Creating Value through Mineral Discovery Investor Presentation: September 2018
1
This presentation has been prepared by Talisman Mining Limited.
This document contains background information about Talisman Mining Ltd current at the date of this presentation. The presentation is in summary form, has not been independently verified and does not purport be all inclusive or complete nor does it contain all the information that a prospective investor may require in evaluating a possible investment in Talisman Mining Ltd or its assets.
Recipients should conduct their own investigations and perform their own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained in this presentation.
This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of securities in any jurisdiction. This document is not a prospectus and does not contain all of the information which would be required to be disclosed in a prospectus. This presentation may not be distributed in any jurisdiction except in accordance with the legal requirements applicable in such jurisdiction. Recipients should inform themselves of the restrictions that apply in their own jurisdiction. A failure to do so may result in a violation of securities laws in such jurisdiction.
This presentation does not constitute investment advice and has been prepared without taking into account the recipient's investment objectives, financial circumstances or particular needs and the opinions and recommendations in this presentation are not intended to represent recommendations of particular investments to particular persons. Recipients should seek their own professional, legal, tax, business and/or financial advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market, financial or political developments. To the fullest extent permitted by law, Talisman Mining Ltd and its related bodies corporate, its directors, officers, employees and representatives (including its agents and advisers), disclaim all liability and take no responsibility for any part of this presentation, or for any errors in or omissions from this presentation arising out of negligence or otherwise and do not make any representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of any information, statements, opinions, estimates, forecasts, conclusions or other representations contained in this presentation. This presentation may include forwardlooking statements. These forward-looking statements are not historical facts but rather are based on Talisman Mining Ltd.'s current expectations, estimates and assumptions about the industry in which Talisman Mining Ltd operates, and beliefs and assumptions regarding Talisman Mining Ltd.'s future performance. Words such as “anticipates”, “expects”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “potential” and similar expressions are intended to identify forward-looking statements. Forward-looking statements are only predictions and are not guaranteed, and they are subject to known and unknown risks, uncertainties and assumptions, some of which are outside the control of Talisman Mining Ltd. Past performance is not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or reasonableness of any forward-looking statements or other forecast. Actual values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward looking statements. Any forward looking statements in this presentation speak only at the date of issue of this presentation. Subject to any continuing obligations under applicable law and the ASX Listing Rules, Talisman Mining Ltd does not undertake any obligation to update or revise any information or any of the forward looking statements in this presentation or any changes in events, conditions or circumstances on which any such forward looking statement is based.
2
Talisman – Asset Portfolio
NSW Lachlan Copper-Gold Project
-
Commanding landholding in a current exploration hotspot with significant potential for the discovery of large Cu, Au and base metal deposits
-
Highly mineralised region with advanced drill targets and large areas subjected to little modern exploration
-
Immediate success in first RC drilling – 13m @ 5.7% Cu[1]
-
Second TLM RC drill program to test 3 separate targets in progress (Sept 2018)
Sinclair Nickel Project
-
Historic nickel mine with 350ktpa processing plant & associated infrastructure
-
Resource base from Sinclair deposit remnants and extensional mineralisation - 720,000t @ 2.3% Ni for 16,200t of contained nickel[2]
-
Exploration target supports resource growth
-
Near-mine and regional exploration opportunities
Springfield Copper-Gold Joint Venture (Talisman 30%)
-
Agreement for sale of JV interest to Sandfire Resources NL[3]
-
Consideration includes $72.3M cash and perpetual 1% NSR on all Cu & Au mined outside of current Monty Mine Plan
-
Transaction subject to Talisman shareholder approval
==> picture [367 x 292] intentionally omitted <==
“Maximise value to shareholders through exploration, discovery and development of opportunities in base and precious metals”.
3
Experienced and Diverse Executive Team and Board
- Dan Madden Managing Director Tony Greenaway General Manager Geology Shaun Vokes Chief Financial Officer and Company Secretary Jeremy Kirkwood Non-Exec Chairman Brian Dawes Non-Exec Director Karen Gadsby Non-Exec Director Alan Senior Non-Exec Director
Share Price
==> picture [433 x 175] intentionally omitted <==
----- Start of picture text -----
0.31
0.29
0.27
0.25
0.23
0.21
0.19
0.17
0.15
----- End of picture text -----
| Capital Structure | ||
|---|---|---|
| Shares on Issue | 185.7M | |
| Unlisted Options | 7.9M | |
| Market Capitalisation (at 29c) | A$54M | |
| Cash at 30 June 2018 (incl restricted cash) | A$5.3M | |
| Substantial Shareholders | ||
| Kerry Harmanis | ~18.4% |
Philosophy and Core Beliefs
-
Behave and act as business owners
-
Be accountable for our decisions and actions
-
What we say is what we do
-
Engage with stakeholders in meaningful and clear way
-
Develop mutually beneficial partnerships and opportunities
-
Build strong commitment across our team and with stakeholders
-
Collaborative approach
Recent Research
==> picture [903 x 52] intentionally omitted <==
4
==> picture [128 x 119] intentionally omitted <==
NSW Lachlan Cu-Au Project
A New Exploration Focus
5
Lachlan Cu-Au Project - Cornerstone Asset
Highly prospective geology and significant potential for further substantial base/precious metal discoveries
-
Meaningful tenement position in highly mineralised but under-explored mining district
-
Multiple significant base and precious metals mines and deposits including:
-
CSA copper mine
-
Peak gold-base metals mine
-
Tritton copper mine
-
Hera/Nymagee polymetallic mines
-
Mallee Bull copper-zinc deposit
-
Production and current reserves estimate[4] : 20.3Mt Cu; 104Moz Au; 1,193Moz Ag
-
Exploration hotspot, recent discovery by Peel Mining:
-
Southern Nights–Wagga Tank copper-zinc-gold and lead-zinc-silver
-
Well developed infrastructure with multiple regional processing opportunities
==> picture [483 x 416] intentionally omitted <==
6
Lachlan Cu-Au Project - Exploration Approach
Cost effective staged exploration to identify and test drill targets
■ Stage I - Reconnaissance:
■ Extensive geochemical analysis (principally auger drilling)
■ MLEM surveys over identified anomalies
Pipeline of Stage I work programs for 12-18 months to identify and deliver targets for Stage II work
■ Stage II - Target Development:
- Initial RC drilling and follow up DHEM
RC Drill program underway at Noisy Ned and Cumbine in Central Region.
■ Stage III - Refined Targeting:
- Follow up RC and Diamond Drilling
RC and diamond drilling to be undertaken in Oct 2018 at Blind Calf Prospect following recent successful Stage II RC drilling
==> picture [424 x 451] intentionally omitted <==
7
Lachlan Cu-Au Project - Southern Region
==> picture [151 x 267] intentionally omitted <==
Blind Calf Prospect
-
Located in 100% owned Crowl Creek tenement
-
package in Southern Region
-
.
■ Crowl Creek is high priority due to:
- _Visible quartz veining outcrop at structurally important positions_
- _Multiple mineralised lodes_
- _Historic mineralisation from 1900’s shafts and limited drilling in 2010/2011_
-
First TLM RC drill program in June 2018 at Blind
-
Calf Prospect -7 holes for 984 metres[1]
==> picture [421 x 163] intentionally omitted <==
----- Start of picture text -----
8
----- End of picture text -----
==> picture [362 x 441] intentionally omitted <==
----- Start of picture text -----
5
----- End of picture text -----
8
Lachlan Cu-Au Project - Southern Region
Blind Calf Prospect
- Multiple high-grade copper lodes that remain open at depth and untested along strike
■ Assay results returned include:
-
BCRC006: 13m @ 5.71% Cu , from 129m downhole[1]
-
BCRC007: 11m @ 4.78% Cu , from 127m downhole[5]
■ Significant Potential
-
Increasing grade at depth
-
Potential broadening of lode along strike
-
DHEM surveys have identified EM plates for testing at depth[5]
-
Stage III RC/DD drill program to commence in October 2018
-
Structural mapping and soil sampling underway along mineralised corridor at Crowl Creek
==> picture [532 x 441] intentionally omitted <==
9
Lachlan Cu-Au Project - Southern Region
Boona Project current work and next steps
-
Boona region is extension to South East of Blind Calf corridor and Mineral Hill corridor
-
Initial Stage I auger drilling programs SE of mineralised Blind Calf mineral trends completed:
-
On site XRF of base metals - gold assays awaited
-
Further auger program scheduled for early 2019 calendar year
==> picture [2 x 4] intentionally omitted <==
----- Start of picture text -----
5
----- End of picture text -----
-
Initial interpretation of XRF data has highlighted multiple anomalous areas for follow up testing:
-
Cu and Pb anomalism located around historic (1900’s) workings (Durnings and Brookland shafts)
-
Cu anomalism along strike from Blind Calf trend
-
Stage II RC drilling planned for late 2018/early 2019
==> picture [7 x 11] intentionally omitted <==
----- Start of picture text -----
6
----- End of picture text -----
10
Lachlan Cu-Au Project - Central Region
Noisy Ned
-
Large, coherent base metal anomaly identified from Stage I auger drilling[7]
-
Extends ~1 km along strike of the regionally significant Gilmore Suture fault zone:
==> picture [234 x 344] intentionally omitted <==
-
Strong coincident copper-zinclead anomaly, consistently high grades for 400 – 600 metres across strike.
-
Coincident gold anomalism in central part of anomaly
■ Abundant brecciated and gossanous iron rich quartz vein outcrop and strong manganese alteration of the surrounding host rocks, indicative of epithermal style mineralisation.
==> picture [118 x 218] intentionally omitted <==
-
RC drill program underway[8]
-
Geophysical survey planned to target geochemical anomaly
==> picture [309 x 449] intentionally omitted <==
11
Lachlan Cu-Au Project - Central Region
Cumbine Prospect
■ RC drilling program in early October to follow-up known historic gold mineralisation and to test an existing untested IP anomaly at the Cumbine Prospect[8]
==> picture [388 x 348] intentionally omitted <==
==> picture [147 x 232] intentionally omitted <==
Cumbine Prospect showing IP chargeability image (125m depth), drill collars, rock chip samples and soil samples
==> picture [309 x 449] intentionally omitted <==
12
Next Steps
Lachlan Cu-Au Project Exploration Work Q3 CY18 4Q CY18 Northern Region Sussex Project regional auger drilling Stage I Central Region Noisy Ned Prospect RC drilling to target Zn-Cu-Pb anomaly Stage II Cumbine Prospect RC drilling to test IP anomaly Stage II Refined targeted work from RC drilling at Noisy Ned & Cumbine Stage III Southern Region – Boona Project Regional auger drilling Stage I Stage II Boona Region follow-up RC drilling Blind Calf Prospect targeted RC and diamond drilling Stage III Crowl Creek RC drilling Stage II
==> picture [204 x 357] intentionally omitted <==
13
Sinclair Nickel Project
Advanced opportunity with exploration upside in a proven nickel provence
14
A regionally strategic asset with established plant and infrastructure
■ Strategically located in the world-class Agnew-Wiluna Greenstone belt
- Significant existing Infrastructure and asset base including 350ktpa concentrator
■ Historic Production 1.58Mt @ 2.44% nickel for 38,599t of nickel from 2008-13
■ JORC 2012 Indicated and Inferred Mineral Resource of
-
720kt @ 2.3% Ni for 16,200t of contained Ni from remnant and extensional mineralisation[2]
-
Exploration Target from wide spaced drilling of down-plunge extension of Sinclair
-
Ranging between approx 670kt @ 2.0% Ni for 13,700t contained Ni and 790kt
-
@ 2.5% Ni for 19,900t of contained Ni[2]
■ High-grade intercepts from exploration at Delphi North and Skye East:
-
Delphi North:
-
9m @ 4.2% Ni from 131m down-hole[9]
-
4m @ 4.8% Ni from 154m down-hole[9]
-
Skye East:
-
7m @ 3.54% Ni from 51m down hole[10] ; including
-
2m @ 7.47% Ni from 55m down hole[10]
-
==> picture [289 x 409] intentionally omitted <==
15
Significant infrastructure in place with replacement value of approx. A$120M
■ 350ktpa concentrator ■ Open pit, decline and underground mine ■ 200-person accommodation village ■ Administration buildings and stores ■ Exploration office and core yard ■ Mining contractor facilities
==> picture [311 x 343] intentionally omitted <==
==> picture [401 x 344] intentionally omitted <==
A re-commencement of operations at Sinclair, subject to near-mine exploration success, has the potential for reduced capital intensity and fast-tracked transition to production
16
JORC 2012 Indicated and Inferred Resource underpins potential mining inventory
JORC 2012 Mineral Resources 2
| JORC Category - Indicated | JORC Category - Indicated | JORC Category - Indicated | |
|---|---|---|---|
| Grade Cut-off (Ni %) |
Tonnage | Ni % | Ni t |
| 0.5 | 370,000 | 2.0 | 7,400 |
| 1.0 | 350,000 | 2.1 | 7,300 |
| 1.5 | 250,000 | 2.4 | 6,000 |
| 2.0 | 140,000 | 2.9 | 4,100 |
| JORC Category - Inferred | |||
| Grade Cut-off (Ni %) |
Tonnage | Ni % | Ni t |
| 0.5 | 1,080,000 | 1.6 | 17,200 |
| 1.0 | 910,000 | 1.7 | 15,900 |
| 1.5 | 460,000 | 2.2 | 10,200 |
| 2.0 | 180,000 | 2.9 | 5,400 |
==> picture [58 x 51] intentionally omitted <==
----- Start of picture text -----
200 200
m m
----- End of picture text -----
■ Total Indicated and Inferred Resource of 720kt @ 2.3% Ni for 16,200t of ctd Ni[2]
■ Indicated and Inferred -remnant nickel sulphide adjacent to existing mine development
■ Inferred -extensional mineralisation continuing immediately down plunge for 500 metres
■ Supported by Exploration Target ranging between approximately 670kt @ 2.0% Ni for 13,700t ctd Ni and 790kt @ 2.5% Ni for 19,900t of ctd Ni[2 ] -continuation of down-plunge mineralisation for a further 700m based on limited drilling
■ Multiple EM plates across support the potential for continuity of mineralisation down-plunge and along strike
17
Newly identified Prospect close to Sinclair deposit and extending Skye Trend
==> picture [477 x 297] intentionally omitted <==
==> picture [318 x 416] intentionally omitted <==
-
Skye East contact position was a conceptual target - hinge fold extension of Skye trend
-
Initial shallow drilling in August 2018 identified massive sulphide mineralization:
-
SNRC045 4m @ 1.28% Ni from 16m down hole[10]
-
SNRC048 7m @ 3.54% Ni from 51m down hole; including
- 2m @ 7.47% Ni from 55m down hole[10]
18
Mineralised corridor 3km to south of Sinclair deposit
■ Strong correlation with the Sinclair mine geological environment
■ Confirmed historic nickel sulphide mineralisation over a strike length of 700m :
-
SNRC010: 4m @ 4.79% Ni from 154m[9]
-
SNRC012: 5m @ 2.39% Ni from 73m[9]
-
SNRC019: 9m @ 4.20% Ni from 131m[9]
-
SND009: 2.6m @ 3.41% Ni from 174m
-
2m @ 2.11% Ni from 195m[11]
-
SND010: 2.5m @ 3.35% Ni from 207m[11]
■ Represents a fertile mineralised setting with near surface massive nickel sulphide mineralisation
==> picture [600 x 373] intentionally omitted <==
19
Potential for discovery of nickel sulphide mineralisation close to existing infrastructure
-
Multiple ultramafic trends over strike length approximately 80kms and within 30km of existing infrastructure
-
Historic Talisman drilling undertaken on a restricted and highly selective targeted basis
-
Multiple prospects with identified high-magnesian ultramafic rocks and/or stringer and matrix disseminated nickel sulphide mineralisation:
- Fly Bore, Cody Well, Parnassus, Sinclair East, Schmitz Well South and Mt Clifford
-
Drilling confirms prospectivity of the belt and continuation of the fertile Sinclair ultramafic sequence
-
Multiple other regional interpreted ultramafic strike positions require initial bedrock or RC drilling
-
Future exploration work to include regional aircore, RC/diamond drilling &
-
geophysics – surface & DHEM.
==> picture [313 x 423] intentionally omitted <==
20
Springfield JV (30% Talisman)
Proposed sale transaction allows Talisman to return significant value to shareholders
21
Springfield Cu-Au Joint Venture - Transaction (TLM 30%, SFR 70%)
72.3M cash component of transaction allows Talisman to return value to shareholders
-
Share Sale Agreement for sale of JV interest to Sandfire Resources NL crystallises significant upfront value
-
[3 ] :
-
Consideration for transaction comprises
-
Gross cash proceeds of $72.3M
-
Ongoing exposure to exploration upside via perpetual, uncapped 1% NSR Royalty on 100% of Cu or Au extracted from the JV tenements beyond the current Monty Mine Plan
-
Assumption by Sandfire Resources NL of Talisman’s obligations under the existing 2.25% gross revenue royalty held by Taurus Mining Finance Fund
-
Proposed transaction subject to Talisman shareholder approval
==> picture [449 x 426] intentionally omitted <==
22
==> picture [115 x 143] intentionally omitted <==
The Talisman Investment Case
Creating value through Mineral Discovery
23
Exceptional exploration and development prospectivity in gold and copper
Lachlan Cu-Au Project, New South Wales
-
Significant potential for discovery of substantial Cu, Au and base metal deposits
-
Active exploration at multiple targets in 2018 including follow up of high grade Cu intersections at Blind Calf
-
Pipeline of exploration targets
Sinclair Nickel Project, Western Australia
-
Regionally strategic 350ktpa processing plant & associated infrastructure
-
Potential scenario for fast track, low cost return to production
-
Sinclair Resource underpins opportunity
-
Exploration target from extension of Sinclair Deposit
-
Near-mine and regional exploration opportunities
Realisation of Value from Springfield Cu-Au Joint Venture (TLM 30%)
- Proposed transaction gross cash proceeds of $72.3 million and ongoing exposure to exploration upside via perpetual 1% NSR Royalty.
==> picture [408 x 394] intentionally omitted <==
24
==> picture [115 x 143] intentionally omitted <==
==> picture [304 x 58] intentionally omitted <==
Investor Presentation: September 2018
Creating value through Mineral Discovery
25
Appendix 1: Competent Persons’ Statements
Exploration Results and Exploration Targets
Information in this presentation that relates to Exploration Results an Exploration Targets is based on, and fairly represents information and supporting documentation complied by Mr Anthony Greenaway, who is a member of the Australasian Institute of Mining and Metallurgy. Mr Greenaway is a full-time employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Greenaway has reviewed the contents of this presentation and consents to the inclusion in this presentation of all technical statements based on his information in the form and context in which they appear.
No new information that is considered material is included in this document. All information relating to exploration results has been previously released to the market and is appropriately referenced in this document. JORC tables are not considered necessary to accompany this document.
References:
-
1 Refer ASX Announcement dated 18 June 2018 “RC Drilling At Blind Calf Returns Strong Initial Cu Results”.
-
2 Information in this release that relates to the Sinclair Nickel Project JORC Mineral Resource estimate is information previously published by Talisman and is available on the Talisman and ASX websites (see announcement “Sinclair Nickel - Talisman Maiden JORC Mineral Resource”, dated 31 August 2018 (Talisman Announcement)). For full details of the Sinclair Nickel Project Resource estimate, including the Competent Person’s Statement related to the estimation of the Sinclair Nickel Project Mineral Resource, please refer to the Talisman Announcement.
-
3 Refer ASX Announcements dated 8 August 2018 “Proposed Sale of Talismans Interest in the Springfield JV” and 28 August 2018 “Chairmans Letter, Notice of Meeting & Proxy Form”.
-
4 http://www.resourcesandenergy.nsw.gov.au/miners-and-explorers/geoscience-information/products-and-data/factsheets
-
5 Refer ASX Announcement dated 5 July 2018 “Further High-Grade Cu Hits & New EM Conductors at Blind Calf”.
-
6 Result taken from CRA Exploration Pty Ltd report GS1978/259.R00023043 and Result taken from Triako Resources Ltd report R000300065. Geological Survey of NSW DIGS reporting system.
-
7 Refer ASX Announcement dated 17 May 2018 “Lachlan Cu-Au Project Update - Cu-Zn-Pb Anomaly identified”.
-
8 Refer ASX Announcement dated 14 September 2018 “NSW Lachlan Project Update - Drilling Commencement”.
-
9 Refer ASX Announcement dated 7 October 2016 “Sinclair Nickel Project Drilling Results”.
-
10 Refer ASX Announcement dated 7 September 2018 “Sinclair Ni Project - new mineralised position identified”.
-
11 Refer ASX Announcement dated 9 January 2017 “Sinclair Nickel Exploration Update”.
26
Sinclair - Development potential under right market conditions
Significant infrastructure in place with replacement value A$120M
Sinclair Nickel Project – 300ktpa Crushing and Grinding Circuit
27
Sinclair - Development potential under right market conditions
Significant infrastructure in place with replacement value A$120M
Sinclair Nickel Project – Flotation Cells and Mill Control Room
28
Sinclair - Development potential under right market conditions
Significant infrastructure in place with replacement value A$120M
Sinclair Nickel Project – Underground Refuge Chambers and Mine Ventilation equipment
29
Sinclair - Development potential under right market conditions
Significant infrastructure in place with replacement value A$120M
Sinclair Nickel Project – +200-person Accommodation Village
30
Sinclair - Development potential under right market conditions
Significant infrastructure in place with replacement value A$120M
Sinclair Nickel Project – 2km Bitumen Airstrip
31