TALISMAN MINING LIMITED Capital/Financing Update 2008

Jul 21, 2008

65926_rns_2008-07-21_62e06b06-3cde-4467-8335-c7d3c8177e44.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [68 x 68] intentionally omitted <==

TALISMAN MINING LTD

PO Box 1262, Subiaco WA 6904 Tel: 61 8 9380 4230 / Fax: 61 8 9382 8200 www.talismanmining.com.au

22 July, 2008

The Manager Company Announcements Office Australian Securities Exchange

By Electronic Lodgement

WONMUNNA IRON PROJECT - UPDATE

Highlights

  • Final NMM resource drilling assay results received,

  • Commencement of JORC resource calculations for NMM prospect,

  • Commencement of NMM wide-diameter diamond drilling to obtain samples for ore characterisation,

  • CMM prospect drilling continues to produce thick intercepts of iron mineralisation to 24m @ 62.12%Fe,

  • Continuation of SMM and CMM drill evaluation.

NMM RESOURCE DRILLING

Assay results have been received for the final 3 reverse circulation drillholes completed as part of the program of gridded resource drilling at the NMM (North Marra Mamba) prospect, Wonmunna Project, East Pilbara Region, Western Australia. Significant (>50% Fe) drill intercepts are listed in Table 1 and drillhole locations are shown on Figure 1.

All of the NMM drilling data is in the process of being compiled and reconciled for use in the JORC-compliant ore resource calculations. This work remains on schedule for announcement of a maiden iron ore resource in late August, 2008.

Six wide-spaced PQ diamond drillholes are being completed at NMM to obtain representative samples for ore characterisation tests. This work will include density measurements (For use in the resource calculations) and tests of the basic metallurgical characteristics of the ore to use as a basis for future work.

080722_SJE_ASX_WonmunnaIronOreUpdate.doc

TALISMAN MINING LTD

PAGE 2

___________

==> picture [28 x 28] intentionally omitted <==

Table 1: Significant (>50% Fe) NMM Resource Drill Intercepts WNC448, 565-567

Hole East North From(m) To(m) Width(m) Fe % **SiO2 % ** **Al2O3 % ** P % S % LOI %
WNC448
710900
7441610 12 44 32 58.02 5.00 2.28 0.09 0.01 9.1
(including 16 20 4 61.56 2.85 1.71 0.09 0.01 7.3)
WNC565
709497
7441404 30 42 12 51.55 8.86 5.39 0.21 0.02 10.5
48 52 4 53.27 8.47 3.95 0.12 0.02 10.2
WNC567
709096
7441848 no significant results (<50% Fe)

==> picture [496 x 41] intentionally omitted <==

==> picture [496 x 41] intentionally omitted <==

==> picture [496 x 41] intentionally omitted <==

==> picture [496 x 41] intentionally omitted <==

==> picture [496 x 42] intentionally omitted <==

Figure 1

CMM DRILLING

Assay results have been received for a further 5 reverse circulation drillholes completed as part of the program of reconnaissance drilling at the CMM (Central Marra Mamba) prospect, Wonmunna Project, East Pilbara Region, Western Australia. Significant (>50% Fe) drill intercepts are listed in Table 2 and drillhole locations are shown on Figure 2.

Further drilling, for use in subsequent resource calculations, is in the process of being completed on 200m x 50m centres over the entire prospect. It is currently anticipated that a maiden JORC resource for the CMM prospect will be available before the end of the 2008 calendar year.

Table 2: Significant (>50% Fe) CMM Resource Drill Intercepts WNC447, 452-456

Hole East North From(m) To(m) Width(m) Fe % SiO %
2
Al2O %
3
P % S % LOI %
WNC447 704874 7438952 28 30 2 50.00 8.77 7.29 0.17 0.05 11.2
WNC452 705762 7439058 32 48 16 59.92 3.42 1.99 0.12 0.01 8.4
(including 38 48 10 61.38 2.95 1.54 0.12 0.01 7.7)
WNC453 705846 7439112 38 56 18 59.52 4.46 2.65 0.11 0.02 7.6
(including 42 44 2 63.14 2.53 2.05 0.08 0.02 5.3)
WNC454 705935 7439078 24 52 28 59.40 3.72 2.51 0.11 0.02 8.6
(including 28 42 24 62.12 2.24 1.55 0.10 0.02 7.3)
WNC456 706088 7439105 18 34 16 55.09 5.69 4.35 0.08 0.04 10.3

080722_SJE_ASX_WonmunnaIronOreUpdate.doc

TALISMAN MINING LTD

PAGE 3

==> picture [28 x 28] intentionally omitted <==

==> picture [463 x 38] intentionally omitted <==

==> picture [463 x 39] intentionally omitted <==

==> picture [463 x 38] intentionally omitted <==

==> picture [463 x 39] intentionally omitted <==

==> picture [463 x 38] intentionally omitted <==

Figure 2

SMM DRILLING

Drill evaluation of the SMM (South Marra Mamba) prospect on 400m x 100m centres, closing to 200m x 50m centres, is ongoing. This drill data will subsequently be utilised for calculation of a maiden JORC resource, anticipated to be available before the close of the 2008 calendar year.

Yours sincerely

==> picture [145 x 68] intentionally omitted <==

S. J. Elliott Managing Director

Information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr Steven Elliott who is a member of the Australasian Institute of Mining and Metallurgy. Mr Steven Elliott is a full time employee of Talisman Mining Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity undertaken to qualify as a Competent Person as defined in the 2004 Edition of the “Australian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Steven Elliott consents to the inclusion in this report of the matters based on information in the form and context in which it appears.

080722_SJE_ASX_WonmunnaIronOreUpdate.doc