Vulcan IOCGU Discovery

- Under Investigation

==> picture [721 x 271] intentionally omitted <==

----- Start of picture text -----

1
----- End of picture text -----

Disclaimer

The interpretations and conclusions reached in this presentation are based on current geological theory and the best evidence available to the authors at the time of writing. It is the nature of all scientific conclusions that they are founded on an assessment of probabilities and, however high these probabilities might be, they make no claim for complete certainty.

Any economic decisions that might be taken on the basis of interpretations or conclusions contained in this report will therefore carry an element of risk.

It should not be assumed that the reported Exploration Results will result, with further exploration, in the definition of a Mineral Resource.

2

Tasman Project Locations

==> picture [385 x 131] intentionally omitted <==

==> picture [385 x 227] intentionally omitted <==

Lake Torrens (1,803 km[2] ) IOCGU Lucas Hill (264 km[2] ) IOCGU Parkinson Dam (194 km[2] ) Epithermal Au, Ag, Zn/Pb Central Gawler (447 km[2] ) Au

3

Lake Torrens Project Bouguer Gravity (+residual insert)

==> picture [553 x 384] intentionally omitted <==

----- Start of picture text -----

EL 4322
----- End of picture text -----

4

Lake Torrens Project Showing Tectonic Lineaments (WMC, 1975) EL 4322

==> picture [483 x 233] intentionally omitted <==

5

Vulcan - Summary

  • Large hematite-dominent IOCGU system (~ 12km[2] ) 30km north of Olympic Dam

  • Hosted by granite, volcanics and metasediments(?)

  • 12 holes drilled:

  • Ver y thick & stron g alteration, inc.100’s metres of hematite breccias; intense sericite and carbonate alteration

  • – Very thick, low grade IOCGU mineralisation (Cu, U, Au, Ag, Mo, REE)

  • Narrower, high grades locally

  • Early days; currently drilling ~ 10 hole program

  • Mineralisation dated at 1590my by Re-Os (PACE 2020)

  • Tasman–Rio Tinto Farm-In/JV Agreement commenced Sept 2012

6

Vulcan IOCGU Discovery

  • 1981 WMC: first hole – SHD 1; barren, off - structure

  • 2009 Tasman reinvestigation:

  • New gravity data

  • Geophysical remodelling

  • Tectonic data synthesis

  • GA seismic reinterpreted

  • 2009 Tasman drills VUD 1 at north – hits Vulcan IOCGU system

  • 2010 Further gravity, modelling, 4 further holes (at north)

  • 2011 Further 3 holes (north and east)

  • 2011 (Oct) Conditional Tasman-Rio Tinto Farm-In/JV Agreement announced

  • 2012 (Sept) Drilling resumed – (at south); Tasman managing

7

Vulcan IOCGU Project Residual Gravity Image showing drilling completed

==> picture [539 x 160] intentionally omitted <==

==> picture [539 x 238] intentionally omitted <==

8

VUD 1: Mineralised Breccias

==> picture [603 x 379] intentionally omitted <==

----- Start of picture text -----

Heterolithic
sulphide rich
breccia
Mineralised, hematite matrix-
rich breccia (py, cpy)
Heterolithic,
carbonate breccia
(py, cpy, hem)
----- End of picture text -----

9

VUD 7: +160m of Mineralised Hematite Breccia

==> picture [245 x 148] intentionally omitted <==

==> picture [245 x 37] intentionally omitted <==

==> picture [245 x 184] intentionally omitted <==

==> picture [314 x 148] intentionally omitted <==

==> picture [314 x 234] intentionally omitted <==

10

VUD 3: High Grade Cu - Au - U3O8

==> picture [526 x 396] intentionally omitted <==

----- Start of picture text -----

0.34m at 5.9% Cu, 2.23g/t Au
0.75m at 4.4% Cu, 1.34g/t Au,
0.58kg/t U3O8
----- End of picture text -----

11

VUD 8: Silica-Hematite Breccia

(+ bornite - chalcopyrite)

==> picture [509 x 148] intentionally omitted <==

==> picture [509 x 236] intentionally omitted <==

12

Vulcan IOCGU Project Residual Gravity Image showing drilling completed

==> picture [545 x 160] intentionally omitted <==

==> picture [545 x 243] intentionally omitted <==

13

VUD 9: 242m intersection of hematite breccia

==> picture [539 x 161] intentionally omitted <==

==> picture [539 x 245] intentionally omitted <==

14

VUD 9: complex, multiphase breccias

==> picture [318 x 154] intentionally omitted <==

==> picture [318 x 86] intentionally omitted <==

==> picture [373 x 47] intentionally omitted <==

==> picture [373 x 233] intentionally omitted <==

15

VUD 10: intense sericite-carbonate alteration

==> picture [393 x 143] intentionally omitted <==

==> picture [393 x 154] intentionally omitted <==

==> picture [297 x 18] intentionally omitted <==

==> picture [297 x 216] intentionally omitted <==

16

VUD 11: Hematite matrix-rich breccias

==> picture [522 x 160] intentionally omitted <==

==> picture [522 x 233] intentionally omitted <==

17

VUD 11: Breccia – alteration styles

==> picture [375 x 157] intentionally omitted <==

==> picture [415 x 239] intentionally omitted <==

18

VUD 11: Late-stage dykes

==> picture [517 x 157] intentionally omitted <==

==> picture [517 x 232] intentionally omitted <==

19

Vulcan Geochronology Re[187] - Os[187] in MoS2 (PACE* 2020)

==> picture [386 x 137] intentionally omitted <==

==> picture [386 x 212] intentionally omitted <==

  • MoS 2 (molybdenite)

  • widespread at Vulcan - ideal for direct dating of mineralisation

  • -

  • 4 samples from 3 holes average age 1590 Ma

  • 1590 Ma consistent with age of GRV and nearby IOCGU systems

  • Program for Accelerating Exploration, funded by SA Government

MoS 2 (grey) in VUD 001

20

Vulcan Project: Time Line

==> picture [666 x 382] intentionally omitted <==

----- Start of picture text -----





$7M contingent on RTX Farming-In

Rio Tinto can elect to pay Tasman $25M, and/or $50M in lieu of actual exploration expenditure
----- End of picture text -----**

21

Competent Person’s Statement

The information in this presentation that relates to Exploration Results and Activities is based on information compiled by Robert Smith and Michael Glasson who are Members of the Australian Institute of Geoscientists.

Robert Smith and Michael Glasson are full-time employees of the Company. Robert Smith and Michael Glasson have sufficient experience which is relevant to the st le of mineralisation and t e of de osit under y yp p consideration and to the which are to as activity they undertaking qualify Competent Persons as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”.