2021-06-29 | New Targets Identified At The Euro Project
==> picture [169 x 36] intentionally omitted <==
TEM | Multiple New Targets at the Euro Project
Key Points
-
Multiple new exploration targets identified for gold, base metals and iron ore
-
Targets identified from in house geophysical data sets
-
Remarkable signatures indicate possible geological connection to the ~1MOz Rothsay Mine
-
Advanced planning and approvals in progress for upcoming drilling
-
Historic drilling identified extensive mineralisation in the north results including 15m @ 2.3g/t gold from 15m, which were never followed up due to depressed markets at the time and remain open in all directions
News Item
Tempest Minerals Ltd (TEM) is pleased to announce that recent geological modelling based on the Company’s internal magnetic data set has confirmed multiple new gold, base metal and iron ore targets at the Company’s 100% Euro Project in the Yalgoo Region of Western Australia.
As part of the Company’s data and technology focussed strategy, a large regional magnetics dataset was remodelled and has given unprecedented resolution for exploration at the Yalgoo Projects. The significant investment in combining this with other historic geological, geochemical and other datasets in a holistic manner has provided an opportunity which may have not been readily identified by previous operators.
Work this quarter has highlighted this value with multiple high priority exploration targets prospective for gold, base metals and iron ore identified. The Kiev target in particular exhibits a geophysical signature similar to that of the nearby Silverlake (ASX:SLK) Rothsay Mine.
In addition, TEM is progressing drill approvals and planning at the northern targets within the Euro Project where numerous historic drillholes intersected thick gold mineralisation. These results include intercepts such as 15m @ 2.3g/t gold from 15m. However, this work was done during depressed metal prices and was never followed through. TEM believe that this zone of mineralisation has not been adequately explained in 3 dimensions and remains open in all directions.
Euro Project
Background
The Euro Project is more than 176km[2] of 100% Tempest owned tenements which makes part of the Companies exciting exploration portfolio in the Yalgoo region of Western Australia totalling more than 900km[2] (>604km[2] granted and 311 km[2] of pending tenure [1] .
Parts of the project were explored in the 1990’s and early 2000’s for gold and iron ore, with drilling occurring in the North of the project area encountering significant gold mineralisation but due to depressed metal prices, were not considered priority at the time and not followed up.
The Euro Project is wedged between 4 current major operations: Karara (Iron), Shine (Iron), Mt Mulgine (Gold/Tungsten) and Rothsay (Gold/Copper) and share the same geology. Yet despite this, much of the project remains largely unexplored.
==> picture [165 x 233] intentionally omitted <==
Tempest Minerals Ltd │ ACN 612 008 358 Phone: +61 8 9200 0435 Address: Level 2, Suite 9, 389 Oxford Street, Mt Hawthorn, WA 6016
Page 1 | 6
ASX : TEM 2021-06-29 | New Targets Identified At The Euro Project
==> picture [169 x 36] intentionally omitted <==
Geology
The Euro Project is dominated by intercalated layers of ultramafic, mafic and felsic units as part of the southern Yalgoo Greenstone belt. There is significant potential for banded iron formations which are being mined at neighbouring iron ore mines and also provide significant potential for gold precipitation as noted throughout the region.
Several generations of shearing intersect the project area. One striking approximately ENE-WSW appears to bifurcate the Mt Mulgine deposit with tungsten mineralisation to the south and gold mineralisation to the north.
The entire project is heavily folded, with large open folds showing an axial planar orientation roughly NW-SE with vestiges of a second phase of refolding striking N-S also evident. The former generation of fold axial planes are host to intense shearing visible both on local and regional scales and appears relevant to hosting both the gold discovered in the N-E of the Euro Project and potentially the Rothsay Mine itself.
==> picture [511 x 361] intentionally omitted <==
Figure 1: Simplified geology map of the Euro Project
Page 2 | 6
ASX : TEM
2021-06-29 | New Targets Identified At The Euro Project
==> picture [169 x 36] intentionally omitted <==
Targets
Recent observations from magnetic data indicate that the prospectivity at the Euro Project is much greater than previously recognised with clear stratigraphic trends linking known mineralisation to areas of little or no exploration.
==> picture [499 x 593] intentionally omitted <==
Figure 2: Euro project with total magnetic intensity (TMI)
Page 3 | 6
ASX : TEM
2021-06-29 | New Targets Identified At The Euro Project
==> picture [169 x 36] intentionally omitted <==
Calais Target
Shallow drilling (mostly (<50m) RAB holes) conducted in the late 90’s and early 2000’s by Aztec, Normandy Gindalbie and others for basement geochemical analysis were concentrated in one small area in the central western apex of the major fold hinge at the projects namesake ‘Euro Bore’ [2] . However, a number of these early holes intersected appreciable levels of near surface gold which were not considered a priority at the time due to depressed metal prices.
Highlights include:
| HoleID | Depth | Results |
|---|---|---|
| NR017 | 20m | 17m @ 1.2g/t |
| NR020 | 20m | 8m @ 0.9g/t (including 5m @ 1.3g/t) |
| NR018 | 15m | 15m @ 2.3 g/t (including 7m @ 3.4g/t) |
This drilling when viewed in 3 dimensions is shown to be open in all directions. When viewed in the context of all datasets now available, the Calais target may represent a much larger overall mineralised zone.
Kiev Target
NW-SE striking structures in the centre of the project may be part of a larger fold and shear complex that has dislocated the ‘heart shaped’ greenstone sequence - of which the Rothsay Mine and surrounding mineral occurrences are hosted on the periphery - from another similar complex located approximately 9km to the west.
The Kiev target is part of an interpreted demagnetised zone with a similar signature to the Rothsay deposit. This target has not been explored previously and will be investigated as part of an imminent field campaign.
Next Steps
-
Fieldwork to commence July comprising geochemical and geological surveys over other priority targets (including Kiev)
-
Potential to extend drilling programs into new target areas
-
Preparation for drilling including approvals at the Euro project (Calais target) in advanced stages
Page 4 | 6
ASX : TEM
2021-06-29 | New Targets Identified At The Euro Project
==> picture [169 x 36] intentionally omitted <==
The Board of the Company has authorised the release of this announcement to the market.
About TEM
Tempest Minerals Ltd is an Australian based mineral exploration company with a diversified portfolio of projects in Western Australia considered highly prospective for precious, base and energy metals.
The Company has an experienced board and management team with a history of exploration, operational and corporate success.
Tempest leverage the team’s energy, technical and commercial acumen to execute the Company’s mission - to maximize shareholder value through focussed, data-driven, risk-weighted exploration and development of our assets.
Contact
For more information, please contact:
Don Smith Managing Director
==> picture [15 x 19] intentionally omitted <==
==> picture [15 x 15] intentionally omitted <==
Level 2, Suite 9 389 Oxford Street Mt Hawthorn, Western Australia 6016 +61 8 9200 0435
==> picture [15 x 16] intentionally omitted <==
==> picture [15 x 15] intentionally omitted <==
==> picture [15 x 16] intentionally omitted <==
==> picture [16 x 16] intentionally omitted <==
==> picture [16 x 16] intentionally omitted <==
www.tempestminerals.com LinkedIn Instagram Twitter Facebook
Forward-looking statements
This document may contain certain forward-looking statements. Such statements are only predictions, based on certain assumptions and involve known and unknown risks, uncertainties and other factors, many of which are beyond the company’s control. Actual events or results may differ materially from the events or results expected or implied in any forward-looking statement.
The inclusion of such statements should not be regarded as a representation, warranty or prediction with respect to the accuracy of the underlying assumptions or that any forward-looking statements will be or are likely to be fulfilled. Tempest undertakes no obligation to update any forward-looking statement to reflect events or circumstances after the date of this document (subject to securities exchange disclosure requirements).
The information in this document does not take into account the objectives, financial situation or particular needs of any person or organisation. Nothing contained in this document constitutes investment, legal, tax or other advice.
Competent Person Statement
The information in this announcement that relates to Exploration Results and general project comments is based on information compiled by Don Smith who is the Managing Director of Tempest Minerals Ltd. Mr Smith is a Member of Ausimm and AIG and has sufficient experience relevant to the style of mineralisation under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Smith consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Page 5 | 6
ASX : TEM
2021-06-29 | New Targets Identified At The Euro Project
==> picture [169 x 36] intentionally omitted <==
Appendix A: References
-
TEM ASX announcement dated 23 February 2021 Messenger Project enlarged and drilling imminent
-
DMIRS WAMEX report A48951
Page 6 | 6