Quarterly Activities Report March 2018

Highlights

- - Springfield Cu Au Project (30% Talisman)

Monty Mine Development and Economic Evaluation

  • Monty underground development ahead of schedule. Decline development at end of March 2018 advanced to 664 metres compared to a budgeted 711 metres.

  • Talisman’s share of actual pre-production capital costs to date of $10.3M are under Budget and Feasibility Study costs.

  • Go-forward[4] pre-tax ungeared NPV of Talisman’s 30% share in Monty, as per the Monty Feasibility Study[3] , as at 1 April 2018 of $66 million.

Exploration Activities

  • Joint Venture exploration activities completed for the quarter included:

  • Diamond drilling of the Monty Upper Zone

  • Two diamond drill holes at Monty NE aircore anomaly and Monty East Trend

  • Infill aircore drilling at Homer and the Southern Volcanics

  • Budgeted exploration for the June Quarter includes on-going aircore drilling and follow-up RC drilling of anomalies identified from aircore drilling.

Lachlan Cu-Au Projects

  • New exploration licences at Crowl Creek in the Boona Project Area granted for six year terms.

  • Remodelling of mineralisation at Blind Calf Prospect highlights multiple lenses, open along strike and at depth.

  • A 1,000m seven-hole RC/diamond drilling program at Blind Calf Prospect has been submitted to the NSW Department of Planning and Environment for approval.

  • Commencement of 4,500-hole auger geochemical drilling campaign at the Cumbine Prospect (Peel JV) in the Bobadah Project Area.

- Sinclair Nickel Project (100% Talisman)

  • Ongoing review and assessment to identify and prioritise potential future on-ground near mine and regional exploration activities.

1

- Springfield Copper Gold Project (Joint Venture with Sandfire Resources NL)

During the March 2018 quarter, joint venture activities at the Springfield Cu-Au Project ( Springfield ) continued to progress the development of the Monty Copper-Gold Project ( Monty ); while exploration focused on better defining the Monty Deposit Upper Zone, diamond drill testing of the Monty NE anomaly, and infill aircore drilling at the Homer Prospect and Southern Volcanics Trend.

Monty Development

On-site construction activities for Monty progressed throughout the March 2018 quarter. Significant Infrastructure milestones included:

  • Works Approval by DWER to allow for dewatering infrastructure to be constructed ;

  • Completion of all contracted bulk earthworks and civils;

  • Commissioning and utilisation of on-site office facilities ;

  • Completion of high-voltage infrastructure, now energised and ready for underground substation commissioning; and

  • Breakthrough of the return air-drive to the base of the vent shaft.

==> picture [433 x 325] intentionally omitted <==

Figure 1: Monty Project: Site office, power generators and associated infrastructure.

2

==> picture [459 x 262] intentionally omitted <==

Figure 2: Monty Project: High voltage switchgear installed and ready for use

==> picture [375 x 282] intentionally omitted <==

Figure 3: Monty Project: Underground ventilation pumping station

Monty underground development continued to make good progress throughout the March quarter with total development metres ahead of schedule on a year-to-date basis.

3

Decline development was impacted by water ingress from discrete structures during the month. By the end of March, the decline had advanced to 664 metres compared to a corresponding feasibility study budget of 711 metres. It is anticipated that the decline advance will be realigned with the schedule during the current June quarter.

Total development advance was 1,322 meters as at the end of March, compared to the Feasibility Study schedule of 1,276 meters.

Monty Development Budget

In December 2017, the Joint Venture approved a new budget for the period ending 30 June 2018 and a forecast to 31 December 2018 (Current Budget/Forecast)[1] which reflected approximately $8M (100% basis) of realised capital cost savings to the end of November 2017 compared to the Monty Feasibility Study total (100% basis) pre-production capital cost estimate of $72.6M. Talisman’s share of this reduction in pre-production capital was estimated at $2.4M[1] .

On a 100% basis, actual Monty pre-production capital expenditure in the first quarter of the 2018 calendar year was $10.8M compared to the Current Budget/Forecast of $14.8M. Talisman’s share of actual expenditure for the quarter was $3.2M compared to the Current Budget/Forecast of $4.4M.

On a project to date basis (1 July 2017 to 31 March 2018) Talisman’s 30% share of actual preproduction capital costs are $10.3M compared to corresponding Monty Feasibility Study costs of $14.6M.

The Joint Venture is currently preparing an updated budget from 1 July 2018 to 30 June 2019.

Monty Project Financing Facility (PFF)

Talisman has secured a project debt Facility Agreement with Taurus for US$20M to fund 100% of Talisman’s share of Monty pre-production capital[2] .

Talisman has made two drawdowns to date totalling US$11.5M. The drawdowns were to cover preproduction costs from 1 July 2017 to 31 March 2018. A further US$8.5M is available to be drawn down against the facility for future pre-production capital costs.

As at 31 March 2018, Talisman held approximately A$4.3M of funds drawn down but not yet called by the Joint Venture Manager.

Talisman’s share of the Current Budget/Forecast pre-production capital for the quarter ending 30 June 2018 is A$3.1M. This expenditure will be funded by the existing surplus in funds drawn but not called by the Joint Venture and a third drawdown against the facility which is likely to be made in the June 2018 quarter.

1 Please refer to TLM ASX announcement: “Monty Development Update”, dated 12 January 2018. 2 Please refer to TLM ASX announcement “Monty Financing Finalised”, dated 30 October 2017

4

Economic Evaluation

As at 1 April 2018, one year from the publication of the Monty Feasibility Study results[3] , Monty has a go-forward[4] , pre tax, ungeared Net Present Value ( NPV ) of $66M based on the Monty Feasibility Study assumptions. These assumptions are as announced to the ASX on 5 April 2017 in Talisman’s ASX announcement “Monty Feasibility Study Results”. (Mineral Resource, Ore Reserve estimates and Production Target for the Monty Feasibility Study are shown in Appendix 4).

With these strong expected margins, the Monty Feasibility Study is forecast to yield more than $78M in go-forward ungeared pre-tax free cash flow to Talisman. Talisman will incur financing and interest costs for the life of the project loan plus structured royalty payments under the Project Financing Facility (PFF)[2] .

As previously announced, the Talisman Group (Group) has carried forward tax losses as at 30 June 2017 of $44M. These losses are expected to be fully available to be offset against future taxable income of the Group including future taxable income from Monty.

Commodity Prices and Exchange Rates

Table 1 outlines the commodity price and exchange rate assumptions utilised to undertake the financial assessment of the Monty Feasibility Study. These assumptions reflect the price and exchange rate forecasts adopted by the Study Manager, Sandfire, in finalising the Monty Feasibility Study.


Study.
Commodity / FX Units CY 2018 CY 2019 CY 2020 CY 2021
Copper US$/t 6031 6196 6119 5899
Gold US$/oz 1398 1375 1374 1296
Silver US$/oz 19.14 18.84 18.83 17.75
A$/US$ USc 0.730 0.725 0.720 0.715

Table 1: Forecast commodity price and exchange rates utilised for the Monty Feasibility Study

Table 2 shows the sensitivity of the go-forward Monty Feasibility Study NPV estimate as at 1 April 2018 to variations in forecast copper price and AUD:USD exchange rate.

Measure Units Spot
Case
(go-forward basis)
Upside
Case
(go-forward basis)
Copper Price US$/t 6,796 7,500
Exchange rate AUD:USD 0.754 0.750
Free Cash flow- ungeared pre tax A$M 88 107
NPV8 (Ungeared pre tax) A$M 74 90
IRR (ungeared pre tax) % 370 455
Notional C1 Cost A$/lb Cu 1.56 1.56

Table 2: Monty Project Financial Return Sensitivity based on Monty Feasibility Study assumptions from 1 April 2018 (Talisman 30% attributable basis)

Talisman retains full exposure to commodity price and exchange rate movements on its share of Monty ore under the terms of the previously announced Ore Sale and Purchase Agreement.

3 Please refer to TLM ASX announcement: “Monty Feasibility Study Results”, dated 6 April 2017 for further details and description of the financial parameters & summary of key Monty Feasibility Study financial return outcomes.

4 Go-forward is from 1 April 2018 and is exclusive of Project capital to 31 March 2018.

5

Exploration

Budgeted work at Springfield during the quarter ending 31 March 2018 focused on drill testing of interpreted target horizons at Monty NE, Monty East and Homer South. A summary of drilling completed during the quarter is provided in Table 3.

Prospect Drill Type Holes
Drilled
Meters
Drilled
Status
Monty NE DD 1 893 Complete
Monty East DD 1 786 Complete
Monty Upper Zone DD 9 1,425 Results Pending
Homer AC 79 3,694 Complete
Southern Volcanics AC 40 2,418 Results Pending

Table 3: Springfield Project Exploration Drilling summary

Diamond drilling activities completed during the quarter comprised both exploration and resource definition drilling. Two drill holes, TLDD117A and TLDD119 were drilled to test target positions at Monty NE and Monty East respectively ( Figure 4 ).

==> picture [482 x 275] intentionally omitted <==

Figure 4: Springfield – Monty Region drill collar location plan for the three-month period ending 31 March 2018.

TLDD117A and TLDD119 were interpreted to have intersected sediment horizons similar to the Monty host stratigraphy. Sampling of the available drill core from these two holes did not return any significant mineralisation. DHEM geophysical surveys have been completed on both drill holes and Sandfire advised that no anomalies were identified in the data. Talisman is currently reviewing the available DHEM data.

In addition to the two exploration diamond drill holes completed during the quarter, the Joint Venture drilled a total of nine holes (TLDD0120 – TLDD0126A), into the Upper Zone of the defined Monty

6

Resource (Table 4 and Table 5). The primary aim of this drilling was to provide additional geotechnical, geological and analytical data on the Upper Zone. It also provided infill drilling between the existing resource definition drill holes in selected areas.

All the completed drill holes into the Monty Upper Zone intersected massive sulphide mineralisation and initial observations show a good correlation with the modelled orebody.

The drill holes are in the process of being logged in detail for geology and structural analysis prior to sampling.

Aircore drilling during the quarter focused on the interpreted Homer South position and the Southern Volcanics trend. Drilling was designed to infill previous aircore drilling and provide additional information over newly interpreted host positions.

Drilling comprised a total of 79 holes for 3,694 metres at Homer and 40 holes for 2,418 metres along the Southern Volcanics. Assay results from composite sampling of the Homer South drilling are currently being interpreted by Sandfire, while the Southern Volcanics drilling is ongoing, with assay results from completed drilling yet to be received.

Budgeted exploration for quarter ending 30 June 2018

Budgeted exploration for the June quarter will focus on the completion of aircore drilling along the Southern Volcanics. Provisional RC drilling of any identified anomalies from the results of the Southern Volcanic and Homer South aircore drilling has been included in the approved June quarter budget.

The Joint Venture has approved an independent technical review of Springfield exploration data. This review will encompass geological and structural data generated to date.

In addition to, and in parallel with, this review of drilling information, a separate review of the available surface and down-hole geophysical data has been initiated, and will include FLEM, SQUID MLEM, IP and DHEM geophysical data.

Sinclair Nickel Project Exploration

Field activities for the March quarter included a programme of reconnaissance regolith mapping and rock-chip sampling, as a precursor to proposed aircore drilling over previously untested geophysical trends.

A total of 533 outcrop samples were collected and submitted for multi element analysis. Results highlighted a number of previously unrecognised prospective areas that will require additional follow up work including aircore and potentially deeper RC drilling.

Approvals for both aircore and RC drilling are in place, with first pass reconnaissance drilling over a number of new areas, as well as infill aircore drilling over existing prospects scheduled to commence in the June quarter.

Strategically, Talisman continues to assess value maximising options for the Sinclair Nickel Project.

7

- Lachlan Copper Gold Project

During the March quarter, Talisman completed a comprehensive compilation and review of historic drilling and other existing exploration data across the Lachlan Copper-Gold Project.

Historic data comprises sporadic isolated surface sampling (soil, rock-chip and auger samples), and limited RC and diamond drilling. The majority of the work was completed by a number of explorers throughout the 1970’s, 1980’s and early 1990’s, with some of the most recent work completed in 2010 and 2011. Talisman’s review of the data has highlighted that there has been no coordinated, systematic regional exploration across the tenement package, which until now has been fragmented and under the control of multiple exploration companies.

Talisman has highlighted multiple high priority areas across the tenure for initial focus where more detailed geological interpretations have been completed or are underway.

The wider Lachlan Copper-Gold Project, including the Boona Project Area and Blind Calf Prospect, lies within a regional Strategic Alliance (“Alliance”) between Talisman and Bacchus Resources Pty Ltd (“Bacchus”). The Alliance allows Talisman and Bacchus to work together to identify and pursue potential opportunities within the region that compliment, benefit or provide synergies to the Joint Venture or are suitable for Joint Venture, given both parties’ technical and financial capacities and the parties’ corporate objectives.

Tenement Administration

Talisman received final confirmation of the grant of two new Exploration Licences from the NSW Department of Planning and Environment – Division of Resources and Geoscience. These tenements are located in the Boona Project Area to the west and south of the current TalismanBacchus Joint Venture tenements ( Appendix 1 ) and cover the historic Crowl Creek tenements acquired from Kidman Resources ( see ASX announcement 9 January 2018 ). The new licences have been granted for a period of six years.

Blind Calf Prospect

The Blind Calf Prospect, comprises a cluster of 13 historic (early 1900’s) mining shafts developed on a series of shear hosted sulphide rich quartz lodes with mapped outcrop strike extents of between 40m to 100m and widths of 5m at surface.

The Blind Calf Prospect is located approximately 5km to the South West of the Mineral Hill Mine ( Figure 6 ) and is a priority for near term initial on-ground exploration drilling.

Drilling by previous explorers in early 2011 confirmed that these lodes contain significant high-grade copper mineralisation, with results including:

  • KD11-17: 27m @ 6.08% Cu, 7.6g/t Ag (from 24m)[i ] ;

  • KD11-19: 14m @ 2.32% Cu, 1.98g/t Ag (from 97m)[i ] ;

  • KD10-1: 21m @ 2.24% Cu, 2.82g/t Ag (from 41m)[i ] ; and

  • KD11-22: 13m @ 2.18% Cu, 2.5g/t Ag (from 71m)[ i] .

8

Talisman recently completed a review and interpretation of historic drill data, modelling a total of 10 separate north-south striking, roughly parallel lodes with a steep, sub-vertical dip ( Figure 5 , Figure 6 and Figure 7 ). Historic drilling has been mostly shallow and concentrated beneath the historic workings. All the identified lodes are open at depth and along strike.

==> picture [467 x 574] intentionally omitted <==

Figure 5: Blind Calf Prospect area, highlighting high-grade copper lodes and untested parallel N-S oriented structures

9

At a more regional scale, mineralisation in this area appears to be associated with the intersection of the regional north-south orientated structures and northwest-southeast cross cutting structures. This essentially creates a prospective corridor that bounds the north-south striking lodes, as evidenced at both Mineral Hill and Blind Calf. Importantly both the Mineral Hill and Blind Calf corridors trend to the southwest into Talisman-Bacchus Joint Venture tenure, where additional untested target areas have been identified. These target areas are supported by historic rock-chip sampling which has returned high-grade gold and lead assay results ( Figure 6 ).

==> picture [445 x 514] intentionally omitted <==

Figure 6: Regional RTP Magnetic image showing N-S and NW-SE trending structures, and interpreted target areas

10

The forthcoming maiden RC drilling program for Talisman at the Boona Project Area is designed to confirm historic intersections at Blind Calf as well as extend the modelled lenses down dip and along strike. The proposed drilling is to a maximum planned depth of 180m down hole highlighting the shallow nature of the previous testing ( Figure 7 ).

==> picture [496 x 239] intentionally omitted <==

Figure 7: Blind Calf Prospect long section showing existing mineralised lode wireframes and Talisman proposed drilling (shown in red), designed to test below and along strike from existing intersections

Talisman has signed land access agreements with all landholders in the areas of interest and a work program for an initial RC drilling campaign of 1,000m has been submitted to regulators for approval.

Requests for the submission of drilling tenders have been made and initial indications are that drill rig availability in the area is good. Talisman anticipates commencing drilling shortly after departmental approvals have been received.

Regional Geochemical Survey at Bobadah Project Area

Systematic auger drilling by a specialist geochemical sampling team has now commenced over the Cumbine Prospect area within the Peel Joint Venture tenement and will shortly move to the wider Bobadah Project Area ( Figure 8 ). A total of approximately 4,500 sample sites are proposed on a 50m x 200m grid over areas highlighted by Talisman’s recent regional targeting exercise. This initial phase of work is estimated to run for the majority of the forthcoming quarter.

11

==> picture [321 x 463] intentionally omitted <==

Figure 8: Boonah Project Area: regolith auger drilling summary map

Preparations have begun for the next phase of geochemical work which will target the Boona Project area. This program will focus on the southwest extension of the Blind Calf and Mineral Hill mineralised corridors, and other structural target areas.

Ends

For further information, please contact:

Dan Madden – Managing Director on +61 8 9380 4230

Michael Vaughan (Media inquiries) on +61 422 602 720

12

About Talisman Mining

Talisman Mining Limited (ASX:TLM) is an Australian mineral development and exploration company. The Company’s aim is to maximise shareholder value through exploration, discovery and development of complementary opportunities in base and precious metals.

Talisman holds a 30% interest in the Springfield Joint Venture with Sandfire Resources NL (70% and JV manager). Springfield is located in a proven VMS province in Western Australia’s Bryah Basin and contains multiple prospective corridors and active exploration activities. Springfield hosts the high-grade Monty coppergold deposit which is located 10 kilometres from Sandfire’s DeGrussa operations. Monty is one of the highestgrade copper-gold discoveries made globally in recent decades and a Feasibility Study on its development was completed in March 2017. The Feasibility Study highlighted the strong technical and financial viability of Monty. The Monty deposit is currently under development and Talisman has secured project debt financing for 100% of its share of pre-production capital costs.

Talisman also holds 100% of the Sinclair Nickel Project located in the world-class Agnew-Wiluna greenstone belt in WA’s north-eastern Goldfields. The Sinclair nickel deposit, developed and commissioned in 2008 and operated successfully before being placed on care and maintenance in August 2013, produced approximately 38,500 tonnes of nickel at an average life-of-mine head grade of 2.44% nickel. Sinclair has extensive infrastructure and includes a substantial 290km2 tenement package covering more than 80km of strike in prospective ultramafic contact within a 35km radius of existing processing plant and infrastructure.

Talisman has also secured tenements in the Cobar/Mineral Hill region in Central NSW through the grant of 100% owned Exploration Licenses and through separate earn-in Joint Venture and tenement purchase agreements. The Cobar/Mineral Hill region is a richly mineralised district that hosts several base and precious metal mines including the CSA, Tritton, and Hera/Nymagee mines. This region contains highly prospective geology that has produced many long-life, high-grade mineral discoveries. Talisman has identified a number of areas within its own and Joint Venture tenements that show evidence of base and precious metals endowment which have had very little modern systematic exploration completed to date. Talisman believes there is significant potential for the discovery of substantial base metals and gold mineralisation within this land package.

Competent Person’s Statement

Information in this ASX release that relates to Exploration Results and Exploration Targets is based on information completed by Mr Anthony Greenaway, who is a member of the Australasian Institute of Mining and Metallurgy. Mr Greenaway is a full-time employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Greenaway consents to the inclusion in this report of the matters based on information in the form and context in which it appears.

i For full details, refer to Kidman Resources (ASX: KDR) ASX announcement “Mineralisation Extended at Blind Calf” dated 07 July 2011,

ii Result taken from CRA Exploration Pty Ltd report GS1978/259.R00023043 and Result taken from Triako Resources Ltd report R000300065. Geological Survey of NSW DIGS reporting system

13

Forward-Looking Statements

This ASX release may include forward-looking statements. These forward-looking statements are not historical facts but rather are based on Talisman Mining Ltd.’s current expectations, estimates and assumptions about the industry in which Talisman Mining Ltd operates, and beliefs and assumptions regarding Talisman Mining Ltd.’s future performance. Words such as “anticipates”, “expects”, “intends”, “plans”, “believes”, “seeks”, “estimates”, “potential” and similar expressions are intended to identify forward-looking statements. Forwardlooking statements are only predictions and are not guaranteed, and they are subject to known and unknown risks, uncertainties and assumptions, some of which are outside the control of Talisman Mining Ltd. Past performance is not necessarily a guide to future performance and no representation or warranty is made as to the likelihood of achievement or reasonableness of any forward-looking statements or other forecast. Actual values, results or events may be materially different to those expressed or implied in this presentation. Given these uncertainties, recipients are cautioned not to place reliance on forward looking statements. Any forward looking statements in this announcement speak only at the date of issue of this announcement. Subject to any continuing obligations under applicable law and the ASX Listing Rules, Talisman Mining Ltd does not undertake any obligation to update or revise any information or any of the forward looking statements in this announcement or any changes in events, conditions or circumstances on which any such forward looking statement is based.

Table 4: Drill-hole Information Summary, Springfield Cu-Au Project

Details and co-ordinates of drill-hole collars for diamond drilling completed during the March 2018 quarter:

Hole ID Grid ID Dip Azimuth East North RL Hole
Type
Max
Depth
Comment
(m) (m) (m)
TLDD0117A MGA94_Z50 -620 1260 745078 7174246 605 DD 893.1 MontyNE
TLDD0119 MGA94_Z50 -620 1220 745865 7172960 612 DD 786.4 MontyEast
TLDD0120 MGA94_Z50 -600 3220 743621 7170941 602 DD 195.8 Monty UZ
TLDD0121 MGA94_Z50 -600 3210 743581 7170940 602 DD 162.7 MontyUZ
TLDD0122 MGA94_Z50 -600 3210 743599 7170922 602 DD 198.0 MontyUZ
TLDD0123 MGA94_Z50 -600 3220 743610 7170901 602 DD 219.0 MontyUZ
TLDD0124 MGA94_Z50 -600 3200 743546 7170919 600 DD 45.5 Abandoned
TLDD0124A MGA94_Z50 -600 3210 743545 7170920 600 DD 162.0 MontyUZ
TLDD0125 MGA94_Z50 -600 3220 743568 7170907 601 DD 190.2 Monty UZ
TLDD0126 MGA94_Z50 -600 3220 743576 7170881 600 DD 41.8 Abandoned
TLDD0126A MGA94_Z50 -600 3220 743576 7170881 600 DD 209.8 MontyUZ

14

Table 5 : Diamond drill-hole Assay Intersections for the Springfield Cu-Au Project

Details of relevant intersections received by Talisman during the March 2018 quarter are provided below.

Calculation of DD intersections for inclusion into this table are based on a 0.5% Cu cut-off, no more than 3m of internal dilution and a minimum composite grade of 1% Cu. Intersection length, Cu (%), Au (ppm), Ag (ppm) and Zn (%) are rounded to 1 decimal point.

Hole ID Depth From Depth To Interval Cu Au Zn
(m) (m) (m) (%) (ppm) (%)
TLDD0117A No significant results
TLDD0119 No significant results
TLDD0120 Results Pending
TLDD0121 Results Pending
TLDD0122 Results Pending
TLDD0123 Results Pending
TLDD0124A Results Pending
TLDD0125 Results Pending
TLDD0126A Results Pending

15

APPENDIX 1 NSW Lachlan Project Tenure simplified regional geology and structure

==> picture [457 x 488] intentionally omitted <==

16

APPENDIX 2

Talisman’s Tenement Holdings

Project /
Tenement
Location
and
Blocks
(Area)
Interest at
Beginning
Quarter
Interest at
End Quarter
Acquired
during
Quarter
Surrendered
during
Quarter
Joint Venture
Partner /
Farm-In Party
HALLOWEEN
WEST
Western Australia JV - Sandfire
Resources NL
E52/2275 6 18.8% 18.8% - -
HALLOWEEN Western Australia JV - Sandfire
Resources NL
P52/1528 (200 HA) 18.8% 18.8% -
SPRINGFIELD W Australia JV - Sandfire
Resources NL
E52/2282 42 30% 30% - -
E52/2313 8 30% 30% - -
E52/2466 14 30% 30% - -
E52/3423 1 30% 30% - -
E52/3424 1 30% 30% - -
E52/3425 6 30% 30% - -
E52/3466 12 30% 30% - -
E52/3467 20 30% 30% - -
L52/170 (246.4HA) 30% 30% - -
M52/1071 (1,642HA) 30% 30% - -
Project /
Tenement
Location
and
Blocks
(Area)
Interest at
Beginning of
Quarter
Interest at
End of
Quarter
Acquired
during
Quarter
Surrendered
during
Quarter
Joint Venture
Partner /
Farm-In Party
SINCLAIR
NICKEL
PROJECT
Western Australia N/A
E36/650 16 100% 100% - -
E37/903 13 100% 100% - -
E37/1231 3 100% 100% -
L36/198 (103.1 HA) 100% 100% - -
L37/175 (83.9 HA) 100% 100% - -
M36/444 (568.0 HA) 100% 100% - -
M36/445 (973.0 HA) 100% 100% - -
M36/446 (843.0 HA) 100% 100% - -
M37/362 (981.5 HA) 100% 100% - -
M37/383 (841.7 HA) 100% 100% - -
M37/384 (536.7 HA) 100% 100% - -
M37/385 (926.8 HA) 100% 100% - -
M37/386 (983.8 HA) 100% 100% - -
M37/424 (891.0 HA) 100% 100% - -
M37/426 (505.0 HA) 100% 100% - -
M37/427 (821.0 HA) 100% 100% - -
M37/590 (120.0 HA) 100% 100% - -
M37/692 (136.1 HA) 100% 100% - -
M37/735 (959.0 HA) 100% 100% - -

17

Project /
Tenement
Location
and
Blocks
(Area)
Interest at
Beginning of
Quarter
Interest at
End of
Quarter
Acquired
during
Quarter
Surrendered
during
Quarter
Joint Venture
Partner /
Farm-In Party
M37/816 (818.4 HA) 100% 100% - -
M37/818 (806.5 HA) 100% 100% - -
M37/819 (380.2 HA) 100% 100% - -
M37/1063 (604.0 HA) 100% 100% - -
M37/1089 (574 HA) 100% 100% - -
M37/1090 (478 HA) 100% 100% - -
M37/1126 (603 HA) 100% 100% - -
M37/1127 (603 HA) 100% 100% - -
M37/1136 (986 HA) 100% 100% - -
M37/1137 (850 HA) 100% 100% - -
M37/1148 (44.78 HA) 100% 100% - -
M37/1168 (190 HA) 100% 100% - -
M37/1223 (675 HA) 100% 100% - -
M37/1275 (1,961 HA) 100% 100% - -
P37/7228 (61.57 HA) 100% 100% - -
P37/7233 (116.01 HA) 100% 100% - -
Project /
Tenement
Location
and
Blocks
(Area)
Interest at
Beginning of
Quarter
Interest at
End of
Quarter
Acquired
during
Quarter
Surrendered
during
Quarter
Joint Venture
Partner /
Farm-In Party
LACHLAN
PROJECT
NSW
EL8615 (726km2) 100% 100% - - N/A
EL8659 (373km2) 100% 100% - -
EL8677 (193km2) 100% 100% -
EL8414 (174km2) 0% 0% - - JV – Peel Mining
Ltd
(TLM earning up to
75%)
EL8547 (205km2) 0% 0% - - JV – Bacchus
Resources Pty Ltd
(TLM earning up to
80%)
EL8571 (258km2) 0% 0% - -
EL8638 (192km2) 0% 0% - -
EL8657 (134m2) 0% 0% - -
EL8658 (256km2) 0% 0% - -
EL8680 (20km2) 0% 0% - -
EL8718 (86km2) 0% 100% Granted - New tenements
granted over Crowl
Creek Project
EL8719 (191km2) 0% 100% Granted -
OTHER NSW
EL8451 (276km2) 0% 0% - - JV – Peel Mining
Ltd
(TLM earning up to
75%)

18

APPENDIX 3 JORC Tables Section 1 & 2

Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections)

  • Criteria JORC Code explanation

  • Sampling • Nature and quality of sampling (e.g. cut techniques channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down-hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken as limiting the broad meaning of sampling.

  • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

  • Aspects of the determination of mineralisation that are Material to the Public Report. In cases where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples from which 3kg was pulverised to produce a 30 g charge for fire assay’). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.

Commentary

  • Sampling techniques employed by Sandfire on the Doolgunna Project include half core sampling of NQ2 Diamond Drill (DD) core, Reverse Circulation (RC) drilling samples collected by a cone splitter for single metre samples or sampling spear for composite samples, and aircore (AC) sample collected using spear techniques for both composite and single metre samples.

  • Sampling is guided by Sandfire DeGrussa protocols and QAQC procedures as per industry standard.

  • RC sample size reduction is completed through a Boyd crusher to -10mm and pulverised via LM5 to nominal - 75µm. Pulp size checks are completed.

  • Diamond core size reduction is through a Jaques jaw crusher to -10mm and all samples Boyd crushed to - 4mm and pulverised via LM5 to nominal 90% passing - 75µm using wet sieving technique.

  • Samples are assayed using Mixed 4 Acid Digest (MAD) 0.3g charge and MAD Hotbox 0.15g charge methods with ICPOES or ICPMS.

  • Fire Assay is completed by firing 40g portion of the sample with ICPMS finish.

  • Sampling techniques employed by Talisman at the Sinclair Nickel Project include saw cut diamond drill core (DD) samples in NQ2 size sampled on geological intervals (0.2 m to 2 m), cut into half (NQ2) core to give sample weights under 3 kg, Reverse Circulation (RC) drilling samples collected by a cone splitter for single metre samples or sampling spear for composite samples, and aircore (AC) sample collected using spear techniques for composite samples or collected by a riffle splitter for single metre samples.

  • Sampling is guided by Talisman protocols and QAQC procedures as per industry standard

  • Samples were crushed, dried and pulverised (total prep) to produce a 30g sub sample for analysis by four acid digest with an ICP/AES finish for base metals; and a 50g Fire assay with an AAS finish for gold

Drilling
techniques
Drill type (e.g. core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc).

Sandfire drilling is completed using industry standard
practices. RC drilling with a face sampling hammer of
nominal 140mm size and diamond drilling is completed
using NQ2 size coring equipment.
All drill collars are surveyed using RTK GPS.
All core, where possible is oriented using a Reflex ACT
II RD orientation tool.
Downhole surveying is undertaken using a gyroscopic
survey instrument.

19

Criteria JORC Code explanation Commentary

Talisman drilling is completed using industry standard
practices. AC drilling with a face sampling blade or
hammer.

AC drill collars are located using handheld GPS
Drill sample
recovery

Method of recording and assessing core and
chip sample recoveries and results
assessed.

Measures taken to maximise sample
recovery and ensure representative nature of
the samples.

Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.

Sandfire core is meter marked and orientated to check
against the driller’s blocks, ensuring that all core loss is
taken into account. Diamond core recovery is logged
and captured into the database with weighted average
core recoveries of approximately 99%.

Surface RC sampling is good with almost no wet
sampling in the project area. AC drilling recovery is
good with sample quality captured in the database.

Samples are routinely weighed and captured into a
central secured database.

No indication of sample bias with respect to recovery
has been established.

Sinclair AC drilling recovery is good with sample quality
captured in the database.

No indication of sample bias with respect to recovery
has been established
Logging
Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc.)
photography.

The total length and percentage of the
relevant intersections logged.

Sandfire geological logging is completed for all holes
and is representative across the ore body. The lithology,
alteration, and structural characteristics of drill samples
are logged directly to a digital format following standard
procedures and using Sandfire DeGrussa geological
codes. Data is imported into the central database after
validation in LogChief™.

Logging is both qualitative and quantitative depending
on field being logged.

All drill-holes are logged in full.

All cores are digitally photographed and stored.

Talisman logging records lithology, mineralogy,
mineralisation, alteration, structure, weathering, colour
and other primary features of the rock samples and is
considered to be representative across the intercepted
geological units.

Logging is both qualitative and quantitative depending on
the field being logged.

All drill-holes are logged in full to end of hole.
Sub-sampling
techniques
and sample
preparation

If core, whether cut or sawn and whether
quarter, half or all core taken.

If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet or
dry.

For all sample types, the nature, quality and
appropriateness of the sample preparation
_technique. _

Sandfire DD Core orientation is completed where
possible and core is marked prior to sampling. Half core
samples are produced using Almonte Core Saw.
Samples are weighed and recorded.

RC samples are split using a cone or riffle splitter. A
majority of RC samples are dry. On occasions that wet

20

  • Criteria JORC Code explanation CommentaryQuality control procedures adopted for all samples are encountered they are dried prior to splitting sub-sampling stages to maximise with a riffle splitter. representivity of samples.

  • Measures taken to ensure that the sampling • All samples are dried at 80° for up to 24 hours and weighed. DD Samples are then crushed through Jaques

  • is representative of the in situ material crusher to nominal -10mm. Second stage crushing uses

  • collected, including for instance results for Boyd crusher to nominal -4mm. Pulverising is

  • field duplicate/second-half sampling.

  • Whether sample sizes are appropriate to the completed using LM5 mill to 90% passing 75%µm. RC samples are Boyd crushed to -4mm.

  • grain size of the material being sampled.

  • Measures taken to ensure that the sampling • All samples are dried at 80° for up to 24 hours and weighed. DD Samples are then crushed through Jaques

  • is representative of the in situ material crusher to nominal -10mm. Second stage crushing uses

  • collected, including for instance results for Boyd crusher to nominal -4mm. Pulverising is

  • field duplicate/second-half sampling.

  • Whether sample sizes are appropriate to the completed using LM5 mill to 90% passing 75%µm. RC samples are Boyd crushed to -4mm.

  • grain size of the material being sampled. • Sample splits are weighed at a frequency of 1:20 and entered into the job results file. Pulverising is completed using LM5 mill to 90% passing 75%µm using wet sieving technique.

  • • 1:20 grind quality checks are completed for 90% passing 75%µm criteria to ensure representativeness of sub-samples.

  • • Sampling is carried out in accordance with Sandfire protocols as per industry best practice.

  • • The sample size is appropriate for the VHMS and Gold mineralisation styles.

  • • Sinclair diamond core is HQ and NQ2 size, sampled on geological intervals (0.2 m to 1.2 m), cut into half (NQ2) or quarter (HQ) core to give sample weights under 3 kg Samples were selected to weigh less than 3kg to ensure total preparation at the pulverization stage.

  • • Samples were submitted to ALS Chemex Laboratories for preparation. The sample preparation follows industry best practice where all drill samples are crushed and split to 1kg then dried, pulverized and (>85%) sieved through 75 microns to produce a 30g charge for 4-acid digest with an ICP-MS or AAS finish for base metals, and a 50g fire assay with an AAS finish for gold.

  • • QAQC protocols for all diamond drill sampling involved the use of Certified Reference Material (CRM) as assay standards. The insertion ratio of CRM standards was 1 in 25 with a minimum of 2 per batch. OREAS and Geostats standards were selected on their grade range and mineralogical properties.

  • • All QAQC controls and measures were routinely reviewed and reported on a sample submission, and drilling campaign basis.

  • • Duplicate samples were inserted at a frequency of 1 in 25, with placement determined by Ni grade and homogeneity.

  • • Sample size is considered appropriate for nickel sulphide mineralisation

  • Quality of • The nature, quality and appropriateness of • Sandfire samples are assayed using Mixed 4 Acid assay data the assaying and laboratory procedures used Digest (MAD) 0.3g charge and MAD Hotbox 0.15g and laboratory and whether the technique is considered charge methods with ICPOES or ICPMS. The samples tests partial or total. are digested and refluxed with a mixture of acids including Hydrofluoric, Nitric, Hydrochloric and

21

Criteria JORC Code explanation Commentary

For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.

Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Perchloric acids and conducted for multi elements
including Cu, Pb, Zn, Ag, As, Fe, S, Sb, Bi, Mo, Re, Mn,
Co, Cd, Cr, Ni, Se, Te, Ti, Zr, V, Sn, W and Ba. The
MAD Hotbox method is an extended digest method that
approaches a total digest for many elements however
some refractory minerals are not completely attacked.
The elements S, Cu, Zn, Co, Fe, Ca, Mg, Mn, Ni, Cr, Ti,
K, Na, V are determined by ICPOES, and Ag, Pb, As,
Sb, Bi, Cd, Se, Te, Mo, Re, Zr, Ba, Sn, W are
determined by ICPMS. Samples are analysed for Au,
Pd and Pt by firing a 40g of sample with ICP AES/MS
finish. Lower sample weights are employed where
samples have very high S contents. This is a classical
FA process and results in total separation of Au, Pt and
Pd in the samples.

No geophysical tools are used in the analysis.

Sandfire DeGrussa QAQC protocol is considered
industry standard with standard reference material
(SRM) submitted on regular basis with routine samples.
SRMs and blanks are inserted at a minimum of 5%
frequency rate.

Sinclair drill samples were submitted to ALS Chemex
Laboratories in Perth for multi-element analysis using a
1g charge with a multi-acid digest and ICP-MS or AAS
finish (OG62). Analytes include Al, Fe, Mg, Mn, S, Ti,
Ag, As, Co, Cr, Cu, Ni, Pb, V, Zn, Zr.

Samples are analysed for Au, by firing a 50g of sample
with AAS finish

QAQC protocols for all drill sampling involved the use of
Certified Reference Material (CRM) as assay standards.
The insertion ratio of CRM standards was 1 in 33 with a
minimum of two per batch. OREAS and Geostats
standards are selected on their grade range and
mineralogical properties.

All drill assays are required to conform to the procedural
QAQC guidelines as well as routine laboratory QAQC
guidelines.

All QAQC controls and measures were routinely
reviewed and reported on a monthly, quarterly and
annual basis. Historic results for all standards and
duplicates indicate most performing well within the two
standard deviation limit.

Lab checks (repeats) occurred at a frequency of 1 in 25.
These alternate between both the pulp and crush
stages.

Portable XRF instruments are used only for qualitative
field analysis. No portable XRF results are reported.
Verification of
sampling and
assaying

The verification of significant intersections by
either independent or alternative company
personnel.

The use of twinned holes.

Significant intersections have been verified by alternate
Talisman personnel.

Sandfire primary data is captured on field tough book
laptops using Logchief™ Software. The software has
validation routines and data is then imported into a
secure central database.
  • Criteria JORC Code explanationFor geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

  • Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established.

Criteria JORC Code explanation Commentary

For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.

Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and
precision have been established.
Perchloric acids and conducted for multi elements
including Cu, Pb, Zn, Ag, As, Fe, S, Sb, Bi, Mo, Re, Mn,
Co, Cd, Cr, Ni, Se, Te, Ti, Zr, V, Sn, W and Ba. The
MAD Hotbox method is an extended digest method that
approaches a total digest for many elements however
some refractory minerals are not completely attacked.
The elements S, Cu, Zn, Co, Fe, Ca, Mg, Mn, Ni, Cr, Ti,
K, Na, V are determined by ICPOES, and Ag, Pb, As,
Sb, Bi, Cd, Se, Te, Mo, Re, Zr, Ba, Sn, W are
determined by ICPMS. Samples are analysed for Au,
Pd and Pt by firing a 40g of sample with ICP AES/MS
finish. Lower sample weights are employed where
samples have very high S contents. This is a classical
FA process and results in total separation of Au, Pt and
Pd in the samples.

No geophysical tools are used in the analysis.

Sandfire DeGrussa QAQC protocol is considered
industry standard with standard reference material
(SRM) submitted on regular basis with routine samples.
SRMs and blanks are inserted at a minimum of 5%
frequency rate.

Sinclair drill samples were submitted to ALS Chemex
Laboratories in Perth for multi-element analysis using a
1g charge with a multi-acid digest and ICP-MS or AAS
finish (OG62). Analytes include Al, Fe, Mg, Mn, S, Ti,
Ag, As, Co, Cr, Cu, Ni, Pb, V, Zn, Zr.

Samples are analysed for Au, by firing a 50g of sample
with AAS finish

QAQC protocols for all drill sampling involved the use of
Certified Reference Material (CRM) as assay standards.
The insertion ratio of CRM standards was 1 in 33 with a
minimum of two per batch. OREAS and Geostats
standards are selected on their grade range and
mineralogical properties.

All drill assays are required to conform to the procedural
QAQC guidelines as well as routine laboratory QAQC
guidelines.

All QAQC controls and measures were routinely
reviewed and reported on a monthly, quarterly and
annual basis. Historic results for all standards and
duplicates indicate most performing well within the two
standard deviation limit.

Lab checks (repeats) occurred at a frequency of 1 in 25.
These alternate between both the pulp and crush
stages.

Portable XRF instruments are used only for qualitative
field analysis. No portable XRF results are reported.
Verification of
sampling and
assaying

The verification of significant intersections by
either independent or alternative company
personnel.

The use of twinned holes.

Significant intersections have been verified by alternate
Talisman personnel.

Sandfire primary data is captured on field tough book
laptops using Logchief™ Software. The software has
validation routines and data is then imported into a
secure central database.

22

Criteria JORC Code explanation Commentary

Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.

Discuss any adjustment to assay data.

The primary data is always kept and is never replaced
by adjusted or interpreted data.

Sinclair significant intercepts have been verified by
alternate company personnel

No twinned holes are being drilled as part of this
program.

Logging and sampling data is captured and imported
using Expedio Ocris software.

All Sinclair drill-hole, sampling and assay data is stored
in a SQL server (Datashed) database. Assay data is
reviewed via DataShed, QAQCR and other customised
software and databases. Datashed software has
numerous validation checks which are completed at
regular time intervals.

Primary assay data is always kept and is not replaced
by any adjusted or interpreted data.
Location of
data points

Accuracy and quality of surveys used to
locate drill-holes (collar and down- hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.

Specification of the grid system used.

Quality and adequacy of topographic control.

Sandfire DeGrussa Survey team undertakes survey
works under the guidelines of best industry practice. All
surface drilling is located using RTK-GPS.

All drill collars are accurately surveyed using RTK GPS
system within +/-50mm of accuracy (X, Y, Z).

For the Springfield project MGA94 Zone 50 grid
coordinate system is used.

Topographic control was established using LiDar laser
imagery technology.

Historic drill collars locations were picked up by Sinclair
Mine Surveyors, with an independent survey contract
group to locate completed DD and RC drill collars,
working under the guidelines of best industry practice.

AC drill collars are located using handheld GPS

The coordinate system used is the Geocentric Datum of
Australia (GDA) 1994. Coordinates are in the Map Grid
of Australia zone 51 (MGA).
Data spacing
and
distribution

Data spacing for reporting of Exploration
Results.

Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.

Whether sample compositing has been
applied.

Infill drilling at Monty is based on a nominal 30m x 40m
grid.

Resource definition drill spacing and distribution of
exploration results is sufficient to support Mineral
Resource Estimation procedures. Refer ASX:SFR
13/04/2016 Maiden High Grade Mineral Resource for
Monty VMS Deposit

Exploration drill spacing outside of the Monty Mineral
Resource is not sufficient to estimate Mineral
Resources.

No sample compositing has been applied to the
exploration results.

Drill spacing at Sinclair was nominally 200m x 25m.

No mineral resource is being reported for the Sinclair
Nickel Project.

23

Criteria JORC Code explanation Commentary

AC drill samples are collected in the field as 4 metre
composite samples.
Orientation of
data in relation
to geological
structure

Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering
the deposit type.

If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.

At Monty, no significant orientation based sampling bias
is known at this time.

The drill holes may not necessarily be perpendicular to
the orientation of the intersected mineralisation.

The orientation of drilling at Sinclair is designed to
intersect either geophysical targets or geological targets
at high angle in order to best represent stratigraphy.

No significant orientation based sampling bias at
Sinclair is known at this time. Drill-holes may not
necessarily be oriented perpendicular to intersected
stratigraphy or mineralisation. All reported intervals are
down-hole intervals, not true widths.
Sample
security

The measures taken to ensure sample
security.

Appropriate security measures are taken to dispatch
samples to the laboratory. Chain of custody of samples
is being managed by Sandfire Resources NL. Samples
are stored onsite and transported to laboratory by a
licenced transport company in sealed bulker bags. The
laboratory receipts received samples against the
sample dispatch documents and issues a reconciliation
report for every sample batch.

Samples were stored at the Sinclair Nickel Mine Site
prior to submission under the supervision of the Senior
Project Geologist. Samples were transported to ALS
Perth by an accredited courier service.
Audits or
reviews

The results of any audits or reviews of
sampling techniques and data.

No external audits or reviews of the sampling
techniques and data have been completed.

24

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section)

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or
national park and environmental settings.

The security of the tenure held at the time of
reporting along with any known impediments
to obtaining a licence to operate in the area.

Sandfire Resources NL and Talisman Mining Limited
have formed a Joint Venture which covers Talisman’s
Doolgunna Project tenements (E52/2282, E52/2313,
E52/2466, E52/2275).

Sandfire and Talisman hold a 70%:30% interest
respectively in the Joint Venture, with the exception
of
tenement
E52/2275
where
interests
of
approximately 81%:19% respectively are held.

Both parties are contributing proportionately to
expenditure.

Sandfire Resources NL has been appointed as the
Joint Venture Manager.

All tenements are current and in good standing.

The Talisman tenements are currently subject to a
Native Title Claim by the Yungunga-Nya People
(WAD6132/98). Sandfire currently has a Land Access
Agreement in place with the Yungunga-Nya Native
Title Claimants and have assumed management of
Heritage Agreements which were executed by
Talisman. These agreements allow Sandfire to carry
out mining and exploration activities on their
traditional land.

The Sinclair Nickel Project is held 100% by Talisman
Nickel Pty Ltd, a wholly owned subsidiary of Talisman
Mining Ltd.

There are no known Native Title Claims over the
Sinclair Nickel Project.

All tenements are in good standing and there are no
existing known impediments to exploration or
mining.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration
by other parties.

Exploration work at Springfield completed prior to
Talisman’s tenure included geochemical soil and rock
chip sampling combined with geological mapping.
Some targeted RC drilling was completed over gold
and diamond targets.

The Sinclair Nickel Deposit was discovered in 2005
by Jubilee Mines NL drill testing a ground EM
anomaly.

M37/1275 hosts the Sinclair Nickel Mine which was
operated by XNAO from 2007-2013 and produced
approximately 38,500 tonnes of contained nickel
metal.

Exploration work on has included diamond, RC and
aircore drilling, ground and downhole EM surveys,
soil sampling, geological interpretation and other
geophysics (magnetics, gravity).

25

Criteria JORC Code explanation Commentary
Geology
Deposit type, geological setting and style of
mineralisation.

The Doolgunna Project lies within the Proterozoic-
aged Bryah rift basin enclosed between the Archaean
Marymia Inlier to the north and the Proterozoic
Yerrida basin to the south.

The principal exploration targets at the Doolgunna
Projects are Volcanogenic Massive Sulphide (VMS)
deposits located with the Proterozoic Bryah Basin of
Western Australia.

The Sinclair project lies within the Archean aged
Norseman-Wiluna Greenstone Belt.

The Sinclair Nickel Deposit is an example of an
Archaean-aged komatiite-hosted nickel deposit, with
massive nickel- iron sulphides hosted at or near the
basal contact of high-MgO ultramafic lava channels
with footwall basaltic volcanic and sedimentary rocks.
Drill-hole
Information

A summary of all information material to the
understanding of the exploration results
including a tabulation of the following
information for all Material drill-holes:

easting and northing of the drill-hole collar

elevation or RL (Reduced Level –
elevation above sea level in metres) of the
drill-hole collar

dip and azimuth of the hole

down hole length and interception depth

hole length.

If the exclusion of this information is justified
on the basis that the information is not
material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain why
_this is the case. _

Drill hole information relating to the Doolgunna
Project is included In Table 4: Drill-hole Information
Summary, Springfield Cu-Au Project.
Data
aggregation
methods

In reporting Exploration Results, weighting
averaging techniques, maximum and/or
minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually
material and should be stated.

Where aggregate intercepts incorporate short
lengths of high grade results and longer
lengths of low grade results, the procedure
used for such aggregation should be stated
and some typical examples of such
aggregations should be shown in detail.

The assumptions used for any reporting of
metal equivalent values should be clearly
stated.

Significant intersections reported from the Springfield
Project are based on greater than 0.5% Cu and may
include up to a maximum of 3.0m of internal dilution,
with a minimum composite grade of 1.0% Cu.

Cu
grades
used
for
calculating
significant
intersections are uncut.

Minimum and maximum DD sample intervals used for
intersection
calculation
are
0.3m
and
1.2m
respectively.

RC reported intersections are based on regular 1m
sample intervals.

No metal equivalents are used in the intersection
calculation.

Where core loss occurs; the average length-weighted
grade of the two adjacent samples are attributed to
the interval for the purpose of calculating the
intersection. The maximum interval of missing core
which can be incorporated with the reported
intersection is 1m.

26

Criteria JORC Code explanation Commentary

Significant intersections reported from the Sinclair
Nickel Project are based on greater than 0.5% Ni
and may include up to 1m of internal dilution, with a
minimum composite grade of 1% Ni.

Ni grades used for calculating significant
intersections are uncut.

A minimum diamond core sample interval of 0.15m
and a maximum interval of 1m is used for
intersection calculations subject to the location of
geological boundaries.

Length weighted intercepts are reported for
mineralised intersections.

No metal equivalents are used in the intersection
calculations.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important
in the reporting of Exploration Results.

If the geometry of the mineralisation with
respect to the drill-hole angle is known, its
nature should be reported.

If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole length,
true width not known’).

Drill-hole intercepts relating to the Doolgunna Project
in this release are reported as both down-hole
intersection
widths
and
estimated
true
width
intersections (refer Table 5: Drill hole assay
intersections for the Springfield Cu-Au Project).

The geometry of the mineralisation has been
interpreted using top of mineralisation surfaces that
link mineralised zones, thought to be continuous,
between neighbouring drill-holes. Given the variable,
and often steeply dipping orientation of the
mineralisation, the angle between mineralisation and
drill-holes is not consistent. Downhole intercepts for
each drill-hole are converted to estimated true widths
using a trigonometric function that utilises the dip and
dip direction of the interpreted top of mineralisation
surface (at the intersection point of that drill-hole) as
well as the dip and azimuth of the drill-hole at that
position.
Diagrams
Appropriate maps and sections (with scales)
and tabulations of intercepts should be
included for any significant discovery being
reported These should include, but not be
limited to a plan view of drill-hole collar
locations and appropriate sectional views.

Appropriate maps with scale are included within the
body of the accompanying document.
Balanced
reporting

Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
_Results. _

The accompanying document is considered to
represent a balanced report.
Other
substantive
exploration
data

Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;

Other exploration data collected is not considered as
material to this document at this stage. Other data
collection will be reviewed and reported when
considered material.

27

Criteria JORC Code explanation Commentary
potential deleterious or contaminating
substances.
Further work
The nature and scale of planned further work
(e.g. tests for lateral extensions or depth
extensions or large-scale step-out drilling).

Diagrams clearly highlighting the areas of
possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.

Planned exploration across the Springfield Joint
Venture Project area includes both surface and
down-hole
geophysical
techniques
and
reconnaissance
and
exploration
drilling
with
diamond, RC and aircore drilling techniques.

Planned future work at the Sinclair Nickel Project
includes geophysical surveys, re-logging of historic
diamond drill core and RC and diamond drilling.

28

APPENDIX 4

Mineral Resource and Ore Reserve estimates and Production Target

Talisman confirms that all the material assumptions underpinning the Monty Ore Reserve and the forecast financial information derived from the Monty Ore Reserve announced to the ASX on 5 April 2017[5] continue to apply and have not materially changed.

Mineral Resource estimate on 100% Basis

Mineralisation
Style
Mineral
Resource
Category 6
Tonnes (t)6 Copper
(%)
Gold
(g/t)
Contained
Copper (t)6
Contained
Gold (oz)6
Massive Sulphides Indicated 754,000 12.0 2.1 91,000 51,000
Inferred 9,000 20.7 2.7 2,000 1,000
Total 763,000 12.1 2.1 92,000 52,000
Halo Indicated 287,000 2.2 0.3 6,000 3,000
Inferred - - - - -
Total 287,000 2.2 0.3 6,000 3,000
Total Indicated 1,041,000 9.3 1.6 97,000 54,000
Inferred 9,000 20.7 2.7 22,000 1,000
**Total ** 1,050,000 9.4 1.6 99,000 55,000

Table 6: Mineral Resource estimate for the Monty deposit (100% basis)

Ore Reserve estimate and Mine Plan on 100% Basis as at 31 March 2017

Reserve Category Tonnes (t)6 Copper (%) Gold (g/t) Contained Copper (t)6 Contained Gold (oz)6
Proved - - - - -
Probable 920,000 8.7 1.4 80,000 42,000
Total 920,000 8.7 1.4 80,000 42,000
Mine Plan 800,000 9.4 1.5 74,000 38,000

Table 7: Ore Reserve estimate and Mine Plan for the Monty deposit (100% basis)

Ore Reserve estimate and Mine Plan on Talisman 30% Basis as at 31 March 2017

Reserve Category Tonnes (t)6 Copper (%) Gold (g/t) Contained Copper (t)6 Contained Gold (oz)6
Proved - - - - -
Probable 280,000 8.7 1.4 24,000 13,000
Total 280,000 8.7 1.4 24,000 13,000
Mine Plan 240,000 9.4 1.5 22,000 11,000

Table 8: Ore Reserve estimate and Mine Plan for the Monty deposit (30% basis)

5 Please refer to TLM ASX announcement: “Monty Feasibility Study Results”, dated 6 April 2017 for further details and description of the financial parameters & summary of key Monty Feasibility Study financial return outcomes. 6 Figures rounded to the nearest thousand

29

Operating parameters (Talisman 30% basis) Units FS
(Mar 2017)
Pre-production mine development months 12
Ore production mine life months 30
Total mined ore kt 239
Copper head grade (LOM avg) % Cu 9.35
Gold head grade (LOM avg) g/t Au 1.50
Silver head grade (LOM avg) g/t Ag 16.2
Total copper-in-ore mined kt 22.3
Total gold-in-ore mined koz 11.5
Total silver-in-ore mined koz 124.0
Total payable copper metal kt 19.9
Total payable gold metal koz 5.7
Total payable silver metal koz 56.2

Table 9: Monty Feasibility Study Operational Results (Talisman 30% attributable basis)

30