TARUGA MINERALS LIMITED Capital/Financing Update 2021

Mar 7, 2021

65895_rns_2021-03-07_81874179-1ed7-4953-8fd0-07dc4148ba54.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [148 x 56] intentionally omitted <==

==> picture [162 x 73] intentionally omitted <==

08 March 2021

Excellent Results from Wyacca Prospect, Mt Craig Copper Project, South Australia

Highlights

  • Reconnaissance field exploration well underway at Mt Craig Copper Project (MCCP)

  • Historic IP data was remodelled at the Wyacca Prospect, highlighting:

  • An open-ended IP anomaly was defined over a distance of at least 1.7km

  • Mapped and sampled breccias coincide with the anomaly at surface

  • Historic RC holes drilled in the 1960’s did not intersect the core of the anomaly – reported up to 58m of copper mineralisation along the anomaly margins

  • Recent breccia sampling results at Wyacca included:

  • 21.6% Cu and 11.4 g/t Ag (MC001); 17.8% Cu and 6.4 g/t Ag (MC005); 11.6% Cu and 23.2g/t Ag (MC007)

  • Taruga and Strikeline are progressing all relevant approvals toward drilling in non-native title ground at Wyacca, in consultation with Traditional Owners

  • Negotiations are under way for a Native Title Mining Agreement (NTMA) with Traditional Owners for exploration on the portion of the MCCP where Native Title is determined

  • A Ministerial Authorisation will be sought under Section 23 of the Aboriginal Heritage Act 1988 (SA) to resolve uncertainty in areas where Native Title has not been determined at the Flinders project. This will support the recommencement of drilling activities at the Woolshed and Jenkins Prospects

Taruga Minerals Limited (ASX: TAR, Taruga or the Company ) is pleased to announce that it has conducted a review of historical IP data collected by CAMS Leases Pty Ltd ( CAMS ) in the 1960’s and has completed a reconnaissance rock chip sampling and mapping program over the Wyacca Prospect on the Mt Craig Copper Project ( MCCP ).

==> picture [74 x 225] intentionally omitted <==

A well-defined IP anomaly with an associated low resistivity anomaly has been defined over a distance of at least 1.7km by the IP survey and is coincident with 3 historic copper workings which reported rock chip results of up to 21.6% Cu and 11.4 g/t Ag (MC001) as shown in Figure 2 . Historic drill holes were mostly vertical and drilled to less than 100m, and only two were drilled coincident to the margin of the IP anomaly which appears to strengthen at depths below 50-100m from surface. CAMS W3 reported 57.9m at 0.27% Cu from 33.5m (including 4.6m at 0.9% Cu from 45.7m and 1.5m at 2% Cu from 76.2m), while CAMS W2 reported 41.2m at 0.21% Cu from 44.2m (including 4.6m at 0.84% Cu from 44.2m) as shown in section in Figure 3 . Furthermore, holes were collared 60m apart suggesting significant widths of copper mineralisation can be expected from angled drill holes which will test the true width and grade of copper mineralisation associated with the IP anomaly.

The mapping further identified a number of parallel mineralised breccias as shown in Figure 2 which reported up to 11.6% Cu and 23.2g/t Ag .

Taruga CEO, Thomas Line commented: “The reprocessing and modelling of the historical IP survey has confirmed a strong association exists between the IP chargeability anomaly, high-grade rock chip samples and significant historical drill intercepts. This further highlights the copper and silver potential at Wyacca. The survey shows that only two of the historical holes, which also contained the best historical intercepts at Wyacca (CAMS W2 and CAMS W3), were drilled in close proximity to the IP anomaly and were stopped short of intersecting the main body of the anomaly at depth. Taruga will plan a number of angled holes across the IP anomaly which will show the grade potential and true width which is expected to exceed 50m from historical drilling. Field mapping and sampling has further highlighted the potential at Wyacca where a number of east-west striking parallel, mineralised breccias were identified for follow up with drilling.

“We understand and respect that we seek to explore on the traditional lands of Aboriginal people and are committed to good faith engagement with identified Aboriginal stakeholders wherever we operate. This includes seeking to maximise the benefits for Aboriginal people from our drilling program and any future mining activity.

“Good engagement with identified Aboriginal stakeholder groups continues to ensure land access at Mt Craig and the management of obligations under the Aboriginal Heritage Act 1988 (SA).”

Wyacca Prospect

==> picture [312 x 311] intentionally omitted <==

Figure 1: MCCP Project Outline showing Priority Exploration Targets, Historical Copper and Gold Mineral Occurrences & Mines, and the Main Structural Feature being the Worrumba Anticline.

The Wyacca Prospect is located in the northern portion of the Mt Craig Copper Project ( MCCP ) as shown in Figure 1 and was the first operational small-scale mine in the MCCP area, with copper being first discovered

2

and developed in 1863. Incomplete mining production records indicate that Wyacca was operating with a run of mine grade of up to 40% Cu during the early years of production, after which higher tonnages at an average grade of 3% Cu were mined for a total 306 tonnes of ore.

Mineralisation is strongly associated with breccias along the apparent contact between the Tapley Hill and Wilyerpa Formations as shown in Figure 2 . These breccias lie parallel to the stratigraphy in the northern and southern portions but are rotated to strike NW-SE over the central portion where they cover more than 1.7 km of strike ( Figure 2 ). The IP anomaly is offset to the east of the workings supporting a northeasterly dip direction observed in the old mine workings.

All exposed breccias were mapped and sampled during a recent reconnaissance field visit. Breccias are shown in Figure 2 and results are summarised in Table 1 , and include: 21.6% Cu and 11.4g/t Ag ; 10.3% Cu and 2.4g/t Ag ; 8.76% Cu and 2.4g/t Ag along the NW breccia, and 17.8% Cu and 6.4g/t Ag ; 11.6% Cu and 23.2g/t Ag; 11.3% Cu and 3.6g/t Ag from the parallel west-east trending breccias.

Table 1: Rock Chip Assay Results at Wyacca Prospect

Sample
ID
Easting **Northing ** Elevation Description Cu % **Ag g/t ** **Aug/t **
MC001 289774 6481590 525 Mineralised Breccia 0.06 0.1 0
MC003 289458 6482595 506 Mineralised Siltstone 2.44 5.4 0.003
MC005 288854 6481403 530 Mineralised Breccia 17.80 6.4 0.005
MC007 291533 6482637 506 Mineralised Breccia 11.60 23.2 0.017
MC008 289462 6482592 507 Mineralised Siltstone 5.03 9.8 0.034
MC009 289776 6481594 525 Mineralised Breccia 11.30 3.6 0.005
MK001 287930 6481928 527 Mineralised Breccia 21.60 11.4 0.005
MK002 287935 6481928 527 Mineralised Breccia 0.5 0.2 0
MK003 287900 6481950 530 Mineralised Siltstone 4.19 3.4 0
MK004 288540 6481340 537 Mineralised Breccia 10.30 2.4 0.005
MK005 288544 6481340 537 Mineralised Breccia 8.76 2.4 0.002
MK006 288548 6481340 537 Mineralised Breccia 1.46 0.6 0.002
MK007 288507 6481335 535 Mineralised Breccia 1.96 0.4 0.003
MK008 288048 6481735 530 Mineralised Breccia 2.29 1.6 0.002

The interpretation and modelling of historic IP data from Wyacca shows high chargeability and associated low resistivity causative bodies located on all the survey lines. The survey extent consisted of a base line and eight perpendicular IP survey lines covering the whole of the project area. Lines were surveyed with a dipole-dipole array and a dipole spacing of 300ft (91.4m). Three of the eight lines were re-surveyed with a dipole spacing of 200ft (61m) to provide more detail down to shallower depths of approximately 120m. The northernmost line (Line 40N) plot was illegible and had to be discarded. It is however noted that an anomalous IP response was still visible on the line. Further acquisition information is detailed in Appendix 1.

Many of the IP sections show increasing chargeability anomaly values to depths of approximately 250m below surface and often show an increase in width at these deeper levels as seen in Figure 7 .

3

This could be a result of the chargeable body increasing in width at deeper levels or it could reflect a second parallel chargeable body and potentially a new mineralised zone. The true width and grade of the potentially mineralised chargeable bodies will be determined by an RC drilling program. The section across drill holes CAMS W1 – W4 clearly shows that holes CAMS W2 and CAMS W3 were drilled on the flanks of the chargeable body ( Figure 3 ) which appears to steepen at depth. An angled hole will be planned to intersect the chargeable body between the two drill holes, both of which reported significant mineralisation down to the end of hole but did not intersect the main anomaly.

==> picture [456 x 499] intentionally omitted <==

Figure 2: Geology Map of the Wyacca Prospect showing IP Anomaly, IP Lines, Section Lines, Copper Workings and Mapped Breccias

4

==> picture [474 x 280] intentionally omitted <==

Figure 3 : IP Chargeability RESIP2D section across Line 10N and Historic Drilling

==> picture [474 x 280] intentionally omitted <==

Figure 4: IP Chargeability RESPI2D section across Line 20S and Historic Drilling

5

Future Work

The Company has commenced with prioritising drill targets at Wyacca and in conjunction with Strikeline Resources Pty Ltd ( Strikeline ), is progressing well with all relevant drilling approvals. Reconnaissance soil sampling and geological mapping programs are ongoing on the remainder of the MCCP in areas where Native Title is not determined. Strikeline continues to consult with Aboriginal stakeholders regarding the ongoing exploration program and negotiations are advancing on an access agreement for exploration on the portions of the MCCP where Native Title has been determined.

Flinders Project

The Company remains committed to drilling Woolshed/Metabase and Jenkins Prospects at Flinders, and provides the following update: In December 2020, Strikeline representatives conducted a heritage survey with a local Aboriginal group who assert to hold heritage knowledge over the areas at Woolshed and Jenkins Prospects. Following this site visit, a report was provided to Strikeline and the Company which was inconsistent with field observations made by Strikeline and its retained archaeologist which required clarification. Further engagement with this group is being sought by Strikeline in the efforts of working through the report provided and the possible recommencement of drilling.

However, in addition to the ongoing engagement being sought with the local Aboriginal group, Strikeline will also seek an authorisation from the Minister under Section 23 of the Aboriginal Heritage Act 1988 (SA) to resolve uncertainty in areas where Native Title has not been determined. The Section 23 authorisation is made available to exploration companies seeking ultimate confirmation on drilling authorisation and it is estimated to take approximately 6-9 months from application.

A Program for the Environment Protection and Rehabilitation (PEPR) covering the southern portion at Flinders was submitted to the Department of Energy and Mining (DEM) during September 2020 and is yet to be approved. The proposed drilling targets at southern Flinders include the Main Lode, Rambla and Mt Stephen Prospects where Taruga has an agreement in place with the local Traditional Owners. Taruga will continue to closely monitor the situation and will provide further updates, as required.

Stakeholder Engagement

Both Strikeline and Taruga remain committed to mutually respectful and transparent engagement with all stakeholders across our growing portfolio of South Australian exploration projects. This includes a focus on providing employment and business development opportunities to local Aboriginal people, while finding ways to explore which have a minimal impact on the environment and Aboriginal cultural values.

About the MCCP

The MCCP is situated within the Adelaide Geosyncline ( AGS ), which lies within the G2 structural corridor. The G2 structural corridor is host to all of South Australia’s past and present major copper projects including Prominent Hill, Olympic Dam and Carrapateena as shown in Figure 5 . The AGS has hosted over 800 historical copper mines or workings, and multiple polymetallic mines since the 1840’s. Copper-gold associations are common within the AGS, with many of the old copper mining ventures not recognising the presence of gold. Modern exploration has continued to uncover significant large-scale, polymetallic, base and precious metal potential around historical mining regions within the AGS, which have undergone limited exploration and development since initial mining ceased in the late 1800’s.

6

==> picture [421 x 473] intentionally omitted <==

Figure 5: Regional Map showing the MCCP (in red) location within the Adelaide Geosyncline and G2 Structural Corridor within the Gawler Craton and Significant Mines/Deposits Nearby.

7

Table 1: MCCP Prospect Summary

Prospect Commodity Soil/Stream
Anomaly
(km2)
Best Channel
Results
Best Drilling
Results
Wyacca Cu - Ag 1(Cu) 0.9m at 3.6% Cu 4.6m at 0.9% Cu
BirthdayRidge Cu 6(Cu) 0.3m at 12% Cu 17.7m at 0.73% Cu
Napoleon Cu - Ag- Zn 3(Cu) 0.6m at 6.4% Cu 7.3m at 0.25% Cu
Hawk Au - Cu 0.5(Au) No Sampling 10m at 0.2g/t Au
Mt Craig Cu - Zn 4(Cu);9(Zn) No Sampling No Drilling
Morgan's Creek Cu - Ni - Ag 3(Cu) No Sampling No Drilling
Iron King Fe - Cu - Ag Cu <50ppm 2.4m at 0.37% Cu No Drilling

The Worrumba Anticline, which is a highly complex fold structure in which dolomites and sediments have been upturned and intruded extensively by deep seated doleritic iron breccias along its fold axis and along its flanks as shown in Figure 6 . These breccias and dolerites have been mapped along the full extent of the 34km Worrumba Anticline and are known to host strong copper, silver, zinc and gold mineralisation. Ironrich intrusive diapirs are potentially highlighted as magnetic and sometimes gravity anomalies along the periphery of the Worrumba Anticline.

8

==> picture [343 x 493] intentionally omitted <==

Figure 6 : Schematic Cross-Section across the Worrumba Anticline highlighting Steeply Dipping, Upturned Sediments and Dolomites which are Extensively Intruded by Iron Breccias and Dolerites (Pale Green) (Source: Bulletin 52 GSSA; Pries WV 1944).

9

This announcement was approved by the Board of Taruga Minerals Limited.

For more information contact:

Thomas Line Eric de Mori CEO Director +61 8 9486 4036 +61 8 6169 2668

Competent Person’s Statement – Exploration Results

The information in this report that relates to exploration results is based on, and fairly represents information and supporting documentation prepared by Mr Mark Gasson, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Processing and modelling of the geophysics have been conducted by Jim Allender, a geophysical consultant to the Company through Allender Exploration. Jim Allender is a member of the Australian Institute of Geoscientists (AIG) and is an experienced geophysicist with over 30 years’ experience. Mr Allender has sufficient experience relevant to the style of mineralisation and the type of deposit under consideration. Mr Gasson is a Director of Taruga Minerals Limited. Mr Gasson has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Both Mr Gasson and Mr Allender consent to the inclusion in this report of the matters based on their information in the form and context in which it appears.

Forward Looking Statements and Important Notice

This report contains forecasts, projections and forward-looking information. Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no assurance that these will be achieved. Expectations and estimates and projections and information provided by the Company are not a guarantee of future performance and involve unknown risks and uncertainties, many of which are out of Taruga’s control.

Actual results and developments will almost certainly differ materially from those expressed or implied. Taruga has not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this announcement. To the maximum extent permitted by applicable laws, Taruga makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability for the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission from, any information, statement or opinion contained in this report and without prejudice, to the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other forward looking information contained or referred to in this report.

Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company’s securities.

10

Appendix 1

The survey extent consisted of a base line and a number of perpendicular IP survey lines as shown in Figure 2 . A total of eight lines were surveyed with a dipole-dipole array with four extensions (n=4) and a dipole spacing of 300ft (91.4m). Three of the eight lines were re-surveyed with a dipole spacing of 200ft (61m) (n=4).

The data values in the RESPI2D-section shown in Figure 7 represent the apparent resistivity ( Ra ) at the top of Figure 7 and a measure of the chargeability of the earth below the survey line in Figure 7 . The Ra is a measure of the conductivity of the investigated area and was converted from ohm.ft to its metric equivalent of ohm.m. The metal factor ( MF ) values at the bottom of the figure indicate the chargeability of the earth as measured by receivers operating in the frequency domain. Frequency domain receivers were the standard during the early years of IP exploration. The MF values were not converted as the modelling software is able to use the MF data.

==> picture [474 x 231] intentionally omitted <==

Figure 7 : IP RESPI2D-sections showing Resistivity at the top and chargeability below. Note the High Chargeability Anomaly is associated with the Low Resistivity Anomaly.

11

JORC Code, 2012 Edition – Table 1 report template

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary Commentary
Sampling Nature and quality of sampling (e.g. cut channels, random chips, or Selective rock-chip samples were collected as in-situ, surface
techniques specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
lag and float samples. Both visibly mineralised and un-
mineralised samples were collected with the aim of obtaining
sondes, or handheld XRF instruments, etc). These examples should representation of all rock types in the target area.
not be taken as limiting the broad meaning of sampling. Stream Sediment sampling was conducted by Gold Copper
Include reference to measures taken to ensure sample representivity Exploration with 3,274 samples at a nominal 8 samples per
and the appropriate calibration of any measurement tools or systems square kilometre. Samples were mapped as taken regularly
used. down channel between 100 and 200m separation as adjusted to
Aspects of the determination of mineralisation that are Material to the account to be above and below channel intersections.
Public Report. Coordinates were determined from maps in historical exploration
In cases where ‘industry standard’ work has been done this would be reports. The samples were sieved to minus 80 mesh size and
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 analysed for Cu, Zn, Pb, Ba, Ag, Fe and Mn by atomic
m samples from which 3 kg was pulverised to produce a 30 g charge absorption techniques following a nitric-perchloric mixed acid
for fire assay’). In other cases more explanation may be required, extraction.
such as where there is coarse gold that has inherent sampling Channel Sampling conducted by Gold Copper Exploration Pty
problems. Unusual commodities or mineralisation types (e.g. Ltd. Coordinates and azimuth were determined from figures and
submarine nodules) may warrant disclosure of detailed information. text descriptions within the historical exploration reports.
Channel samples were taken at 90 degrees across strike of the
mineralised lithology within bulldozed costeans and historical
shafts and pits. Geochemical analysis was conducted through
atomic absorption and multi-element semi-quantitative
spectrometry.
Drilling Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air A total of 105 historical drill holes encompassing RC, Rotary
techniques blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple
_or standard tube, depth of diamond tails, face-sampling bit or other _
Percussion and Diamond techniques were completed by 5
different companies.

12

Criteria JORC Code explanation Commentary Commentary
type, whether core is oriented and if so, by what method, etc). Cams Leases Pty Ltd. completed 11 rotary holes
Copper Range (SA) Pty Ltd. completed 44 Reverse Circulation
holes
Gold Copper Exploration Ltd. completed 33 Rotary Percussion
holes
SAEI Triassic Coal Exploration completed 3 Reverse Circulation
holes
Utah Development Company Ltd. completed 6 diamond drill
holes and 8 rotary percussion holes. Available data did not
specify core diameter or core orientation methods.
Drill Method of recording and assessing core and chip sample recoveries No information was available in historical exploration reports
sample and results asses outlining drill sample recovery procedures or outcomes.
recovery Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Logging Whether core and chip samples have been geologically and Rock chip samples were field logged with the assistance of
geotechnically logged to a level of detail to support appropriate historical mapping and petrology work. Samples were then
Mineral Resource estimation, mining studies and metallurgical reviewed for petrology using a 10x loupe. Review of logging was
studies. conducted following the return of geochemical results.
Whether logging is qualitative or quantitative in nature. Core (or Historical core and chip samples were logged by the historical
costean, channel, etc) photography. licence holder. Historical logging was reviewed against modern
The total length and percentage of the relevant intersections logged. geological interpretations of the region and geochemical assays.
Sub- If core, whether cut or sawn and whether quarter, half or all core No information was available in historical exploration reports
sampling taken. concerning sub-sampling
techniques
and sample
preparation

If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.

13

Criteria JORC Code explanation Commentary Commentary
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
Quality of The nature, quality and appropriateness of the assaying and Samples were analysed at Bureau Veritas, Adelaide for broad
assay data
and
laboratory
tests
laboratory procedures used and whether the technique is considered
partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their

suite multi-element analysis using 4-acid digest ICP-MS. Gold
and PGE analysis was by Fire Assay ICP-OES.
Laboratory QA/QC samples and duplicates were included in
each sample despatch and reported in the results. QA/QC
samples included lab standards, field and lab blanks, and
derivation, etc. duplicate samples; repeats were conducted on every 10th
Nature of quality control procedures adopted (e.g. standards, blanks, sample.
duplicates, external laboratory checks) and whether acceptable levels
No information is available in the historical exploration reports
of accuracy (i.e. lack of bias) and precision have been established. regarding QAQC procedures.
Copper Range geochemical analysis was conducted using Aqua
Regia with an ICP-AES Finish.
Utah Development Co. geochemical analysis was conducted
using Atomic Absorption Spectroscopy for Cu, Pb, Zn, Ag & Au.
XRF was used for As
Gold Copper Exploration Ltd. Gave no specific information on
geochemical analysis method used however it is assumed to be
the same as the channel samples and be conducted through
atomic absorption and multi-element semi-quantitative
spectrometry.
CAMS Leases Pty Ltd. & SAEI Triassic Coal Exploration
provided no information on geochemical analysis method used

14

Criteria JORC Code explanation Commentary Commentary
Verification
The verification of significant intersections by either independent or
No further verification was carried out and no adjustments were
of alternative company personnel. made on new samples as the geochemical sampling was
sampling
and
assaying
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
completed on a reconnaissance scale.
Verification of available data has been carried out on historical
data as best as possible by using cross references of data,
descriptions of work completed and maps. All maps, data tables
have been digitised into a working dataset. No significant
adjustments were made. Data conversions were applied to
ensure common units of measurement i.e. feet and inches to
metres. Insufficient fieldwork has been conducted by Taruga
Minerals to be able to verify all mining or drilling intercepts.
Location of
Accuracy and quality of surveys used to locate drill holes (collar and
A handheld GPS with 5m accuracy was used to collect sample
data points
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
coordinates for each sample.
No information was given in the historical exploration reports
Specification of the grid system used. regarding the method of surveying to determine coordinates.
Quality and adequacy of topographic control. The location points were determined from the historical
exploration report text and figures.
Data Data spacing for reporting of Exploration Results. Rock chips were collected on a selective basis.
spacing Whether the data spacing and distribution is sufficient to establish the
Data is insufficient to be used in a Mineral Resource Estimate.
and
distribution

degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
The data is sufficient to guide and define further exploration
activities. It appears historical samples have not been
composited prior to analysis.
Whether sample compositing has been applied.
Orientation
Whether the orientation of sampling achieves unbiased sampling of
Samples were collected selectively. Grid spacing was used for
of data in possible structures and the extent to which this is known, considering soil sampling.
relation to the deposit type. Historical sampling observed in drilling and channel intercepts
geological
structure
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
appears to conform with best practice. E.g. sampling
perpendicular to lithology and sampling separate intervals with
variations in mineralisation or rock type.

15

Criteria JORC Code explanation Commentary Commentary
Sample The measures taken to ensure sample security. The samples were collected, processed and despatched by the
security Supervising Geologist before being sent directly by courier to
Bureau Veritas, Adelaide.
Audits or The results of any audits or reviews of sampling techniques and data.
No audits completed.
reviews

16

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary Commentary
Mineral Type, reference name/number, location and ownership including Sampling was completed on EL6541. The license is 100%
tenement agreements or material issues with third parties such as joint owned by Strikeline Resources Pty Ltd and located in the
and land
tenure
status
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The security of the tenure held at the time of reporting along with any
Hawker area approximately 15km east of Hawker. The tenement
is in good standing and there are no impediments to operate.
known impediments to obtaining a licence to operate in the area.
Exploration
Acknowledgment and appraisal of exploration by other parties.
Extensive small-scale historic mining for base metals occurred
done by
other
parties
throughout the area. This occurred most prominently at the
Wyacca Mine and Wirrawilka workings. Further historic shafts at
Iron King are presumed to have mined Silver and Gold.
From the 1960’s onwards numerous companies have explored
the region with soil, stream, rock chip & channel sampling,
geophysics and drilling campaigns. The most prominent prior
exploration was conducted by Cams Leases Pty Ltd., Copper
Range (SA) Pty Ltd., Gold Copper Exploration Ltd., SAEI
Triassic Coal Exploration & Utah Development Company Ltd
Geology Deposit type, geological setting and style of mineralisation. The Wyacca target horizon at surface is a hematite breccia which can
be traced along strike at surface where exposed.
The full Mt Craig general prospective area lies within the Worumba
Anticline, a structurally complex area composed of dolomites,
sandstones, siltstones, shales and dolerites; the majority of which are
hosted within a diapiric breccia.
Mineralisation occurs along fault planes, joint faces and lithologic
contact zones.

17

Criteria JORC Code explanation Commentary Commentary
From the limited historical data, the deposit model isn’t well
constrained however the region is thought to be prospective for IOCG-
style deposits.
Drill hole A summary of all information material to the understanding of the All available historic information regarding the drill hole data is
Information exploration results including a tabulation of the following information included within the appendices.
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
Data In reporting Exploration Results, weighting averaging techniques, Rare earth elements (REE) were aggregated as either combined
aggregation maximum and/or minimum grade truncations (e.g. cutting of high heavy rare earth elements (HREE) or light rare earth elements
methods grades) and cut-off grades are usually Material and should be stated. (LREE) using industry standards. Platinum and Palladium were
Where aggregate intercepts incorporate short lengths of high grade combined and reported as “combined PGE’s.
results and longer lengths of low grade results, the procedure used Where applicable when significant intercepts are reported they
for such aggregation should be stated and some typical examples of are weighted average grades taking into account variable
such aggregations should be shown in detail. sampling lengths.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
Relationship These relationships are particularly important in the reporting of An interpreted potential mineralisation width has been derived
between Exploration Results. from historical geophysical IP data re processing, recent
mineralisatio If the geometry of the mineralisation with respect to the drill hole mapping and historical drilling interpretation and indicated within
n widths and
angle is known, its nature should be reported.
the documents images. The true width and grade of the
If it is not known and only the down hole lengths are reported, there potentially mineralised chargeable bodies will only be realised
should be a clear statement to this effect(e.g. ‘down hole length, true from future drilling.

18

Criteria JORC Code explanation Commentary Commentary
intercept width not known’). There is no information within the historical drill logs indicating
lengths any geometry of mineralisation.
Diagrams Appropriate maps and sections (with scales) and tabulations of Appropriate diagrams of location, surface features and results
intercepts should be included for any significant discovery being are provided in the report.
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
Balanced Where comprehensive reporting of all Exploration Results is not All applicable sample results are reported in the appendix if not
reporting practicable, representative reporting of both low and high grades reported previously.
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
Other Other exploration data, if meaningful and material, should be reported
Recent 2021 reconnaissance rock chip sampling and mapping
substantive including (but not limited to): geological observations; geophysical program over the Wyacca Prospect has identified surface
exploration survey results; geochemical survey results; bulk samples – size and expressed extents of mineralised breccia including parallel
data method of treatment; metallurgical test results; bulk density, mineralised breccias which have been included in the updated
groundwater, geotechnical and rock characteristics; potential geological interpretation for the Wyacca Prospect.
deleterious or contaminating substances. Historical IP survey and data collected and reported by CAMS
Leases Pty Ltd in 1968 consists of a base line parallel to the
Wyacca outcrop aligning with recent mapped breccias and 9
perpendicular IP survey lines and cross sections of data
processed by McPhar Geophysics. 8 of 9 lines included useable
data. All data was collected in feet (ft) and on reprocessing
converted to metres where required. The 8 lines utilised in
reprocessing were surveyed with a dipole-dipole array with four
extensions (n=4) and a dipole spacing of 300ft. Three of the
eight lines were re-surveyed with a dipole spacing of 200ft (n=4).
The results for Line40N at the north-western end of the survey
area were not included. Reprocessing was completed by Cobus
Elstadt of ExplorationGeneralServices.

19

Criteria JORC Code explanation Commentary Commentary
A significant chargeable IP anomaly and associated low
resistivity has been defined over 1.5km in the IP survey and is
coincident with 3 historic copper workings which reported rock
chip results.
Further work
The nature and scale of planned further work (e.g. tests for lateral
Planned RC with follow up Diamond drilling of target horizons
extensions or depth extensions or large-scale step-out drilling). identified from reprocessing IP data, surface mapping and
Diagrams clearly highlighting the areas of possible extensions, historical work.
including the main geological interpretations and future drilling areas, Elsewhere in Mt Craig Project; Detailed geological mapping and
provided this information is not commercially sensitive. surface (soil sediment/rock-chip) geochemical sampling is
planned using grid spacing.
Collection of new IP and other geophysical data is being planned
to provide further insight and definition of Mt Craig Project key
targets. New and historical data will be combined to be used to
finalise further programs.
Following the results, further drill planning may commence.