Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

TALISMAN MINING LIMITED Interim / Quarterly Report 2014

Jul 29, 2014

65926_rns_2014-07-29_d4609c17-a24d-4651-8931-e5c0a9c91a14.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

30[th] July 2014

COMPANY SNAPSHOT

June 2014 Quarterly Activities Report

Board of Directors

Alan Senior Non-Executive Chairman

Gary Lethridge Managing Director

Graeme Cameron Technical Director

Brian Dawes Non-Executive Director

Karen Gadsby Non-Executive Director

Doolgunna Copper-Gold Projects - Sandfire Resources Exploration Farm-in

  • On-ground field exploration activities by Sandfire Resources NL commenced at the Springfield Project late in the Quarter following a period of data compilation, review and assessment.

  • In early June Sandfire commenced activities along the interpreted extension of the DeGrussa Mine Corridor including:

  • a series of high-powered down-hole electromagnetic (DHEM) geophysical surveys of previous Talisman drill holes; and

  • the first stage of a four stage fixed loop electromagnetic (FLEM) geophysical survey.

Contact Details

6 Centro Avenue Subiaco, Western Australia, 6008 Australia

Telephone: + 61 8 9380 4230

Facsimile: + 61 8 9382 8200

Email:

[email protected]

Website: www.talismanmining.com.au

Capital Structure

Shares on Issue: 131,538,627 (TLM)

Options on Issue: 8,750,000 (Unlisted) ASX: TLM

  • The first stage of the FLEM survey was completed across a portion of the Homer Prospect and in collaboration with geophysical consultants Newexco, Sandfire identified a priority late-time EM conductor at approximately 400m depth and approximately 5km east of the DeGrussa Copper Mine.

  • In late June, Sandfire commenced a diamond drill hole to test the interpreted position of this EM conductor.

  • This deep diamond drill hole will also be used to establish a platform for DHEM to assist in better vectoring to the EM target and also to test for additional conductors at depth and away from the principle EM target.

  • In July, Sandfire commenced the next three stages of the FLEM geophysical surveys at Homer.

Business Development

  • Active project identification and due diligence activities continue with several exploration project opportunities currently under detailed assessment with a clear commodity focus on nickel sulphide, copper and/or gold projects located within Australia.

Corporate and Investment

  • Cash reserves of $16.1 million at 30 June.

  • Significant savings in the cost of doing business effected during the Quarter.

Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, SubiacoWestern Australia 6008 www.talismanmining.com.au

June 2014 Quarterly Activities Report

- Exploration Farm in Joint Venture with Sandfire Resources NL

In December 2013, Talisman secured the involvement of leading Australian copper producer Sandfire Resources NL (ASX: SFR) in the next phase of exploration of its Doolgunna copper-gold projects through a $15 million exploration farm-in joint venture (refer ASX release 20[th] December 2013). The Letter Agreement covers Talisman’s interests in the Springfield , Halloween and Halloween West JV Projects.

Talisman’s Springfield Projec t lies immediately along strike, to the east; from Sandfire’s operating DeGrussa Copper-Gold mine, and the Halloween and Halloween West JV Projects abut Sandfire’s Doolgunna Project to the west ( see Figure 1 ). These Projects are interpreted to contain extensions of the volcanic rock package which hosts the DeGrussa VMS deposits. The exploration farm-in enables the two companies to work together and share local exploration knowledge in order to target potential copper-gold discoveries at these projects.

==> picture [344 x 441] intentionally omitted <==

Following the completion of the Exploration Farm-in Joint Venture Agreement, Talisman provided a copy of its extensive, high-quality Doolgunna Project datasets to Sandfire. Full integration, processing and evaluation of these datasets by Sandfire is ongoing with a focus on identification of initial priority target areas along the extended DeGrussa Mine Corridor at Springfield.

This work has already identified a combined 65km strike length of prospective Volcanogenic Massive Sulphide (VMS) horizon across the combined Talisman and Sandfire tenements, providing a significantly expanded search horizon for potential new VMS deposits ( see Figure 1 )

This technically driven and systematic approach by Sandfire’s in-house exploration team is being supported by Talisman technical personnel as well as external expert consultants including Newexco.

Figure 1 - Talisman’s Doolgunna Copper-Gold Projects subject to the $15M Exploration Farmin Joint Venture with Sandfire and interpreted DeGrussa Mine Corridor and regional geology

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

- - High Powered Electromagnetic Surveys at the Springfield Project Copper Gold Project

A critical step towards robust new target generation is the compilation, integration and evaluation of the Talisman geophysical datasets in combination with data collated by Sandfire during the exploration, discovery and development of the DeGrussa Mine.

Sandfire has demonstrated considerable capability with the successful discovery of the “blind” C4 and C5 mineralised lenses at DeGrussa using these high-energy electromagnetic methods and has the ability to apply these same techniques over targets on the Doolgunna JV Projects.

During the June Quarter, Sandfire completed Stage 1 of a four-stage high-powered fixed-loop electromagnetic (FLEM) survey across the Homer Prospect. This four stage survey will ultimately cover approximately 1.6km of the prospective DeGrussa host horizon at Springfield (see Figure 2 ).

This survey was designed to provide a better test, beyond the extent of previous ground electromagnetic surveys, for the presence of electromagnetic conductors which could represent accumulations of massive sulphides similar to the DeGrussa copper-gold VMS lenses.

==> picture [513 x 381] intentionally omitted <==

Figure 2: Springfield Project geology showing the interpreted DeGrussa Mine Corridor, approximate position of the late-time EM conductor, the diamond hole and the area of completed and proposed EM surveys.

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

This is the first time Sandfire’s high-energy geophysical techniques have been deployed along the extension of the DeGrussa Mine Corridor at Springfield. As at the end of the Quarter, Sandfire had completed Stage 1 of the planned four-stage FLEM survey.

Sandfire also completed high-energy DHEM surveys on four out of six drill-holes previously drilled by Talisman at the Homer Prospect. The results from the Stage 1 high-energy FLEM survey and the four completed DHEM surveys were integrated with existing data sets and analysed by Sandfire with input from their geophysical consultants, Newexco.

This analysis resulted in the detection of a late-time conductor which is interpreted to sit within the extension of the prospective DeGrussa stratigraphic horizon (see Figure 2 ). This conductor is located approximately 5km east of the DeGrussa Copper-Gold Mine.

Late in the Quarter, Sandfire commenced a single diamond drill hole, of approximately 900m, with the aim of intersecting the modelled conductor at a target depth of approximately 400m. This drill hole will also be used by Sandfire to establish a platform for further down-hole EM to better define the position of the existing target as well as potentially identifying other conductors in the vicinity; both at depth and away from this principal EM target.

Subsequent to the end of the Quarter, Sandfire advised that the next three stages of the FLEM survey commenced during the latter part of July.

Murchison Exploration Projects

Livingstone Project (TLM 80%)

The Livingstone Project is located approximately 130km to the north-west of Meekatharra (see Appendix 1) and covers an area of 208 km². The Project straddles the western extension of the prospective Bryah Basin at the northern margin of the Yilgarn Craton. A major shear zone traverses the entire Project with widespread gold intercepts returned by historic percussion drilling programs over a strike length of more than 31km.

A site visit was conducted to Livingstone during the Quarter to complete RC drill site rehabilitation of a first pass 4-hole RC drilling program completed in November 2013 at the Kerba Prospect.

The principal exploration target at Kerba is a Voisey Bay (or Nova)-style magmatic nickel-copper-PGE sulphide mineralization associated with the basal contact of the host mafic-ultramafic intrusion.

A recent review highlighted that the basal contact of the main peridotite body lies to the south of the current drilling and as such remains untested. Further mapping and surface geochemistry is under consideration at Kerba to check for evidence of nickel sulphide accumulation along this untested basal contact position.

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

Muddawerrie Gold Project (TLM 80%)

The Muddawerrie Project is located approximately 100km north-west of Meekatharra in the Murchison Region of Western Australia (see Appendix 1). The Project covers an area of approximately 52km² and comprises a prospective Archaean greenstone belt with significant potential to host high-grade, banded iron formation (BIF) and mafic-hosted shear zone gold deposits, similar to those at Mt Magnet and Meekatharra.

A field visit was made to Muddawerrie in the first week of June to further ground truth several gold-in-soil anomalies and to help refine sites for potential first pass RC drilling to test these targets.

At least six areas of interest have been identified from this work which are associated with a sheared banded-iron formations and/or basalt horizons cross-cut by a series of NW and NE-trending faults.

Shelby Project (TLM 100%)

The 1,816 km² Shelby Project is located along the northern margin of the Bryah Basin approximately 30km north of the Horseshoe Lights Copper-Gold Mine (see Appendix 1). On the basis of its geological setting, Talisman has identified the Shelby Project as having the potential to host large Iron Oxide-Copper-Gold (IOCG) deposits (e.g. Olympic Dam, Prominent Hill) and/or a Voisey’s Bay-style mafic-ultramafic intrusive hosted nickel-copper-PGE sulphide deposit.

==> picture [408 x 243] intentionally omitted <==

Figure 3 – Shelby Project Gravity Image and position of drill hole SHD001A

In May 2011, Talisman completed an initial 1,452m-deep diamond hole (SHD001A) cofunded as part of the WA State Government Exploration Incentive Scheme (EIS) and designed to test a large magnetic body identified by a detailed airborne magnetic survey (see Figure 3 ).

This drilling identified strong IOCG-style magnetite alteration (and minor chalcopyrite) associated with ultra-

mafic intrusions beneath younger cover with several other magnetic anomalies identified along a major regional structure that may be associated with similar intrusive bodies. The mafic-ultramafic rocks and strong magnetiteamphibole-chlorite alteration intersected by SHD001A demonstrated encouraging evidence that Shelby could host a large iron oxide-copper-gold mineralising system.

The Company is seeking a strategic joint venture partner to further advance the Shelby Project.

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

Milgun Project (TLM 100%)

The Milgun Project is located approximately 20km north west of the Shelby Project and covers a potential northern outlier of the Bryah Basin (see Appendix 1). The Milgun Project is interpreted to be located within a tectonically uplifted block of Bryah basement rocks. It is interpreted that basement uplift is an effective mechanism for focused fluid flow and possible copper-gold and gold mineralisation.

A field visit was conducted in June to the Milgun Project to assess several historical geophysical and geochemical copper-gold targets (see Figure 4 ) and to identify areas of interest for possible follow-up exploration activities.

==> picture [531 x 349] intentionally omitted <==

Figure 4 – Milgun geology showing gold anomalies and magnetic targets.

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

CORPORATE

At the end of the Quarter, Talisman held cash of $16.1 million.

Business Development

Having secured external exploration funding for the Doolgunna Copper-Gold Projects via the exploration farmin agreement with Sandfire, Talisman is actively seeking to secure high-quality exploration assets.

Principal commodities under consideration are nickel sulphide, copper and gold.

Talisman continues to undertake active identification, review and assessment activities focused upon the acquisition of new exploration projects located within Australia. During the Quarter, detailed due diligence on selected projects was undertaken or is currently underway.

During the Quarter, the Company made application for exploration ground that had become available in an area that was assessed as being prospective. Identification of this area stems from a strategic high-level targeting exercise undertaken by Talisman in 2013 to identify terrains and exploration assets with the potential to host quality copper-gold mineralisation.

This new project, Killara, comprises 68 blocks over an area of 210km² and is located approximately 75kms north of Meekatharra.

Cost Saving Initiatives

During the Quarter the Company initiated a significant reduction in its fixed costs of doing business. These cost reduction initiatives included:

  • Agreement by all directors, executive and non-executive, to accept a 15% salary / director’s fees reduction effective from 1 July 2015. This reduction follows on from a 10% reduction effected previously from 1 July 2013.

  • A reduction in the number of full time staff during the Quarter.

  • A reduction of approximately 60% of annual office accommodation and associated costs; secured for the next two years.

Investment & Royalty Update – Ochre Group Holdings Limited Announce Revised Terms

Subsequent to the end of the June Quarter, Ochre Group Holdings Limited (“Ochre” - ASX: OGH) announced revised terms to its proposed transaction to sell the Wonmunna Iron Ore Project, located in the Pilbara region of Western Australia to Ascot Resources Limited (“Ascot” - ASX: AZQ) - refer OGH & AZQ announcements on 3[rd] July 2014 .

Talisman holds 35.5 million ordinary shares in Ochre which currently represents approximately 5.9% of Ochre’s issued capital. This investment was acquired in 2011 as part consideration for the sale of the Wonmunna Iron Ore Project to Ochre at that time.

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

In addition, Talisman also holds a 1% gross revenue royalty attributable to the Wonmunna Project which is proposed to be assigned from Ochre to Ascot under the terms of the proposed transaction between the two companies.

ENDS

For further information, please contact: Gary Lethridge – Managing Director on +61 8 9380 4230

For media inquiries, please contact: Nicholas Read – Read Corporate on +61 419 929 046

Competent Persons’ Statement

Information in this ASX release that relates to Exploration Results and Mineral Resources is based on information compiled by Mr Graeme Cameron, who is a member of the Australasian Institute of Mining and Metallurgy. Mr Graeme Cameron is a full time employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and types of deposit under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Graeme Cameron consents to the inclusion in this report of the matters based on information in the form and context in which it appear.

==> picture [194 x 9] intentionally omitted <==

----- Start of picture text -----

Appendix 1 – Talisman Mining Ltd Project locations
----- End of picture text -----

==> picture [482 x 375] intentionally omitted <==

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

Appendix 2 – Talisman Mining Tenement Schedule as at 30[th] June 2014

Project/Tenement Location
and
blocks
(Area)
Interest at
Beginning
Quarter
Interest
at End
Quarter
Acquired
during
Quarter
Disposed
during
Quarter
Joint Venture
Partner/Farm-In
Party
**HALLOWEEN WEST ** W.Australia
E52/2275 6 60% 63% - - JV -Chrysalis Resources
Farm-in - Sandfire
Resources Ltd
HALLOWEEN W.Australia
P52/1241 (200HA) 100% 100% - - SandfireResourcesLtd
LIVINGSTONE W.Australia
E52/2565 15 80% 80% - - ZebinaMineralsPtyLtd
E52/2566 31 80% 80% - - Zebina Minerals Pty Ltd
E52/2593 24 80% 80% - - ZebinaMineralsPtyLtd
P52/1423 (195 HA) 100% 100% - -
E52/2931 2 100% 100% - -
**MILGUN ** W.Australia
E52/2281 41 100% 100% - -
E52/2708 21 100% 100% - -
MUDDAWERRIE W.Australia
E51/1447 17 80% 80% - - Zebina Minerals Pty Ltd
SHELBY W.Australia
E52/2499 42 100% 100% - -
E52/2500 36 100% 100% - -
E52/2519 3 100% 100% - -
E52/2628 29 100% 100% - -
E52/2629 9 100% 100% - -
E52/2634 19 100% 100% - -
SPRINGFIELD W.Australia
E52/2282 70 100% 100% - - Sandfire Resources Ltd
E52/2313 14 100% 100% - - Sandfire Resources Ltd
E52/2466 14 100% 100% - - Sandfire Resources Ltd
KILLARA W.Australia
E51/1643 68 0% 0% Application -

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

Appendix 3 - JORC TABLE 1

Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections)

Criteria JORC Code explanation Commentary
Sampling
techniques
 Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down-hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
 Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
 Aspects of the determination of
mineralisation that are Material to the
Public Report.
 In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed
information.

Sampling methods employed by Sandfire include half-core
sampling of NQ2 core from diamond drilling (DD).

Sampling is guided by Sandfire DeGrussa protocols and
QAQC procedures as per industry standard.

Pulp samples are fused into a glass bead by the
combination of 0.4g of assay sample plus 9.0g flux XRF analysis.
A 40g and 0.15g assays charges are used for FA and mixed acid
digest respectively.

Sandfire core samples are routinely sampled for SG
determination.
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).

Sandfire diamond drilling is completed by DD rig with a core
size of NQ2.

All surface drill collars are surveyed using RTK GPS.

Holes are inclined at varying angles for optimal ore zone
intersection from the drilling position.

All core where possible is oriented using a Reflex ACT II RD
orientation tool with stated accuracy of +/-1% in the range 0 to
88°.

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

Drill sample
recovery

Method of recording and assessing core
and chip sample recoveries and results
assessed.

Measures taken to maximise sample
recovery and ensure representative nature
of the samples.

Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.

Sandfire core is meter marked and orientated to check against
the driller’s blocks, ensuring that all core loss is taken into
account.

Diamond core recovery is logged and captured into the
database with weighted average core recoveries of approximately
99%. Sample quality is routinely captured in the database.

Samples are routinely weighed and captured into a central
secured database.

No sample recovery issues have impacted on potential
sample bias.
Logging
Whether core and chip samples have
been geologically and geotechnically logged
to a level of detail to support appropriate
Mineral Resource estimation, mining studies
and metallurgical studies.

Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.

The total length and percentage of the
relevant intersections logged.

Sandfire geological logging is completed for all holes and
representative across the ore body. The lithology, alteration,
and structural characteristics of core are logged
directly to a digital format following standard procedures and
using Sandfire DeGrussa geological codes. Data is imported
into the central database after validation in LogChief™.

Logging is both qualitative and quantitative depending on field
being logged.

All cores are digitally photographed and stored.
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and whether
quarter, half or all core taken.

If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.

For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.

Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-
half sampling.

Whether sample sizes are appropriate to
the grain size of the material being sampled.

Sandfire diamond core orientation is completed where
possible and all are marked prior to sampling. Half core
samples are produced using Almonte Core Saw. Samples are
weighed and recorded.

Sandfire sample preparation at UltraTrace in Perth involves
the original samples being dried at 80° for up to 24 hours and
weighed. DD Samples are then crushed through Jaques crusher
to nominal -10mm. Second stage crushing uses Boyd crusher to
nominal -4mm.. Pulverising is completed using LM5 mill to 90%
passing 75%µm.

Sandfire has protocols that cover auditing of sample
preparation at the laboratories and the collection and assessment
of data to ensure accurate steps in producing representative
samples for the analytical process. Key performance indices
include contamination index of 90% (that is 90% blanks pass);
Crush Size index of P95-10mm; Grind Size index of P90-75µm
and Check Samples returning at worse 20% precision at 95%
confidence interval and bias of 5% or better.

Duplicate analysis is routinely completed.

The sample size is appropriate for the VHMS and Gold
mineralisation styles.

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

Quality of
assay data and
laboratory tests

The nature, quality and appropriateness
of the assaying and laboratory procedures
used and whether the technique is
considered partial or total.

For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make
and model, reading times, calibrations
factors applied and their derivation,
etc.

Nature of quality control procedures
adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.

Sandfire samples submitted to Ultra Trace in Perth are
assayed using Mixed 4 Acid Digest (MAD) 0.3g charge and
MAD Hotbox 0.15g charge methods with ICPOES or ICPMS.
The samples are digested and refluxed with a mixture of acids
including Hydrofluoric, Nitric, Hydrochloric and Perchloric acids
and conducted for multi elements including Cu, Pb, Zn, Ag, As,
Fe, S, Sb, Bi, Mo, Re, Mn, Co, Cd, Cr, Ni, Se, Te, Ti, Zr, V, Sn, W
and Ba. The MAD Hotbox method is an extended digest method
that approaches a total digest for many elements however some
refractory minerals are not completely attacked. The elements S,
Cu, Zn, Co, Fe, Ca, Mg, Mn, Ni, Cr, Ti, K, Na, V are determined
by ICPOES, and Ag, Pb, As, Sb, Bi, Cd, Se, Te, Mo, Re, Zr, Ba,
Sn, W are determined by ICPMS. Samples are analysed for Au,
Pd and Pt by firing a 40g of sample with ICP AES/MS finish.
Lower sample weights are employed where samples have very
high S contents. This is a classical FA process and results in total
separation of Au, Pt and Pd in the samples.

Sandfire DeGrussa QAQC protocol is considered industry
standard with standard reference material (SRM) submitted on
regular basis with routine samples.

Sandfire insert SRMs and blanks at a minimum of 5%
frequency rate. A minimum of 2% of assays are routinely re-
submitted as Check Assays and Check Samples through blind
submittals to external and primary laboratories respectively.
Adhoc umpire checks are completed annually.
Verification of
sampling and
assaying

The verification of significant
intersections by either independent or
alternative company personnel.

The use of twinned holes.

Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic) protocols.

Discuss any adjustment to assay data.

No significant drilling intersections are reported in this report.

No twinned holes are being drilled as part of this
programme.

Primary data is captured on field tough book laptops using
Logchief™ Software. The software has validation routines and
data is then imported into a secure central database.

The primary data is always kept and is never replaced by
adjusted or interpreted data.
Location of
data points

Accuracy and quality of surveys used to
locate drill holes (collar and down- hole
surveys), trenches, mine workings and other
locations used in
Mineral Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic
control.

Sandfire DeGrussa Survey team undertakes survey works
under the guidelines of best industry practice.

Downhole survey completed by electronic multishot systems.

MGA94 Zone 50 grid coordinate system is used.
Data spacing
and distribution

Data spacing for reporting of Exploration
Results.

Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade continuity
appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.

Whether sample compositing has been
applied.

Programme comprises a singular diamond drill hole
(TLD001).

No drilling results are reported.

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

Orientation of
data in relation
to geological
structure

Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.

If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.

Sandfire exploration holes are oriented to achieve high
angles of intersection. Diamond drilling is used as required to
determine structural orientations in regional programs.
Sample
security

The measures taken to ensure sample
security.

All samples are prepared onsite under the supervision of
Sandfire Geological staff.

Sandfire samples are transported to the Perth Ultra Trace
laboratory by Toll IPEC or Nexus transport companies in sealed
bulka bags, or to the onsite laboratory by company personnel.

The laboratories receipt received samples against the sample
dispatch documents and issues a reconciliation report for every
sample batch.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.

The Sandfire sampling techniques and data collection
processes are of industry standard and have been subjected to
multiple internal and external reviews.

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.

The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.

Diamond drilling by Farm-in Partner Sandfire is on tenement
E52/2313. This lease is part of Talisman’s 100% owned
Springfield Project, 150km north-east of Meekatharra, WA. This
tenement falls within the Department of Conservation-managed
Doolgunna pastoral lease.

All Springfield tenements are current and in good standing.
Exploration
done by other
parties

Acknowledgment and appraisal of
exploration by other parties.

Exploration work at Springfield completed prior to Talisman’s
tenure included geochemical soil and rock chip sampling
combined with geological mapping. Some targeted RC drilling
was completed over gold and diamond targets.
Geology
Deposit type, geological setting and
style of mineralisation.

Talisman’s Doolgunna, Shelby, Milgun, Livingstone and
Killara Projects lie within the Proterozoic-aged Bryah rift basin
enclosed between the Archaean Marymia Inlier to the north and
the Proterozoic Yerrida basin to the south.

Talisman’s Muddawerrie Projects lie within the Archaean-
aged Mt Maitland greenstone belt 100km NW of Meekatharra in
the Murchison region of Western Australia

The principal exploration targets at the Doolgunna Projects
are Volcanogenic Massive Sulphide (VMS) deposits located with
the Proterozoic Bryah Basin of Western Australia.

The principal exploration targets at the Livingstone and
Muddawerrie Projects are orogenic gold and magmatic nickel-
copper-PGE sulphide deposits.

The principal exploration targets at the Shelby and Milgun
Projects are Iron-Oxide Copper-Gold (IOCG), magmatic Ni-Cu-
PGE and VMS deposits.

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

Drill hole
Information

A summary of all information material to
the understanding of the exploration results
including a tabulation of the following
information for all Material drill holes:
oeasting and northing of the drill hole
collar
oelevation or RL (Reduced Level –
elevation above sea level in metres)
of the drill hole collar
odip and azimuth of the hole
odown hole length and interception depth
ohole length.
If the exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not detract
from the understanding of the report, the
Competent Person should clearly explain
why this is the case.

Diamond drillhole TLD001
Location: 740150E, 7174150N, 590.479mRL.
Azimuth: 360
Dip: -60
Proposed Depth: 900m
Data
aggregation
methods

In reporting Exploration Results,
weighting averaging techniques, maximum
and/or minimum grade truncations (e.g.
cutting of high grades) and cut-off grades
are usually Material and should be stated.

Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation should
be stated and some typical examples of
such aggregations should be shown in
detail.

The assumptions used for any reporting
of metal equivalent values should be clearly
stated.

No drilling intersections reported.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly
important in the reporting of
Exploration Results.

If the geometry of the mineralisation with
respect to the drill-hole angle is known, its
nature should be reported.

If it is not known and only the down hole
lengths are reported, there should be a clear
statement to this effect (e.g. ‘down hole
length, true width not
known’).

No drilling intersections reported.
Diagrams
Appropriate maps and sections (with
scales) and tabulations of intercepts should
be included for any significant discovery
being reported These should include, but not
be limited to a plan view of drill hole collar
locations and appropriate sectional views.

Appropriate maps with scale are included within the body of
the accompanying document.

No drilling intersections reported.

==> picture [612 x 41] intentionally omitted <==

June 2014 Quarterly Activities Report

Balanced
reporting

Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and high
grades and/or widths should be practiced to
avoid misleading reporting of Exploration
Results.

The accompanying document is considered to represent a
balanced report.
Other
substantive
exploration
data

Other exploration data, if meaningful and
material, should be reported including (but
not limited to): geological observations;
geophysical survey results; geochemical
survey results; bulk samples – size and
method of treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock characteristics;
potential deleterious or contaminating
substances.

Other exploration data collected is not considered as material
to this document at this stage. Further data collection will be
reviewed and reported when considered material.
Further work
The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).

Diagrams clearly highlighting the areas
of possible extensions, including the main
geological interpretations and future drilling
areas, provided this information is not
commercially sensitive.

Further work is contingent on the outcomes of current drilling
and ground electromagnetic surveys.

==> picture [612 x 41] intentionally omitted <==