AI assistant
TASMAN RESOURCES LTD — Investor Presentation 2011
Jan 26, 2011
65896_rns_2011-01-26_7c85f0c3-b639-4353-9f27-c9e580deef6d.pdf
Investor Presentation
Open in viewerOpens in your device viewer
==> picture [721 x 271] intentionally omitted <==
Vulcan- the Next Olympic Dam? January 2011 Greg Solomon Chairman
Tasman Group Corporate Overview
Tasman Resources Ltd (TAS)
Minerals Cu, Au, U, Ag, Pb, Zn, Ni , Oil Shale
Eden Energy Ltd (EDE) Hydrogen & Hythane Pyrolysis Coal Bed Methane SA Natural Gas Geothermal Energy
Fission Energy Ltd (FIS) 50% Mt Thirsty Co-Ni 100% Uranium – SA, WA
Lake Torrens Project Summary
==> picture [721 x 271] intentionally omitted <==
----- Start of picture text -----
-
30 km north of Olympic Dam
- IOCGU mineralisation - Cu, Au, Ag, U, (+ Mo, REE etc)
- 57 m of strong Cpy/Py mineralisation in VUD 3
- -
similar target area to OD > 11 km [2] virtually untested
- 5 drill holes to date – all mineralised
- drilling resumed Jan 2011
----- End of picture text -----
Vulcan Project: Showing Tectonic Lineaments (WMC, 1975)
==> picture [721 x 271] intentionally omitted <==
Tasman IOCGU Targets
==> picture [721 x 271] intentionally omitted <==
Vulcan IOCGU Project
==> picture [721 x 271] intentionally omitted <==
----- Start of picture text -----
Residual Gravity Image showing Tasman Drilling
----- End of picture text -----
Olympic Dam - Vulcan: Residual Gravity Comparison
==> picture [721 x 325] intentionally omitted <==
----- Start of picture text -----
2km
2km
----- End of picture text -----
Vulcan Prospect: Comparisons
==> picture [721 x 271] intentionally omitted <==
Vulcan VUD 001: Breccia Styles
Heterolithic, sulphiderich breccia
Mineralised, hematite matrixrich breccia (py, cpy)
Heterolithic, carbonate breccia (py, cpy, hem)
Vulcan: VUD 3 Massive Sulphides - 930.2 - 930.9m
py
cpy
Vulcan VUD 003: Cu - Au - U3O8 Mineralisation
Core from interval: 0.34m at 5.9% Cu, 2.23g/t Au
Core from interval: 0.75m at 4.4% Cu, 1.34g/t Au, 0.58kg/t U3O8
Vulcan VUD 003:
• 245m Alteration and Mineralisation, includes:
| From To Th. Cu (%) Au (g/t) U ~~3~~ O ~~8~~ (kg/t) 874.20 930.85 56.65 0.59 0.17 0.05 inc. 895 08 895 42 0 34 5 85 2 23 0 03 . . . . . . and 912.00 919.80 7.80 1.21 0.35 0.14 inc. 919.05 919.80 0.75 4.44 1.340.58 and 930.20 930.85 0.657.80 2.41 0.03 |
|
|---|---|
Vulcan VUD 003:
Down-hole correlation of IOCGU metals
==> picture [721 x 446] intentionally omitted <==
----- Start of picture text -----
Cover Sediments Cover Sediments
Basement Basement
Au Cu U O Cu
3 8
----- End of picture text -----
Vulcan IOCGU Project: Program
==> picture [721 x 271] intentionally omitted <==
----- Start of picture text -----
- 4-6 holes over 2 to 3 months
•
Proposed resolution of Aboriginal heritage
issues affecting southern part of target -
current
----- End of picture text -----
Corporate Structure - January 2011
==> picture [721 x 271] intentionally omitted <==
----- Start of picture text -----
•
Market Cap - $26.4m (Jan 2011)
•
Cash - $1.9m (Jan 2011)
----- End of picture text -----
Disclaimer
==> picture [721 x 271] intentionally omitted <==
----- Start of picture text -----
will therefore carry an element of risk.
It should not be assumed that the reported Exploration Results
will result, with further exploration, in the definition of a
Mineral Resource.
----- End of picture text -----
Competent Person’s Statement
==> picture [721 x 271] intentionally omitted <==
----- Start of picture text -----
to the style of mineralisation and type of deposit under
consideration and to the activity which they are undertaking to
qualify as Competent Persons as defined in the 2004 Edition of
the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Robert Smith and Michael
Glasson consent to the inclusion in the report of the matters based
on their information in the form and context in which it appears.
----- End of picture text -----