TALISMAN MINING LIMITED — Investor Presentation 2018
Mar 11, 2018
65926_rns_2018-03-11_e4850e9a-79f3-4016-ba80-5727849eb577.pdf
Investor Presentation
Open in viewerOpens in your device viewer
==> picture [45 x 540] intentionally omitted <==
==> picture [128 x 158] intentionally omitted <==
Emerging Copper-Gold Producer – Actively Exploring in Australia’s Premier Regions
Investor Presentation: March 2018
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
This presentation has been prepared by Talisman Mining Limited.
This document contains background information about Talisman Mining Ltd current at the date of this presentation. The presentation is in summary form, has not been independently verified and does not purport be all inclusive or complete nor does it contain all the information that a prospective investor may require in evaluating a possible investment in Talisman Mining Ltd or its assets.
Recipients should conduct their own investigations and perform their own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained in this presentation.
This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of securities in any jurisdiction. This document is not a prospectus and does not contain all of the information which would be required to be disclosed in a prospectus. This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdiction. Recipients should inform themselves of the restrictions that apply in their own jurisdiction. A failure to do so may result in a violation of securities laws in such jurisdiction.
This presentation does not constitute investment advice and has been prepared without taking into account the recipient's investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentation are not intended to represent recommendations of particular investments to particular persons. Recipients should seek their own professional, legal, tax, business and/or financial advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market, financial or political developments. To the fullest extent permitted by law, Talisman Mining Ltd and its related bodies corporate, its directors, officers, employees and representatives (including its agents and advisers), disclaim all liability and take no responsibility for any part of this presentation, or for any errors in or omissions from this presentation arising out of negligence or otherwise and do not make any representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of any information, statements, opinions, estimates, forecasts, conclusions or other representations contained in this presentation. This presentation may include forward-looking statements. These forward-looking statements are not historical facts but rather are based on Talisman Mining Ltd.'s current expectations, estimates and assumptions about the industry in which Talisman Mining Ltd operates, and beliefs and assumptions regarding Talisman Mining Ltd.'s future performance. Words such as “anticipates”, “expects”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “potential” and similar expressions are intended to identify forward-looking statements. Forward-looking statements are only predictions and are not guaranteed, and they are subject to known and unknown risks, uncertainties and assumptions, some of which are outside the control of Talisman Mining Ltd. Past performance is not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or reasonableness of any forward-looking statements or other forecast. Actual values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward looking statements. Any forward looking statements in this presentation speak only at the date of issue of this presentation. Subject to any continuing obligations under applicable law and the ASX Listing Rules, Talisman Mining Ltd does not undertake any obligation to update or revise any information or any of the forward looking statements in this presentation or any changes in events, conditions or circumstances on which any such forward looking statement is based.
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 2
Springfield Cu-Au Joint Venture (Talisman 30%)
-
♦ High grade Cu-Au mine development in world-class VMS province
-
♦ Outstanding high grade orebody – Monty Ore Reserve = 8.7% Cu
-
♦ Monty Feasibility Study outlines exceptional forecast returns
-
♦ Pre-production finance secured – $US20 million facility
-
♦ Construction and mine development rapidly advancing
-
♦ First production targeted for early Q4 CY 2018
-
♦ Significant exploration value and untested potential
NSW Lachlan Cu-Au Project
-
♦ Large landholding in an Australian exploration hotspot
-
♦ Significant potential for discovery of substantial Cu, Au and base metal deposits
Sinclair Nickel Project
-
♦ 350ktpa processing plant & associated infrastructure
-
♦ Near-mine and regional opportunities
==> picture [393 x 311] intentionally omitted <==
“Maximise value to shareholders through exploration, discovery and development of complementary opportunities in base and precious metals”.
- ♦ Regionally strategic asset
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 3
Experienced and Diverse Executive Team and Board
Dan Madden – Managing Director
- ♦ +17 years experience across base and precious metals from exploration through to operations
Tony Greenaway – General Manager Geology
- ♦ +25 years base and precious metal exploration experience from grass roots evaluation through to advanced feasibility studies
Shaun Vokes – Chief Financial Officer and Company Secretary
- ♦ +25 years experience in senior commercial and financial roles from project evaluation/development through to financing and metals marketing
| Non Executive Directors | Non Executive Directors |
|---|---|
| Jeremy Kirkwood(Non-Exec. Chair) | Investment Banking, Corporate Strategy |
| Karen Gadsby(Non-Exec. Dir) | Finance, Commercial & Board Experience |
| Brian Dawes(Non-Exec. Dir) | Operational Executive |
| Alan Senior(Non-Exec. Dir) | Resources Project Development |
Recent Research
| Capital Structure | ||
|---|---|---|
| Shares on Issue | 185.7M | |
| Unlisted Options | 9.7M | |
| Market Capitalisation (at 22c) | A$41M | |
| Cash at 31 Dec 2017 (incl restricted cash) Substantial Shareholders |
A$12.1M | |
| Kerry Harmanis | ~18% | |
| Institutional Investors | ~10% |
| Capital Structure | ||
|---|---|---|
| Shares on Issue | 185.7M | |
| Unlisted Options | 9.7M | |
| Market Capitalisation (at 22c) | A$41M | |
| Cash at 31 Dec 2017 (incl restricted cash) Substantial Shareholders |
A$12.1M | |
| Kerry Harmanis | ~18% | |
| Institutional Investors | ~10% |
Philosophy and Core Beliefs
-
♦ Behave and act as business owners
-
♦ Be accountable for our decisions and actions
-
♦ What we say is what we do
-
♦ Engage with stakeholders in meaningful and clear way
-
♦ Develop mutually beneficial partnerships and opportunities
-
♦ Build strong commitment across our team and with stakeholders
-
♦ Collaborative approach
==> picture [921 x 70] intentionally omitted <==
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 4
Springfield JV (30% Talisman)
==> picture [926 x 32] intentionally omitted <==
==> picture [205 x 190] intentionally omitted <==
Development of the world’s highest grade copper mine underway
Page: 5
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Monty provides tremendous confidence in the exceptional exploration potential of the Springfield JV
-
♦ Proven world-class VMS province with two deposits
-
<10km apart and significant untested potential for more discoveries
-
♦ Includes high-grade and high value Monty Cu-Au deposit:
-
♦ TLM 30% share Monty Ore Reserve[ii] = 280kt @ 8.7% Cu
- & 1.4g/t Au for contained 24kt Cu and 13koz Au
-
-
♦ TLM forecast Monty LoM post-tax free cash flow
>A$50M
- ♦ Multiple opportunities exist to outperform Feasibility
Study estimates
==> picture [349 x 178] intentionally omitted <==
==> picture [456 x 402] intentionally omitted <==
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 6
A high value deposit that underpins strong forecast financial returns
-
♦ Ultra high grade deposit will drive strong margins
-
♦ Technically sound and financially compelling
-
underground mine
-
♦ Forecast operating costs in bottom third of cost
- curve
-
♦ Talisman post-tax cash flow >A$50M
-
-
♦ Low capital and low risk development pathway utilising existing DeGrussa plant (owned by JV partner)
- ♦ Talisman share pre-production capital ~A$20M
==> picture [496 x 250] intentionally omitted <==
-
♦ Agreements in place to allow JV mining and ore sales to Sandfire
-
♦ Talisman’s pre-production capital is fully funded
-
♦ Project debt finance facility of up to US$20M
-
♦ No mandatory copper hedging requirements
==> picture [500 x 126] intentionally omitted <==
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 7
Construction and mine development rapidly advancing
-
♦ All regulatory approval received for Monty development and production
-
♦ Decline advanced to 586 metres as at 28 Feb 2018 (on budget)
-
♦ Development plan leverages off existing DeGrussa infrastructure
-
♦ Experienced mining contractor – Byrnecut Australia
3D schematic of Monty decline and underground mine design
- ♦ First production scheduled in Q4 2018
==> picture [347 x 214] intentionally omitted <==
==> picture [379 x 251] intentionally omitted <==
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 8
Construction and mine development rapidly advancing
==> picture [254 x 384] intentionally omitted <==
==> picture [626 x 388] intentionally omitted <==
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 9
Construction and mine development rapidly advancing
==> picture [249 x 384] intentionally omitted <==
==> picture [321 x 220] intentionally omitted <==
==> picture [332 x 220] intentionally omitted <==
==> picture [235 x 156] intentionally omitted <==
==> picture [208 x 156] intentionally omitted <==
==> picture [205 x 154] intentionally omitted <==
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 10
Low capital and low risk development pathway with outstanding forecast returns
Initial ore production life = 30 months
Payback period from first production = 17 months
Talisman retains full upside (and downside) exposure to variations in Monty revenue and cost estimates on:
-
♦ Total ore mined and ♦ Underground delivered mining costs
-
♦ Ore head grades
-
♦ Ore haulage costs
-
♦ Metal prices
-
♦ Closure costs
-
♦ Development timeline
-
♦ Capital costs
Pre-production capital cost = A$20M
Forecast post-tax free cash flow >A$50M
-
♦ Ore Sales Agreement (OSA) provides a low capital, low risk and high return development route for Talisman:
-
♦ No plant build (low pre-production capital intensity, fast-tracked and lower risk)
-
♦ Independent third-party calculation of mined grade
-
♦ Fixed metal recovery formulae and high fixed payabilities
-
♦ Commercial, highly competitive and transparent Ore Treatment Fee (OTF)
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 11
Multiple opportunities exist to outperform Feasibility Study estimates
-
♦ Ore Reserve[ii] (100% basis) 920kt @ 8.7% Cu, 1.4g/t Au consists of Upper Zone and Lower Zone
-
♦ Current mine plan focuses only on the higher-grade and higher tonnage Lower Zone – captures 92% of contained metal of reserve
-
♦ Potential for Upper Zone to enter mine plan with grade control drilling or at a later date
-
♦ No additional drilling of the Lower Zone since the original Mineral Resource estimate in April 2016
-
♦ Grade control drilling will commence in mid-2018
-
♦ Potential for increase in contained metal as experienced at nearby DeGrussa mine
FS Stope design
Main Massive Sulphides Subordinate Massive Sulphides Halo Mineralisation
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 12
Untested potential for further mineralisation in Monty near mine environment
-
♦ VMS geological model dictates high potential for further discoveries in field
-
♦ The majority of drilling to date has been shallow at depths of <150m
♦ Underground development will provide a platform to test for new mineralised lenses ♦ Limited effectiveness of DHEM to identify nearby conductors
- ♦ Represents one limited stratigraphic package within the wider prospective Monty Corridor
==> picture [719 x 404] intentionally omitted <==
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 13
Monty Deposit provides ‘proof of concept’ for Doolgunna VMS Camp
==> picture [868 x 318] intentionally omitted <==
----- Start of picture text -----
NORANDA VMS MINING CAMP
----- End of picture text -----
-
♦ VMS deposits can and do occur at multiple stratigraphic levels within the prospective sequence, e.g. Noranda VMS mining camp
-
♦ Bryah Basin VMS Camp now with three VMS Deposits (DeGrussa, Monty, Horseshoe Lights) and four VMS occurrences at different stratigraphic levels within the prospective Karalundi sequence
-
♦ Springfield has potential for multiple host horizons within four prospective corridors; Monty, Homer, Southern Volcanics and Central
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 14
Multiple Prospective Horizons in proven world class VMS province
-
♦ Limited diamond and RC drilling by JV outside of Monty Resource
-
♦ ~90% of JV diamond holes drilled for resource definition purposes
-
♦ 16km Southern Volcanics Corridor has minimal RC holes and no diamond drilling to date
-
♦ Recently identified opportunities and interpretations include Monty NE, Monty East and Homer South Trend:
-
♦ Monty NE significant intersection of 5m @ 4.11% Cu[1]
-
♦ IP anomaly at Monty NE
-
♦ Ongoing RC and diamond drilling of selective targets
-
♦ Evolving and improving geological understanding and interpretations
-
♦ Potential remains to increase known mineralisation with further systematic exploration
==> picture [506 x 411] intentionally omitted <==
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 15
-Monty is a low risk, high return copper project with outstanding potential upside-Multiple opportunities exist to outperform Feasibility Study estimates-First production from Monty targeted for Q4 calendar 2018-Multiple Prospective Horizons in proven world class VMS province-Active exploration and RC and diamond drilling of selective targets-
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 16
==> picture [260 x 241] intentionally omitted <==
NSW Lachlan Cu-Au Project
A New Exploration Focus
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 17
Ramping up activities in a current Australian exploration hotspot
-
♦ Low cost opportunity to move into Lachlan Fold Belt identified in late 2017/early 2018
-
♦ Combination of Farm-Ins, acquisition and pegging
-
♦ Region is vastly mineralised with highly prospective geology and significant potential for further substantial base/precious metal discoveries
-
♦ Highlighted by historical production and recent exploration success:
-
♦ Production and current reserves estimate[2 ] : 20.3Mt Cu, 104Moz Au, 1,193Moz Ag
-
♦ Underexplored tenure – minimal to no recent exploration, historic shallow drilling
-
♦ Nature of the cover, lithology and mineralisation styles amenable to:
-
♦ Geophysical targeting techniques (EM, IP and gravity surveying)
-
♦ Soil sampling, auger sampling, geological and structure mapping
-
♦ First year commitments approximately $0.7M
-
♦ Land Access Agreements signed over key areas of initial interest
==> picture [404 x 413] intentionally omitted <==
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 18
Boona Project area
-
♦ Southern Extension of the Mineral Hill host volcanic sequence, over a strike length of ~10km
-
♦ Numerous historical mine workings from the early 1900’s
-
♦ High-grade gold/copper/lead mineralisation at surface identified in historic rock-chip sampling[3]
-
♦ Previous drilling has been focused proximal to historical workings and has intersected high-grade gold and base metal mineralisation
==> picture [204 x 108] intentionally omitted <==
----- Start of picture text -----
4
4
4
4
4 3 3
3
----- End of picture text -----
♦ Blind Calf Prospect
-
Located within 100% TLM tenure 5km SW of Mineral Hill mine
-
Historic drilling identified near surface high-grade copper mineralisation remaining open along strike and at depth, including:
-
♦ 27m @ 6.08% Cu , 7.6g/t Ag (from 24m)[4]
-
♦ 14m @ 2.32% Cu , 1.98g/t Ag (from 97m)[4]
-
♦ 21m @ 2.24% Cu , 2.82g/t Ag (from 41m)[4]
-
♦ 13m @ 2.18% Cu , 2.5g/t Ag (from 71m)[4]
==> picture [119 x 150] intentionally omitted <==
----- Start of picture text -----
3
3
3
3
3
3
----- End of picture text -----
- High priority area for RC and diamond drilling
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 19
Boona Project Area – Blind Calf Prospect
Planned Work to include:
-
♦ RC/ diamond drill testing of known Cu lodes to test for depth and strike extensions
-
♦ RC/ diamond drilling of untested parallel target positions
-
♦ Detailed geological and structural mapping
-
♦ Detailed ground based geophysical surveys (IP, magnetic) over mineralised corridor
-
♦ Systematic geochemical sampling along strike extensions of mineralised corridor
-
♦ Mapping and geochemical sampling within the wider Boona Project Area to highlight potential new mineralised corridors
==> picture [341 x 419] intentionally omitted <==
==> picture [291 x 415] intentionally omitted <==
----- Start of picture text -----
5
5
5
5
5
----- End of picture text -----
5For full details of drilling results, refer to Kidman Resources (ASX: KDR) ASX announcements dated 07 July 2011,
- 02 August 2011 and 10 November 2012
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 20
Bobadah Project area – Peel JV
-
♦ Historic exploration (1970’s) included mapping, rock chip sampling, auger sampling and an IP survey
-
♦ Project area straddled the highly prospective Cambelego-Mineral Hill
-
Rift sequence
-
♦ Geological interpretation by TLM complied from historic mapping, auger sampling and regional geophysical data
-
♦ Low level Cu-Zn anomalism identified in historic auger drilling and rock
-
chip samples
-
♦ Seven target areas identified by Talisman using historical data and geological interpretation
-
♦ NW trending faults intersecting volcanic tuff, rhyolite and sedimentary lithologies
-
-
♦ Cumbine Prospect identified as the first priority area for testing
==> picture [327 x 415] intentionally omitted <==
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 21
Bobadah Project Area - Cumbine Prospect
♦ Cumbine Prospect Historic Work
-
♦ Historic exploration included soils, rock chip sampling[6] , RC drilling[7] and an IP survey
-
♦ Identification of significant gold mineralisation and an IP chargeability anomaly
-
♦ IP anomaly close to volcanic-conglomerate contact and remains untested by historic drilling
♦ Planned work
-
♦ Geochemical drilling over the target areas to better define historic anomalies and test new target areas
-
♦ Follow up infill sampling and new detailed geophysical surveys utilising latest technologies/ survey equipment
-
♦ RC/Diamond drill testing of priority targets
==> picture [434 x 362] intentionally omitted <==
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 22
==> picture [261 x 241] intentionally omitted <==
Sinclair Nickel Project
Advanced opportunity with exploration upside in a proven nickel province
Page: 23
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
A regionally strategic asset with established plant and infrastructure
-
♦ Located in the world-class Agnew-Wiluna Greenstone belt – 9Mt of historic nickel production
-
♦ 1.58Mt @ 2.44% nickel for 38,599t of nickel from 2008-13
-
♦ Significant existing Infrastructure and asset base:
-
♦ 350ktpa concentrator, open pit, decline and underground mine, 200-person accommodation village, airstrip
-
♦ Talisman exploration has returned high-grade intercepts in new areas:
-
♦ 9m at 4.2% Ni from 131m down-hole[8] (Delphi North)
-
♦ 4m at 4.79% Ni and 154m down-hole[8] (Delphi North)
-
♦ Regional targets identified for future aircore drilling
-
♦ Clear potential for low capital intensity and fast-track to production subject to further exploration success or higher nickel price
-
♦ Regionally strategic asset with established plant and infrastructure
-
♦ Ongoing assessment of value maximising options
==> picture [451 x 381] intentionally omitted <==
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 24
The Talisman Investment Case
Emerging metals producer with exceptional prospectivity
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 25
Emerging metals producer with exceptional exploration prospectivity
♦ Monty is a high-grade, high-returning copper-gold project
-
♦ Development underway
-
♦ JV with a proven development and operating partner
-
♦ Low risk, low capital driven by ore sales arrangement
-
♦ Pre-production capital fully financed
-
♦ First production targeted December quarter 2018
-
♦ Outstanding exploration upside potential to be tested
-
♦ New Lachlan Cu-Au Project is a large position in an Australian exploration hotspot
-
♦ Low cost entry and limited obligated expenditure
-
♦ A range of targets at varying stages including advanced, drill-ready prospects
♦ Upcoming activities
-
♦ Testing of exploration targets at Springfield (Q1 CY 2018)
-
♦ Progression of Monty decline (Q1 CY 2018)
-
♦ Shallow geochemical drilling at Bobadah within Lachlan Cu-Au Project (early Q2 CY2018)
-
♦ Targeted RC/diamond drilling at Blind Calf Prospect (Q2 CY2018)
-
♦ Detailed geophysical surveys over Boona Project area (Q2 CY2018)
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 26
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
==> picture [303 x 58] intentionally omitted <==
Discovering and Developing Opportunities in Base and Precious Metals
Investor Presentation: March 2018
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 27
Note i: Mineral Resources
Information in this presentation that relates to the Monty JORC Mineral Resource estimate is information previously published by Sandfire Resources NL (“Sandfire”) and is available on the Sandfire and ASX websites (see announcement “Maiden High-Grade Mineral Resource for Monty VMS Deposit: 99,000t of Copper and 55,000oz of Gold”, dated 13 April 2016 (Sandfire Announcement)). For full details of the Monty Resource estimate, including the Competent Person’s Statement related to the estimation of the Monty Mineral Resource, please refer to the Sandfire Announcement.
Talisman confirms that it is not aware of any new information or data that materially affects the information included in the Sandfire Announcement, and that all material assumptions and technical parameters underpinning the estimates in the Sandfire Announcement continue to apply and have not materially changed and confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original Sandfire Announcement.
Note ii: Ore Reserves
Information in this presentation that relates to Ore Reserves and Exploration Results and Exploration Targets as defined under the 2012 Edition of the “Australian Code for Reporting of Mineral Resources and Ore Reserves”, is information previously published by Talisman Mining Ltd (“Talisman”) and is available on the Talisman and ASX websites (see announcement “Monty Feasibility Study Results”, dated 6 April 2017 (“Talisman Announcement”)). For full details of the Ore Reserve estimate, including the Competent Person’s Statement related to the estimation of the Ore Reserve, please refer to the Talisman Announcement.
Talisman confirms that it is not aware of any new information or data that materially affects the information included in the Talisman Announcement, and that all material assumptions and technical parameters underpinning the estimates in the Talisman Announcement continue to apply and have not materially changed and confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original Talisman Announcement.
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 28
Exploration Results and Exploration Targets
Information in this presentation that relates to Exploration Results and Exploration Targets as defined under the 2012 Edition of the “Australian Code for Reporting of Mineral Resources and Ore Reserves”, is based on information compiled by Mr Anthony Greenaway, who is a member of the Australasian Institute of Mining and Metallurgy. Mr Greenaway is a full-time employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and types of deposit under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Greenaway consents to the inclusion in this report of the matters based on information in the form and context in which it appears.
No new information that is considered material is included in this document. All information relating to exploration results has been previously released to the market and is appropriately referenced in this document. JORC tables are not considered necessary to accompany this document.
-
1 Refer to Talisman Mining Ltd (ASX:TLM) ASX announcements dated 13 September 2016 for full details and JORC Tables
-
2 http://www.resourcesandenergy.nsw.gov.au/miners-and-explorers/geoscience-information/products-and-data/factsheets
-
3 Result taken from CRA Exploration Pty Ltd report GS1978/259.R00023043 and Result taken from Triako Resources Ltd report R000300065. Geological Survey of NSW DIGS reporting system
-
4 For full details, refer to Kidman Resources (ASX: KDR) ASX announcement “Mineralisation Extended at Blind Calf” dated 07 July 2011
-
5 For full details, refer to Kidman Resources (ASX: KDR) ASX announcements dated 07 July 2011, 02 August 2011 and 10 November 2012
-
6 Rock-chip sampling result taken from Triako Resources Ltd report R000300150. Geological Survey of NSW DIGS reporting system
-
7 Drill result taken from Triako Resources Ltd report R000300150. Geological Survey of NSW DIGS reporting system
-
8 Refer to Talisman Mining Ltd (ASX:TLM) ASX announcement dated 07 October 2016 for full details and JORC Tables.
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 29
Appendix 2
Additional Monty Feasibility Study Detail
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 30
Logical and low risk pathway with economic benefits shared between JV partners
Mining Joint Venture Agreement (MJVA)
Ore Sale Agreement (OSA)
-
♦ Establishes the rights and obligations of the Springfield JV parties related to activities associated with the development, mining and ultimate decommissioning of mineral discoveries
-
♦ Development and mining of Monty will operate under the terms of this MJVA
-
♦ Applies to Monty ore (and near-Monty extensions)
-
♦ Potential future Springfield JV discoveries subject to separate OSA at discretion of both JV parties
-
♦ Monty ore (at a max rate of approx. 0.4Mtpa) blended with Sandfire’s existing DeGrussa ore feed
Exploration Joint Venture Agreement (EJVA)
-
♦ Point of ore sale to Sandfire is at a dedicated weighbridge near DeGrussa ROM pad
-
♦ Covers the ongoing exploration activities of the Springfield JV on the JV tenements and outlines the rights and obligations of the JV parties
-
♦ Provides a mechanism to progress future mineral discoveries, including the option to utilise the existing MJVA
-
♦ TLM receives net ore sale revenue payment on equivalent payable metal-in-concentrate basis after deduction of Ore Treatment Fee (OTF) per tonne of delivered ore and Royalties
-
♦ Ore sales revenue derived from (independently) calculated head grade, prevailing metal prices, fixed recovery formulae and fixed payabilities
-
♦ Certain components of OTF are subject to annual indexation and/or pegged to annual industry determined benchmarks
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 31
==> picture [405 x 249] intentionally omitted <==
----- Start of picture text -----
Springfield JV exposure
OPEX variables (ex royalties):
♦ Underground mining costs
Underground
♦ Ore haulage costs to DeGrussa
mining
♦ Closure costs
Fixed exposure (with indexation):
Ore haulage to ♦ Ore Treatment Fee (OTF) – covers
DeGrussa plant all Sandfire downstream costs and
plant usage charge
REVENUE variables:
♦ Ore volumes and grades
♦ Metal prices
POINT OF
ORE SALES Fixed exposure:
----- End of picture text -----
-
♦ Ore volumes and grades ♦ Metal prices Fixed exposure: ♦ Process recovery formulae
-
♦ Metal payabilities
Talisman economics
Monty Feasibility Study OPEX estimates (TLM 30% basis)
-
♦ 239kt mined ore
-
♦ Underground mining + ore haulage cost = A$126/t
-
♦ Sandfire Ore Treatment Fee (OTF) = A$211/t
-
♦ Fixed Sandfire monthly management fee = equates to ~A$1/t
-
♦ Total operating costs (excl royalties and closure) = A$81M
-
♦ Implied operating cost per tonne ore = A$338/t
Monty Feasibility Study REVENUE estimates (TLM 30% basis)
-
♦ 239kt mined ore containing 22.3kt Cu, 11.5koz Au & 124koz Ag
-
♦ LOM average prices: US$6118/t Cu, US$1369/oz Au, US$18.7/oz Ag & 0.723 A$
-
♦ Implied gross revenue = A$181M
-
♦ Implied gross revenue per tonne ore = A$758/t
-
♦ Copper revenue received / metal-in-ore value = 89.0%*
-
♦ * Feasibility Study LOM average copper recovery of 92.8% multiplied by payability of 95.9%
==> picture [790 x 111] intentionally omitted <==
----- Start of picture text -----
Sandfire exposure (cost volatility mitigated with indexation of OTF)
Business service Concentrate Concentrate Treatment and Metals
Ore processing
support (G&A) product transport refining charges production
----- End of picture text -----
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 32
OSA reduces risk with full exposure to revenue and cost upside
-
♦ Ore Sales Agreement (OSA) provides a low capital, low risk and high return development route for Talisman:
-
Retains optionality in relation to any future discoveries on the Springfield JV tenements
-
No plant build (attractive (low) pre-production capital intensity and lower risk)
-
Independent third-party calculation of mined grade
-
Fixed metal recovery formulae and high fixed payabilities
-
Recognises expected Monty ore processing performance and concentrate quality
-
Eliminates Talisman exposure to metallurgical processing and product marketing risks
-
-
Commercial, highly competitive and transparent Ore Treatment Fee (OTF)
-
Incorporates all downstream costs (processing, G&A, transport and conc. treatment/refining)
-
Closely aligned with actual DeGrussa processing, G&A and downstream costs
-
Transparency of cost components (linkage to industry benchmarks or annual indexation)
-
-
♦ Exploration JV Agreement covers ongoing exploration activities of the Springfield JV
-
♦ Mining JV Agreement covers rights/obligations for development and mining activities
==> picture [254 x 380] intentionally omitted <==
See Appendix 2 for further explanation of OSA and OTF
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 33
Monty ore ownership and risks transfer at this point
==> picture [500 x 106] intentionally omitted <==
----- Start of picture text -----
Mined
Monty ore Dedicated weighbridge at
Springfield JV mining/ore haulage risk
(TLM 30% DeGrussa ROM pad
Basis)
Talisman 30% of Monty ore
----- End of picture text -----
==> picture [356 x 60] intentionally omitted <==
----- Start of picture text -----
DeGrussa plant
Sandfire processing/downstream risk processing and
concentrate sales
----- End of picture text -----
==> picture [936 x 152] intentionally omitted <==
==> picture [181 x 106] intentionally omitted <==
----- Start of picture text -----
TALISMAN
----- End of picture text -----
Ore sale revenue per Monty ore tonne Ore Treatment Fee (OTF) of A$211 per Monty ore tonne delivered to DeGrussa. (equiv. U$0.83/lb payable Cu) Fixed monthly management fee (equates to ~A$1 per Monty ore tonne delivered) Forecast government and native title royalty payments based on calculated payable metal
==> picture [179 x 106] intentionally omitted <==
----- Start of picture text -----
SANDFIRE RESOURCES
----- End of picture text -----
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 34
♦ Ore Treatment Fee (OTF) of approx. A$211/t ore
-
♦ Recognises all downstream costs post ore sale:
-
Ore processing and associated business services/G&A
-
Concentrate transport and refining costs (~55% of OTF)
-
A dedicated plant usage charge
-
♦ Closely aligned with actual DeGrussa processing, G&A and downstream costs
-
♦ Appears elevated on a per tonne of ore basis due to the extremely high grade nature of Monty ore
==> picture [442 x 254] intentionally omitted <==
-
Concentrate costs actually levied per tonne of conc/Cu
-
Equates to US$0.86/lb payable Cu metal (at spot A$)
-
♦ Modest plant usage charge allows Talisman to avoid a substantial investment in dedicated processing, site services, transport and marketing infrastructure
-
Plus removes all accompanying risk exposures
DeGrussa opex as per quarterly US$ operating data released by Sandfire and avg. 1HFY17 A$/US$ rate of 0.75; all A$/US$ conversions above at this rate.
DeGrussa opex expressed on a per pound contained metal basis; Monty OTF and implied usage charge expressed on a per pound payable metal basis.
This is an indicative analysis only. The calculation of specific OTF components is notional and derived solely on an implied basis utilising DeGrussa 1HFY17 actual opex. Talisman does not warrant that these implied component amounts align in any way with the specific component amounts of the aggregate OTF within the OSA.
Adjustments to reflect high Monty ore grade
DeGrussa processing/G&A costs applied to Monty Feasibility Study operating parameters
to arrive at notional per pound unit costs.
DeGrussa transport, treatment and refining cost notionally adjusted back to a per tonne ore cost utilising Monty Feasibility Study operating parameters.
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 35
A technically sound and highly economic underground project
All costs borne by the Springfield Joint Venture under the OSA are incorporated in the Monty financial analysis on a 100% basis. As such, Talisman’s underlying economic interest in the development of Monty equates to its 30% interest in the Springfield Joint Venture and is therefore represented by its simple 30% share of forecast financial returns as outlined below.
| Operating parameters (TLM 30% basis) | Units | FS (Mar 2017) |
|---|---|---|
| Pre-production mine development | months | 12 |
| Ore production mine life | months | 30 |
| Total mined and milled ore | kt | 239 |
| Copper head grade (LOM avg) | % Cu | 9.35 |
| Gold head grade (LOM avg) | g/t Au | 1.50 |
| Silver head grade (LOM avg) | g/t Ag | 16.2 |
| Total copper-in-ore mined | kt | 22.3 |
| Total gold-in-ore mined | koz | 11.5 |
| Total silver-in-ore mined | koz | 124.0 |
| Total payable copper metal | kt | 19.9 |
| Total payable gold metal | koz | 5.7 |
| Total payable silver metal | koz | 56.2 |
==> picture [441 x 110] intentionally omitted <==
| Financial parameters (TLM 30% basis) | Units | FS (Mar 2017) |
|---|---|---|
| Forecast copper price (LOM avg) | US$/t | 6,118 |
| Forecast gold price (LOM avg) | US$/oz | 1,369 |
| Forecast silver price (LOM avg) | US$/oz | 18.76 |
| Forecast A$/US$ (LOM avg) | USc | 0.723 |
| Total gross revenue | A$M | 181 |
| Total net revenue (post royalties) | A$M | 173 |
| Total cash operating costs | A$M | 89 |
| Pre-tax operating cashflow | A$M | 92 |
| Pre-production capital cost | A$M | 22 |
| LOM sustaining capital cost | A$M | 5 |
| Ungeared, pre-tax free cashflow | A$M | 64 |
| Notional C1 costi | A$/lb pay Cu | 1.56 |
| Notional All-in-sustaining-cost (AISC)i | A$/lb pay Cu | 1.90 |
| Pre-tax NPV (8% discount rate, real) | A$M | 46 |
| Pre-tax IRR | % | 78 |
| Payback period (from first production) | months | 17 |
| Ore reserve life - to - payback period | x | 1.8 |
| NPV / pre-production capex | x | 2.1 |
iC1 and AISC are calculated on the basis of notionally including the OSA Ore Treatment Fee as a production cost. AISC is defined as the operating cash cost of production (net of by-product credits) plus royalties and sustaining capital and closure costs but exclusive of any finance costs or corporate overhead allocation.
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 36
Capital cost composition (TLM 30% basis)
| Capital item | A$M |
|---|---|
| Surface infrastructure | 9.9 |
| Underground mine development | 9.5 |
| Underground mine infrastructure | 2.4 |
| Total pre-production capital | 21.8 |
| Sustaining capital 5.5 |
|
| Closure costs | 1.0 |
| Total capital cost | 28.3 |
Commodity price assumptions
| Commodity / FX | CY 2017 | CY 2018 | CY 2019 | CY 2020 | CY 2021 |
|---|---|---|---|---|---|
| Copper – U$/lb | 2.51 | 2.74 | 2.81 | 2.78 | 2.68 |
| Gold – U$/Oz | 1310 | 1398 | 1375 | 1374 | 1296 |
| Silver – U$/Oz | 17.95 | 19.14 | 18.84 | 18.83 | 17.75 |
| Currency AUD:USD | 0.733 | 0.730 | 0.725 | 0.720 | 0.715 |
Operating cost parameters (TLM 30% basis)
| Operating item | A$M | A$/t ore |
|---|---|---|
| Underground mining | 28.8 | 120.5 |
| Ore transport to DeGrussa | 1.4 | 5.8 |
| Ore Treatment Fee (OTF) | 50.4 | 211.0 |
| Sandfire management fee 0.2 1.0 |
||
| Royalties | 8.1 | 34.0 |
| Total operating cost | 88.9 | 372.3 |
| Operating item | A$M | A$/lb payable Cu |
|---|---|---|
| Underground mining | 28.8 | 0.65 |
| Ore transport | 1.4 | 0.03 |
| Ore Treatment Fee(OTF) | 50.4 | 1.15 |
| Sandfire management fee | 0.2 | 0.01 |
| Gold and silver credits | (12.3) | (0.28) |
| Notional C1i cost | 68.5 | 1.56 |
| Royalties – gov’t and native title | 8.1 | 0.19 |
| Sustaining capital 5.5 0.13 |
||
| Closure costs | 1.0 | 0.02 |
| Total notional AISCi | 83.1 | 1.90 |
i C1 and AISC are calculated on the basis of notionally including the OSA Ore Treatment Fee as a production cost. AISC is defined as the operating cash cost of production (net of by-product credits) plus royalties and sustaining capital and closure costs but exclusive of any finance costs or corporate overhead allocation.
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 37
| Mineralisation Style | Mineral Resource Category |
Tonnes (t) | Copper (%) | Gold (g/t) | Contained Copper (t) | Contained Gold (oz) |
|---|---|---|---|---|---|---|
| Massive Sulphides | Indicated | 754,000 | 12.0 | 2.1 | 91,000 | 51,000 |
| Inferred | 9,000 | 20.7 | 2.7 | 2,000 | 1,000 | |
| Total | 763,000 | 12.1 | 2.1 | 92,000 | 52,000 | |
| Halo | Indicated | 287,000 | 2.2 | 0.3 | 6,000 | 3,000 |
| Inferred | - | - | - | - | - | |
| Total | 287,000 | 2.2 | 0.3 | 6,000 | 3,000 | |
| Total | Indicated | 1,041,000 | 9.3 | 1.6 | 97,000 | 54,000 |
| Inferred | 9,000 | 20.7 | 2.7 | 22,000 | 1,000 | |
| Total | 1,050,000 | 9.4 | 1.6 | 99,000 | 55,000 |
Refer Appendix 1 Note i Figures in this table are rounded to the nearest thousand.
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 38
| Ore Reserve estimate and Mine Plan on 100% Basis as at 31 March 2017 | Ore Reserve estimate and Mine Plan on 100% Basis as at 31 March 2017 | Ore Reserve estimate and Mine Plan on 100% Basis as at 31 March 2017 | Ore Reserve estimate and Mine Plan on 100% Basis as at 31 March 2017 | Ore Reserve estimate and Mine Plan on 100% Basis as at 31 March 2017 | Ore Reserve estimate and Mine Plan on 100% Basis as at 31 March 2017 |
|---|---|---|---|---|---|
| Reserve Category | Tonnes(t) | Copper(%) | Gold(g/t) | Contained Copper(t) | Contained Gold(oz) |
| Proved - - - - - Probable 920,000 8.7 1.4 80,000 42,000 Total 920,000 8.7 1.4 80,000 42,000 Mine Plan 800,000 9.4 1.5 74,000 38,000 Ore Reserve estimate and Mine Plan for the Monty deposit (100% basis) |
- | - | - | - | - |
| 920,000 | 8.7 | 1.4 | 80,000 | 42,000 | |
| 920,000 | 8.7 | 1.4 | 80,000 | 42,000 | |
| 800,000 | 9.4 | 1.5 | 74,000 | 38,000 | |
| Ore Reserve estimate and Mine Plan on Talisman 30% Basis as at 31 March 2017 | |||||
| Reserve Category | Tonnes (t) | Copper (%) | Gold (g/t) | Contained Copper (t) | Contained Gold (oz) |
| Proved - - - - - Probable 280,000 8.7 1.4 24,000 13,000 Total 280,000 8.7 1.4 24,000 13,000 Mine Plan 240,000 9.4 1.5 22,000 11,000 Ore Reserve estimate and Mine Plan for the Monty deposit(30% basis) |
- | - | - | - | - |
| 280,000 | 8.7 | 1.4 | 24,000 | 13,000 | |
| 280,000 | 8.7 | 1.4 | 24,000 | 13,000 | |
| 240,000 | 9.4 | 1.5 | 22,000 | 11,000 |
Refer Appendix 1 Note ii Figures in this table rounded to the nearest thousand
F o c u s e d A u s t r a l i a n m i n e r a l r e s o u r c e s c o m p a n y
Page: 39