AI assistant
TASMAN RESOURCES LTD — AGM Information 2009
Nov 19, 2009
65896_rns_2009-11-19_9d77009e-d063-49c8-a9fd-89f9897f99e9.pdf
AGM Information
Open in viewerOpens in your device viewer
==> picture [721 x 271] intentionally omitted <==
Presentation to AGM 20[th] November 2009
Tasman Group Corporate Overview
Tasman Resources Ltd (TAS)
Minerals Cu, Au, U, Ag, Pb, Zn, Ni , Oil Shale
Eden Energy Ltd (EDE) Hydrogen & Hythane Pyrolysis Coal Bed Methane SA Natural Gas Geothermal Energy
Fission Energy Ltd (FIS) 50% Mt Thirsty Co-Ni 100% Uranium – SA, WA
Tasman Resources: Project Locations
Julia Creek: Oil Shale
Mirrica: Au, Cu/Zn/Pb Lake Torrens: IOCGU Parkinson Dam: Au/Ag/Zn/Pb Central Gawler: Au, Ni Streaky Bay: U
Lake Torrens Project
• New IOCGU system discovered at Vulcan in November 2009. Large untested anomaly (>10km[2] )
==> picture [721 x 271] intentionally omitted <==
----- Start of picture text -----
Olympic Dam
•
IOCGU mineralisation at Titan (inc.
334m @ 0.1% Cu)
•
Untested targets at Marathon Sth, Zeus,
Billy Barnes, Atlas
----- End of picture text -----
Lake Torrens Project: Targets
==> picture [721 x 271] intentionally omitted <==
==> picture [721 x 541] intentionally omitted <==
----- Start of picture text -----
Lake Torrens Project
----- End of picture text -----
Bouguer Gravity Comparison
==> picture [721 x 271] intentionally omitted <==
VUD 001
Vulcan: S-N Seismic Reflection Profile
==> picture [721 x 421] intentionally omitted <==
----- Start of picture text -----
S SHD 1 VUD 001 N
Cover Sediments
Basement
Strong Seismic
Reflectors in Basement
– IOCGU?
Geoscience Australia – PIRSA 2003 Traverse OD 1
----- End of picture text -----
Olympic Dam: W-E Seismic Reflection Profile
==> picture [721 x 410] intentionally omitted <==
----- Start of picture text -----
|||
|---|---|
|W|E|
|Cover Sediments|
|Basement|
|Seismic Reflectors in|
|Basement (Olympic Dam|
|Breccia Complex, SE limb)|
|Geoscience Australia – PIRSA 2003 Traverse OD 2|
----- End of picture text -----
Vulcan Drill Core: VUD 001
NQ Drill Core: depth approx. 928m
Vulcan Drill Core: VUD 001
==> picture [273 x 205] intentionally omitted <==
----- Start of picture text -----
NQ Drill Core: depth approx. 933m
----- End of picture text -----
NQ Drill Core: depth approx. 1077m
Vulcan Project: The Way Forward
- Geological review and synthesis: VUD 001
– Assays, rock chemistry, petrology & physical properties (density, magnetic sus.)
-
Geophysical data assessment, detailed gravity surveying , modelling
-
Data synthesis. Apply enhanced IOCGU deposit model to Vulcan based on new data
-
Plan follow up drilling
-
Drill priority targets
-
Resolve access issues
Parkinson Dam Gold – Silver Project
==> picture [721 x 271] intentionally omitted <==
Parkinson Dam – High Grade Mineralisation
• PD 63: 21m @ 21g/t Au, 83g/t Ag (inc 9m @ 31g/t Au, 152 g/t Ag)
- PD 64: 3m @ 18.1% Pb, 1.1% Zn, 44.2g/t Ag
Parkinson Dam: Recent Drilling
==> picture [721 x 271] intentionally omitted <==
Parkinson Dam: High Grade Au/Ag plus Zn/Pb
50m @ 0.9% Zn, 0.3% Pb 185m[+] @ 0.3% Zn, 0.1% Pb
Julia Creek Oil Shale Project, Qld
==> picture [721 x 271] intentionally omitted <==
----- Start of picture text -----
•
EPM Applications 1800km [2 ] over Toolebuc Formation
•
Shallow, potentially open-pittable areas selected
•
Reported conventional oil shale yields 65-75 l/t
•
Xtract developing higher yielding hydrogenation process
----- End of picture text -----
Competent Person’s Statement
==> picture [721 x 271] intentionally omitted <==
----- Start of picture text -----
to the style of mineralisation and type of deposit under
consideration and to the activity which they are undertaking to
qualify as Competent Persons as defined in the 2004 Edition of
the “Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves”. Robert Smith and Michael
Glasson consent to the inclusion in the report of the matters based
on their information in the form and context in which it appears.
----- End of picture text -----
Disclaimer
==> picture [721 x 271] intentionally omitted <==
----- Start of picture text -----
will therefore carry an element of risk.
It should not be assumed that the reported Exploration Results
will result, with further exploration, in the definition of a
Mineral Resource.
----- End of picture text -----