JUNE 2011 QUARTERLY REPORT
COMPANY SNAPSHOT
HIGHLIGHTS
Board of Directors
Alan Senior Non Executive Chairman Gary Lethridge Managing Director
Peter Langworthy Technical Director
Brian Dawes Non Executive Director
Karen Gadsby Non Executive Director
-
High grade Copper sulphides intersected at depth at the Monty Prospect – target horizon defined and currently being drilled.
-
Coincident and significant geochemical anomalism directly above drill hole SPD020 demonstrates the potential for the Monty prospect to host a VMS style mineralized system.
-
Significant headway made on systematic and sweeping multidiscipline exploration analysis of the Springfield project – providing significant advancement of geological model.
Contact Details
6 Centro Avenue Subiaco, Western Australia, 6008 Australia
Telephon e: +61 8 9380 4230
Facsimile: +61 8 9382 8200
Email: [email protected]
Website: www.talismanmining.com.au
Capital Structure
Shares on Issue: 130,538,627 (TLM)
Options on Issue: 12,850,000 (Unlisted)
ASX: TLM
-
Asset portfolio broadened in the Murchison, Western Australia with acquisition of two new gold exploration projects – drilling planned to commence during the September Quarter.
-
Strong cash position of $43M – supports comprehensive exploration strategy and provides strong platform to assess ongoing quality opportunities.
==> picture [378 x 220] intentionally omitted <==
Chalcopyrite Intercept – SPD020
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
EXPLORATION
SPRINGFIELD COPPER-GOLD PROJECT (TLM 100%)
The Springfield Project comprises a 303km² ground package located approximately 150km north east of Meekatharra in the northern Murchison Goldfields (see Figure 1 ). The project is located immediately along strike to the east of Sandfire Resources’ DeGrussa Project where reported mineral resources now stand at 14.33mt @ 4.6% Cu and 1.6g/t Au contained in four deposits.
Talisman has been aggressively exploring the Springfield Project since the grant of the first two project tenements in November 2009 with systematic exploration activities focused on the generation of quality and comprehensive data sets. Work completed to date confirms that the Springfield Project has multiple prospective exploration opportunities and in light of recent drilling results, confirms Talisman’s view that the Springfield Project has the potential to host world class copper-gold VMS deposits.
MONTY PROSPECT
During the quarter Talisman announced that significant copper mineralisation had been identified in diamond drilling at the Monty Prospect . The results from diamond drill hole SPD020 intersected a zone of breccia-massive copper sulphides interpreted to be part of a mineralised “feeder zone” within an extensive alteration system (see Figure 2 ). The mineralised zone returned final assay results of (see Table 1 for details):
==> picture [11 x 14] intentionally omitted <==
SPD020 0.3 metres @ 7.6% Cu (502.0m – 502.3m)
Subsequent drilling at Monty up dip of SPD020 and along strike to the east has now confirmed the presence of a defined mineralised target horizon associated with this alteration system over at least 1.6 kilometres and potentially up to 3 kilometres based on the interpretation of geophysical and geochemical data (see Figure 3 ).
RC drilling up-dip of SPD 020 intersected thick zones of highly anomalous copper over a broad area. Central to this zone SPRC141 intersected 7 metres @ 0.21% Cu on a defined sediment horizon within the package of altered mafic volcanic rocks. To test this horizon two existing RC holes were utilised as pre-collars for deeper diamond drilling. SPD021 intersected the target horizon approximately 250 metres below the previous drilling and intersected a zone of quartz-sulphide (chalcopyrite-pyrite) mineralisation. From within a broader 6 metre zone of anomalous copper and gold values best results were (see Table 1* for details):
==> picture [11 x 15] intentionally omitted <==
SPD021 0.5 metres @ 1.3% Cu and 1.0g/t Au (347.5m – 348m)
To test this target horizon between SPD020 and SPD021, diamond drillhole SPD022 was drilled to a depth of 646 metres. The hole failed to intersect the prospective horizon at the targeted depth where it appears a mafic intrusive body (dolerite) has locally obscured the target zone (see Figure 2 ).
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
Talisman believes that these drilling results are highly encouraging. A prospective mineralised horizon has now been defined and can be interpreted on this drilling section to have a down-dip extent of up to 500 metres. Nearest drilling is located 800 metres to the east where the targeted sediment horizon has been located within the extensive alteration zone including broad zones of disseminated and stringer copper sulphides (i.e. chalcopyrite).
Most recent drilling targeted the prospective sediment horizon a further 800 metre step out to the east (see Figure 3 ). Diamond drill hole SPD023 successfully intersected a narrow zone (~0.30m) of quartzsulphide (chalcopyrite-pyrite) mineralisation in the targeted horizon. Final assays are awaited.
A target horizon which remains open in all directions has now been identified and will be the focus of a diamond drilling programme in conjunction with DHEM.
MLEM Survey
The collection of regional datasets across the entire Springfield Project has continued in parallel with the diamond and RC drilling programs. A comprehensive MLEM survey has now covered most of the Northern Corridor and is currently moving onto the Central Corridor. It is expected that the remainder of the survey will take another month to complete.
Whilst results from this survey are currently incomplete, it is likely that a number of already identified conductive anomalies will justify drill testing once data is fully assessed and regulatory approvals achieved.
Gravity Survey
The recognition of the association of strong alteration with coincident discrete gravity highs and magnetic lows is providing a key targeting parameter that can now be applied across the wider Springfield Project.
The immediate and positive impact of the gravity results on the targeting process has resulted in the gravity survey being expanded to cover the majority of the Springfield Project. This work was completed during July with the results currently being assessed and integrated with other data sets.
RAB Drilling
An extensive second phase of RAB drilling covering the Central Corridor was completed during the quarter (approximately 300 holes for 12,500 metres). An additional phase of RAB drilling covering extensions of the Northern Corridor is awaiting statutory approval and is currently scheduled for commencement during the September quarter (150 holes for 10,000 metres).
The data collected from the RAB drilling is proving critical in constructing the detailed project geology and also in providing important geochemical data that can then be targeted with follow-up RC drilling.
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
REGIONAL BASE METALS PROJECTS
In addition to the advancing Springfield Project, Talisman has also successfully consolidated a series of exploration projects both within the Bryah Basin and the adjacent Bangemall Basin. These projects provide Talisman with exposure to extensive areas of prospective geology in areas that have had little, if any, meaningful base metals exploration. These projects position Talisman to take advantage of the emergence of what could be a new geological province for world class base metal deposits.
These projects also provide depth and continuity to the Company‟s exploration portfolio, providing the opportunity to apply „local‟ geological knowledge gained from exploration across the region and to develop exploration strategies that complement the core activities at Springfield.
Halloween Project (TLM 100%)
The Halloween Project is located approximately 16.5km west of the Springfield Project and 11.5km south-west of, and along strike from, the high-grade DeGrussa Deposit (see Figure 1 ). The Halloween Project covers part of the Narracoota Volcanic Formation and is located along strike of a series of airborne EM conductors identified by both Sandfire and Chrysalis Resources.
A 2,000 metre (~15 hole) reverse circulation (RC) drilling program is planned at the Halloween Project to test several geochemical anomalies and represents the first phase of drilling at this prospect. This maiden drilling programme is scheduled for completion during the September quarter with all permits and approvals now granted.
Shelby Project (TLM 100%)
The 1,050km[2] Shelby Project is located on the northern margin of the Bryah Basin approximately 30km north of the Horseshoe Lights Copper-Gold Mine (see Figure 1 ). Talisman is targeting large scale mineral deposits along a 140 kilometre extent of an interpreted crustal suture zone on the edge of the Yilgarn Craton.
EIS Deep Diamond Drilling Program
Talisman has been granted funding up to $200,000 under the WA State Government Exploration Incentive Scheme (EIS) for an initial deep diamond drilling at Shelby. During the quarter Talisman successfully completed a 1,452 metre drill hole to test a large magnetic body that had been identified and modelled from recently collected airborne magnetic data (see Figure 4 ).
The hole intersected a thick package of schistose and altered mafic and ultramafic rocks that are interpreted as a series of volcanic flows and locally derived volcanogenic breccia deposits. Deeper in the hole a yet to be fully defined complex of intermediate to felsic intrusive rocks has possibly been identified. This sequence of rocks is located approximately 500 metres beneath a sequence of younger Bangemall Basin sediments.
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
Importantly the sequence of rocks is over printed by a strong, zoned hematite-magnetite alteration system that may be related to a mineralising event. Minor trace chalcopyrite was also noted. Samples from this hole have been sent to ACME Labs in Vancouver, Canada which is recognised as one of the leading geochemical and assaying laboratories in the world. ACME Labs will complete a detailed geochemical suite of analysis with results due in August.
Importantly, the results of this analysis along with detailed geochronology analysis currently being completed in Australia, will assist in identifying the age and sequence of the geology, further refining follow-up drill targets designed to identify potential mineralised VMS systems.
Geophysical Surveys
To understand and evaluate the entire Shelby Project, and to provide the basis for ongoing targeting, a regional airborne magnetic survey and a regional ground based gravity survey were completed during the quarter covering the entire project (see Figure 5 ). The results of this work have already identified a number of priority areas for more detailed evaluation during the September quarter.
On completion of the ongoing interpretation of the regional gravity and airborne magnetic surveys and interpretation of the results from this initial deep drill hole, the next phase of drilling will be assessed during the September quarter. Activities at Shelby further demonstrate Talisman‟s capacity to develop large scale, grassroots exploration targets at a relatively low cost using sophisticated modern day exploration techniques.
Milgun Project (TLM 100%)
The Milgun Project is located approximately 20km north west of the Shelby Project and covers what Talisman has identified as a northern outlier of the Bryah Basin (see Figure 1 ). The 766km[2] Project was originally targeted for gold; however recent assessments have identified the presence of a sequence of volcanic rocks that are likely to be the equivalent of the Narracoota Volcanic Formation, and are therefore prospective for VMS-style deposits.
During the quarter exploration at the Milgun Project consisted of a detailed airborne magnetic survey, a detailed ground gravity survey, detailed geological mapping around an area of outcropping copper gossans and completion of a geochemical sampling program (see Figure 6 ). This data will be evaluated over the next quarter to identify priority areas for the next phase of detailed exploration.
To consolidate what Talisman believes already to be a highly prospective regional corridor, an additional 630km[2 ] covering 30 strike kilometres has been added to the Milgun project during the quarter through an open ground pegging opportunity. Immediate work will include assessment of any available historical exploration data and a reconnaissance field visit.
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
EXPLORATION PROJECTS - GOLD
As previously reported (ASX release 27 June 2011) Talisman has acquired two significant gold projects in the Murchison area of Western Australia. The acquisitions are consistent with Talisman‟s stated strategy of seeking to expand and diversify its exploration portfolio through the pursuit and acquisition of suitable new growth opportunities in copper-gold, gold and nickel.
The key terms of the acquisitions are summarised as follows:
==> picture [11 x 15] intentionally omitted <==
==> picture [11 x 14] intentionally omitted <==
==> picture [11 x 14] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
-
Talisman acquired an 80% interest in the Muddawerrie and Livingstone Projects for a combined consideration of 100,000 ordinary fully-paid Talisman shares;
-
the projects are held in separate Joint Ventures between Talisman (80%) and Murchison Resources Pty Ltd (Murchison) (20%);
-
the Joint Ventures are managed and operated by Talisman;
-
the interest held by Murchison will be free-carried until a decision to mine is made, at which point Murchison may elect to contribute on a pro-rata basis to the joint venture. Should Murchison not elect to contribute on a pro-rata basis at this time then it must transfer its 20% interest to Talisman in exchange for a 1% gross production royalty; and
Murchison retains the right to dilute in accordance with an industry standard formula should it elect to contribute on a pro-rata basis to the joint venture from the decision to mine. Should Murchison‟s interest fall below 5%, it must transfer all remaining equity to Talisman in exchange for a 1% gross production royalty.
Muddawerrie Project (TLM 80%)
The Muddawerrie Project is located approximately 100km north west of Meekatharra in the Murchison Region of Western Australia (see Figure 1 ). The granted Exploration Licence covers an area of approximately 52km² and encompasses the entire 16km strike length of an Archaean greenstone belt that is highly prospective for banded iron formation (BIF) and mafic hosted shear zone gold deposits, similar to those at Mt Magnet and Meekatharra.
The exploration opportunity presented at the Muddawerrie Project is based on the fact that two demonstrably mineralised shear zones covering at least 16km of strike have only received cursory amounts of historic exploration (see Figure 7 ). Limited shallow drilling on this trend has consistently returned highly anomalous results including (see Table 2 for details):
==> picture [11 x 14] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
MTC007 2m @ 1.54g/t Au MTC011 1m @ 1.18g/t Au
The Mount Maitland Trend extends for 5km along the eastern side of the project. The trend is characterized by sheared mafic volcanic rocks with a number of zones of old gold workings present.
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008
www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
Drilling has been limited to one area of old workings along the Mount Maitland trend and the results returned clearly demonstrate that the shear zone has the potential to be strongly mineralised. Results from the only drilling along this trend include (see Table 3 for details):
==> picture [11 x 14] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
- MTC003 10m @ 2.10g/t Au MTC005 2m @ 1.01g/t Au
Subject to attaining the required statutory permits, the Muddawerrie Project represents an opportunity to quickly develop a series of high priority drilling targets for gold with the first phase of RC drilling expected to begin towards the end of the September quarter.
Livingstone Project (TLM 80%)
The Livingstone Project is located approximately 25km to the immediate north west of the Muddawerrie Project (see Figure 1 ). The project consists of three Exploration Licences and covers an area of 208 km² of the western extension of the Proterozoic aged Bryah Basin.
The Project has demonstrated gold endowment with a series of significant high-grade gold intercepts returned from both reverse circulation (RC) and rotary air blast (RAB) drilling over a 31km strike length of the Central Shear Zone (CSZ) (see Figure 8 ). In general, this extensive gold mineralised trend has not been subject to systematic exploration. Significant historic results include (see Table 4 for details):
==> picture [11 x 14] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
- TRC015 6m @ 5.30g/t Au TRC037 7m @ 4.75g/t Au MSEC165 2m @ 4.65g/t Au
In addition to the main CSZ, a number of other targets have been identified that require follow-up exploration. The Winja Prospect has returned sporadic thick, high grade gold intersections from within a dolomitic host sequence. Exploration is required to determine the style and extent of this gold mineralisation with best results including (see Table 5 for details):
==> picture [11 x 14] intentionally omitted <==
==> picture [11 x 14] intentionally omitted <==
- TRC070 29m @ 5.20g/t Au TRC094 13m @ 3.71g/t Au
At the Livingstone Prospect, a large zone of mineralised quartz stockwork has been defined through an extensive series of old workings and a limited amount of shallow drilling. Further work is required to understand the extent and quality of the gold stockwork zone and to determine the best drilling orientation. Best results include (see Table 6 for details):
==> picture [11 x 14] intentionally omitted <==
==> picture [11 x 15] intentionally omitted <==
- LR051 14m @ 2.71g/t Au LRC001 4m @ 3.39g/t Au
Subject to securing the required statutory permits, the Livingstone Project represents an opportunity to quickly develop a series of high priority drilling targets for gold.
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
Skull Springs JV (TLM 100%)
The Skull Springs Project is comprised of 3 granted exploration licenses located to the immediate west of the Woodie Woodie operations. High grade rock chips up to 65% Mn have previously been assayed from samples taken from outcropping rock exposures.
In October 2009 Talisman and Shaw River Resources entered into a letter agreement setting out the terms and conditions of a farm-in on Talisman‟s East Pilbara manganese tenements. Shaw River has subsequently failed to undertake the required level of exploration during the farm-in period and has notified Talisman that it has withdrawn from the Skull Springs JV. Subject to Shaw River Resources satisfying their reporting obligations, the project will be returned 100% to Talisman.
Talisman believes that the Skull Springs Project remains an attractive opportunity for the discovery of quality manganese deposits with a series of drill ready targets over a 2.5km strike length where evidence of a strong hydrothermal signature, hosting structures and manganese alteration have been identified as being most intense. The project will be reviewed and its future direction determined.
CORPORATE
At the end of the June quarter, Talisman maintained a very strong cash position of $43M which provides a strong platform to continue the existing systematic and aggressive exploration of its current stable of quality assets. With this funding capacity and proven ability to execute deals, Talisman also places itself in a position to take advantage of new growth opportunities and acquisitions in the region that will compliment an evolving pipeline of quality projects.
For further information, please contact: For media inquiries, please contact: Gary Lethridge – Managing Director Nicholas Read – Read Corporate or on +61 419 929 046 Peter Langworthy – Technical Director on +61 8 9380 4230
Competent Persons’ Statement
Information in this ASX release that relates to Exploration Results and Mineral Resources is based on information compiled by Mr Harry Cornelius, who is a member of the Australasian Institute of Mining and Metallurgy. Mr Harry Cornelius is a full time employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and types of deposit under consideration and to the activities undertaken to qualify as a Competent Person as defined in the 2004 Edition of the “Australian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Harry Cornelius consents to the inclusion in this report of the matters based on information in the form and context in which it appears.
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Figure 1 – Talisman Mining Ltd Project locations
==> picture [514 x 429] intentionally omitted <==
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
Figure 2 – Monty Cross Section –RC Drill Holes and Diamond Drill Hole
==> picture [455 x 306] intentionally omitted <==
Figure 3 – Monty Prospect Interpreted Geology
==> picture [469 x 316] intentionally omitted <==
==> picture [168 x 28] intentionally omitted <==
----- Start of picture text -----
Talisman Mining Ltd ABN 71 079 536 495
6 Centro Avenue, Subiaco Western Australia 6008
www.talismanmining.com.au
----- End of picture text -----
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
Figure 4 – Shelby Project EIS Drill Hole Location
==> picture [514 x 274] intentionally omitted <==
Figure 5 – Shelby Project Area of Regional Gravity and Aeromagnetic survey
==> picture [514 x 274] intentionally omitted <==
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
Figure 6 – Milgun Project area of Regional Gravity Survey
==> picture [514 x 274] intentionally omitted <==
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
Figure 7– Muddawerrie Project
==> picture [509 x 613] intentionally omitted <==
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
Figure 8 – Livingstone Project
==> picture [514 x 386] intentionally omitted <==
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
Table 1 – Monty Prospect Drilling Results, Springfield Project
| Hole ID | Easting | Northing | Dip | Azimuth | From (m) | To (m) | Intercept (m) |
Cu (%) | Au (g/t) |
|---|---|---|---|---|---|---|---|---|---|
| SPD020 | 743603 | 7171669 | -60 | 180 | 502.0 | 502.3 | 0.3 | 7.6% | NSA |
| SPD021 (SPRC134) |
743598 | 7171434 | -60 | 180 | 347.5 (87) |
348 (136) |
0.5 (49) |
1.3% (0.03%) |
1.0 (NSA) |
| SPRC141 | 743600 | 7171307 | -60 | 180 | 65 | 72 | 7 | 0.21%* | NSA |
| SPRC142 | 743604 | 7171169 | -60 | 180 | 49 | 119 | 70 | 0.04%* | NSA |
| SPRC135 | 743596 | 7171560 | -60 | 180 | 105 | 108 | 3 | 0.03%* | NSA |
NSA -No significant assay
n.b: SPRC134 used as pre-collar for SPD021
Table 2 – Muddawerrie Trend Drilling Results
| Hole ID | Easting | Northing | Dip | Azimuth | From (m) |
To (m) | Intercept (m) |
Gold (g/t) |
|---|---|---|---|---|---|---|---|---|
| MTC002 | 601504 | 7148717 | -60 | 270 | 0 | 4 | 4 | 1.17** |
| MTC003 | 601538 | 7148721 | -60 | 270 (incl. |
66 67 |
76 71 |
10 4 |
2.02 3.82) |
| MTC005 | 601505 | 7148791 | -60 | 270 | 18 | 20 | 2 | 1.01 |
Table 3 – Mt Maitland Trend Drilling Results
| Hole ID | Easting | Northing | Dip | Azimuth | From (m) |
To (m) | Intercept (m) |
Gold (g/t) |
|---|---|---|---|---|---|---|---|---|
| MTC007 | 602742 | 7151290 | -60 | 270 | 13 | 15 | 2 | 1.54 |
| MTC011 | 602774 | 7151209 | -60 | 270 | 33 | 34 | 1 | 1.18 |
* Note: Hand-held XRF Analyser - The estimates of Cu for RC samples referred to in this release are based on readings on pulverized drill-spoil samples using an InnovX portable XRF analyser. Whilst Talisman believes that these readings are indicative of grade, the Company wishes to make clear that the InnovX results are not formal assays and are an estimate of Cu grades only.
**Note: = 4m composite sample (not split)
#Note: = 2m composite sample (not split)
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Talisman Mining June 2011 Quarterly Report
==> picture [42 x 43] intentionally omitted <==
Table 4 – Central Shear Zone Drilling Results
| Hole ID | Easting | Northing | Dip | Azimuth | From (m) |
To (m) | Intercept (m) |
Gold (g/t) |
|---|---|---|---|---|---|---|---|---|
| MSEC165 | 566939 | 7173393 | -60 | 180 | 47 | 49 | 2 | 4.65 |
| TR649 | 581714 | 7169533 | -60 | 180 | 24 | 39 | 15 | 0.46 |
| TRC015 | 578706 | 7170684 | -60 | 180 | 27 | 33 | 6 | 5.30 |
| TRC037 | 578708 | 7170765 | -60 | 180 (incl. |
104 112 |
139 119 |
35 7 |
1.57 4.75) |
| TRC110 | 585340 | 7167272 | -60 | 180 | 9 | 17 | 8 | 1.07 |
| TRC111 | 585342 | 7167310 | -60 | 179 | 46 | 49 | 3 | 2.56 |
Table 5 – Winja Prospect Drilling Results
| Hole ID | Easting | Northing | Dip | Azimuth | From (m) |
To (m) | Intercept (m) |
Gold (g/t) |
|---|---|---|---|---|---|---|---|---|
| TRC070 | 578759 | 7169262 | -60 | 180 (incl. |
64 68 |
93 77 |
29 9 |
5.20 13.96) |
| TRC094 | 578780 | 7169240 | -60 | 180 (incl. |
52 56 |
65 59 |
13 3 |
3.71 7.69) |
Table 6 – Livingstone Prospect Drilling Results
| Hole ID | Easting | Northing | Dip | Azimuth | From (m) |
To (m) | Intercept (m) |
Gold (g/t) |
|---|---|---|---|---|---|---|---|---|
| LRC001 | 567150 | 7170950 | -60 | 225 | 1 | 5 | 4 | 3.39 |
| LR051 | 567906 | 7171644 | -60 | 010 | 6 | 20 | 14 | 2.71# |
* Note: Hand-held XRF Analyser - The estimates of Cu for RC samples referred to in this release are based on readings on pulverized drill-spoil samples using an InnovX portable XRF analyser. Whilst Talisman believes that these readings are indicative of grade, the Company wishes to make clear that the InnovX results are not formal assays and are an estimate of Cu grades only.
** Note: = 4m composite sample (not split)
# Note: = 2m composite sample (not split)
Talisman Mining Ltd ABN 71 079 536 495 6 Centro Avenue, Subiaco Western Australia 6008 www.talismanmining.com.au
Appendix 5B Mining exploration entity quarterly report
Rule 5.3
Appendix 5B
Mining exploration entity quarterly report
Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10
Name of entity
TALISMAN MINING LIMITED ABN Quarter ended (“current quarter”) 71 079 536 495 30 June 2011
Consolidated statement of cash flows
| Cash flows related to operating activities 1.1 Receipts from product sales and related debtors 1.2 Payments for (a) exploration & evaluation (b) development (c) production (d) administration 1.3 Dividends received 1.4 Interest and other items of a similar nature received 1.5 Interest and other costs of finance paid 1.6 Income taxes paid 1.7 Other (provide details if material) Net Operating Cash Flows |
Current quarter $A’000 |
Year to date (12 months) $A’000 |
|---|---|---|
| - (3,895) - - (382) - 741 - - 33 |
37 (8,942) - - (1,608) - 1,332 - - 33 |
|
| (3,503) | (9,148) | |
| Cash flows related to investing activities 1.8 Payment for purchases of: (a) prospects (b) equity investments (c) other fixed assets 1.9 Proceeds from sale of: (a) prospects (b) equity investments (c) other fixed assets 1.10 Loans to other entities 1.11 Loans repaid by other entities 1.12 Other (provide details if material) Net investing cash flows 1.13 Total operating and investing cash flows (carried forward) |
- - (52) - - - - - - |
- - (336) - - 34,250 - - - |
| (52) | 33,914 | |
| (3,555) | 24,766 |
- See chapter 19 for defined terms.
Appendix 5B Page 10
31/03/2011
Appendix 5B Mining exploration entity quarterly report
| 1.13 Total operating and investing cash flows (brought forward) |
(3,555) | 24,766 |
|---|---|---|
| Cash flows related to financing activities 1.14 Proceeds from issues of shares, options, etc. 1.15 Proceeds from sale of forfeited shares 1.16 Proceeds from borrowings 1.17 Repayment of borrowings 1.18 Dividends paid 1.19 Other (provide details if material) Net financing cash flows |
- - - - - - |
5,012 - - (1) - - |
| - | 5,011 | |
| Net increase (decrease) in cash held 1.20 Cash at beginning of quarter/year to date 1.21 Exchange rate adjustments to item 1.20 1.22 Cash at end ofquarter |
(3,555) 46,994 |
29,777 13,662 |
| 43,439 | 43,439 |
Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities
| ts to directors of the entity and associates of the directors ts to related entities of the entity and associates of the related entities |
|
|---|---|
| 1.23 Aggregate amount of payments to the parties included in item 1.2 1.24 Aggregate amount of loans to the parties included in item 1.10 |
Current quarter $A'000 |
| 224 | |
| - |
Explanation necessary for an understanding of the transactions
Remuneration to Directors.
Non-cash financing and investing activities
- 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows
N/A
- 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest
N/A
- See chapter 19 for defined terms.
Appendix 5B Page 11
31/03/2011
Appendix 5B Mining exploration entity quarterly report
Financing facilities available
Add notes as necessary for an understanding of the position.
| 3.1 Loan facilities 3.2 Credit standby arrangements |
Amount available $A’000 |
Amount used $A’000 |
|---|---|---|
| - | - | |
| - | - |
Estimated cash outflows for next quarter
| Estimated cash outflows for next quarter | |
|---|---|
| 4.1 Exploration and evaluation 4.2 Development 4.3 Production 4.4 Administration |
$A’000 |
| 3,250 | |
| - | |
| - | |
| 400 | |
| Total | 3,650 |
Reconciliation of cash
| Reconciliation of cash at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts is as follows. |
Current quarter $A’000 |
Previous quarter $A’000 |
|---|---|---|
| 5.1 Cash on hand and at bank 5.2 Deposits at call 5.3 Bank overdraft 5.4 Other (provide details) |
1,062 | 1,098 |
| 42,377 | 45,895 | |
| - | - | |
| - | - | |
| Total: cash at end of quarter(item 1.22) | 43,439 | 46,994 |
- See chapter 19 for defined terms.
Appendix 5B Page 12
31/03/2011
Appendix 5B Mining exploration entity quarterly report
Changes in interests in mining tenements
| 6.1 Interests in mining tenements relinquished, reduced or lapsed 6.2 Interests in mining tenements acquired or increased |
Tenement reference |
Nature of interest (note (2)) |
Interest at beginning of quarter |
Interest at end of quarter |
|---|---|---|---|---|
| N/A | ||||
| E52/2689 E52/2690 E52/2691 E53/1578 E52/2660 E52/2661 E52/2662 E52/2565 E52/2566 E52/2593 E51/1447 |
Application Application Application Granted from Application Granted from Application Granted from Application Granted from Application Acquired Acquired Acquired Acquired |
- - - 100% 100% 100% 100% - - - - |
100% 100% 100% 100% 100% 100% 100% 80% 80% 80% 80% |
Issued and quoted securities at end of current quarter
Description includes rate of interest and any redemption or conversion rights together with prices and dates.
| Total number | Number quoted | Issue price per security (see note 3) (cents) |
Amount paid up per security (see note 3) (cents) |
|
|---|---|---|---|---|
| 7.1 Preference +securities (descriptio n) 7.2 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs, redemption s |
||||
| 7.3 +Ordinary securities |
130,538,627 | 130,538,627 |
- See chapter 19 for defined terms.
Appendix 5B Page 13
31/03/2011
Appendix 5B Mining exploration entity quarterly report
| 7.4 Changes during quarter (a) Increases through issues (b) Decreases through returns of capital, buy-backs |
100,000 | 100,000 | 68 cents | Issued as consideration for acquisition of Muddawerrie and Livingstone Gold exploration projects as announced to ASX on 27/7/2011 |
|---|---|---|---|---|
| 7.5 +Convertible debt securities (description) 7.6 Changes during quarter (a) Increases through issues (b) Decreases through securities matured, converted |
||||
| 7.7 Options (description and conversion factor) 7.8 Issued during quarter 7.9 Exercised during quarter 7.10 Expired during quarter |
4,000,000 250,000 250,000 250,000 250,000 50,000 50,000 2,250,000 1,500,000 2,250,000 200,000 400,000 200,000 200,000 200,000 200,000 25,000 25,000 |
- - - - - - - - - - - - - - - - - - |
Exercise price $0.22 $1.27 $1.35 $1.44 $1.53 $1.03 $1.09 $0.50 $0.60 $0.70 $1.36 $1.00 $1.10 $1.20 $1.30 $0.95 $1.14 $1.32 |
Expiry date 31/08/11 30/11/13 30/11/13 30/11/13 30/11/13 14/09/12 14/03/14 30/06/13 30/06/13 30/06/13 07/07/11 30/11/13 30/11/13 30/11/13 30/11/13 30/06/13 27/10/11 27/04/13 |
| 500,000 500,000 500,000 500,000 |
$1.00 $1.20 $1.60 $2.20 |
31 May 2011 31 May 2011 31 May 2011 31 May2011 |
- See chapter 19 for defined terms.
Appendix 5B Page 14
31/03/2011
Appendix 5B Mining exploration entity quarterly report
7.11 Debentures (totals only) 7.12 Unsecured notes (totals only)
Compliance statement
1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).
- 2 This statement does give a true and fair view of the matters disclosed.
Sign here: Daniel Madden Date: July 2011
Company Secretary
==> picture [177 x 45] intentionally omitted <==
Print name: Daniel Madden
Notes
1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.
2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.
3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .
4 The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.
5 Accounting Standards ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.
- See chapter 19 for defined terms.
Appendix 5B Page 15
31/03/2011