Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

TASMAN RESOURCES LTD AGM Information 2011

Oct 30, 2011

65896_rns_2011-10-30_65242f8c-c332-4f27-9eb6-22f902a4bf5b.pdf

AGM Information

Open in viewer

Opens in your device viewer

==> picture [721 x 271] intentionally omitted <==

Annual General Meeting 31[st] October 2011 Greg Solomon Executive Chairman

Tasman Group Corporate Overview

Tasman Resources Ltd (TAS)

Minerals Cu, Au, U, Ag, Pb, Zn.

Eden Energy Ltd (EDE) Pyrolysis Hydrogen-Hythane Dual fuel Gas (UK)

Fission Energy Ltd (FIS) 50% Mt Thirsty Co-Ni 100% Uranium – SA, WA

Lake Torrens Project Summary

  • > 2,000 km[2] of tenements adjacent to Olympic Dam

  • Six IOCGU targets within ~ 35 km of Olympic Dam - includes two known IOCGU systems (Vulcan and Titan) and 4 interpreted systems

  • Vu can - new l IOCGU tem discovered Nov 2009 sys

  • - Similar target area to OD > 12 km[2]

  • 30 km north of Olympic Dam; priority tectonic address

  • Condtional Farm-in Agreement with Rio Tinto Exploration

  • ( EL 4322)

  • Lucas Hill –large new priority IOCGU target near Woomera

Lake Torrens Project: Location Plan

==> picture [721 x 472] intentionally omitted <==

----- Start of picture text -----

EL 4322
----- End of picture text -----

VULCAN

  • Vulcan - new IOCGU system discovered Nov 2009

- IOCGU min./alt. (all 8 holes) - Cu, Au, Ag, U, Mo (+ REE) - 57 m of strong chalcopyrite/pyrite mineralisation in VUD 3 - +150m “classic” min. hematite-rich breccias in VUD 7

  • Classic zonation (bornite/chalcopyrite/pyrite) in VUD 8

  • Rio Tinto Exploration (RTX) farm-in (conditional)

  • only EL 4322

  • $10m to Tasman which will drill 12,000m (est $5m) in 12 months

  • RTX to pay TAS $7m and spend $25m on exploration for 55%

  • if TAS dilutes, RTX may expend $50m for further 25% ( ie 80% )

  • TAS may then contribute or require RTX to buy TAS share ( 20% )

  • Conditions – include Aboriginal heritage clearance

Lake Torrens Project: Showing Tectonic Lineaments (WMC, 1975)

==> picture [721 x 449] intentionally omitted <==

----- Start of picture text -----

EL 4322
----- End of picture text -----

Lake Torrens Project: Gravity

EL 4322

==> picture [721 x 271] intentionally omitted <==

Lake Torrens Project: Bouguer gravity (+residual inset)

EL 4322

==> picture [721 x 271] intentionally omitted <==

Vulcan IOCGU Project

Residual Gravity Image showing Tasman Drilling

Olympic Dam - Vulcan: Residual Gravity Comparison (calculated residual gravity response if Vulcan at same depth as OD) Olympic Dam Vulcan

2km 2km

==> picture [721 x 271] intentionally omitted <==

Vulcan VUD 001

Heterolithic, sulphiderich breccia

Mineralised, hematite matrixrich breccia (py, cpy)

Heterolithic, carbonate breccia (py, cpy, hem)

Vulcan: VUD 3 Massive Sulphides - 930.2 - 930.9m

py

cpy

Vulcan VUD 003: Cu - Au - U3O8 Mineralisation

Core from interval: 0.34m at 5.9% Cu, 2.23g/t Au

Core from interval: 0.75m at 4.4% Cu, 1.34g/t Au, 0.58kg/t U3O8

Vulcan VUD 008: Silica-Hematite Breccia (+ bornite - chalcopyrite)

==> picture [721 x 271] intentionally omitted <==

Vulcan VUD 002: Molybdenite Mineralisation: PACE 2020 Re[187] – Os[187] Dating

==> picture [721 x 271] intentionally omitted <==

Vulcan VUD 3

**• ** 245m Alteration and Mineralisation, includes:
From To
m
Cu (%)Au (g/t)
U
~~3~~
O
~~8~~
(kg/t)
874.20 930.8556.65
0.59
0.17
0.05
includes:
5 85
2 23
895.08 895.420.34
.
.
0.03
and
912.00 919.807.80 1.21 0.35 0.14
includes:
919.05 919.800.75 4.44 1.340.58
and
930.20 930.850.65
7.80
2.41
0.03

Vulcan VUD 003

Down-hole correlation of IOCGU metals

Cover Sediments Cover Sediments Basement Basement Au Cu U O Cu 3 8

Vulcan IOCGU Project

Residual Gravity Image showing Tasman Drilling

Vulcan VUD 7: +150m of Hematite Breccia

==> picture [721 x 271] intentionally omitted <==

Vulcan VUD 7

  • 150m+ Alteration and Mineralisation, includes:

From To m Cu (%) Au (g/t) U ~~3~~ O ~~8~~ (kg/t) Mo (%) 1065 1228 163 0.23 0.08 0.04 0.01

Includes: 1118 1208 90 0.25 0.09 0.05 0.02

Olympic Dam – Vulcan Zonation Comparison

==> picture [721 x 271] intentionally omitted <==

Vulcan IOCGU Project

==> picture [721 x 271] intentionally omitted <==

----- Start of picture text -----

Residual Gravity Image showing Tasman Drilling
----- End of picture text -----

Vulcan Prospect: Comparisons

==> picture [721 x 271] intentionally omitted <==

Vulcan IOCGU Project: Current Program

Completed Results available Completed Completed Awaiting report Pending

Lake Torrens Project: Location Plan

==> picture [721 x 472] intentionally omitted <==

----- Start of picture text -----

EL 4322
----- End of picture text -----

Lucas Hill: Bouguer Gravity

==> picture [721 x 271] intentionally omitted <==

Lucas Hill: Residual Gravity

==> picture [721 x 271] intentionally omitted <==

Competent Person’s Statement

==> picture [721 x 271] intentionally omitted <==

----- Start of picture text -----

to the style of mineralisation and type of deposit under
consideration and to the activity which they are undertaking to
qualify as Competent Persons as defined in the 2004 Edition of
the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Robert Smith and
Michael Glasson consent to the inclusion in the report of the
matters based on their information in the form and context in
which it appears.
----- End of picture text -----