STRATEGIC HIGHLIGHTS

  • Well capitalised with A$3.1M cash and A$2.4M exploration assets

  • Station Creek Project- IP geophysics survey booked for April 22 to cover 54.7% Cu & 257g/t Ag samples

  • Blue Rock Valley - Copper confirmed in RC drilling at 4m @ 1.02% Cu

  • Mt Boggola Project- Flagship base metals project- drilling planned for Q2

  • Strategic focus on project development and growth opportunities

TechGen Metals Limited (ACN 624 721 035) (“TechGen” or the “Company”) is pleased to provide an update on the release of the Company’s half year results as well as activities at the Company’s 100% owned copper exploration assets including, the Station Creek Project, Blue Rock Valley Copper Project and Mt Boggola Project, all located within the Proterozoic-aged Ashburton and Edmund Basins of Western Australia.

Well capitalised Balance Sheet with A$3.1M cash and A$2.4M exploration assets

On 25 February 2022, the Company released its audited half year accounts, noting a cash balance of A$3.1M and a total exploration asset value of A$2.4M. TechGen Managing Director, Mr Ashley Hood, commented : “We are very pleased with the Company’s strong and healthy cash position, particularly in view of on-going exploration works undertaken and in progress, across all our projects since listing in April 2021 (including three drilling campaigns, geophysical and geochemistry surveys, etc.). TechGen‘s financial management affords us the ability to focus resources on the development of our priority targets as well as strategic advancement of our current portfolio, as well as growth opportunities.”

Station Creek Project- induced polarisation (“IP”) geophysics survey

An IP geophysics survey crew has been secured to cover a part of the highly prospective Station Creek Project in April. The Company has been waiting for this style of geophysics survey since IPO. The survey will cover the area around high grade copper - silver rock chip samples and where the XRD analysis of a 54.7% Cu & 257g/t Ag sample (sample SCR34; 31[st] May 2021), indicated that in addition to the presence of copper oxide minerals (Malachite, Brochantite & Atacamite) that the copper arsenate mineral Olivenite and copper sulphide mineral Djurleite was also present within the sample.

The Companies technical team are currently in the field mapping this very zone that’s been highlighted to sit within a fault splay in a discrete magnetic oval shape that has previously not been explored (Figure 1). The magnetic splay was identified in airborne surveys (ASX announcement 8[th] July 2021).

ABN: 66 624 721 035 Registered Office: 683 Murray Street, West Perth 6005 T : +61 427 268 999 E: [email protected] W: techgenmetals.com.au Non-Exec Chair: Maja McGuire Managing Director: Ashley Hood Technical Director: Andrew Jones Non-Exec Director/ Chief Financial Officer and Company Secretary: Rick S Govender

==> picture [595 x 84] intentionally omitted <==

==> picture [475 x 327] intentionally omitted <==

----- Start of picture text -----

54.7% Cu & 257g/t Ag
Sample SCR34
----- End of picture text -----

Figure 1: Station Creek Project mineral occurrences on airborne magnetics.

Blue Rock Valley - Copper confirmed in RC drilling at 4m @ 1.02% Cu

A reverse circulation (RC) drilling program of 7 holes for 1,153 metres was completed at the Blue Rock Valley Copper Project in November 2021. Eagerly awaited assay results have now been received and confirm the presence of highly anomalous copper in three separate drill holes (Image 1, Table 1, Figures 2 & 3). Two of the drill holes, BRRC004 & BRRC005, both returned assays of greater than 1% Cu from shallow depths. Best results include 4m @ 1.02% Cu from 0 - 4m (BRRC005) and 8m @ 0.54% Cu from 6m - 14m (BRRC004). Anomalous copper assays correlate well with intervals of copper carbonates (malachite ± azurite) logged on site during drilling.

Blue Rock Valley licences (E08/3453 & E08/3454) which are contiguous with the current project area and are along strike from the historical Blue Rock copper shafts which recently returned an impressive 49.9% Cu rockchip sample (refer to ASX announcement 13[th] October 2021). The regionally significant Talga Fault Zone, a deep primary mantle tapping regionally significant fault zone and is highly prospective for shear-zone hosted mineralisation runs through the entire length of the tenements covering more than 80km. A first pass ultrafine multi-element geochemistry survey has been planned and booked for April/May 2022 in this lightly explored region, open file records show a small number of previous activities including WMC exploration in the 1990’s.

==> picture [595 x 84] intentionally omitted <==

==> picture [414 x 311] intentionally omitted <==

Image 1: RC drilling at the Blue Rock Valley Copper Project (November 2021).

==> picture [412 x 341] intentionally omitted <==

Figure 2: Blue Rock Valley Project area with EM anomalies & mineral occurrences on airborne magnetics.

==> picture [595 x 84] intentionally omitted <==

==> picture [440 x 277] intentionally omitted <==

Figure 3: Drill hole locations, Blue Rock Valley Project.

FUTURE EXPLORATION

The Blue Rock Valley Copper Project covers an area of 880km[2] and exploration planning is underway to evaluate other areas of the project area. The project covers the contact between the Ashburton Basin and Edmund Basin and approximately 80km of strike extent of the regionally significant Talga Fault Zone (a deep mantle tapping regionally significant fault zone). The project is prospective for gold and base metal discoveries.

Table 1: RC drill intercepts >0.1% Copper from Blue Rock Valley Copper Project.

Hole Easting
(mE)
Northing
(mN)
Dip Azimuth Depth
(m)
From
(m)
To
(m)

Width
(m)
Intersection
(% Cu)
BRRC001 394301 7459166 -60 180 237 NSR
BRRC002 396562 7454985 -60 0 249 NSR
BRRC003 396662 7455124 -75 85 99 4 12 8 0.25
BRRC004 396663 7455124 -60 85 135 6 14 8 0.54
BRRC004 including 10 11 1 1.39
BRRC004 28 32 4 0.17
BRRC005 396693 7455121 -60 45 75 0 8 8 0.57
BRRC005 including 0 4 4 1.02
BRRC005 20 24 4 0.12
BRRC006 396637 7455081 -60 45 163 NSR
BRRC007 396389 7455181 -70 0 195 NSR

==> picture [595 x 84] intentionally omitted <==

Mt Boggola Project - Flagship base metals project drilling planned for Q2

Following up on successful VTEM and ground EM surveys, a heritage survey and flora survey is planned for March - April in preparation for drilling shortly after. Field teams are currently at Mt Boggola marking access areas, pegging drill locations and rock chip sampling within the lightly explored VTEM anomalism areas (ASX announcement 14[th] February 2022).

==> picture [396 x 297] intentionally omitted <==

Image 2: Mt Boggola copper oxide mapping program.

Strategic focus on project development and growth opportunities

The acquisition of the Narryer Project, prospective for Ni-Cu-PGE mineralisation, and the Earaheedy Project, prospective for Zn-Pb-Ag mineralisation, is part of the Company's strategy to broaden its project pipeline and have complimentary projects across the full lifecycle of exploration. Both projects were recently pegged by the Company, enhancing TechGen’s growth trajectory and commitment to creating shareholder value.

The Company currently has an independent geological expert completing a detailed project review of the Narryer Project and the Earaheedy Project, on completion of the report the Company will update the market and commence exploration activities currently in planning.

TechGen’s Executive Technical Director, Mr Andrew Jones, noted: “The acquisition of additional battery metals projects to compliment the Company’s copper and gold project pipeline is an exciting opportunity for all stakeholders in 2022. TechGen’s new assets dovetail into the Company’s flagship Mt Boggola copper/gold project that’s been granted EIS funding and is due to commence drill testing over the coming months” (ASX announcement 11[th] January 2022).

The Company looks forward to providing further updates as data and results become available.

ENDS

==> picture [595 x 84] intentionally omitted <==

==> picture [250 x 362] intentionally omitted <==

TechGen is an Australian registered exploration Company with a primary focus on exploring and developing its 100% owned gold and base metal projects in Western Australia (regarded as the top jurisdiction in the world for mining investment). The Company’s objective is to create wealth for its shareholders through commercial exploration success.

TechGen holds a portfolio of twenty-two exploration licences strategically located in four highly prospective geological regions of Western Australia; the Yilgarn Craton, Paterson Orogen, Ashburton Basin and Earaheedy Basin.

The Yilgarn Craton and Paterson Orogen are both proven world class gold and base metal provinces whilst the Ashburton and Earaheedy Basins are considered highly prospective yet under explored and have the potential for major new gold and base metal discoveries. The spread of projects across these geological regions provides the Company with geographical and operational diversification.

TechGen has an experienced board and management team, with a broad range of exploration, development, management, legal, finance, commercial and technical skills in the resource industry. The Company’s Managing Director and Technical Director are project vendors and substantial holders, driven to actively manage projects and deliver value to shareholders.

For more information, please visit our website: www.techgenmetals.com.au

Authorisation

For the purpose of Listing Rule 15.5, this announcement has been authorised for release by the Board of Directors of TechGen Metals Limited.

Competent Person Statement

The information in this announcement that relates to Exploration Results is based on and fairly represents information compiled and reviewed by Andrew Jones, a Competent Person who is a member of the Australasian Institute of Mining and Metallurgy (AusIMM). Andrew Jones is employed as a Director of TechGen Metals Limited. Andrew Jones has sufficient experience that is relevant to to the style of mineralisation and type of deposits under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves. Andrew Jones consents to the inclusion in this announcement of the matters based on his work in the form and context in which it appears.

Previously Reported Information

Any information in this announcement that references previous exploration results is extracted from the Company's Prospectus dated 17 February 2021 or from previous ASX Announcements made by the Company.

For further information, please contact:

Mr Ashley Hood Managing Director P: +61 427 268 999 E: [email protected] www.techgenmetals.com.au

JORC Code, 2012 Edition – Table 1 report template

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling
techniques

Nature and quality of sampling (eg cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation,
such as down hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of sampling.

Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.

Aspects of the determination of mineralisation that are Material to the Public Report.

In cases where ‘industry standard’ work has been done this would be relatively simple
(eg ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg submarine nodules) may
warrant disclosure of detailed information.

Reverse Circulation (RC) drilling samples collected as 4 metre composite samples.

The 4m composite samples were collected from the 1m sample interval sample piles
using a PVC spear to create a sample of between 2.5 - 4kg.

Samples were submitted to ALS Laboratories in Perth for drying and pulverising to
produce a 50g sample for Fire Assay gold analysis and multi-element analysis via ICP-
MS following multi-acid digestion.

The laboratory used internal standards to ensure quality control.
Drilling
techniques

Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other type, whether core is oriented and if so, by
_what method, etc). _

RC drilling used a truck mounted Schramm T66 drill rig with a 5 1/4 inch face sampling
hammer. An auxilliary compressor and booster was also utilised for some drill holes.

Holes were surveyed downhole using a Reflex North Seeking Gyro tool.
Drill sample
recovery

Method of recording and assessing core and chip sample recoveries and results
assessed.

Measures taken to maximise sample recovery and ensure representative nature of the
samples.

Whether a relationship exists between sample recovery and grade and whether sample
bias may have occurred due topreferential loss/gain of fine/coarse material.

Recovery of drill cutting material was estimated from sample piles and recorded at the
time of drilling. Recoveries were considered adequate.

The cyclone was regularly checked and cleaned.

For composite sampling care was taken to ensure the same sample size from each 1m
sample pile was used to ensure a representative sample was collected.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a
level of detail to support appropriate Mineral Resource estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography.

The total length andpercentage of the relevant intersections logged.

All drilling was geologically logged by a geologist at the time of drilling.

Logging was qualitative in nature.

All holes were geologically logged in full.

Geotechnical logging has not been carried out.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether quarter, half or all core taken.

If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or
dry.

For all sample types, the nature, quality and appropriateness of the sample preparation
technique.

Quality control procedures adopted for all sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the sampling is representative of the in situ material
collected, including for instance results for field duplicate/second-half sampling.

Whether sample sizes are appropriate to the grain size of the material being sampled.

Composite samples were created using a PVC spear to collect sample material from
individual 1m sample piles. The composite sample was placed in a pre-numbered
calico bag and submitted to ALS Laboratories in Perth. Most samples were dry
although some were moist or wet. These details were recorded at the time of drilling
and sampling.

Sample preparation for drill samples involved drying the whole sample, pulverising to
85% passing 75 microns. A 50 gram sample charge was then used for the Fire Assay
analysis.

Laboratory repeats (1:20) and standards (1:20) and internal TechGen standards, field
duplicates and blanks have been used to assess laboratory accuracy and
reproducibility.

Sample sizes are considered appropriate for the grain size of the material sampled.
Quality of assay
data and
laboratory tests

The nature, quality and appropriateness of the assaying and laboratory procedures
used and whether the technique is considered partial or total.

For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters
used in determining the analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.

The samples were delivered to ALS Laboratories in Perth.

Samples were crushed and pulverised.

Samples were assayed by Fire Assay and ICP-MS. This is considered an estimation of
total gold content.

The laboratoryused internal standards to ensurequalitycontrol.
Criteria JORC Code explanation Commentary

Nature of quality control procedures adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.

The company also inserted standards, field duplicate and blank standards into the
sample sequence submitted for assay.

The assaying and laboratory procedures used are considered appropriate for the
material tested.

No geophysical tools were used in determining element concentrations.
Verification of
sampling and
assaying

The verification of significant intersections by either independent or alternative
company personnel.

The use of twinned holes.

Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.

Significant intersections have not been independently verified.

Twinned drill holes are not considered necessary at this stage.

Field data was collected onto paper log sheets and then entered digitally. The assay
results were checked by separate Company personnel.

Sample number, GPS coordinates and description were recorded in the field.

No adjustment has been made to assay data.
Location of data
points

Accuracy and quality of surveys used to locate drill holes (collar and down-hole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.

Sample coordinates were taken from a Garmin hand held GPS unit.

Downhole surveys were collected using a reflex North Seeking Gyro tool.

The grid system used is GDA94/MGA94 Zone 50.

Topographic control is considered adequate.
Data spacing and
distribution

Data spacing for reporting of Exploration Results.

Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

Whether sample compositing has been applied.

Data spacing is varied for the drill holes reported with some 20m spaced along lines but
most on separate drill lines.

Data density is appropriately indicated in the announcement on drill hole location plans.

No Resource or Ore Reserve estimates are presented.
Orientation of
data in relation to
geological
structure

Whether the orientation of sampling achieves unbiased sampling of possible structures
and the extent to which this is known, considering the deposit type.

If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced a sampling bias, this should be assessed
and reported if material.

Holes targeted EM plate models with varying orientations.

To accurately sample the interpreted orientation drillholes were oriented across the
interpreted target bodies, perpendicular to the interpreted strike of mineralisation. Holes
were given a design dip of -60 to -70 degrees.

No sampling bias from the orientation of the drilling is believed to exist.
Sample security
The measures taken to ensure sample security.

Samples were taken and delivered to ALS Laboratories by Company personnel.
Audits or reviews
The results of any audits or reviews of sampling techniques and data.

No formal audit has been completed on the data being reported.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status

Type, reference name/number, location and ownership including agreements or
material issues with third parties such as joint ventures, partnerships, overriding
royalties, native title interests, historical sites, wilderness or national park and
environmental settings.

The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.

TheBlue Rock Valley Projectcomprises a granted Exploration Licence, namely
E08/3030 and a pending Exploration Licence, namely E08/3276. The licences cover
an area of 165km2. Blue Rock Valley Pty Ltd is the registered holder of E08/3030 and
TechGen is the registered holder of E08/3276. TechGen has entered into a term sheet
with Blue Rock Valley Pty Ltd to acquire a 100% interest in E08/3030.
The Project lies on the Glen Florrie (PL N050594) Wyloo (PL N050360) and Nanutarra
(PL N049833) Pastoral Leases.
Tenement E08/3030 is subject to the Thudgari People native title determination
(WCD2009/002) (as to 94.77% of the area of the tenement) and the Combined Thiin-
Mah, Warriyangka, Tharrikari and Jiwarli native title determination (as to 1.91% of the
area of the tenements) each of which incorporate Indigenous Land Use Agreements
(ILUA). Tenement E08/3030 overlies areas described as an “Other Heritage Place”
beingCarlamurlyanggu(reference 6753)affectingthe westernportion of the tenement
Criteria JORC Code explanation Commentary
and Glen Florrie Station (reference 11031) covering less than 1% of the area of the
tenement.
Tenement E08/3276 is subject to the Puutu Kunti Kurrama People and Pinikura
people #1 and #2 native title determination (WCD2015/003) with multiple Indigenous
Land Use Agreements (ILUA); and the Thudgari People native title determination
(WCD2009/002) (as to 32.62% of the area of the tenement).
Exploration done
by other parties

Acknowledgment and appraisal of exploration by other parties.

The Ashburton Mineral Field has a long history of gold, copper, silver, lead and zinc
exploration and is among the oldest in the state.
In the 1970s and 1980s, majors like BHP, Newmont Corporation and BP Minerals
began to explore the Ashburton Basin. This early exploration resulted in the initial
identification of some significant deposits, namely Mt Clement and Mt Olympus.
Geology
Deposit type, geological setting and style of mineralisation.

The Project is located within the Ashburton Basin which forms the northern part of the
Capricorn Orogen. The Project contains a small (1km strike length), high grade copper
occurrence, referred to as the_Blue Rocks Prospect._
Drill hole
Information

A summary of all information material to the understanding of the exploration results
including a tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill
hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.

If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.

The location of all drillholes is shown in a diagram in the main body of the Report. All
hole collar locations, depths, azimuths and dips are provided within this Report for
drilling.

No information has been excluded.
Data aggregation
methods

In reporting Exploration Results, weighting averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate short lengths of high grade results and longer
lengths of low grade results, the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be shown in detail.

The assumptions used for any reporting of metal equivalent values should be clearly
stated.

Reported intersections are downhole, length-weighted averages that were calculated
using a nominal >0.1% Cu.

Length weighted averaging of drill results was carried out according to the following
formula:

{[Sum of (all individual assay values x corresponding individual sample length for
selected intersection)] divided by [total length of selected intersection]}.

No metal equivalent values are currently being used for reporting exploration results.
Relationship
between
mineralisation
widths and
intercept lengths

These relationships are particularly important in the reporting of Exploration Results.

If the geometry of the mineralisation with respect to the drill hole angle is known, its
nature should be reported.

If it is not known and only the down hole lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length, true width not known’).

Widths of mineralisation have not been postulated. All mineralised intervals quoted in
this Report are quoted as downhole widths only. While the geometry of the
mineralisation is not known, the orientation of the drillholes in relation to the interested
geology is shown in the figures of the Report.
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to aplan view of drill hole collar locations and appropriate sectional views.

Suitable maps and diagrams have been included in the body of the report.
Balanced
reporting

Where comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grades and/or widths should be practiced
to avoid misleading reporting of Exploration Results.

All results have been included.
Other substantive
exploration data

Other exploration data, if meaningful and material, should be reported including (but not
limited to): geological observations; geophysical survey results; geochemical survey
results; bulk samples – size and method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock characteristics; potential deleterious or
contaminating substances.

All relevant exploration data is shown on diagrams within the text.
Criteria JORC Code explanation Commentary
Further work
The nature and scale of planned further work (eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of possible extensions, including the main
geological interpretations and future drilling areas, provided this information is not
commercially sensitive.

Further work anticipated:
Geological mapping, rock chip and soil sampling and drilling.