TALISMAN MINING LIMITED Interim / Quarterly Report 2014

Oct 28, 2014

65926_rns_2014-10-28_6062fa03-f4e2-4118-9ae4-6b6e502ecd0f.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

29[th] October 2014 COMPANY SNAPSHOT

Board of Directors

Alan Senior Non-Executive Chairman

Gary Lethridge Managing Director

Graeme Cameron Technical Director

Brian Dawes Non-Executive Director

Karen Gadsby Non-Executive Director

Contact Details

6 Centro Avenue Subiaco, Western Australia, 6008

Telephone: +61 8 9380 4230

Facsimile: +61 8 9382 8200

Email:

[email protected]

Website:

www.talismanmining.com.au

September 2014 Quarterly Activities Report

Sinclair Nickel Project Acquisition

  • Talisman has secured an outstanding growth opportunity in one of the world’s premier nickel sulphide provinces after reaching a binding agreement with Xstrata Nickel Australasia Operations Pty Ltd, a subsidiary of Glencore, to acquire the Sinclair Nickel Project.

  • Sinclair (originally discovered by Jubilee Mines NL in 2005 and placed on care & maintenance in August 2013) is an advanced, high quality nickel sulphide project located in the southern portion of WA’s Agnew-Wiluna Greenstone Belt.

  • The acquisition includes extensive, near-new mine and surface infrastructure and a 300,000tpa nickel concentrate plant.

  • Sinclair offers outstanding exploration upside by confirming the extension of the Sinclair nickel deposit along strike and beyond the end of existing mining development.

  • Other immediate near-mine targets exist within the Stirling and Skye channels, located adjacent to and below the Sinclair deposit.

  • The broader Sinclair Project includes a highly prospective 300km[2] tenement package which hosts extensive ultramafic rock packages and numerous walk-up nickel sulphide drill targets.

Doolgunna Copper-Gold Projects – JV with Sandfire Resources

  • Preliminary observations from the initial phases of exploration at the Springfield Project have delivered significant geological encouragement, confirming that Springfield contains interpreted extensions of the volcanic rock package which hosts the DeGrussa VMS deposits.

  • Based on this early encouragement, Sandfire has advised that the following activities are ongoing or have been completed at Springfield:

  • Initial 1,099m diamond hole completed confirming that the Project hosts the interpreted extensions to the DeGrussa mine stratigraphy;

  • Extensive aircore drilling completed across the Homer Trend;

Capital Structure

Shares on Issue: 131,538,627 (TLM)

Options on Issue: 8,250,000 (Unlisted) ASX: TLM

  • Additional aircore drilling programs underway at Monty and the Central Corridor;

  • High-powered ground and down-hole electro-magnetic surveys ongoing across the prospective sequences; and

  • Detailed low-level litho-chemical analysis of current and historical drill samples underway.

  • The aim of these tightly focused, multi-disciplined exploration campaigns is to assist Sandfire in generating robust DeGrussa-style exploration targets at Springfield for potential drill testing later this year or early 2015.

Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco, Western Australia 6008 www.talismanmining.com.au

September 2014 Quarterly Activities Report

Sinclair Nickel Project Acquisition

==> picture [98 x 134] intentionally omitted <==

During October, Talisman secured an outstanding growth opportunity in one of the world’s premier nickel sulphide provinces after reaching agreement to acquire the Sinclair Nickel Project from Xstrata Nickel Australasia Operations Pty Ltd, a subsidiary of Glencore. This acquisition marks the culmination of an extensive search for suitable, value- accretive resource projects throughout Australia and represents a transformational opportunity for the Company.

Located in the prolific Agnew-Wiluna Greenstone Belt in WA’s Northeastern Goldfields (see Figure 1 ), Sinclair is an advanced nickel sulphide project with extensive, nearnew and well-maintained infrastructure and, importantly, outstanding exploration upside.

The Project will provide Talisman with a unique combination of immediate exploration potential that, with success, offers optionality to fasttrack a return to production, subject to prevailing nickel prices.

In light of the strong market outlook for nickel in the medium term, Talisman believes that Sinclair represents a rare transformational opportunity.

Figure 1: The Sinclair Nickel Project showing regional geology nickel production centres and reported contained nickel of the Agnew-Wiluna Belt (MINDEX 2012)

Sinclair Nickel Project Overview

The Sinclair Nickel Project is located in the southern portion of the Agnew-Wiluna Belt in Western Australia, one of the world’s premier nickel provinces with over 9 million tonnes of reported contained nickel metal (see Figure 1 ).

The Sinclair nickel deposit was discovered by the former highly successful nickel miner and explorer, Jubilee Mines NL, in October 2005 and was developed and commissioned in 2008. The project was operated successfully before being placed on care and maintenance in August 2013, having produced approximately 38,500 tonnes of nickel at an average life-of-mine head grade of 2.44% Ni.

Sinclair offers an exceptional Australian nickel sulphide exploration opportunity, including potential immediate extensions of the Sinclair deposit itself, advanced near-mine targets within close proximity of the existing mine infrastructure, as well as a number of drill-ready emerging exploration prospects within a 30km radius of the mine.

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Sinclair Nickel Project Infrastructure

The Sinclair Nickel Project includes extensive new-near infrastructure including an existing open-cut and underground mine, an on-site 300,000tpa Concentrator, sealed airstrip and +200-person accommodation village. The process plant and mine were placed on care and maintenance in August 2013 and have been maintained to a very high standard.

Key infrastructure associated with the Sinclair Nickel Project includes (see Figure 2 ):

==> picture [352 x 419] intentionally omitted <==

  • Open pit, decline and underground mine;

  • Processing, crushing and screening plant;

  • Nickel Concentrate plant;

  • Run-of-Mine (“ROM”) pad;

  • Waste dump and topsoil stockpiles;

  • Tailings storage facility;

  • 200-person accommodation village and facilities;

  • Administration buildings;  Fully-equipped maintenance and stores warehouse;

  • and stores warehouse;

  • Core yard and exploration offices;

  • Borefield and pipelines; 

  • Mining contractor facilities;

  • Reverse Osmosis plant and potable water pipelines; and

  • Waste-water treatment plant.

The availability of this extensive, high quality infrastructure package represents a significant strategic advantage to Talisman, as, subject to exploration success and the prevailing global nickel price, it provides optionality to potentially fasttrack a future production pathway.

Figure 2: Aerial photo of the Sinclair Nickel Project showing key mine and processing infrastructure

Sinclair Nickel Deposit Extension

The Sinclair deposit comprises an elongated body of massive and heavily disseminated sulphide mineralisation with a shallow plunge of around 20 degrees to the north (see Figure 3 ). The underground operation mined the deposit to around 445m below surface and offers a near-mine nickel sulphide exploration opportunity within the down-plunge extensions of the Sinclair ore body.

Nickel mineralisation at Sinclair continues down-plunge beyond the current underground mine infrastructure and has been identified in drilling for a further 1km along strike from the end of actual mining development.

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

The first 350m of this continuation has been drilled at a sufficient density to potentially enable Inferred Resource classification, but beyond that the continuation of the Sinclair down-plunge mineralisation has only limited drilling for a further 790m on a 100-200m spaced drill pattern (see Figure 3 ).

==> picture [518 x 211] intentionally omitted <==

Figure 3: Sinclair Nickel deposit longitudinal projection with mine development showing mineralised Ni drill intercepts greater than 2% Ni beyond the limit of existing mine development

Consequently, the nickel sulphide mineralisation in the down-plunge position, beyond the existing mine development, has not been classified at this time as being a JORC compliant resource (see Figure 3 ).

Significant intersections of nickel sulphide mineralisation beyond the current mine development include (see Table 1 and Appendix 2 ):

  • CWD381 4.35m @ 2.38% Ni

  • CWD381B 14.95m @ 1.64% Ni ( including 5.63m @ 2.64% Ni)

  • CWD545A 18.44m @ 1.74% Ni ( including 9.33m @ 2.31% Ni)

  • CWD535B 6.34m @ 3.32% NiCWD546C 9.30m @ 2.77% Ni

Of note is that underground mining in some of the final mining levels yielded significant increases in mineralised volume compared with the geological model (as defined by surface diamond drilling). These additions were realised where the vertical extent of mineralisation was greater than could be identified with 1520m spaced drilling from surface.

The dip and orientation of the Sinclair ore body coupled with the existing broad drill spacing across the mine extension position is large enough to miss significant mineralisation, as demonstrated by the last four northernmost drill traverses which intersected high-grade mineralisation with grades greater than 2.5% Ni over widths of up to 9m.

In addition, there is a strong correlation between DHEM responses and nickel sulphide mineralisation at Sinclair, demonstrating that EM is an effective tool in identifying potential massive nickel sulphides. Multiple DHEM plates within the Sinclair deposit extension support the continuity of the mineralisation and the potential to identify additional mineralisation down-plunge and along strike from the existing mineral inventory (see Figure 4 ).

==> picture [596 x 40] intentionally omitted <==

==> picture [596 x 60] intentionally omitted <==

----- Start of picture text -----

September 2014 Quarterly Activities Report
----- End of picture text -----

==> picture [517 x 203] intentionally omitted <==

Figure 4: Sinclair Nickel deposit longitudinal projection with mine development, drill traces and existing DHEM plates within the Sinclair deposit extension

Talisman will undertake detailed assessment of this opportunity as part of its Sinclair mine extension exploration strategy.

Near-Mine Exploration Potential – Skye and Stirling

The Sinclair Project also offers outstanding near-mine exploration potential along two additional mineralised ultramafic channels at the Skye and Stirling Prospects which have been identified to the south and trend underneath and parallel to the main Sinclair ore body (see Figure 5 ). Significantly, both occur within an ultramafic rock type similar in style to the Sinclair ultramafic, but at much greater volumes.

==> picture [537 x 176] intentionally omitted <==

Figure 5: Longitudinal projection showing Stirling, Skye ultra-mafic channels, nickel sulphide intercepts, late-time EM plates in close proximity to the existing Sinclair Mine infrastructure and areas not tested by drilling

The Skye and Stirling mineralisation shows strong similarities to the Sinclair ore body and the two emerging channels are associated with at least two basal positions along a complexly folded high-MgO ultramafic body. Both prospects contain drilling on a 50m x 20m pattern at their near-surface positions, but are largely untested down-plunge and to the north beneath Sinclair (see Figure 5 ).

These two nickel sulphide bearing channels show good down-plunge continuity and several late-time EM conductors remain to be tested for thicker and/or higher grade mineralisation beneath the Sinclair deposit (see Figure 5 ). These target areas represent the main exploration opportunity at the near-mine Skye and Stirling Prospects.

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Mineralisation at Sinclair is known to pinch and swell; therefore, if these EM conductors are as extensive as their size and conductivity indicate, they could represent new nickel sulphide ore bodies proximal to the existing Sinclair mine infrastructure. Given that positions up-plunge and to the south of these EM conductors are known to carry massive nickel sulphide mineralisation, these EM targets present as highly prospective exploration targets.

Sinclair Trend – A pipeline of exploration opportunities

Within an 8km strike length along the Sinclair Trend, several exploration prospects contain substantial volumes of near-surface prospective high-MgO ultramafic rock; have coincident ground and down-hole EM targets and existing nickel sulphide intersections warranting follow up assessment.

Target areas include Delphi, Parnassus and Cody Well which are hosted along strike and within the Sinclair Trend (see Figure 6 ). An integrated and systematic exploration approach is required in these areas in order to test for significant massive nickel sulphide mineralisation away from previous drilling and associated with strongly conductive EM targets along the mineralised contact.

A prioritised review of the project’s electromagnetic data, is planned to be conducted (using expert geophysical analysis) to assist in developing and identifying potential drill targets.

==> picture [534 x 182] intentionally omitted <==

Figure 6: Sinclair Trend longitudinal projection showing 8km of strike extent, late-time EM plates and historical mineralised intercepts

Regional Exploration

The Sinclair Nickel Project includes an extensive 300km[2 ] tenement package covering at least five known ultramafic volcanic sequences which are considered prospective for massive nickel sulphide mineralisation.

Numerous nickel occurrences have been identified through historical drilling across the Project (see Figure 7 ) including at the following exploration prospects:

  • Marriott’s;

  • Babylon;

  • Carthage;

  • Antioch; and

  • Schmitz Well Prospects

==> picture [596 x 40] intentionally omitted <==

==> picture [596 x 60] intentionally omitted <==

----- Start of picture text -----

September 2014 Quarterly Activities Report
----- End of picture text -----

Other regional prospects (see Figure 7 ) including Schmitz Well South and Pink Well host several walk-up drilling targets associated with known EM anomalies with coincident surface nickel geochemistry.

Neither of these prospects have been drill tested to date and will form part of Talisman’s future regional exploration strategy at the Sinclair Nickel Project.

Figure 8: Sinclair Nickel Project tenements showing at least 5 highly prospective ultramafic trends and prospect areas

Figure 7: Sinclair Nickel Project showing known ultra-mafic volcanic sequences considered prospective for massive nickel sulphide mineralisation over regional geology

Transaction Details

Talisman Nickel Pty Ltd, a wholly owned subsidiary of Talisman Mining Limited, has entered into a binding Sale and Purchase Agreement with Xstrata Nickel Australasia Operations Pty Ltd, a subsidiary of Glencore to acquire 100% of the Sinclair Nickel Project.

The consideration for the acquisition of the Sinclair Nickel Project consists of:

  • a cash payment of $8 million payable at completion of the transaction; and

  • a deferred payment of $2 million triggered by production recommencing within 6 years of transaction completion.

The contingent consideration is to be paid six months following the receipt of the first payment for the sale of nickel product.

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Talisman will assume all environmental liabilities and obligations associated with the Sinclair Nickel Project.

Talisman has agreed to grant Glencore the right to make an offer for off-take for the first 20,000 tonnes of contained nickel-in-concentrate produced from the Sinclair Nickel Project. Talisman may accept or reject this offer. Glencore has also been granted the right to match the best 3[rd] party off-take offer should Talisman elect to seek alternative offers.

Completion of the acquisition is subject to the following:

  • Ministerial consent under the Mining Act 1978 (WA) to the transfer of tenements; and

  • Potential relevant regulatory approvals (if any are required).

- - Doolgunna Copper Gold Projects (Farm in JV with Sandfire Resources)

Talisman has an extensive portfolio of high-quality VMS copper-gold exploration projects in the Bryah Basin region of Western Australia. Leading Australian copper producer Sandfire Resources NL (ASX: SFR) is funding active exploration at these projects as part of a joint venture farm-in. Sandfire has the right to earn up to a 70% interest in Talisman’s Doolgunna Projects by spending $15 million on exploration over five-and-a-half years.

Talisman’s Doolgunna Projects comprise the Springfield , Halloween and Halloween West Projects ( see Figure 8) , which abut Sandfire’s DeGrussa-Doolgunna tenements and contain extensions of the volcanic rock package which hosts the DeGrussa VMS deposits.

==> picture [498 x 375] intentionally omitted <==

Figure 8: Talisman Mining Ltd Doolgunna Project locations

==> picture [596 x 40] intentionally omitted <==

==> picture [596 x 60] intentionally omitted <==

----- Start of picture text -----

September 2014 Quarterly Activities Report
----- End of picture text -----

The preliminary observations from the initial phases of exploration at the Springfield Project have already delivered significant geological encouragement, confirming that Springfield contains interpreted extensions of the volcanic rock package which hosts the DeGrussa VMS deposits.

During the Quarter, exploration continued with detailed Aircore (AC) drilling conducted by Sandfire across the Homer Trend at the Springfield Project, with a total of 12,486m drilled (see Figure 9 ). Geological units encountered included sediments, mafic volcanic sediments, dolerites and basalts, which are interpreted to be consistent with the geology encountered along the DeGrussa corridor on Sandfire’s tenements. Assay results for this drilling are pending and a detailed interpretation of the geochemical and geological information will begin early in the December Quarter once all results have been returned.

To assist with future modelling and interpretation, 1,131 pulp samples are being re-assayed for detailed low detection level multi-element analysis. The samples were targeted from the fresh rock interface in historical drilling completed by Talisman. Analysis and interpretation of the data collected will continue in the December Quarter, as the final assays are received.

==> picture [511 x 358] intentionally omitted <==

Figure 9: Aircore drilling and the existing DDH and RC holes flushed as part of the ongoing EM surveying being undertaken across the Springfield Project; simplified geology as background

TLDD0001, the first Sandfire diamond hole drilled on the Talisman JV project, was completed in early August, with an end-of-hole depth of 1,099m (see Figure 9 ). The hole was designed to target an off-hole conductor identified during DHEM surveying of historical Talisman drill holes.

Preliminary analysis of the DHEM did not provide a clear in-hole explanation for the late-time EM target or a definitive conductor within the immediate environment (80-100m) of TLD0001.

==> picture [596 x 40] intentionally omitted <==

==> picture [596 x 60] intentionally omitted <==

----- Start of picture text -----

September 2014 Quarterly Activities Report
----- End of picture text -----

Re-interpretation of all EM in the Homer Prospect will be completed by Newexco Services. However, the hole intersected a package of rocks potentially analogous to the DeGrussa C1 host horizon from 931.10m to 967.97m.

The package consists of siliciclastic rocks with variable haematite alteration, ranging from unaltered to pervasively altered. Sporadic jasper clasts were observed throughout the package. Within the most altered component of the package, a narrow zone of strong silicification, banded magnetite and fine sulphides was intersected from 957.08m to 957.50m. Assaying has not identified any economic mineralisation although trace element signatures will be investigated in the December Quarter.

The haematitic, jasper and magnetite-rich sediments with sulphides are likely to represent an exhalite horizon that may be related to a volcanogenic massive sulphide system. 22 samples have been submitted for detailed litho-geochemical analysis and LA-ICPMS analysis. This work is ongoing.

High-powered down-hole DHEM (down-hole electro-magnetic surveying) and FLEM (fixed-loop electromagnetic surveying) are key tools in VHMS exploration, and these geophysical techniques have proven to be successful in the DeGrussa environment. Accordingly, they will be extensively deployed across the interpreted prospective stratigraphy at the Springfield Project in the coming months.

During the Quarter, preparation for DHEM programs continued within the Springfield area with flushing and casing of a total of 23 RC and diamond drill holes within E52/2282 and E52/2313 in preparation for DHEM surveys later this Quarter (see Figure 9 ).

==> picture [497 x 350] intentionally omitted <==

Figure 10: Completed and planned FLEM loops as part of the ongoing EM survey programs

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

The first phase of FLEM surveys, consisting of four 1,200m by 1,000m high-power FLEM loops covering the northern extension of the DeGrussa Formation at Homer, was completed towards the end of the June Quarter.

The second phase of the program commenced during the September Quarter, consisting of 19 loops encompassing a large proportion of the DeGrussa Formation mafic sediment extension and projected fold hinge to the east, along strike from DeGrussa (see Figure 10 ). Before the end of the Quarter, the crew had completed the first four loops and submitted the data to Newexco for analysis. This work program is ongoing.

In addition to the current extensive work completed at Homer, further activities will continue to allow for a more holistic geological interpretation of the Central Corridor, Monty Prospect and Southern Volcanics to be developed. These programmes include:

  • Continued high-powered FLEM program with Phases Two and Three scheduled to be completed before the end of the calendar year;

  • High-powered DHEM surveying of 23 deep holes drilled historically by Talisman across the Homer and Monty prospects as well as the Central Corridor;

  • Continued geochemical aircore drilling programmes over the Central Corridor, Southern Volcanics and Monty Prospects; and

  • Commencement of a detailed interpretation of the geology of the Homer trend incorporating, surface AC drilling, DHEM, FLEM, and low-level multi-element analysis.

It is anticipated that the integration and assessment of the data received from these tightly focused, multidisciplined exploration campaigns will assist Sandfire in generating robust DeGrussa-style exploration targets at Springfield for potential drill testing later this year or early 2015.

Murchison Exploration Projects

Livingstone Project (TLM 80%)

The Livingstone Project is located approximately 130km to the north-west of Meekatharra and covers an area of 208 km². The Project straddles the western extension of the prospective Bryah Basin at the northern margin of the Yilgarn Craton. A major shear zone traverses the entire Project with widespread gold intercepts returned by historical drilling programs over a strike length of more than 31km.

In general, this large and extensively mineralised structure has not been subject to systematic exploration.

Work by Talisman in 2013/14 has identified a coherent 1.8km long Ni-Cu-PGE-in-soil anomaly associated with a prominent ovoid, magnetic body at the Kerba Prospect, thought to be related to a mafic-ultramafic intrusion along a major cratonic margin.

This geological setting is interpreted to be prospective for Voisey’s-Bay style magmatic Ni-Cu-PGE sulphide mineralization in Proterozoic mafic-ultramafic intrusive rocks.

No field work was conducted during the Quarter.

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Muddawerrie Gold Project (TLM 80%)

The Muddawerrie Project is located approximately 100km north-west of Meekatharra in the Murchison Region of Western Australia (see Appendix 1). The Project covers an area of approximately 52km² and comprises a prospective Archaean greenstone belt with significant potential to host high-grade, banded iron formation (BIF) and mafic-hosted shear zone gold deposits, similar to those at Mt Magnet and Meekatharra.

Extensive geological mapping, prospecting and soil sampling work by Talisman has identified at least six areas of interest associated with sheared banded-iron formations and/or basalt horizons cross-cut by a series of NW and NE-trending faults.

No fieldwork was completed during the Quarter, however Permits-of-Work for follow-up drilling have been received from the DMP and first-pass RC drilling is being considered to further test several geochemical anomalies and geological structures.

Shelby Project (TLM 100%)

The 1,816 km² Shelby Project is located along the northern margin of the Bryah Basin approximately 30km north of the Horseshoe Lights Copper-Gold Mine (see Appendix 1). On the basis of its geological setting, Talisman has identified the Shelby Project as having the potential to host large Iron OxideCopper-Gold (IOCG) deposits (e.g. Olympic Dam, Prominent Hill) and/or a Voisey’s Bay-style maficultramafic intrusive hosted nickel-copper-PGE sulphide deposit.

In May 2011, Talisman completed an initial 1,452m-deep diamond hole (SHD001A) which was co-funded as part of the WA State Government Exploration Incentive Scheme (EIS) and designed to test a large magnetic body identified by a detailed airborne magnetic survey.

This drilling identified strong IOCG-style magnetite alteration (and minor chalcopyrite) associated with ultramafic intrusions beneath younger cover with several other magnetic anomalies identified along a major regional structure that may be associated with similar intrusive bodies. The mafic-ultramafic rocks and strong magnetite-amphibole-chlorite alteration intersected by SHD001A demonstrated encouraging evidence that Shelby could host a large iron oxide-copper-gold mineralising system.

The Company is seeking a strategic joint venture partner to further advance the Shelby Project.

Milgun Project (TLM 100%)

The Milgun Project is located approximately 20km north west of the Shelby Project and covers a potential northern outlier of the Bryah Basin (see Appendix 1). The Milgun Project is interpreted to be located within a tectonically uplifted block of Bryah basement rocks. It is interpreted that basement uplift is an effective mechanism for focused fluid flow and possible copper-gold and gold mineralisation.

No field activities were conducted, however an assessment of the Project’s gold potential commenced during the September Quarter.

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Killara Project (TLM -application for 100%)

The Killara Project is located approximately 75kms north of Meekatharra (see Appendix 1) and comprises three large tenements covering an area of 370 sq km over the northern margin of the Yerrida Basin. This structural position is thought to be highly prospective for sediment-hosted and VHMS-style copper mineralisation and was identified as a result of a strategic high-level targeting exercise undertaken by Talisman in 2013 to identify terrains and exploration assets with the potential to host quality copper-gold mineralisation.

As the tenements are still in the application phase, no field activities were conducted, however a detailed literature review and assessment of the Project’s mineralisation potential commenced during the September Quarter.

CORPORATE

At the end of the Quarter, Talisman held cash of $15.4 million.

Investment & Royalty Update – Ochre Group Holdings Limited disposes of Wonmunna Iron Ore Project to Ascot Resources Limited

During the September Quarter, Ochre Group Holdings Limited (“Ochre” – ASX: OGH) completed the sale of the Wonmunna Iron Ore Project, located in the Pilbara region of Western Australia, to Ascot Resources Limited (“Ascot” - ASX: AZQ) – refer OGH & AZQ announcements on 23rd September 2014.

Talisman holds 35.5 million ordinary shares in Ochre which currently represents approximately 5.9% of Ochre’s issued capital. This investment was acquired in 2011 as part consideration for the sale of the Wonmunna Iron Ore Project to Ochre at that time.

In addition, Talisman also holds a 1% gross revenue royalty attributable to the Wonmunna Project which has been assigned from Ochre to Ascot under the terms of the transaction between the two companies.

ENDS

For further information, please contact: Gary Lethridge – Managing Director on +61 8 9380 4230

For media inquiries, please contact: Nicholas Read – Read Corporate on +61 419 929 046

Competent Persons’ Statement

Information in this ASX release that relates to Exploration Results and Mineral Resources is based on information compiled by Mr Graeme Cameron, who is a member of the Australasian Institute of Mining and Metallurgy. Mr Graeme Cameron is a full time employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and types of deposit under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Graeme Cameron consents to the inclusion in this report of the matters based on information in the form and context in which it appear.

==> picture [596 x 40] intentionally omitted <==

==> picture [596 x 60] intentionally omitted <==

----- Start of picture text -----

September 2014 Quarterly Activities Report
----- End of picture text -----

Table 1 – Intercepts greater than 2% Ni from the Sinclair Nickel Deposit Extension

Hole ID East
(MGA)
North
(MGA)
RL
(MGA)
Dip Azimuth From
(m)
Intersection
CWD405 290674 6861658 428.54 -75.08 84.26 698.55 [email protected]% Ni
CWD536D 290613 6862160 432 -74 76.41 947.84 [email protected]% Ni
CWD541E 290561 6862356 430 -74 77 1058.13 [email protected]% Ni
CWD535B 290620 6861959 430.23 -75 79.01 837.3 [email protected]% Ni
CWD535A 290620 6861959 430.23 -75 79 833.99 [email protected]% Ni
CWD536A 290613 6862160 432 -74 76.24 939.65 [email protected]% Ni
CWD390 290708 6861558 428.18 -73 83 609.7 [email protected]% Ni
CWD546C 290626 6862058 425 -74 79 873.32 [email protected]% Ni
CWD543B 290608 6861409 428.37 -61 84 558.5 [email protected]% Ni
CWD381B 290749 6861459 427.98 -73 85 522.45 [email protected]% Ni
CWD541A 290561 6862356 430 -74 77 1030.32 [email protected]% Ni
CWD405C 290674 6861658 428.54 -75.08 84.26 691.31 [email protected]% Ni
CWD543B 290608 6861409 428.37 -61 84 554.09 [email protected]% Ni
CWD382 290775 6861459 427.92 -78 78 520.55 [email protected]% Ni
CWD381 290749 6861459 427.98 -73 85 549.18 [email protected]% Ni
CWD535C 290620 6861959 430.23 -75 79 829.57 [email protected]% Ni
CWD545A 290663 6861860 431.88 -74 79 780.72 [email protected]% Ni
CWD541E 290561 6862356 430 -74 77 1046.22 [email protected]% Ni
CWD381A 290749 6861459 427.98 -73 85 534.25 [email protected]% Ni
CWD414 290686 6861758 429 -74.81 81.97 742.46 [email protected]% Ni
CWD405C 290674 6861658 428.54 -75.08 84.26 683.54 [email protected]% Ni
CWD415 290736 6861758 428.47 -74.97 80.99 703.61 [email protected]% Ni
CWD541A 290561 6862356 430 -74 77 1026.1 [email protected]% Ni
CWD415D 290736 6861758 427 -74.97 80.99 701.74 [email protected]% Ni
CWD539A 290751 6861609 428.02 -77 83.91 624.5 [email protected]% Ni

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Appendix 1 – Talisman Mining Ltd Doolgunna Project locations

==> picture [483 x 364] intentionally omitted <==

==> picture [596 x 40] intentionally omitted <==

==> picture [596 x 60] intentionally omitted <==

----- Start of picture text -----

September 2014 Quarterly Activities Report
----- End of picture text -----

Appendix 2 – Talisman Mining Tenement Schedule as at 30[th] September 2014

Project/Tenement Location
and
blocks
(Area)
Interest at
Beginning
Quarter
Interest
at End
Quarter
Acquired
during
Quarter
Disposed
during
Quarter
Joint Venture
Partner/Farm-In
Party
**HALLOWEEN WEST ** W.Australia
E52/2275 6 63% 63% - - JV -Chrysalis Resources
Farm-in - Sandfire
Resources Ltd
HALLOWEEN W.Australia
P52/1241 (200HA) 100% 100% - - SandfireResourcesLtd
LIVINGSTONE W.Australia
E52/2565 15 80% 80% - - Zebina Minerals Pty Ltd
E52/2566 31 80% 80% - - Zebina Minerals Pty Ltd
E52/2593 24 80% 80% - - ZebinaMineralsPtyLtd
P52/1423 (195 HA) 100% 100% - -
E52/2931 2 100% 100% - -
MILGUN W.Australia
E52/2281 41 100% 100% - -
E52/2708 21 100% 100% - -
MUDDAWERRIE W.Australia
E51/1447 17 80% 80% - - ZebinaMineralsPtyLtd
SHELBY W.Australia
E52/2499 42 100% 100% - -
E52/2500 36 100% 100% - -
E52/2519 3 100% 100% - -
E52/2628 29 100% 100% - -
E52/2629 9 100% 100% - -
E52/2634 19 100% 100% - -
SPRINGFIELD W.Australia
E52/2282 70 100% 100% - - Sandfire Resources Ltd
E52/2313 14 100% 100% - - Sandfire Resources Ltd
E52/2466 14 100% 100% - - Sandfire Resources Ltd
KILLARA W.Australia
E51/1643 68 0% 0% - -
E51/1662 29 0% 0% Application
E51/1663 23 0% 0% Application

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Appendix 2 – JORC Table 1

Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.)

Criteria JORC Code Explanation Commentary
Sampling techniques Nature and quality of sampling (e.g.
cut
channels,
random
chips,
or
specific specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down
hole
gamma
sondes,
or
handheld
XRF
instruments,
etc.).
These examples should not be taken
as limiting the broad meaning of
sampling.
The Sinclair Nickel Deposit Extension describes the
Sinclair massive nickel sulphide mineralised position
defined by diamond drilling beyond the current mine
development i.e. from 6861350N to 6862350N.
The Sinclair Nickel Deposit Extension was drilled by
Xstrata Nickel Australasia Operations (XNAO) using
surface diamond drilling methods.
74 diamond drill holes have been drilled along the
Extension on 50m x 20m spacing stepping out to
100m/200m to the north of 6861750N.
All diamond drill holes reported in this report were
historically drilled by XNAO between 2007 and 2012.
Drill hole locations were designed to allow for 20m-
spaced intersections on sections across the Sinclair
mineralised zone.
Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems used.
Diamond core is HQ and NQ2 size, was sampled on
geological intervals (0.2 m to 1.2 m), cut into half (NQ2)
or quarter (HQ) core to give sample weights under 3 kg.
Samples were crushed, dried and pulverised (total prep)
to produce a sub sample for analysis by four acid digest
with an ICP/OES or AAS finish.
All drill hole collars were initially located using a
handheld DGPS device and subsequently picked up by
Mine Surveyors upon their completion.
Aspects
of
the
determination
of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’
work has been done this would be
relatively
simple
(e.g.
‘reverse
circulation drilling was used to obtain 1
m samples from which 3 kg was
pulverised to produce a 30 g charge
for fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types
(e.g. submarine nodules) may warrant
disclosure of detailed information.
Diamond drilling at the Sinclair Nickel Deposit Extension
was used to obtain 1 m or geologically selected core
samples which were crushed, dried and pulverised to
produce a 25g charge for 4-acid digest with an ICP-AES
or AAS finish.
A visual estimation of the percentage of mineralisation
was gathered as part of the standard XNAO geological
logging system.

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Drilling techniques Drill
type
(e.g.
core,
reverse
circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc.)
and details (e.g. core diameter, triple
or standard tube, depth of diamond
tails, face-sampling bit or other type,
whether core is oriented and if so, by
what method, etc.).
74 diamond drill holes have been drilled along the
Sinclair Nickel Deposit Extension on 50m x 20m spacing
stepping out to 100m/200m to the north of 6861750N.
All surface diamond drill holes along the Sinclair Nickel
Deposit Extension were completed using wedge drilling
techniques with up to 4 daughter holes drilled from a
single parent drill hole. Both HQ and NQ2 diameter core
was collected for logging and sampling purposes.
All drill holes were routinely surveyed using downhole
NSG Gyroscope survey tools.
All drill core was routinely orientated at nominal 6m
intervals using an EzyMark-OriBlock core orientation
system.
Drill sample recovery Method of recording and assessing
core and chip sample recoveries and
results assessed.
Diamond core recoveries are logged and recorded in the
Sinclair_Datashed_database. Core photography shows
overall recoveries >95%.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.
Diamond core was reconstructed into continuous runs on
an angle iron cradle for orientation marking. Depths were
checked against the depth given on the core blocks and
rod counts were routinely carried out by the drillers.
Whether a relationship exists between
sample recovery and grade and
whether
sample
bias
may
have
occurred due to preferential loss/gain
of fine/coarse material.
No indication of sample bias is evident or has been
established.
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
Logging of diamond core records lithology, mineralogy,
mineralisation, alteration, structure, weathering, colour
and other primary features of the rock samples.
Specific Gravity measurements were taken for all
diamond drill holes.
Whether logging is qualitative or
quantitative
in
nature.
Core
(or
costean, channel, etc.) photography.
Core was photographed in both dry and wet form.
The total length and percentage of the
relevant intersections logged.
All drill holes were logged in full to the end of each hole.
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
Diamond core is HQ and NQ2 size, sampled on
geological intervals (0.2 m to 1.2 m), cut into half (NQ2)
or quarter (HQ) core to give sample weights under 3 kg.
If non-core, whether riffled, tube
sampled, rotary split, etc. and whether
sampled wet or dry.
No non-core samples taken from the Sinclair Nickel
Deposit Extension
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
The sample preparation follows industry best practice
where all core samples are crushed and split to 1kg then
dried , pulverized and (>85%) sieved through 75 microns
to produce a 25g/30g charge for 4-acid digest with an
ICP-AES or AAS finish.

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
QAQC protocols for all diamond drill sampling involved
the use of Certified Reference Material (CRM) as assay
standards. The insertion ratio of CRM standards was 1 in
25 with a minimum of 2 per batch. OREAS and Geostats
standards were selected on their grade range and
mineralogical properties.
All QAQC controls and measures were routinely
reviewed and reported on a monthly, quarterly and
annual basis by XNAO.
Measures taken to ensure that the
sampling is representative of the in
situ material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Duplicate samples were inserted at a frequency of 1 in
25, with placement determined by Ni grade and
homogeneity.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
Samples were selected to weigh less than 3kg to ensure
total preparation at the pulverization stage.
Sample size is considered adequate for the rocks and
mineralisation styles encountered.
Quality of assay data
and laboratory tests
The
nature,
quality
and
appropriateness of the assaying and
laboratory
procedures
used
and
whether the technique is considered
partial or total.
All
drill
core
samples
were
submitted
to
ALS
Laboratories in Perth for multi-element analysis using a
25g charge with a 4-acid digest and ICP-AES or AAS
finish (OG62).
Analytes include Al, Fe, Mg, Mn, S, Ti, Ag, As, Co, Cr,
Cu, Ni, Pb, V, Zn, Zr
All ore-zone sampling underwent gravimetric analysis at
ALS Chemex via the OA-GRA08d method, which
calculates SG by the weight of the solvent (acetone) in
the pyncometer displaced.
For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make
and model, reading times, calibrations
factors applied and their derivation,
etc.
No handheld XRF results reported.
Not applicable to reporting of laboratory assay data.
Nature of quality control procedures
adopted
(eg
standards,
blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
QAQC protocols for all diamond drill sampling involved
the use of Certified Reference Material (CRM) as assay
standards. The insertion ratio of CRM standards was 1 in
25 with a minimum of 2 per batch. OREAS and Geostats
standards were selected on their grade range and
mineralogical properties.
All core assays were required to conform to the XNAO
procedural QAQC guidelines as well as routine
laboratory QAQC guidelines.
All QAQC controls and measures were routinely
reviewed and reported on a monthly, quarterly and
annual basis.
Generally excellent historic results for all standards and
duplicates with most performing well within the 2
standard deviation limit.
Lab checks (repeats) occurred at a frequency of 1 in 25.
These alternate between both the pulp and crush stages.
5% of all pulps were routinely submitted monthly to
Genalysis Laboratories in Perth for Umpire Sampling.

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Verification of
sampling and
assaying
The
verification
of
significant
intersections by either independent or
alternative company personnel.
The Talisman Technical Director has verified significant
drill intersections in drill hole data for the Sinclair Nickel
Deposit Extensional drilling.
The use of twinned holes. No twinned holes drilled.
Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
Logging and Sampling Data was captured and imported
using Maxwell’s LogChief software.
All Drill hole, Sampling and Assay data is stored in a
SQL server (Datashed) database.
AssayData is reviewed via DataShed, QAQCR and other
customised software and databases.
All assay QAQC controls were checked on a monthly,
quarterly and annual period, identifying any longer term
trends or patterns.
Datashed software has numerous validation checks
which were completed at regular time intervals.
XNAO database was audited annually by an external
consultant to ensure compliance.
Discuss any adjustment to assay data. No adjustments reported.
Specification of the grid system used. The coordinate system used is the Geocentric Datum of
Australia (GDA) 1994. Coordinates are in the Map Grid
of Australia zone 51 (MGA).
Quality and adequacy of topographic
control.
The relative level (RL) was determined using a DGPS
and picked up by Mine Surveyors at a later date.
Data spacing and
distribution
Data
spacing
for
reporting
of
Exploration Results.
74 diamond drill holes have been drilled along the
Sinclair Nickel Deposit Extension on 50m x 20m spacing
stepping out to 100m/200m to the north of 6861750N.
Whether
the
data
spacing
and
distribution is sufficient to establish the
degree
of
geological
and
grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s)
and
classifications
applied.
Not applicable. No resources reported.
Whether sample compositing has
been applied.
No sample compositing applied.
Orientation of data in
relation to geological
structure
Whether the orientation of sampling
achieves
unbiased
sampling
of
possible structures and the extent to
which this is known, considering the
deposit type.
The orientation of drilling was designed to intersect either
geophysical
targets
or geological
contacts
at a
perpendicular angle in order to reflect the true width of
stratigraphy.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
No known orientation-based sampling bias has been
identified.
Sample security The measures taken to ensure sample
security.
Samples were stored at the Sinclair Nickel Mine Site
prior to submission under the supervision of the Senior
Project Geologist. Samples were transported to ALS
Perth by an accredited courier service.

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Audits or reviews The results of any audits or reviews of None undertaken. sampling techniques and data.

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code Explanation Commentary
Mineral tenement and
land tenure status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such
as
joint
ventures,
partnerships,
overriding
royalties,
native
title
interests, historical sites, wilderness or
national
park
and
environmental
settings.
The Sinclair Nickel Deposit Extensional diamond drilling is
located within M37/1275 and M37/816.
Both tenements are subject to a binding Sale and Purchase
Agreement whereby Talisman Nickel Pty Ltd (a wholly
owned subsidiary of Talisman Mining Limited) is contracted
to acquire a 100% interest in these tenements and form
part of the Sinclair Nickel Project.
There are no known Native Title Claims over the Sinclair
Nickel Project.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a license to
operate in the area.
M37/816 expires on the 27thMarch 2029.
M37/1275 expires on the 279hJuly 2028.
M37/1275 and M37/816 are in good standing and there are
no existing known impediments to exploration or mining.
Exploration done by
other parties
Acknowledgment
and
appraisal
of
exploration by other parties.
M37/1275 hosts the Sinclair Nickel Mine which was
operated by XNAO from 2007-2013 and produced
approximately 38,500 tonnes of contained nickel metal.
The Sinclair Nickel Deposit was discovered in 2005 by
Jubilee Mines NL drill testing a ground EM anomaly.
Exploration work on M37/1275 and M37/816 has included
diamond, RC and Aircore drilling, ground and downhole EM
surveys, soil sampling, geological interpretation and other
geophysics (magnetics, gravity).
Geology Deposit type, geological setting and
style of mineralisation.
The Sinclair Nickel Deposit is an example of an Archaean-
aged komatiite-hosted nickel deposit, with massive nickel-
iron sulphides hosted at or near the basal contact of high-
MgO ultramafic lava channels with footwall basaltic
volcanic and sedimentary rocks.
Drill hole Information A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes: easting and northing of the drill
hole collar elevation or RL (Reduced
Level – elevation above sea level in
metres) of the drill hole collar dip and
azimuth of the hole down hole length
and interception depth hole length.
If the exclusion of this information is
justified
on
the
basis
that
the
information is not Material and this
exclusion does not detract from the
understanding
of
the
report,
the
Competent
Person
should
clearly
explain why this is the case.
Drillhole locations are shown in figures in body of text.
Refer to Appendix 2 – Significant nickel intersections from
the Sinclair Nickel Deposit Extension (greater than 2% Ni).
Data aggregation
methods
In
reporting
Exploration
Results,
weighting
averaging
techniques,
maximum
and/or
minimum
grade
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.
Significant intersections along the Sinclair Nickel Deposit
Extension were calculated using a weighted average
method. A lower cut off value of 1% nickel was used with a
minimum mineralised width of 0.1m, and maximum allowed
internal waste of 2m.

==> picture [596 x 40] intentionally omitted <==

September 2014 Quarterly Activities Report

Where aggregate intercepts incorporate
short lengths of high grade results and
longer lengths of low grade results, the
procedure used for such aggregation
should be stated and some typical
examples of such aggregations should
be shown in detail.
No aggregate intercepts reported.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
No metal equivalent values reported.
Relationship between
mineralisation widths
and intercept lengths
These relationships are particularly
important in the reporting of Exploration
Results.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down
hole lengths are reported, there should
be a clear statement to this effect (e.g.
‘down hole length, true width not
known’).
The Sinclair nickel ore body is a complexly folded, with
elongate sub-horizontal to steeply dipping massive
sulphide lenses, plunging to the north at -20 degrees.
Surface diamond drill holes at the Sinclair extension were
angled towards the east at an inclination of -70-80 degrees
to intersect the Sinclair nickel mineralised terrace at a high
angle.
Consequently, the majority of significant surface diamond
intercepts are inferred to be approximately equal to true
width.
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan
view of drill hole collar locations and
appropriate sectional views.
Refer to Figures and Tables in the body of text.
Balanced reporting Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting
of Exploration Results.
Refer to Figures and Tables in the body of text.
Significant intersections along the Sinclair Nickel Deposit
Extension are calculated by Talisman using a weighted
average method. A lower cut off value of 1% nickel was
used with a minimum mineralised width of 0.1m, and
maximum allowed internal waste of 2m.NB: Only those
intersections greater than 2% are reported in this report.
Other substantive
exploration data
Other exploration data, if meaningful
and
material,
should
be
reported
including (but not limited to): geological
observations;
geophysical
survey
results; geochemical survey results;
bulk samples – size and method of
treatment; metallurgical test results;
bulk density, groundwater, geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating
substances.
All relevant exploration data is shown on figures in text.
Downhole EM surveys were completed by Outer Rim
Exploration using a Crone transmitter/receiver with 5-50m
station spacing and a tx current of 20-35A.
Further work The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-
out drilling).
Diagrams clearly highlighting the areas
of possible extensions, including the
main geological interpretations and
future drilling areas, provided this
information
is
not
commercially
sensitive.
Refer to Figures and body of text.
A complete review of the Sinclair database is currently
underway to determine the nature and significance of
historic exploration and mining results and to identify and
prioritize future exploration targets for further work.

==> picture [596 x 40] intentionally omitted <==