Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

TALISMAN MINING LIMITED Investor Presentation 2007

Oct 10, 2007

65926_rns_2007-10-10_8a38c695-5544-42cc-bb76-c7f48ca87bf7.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

==> picture [61 x 61] intentionally omitted <==

TALISMAN MINING LTD

PO Box 1262 Subiaco WA 6904 Tel: +61 8 9380 4230 / Fax: +61 8 9382 8200

www.talismanmining.com.au

11 October 2007

Companies Announcements Office Australian Stock Exchange Limited Exchange House Level 4, 20 Bridge Street Sydney, NSW 2000

Dear Sir/ Madam,

WONMUNNA IRON ORE PRESENTATION

Please find attached a presentation that is currently being made on the prospectivity of the Company’s iron ore assets

Yours faithfully, Talisman Mining Limited

Steve Elliott Managing Director

ABN 71 079 536 495

TALISMAN MINING LTD

==> picture [832 x 138] intentionally omitted <==

WONMUNNA IRON ORE

==> picture [832 x 579] intentionally omitted <==

----- Start of picture text -----

T A L I S M A N M I N I N G L T D
----- End of picture text -----

T A L I S M A N M I N I N G L T D

‘Elephant Country’

==> picture [812 x 379] intentionally omitted <==

==> picture [832 x 579] intentionally omitted <==

----- Start of picture text -----

T A L I S M A N M I N I N G L T D
----- End of picture text -----

T A L I S M A N M I N I N G L T D

==> picture [506 x 72] intentionally omitted <==

==> picture [371 x 44] intentionally omitted <==

==> picture [506 x 72] intentionally omitted <==

==> picture [371 x 44] intentionally omitted <==

==> picture [506 x 71] intentionally omitted <==

==> picture [474 x 55] intentionally omitted <==

==> picture [380 x 230] intentionally omitted <==

==> picture [474 x 54] intentionally omitted <==

==> picture [474 x 54] intentionally omitted <==

==> picture [474 x 55] intentionally omitted <==

==> picture [474 x 54] intentionally omitted <==

T A L I S M A N M I N I N G L T D

==> picture [679 x 49] intentionally omitted <==

==> picture [679 x 50] intentionally omitted <==

==> picture [679 x 49] intentionally omitted <==

==> picture [679 x 50] intentionally omitted <==

==> picture [679 x 49] intentionally omitted <==

Poondano Ex loration Ltd CID Drill Interce ts p p

HoleID East North **RL ** From To Intercept Fe P Al2O5 SiO2 S Mn LOI
(m) (m) (m) (%) (%) (%) (%) (%) (%) (%)
TRC003 709885 7440755 716 **no significant ** results
TRC004 709930 7440685 724 0 4 4 51.15 0.033 7.40 7.35 0.027 0.040 0.250
TRC005 709959 7440629 721 0 4 4 51.55 0.032 6.75 6.75 0.090 0.025 11.75
TRC008 709645 7440670 730 2 8 6 54.33 0.028 5.30 4.90 0.042 0.091 10.90
including 2 6 4 56.15 0.028 4.10 4.10 0.042 0.105 10.70
TRC009 709220 7440620 739 0 4 4 54.65 0.025 4.60 5.55 0.029 0.006 10.75
including 0 2 2 56.00 0.024 3.40 5.40 0.036 0.002 9.90
TRC010 709325 7440550 730 2 12 10 51.90 0.034 6.14 6.12 0.032 0.049 12.66
TRC011 709325 7440550 730 **no significant ** results

==> picture [832 x 579] intentionally omitted <==

----- Start of picture text -----

T A L I S M A N M I N I N G L T D
----- End of picture text -----

T A L I S M A N M I N I N G L T D

==> picture [507 x 38] intentionally omitted <==

==> picture [507 x 37] intentionally omitted <==

==> picture [507 x 37] intentionally omitted <==

==> picture [507 x 37] intentionally omitted <==

==> picture [507 x 38] intentionally omitted <==

Poondano Exploration Ltd Marra Mamba Drill Intercepts

HoleID East North **RL ** From To Intercept Fe P Al2O5 SiO2 S Mn LOI
(m) (m) (m) (%) (%) (%) (%) (%) (%) (%)
TRC023 712848 7441100 702 24 26 2 55.62 0.113 2.00 7.98 0.014 0.020 9.63
TRC024 712767 7441033 704 12 24 12 59.1 0.066 2.70 6.45 0.016 0.005 7.83
including 20 24 4 61.31 0.088 1.75 3.87 0.010 0.005 6.37
TRC025 712697 7440986 710 **no significant ** results
TRC026 712620 7440930 711 12 30 18 58.6 0.084 2.68 4.83 0.026 0.023 7.85
including 20 24 4 61.21 0.078 1.69 3.36 0.021 0.020 6.94
TRC027 712557 7440863 708 12 14 2 57.46 0.111 4.37 4.74 0.025 0.020 8.03
TRC028 712468 7440803 716 12 20 8 59.98 0.054 2.17 3.44 0.014 0.005 8.05
including 14 18 4 61.25 0.054 1.39 2.49 0.012 0.005 8.06
TRC029 712400 7440747 716 **no significant ** results
TRC030 712820 7440766 715 12 30 18 58.4 0.067 3.13 5.45 0.026 0.021 6.94
including 20 22 2 62.85 0.066 2.21 4.31 0.025 0.020 6.40
TRC031 713254 7440679 711 18 32 14 57.08 0.058 3.40 6.35 0.024 0.019 7.93
including 20 22 2 61.09 0.093 1.86 3.24 0.025 0.030 6.87
TRC032 713793 7440712 705 14 36 22 60.81 0.106 2.09 3.12 0.009 0.009 7.14
including 16 34 18 61.27 0.107 2.03 3.02 0.008 0.010 6.63
TRC033 713804 7440849 702 **no significant ** results

T A L I S M A N M I N I N G L T D

==> picture [355 x 26] intentionally omitted <==

==> picture [355 x 26] intentionally omitted <==

==> picture [355 x 27] intentionally omitted <==

==> picture [355 x 26] intentionally omitted <==

==> picture [355 x 27] intentionally omitted <==

==> picture [569 x 96] intentionally omitted <==

==> picture [569 x 96] intentionally omitted <==

==> picture [569 x 97] intentionally omitted <==

Marra Mamba Drill Intercepts – Interpreted Section

T A L I S M A N M I N I N G L T D

WONMUNNA IRON ORE POTENTIAL

Type Potential Initial Mt @ %Fe Target Channel Iron +100 +55 50Mt Marra Mamba +150 +60 50Mt

T A L I S M A N M I N I N G L T D

WONMUNNA SUMMARY

==> picture [18 x 18] intentionally omitted <==

==> picture [18 x 18] intentionally omitted <==

==> picture [18 x 18] intentionally omitted <==

==> picture [18 x 18] intentionally omitted <==

Excellent potential for definition of World-class iron ore deposits.

Proximal to existing iron ore infrastrucure. Amenable to rapid and low-cost evaluation. Drilling commenced September, 2007 – Preliminary results expected early November, 2007.

T A L I S M A N M I N I N G L T D

OTHER PROJECTS

==> picture [385 x 103] intentionally omitted <==

==> picture [385 x 102] intentionally omitted <==

==> picture [385 x 103] intentionally omitted <==

==> picture [385 x 102] intentionally omitted <==

80% TRILLBAR (Au): Includes Boundary Deposit (50,000ozs gold) + Drill - ready targets

80% MAITLAND (Au): Drill – ready targets

Earning 60% MT. JAMES (Au): Drill – ready targets

80% BUSTLER W. (Au): Drill – ready target

100% WONMUNNA (Cu-Zn-Au-Ag): Targets drilled, Low grade copper intersected.

100% TOM PRICE (Cu-Zn-Au-Ag): Drill – ready targets

100% ANTICLINE (Cu-Zn-Au-Ag): Greenfields

100% COPPER H. (Ni-Cu-PGE / Au): Greenfields

  • 100% EAST KIMBERLEY (Ni-Cu-PGE): Greenfields (Adjacent Sally Malay Ni Mine)

100% YILGALONG (Cu-Zn / Au): Greenfields

T A L I S M A N M I N I N G L T D

CORPORATE SUMMARY

BOARD Ian Macpherson – Chairman Steve Elliott – Managing Director Mick Bunyard – Non-executive Director

ASX CODE: TLM

CAPITAL STRUCTURE

Shares on Issue 60,504,665 (Escrow) (12,959,638) Options (20c, 31/12/2010) 22,632,639 Unlisted Options (25c, 30/09/2008) 3,900,000 Unlisted Options (25c, 31/12/2010) 3,900,000 Capitalisation (October 2, 2007) M$24.2

TOP 15
( At 4/10/2007)
Arcaro Holdings Pty Ltd
4,590,001
7.6%
G. G. Walker
4,025,000
6.6%
Metalmite Pty Ltd
1,800,000
3.0%
Redcode Pty Ltd
1,800,000
3.0%
Bitutti Pty Ltd
1,700,000
2.8%
Golbay Ltd
1,500,000
2.5%
P. R. Oost
1,262,600
2.1%
Fats Pty Ltd
1,000,000
1.6%
C. M. Edwards
1,000,000
1.6%
T. R. Gerard
845,000
1.4%
I. K. Macpherson
800,000
1.3%
Twynam Agricultural Gp.
654,655
1.1%
Orbit Drilling Pty Ltd
606,665
1.0%
Proto Resources & Inv.
600,000
1.0%
Murchison Resources P/ L
564,445
0.9%
22,748,366
37.5%