KIHABE-NXUU POLYMETALLIC Zn/Pb/Ag/Ge/V/V2O5 PROJECT BOTSWANA

QUARTERLY REPORT TO 31 MARCH 2021

HIGHLIGHTS

  • Analysis of size fractions from vertical milling test work conducted on the Nxuu Deposit

  • In-depth review of the Kihabe Deposit silver domains

  • In-depth review of the Kihabe Deposit copper domain

VERTICAL MILLING TEST WORK ON NXUU DEPOSIT CORE TO REDUCE POWER REQUIREMENTS

On 3 December 2020, the Company released an announcement in respect of Vertical Milling test work conducted by Energy and Densification Systems (EDS) South Africa on Nxuu Deposit samples.

Some 688kg of half HQ diamond core from 14 Nxuu Deposit drill holes (Refer to Figures 1 – 6), with a maximum size of >50mm and an F80 of 47.68mm was used by EDS for this comminution test work.

EDS 10 HORIZONTAL SHAFT VERTICAL MILL

EDS has developed a 10 horizontal shaft Vertical Mill which may require as little as 25% of the power required for a conventional Ball/SAG/ROD mill. The mill has 180 agitating attachments known as flingers which rotate at speeds of up to 60m/s. Opposing flingers rotating towards one another create large impact forces on gravity fed material which can be impacted up to 24 times per second before being discharged from the mill. This allows for significant potential to break down particles, creating a high ratio of fines.

TEST WORK RESULTS

The results from this test work were very encouraging, indicating the ability, after primary and secondary crushing to <40mm, to reduce the particle size through the vertical mill to a P80 of 1mm (1,000 microns) for a 2kWh/t power requirement. A further reduction to 106 microns at 80t/h through a small ball mill with an estimated average work index (BWi) of 10kWh/t should only require an additional 6.5kWh/t. The ball mill’s efficiency is enhanced by microfractures that occur in the minerals and milled product caused through the EDS Vertical Milling process. This enables them to be broken down more easily than normal in the ball mill.

A typical ball mill feed at a crush size of 12mm would require at least an extra 40% of power, estimated in the region of 10kWh/t. Also, a typical ball mill has a capital cost significantly higher than that of a Vertical Mill.

ASSAYING MILLED PRODUCT TO TEST FOR CONCENTRATION OF MINERALLSATION IN MILLED SIZE FRACTIONS

With certain minerals, such as chromite ores, the Vertical Milling impact forces can cause a concentration of mineralisation within particular size fractions. Any such concentration of mineralisation within particular size fractions could potentially require additional separation processes, thereby making further recovery processing more complex.

For this reason, EDS separated 5,049 grams of samples from 12 size fractions of the milled product, ranging from 1,700 microns down to 38 microns. These were sent to Australia to be assayed by Intertek Genalysis for Zn/Pb/Ag/Cu/V/Ge to determine whether any particular size fraction contained excessive concentrations of mineralisation.

MILLED SIZE FRACTION ASSAY RESULTS

The assay results confirmed that no particular size fraction contained excessive concentrations of mineralisation. Therefore, the application of a standard separation process of the overall milled product will only be required. This will make the recovery of metal from the milled product less complex compared to also having to deal with excessive concentrations of mineralisation in particular size fractions.

KIHABE POLYMETALLIC Zn/Pb/Ag/Ge/V DEPOSIT SILVER DOMAINS

The Kihabe Zn/Pb/Ag/Ge/V Deposit has two domains which contain elevated grades of silver mineralisation. The southwest domain covers 400m from 9,900mE to 10,300mE and the NE domain covers 500m from 11,500mE to 12,000mE.

Since March 2020, the silver price has risen from around US $17/oz to its current level of US $26 plus/oz. One possible reason for the extended time frame of elevated silver prices could be the result of an increase in its industrial demand. The major portion of its industrial demand is for solar panels as power sources become more reliant on green technology.

With this concept in mind, during the quarter, the Company conducted an in-depth review of all holes drilled into the two Kihabe Deposit silver domains. Only intersections in excess of 15g/t Ag have been taken into account. All these results have previously been reported to ASX.

AVERAGE WIDTHS AND AVERAGE GRADES OF Ag MINERALISATION

In the SW domain the average width of mineralisation per hole of the 26 holes in this domain amounts to 12.2m per hole. The average grade of the total 319m of mineralisation of the 26 holes amounts to 2.2oz/t Ag.

All 26 drill holes in the SW Silver domain contain significant Zn/Pb mineralisation. All 9 drill holes marked with an * in Table 1, also include significant V/V2O5 mineralisation.

In the V/V2O5 announcement released to the ASX on 28 April 2021- work conducted in the current quarter to 30 June 2021 (refer to website www.mountburgess.com) - the Zn/Pb/Ag/V/V2O5 mineralisation of the 9 holes is shown in the SW domain, Zone 1, as follows:

Section 1: KRC038, KDD204

Section 2: KDD203

Section 3: KDD202

Section 4: KDD201

Section 5: KRC044, KDD109, KDD206, KDD126.

In the NE domain the average width of mineralisation per hole of the 18 holes in this domain amounts to 11.7m per hole. The average grade of the total 212m of mineralisation of the 18 holes amounts to 2.5oz/t Ag.

All 18 drill holes in the NE Silver domain contain significant Zn/Pb mineralisation. All 14 drill holes marked with an * in Table 2, also include significant V/V2O5 mineralisation.

In the V/V2O5 announcement released to the ASX on 28 April 2021 - work conducted in the current quarter to 30 June 2021 (refer to website www.mountburgess.com) - the Zn/Pb/Ag/V/V2O5 mineralisation is shown in the NE domain, Zone 4, as follows:

Section 1: KRC048, KDD114, KRC049 Section 2: KDD115, KRC059, KRC054, KRC056, KRC058 Section 3: KRC061, KRC072

Section 5: KDD116, KRC076 Section 6: KRC082

Section 7: KDD117

The assay results, the widths and depths of the Ag mineralised intersections of drill holes are shown in Tables 1 and 2. The drill hole locations are shown on the Kihabe Drill Hole Map (Figure 7).

CONCLUSION OF IN-DEPTH REVIEW

The in-depth review of these drill holes which are mostly drilled on 100m line spacings has enabled the Company to better determine a future in-fill drilling programme with much closer line spacings. This will enable a more accurate estimate of an Ag resource tonnage and grade.

Table 1 – Kihabe Silver Grades Section 9,900E – Section 10,400E

HOLE ID COORDINATES COORDINATES DIP AZI-
MUTH
INTERVAL Silver Grade Silver Grade
Easting Northing Degrees Degrees From (m) To (m) Width (m) g/t oz/t
SECTION 9,900E
KRC034 9,900 9,937 -60 339 181 191 10 48.2 1.5
KRC015 9,900 9,957 -60 339 140 143 3 33.7 1.1
KRC036 9,900 9,974 -60 339 106 109 3 57.3 1.8
KRC014 9,900 9,997 -58 336 87 90 3 31.7 1.0
SECTION 9,995E
KIH003 9,995 10,009 -60 339 109 113 4 124.0 4.0
118 120 2 63.5 2.0
SECTION 10,000E
KRC037 10,000 9,940 -60 339 128 150 22 26.2 0.8
(including) 138 140 2 40.5 1.3
and 142 150 8 45.9 1.5
KRC041 10,000 9,960 -60 339 90 93 3 44.7 1.4
KIH004 10,000 9,976 -60 339 96 112 16 48.2 1.5
KIH001 10,000 10,003 -60 339 62 79 17 37.9 1.2
KRC038* 10,000 10,020 -60 339 27 44 17 59.5 1.9
(including) 29 32 3 69.5 2.2
and 38 44 6 104.0 3.3
KDD204* 10,000 10,025 -60 340 16 18 2 47.5 1.5
SECTION 10,025E
KDD203* 10,025 10,033 -60 340 14 23 9 23.1 0.7
33 40 7 32.8 1.0
46 48 2 23.1 0.7
SECTION 10,050E
KDD124 10,050 10,000 -60 339 64 71 7 85.89 2.8
91 95 4 172.3 5.5
KDD125 10,050 10,025 -60 339 47 61 14 101.6 3.3
KDD202* 10,050 10,037 -60 339 24.90 29.80 4.90 55.3 1.8
39.16 43 3.84 33.4 1.1
64 67 3 227.8 7.3
SECTION 10,060 E
KRC098 10,100 10,048 -60 69 42 74 32 36.5 1.2
(including) 59 67 8 96.8 3.1
76 78 2 83.1 2.7
SECTION 10,075E
KDD201* 10,075 10,045 -60 340 34 39 5 19.4 0.6
41 45 4 27.8 0.9
50 55.68 5.68 24.5 0.8
70 76 6 221.4 7.1
82 84 2 92.9 3.0

Table 1 – Kihabe Silver Grades Section 9,900E – Section 10,400E (cont’d)

HOLE ID COORDINATES COORDINATES DIP AZI-
MUTH
INTERVAL Silver Grade Silver Grade
Easting Northing Degrees Degrees From (m) To (m) Width (m) g/t oz/t
SECTION 10,100E
KRC046 10,100 9,985 -60 339 120 131 11 25.1 0.8
KRC044* 10,100 10,010 -60 339 73 81 8 17.4 0.6
83 88 5 452.0 14.5
KDD109* 10,100 10,030 -65 339 60 70 10 38.2 1.2
73 82 9 318.0 10.2
KDD206* 10,100 10,050 -60 340 60 68 8 31.6 1.0
KDD126* 10,100 10,075 -60 339 98 102 4 448.2 14.4
SECTION 10,300E
KRC021 10,300 10,000 -60 339 66 69 3 38.3 1.2
71 74 3 26.3 0.8
90 91 1 51.0 1.6
KDD129 10,300 10,037 -90 0 44 79 35 30.2 1.0
SECTION 10,400E
KRC025 10.400 10,014 -60 339 32 34 2 39.5 1.3
KRC028 10,400 10,129 -60 159 115 117 2 48.0 1.5
118 123 5 25.0 0.8

Table 2 Kihabe Silver Grades Section 11,500E To Section 12,000E

HOLE ID COORDINATES COORDINATES DIP AZI-
MUTH
INTERVAL Silver Grade
Easting Northing Degrees Degrees From (m) To (m) Width (m) g/t oz/t
SECTION 11,500E
KRC048* 11,500 10,069 -60 159 50 52 2 26.0 0.8
59 63 4 43.3 1.4
72 74 2 132.0 4.2
KDD114* 11,500 10,073 -90 0 65 81 16 42.6 1.4
97 141 44 181.7 5.8
KRC049* 11,500 10,099 -60 159 71 84 13 25.4 0.8
104 106 2 30.5 0.9
KRC052 11,500 10,129 -60 159 124 134 10 40.8 1.3
136 138 2 26.5 0.8
142 146 4 34.0 1.1
SECTION 11,595E
KRC058* 11,595 10,130 -60 159 135 136 1 97.0 3.1
161 163 2 33.0 1.1
SECTION 11,600E
KDD115* 11,600 9,900 -60 339 50 62 12 35.6 1.1
KDD143 11,600 10,009 -60 339 52 66 14 44.3 1.4
KIH007 11,607 10,037 -60 339 91 112 21 120.1 3.9
KRC059* 11,600 10,055 -60 159 26 27 1 43.0 1.4
44 50 6 34.5 1.1
53 58 5 28.6 0.9
KRC054* 11,600 10,058 -60 339 65 74 9 43.5 1.4
KRC056* 11,600 10,110 -60 159 99 104 5 124.4 4.0

Table 2 Kihabe Silver Grades Section 11,500E To Section 12,000E

HOLE ID COORDINATES COORDINATES DIP AZI-
MUTH
INTERVAL Silver Grade
Easting Northing Degrees Degrees From (m) To (m) Width (m) g/t Oz/t
SECTION 11,700E
KRC061* 11,700 10,060 -60 159 41 43 2 25.3 0.8
48 50 2 28.5 0.9
KRC067 11,700 10,120 -60 159 96 97 1 36.0 1.2
KRC072* 11,700 10,150 -60 159 129 138 9 35.3 1.1
140 141 1 57.0 1.8
SECTION 11,800E
KDD116* 11,800 10,015 -67 339 48 52 4 80.0 2.6
KRC076* 11,800 10,075 -60 159 46 47 1 64.0 2.1
64 65 1 30.0 1.0
SECTION 11,900E
KRC082* 11,900 10,096 -60 159 97 107 10 31.5 1.0
SECTION 12,000E
KDD117* 12,000 10,100 -60 159 85 91 6 32.8 1.1

KIHABE POLYMETALLIC Zn/Pb/Ag/Ge/V/Cu DEPOSIT

COPPER GRADES NOT CURRENTLY INCLUDED IN THE KIHABE DEPOSIT RESOURCE ESTIMATE PREVIOUS ASSESSMENT

In March 2007, Ravensgate, Independent Geological Consultants, compiled an Inferred Copper Resource Estimate in the NE sector of the Kihabe Deposit, compliant with the 2004 JORC Code. This was estimated at various low grade cuts (Refer to Table 3).

Because focus on the Kihabe Deposit at the time only concentrated on Zn/Pb/Ag, none of the additional credits for Vanadium, Germanium and Copper were taken into account.

RECENT ASSESSMENT

With the recent increases in the copper price since September 2020, currently in excess of US $9,000/t, during the quarter, the Company conducted an in-depth assessment of this zone where Cu occurs in association with Zn/Pb/Ag/ Ge/V mineralisation.

This recent assessment has taken into account results from five additional diamond core holes drilled into the area of Cu mineralisation since Ravensgate compiled the Inferred Mineral Resource Estimate (Refer Table 3 and Figure 8). The assessment has shown:

  • This zone of Cu mineralisation now extends from 11,200mE to 12,000mE, covering a potential strike length of 800m.

  • The 17 drill holes now taken into account show that the average width of Cu mineralisation per drill hole amounts to 18.4m

  • The average grade of the mineralised intersections of the 17 drill holes amounts to 0.27% Cu.

  • Results from the five additional diamond core holes (highlighted in orange in Table 4) will enable the Company to better understand the continuity of the Cu mineralised zones.

  • The results from the five additional diamond core holes will enable the Company to more precisely plan future in-fill drilling programmes. Lines of drill holes in this area are mainly 100m apart, which now need to be reduced.

==> picture [335 x 251] intentionally omitted <==

Of the 17 drill holes in the Copper domain, 15 drill holes include significant Zn/Pb/Ag mineralisation. KRC093 and KRC090 only contain Cu. All 11 drill holes marked with an * in Table 4, also include significant V/V2O5 mineralisation.

In the V/V2O5 announcement released to the ASX on 28 April 2021 - work conducted in the current quarter to 30 June 2021 (refer to website www.mountburgess.com) - the Zn/Pb/Ag/Cu/V/V2O5 mineralisation is shown in the NE domain, Zone 4, as follows:

Section 1: KDD114, KRC049

Section 2: KIH007, KDD115, KRC056, KRC058 Section 3: KRC072 Section 4: KIH011 Section 5: KRC076, KRC077 Section 7: KDD117

Table 4 Kihabe Copper Grades Section 11,200E to 12,000E

HOLE ID COORDINATES COORDINATES DIP AZI-
MUTH
INTERVAL INTERVAL Copper Oxide
(O)/
Sulphide
(S)
Easting Northing Degrees Degrees From (m) To (m) Width Grade
(m) %
Section 11,200E
KRC092 11,200E 10.070N -60 160 65 67 2 0.18 S
71 73 2 0.13 S
74 76 2 0.13 S
78 83 5 0.14 S
103 105 2 0.42 S
KRC093 11,200E 10,100N -60 159 100 109 9 0.14 S
123 126 3 0.19 S
Section 11,300E
KRC090 11,300E 10.114N -60 159 136 146 10 0.16 S
Section 11,450E
KDD140 11,450E 10,100N -60 339 73 77 4 0.13 S
91 97.50 6.50 0.67 S

Table 4 Kihabe Copper Grades Section 11,200E to 12,000E (cont’d)

HOLE ID COORDINATES COORDINATES DIP AZI-
MUTH
INTERVAL INTERVAL Copper Oxide
(O)/
Sulphide
(S)
Easting Northing Degrees Degrees From (m) To (m) Width Grade
(m) %
Section 11,500E
KDD114* 11,500E 10,073N -90 0 9 54 45 0.16 O
60 63 3 0.13 O
66 68 2 0.39 S
97 99 2 0.94 S
101 104 3 0.15 S
106 117 11 0.37 S
inc 116 117 1 1.44 S
118 128 10 0.43 S
inc 125 126 1 1.22 S
KRC049* 11,500E 10,099N -60 159 28 31 3 0.15 O
32 47 15 0.17 O
50 65 15 0.27 O
KRC052 11,500E 10,129N -60 159 63 65 2 0.12 O
69 77 8 0.12 S
80 84 4 0.11 S
86 89 3 0.15 S
92 94 2 0.16 S
115 121 6 0.20 S
122 140 18 0.43 S
inc 125 127 2 0.75 S
inc 130 133 3 0.76 S
Section 11,600E
KDD115* 11,600E 9,900N -60 339 38 39 1 0.20 O
50 51 1 0.16 O
119 120 1 0.11 S
151 152 1 0.10 S
181 182 1 0.11 S
KDD143 11,600E 10,010N -60 339 45 47 2 0.12 O
52 54 2 0.13 O
112 113 1 0.12 S
126 130 4 0.22 S
Section 11,600E
KIH007* 11,607E 10,037N -60 339 62 64 2 0.12 O
95 96 1 2.45 S
98 101 3 0.18 S
135 138 3 0.43 S
inc 136 137 1 1.06 S
KRC056* 11,600E 10,110N -60 159 61 64 3 0.17 O
69 71 2 0.13 O
72 75 3 0.16 S
99 101 2 0.21 S
KRC058* 11,595E 10,130N -60 159 87 91 4 0.24 S
92 95 3 0.52 S
112 115 3 0.19 S
Section 11,700E
KRC072* 11,700E 10,150N -60 159 125 130 5 0.28 S
137 141 4 0.20 S

Table 4 Kihabe Copper Grades Section 11,200E to 12,000E (cont’d)

HOLE ID COORDINATES COORDINATES DIP AZI-
MUTH
INTERVAL INTERVAL Copper Oxide
(O)/
Sulphide
(S)
Easting Northing Degrees Degrees From (m) To (m) Width Grade
(m) %
Section 11,770E
KIH011* 11,769E 10,124N -60 339 54 56 2 0.18 O
60 62 2 0.39 S
63 66 3 0.32 S
71 78 7 1.04 S
81 86 5 0.21 S
87 89 2 0.39 S
Section 11,800E
KRC076* 11,800E 10,075N -60 159 17 37 20 0.28 O
inc 23 25 2 0.71 O
42 47 5 0.31 O
inc 46 47 1 1.34 O
KRC077* 11,800E 10,090N -60 159 37 43 6 0.23 O
Section 12,000E
KDD117* 12,000E 11,090N -60 159 76 78 2 0.23 S
82 86 4 0.19 S
92 93 1 0.29 S
106 110 4 0.22 S

CORPORATE

Listing of Options

In September 2020, the Company concluded a share placement of 52,000,000 shares at 0.8 of a cent.

Attached to the share issue were options based on the issue of 2 options for every 3 shares applied for, amounting to 34,666,666 options. The issue of options was subject to shareholder approval at the Company’s AGM held on 30 November 2020.

Shareholder approval was granted at the AGM, allowing the Company to then proceed to issue a prospectus to cover the listed option issue.

On 11 February 2021, notice was received from ASX confirming that the proposed issue of options was compliant, and official quotation was granted as from the commencement of trading on Wednesday 17 February 2021.

==> picture [61 x 11] intentionally omitted <==

----- Start of picture text -----

FIGURE 1
----- End of picture text -----

==> picture [476 x 730] intentionally omitted <==

----- Start of picture text -----

! I 7,821,J I U) c:, LO � 0 Ll.l l.!J Ill r-. 00 0 0 f.!,) tJl � 0 1.1.1 0 0\ LO orS 0 jJ.J 0 � Ul r-:, 00 0 w 0 rt)
?,821,880N
7,S21,760N
7,821,700N
. 1,s21,GG0N , .. - - -■----i----i -+----+ --1 --1 --+ -_J __ •
NXDD048
7,821,640N
----- End of picture text -----

==> picture [129 x 289] intentionally omitted <==

----- Start of picture text -----

·-
s£cnoN 8
- -- -
NXDD031
----- End of picture text -----

DRILL HOLES FROM WHICH CORE WAS SELECTED FOR EDS VERTICAL MILLING TEST WORK

FIGURE 2

NXUU DEPOSIT NORTH AREA

DRILL HOLES FROM WHICH CORE WAS SELECTED FOR VERTICAL MILLING TEST WORK

==> picture [811 x 977] intentionally omitted <==

----- Start of picture text -----

or-.. 0 <::l"Omw I.O
0
xo co
7,821;B00N
KALAHARI SAND
5.1Sm..:; �a;.:;.:======= -
-----------�� .95m
6.95m. .-
.05m @ 186ppm (149ppm)
m
12.48m
7.43m@ l,269ppm (1,0lSppm}
19.43m
20.95m
NXDD043,12.48m core submitted to EDS
for Vertical Milling Test Work
w
rt') r-... 0
co
0 "
0
..
X �
7,821,750N Z Ul
KALAHARI SAND
===== 3.00m
=4
7.00m ... _------------· 7.00m
3.00m @ 0.43¾
10.0Dm
15.00m @ 1,398ppm (1,118ppm)
MINERALISED OXIDISED
23.00m @ l.47% 22.00rn
33.00m �3_4.00m .oom l.00m @ 210ppm (168ppm) QUARTZ WACKE
25.00m · 25.42m
4.58m @ 305ppm (244ppm)
8.00m@Gppm 30.00m
31.00m
33.00m ,- -- 33.00m - 1.00m @ 325ppm (260ppm}
34.00m
4.00m @ 0.46%
DOLOSTONE BASEMENT
37.00m ·
40.00m ··� � -----------=-= ==•=Ji�4o.oom .37.0Dm ��D. m 1.00m @ 298ppm (238ppm}
41.95m I.O w
NXDD037, 33.00m core submitted to EDS EOH cno0 Ill0 r--
0 oo
For Vertical Milling Test Work Xo
7,821,700N Ztn
KALAHARI SAND
-- =-=������] 6.00m
---= - - - =-
LEGEND
RECOVERABLE ZINC VANADIUM
E!QUIVALENT GRADE FOR PENTOXIDE MINERALISED OXIDISED
ZnJPblAg
QUARTZ WACl<E
Vanadium Pentoxide)
0.3%-1%
1%-3%
3%-4%
36.00m
38.00m
39.00m · w � - · 1.00m@ 867ppm (694ppm)
GERMANIUM 5%-0% * 15.64m { 10.00m est) 4ppm @ � � i.,., o 40m ® 3 42m -[39.oom re) "' � g :i,: 0.10% 44.O0m 3 . 42.00m 39.00m
46.40m
(
50.95m
EOH
NXDD036,15.64m core submitted to EDS
for Vertical Milling Test Work
z. I.O
4i.o7m 0.93m @ 889ppm { 71lppm)
m 34
--r-:i...: .00m 2.00m @ 295ppm { 236ppm)
34.00m r- ------------�34:,.:o�o:.!l
36.00m 1.00m @ 232ppm (186ppm)
(Recoverable
.!O�O�l!O:S�T�O:N:E�BAS: EM� :E:N�T�4:9.� :64; �m;.;=;;;; ;;::�4�9�.00�:m�;;; •· 3•2·b4m � - - �?-OOm 0.64m @ 1, 719ppm {1,375ppm)
49.64!11"'
----- End of picture text -----*

FIGURE 3

NXUU DEPOSIT NORTH

AREAB

DRILL HOLES FROM WHICH CORE WAS SELECTED FOR VERTICAL MILLING TEST WORK

==> picture [999 x 388] intentionally omitted <==

----- Start of picture text -----

m w
m o
0 0o en
o
7,821,750N X o oo
z LI')
3.00m [-. -· a,oom] 5ppm _3.oom '(2m/6,303ppm) - . N 3m
, /WDii1 l<ALAHARI
7.oom (2m/4,030 !'J N
a:oo.m IR&m PP� [) ] � 3 SAND
Sppm ; 00 [.. ][(2m/3,624 ] O'I �
12.oon:i 1, ppm) "C W "C 't!J
3N
26.00m il·7.00111 - -...J
3.00m@ 4,17Sppm
.§'
20.00m
(3,340ppm) -c
3
.,, , 2!:i.00111 7.ll,00111 25m s.oom@ o.11s% 26,00111 MINERALISED OXIDISED
4.85% • "Ill 7 [., ] 1.73m@ 534ppm {427ppm) 26.00m 29.00ni 31.00m 3.00m @228ppm ·· (183ppm) QUARTZ WACKE
32,00m 1.00m @ 387ppm
14.00m om �2.oom (310ppm)
, 31),00
3.00m @ 271ppm
13,1, [s] · :i1.oo 1(217ppm)
40.00m--�
3.80m @ 3.50% l3 43.80m
... 45,Q0n, I Sppm I -2--:-0om il!.i 00m @':€ ·-·� o,= Ml,07111 - , ---- 45.00m -- . -1 1.20m * 4a.OOm · 118,00m 3,oom [@0.41% ] 44.00in [4] [1] 100'� -; 47.00m ---------47 .oom
NXDD030, 29.58m core submitted to EDS * 51.62m. 4.62m I Sppm so.oom ■ ... 4.62m @ 3.22% -•D••· _ ....!. . .;.._ 1 . �i�s�@ 1 0 , 71 ppm) 50 oom . lm@ 3.86% 49.00m :vo,;r'®g 6.22m@ 1,(950ppm)187ppm 6.62m
For Vertical Milling Test Work 53.6 m· •53.62m 53.62m
EOH
NXDD039.19.82m core submitted to EDS 56.95m
51.62m EOH 53.95m 51.621n.
l.Ci n (857ppm a:.:= - - - 2.O0m ,.,,, G2m @o,s2%
DOLOSTONE BASEMENT @ 6ppm
47.00m
,
__ 47,oom·,
-.,Jiz,oom_ f
: .. • .m
----- End of picture text -----*

  • NXDD039.19.82m core submitted to EDS for Vertical Milling Test Work

LEGEND

  • NXDD033..6.62m core submitted to EDS for Vertical Milling Test Work

==> picture [263 x 152] intentionally omitted <==

----- Start of picture text -----

RECOVERABLE ZINC VANADIUM
EQUIVALENT GRADE FOR PENTOXIDE
Zn/Pb/Ag {Recoverable
Vanadium Pentoxide)
0.3%-1%
1%-3%
4%-5%
GERMANIUM 5%-6%
----- End of picture text -----

FIGURE 4

NXUU DEPOSIT NORTH

AREAB

DRILL HOLES FROM WHICH CORE WAS SELECTED FOR VERTICAL MILLING TEST WORK

GERMANIUM

O') w i;:t, 0 Q� 0 Q 'e . f.l) X o 00

==> picture [31 x 49] intentionally omitted <==

7,821,S00N

5.15m 5,1511** KALAHARl .SAND 15.54m@ 13.00nl _996ppm * 18.85m {797pptn) MINERALISED OXIDISED :l7.00m @4ppm "[email protected] @ 4.21% 22.00111 2.44m 23.00m 2-, ,,,, ( 27.85m * ·-"··�·-· - · · · m 24.00m * 11.0Sm ·a· ..... j 1·00111 1,396ppm 4pprri 4.00m@ 3.01% 5.00m @ 1,862ppm 7.9.00111 (1,489ppm) l -� � 3,25m@) O,"S., ,[ ? " 36,0 � '° S 35,00 42.25m 4tl.00lll 2.00m @ 234ppm LEGEND VANADIUM EOH 49 · 62 m�-... 4:.," 2om 1.2 �2320pp_;5�6p 0m @ :;:p;mm �) 39.O0rn 3 5 p p m · ■ 1 42.00m 8rri' 1� 4 64 % 0 . �-��J� o 38.001ll 38.70m ·, _ .;.,.(187ppo,) __ ,37,oon 45.00m Vanadium Pentox/de) (Recoverable (Recoverable PENTOXIDE * NXDD034,29.90m core submitted to EDS :.....,...,.. : : : � � 50 09 EOH • m 1.16m ,:.1 1 4s,s4m-,.ll @ 01n 0.69¼ ·-· 110.oom 2.00m@ (1,1, 31.0048ppm) ppm s' • OOm * for Vertical Milling Test Work .. . --. . . .. so.oom ..50.rITm • 30,QOm .,,- ; ., Ill "' . t 7.9 00 2.oom@ :-:- r,i · 4.oom -· w.oom·- - i 27 gsm + --2'' n,• • ,i,:1:>lll 865•Jpm) - 25.00m 24.114m 3.74% 9.1 1.00m 3'/ 5r:>Prri .oorn · 29.o· on· 1 z9.oon1 r,,,,. w 24.00m ---2 3.95m 7.1 1 11 · \�-�Sm @ l,0S2.ppm 1 36 As n (1117ppn1) 3·a:oo�n ' 1 .s2m@ 3.37% 39.00., 39.00m _ _ _ _ _ _ _ _ o _� �.,,91m 20,69 1ll QUARTZ WACKE 15.oom l**

RECOVERABLE ZINC VANADIUM EQUIVALENT GRADE FOR PENTOXIDE Zn/Pb/Ag Vanadium Pentox/de) (Recoverable (Recoverable

  • NXDD032.32.85m core submitted to EDS for Vertical Milling Test Work

FIGURE 5

NXUU DEPOSIT NORTH AREAC

DRILL HOLES FROM WHICH CORE WAS SELECTED FOR VERTICAL MILLING TEST WORK

==> picture [992 x 508] intentionally omitted <==

----- Start of picture text -----

7,821,SS0N
KALAHARI SAND
' 5.15111
6.85m@ [593ppm (474ppm} ]
12.00111
13.00m
4.03m@ 569ppm (455ppm)
' li'.0Jm
MINERALISED OXIDISED
QUARTZ WACKE
27.00m
2.00m @ 3. 79%
2.24m @ 4.97% �i:��: 7,821,820N
2.76m @3.52%
[8.47m] 34.00m
3G,OOm
5.87m @ 957ppm (765ppm}
EOM
44.95m
NXDD040 .. 8.47m core submitted to EDSfor Vertical Milling Test Work
T
NXDD044�29.72m core submitted to EDS
for Vertical Milling Test Work
20.72m

LEGEND
- - - 38. 72m
40,83m ; � ;� @3.29%
RECOVERABLE ZINC VANADIUM 2.17m @ 6ppm 42.00m
EQUIVALENTGRADE FOR PENTOXIDE .,, IC���:: _
Zn/PblAg (Recoverable
Vanadium Pentoxide) 47.00m l · , · •7 • • l.70m @ . 10 111 1,723ppm · --�-147 70 • m
0.3%-1% EOH
(1,378ppm)
49.00m
m:m========:::cm::====�;;;;;��;;�.;= -==-.f 5.1Sm1::i.· :=:ma:== 5.15m lllliii aa
· � �a�ofo�mt�· tlG.oom 5.70m
-- -..
----- End of picture text -----*

==> picture [264 x 147] intentionally omitted <==

----- Start of picture text -----

RECOVERABLE ZINC VANADIUM
EQUIVALENTGRADE FOR PENTOXIDE
Zn/PblAg (Recoverable
Vanadium Pentoxide)
0.3%-1%
:l.%-3%
GERMANIUM 5%-6%
----- End of picture text -----

  • NXDD031. 26.52m core submitted to EDS for Vertical Milling Test Work

FIGURE NXUU DEPOSIT· NORTH AREAC

DRILL HOLES FROM WHICH CORE WAS SELECTED FOR VERTICAL MILLING TEST WORK

==> picture [725 x 804] intentionally omitted <==

----- Start of picture text -----

U> LU
tj- 0
0 U')
Oen
0
X o00
7,821,9SON Z LO
KALAHARI SAND
s.oom
s.oom@ 909ppm
6.00m
11.00m lO.OOm (727ppm)
3.00m @ 3.13%. 11.0Dm 3.00m @ 343ppm =_]. 11.00m
- 0.8m -@ 14.00m 2.05% 14.00m {274ppm)---14.00mj 3.00m

2.35m @ 17.0 3.31% 4m {2,578ppm) 17.00m
19.39m
EOH
20.95m
NXDD046 6 9.00m core submitted to EDS
for Vertical Milling Test Work
0) IJJ
No
-Oo
Oo
Om
X.o
7,821,900N z U')
KALAHARI SAND
� � ==- 3.SSm
-=::zzz: :=::� ;;;;::t: i
3.85m @2.64% · 7 OOm
·7.40m 7.40m
9m@ 6ppm · 12m 12.00m . __ 1.75m@ 286ppm (228ppm)
·-, 13.75m
N lSm·
� � }�:;; . � 1.00m @ 312ppm (ZSQppm)
8 � 2m @ 6ppm ■ oo
o � 19m 3
XO MINERALISED OXIDISED
7,821,875N Z i.n le)
�� ��= -� �� QUARTZ W.ACKE
KALAHARI SAND :c:::z:::; �==- ===-
31m
5.15m ..
4.90m 3.00m @ 4.58%
7.85m 650ppm I •34m
10.0sm·(SZ0ppm .�. 38.00m
13.00m ·13.00m - �
.... 39.58m 39.58m
4.00m@ 3.04%
17.00m 17.00m EOH 41.95m
MIINERALISED OXIDISED
QURTZWACKE * 7.00m � * NXDD029A' 3.85m core submitted to EDS
[24.00m for Vertical Milling Test Work
24.00m . �
5.00m @ 4.15%
29.00m
29.00m
35.00m
1
3.45m @ 867ppm (694ppm)
41.3�m (3,668ppm)
EOH
43.85m
NXDD045. 27 .21m core submitted to EDS
for Vertical Milling Test Work
__ L 1.58m @ 1,835ppm (l,468ppm)
'"
·
- -
7m- , 0.40m @ 416ppm (333ppm}
-J. m
,
DOLOSTONE BASEMENT
DOLOSTONE BASEMENT * 12.36m
:,'
k.1
25m:
3 85

15.0Dm 4.39rn @ 3,222ppm
38.45m
41.36m�:��-=�..=-,;:;-;,�Jji� 40.53m0.83m @4,586ppm
ai:88� 1.00m@ 623ppm (498ppm)
----- End of picture text -----

LEGEND

==> picture [71 x 21] intentionally omitted <==

==> picture [189 x 152] intentionally omitted <==

----- Start of picture text -----

RECOVERABLE ZINC VANADIUM
EQUIVAlJENT GRADE FOR PENTOXIDE
ZnlPb/Ag (Recoverable
Vanadium Pentoxide)
0.3%-1¾
:!.%-3%
3%•4%
4%-5%
----- End of picture text -----

GERMANIUM

FIGURE 7

KIHABE POLYMETALLIC Zn/Pb/ Ag/Ge/V DEPOSIT- BOTSWANA

HOLES DRILLED TO DATE CONTAINING SILVER GRADES OF OVER 15 g/t

==> picture [1150 x 483] intentionally omitted <==

----- Start of picture text -----

� � ,),. -l.. ,.. --l.. --l.. � -l..
->.. -lo. ,). . -l,. -),. -l. I.)
.... "' ..... .... ... ... ... "' ..... ....
0
.N W, .� /CS.>. · -....J co (0
o 0 0 0, o 0 / 0: 0 ·
.0 ,. 0 0 ; ,0 0 o. o
· : •.
_�3: · ... 3 . � 3� 3i .3·: 3: ,:f· 3 · :31 .
I m .:• • m. I ,m l rr( ', m. : · _ m m
1...,<---S00m
--�)f
NE Silver Domain
✓-o
· ' • · ·
ni m
'.
, ;
01
OJ,
,0,
----- End of picture text -----

Zinc Soil Anomaly .. - --Drill Lines Soil Geochem Sampling Area

FIGURE 8

KIHABE DEPOSIT- LOCATION OF DRILL HOLES CONTAINING COPPER

==> picture [1053 x 738] intentionally omitted <==

----- Start of picture text -----

N
- - - - Zinc Soil Anomaly
Drill Hole Lines
--...
----- End of picture text -----

Forward Looking Statement

This report contains forward looking statements in respect of the projects being reported on by the Company. Forward looking statements are based on beliefs, opinions, assessments and estimates based on facts and information available to management and/or professional consultants at the time they are formed or made and are, in the opinion of management and/or consultants, applied as reasonably and responsibly as possible as at the time that they are applied.

Any statements in respect of Ore Reserves, Mineral Resources and zones of mineralisation may also be deemed to be forward looking statements in that they contain estimates that the Company believes have been based on reasonable assumptions with respect to the mineralisation that has been found thus far. Exploration targets are conceptual in nature and are formed from projection of the known resource dimensions along strike. The quantity and grade of an exploration target is insufficient to define a Mineral Resource. Forward looking statements are not statements of historical fact, they are based on reasonable projections and calculations, the ultimate results or outcomes of which may differ materially from those described or incorporated in the forward-looking statements. Such differences or changes in circumstances to those described or incorporated in the forward-looking statements may arise as a consequence of the variety of risks, uncertainties and other factors relative to the exploration and mining industry and the particular properties in which the Company has an interest.

Such risks, uncertainties and other factors could include but would not necessarily be limited to fluctuations in metals and minerals prices, fluctuations in rates of exchange, changes in government policy and political instability in the countries in which the Company operates.

Purpose of document : This document has been prepared by Mount Burgess Mining NL (MTB). It is intended only for the purpose of providing information on MTB, its project and its proposed operations. This document is neither of an investment advice, a prospectus nor a product disclosure statement. It does not represent an investment disclosure document. It does not purport to contain all the information that a prospective investor may require to make an evaluated investment decision. MTB does not purport to give financial or investment advice.

Professional advice: Recipients of this document should consider seeking appropriate professional advice in reviewing this document and should review any other information relative to MTB in the event of considering any investment decision.

Forward looking statements : This document contains forward looking statements which should be reviewed and considered as part of the overall disclosure relative to this report.

Disclaimer: Neither MTB nor any of its officers, employees or advisors make any warranty (express or implied) as to the accuracy, reliability and completeness of the information contained in this document. Nothing in this document can be relied upon as a promise, representation or warranty.

Proprietary information : This document and the information contained therein is proprietary to MTB.

Competent Persons’ Statements:

The information in this report that relates to mineralogical and metallurgical test work results conducted on samples from the Nxuu Deposit fairly represents information and supporting documentation approved for release by Mr Chris CampbellHicks, Metallurgist, FAusIMM (CP Metallurgy),MMICA, Non-Executive Director of the Company, who reviewed the content of the announcement. Mr Campbell-Hicks has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the JORC Code and has consented to the inclusion in respect of the matters based on the information in the form and context in which it appears.

Mr Campbell-Hicks has for a number of years whilst working with Coffey Mining and other consultancies and companies made contributions to numerous Scoping Studies, Pre-feasibility Studies and Feasibility Studies under the 2004 JORC Code, the 2012 JORC Code and the Canadian National Instrument (NI 43-101). As such he qualifies as a Competent Person for reporting on matters pertaining to metallurgy, process engineering and interpretation of test work results and data for the establishment of Design Criteria for such studies.

The information in this report that relates to drilling results at the Kihabe Deposit fairly represents information and supporting documentation approved for release by Giles Rodney Dale FRMIT who is a Fellow of the Australasian Institute of Mining & Metallurgy. Mr Dale is engaged as an independent Geological Consultant to the Company. Mr Dale has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the

activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Mineral Resources and Ore Reserves (the JORC Code)’. Mr Dale consents to the inclusion in this report of the drilling results and the supporting information in the form and context as it appears.

The information that relates to the March 2007 Kihabe Copper Inferred Mineral Resource was compiled by John Haywood, BSc (Hons), FAusIMM. Mr Haywood is an independent qualified person and has sufficient experience relevant to the style of mineralisation under consideration and to the activity to which he has undertaken to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Haywood consents to the inclusion in this report of the matters based on the information in the form and context in which it appears.

The following extract from the JORC Code 2012 Table 1 is provided for compliance with the Code requirements for the reporting of drilling results.

Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections).

Criteria JORC code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the
minerals under investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling. • Include reference to measures
taken to ensure sample representivity and the appropriate calibration of any
measurement tools or systems used. • Aspects of the determination of
mineralisation that are Material to the Public Report. • In cases where
‘industry standard’ work has been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of detailed information.
Mount Burgess Mining Diamond Core Holes
HQ Diamond Core was marked and collected in sample trays, visually logged and cut in half. Samples were
collected as nominal 1m intervals but based on visible geology with minimum samples of 0.3m and maximum
samples of 1.3m. Half of each core was retained on site in core trays and the other half was double bagged and
sent to Intertek Genalysis Randburg, South Africa where they were crushed. A portion of each intersection sample
was then pulverised to p80 75um and sent to Intertek Genalysis for assaying via ICPMS/OES for Ag/Co/Cu/
Pb/Zn/V.
Mount Burgess Mining Reverse Circulation Holes
Individual meters of RC drill chips were bagged from the cyclone. These were then riffle split for storage in
smaller bags, with selected drill chips being stored in drill chip trays. A trowel was used to select drill chip samples
from sample bags to be packaged and sent to Intertek Genalysis, Randburg, South Africa where they were
crushed. A portion of each intersection’s sample was then pulverised to P80 75um and sent to Intertek Genalysis,
Maddington, WA, for assaying via ICP/OES for Ag/Co/Cu/Pb/Zn/V.
Mount Burgess Mining Diamond Core Samples submitted for Metallurgical Test Work
The remainder of the crushed samples were then sent from Intertek Genalysis Randburg to Intertek Genalysis
Maddington, Western Australia where they were then collected by the Company for storage. Samples from
various intersections from drill holes were selected bythe Companyfor submission for metallurgical test work.
Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core
is oriented and if so, by what method, etc).
Mount Burgess Mining Diamond Core Holes
HQ diameter triple tube was generally used for diamond core drilling in the oxide zone of the Kihabe Deposit. NQ
diameter was generally used in the sulphide zone. Down hole surveys were conducted on all DD holes.
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and
results assessed. • Measures taken to maximise sample recovery and ensure
representative nature of the samples. • Whether a relationship exists
between sample recovery and grade and whether sample bias may have
occurred due to preferential loss/gain of fine/coarse material
Mount Burgess Mining Diamond Core and RC Holes
Sample recoveries were in general high and no unusual measures were taken to maximise sample recovery other
than the use of triple tube core for diamond core drilling. Mount Burgess believes there is no evidence of sample
bias due to preferential loss/gain of fine/coarse material.
Logging Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical studies. • Whether logging is
qualitative or quantitative in nature. Core (or costean, channel, etc)
photography. • The total length and percentage of the relevant intersections
logged.
Mount Burgess Mining Diamond Core Holes and RC Hole
Holes were logged in the field by qualified Geologists on the Company’s log sheet template and of sufficient detail
to support future mineral resource estimation: Qualitative observations covered Lithology, grain size, colour,
alteration, mineralisation, structure. Quantitative logging included vein percent. SG calculations at ~5m intervals
were taken in the DD holes. All holes were logged for the entire length of hole. Logs are entered into MTBs GIS
database managed by MTB in Perth.
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken. • If
non-core, whether riffled, tube sampled, rotary split, etc and whether
sampled wet or dry. • For all sample types, the nature, quality and
appropriateness of the sample preparation technique. • Quality control
procedures adopted for all sub-sampling stages to maximise representivity
of samples. • Measures taken to ensure that the sampling is representative
of the in situ material collected,includingfor instance results for field
Mount Burgess Mining Diamond Holes and RC Hole
HQ and NQ Core was sawn in half on site. Half of each core was retained on site in core trays and the other half
was double bagged and labelled noting Hole# and interval both within the bag and on the bag. Sample bags were
then placed in larger bags of ~40 individual samples and the larger bag also labelled describing the contents. Field
duplicates were inserted at regular intervals.
duplicate/second-half sampling. • Whether sample sizes are appropriate to
the grain size of the material being sampled
All samples currently being reported on were assayed for Ag/Co/Cu/ Pb/Zn/V.
Samples from six drill holes currently being reported on were also assayed for Ge.
All RC sample bags were labelled with drill hole number and sample interval and collectively stored in larger bags
with similar reference. Drill chip trays were all stored separately.
All samples currently reported on were assayed for Ag/Co/Cu/Pb/Zn/V.
Quality of
assay data and
laboratory
tests
•The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total
•For geophysical tools, spectrometers, hand-held XRF instruments, etc, the
parameters used in determining the analysis including instrument make and
model, reading times, calibration factors applied and their derivation etc. •
nature of quality control procedures adopted (e.g. standards, blanks,
duplicates, external laboratory checks ) and whether acceptable levels of
accuracy (i.e. lack of bias) and precision have been established.
All Mount Burgess Samples
All samples, when originally assayed, were sent to Intertek Genalysis Perth, for assaying according to the
following standard techniques:
Diamond Core Samples
(a)
Ore grade digest followed by ICP – OES finish for Silver, Lead & Zinc
(b)
Also 4 acid digest for silver, lead, zinc followed by AAS
RC Samples
Ore grade digest followed by ICP-OES for Ag/Co/Cu/Pb/Zn/V
Mount Burgess quality control procedures include following standard procedures when sampling, including
sampling on geological intervals, and reviews of sampling techniques in the field.
The current laboratory procedures applied to the Mount Burgess sample preparation include the use of cleaning
lab equip. w/ compressed air between samples, quartz flushes between high grade samples, insertion of crusher
duplicate QAQC samples, periodic pulverised sample particle size (QAQC) testing and insertion of laboratory pulp
duplicates QAQC samples according to Intertek protocols.
Intertek inserts QA/QC samples (duplicates, blanks and standards) into the sample series at a rate of approx. 1 in
20. These are tracked and reported on by Mount Burgess for each batch. When issues are noted the laboratory
is informed and investigation conducted defining the nature of the discrepancy and whether further check assays
are required. The laboratory completes its own QA/QC procedures and these are also tracked and reported on by
Mount Burgess. Acceptable overall levels of analytical precision and accuracy are evident from analyses of the
routine QAQC data
Verification of
sampling and
assaying
The verification of significant intersections by either independent or
alternative company personnel. • The use of twinned holes. •
Documentation of primary data, data entry procedures, data verification,
data storage (physical and electronic) protocols. • Discuss any adjustment to
assay data.
All Mount Burgess Samples
Assay results for samples were received electronically from Intertek Genalysis and uploaded into MTB’s
database managed by MTB at its Perth Office.
Location of
data points
Accuracy and quality of surveys used to locate drill holes (collar and down-
hole surveys), trenches, mine workings and other locations used in Mineral
Resource estimation. • Specification of the grid system used. • Quality and
adequacy of topographic control.
All Mount Burgess Holes
Drill hole collar locations were recorded at the completion of each hole by hand held Garmin 62S GPS with
horizontal accuracy of approx. 5 metres • Positional data was recorded in projection WGS84 UTM Zone 34S. The
accuracy provided by the system employed is sufficient for the nature of the exploratory program. Downhole
surveys were also conducted.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results. • Whether the data
spacing and distribution is sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied. • Whether sample
compositing has been applied.
All Mount Burgess Holes
Mount Burgess drilling campaigns were undertaken to validate historical drilling as well as to acquire further data
for future resource estimation.. The data spacing and distribution is currently insufficient to establish the degree
of geological and grade continuity appropriate for the estimation of Mineral Resources compliant with the 2012
JORC Code.
Additional drilling will be required to determine the extent of mineralisation and estimate a Mineral Resource
compliant with the 2012 JORC Code. Sample compositing was conducted on drill holes, following receipt of assays
from Intertek Genalysis, for the purpose of mineralogical and metallurgical test work.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit
type. • If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
All Mount Burgess Holes
Mineralisation was typically intersected at -60 degrees and -90 degrees at the Kihabe Deposit and the Company
believes that unbiased sampling was achieved.
Sample
security
The measures taken to ensure sample security. All Mount Burgess Holes
Samples were taken by vehicle on the day of collection to MTB’s permanent field camp and stored there until
transported by MTB personnel to Maun from where they were transported via regular courier service to
laboratories in South Africa.
Audits or
reviews
The results of any audits or reviews of sampling techniques and data. All Mount Burgess Diamond Core Holes
A Company Geologist reviewed sampling and logging methods throughout the drilling programs.
Mount Burgess RC Hole
MTB’s Exploration Geologists continually reviewed sampling and logging methods on site throughout the drilling
programs.

Section 2 Reporting of Exploration Results (Criteria listed in the preceding section also apply to this section).

Criteria JORC Code Explanation Commentary
Mineral tenement and land tenure status Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The Kihabe-Nxuu Project is located in north-western Botswana, adjacent to the
border with Namibia. The Project is made up of one granted prospecting licence
- PL 43/2016, which covers an area of 1000 sq km. This licence is 100% owned
and operated by Mount Burgess. The title is current at the time of release of this
report, with a renewal granted in November 2020 to 31 December 2022.
PL 43/2016 is in an area designated as Communal Grazing Area.
The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.
The licence is in good standing and no impediments to operating are currently
known to exist.
Exploration done by other parties Acknowledgment and appraisal of exploration
by other parties.
The Geological Survey of Botswana undertook a program of soil geochemical
sampling in 1982. As a result of this program, Billiton was invited to undertake
exploration and drilling activities in and around the project area. Mount Burgess
first took ownership of the project in 2003 and has undertaken exploration
activities on a continual basis since then.
Geology Deposit type, geological setting and style of
mineralisation.
The Kihabe-Nxuu Project lies in the NW part of Botswana at the southern margin
of the Congo craton The Gossan Anomaly is centred on an exposed gossan
within the project. To the north of the project are granitoids, ironstones,
quartzites and mica schists of the Tsodilo Hills Group covered by extensive
recent Cainozoic sediments of the Kalahari Group. Below the extensive Kalahari
sediments are siliciclastic sediments and igneous rocks of the Karoo Supergroup
in fault bounded blocks.
Drill hole Information A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole
collar
dip and azimuth of the hole
down hole length and interception depth
hole length
If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
Information material to the understanding of the exploration results reported by
Mount Burgess is provided in the text of the public announcements released to
the ASX.
No material information has been excluded from the announcements.
Criteria JORC Code Explanation Commentary
from the understanding of the report, the
Competent Person should clearly explain why
this is the case.
Data aggregation methods In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material
and should be stated.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths
of low grade results, the procedure used for
such aggregation should be stated and some
typical examples of such aggregations should
be shown in detail.
The assumptions used for any reporting of
metal equivalent values should be clearly
stated.
All Mount Burgess Holes
No data aggregation methods have been used.
Relationship between mineralisation widths and intercept lengths These relationships are particularly important
in the reporting of Exploration Results.
If the geometry of the mineralisation with
respect to the drill hole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (eg ‘down hole length,
true width not known’).
All Mount Burgess Holes
The geometry of the mineralisation with respect to the drill hole angle is
typically at -60 degrees at the Kihabe Deposit which is considered
representative from a geological modelling perspective.
Diagrams Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill hole collar
locations and appropriate sectional views.
All Mount Burgess Holes
Appropriate maps, sections and mineralised drill intersection details are
provided in public announcements released to the ASX. Refer to the Company’s
website www.mountburgess.com.
Balanced reporting Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.
Exploration results reported in Mount Burgess public announcements and this
report are comprehensively reported in a balanced manner.
Other Substantive Exploration Data Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations,
geophysical survey results, geochemical survey
results, bulk samples – size and method of
treatment, metallurgical test results, bulk
density, ground water, geotechnical and rock
Criteria JORC Code Explanation Commentary
characteristics, potential deleterious or
contaminating substances.
Further work The nature and scale of planned further work
(eg tests for lateral extensions or depth
extensions or large-scale step-out drilling).
Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Further works planned at the Project include additional drilling and surface
mapping at the Kihabe-Nxuu Zinc/Lead/Silver/Germanium and Vanadium
Project.

ACN: 009 067 476 8/800 Albany Hwy, East Victoria Park, Western Australia 6101 Tel: (61 8) 9355 0123 Fax: (61 8) 9355 1484 [email protected] www.mountburgess.com

Rule 5.5

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Name of entity

MOUNT BURGESS MINING N.L.

ABN
31009067476
Quarter ended (“current quarter”)
31009067476 31 March 2021
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(9 months)
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation (if
expensed)
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
- audit adjustment for Dec20 qtr
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other – Covid 19 stimulus package
1.9
Net cash from / (used in) operating
activities
-
-
-
-
(16)
(99)
-
-
-
-
-
16
-
-
-
-
-
(46)
(279)
27
-
-
-
-
16
10
(99) (272)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation (if
capitalised)
(e) investments
(f) other non-current assets
-
-
(3)
(17)
-
-
-
-
(5)
(54)
-
-

ASX Listing Rules Appendix 5B (01/12/19) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 1

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(9 months)
$A’000
2.2
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other – R&D tax incentives
2.6
Net cash from / (used in) investing
activities
-
-
-
-
-
-
-
2
-
-
-
-
-
-
-
2
(18) (57)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of
equity securities or convertible debt
securities – audit adjustment for Dec20
qtr
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
-
-
-
-
-
(9)
-
-
-
462
-
-
(27)
10
(75)
-
-
-
(9) 370
4.
Net increase / (decrease) in cash and
cash equivalents for theperiod
4.1
Cash and cash equivalents at
beginning of period
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing
activities (item 2.6 above)
4.4
Net cash from / (used in) financing
activities (item 3.10 above)
4.5
Effect of movement in exchange rates
on cash held
4.6
Cash and cash equivalents at end of
period
188
(99)
(18)
(9)
-
21
(272)
(57)
370
-
62 62

ASX Listing Rules Appendix 5B (01/12/19) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 2

Appendix 5B Mining exploration entity or oil and gas exploration entity quarterly cash flow report

5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in
the consolidated statement of cash
flows) to the related items in the
accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter(should equal item 4.6 above)
62
-
-
-
188
-
-
-
62 188
6.
Payments to related parties of the entity and their associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
Current quarter
$A'000
-
-

Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for, such payments

7.
Financing facilities
Note: the term “facility’ includes all forms of
financing arrangements available to the entity.
Add notes as necessary for an understanding of
the sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
-
-
7.2
Credit standby arrangements
10
2
7.3
Other (please specify)
-
-
7.4
Total financing facilities
10
2
7.5
Unused financing facilities available at quarter end
8
7.6
Include in the box below a description of each facility above, including the lender,
interest rate, maturity date and whether it is secured or unsecured. If any additional
financing facilities have been entered into or are proposed to be entered into after
quarter end, include a note providing details of those facilities as well.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
- -
10 2
- -
10 2
N/A

ASX Listing Rules Appendix 5B (01/12/19) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 3

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (Item 1.9)
8.2
Capitalised exploration & evaluation (Item 2.1(d))
8.3
Total relevant outgoings (Item 8.1 + Item 8.2)
8.4
Cash and cash equivalents at quarter end (Item 4.6)
8.5
Unused finance facilities available at quarter end (Item 7.5)
8.6
Total available funding (Item 8.4 + Item 8.5)
8.7
Estimated quarters of funding available (Item 8.6 divided by
Item 8.3)
(99)
(17)
(116)
62
8
70
0.6 quarters
  • 8.8 If Item 8.7 is less than 2 quarters, please provide answers to the following questions:

  • Does the entity expect that it will continue to have the current level of net operating cash flows for the time being and, if not, why not?

Answer: Yes

  1. Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its operations and, if so, what are those steps and how likely does it believe that they will be successful?

  2. The Company has the ability to raise further funds by way of share placements through the issue of up to 165,037,200 shares as follows:

  3. 99,022,320 shares are available under Section 7.1 (the 15% rule)

  4. • 66,014,880 shares are available under Section 7.1A (the 10% rule) as approved at the Company’s AGM on 30/11/2020.

  5. Does the entity expect to be able to continue its operations and to meet its business objectives and, if so, on what basis?

Answer:

The Directors believe the Company will continue its operations and to meet its business objectives for the following reasons:

  • (a) The Company has continued financial support from the Directors, former Directors and their associated entities, in that they have confirmed in writing that they will not call upon their loans to be repaid within the next 12 months, unless sufficient funds are available to do so without affecting the Company’s going concern.

  • (b) The Company has the ability to raise funds through equity issues. In relation to additional funding via capital raisings.

  • In addition, the Directors have also embarked on a strategy to reduce costs in line with the funds available to the Consolidated Entity.

ASX Listing Rules Appendix 5B (01/12/19) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 4

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Compliance statement

  • 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

  • 2 This statement gives a true and fair view of the matters disclosed.

Date: 30 April 2021

Authorised by: By the Board (Unaudited cashflow)

Notes

  1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.

  2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

  3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

  4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [ name of board committeeeg Audit and Risk Committee ]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee”.

  5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations , the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.

ASX Listing Rules Appendix 5B (01/12/19) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 5