDDH0055 200.00 201.00 1.00 2.83 including ZDDH0064 311.00 314.00 3.00 1.53
ZDDH0055 207.00 208.00 1.00 6.51 including ZDDH0065 25.00 27.00 2.00 1.25
ZDDH0055 217.00 231.00 14.00 2.03 including ZDDH0065 56.40 58.80 2.40 0.78
ZDDH0055 223.00 231.00 8.00 2.64 including ZDDH0065 155.00 167.00 12.00 1.72
ZDDH0055 282.00 326.00 44.00 0.48 ZDDH0066 306.00 465.00 159.00 0.46 including
ZDDH0055 282.00 283.00 1.00 3.91 including ZDDH0066 306.00 443.00 137.00 0.51 including
ZDDH0055 302.00 308.00 6.00 1.97 including ZDDH0066 389.00 436.00 47.00 1.00 including
ZDDH0055 319.00 320.00 1.00 1.51 including ZDDH0066 308.00 310.00 2.00 1.98 including
ZDDH0055 325.00 326.00 1.00 3.77 including ZDDH0066 357.00 362.00 5.00 1.10 including
ZDDH0056 232.00 236.70 4.70 0.70 ZDDH0066 357.50 361.00 3.50 1.43 including
ZDDH0056 236.00 236.70 0.70 3.09 ZDDH0066 389.00 412.00 23.00 1.09 including
ZDDH0057 22.00 44.00 22.00 1.03 ZDDH0066 389.00 401.00 12.00 1.59 including
ZDDH0057 22.00 23.00 1.00 10.20 including ZDDH0066 389.00 392.00 3.00 2.97 including
ZDDH0057 22.00 30.00 8.00 1.61 including ZDDH0066 424.00 443.00 19.00 1.24 including
ZDDH0057 216.00 233.00 17.00 0.55 ZDDH0066 427.00 436.00 9.00 2.14 including
ZDDH0057 225.00 228.00 3.00 1.93 including ZDDH0067 5.00 64.00 59.00 1.72
ZDDH0057 274.00 351.00 77.00 1.13
ZDDH0057 279.00 321.00 42.00 1.97 including
ZDDH0057 279.00 311.00 32.00 2.32 including
ZDDH0057 283.00 298.00 15.00 3.25 including
ZDDH0057 318.00 321.00 3.00 2.75 including

9

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

Hole_ID From(m) To(m) Interval Au(g/t) Comments
ZDDH0067 5.00 37.40 32.40 3.05 including
ZDDH0067 31.00 37.00 6.00 15.18 including
ZDDH0067 81.00 82.00 1.00 1.87
ZDDH0067 91.00 96.00 5.00 0.53
ZDDH0067 107.00 121.00 14.00 0.47
ZDDH0067 108.00 109.00 1.00 1.27 including
ZDDH0067 119.00 121.00 2.00 1.17 including
ZDDH0067 136.00 139.00 3.00 2.13
ZDDH0068 0.00 7.00 7.00 0.45
ZDDH0068 56.00 117.70 61.70 0.30
ZDDH0068 60.00 83.00 23.00 0.46 including
ZDDH0068 60.00 61.00 1.00 2.43 including
ZDDH0068 74.00 75.00 1.00 1.14 including
ZDDH0068 114.90 117.70 2.80 0.84 including
ZDDH0068 143.00 154.00 11.00 0.62
ZDDH0068 152.00 153.00 1.00 1.59 including
ZDDH0068 185.00 186.00 1.00 1.84
ZDDH0068 189.00 190.00 1.00 1.37
ZDDH0068 200.00 201.00 1.00 2.03
ZDDH0068 209.00 210.00 1.00 4.42
ZDDH0068 225.00 226.00 1.00 1.53
ZDDH0068 303.00 303.93 0.93 1.14
ZDDH0069 147.00 414.00 267.00 1.12
ZDDH0069 221.00 414.00 193.00 1.47 including
ZDDH0069 224.00 404.00 180.00 1.57 including
ZDDH0069 234.00 366.00 132.00 1.89 including
ZDDH0069 147.00 162.00 15.00 0.68 including
ZDDH0069 147.00 152.00 5.00 1.24 including
ZDDH0069 184.00 184.50 0.50 8.69 including
ZDDH0069 234.00 258.00 24.00 1.72 including
ZDDH0069 244.00 248.00 4.00 4.94 including
ZDDH0069 289.00 345.00 56.00 3.49 including
ZDDH0069 292.00 337.00 45.00 4.02 including
ZDDH0069 289.00 322.00 33.00 5.07 including
ZDDH0069 292.00 320.50 28.50 5.68 including
ZDDH0069 314.00 320.50 6.50 7.28 including
ZDDH0069 292.00 303.00 11.00 7.73 including
ZDDH0069 392.50 401.00 8.50 2.49 including
ZDDH0069 398.00 400.00 2.00 7.89 including
ZDDH0070 1.50 24.00 22.50 0.34
ZDDH0070 10.95 24.00 13.05 0.50 including
ZDDH0070 18.00 21.50 3.50 0.98 including
ZDDH0070 155.00 156.00 1.00 2.28
ZDDH0071 25.00 96.00 71.00 0.80
ZDDH0071 41.00 43.00 2.00 1.96 including
ZDDH0071 62.79 70.00 7.21 1.04 including
ZDDH0071 67.00 70.00 3.00 1.98 including
ZDDH0071 88.00 96.00 8.00 4.18 including
ZDDH0071 89.75 95.00 5.25 5.97 including
ZDDH0071 133.00 149.50 16.50 0.36
ZDDH0071 139.00 146.50 7.50 0.55 including
ZDDH0071 255.00 255.50 0.50 2.69
ZDDH0072 356.00 396.00 40.00 0.69
ZDDH0072 366.20 372.20 6.00 1.89 including
ZDDH0072 366.20 368.00 1.80 5.50 including
ZDDH0072 383.00 384.00 1.00 5.01 including
ZDDH0072 393.00 394.00 1.00 8.39 including
ZDDH0073 21.40 23.00 1.60 0.62
ZDDH0073 69.00 70.00 1.00 3.33
ZDDH0073 93.00 95.00 2.00 2.04
ZDDH0073 179.00 180.00 1.00 2.73
ZDDH0073 207.00 285.00 78.00 0.41
ZDDH0073 207.00 209.00 2.00 7.42 including
ZDDH0073 207.00 232.06 25.06 0.74 including
ZDDH0073 279.00 279.50 0.50 13.80 including
ZDDH0074 89.00 116.00 27.00 1.16
ZDDH0074 89.00 94.00 5.00 2.15 including
ZDDH0074 114.00 116.00 2.00 8.06 including
Hole_ID From(m) To(m) Interval Au(g/t) Comments
ZDDH0075 76.00 335.90 259.90 0.70
ZDDH0075 89.00 309.00 220.00 0.86 including
ZDDH0075 97.00 100.00 3.00 2.63 including
ZDDH0075 124.00 127.00 3.00 2.40 including
ZDDH0075 137.00 140.00 3.00 1.49 including
ZDDH0075 153.50 155.00 1.50 5.99 including
ZDDH0075 178.00 187.00 9.00 1.02 including
ZDDH0075 217.00 220.00 3.00 1.18 including
ZDDH0075 236.00 238.00 2.00 1.56 including
ZDDH0075 249.00 251.00 2.00 1.03 including
ZDDH0075 270.00 309.00 39.00 2.73 including
ZDDH0075 270.00 296.00 26.00 3.54 including
ZDDH0075 270.00 285.50 15.50 5.49 including
ZDDH0075 304.00 309.00 5.00 2.72 including
ZDDH0075 328.00 338.80 10.80 1.44 including
ZDDH0075 336.00 338.80 2.80 4.97 including
ZDDH0076 145.00 146.00 1.00 0.57
ZDDH0077 65.00 82.00 17.00 0.54
ZDDH0077 74.00 78.00 4.00 1.13 including
ZDDH0077 69.60 70.60 1.00 1.91 including
ZDDH0077 121.70 122.50 0.80 1.56
ZDDH0078 214.00 225.00 11.00 0.67
ZDDH0078 214.33 216.00 1.67 3.46 including
ZDDH0078 263.00 265.00 2.00 1.54
ZDDH0078 391.00 393.00 2.00 0.92
ZDDH0079 33.00 34.00 1.00 1.33
ZDDH0079 70.20 72.10 1.90 1.56
ZDDH0079 165.60 166.00 0.40 4.26
ZDDH0079 256.00 257.00 1.00 2.14
ZDDH0079 272.00 273.00 1.00 1.26
ZDDH0079 288.00 295.00 7.00 0.91
ZDDH0079 290.00 294.00 4.00 1.19 including
ZDDH0080 108.00 121.00 13.00 1.17
ZDDH0080 115.50 120.00 4.50 3.08 including
ZDDH0080 141.00 143.00 2.00 0.98
ZDDH0080 254.50 255.00 0.50 1.19
ZDDH0080 285.05 293.00 7.95 0.46
ZDDH0080 286.00 287.50 1.50 1.01 including
ZDDH0081 82.00 110.00 28.00 1.90
ZDDH0081 82.00 91.00 9.00 3.76 including
ZDDH0081 82.00 84.00 2.00 10.95 including
ZDDH0081 88.50 91.00 2.50 4.63 including
ZDDH0081 104.00 110.00 6.00 2.91 including
ZDDH0081 104.00 106.00 2.00 7.45 including
ZDDH0081 201.00 202.00 1.00 1.62
ZDDH0082 151.00 153.00 2.00 3.30
ZDDH0082 273.00 303.00 30.00 0.33
ZDDH0082 294.00 295.00 1.00 2.88
ZDDH0082 301.00 303.00 2.00 2.43
ZDDH0083 180.00 190.10 10.10 0.92
ZDDH0083 180.00 184.00 4.00 1.85 including
ZDDH0083 264.00 288.00 24.00 1.63
ZDDH0083 273.00 288.00 15.00 2.55 including
ZDDH0083 273.00 280.00 7.00 4.48 including
ZDDH0083 276.00 280.00 4.00 7.25 including
ZDDH0083 336.00 339.00 3.00 1.21
ZDDH0083 362.00 363.00 1.00 3.57
ZDDH0083 395.00 409.00 14.00 1.11
ZDDH0083 401.00 407.00 6.00 2.12 including
ZDDH0084 118.30 203.97 85.67 1.42
ZDDH0084 124.00 144.70 20.70 3.81 including
ZDDH0084 125.00 136.00 11.00 5.49 including
ZDDH0084 162.00 169.50 7.50 3.85 including

10

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

Hole_ID From(m) To(m) Interval Au(g/t) Comments Hole_ID From(m) To(m) Interval Au(g/t) Comments
ZDDH0085 22.00 24.00 2.00 1.94 ZDDH0094 37.00 40.00 3.00 2.41
ZDDH0085 85.00 153.00 68.00 0.47 ZDDH0094 83.49 105.00 21.51 0.71
ZDDH0085 85.00 87.00 2.00 2.34 including ZDDH0094 86.30 91.00 4.70 1.02
ZDDH0085 141.65 153.00 11.35 2.19 ZDDH0094 100.00 105.00 5.00 1.64
ZDDH0085 147.00 151.00 4.00 5.38 ZDDH0094 298.00 346.00 48.00 0.67
ZDDH0085 185.00 186.00 1.00 1.62 ZDDH0094 298.00 299.00 1.00 1.54 including
ZDDH0085 219.00 318.00 99.00 0.49 ZDDH0094 319.00 323.00 4.00 6.45 including
ZDDH0085 219.00 224.00 5.00 2.40 including ZDDH0094 343.00 344.00 1.00 1.03 including
ZDDH0085 250.00 256.00 6.00 2.25 including ZDDH0094 375.00 375.50 0.50 1.51
ZDDH0085 265.60 269.00 3.40 1.42 including ZDDH0095 106.00 108.00 2.00 0.62
ZDDH0085 290.00 292.00 2.00 1.69 including ZDDH0095 135.95 136.50 0.55 1.52
ZDDH0085 307.00 309.00 2.00 1.46 including ZDDH0095 212.50 224.00 11.50 1.13
ZDDH0085 312.00 313.00 1.00 1.48 including ZDDH0095 212.50 214.07 1.57 7.37 including
ZDDH0086 15.00 16.00 1.00 0.58 ZDDH0096 29.00 47.00 18.00 0.46
ZDDH0086 36.00 38.00 2.00 0.30 ZDDH0096 39.00 46.00 7.00 0.79 including
ZDDH0086 128.00 129.00 1.00 0.90 ZDDH0096 112.00 113.50 1.50 0.98
ZDDH0086 135.00 137.00 2.00 0.51 ZDDH0096 155.00 157.50 2.50 0.83
ZDDH0087 86.00 190.00 104.00 0.76 ZDDH0096 185.00 187.00 2.00 1.59
ZDDH0087 86.00 131.00 45.00 1.57 including ZDDH0096 190.00 191.00 1.00 1.41
ZDDH0087 86.00 116.00 30.00 2.24 including ZDDH0096 261.00 267.00 6.00 0.64
ZDDH0087 90.00 107.00 17.00 3.62 including ZDDH0096 261.00 262.00 1.00 2.21 including
ZDDH0087 187.00 189.00 2.00 1.12 ZDDH0097 9.00 10.00 1.00 2.95
ZDDH0088 9.00 10.00 1.00 0.48 ZDDH0097 89.00 90.00 1.00 2.15
ZDDH0088 22.50 23.50 1.00 0.49 ZDDH0098 1.20 3.00 1.80 1.25
ZDDH0088 39.80 40.50 0.70 0.97 ZDDH0098 74.00 124.00 50.00 1.73
ZDDH0088 90.00 92.00 2.00 0.57 ZDDH0098 74.00 76.00 2.00 13.95 including
ZDDH0088 133.50 134.00 0.50 0.91 ZDDH0098 97.00 103.00 6.00 8.47 including
ZDDH0088 180.00 181.00 1.00 69.70 ZDDH0098 166.00 203.00 37.00 0.62
ZDDH0089 28.45 37.00 8.55 0.37 ZDDH0098 168.15 172.82 4.67 1.88 including
ZDDH0089 29.00 33.00 4.00 0.49 ZDDH0098 190.00 203.00 13.00 0.98 including
ZDDH0090 23.00 24.00 1.00 0.89 ZDDH0098 199.00 203.00 4.00 2.40 including
ZDDH0090 43.00 83.00 40.00 0.53 ZDDH0099 10.00 11.00 1.00 3.57
ZDDH0090 60.00 78.00 18.00 1.05 including ZDDH0099 90.80 157.00 66.20 0.53
ZDDH0090 60.00 69.00 9.00 1.35 including ZDDH0099 96.00 111.00 15.00 1.36
ZDDH0090 148.00 182.00 34.00 0.44 ZDDH0099 138.00 139.00 1.00 1.13
ZDDH0090 148.00 149.00 1.00 1.86 including ZDDH0099 148.00 148.80 0.80 3.43
ZDDH0090 157.00 159.00 2.00 5.42 including ZDDH0099 178.00 178.90 0.90 6.53
ZDDH0090 223.00 224.00 1.00 3.99 ZDDH0099 251.00 252.00 1.00 1.11
ZDDH0091 36.00 40.00 4.00 8.04 ZDDH0099 319.40 328.00 8.60 0.58
ZDDH0091 36.00 38.00 2.00 14.44 including ZDDH0099 319.40 322.00 2.60 1.32
ZDDH0091 73.00 85.50 12.50 0.33 ZDDH0099 342.00 343.00 1.00 1.13
ZDDH0091 83.00 84.50 1.50 1.42 including ZDDH0100 8.00 9.00 1.00 1.08
ZDDH0091 125.00 131.00 6.00 0.34 ZDDH0100 21.00 56.00 35.00 1.07
ZDDH0091 172.00 173.00 1.00 0.47 ZDDH0100 29.10 54.50 25.40 1.39 including
ZDDH0092 45.00 46.00 1.00 2.24 ZDDH0100 29.10 31.00 1.90 10.30 including
ZDDH0092 86.00 87.00 1.00 10.88 ZDDH0100 105.00 106.00 1.00 5.86
ZDDH0092 121.00 123.94 2.94 1.11 ZDDH0100 144.50 157.00 12.50 0.75
ZDDH0092 282.00 382.00 100.00 0.48 ZDDH0100 147.00 148.00 1.00 4.99 including
ZDDH0092 282.00 292.00 10.00 1.43 including ZDDH0100 155.00 157.00 2.00 1.51 including
ZDDH0092 305.00 326.00 21.00 0.58 including ZDDH0100 193.00 194.00 1.00 1.45
ZDDH0092 311.00 319.00 8.00 1.08 including ZDDH0101 80.00 81.87 1.87 0.82
ZDDH0092 331.00 332.00 1.00 1.12 including ZDDH0101 133.00 202.00 69.00 0.95
ZDDH0092 369.00 371.00 2.00 2.31 including ZDDH0101 133.00 180.00 47.00 1.21 including
ZDDH0092 378.00 379.00 1.00 1.25 including ZDDH0101 136.00 159.40 23.40 1.76 including
ZDDH0093 25.60 27.05 1.45 15.94 ZDDH0101 196.00 197.00 1.00 4.14 including
ZDDH0093 116.00 117.00 1.00 1.85 ZDDH0101 258.00 286.56 28.56 1.30
ZDDH0093 132.00 150.00 18.00 0.51 ZDDH0101 275.50 285.00 9.50 3.05 including
ZDDH0093 136.00 142.00 6.00 1.16 including ZDDH0101 280.00 284.00 4.00 5.94 including
ZDDH0093 165.00 175.00 10.00 0.74 ZDDH0102 187.50 202.00 14.50 0.28
ZDDH0093 170.00 173.00 3.00 1.86 including ZDDH0102 189.00 190.00 1.00 1.46 including
ZDDH0093 190.47 194.18 3.71 0.79 ZDDH0103 4.50 9.00 4.50 0.35
ZDDH0093 268.00 270.00 2.00 1.10 ZDDH0103 31.20 31.60 0.40 3.48
ZDDH0093 279.00 304.00 25.00 0.77 ZDDH0103 88.00 102.00 14.00 1.42
ZDDH0093 279.00 281.00 2.00 1.40 including ZDDH0103 88.00 93.60 5.60 3.01 including
ZDDH0093 290.00 304.00 14.00 1.08 including
ZDDH0093 298.00 304.00 6.00 2.24 including

11

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

Hole_ID **From(m) ** **To(m) ** Interval Au(g/t) Comments Hole_ID From(m) To(m) Interval Au(g/t) Comments
ZDDH0103 133.00 133.76 0.76 1.50 ZDDH0119 350.00 374.00 24.00 1.02 including
ZDDH0103 140.00 141.00 1.00 4.26 ZDDH0119 355.00 374.00 19.00 1.22 including
ZDDH0103 168.00 180.00 12.00 0.40 ZDDH0119 355.00 359.50 4.50 2.97 including
ZDDH0103 178.70 180.00 1.30 1.76 including ZDDH0119 365.00 366.00 1.00 2.64 including
ZDDH0103 226.00 228.00 2.00 0.56 ZDDH0119 373.00 374.00 1.00 4.22 including
ZDDH0104 174.91 216.00 41.09 0.95 ZDDH0120 229.00 232.00 3.00 1.47
ZDDH0104 174.91 197.00 22.09 1.50 including ZDDH0120 317.00 318.00 1.00 15.30
ZDDH0104 183.00 197.00 14.00 1.87 including ZDDH0120 351.00 352.00 1.00 1.16
ZDDH0107 14.10 16.28 2.18 1.15 ZDDH0120 371.00 378.00 7.00 0.61
ZDDH0107 35.70 48.00 12.30 0.70 ZDDH0120 376.00 377.00 1.00 1.39 including
ZDDH0107 37.00 39.00 2.00 2.31 including ZDDH0120 383.00 384.00 1.00 1.03
ZDDH0107 46.00 48.00 2.00 1.08 ZDDH0120 387.00 388.00 1.00 1.27
ZDDH0107 359.00 382.00 23.00 0.57 ZDDH0120 396.00 397.00 1.00 1.02
ZDDH0107 372.00 381.00 9.00 1.16 including ZDDH0120 412.00 415.00 3.00 0.41
ZDDH0107 353.00 354.00 1.00 1.28 ZDDH0121 35.00 41.00 6.00 0.47
ZDDH0110 80.00 100.00 20.00 1.48 ZDDH0121 35.00 36.00 1.00 1.07 including
ZDDH0110 80.00 92.00 12.00 1.99 including ZDDH0121 60.00 91.50 31.50 0.34
ZDDH0110 82.50 88.00 5.50 3.37 including ZDDH0121 66.00 73.50 7.50 0.59 including
ZDDH0110 114.00 120.00 6.00 0.53 ZDDH0121 66.00 67.00 1.00 1.11 including
ZDDH0110 117.00 118.00 1.00 1.39 including ZDDH0121 72.50 73.20 0.70 3.27 including
ZDDH0110 186.00 187.00 1.00 1.10 ZDDH0121 79.00 80.00 1.00 1.40 including
ZDDH0110 194.00 195.00 1.00 1.33 ZDDH0121 86.50 88.00 1.50 2.31 including
ZDDH0111 8.00 130.00 122.00 0.43 ZDDH0121 230.00 231.00 1.00 2.94 including
ZDDH0111 8.00 10.00 2.00 0.71 including ZDDH0122 3.00 7.10 4.10 0.38
ZDDH0111 19.00 27.00 8.00 0.65 including ZDDH0122 36.50 37.39 0.89 0.87
ZDDH0111 21.00 22.00 1.00 2.30 including ZDDH0122 43.00 44.00 1.00 0.87
ZDDH0111 27.00 28.00 1.00 1.57 including ZDDH0122 85.00 85.65 0.65 1.11
ZDDH0111 43.00 54.00 11.00 0.34 including ZDDH0122 155.00 156.00 1.00 0.84
ZDDH0111 85.00 86.00 1.00 3.01 including ZDDH0123 70.00 98.00 28.00 0.87
ZDDH0111 98.00 109.00 11.00 2.16 including ZDDH0123 76.00 77.00 1.00 1.93 including
ZDDH0111 120.00 125.00 5.00 1.35 including ZDDH0123 84.07 87.00 2.93 5.38 including
ZDDH0112 130.00 132.00 2.00 0.47 ZDDH0123 200.00 204.00 4.00 0.85
ZDDH0112 154.00 155.00 1.00 11.90 ZDDH0123 203.00 204.00 1.00 1.48 including
ZDDH0112 240.00 241.00 1.00 1.08 ZDDH0123 215.00 221.00 6.00 1.51
ZDDH0114 26.50 27.20 0.70 0.40 ZDDH0123 242.60 243.20 0.60 1.16
ZDDH0114 47.20 53.00 5.80 0.47 ZDDH0123 360.00 361.00 1.00 3.55
ZDDH0114 49.00 51.00 2.00 0.85 ZDDH0123 383.00 384.00 1.00 0.78
ZDDH0114 69.00 71.00 2.00 0.44
ZDDH0114 97.00 106.90 9.90 0.57
ZDDH0114 103.00 105.00 2.00 1.74 including
ZDDH0114 164.00 165.00 1.00 1.00
ZDDH0114 223.00 229.00 6.00 2.29
ZDDH0114 224.00 227.00 3.00 4.36 including
ZDDH0115 235.00 236.00 1.00 0.43
ZDDH0115 311.00 318.00 7.00 1.00
ZDDH0115 312.00 313.00 1.00 3.33
ZDDH0116 59.00 60.00 1.00 5.76
ZDDH0116 65.88 67.27 1.39 0.49
ZDDH0117 162.00 163.00 1.00 1.20
ZDDH0117 190.80 201.00 10.20 0.65
ZDDH0117 190.80 191.50 0.70 5.03 including
ZDDH0117 198.00 201.00 3.00 1.00 including
ZDDH0117 225.00 227.00 2.00 0.46
ZDDH0117 261.00 285.00 24.00 0.58
ZDDH0117 268.00 281.00 13.00 0.88 including
ZDDH0117 268.00 270.00 2.00 1.50 including
ZDDH0117 280.00 281.00 1.00 4.12 including
ZDDH0118 No Significant intercept
ZDDH0119 4.60 6.60 2.00 0.52
ZDDH0119 20.00 26.00 6.00 0.50
ZDDH0119 20.00 21.00 1.00 1.69
ZDDH0119 261.00 262.00 1.00 1.18
ZDDH0119 269.00 270.00 1.00 1.48
ZDDH0119 326.00 374.00 48.00 0.53

*For full results for holes ZDDH00001 to ZDDH00016, refer to Plukka Ltd Prospectus 30 October 2019. For results of ZDDH00017 to ZDDH00091 and ZDDH00095 refer to TSO:ASX announcements 6 March,12 March, 27 April, 6 May, 27 May 2020, 10 June 2020, 26 August 2020 , 4 September 2020, 9 October 2020, 23 October 2020, 4 November 2020, 24 November 2020, 16 December 2020, 22 December 2020, 11 January 2021, 27 January 2021, 19 February 2021, 5 March 2021, 23 March 2021, 29 March 2021, and 29 April 2021

12

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

APPENDIX 2 – DRILL HOLE DETAILS

Hole ID Hole Location Hole Location Hole Location Hole Orientation Hole Orientation Drill Depth
(m)
Northing Easting Elevation Dip Azimuth
ZDDH00028 7036049 341605 581 -60 240 220.60
ZDDH00029 7036351 341849 603 -60 240 250.00
ZDDH00030 7036061 341676 569 -60 240 250.00
ZDDH00031 7036290 341875 605 -60 240 320.00
ZDDH00032 7036047 341757 584 -60 60 285.90
ZDDH00033 7036305 341846 599 -60 240 205.00
ZDDH00034 7036149 341781 579 -60 240 220.60
ZDDH00035 7036349 341876 612 -60 240 283.20
ZDDH00036 7036169 341840 597 -60 240 280.30
ZDDH00037 7036387 341829 624 -60 240 230.00
ZDDH00038 7036118 341693 584 -60 240 299.30
ZDDH00039 7036452 341942 658 -60 240 310.00
ZDDH00040 7036257 341878 607 -60 240 300.00
ZDDH00041 7036092 341621 591 -60 240 200.00
ZDDH00042 7036595 341800 610 -60 240 201.00
ZDDH00043 7036203 341796 584 -60 240 250.00
ZDDH00044 7036501 341643 588 -60 240 308.20
ZDDH00045 7036243 341751 610 -60 240 271.20
ZDDH00046 7036220 341742 613 -60 240 260.00
ZDDH00047 7036100 341774 578 -60 240 320.00
ZDDH00048 7036298 341760 615 -60 240 230.00
ZDDH00049 7036228 341897 626 -60 240 300.00
ZDDH00050 7036327 341767 631 -60 240 250.00
ZDDH00051 7036127 341955 646 -60 240 364.40
ZDDH00052 7036144 341740 601 -60 240 200.00
ZDDH00053 7036251 341821 588 -60 240 300.00
ZDDH00054 7036573 341763 607 -60 240 350.00
ZDDH00055 7036235 341843 609 -60 240 341.00
ZDDH00056 7036538 341927 640 -60 240 305.30
ZDDH00057 7036231 341842 605 -60 60 360.50
ZDDH00058 7036484 341928 654 -60 240 300.00
ZDDH00059 7036189 341929 636 -60 240 320.00
ZDDH00060 7036348 341872 618 -60 60 290.00
ZDDH00061 7036499 341765 605 -60 240 299.40
ZDDH00062 7036333 341803 624 -60 240 300.00
ZDDH00063 7036466 341895 637 -60 60 337.30
ZDDH00064 7036096 341836 604 -60 240 326.80
ZDDH00065 7036542 341918 636 -60 60 269.30
ZDDH00066 7035966 341793 616 -60 60 474.80
ZDDH00067 7036389 341781 647 -60 240 306.80
ZDDH00068 7036371 341744 627 -60 240 323.00
ZDDH00069 7036094 341834 602 -60 60 426.70
ZDDH00070 7036397 341858 628 -60 240 294.20
ZDDH00071 7036112 341610 582 -60 240 223.20
ZDDH00072 7035932 341845 595 -60 60 450.70
ZDDH00073 7035917 341646 546 -60 60 290.20
ZDDH00074 7035972 341594 578 -60 240 257.20
ZDDH00075 7036167 341849 608 -60 60 354.80
ZDDH00076 7036607 341827 602 -60 60 320.66
ZDDH00077 7036179 341615 570 -60 240 225.00
ZDDH00078 7036053 341845 620 -60 60 423.90
ZDDH00079 7036268 341836 588 -60 60 302.00
ZDDH00080 7035745 341887 563 -60 60 419.50
ZDDH00081 7036142 341851 604 -60 240 322.70
ZDDH00082 7035610 341443 525 -60 60 370.20
ZDDH00083 7036088 341903 637 -60 240 455.80
ZDDH00084 7036417 341934 641 -60 60 262.70
ZDDH00085 7036324 341907 625 -60 240 362.90
ZDDH00086 7035715 341528 501 -60 60 200.00
ZDDH00087 7036455 341940 662 -60 60 252.60
ZDDH00088 7035878 341656 565 -60 240 226.90
Hole ID Hole Location Hole Location Hole Location Hole Orientation Hole Orientation Drill Depth
(m)
Northing Easting Elevation Dip Azimuth
ZDDH00089 7036129 341949 655 -60 60 332.00
ZDDH00090 7036258 341871 619 -60 60 358.00
ZDDH00091 7036002 341575 583 -60 240 210.20
ZDDH00092 7036358 341935 636 -60 60 407.40
ZDDH00093 7036124 341810 594 -60 240 319.00
ZDDH00094 7036185 341764 594 -60 240 361.50
ZDDH00095 7036630 341444 633 -60 60 226.30
ZDDH00096 7036349 341706 606 -60 240 268.90
ZDDH00097 7035954 341633 560 -6 240 184.00
ZDDH00098 7036389 341871 361 -60 240 331.70
ZDDH00099 7036199 341870 596 -60 240 301.60
ZDDH00100 7036354 341801 636 -60 240 280.20
ZDDH00101 7036227 341892 615 -60 60 317.00
ZDDH00102 7035940 341996 635 -60 60 347.00
ZDDH00103 7036308 341726 606 -60 240 293.00
ZDDH00104 7036336 341992 660 -60 60 375.60
ZDDH00105 7036411 342036 695 -60 60 257.30
ZDDH00106 7036124 341880 613 -60 60 294.00
ZDDH00107 7036193 341925 632 -60 60 444.20
ZDDH00108 7036386 341972 670 -60 60 294.30
ZDDH00109 7036044 341891 632 -60 240 315.30
ZDDH00110 7036277 341916 623 -60 60 295.50
ZDDH00111 7036486 341928 659 -60 60 300.10
ZDDH00112 7036013 341871 636 -60 60 320.00
ZDDH00113 7036042 341885 632 -60 60 287.00
ZDDH00114 7036379 341916 624 -60 60 339.40
ZDDH00115 7035873 342038 621 -60 60 362.50
ZDDH00116 7035998 341961 685 -60 60 289.10
ZDDH00117 7036306 341968 613 -60 60 357.40
ZDDH00118 7036603 341939 659 -60 60 245.40
ZDDH00119 7036357 342134 646 -60 240 384.40
ZDDH00120 7036005 341906 637 -60 240 433.60
ZDDH00121 7036435 341981 646 -60 60 309.80
ZDDH00122 7036019 341541 574 -60 240 200.00
ZDDH00123 7036211 341913 631 -60 60 283.50
ZDDH00124 7036175 341897 625 -60 240 199.50
ZDDH00125 7036292 342113 677 -60 240 175.10
ZDDH00126 7035876 341647 560 -60 60 470.50
ZDDH00127 7036521 341933 647 -60 60 311.60
ZDDH00128 7035932 341845 596 -60 240 293.00
ZDDH00129 7036229 342096 664 -60 240 410.20
ZDDH00130 7035800 341644 544 -60 60 395.30
ZDDH00131 7036050 341850 618 -60 240 470.20
ZDDH00132 7036687 342156 712 -60 240 310.50
ZDDH00133 7035850 341604 551 -60 60 451.20
ZDDH00134 7036413 342231 638 -60 240 400.00
ZDDH00135 7036590 342166 708 -60 240 390.40
ZDDH00136 7035900 341697 578 -60 60 353.00
ZDDH00137 7036628 342156 705 -60 240 368.30
ZDDH00138 7036506 342306 643 -60 240 367.20
ZDDH00139 7036029 341683 571 60 240 277.80
ZDDH00140 7036578 342260 664 -60 240 362.30
ZDDH00141 7035863 341876 614 -60 240 56.50
ZDDH00142 7036000 341755 586 -60 240 400.00
ZDDH00143 7036305 341939 618 -60 240 326.40
ZDDH00144 7036365 341915 628 -60 60 325.25
ZDDH00145 7036339 341958 639 -60 240 371.00
ZDDH00146 7036304 341933 635 -60 60 441.00
ZDDH00147 7036187 341806 586 -60 240 290.00
ZDDH00148 7036110 341750 573 -60 240 174.00
ZDDH00149 7036431 342435 646 -60 240 226.80
ZDDH00150 7036176 341706 606 -60 240 142.00

13

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

Drill hole details for holes completed at El Zorro by Tesoro since February 2020. Co-ordinate system is PSAD56-19S. APPENDIX 3 – JORC TABLES

JORC Table 1

Section 1: Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut
channels, random chips, or specific specialised
industry standard measurement tools
appropriate to the minerals under
investigation, such as downhole gamma
sondes, or handheld XRF instruments, etc.).
These examples should not be taken as
limiting the broad meaning of sampling.
Tesoro has completed 150 diamond drill holes for 47,208m in
2017, 2018, 2020 and 2021 (ZDDH0001 to ZDDH00150).
Diamond drill holes were drilled with HQ. Sampling was half
core at geologically defined and significant mineralisation
boundaries.
Tesoro considers the sampling methodologies to be
appropriate for this style of mineralisation.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Tesoro Diamond drill holes were drilled with HQ. Sampling was
half core at geological and significant mineralisation
boundaries. Tesoro consider this appropriate for the style of
mineralisation.
Aspects of the determination of mineralisation
that are Material to the Public Report. In cases
where ‘industry standard’ work has been done,
this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Diamond drilling was used to obtain ½ core samples of various
lengths (minimum 0.25m), from which 1kg of material was
pulverised passing 200 mesh to produce a 50g charge for fire
assay fusion with a gravimetric finish. Multielement assays
were completed by 4-acid digest with a 2.5g charge. Tesoro
consider these appropriate assay techniques.
Drilling techniques Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core diameter,
triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Tesoro has completed 150 diamond drill holes for 47,208m.
Diamond drill holes were drilled with HQ. Sampling was half
core at geological and significant mineralisation boundaries.
Standard tube was used.
Drill sample
recovery
Method of recording and assessing core and
chip sample recoveries and results assessed.
Core recovery was estimated using the drillers recorded depth
marks against the length of the core recovered. Reviewing the
core photos, there are occasional shears/faults where core is
broken. There is however no significant core loss.
Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
A single tube system was employed and in general core
recovery good.
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential
loss/gain of fine/coarse material.
There appears to be no potential sample bias as there was no
regular loss of core.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
Geological core logging to a resolution of 25 cm was
undertaken with a record kept of, inter alia, colour, lithology,
weathering, grain size, mineralisation, alteration, geotechnical
characteristics etc. Diamond core is stored at the Company’s
warehouse.
Tesoro consider the data to be of an appropriate level of detail
to support a future resource estimation.
Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc.)
photography.
Logging of diamond core was qualitative and diamond core was
photographed.
The total length and percentage of the relevant
intersections logged.
All drilled intervals are logged and recorded.
Subsampling
techniques and
sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
Drill core was cut, and half core was collected for analysis
If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet or
dry.
Tesoro has not completed any percussion drilling.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
Collection of half core ensured the nature, quality and
appropriateness of the collected sample.

14

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

Criteria JORC Code explanation Commentary
The sample preparation of crushing half core at the lab to mm
size prior to splitting off a 50g charge (either by cone/quarter
or riffle) for pulverisation provides an appropriate and
representative sample for analysis.
Quality control procedures adopted for all
subsampling stages to maximise representivity
of samples.
Half core was collected for the entirety of the Tesoro drilling, as
such there was consistency throughout the drilling. Core was
logged by a qualified geoscientist. Each subsample is
considered to be representative of the interval.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
Sampling of half core is representative of the in-situ material.
There are field duplicate samples collected from the diamond
core with irregular results. Field drill core duplicates are
irregular by nature and it has been recommended by Tesoro’s
consultants to use coarse reject material to monitor the
samplepreparation.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
sample sizes collected were considered appropriate to
reasonably represent the material being tested.
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
Assays reported in this report were undertaken at the
accredited laboratory of ALS Santiago, which is fully certified.
Core samples of various lengths were assayed (minimum
0.25m) from which 1kg of material was pulverized passing 200
mesh to produce a 50 g charge for fire assay fusion with
gravimetric finish. Multielement assays were completed by 4-
acid digest with a 2.5 g charge.
All techniques are appropriate for the element being
determined.
For geophysical tools, spectrometers, handheld
XRF instruments, etc., the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Standard chemical analyses were used for grade
determination. There was no reliance on determination of
analysis by geophysical tools.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
QAQC procedures included the insertion of Certified Reference
Materials (CRMs) (5%) and blank material (2%), Check samples
(5%) and check assaying 5%
Cube Consulting Pty Ltd manage the database for Tesoro.
The laboratories used have generally demonstrated analytical
accuracy at an acceptable level within 95% confidence limits.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
A number of independent consulting geoscientists (Cube
Consulting, Oliver, and Cooley) external to Tesoro have verified
the intersections for holes ZDDH0001 to ZDDH0080. Holes
ZDDH0081 onwards have been verified by multiple
appropriately qualified Company personnel.
The use of twinned holes. no twinned holes have been completed
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Tesoro drilling is digitally entered and stored following
documented core handling protocols.
The protocols are considered adequate.
Discuss any adjustment to assay data. No adjustments were made to Tesoro Drilling
Location of data
points
Accuracy and quality of surveys used to locate
drillholes (collar and downhole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
Tesoro drill hole collars have been surveyed accurately using
differential GPS for holes ZDDH0001 to ZDDH00080. Holes
ZDDH0081 onwards have been surveyed using handheld GPS
and will be surveyed using differential GPS once the drill
program has concluded.
Specification of thegrid system used. The grid system used PSAD56 19S
Quality and adequacy of topographic control. The topography generated from an accurate topographic
survey data completed by a registered surveyor and has been
used for the current control.
Data spacing and
distribution
Data spacing for reporting of Exploration
Results.
Drill hole spacing is variable between 25m and 200m
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
The spacing of drill holes is variable and satisfactory for
reconnaissance level drilling. The holes are not intended to be
used for resource estimates at this stage of exploration.
Whether sample compositing has been
applied.
Sample composites was not employed.
Orientation of data
in relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.
Drill holes were drilled across the interpreted strike of the
mineralization

15

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

Criteria JORC Code explanation Commentary
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
Tesoro diamond drilling at various orientations does not reveal
any bias regarding the orientation of the mineralised horizons.
Sample security The measures taken to ensure sample
security.
Chain of Custody of digital data is managed by the Company.
Physical material was stored on site and, when necessary,
delivered to the assay laboratory. Thereafter laboratory
samples were controlled by the nominated laboratory which to
date has been Bureau Veritas and ALS Santiago. All sample
collection was controlled by digital sample control file(s) and
hardcopyticket books.
Audits or reviews The results of any audits or reviews of
sampling techniques and data.
No audits have been undertaken.

(Criteria in this section apply to all succeeding sections)

Section 2: Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section)

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint
ventures, partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
Information regarding tenure is included in the company’s
December 2020 half yearly report released to the ASX on 12
March 2021
Tesoro Resources Ltd, 95% owned Chilean subsidiary, Tesoro
Mining Chile SpA, owns 85% of the El Zorro Gold Project
Concessions.
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
The Concession is believed to be in good standing with the
governing authority and there is no known impediment to
operating in the area.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration
by other parties.
Little historical exploration has been undertaken in either project
area. Coeur d’Alene’s Chilean exploration division undertook
activities on the Ternera prospect, under an option agreement
with theprevious owners between April 1990 and January1993.
Geology Deposit type, geological setting and style of
mineralisation.
The mineralisation model is to likely to be intrusive related gold
deposit. The key characteristics that are consistent with this
style deposit include:
• Low sulphide content, (typically <5%); reduced ore mineral
assemblage that typically comprises pyrite and lacks primary
magnetite or hematite
• Mineralisation occurs as sheeted vein deposits or stockwork
assemblages and often combine gold with variably elevated
Bi, W, As, Mo, Te, and/or Sb but low concentrations of base
metals as seen in the initial four holes by Tesoro at El Zorro
• Restricted and commonly weak proximal hydrothermal
alteration
• Intrusions of intermediate to felsic composition.
Drillhole
information
A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drillholes:
o easting and northing of the drillhole collar
o elevation or RL (Reduced Level – elevation
above sea level in metres) of the drillhole
collar
o dip and azimuth of the hole
o downhole length and interception depth
o hole length.
If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain why
this is the case.
Information relating to current drill program presented in this
report.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
No cutting of grades has been undertaken at this early stage of
exploration drilling.
Downhole intercepts are calculated using a length weighted
averagingmethod.

16

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au

ASX Announcement 25 May 2021

Criteria JORC Code explanation Commentary
high grades) and cut-off grades are usually
Material and should be stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.
All individual results for holes ZDDH00001 to ZDDH00016 are
reported in prospectus dated 30th October 2019 lodged by
Plukka Ltd.
Down hole length weighted average results are calculated using
a 0.20g/t Au cut off and a maximum of 5m internal dilution
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
No metal equivalents are reported.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important
in the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drillhole angle is known, its
nature should be reported.
The mineralisation forms sub-vertical sheeted veins and
individual veins and may form plunging zones within the
mineralised structures. Drilling by Tesoro has been undertaken
to test these orientations.
If it is not known and only the downhole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘downhole
length, true width not known’).
Exploration results are reported as downhole widths as the true
width is not known with any certainty.
Diagrams Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drillhole collar
locations and appropriate sectional views.
Relevant maps and diagrams are included in the body of the
report.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
All assay results from drilling are reported. Reporting of visible
gold occurrences in drill core is by visual inspection only and
final gold content is not known until assay results have been
received.
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.
All material exploration data is reported in the body of the report.
Further work The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Further work will be focused on drill testing the Ternera
mineralisation and additional prospects as defined in the work
program. Core will be used for metallurgical testwork and
resource modellingisplanned.
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Diagrams have been included in the body of this report.

17

+61 8 9322 1587 | [email protected] | Suite 5, 62 Ord Street, West Perth WA 6005 | www.tesororesources.com.au