AI assistant
SUNSTONE METALS LTD — Capital/Financing Update 2011
Mar 23, 2011
65870_rns_2011-03-23_0238997a-23e4-41e4-9234-c3e06b030cb3.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
ASX/Media Release
24 March 2011
==> picture [535 x 90] intentionally omitted <==
SIGNIFICANT HIGH GRADE COPPER INTERSECTIONS FROM VISCARIA COPPER-IRON PROJECT, SWEDEN
DTR TESTWORK CONFIRMS ABILITY TO UPGRADE MAGNETITE TO HIGH GRADE IRON CONCENTRATE
International minerals company Avalon Minerals Ltd (ASX: AVI ; “Avalon” or “the Company”) is pleased to announce that on-going exploration and resource development drilling at its 100%-owned Viscaria Copper-Iron Project in Northern Sweden has returned a series of outstanding results from the D Zone.
The drilling program is designed to upgrade the current mineral resource at D Zone of 9.0Mt at 0.6% Cu and 27% Fe to the Measured and Indicated category.
Recent drilling within the current resource envelope has returned wider and higher grade copper intersections than predicted by the September 2010 resource model, with best results including:
| VDD082 | 20m @ 1.1% Cu and 21% Fe from 53m |
|---|---|
| VDD083 | 28m @ 1.9% Cu and 20% Fe from 52m |
| including 18m @ 2.1% Cu from 62m | |
| VDD084 | 19m @ 1.3% Cu and 28% Fe from 132m |
| VDD085 | 13m @ 1.1% Cu and 28% Fe from 28m |
| VDD086 | 79m @ 0.8% Cu and 26% Fe from 88m |
| including 43m @ 1.4% Cu and 31% Fe from 124m | |
| VDD089 | 20m @ 1.0% Cu and 42% Fe from 120m |
Drilling results are summarised in Table 1 and head assay results and location of drill intersections are shown in Figure 1.
In addition to the assay results reported above, Davis Tube Recovery (DTR) results have also been received for a number of previously drilled holes. These include:
include: |
|
|---|---|
| VDD0068 | 22m @ 33% Wt Rec, 71.1% Fe and 0.8% SiO2 from 40m |
| VDD0070 | 23m @ 35% Wt Rec, 70.7% Fe and 0.8% SiO2 from 43m |
| VDD0077 | 14m @ 40% Wt Rec, 71.4% Fe and 0.6% SiO2 from 43m |
| VRC0019 | 13m @ 36% Wt Rec, 70.0% Fe and 1.2% SiO2 from 39m |
| Drilling results | are summarised in Table 2 and DTR results and locations of |
| reported drilling are shown in Figure 2. |
Avalon Minerals Ltd ACN 123 184 412 PO Box 165 West Perth WA 6872 Telephone: +61 8 9322 2752 Mobile: 0435 635 598 Email: andrew.munckton@avalonminerals. com.au Web: www.avalonminerals.com.au ASX Code: AVI Directors David McSweeney (Chairman) Andrew Munckton (Managing Director / CEO) Tan Sri Abu Sahid Mohamed (Non-Executive Director) Stephen Stone (Non-Executive Director) Amro Al Khadra (Non-Executive Director)
The results indicate the magnetite mineralisation within the D Zone resource can be effectively upgraded to achieve a high quality iron concentrate.
==> picture [535 x 90] intentionally omitted <==
Commenting on the results, CEO of Avalon, Mr Andrew Munckton, said: “These are outstanding results which reinforce our confidence in the D Zone mineralised horizon to host a significant copper and iron ore resource that will underpin the Bankable Feasibility Study for the Viscaria Project Development.
“The wide and consistent nature of the copper mineralisation, particularly in the central part of the D Zone Resource area, gives us confidence to now investigate deeper, down plunge extensions below the current open pit design. In addition to the excellent copper intersections, the DTR results for the coincident magnetite mineralisation are also outstanding.
“Consistent weight recoveries above 35% and outstanding assay results for magnetite concentrate show that the D Zone iron mineralisation is capable of producing a premium quality concentrate averaging greater than 70% iron and less than 1.0% silicon dioxide – which is in line with the nearby LKAB owned Kiruna operations.
“The consistent nature of the results suggests we will be able to produce a highly sought after, premium grade magnetite concentrate from the tailings stream of the proposed copper and iron processing plant.
“The drilling program will continue to evaluate the potential of the D Zone deposit over the March and June Quarters when we expect to move into the southern and deeper parts of the ore zones.
“We are looking forward to testing the potential open pit extension and underground mining positions of the ore body over this period,” Mr Munckton concluded.
==> picture [560 x 256] intentionally omitted <==
Figure 1 – D Zone Drilling Overview
==> picture [535 x 90] intentionally omitted <==
Table 1: Drilling Intersections Viscaria D Zone
| North | Hole ID | From (m) | To (m) | Interval (m) | Fe% | Cu% |
|---|---|---|---|---|---|---|
| 19400 | VDD082 | 50 | 83 | 33 | 15.8 | 0.75 |
| Including | 53 | 73 | 20 | 20.8 | 1.08 | |
| 19475 | VDD083 | 52 | 80 | 28 | 20.2 | 1.85 |
| Including | 62 | 80 | 18 | 17.9 | 2.07 | |
| 19650 | VDD085 | 28 | 41 | 13 | 28.1 | 1.05 |
| 19650 | VDD086 | 88 | 167 | 79 | 26.3 | 0.84 |
| Including | 124 | 167 | 43 | 30.8 | 1.42 | |
| 19400 | VDD084 | 132 | 151 | 19 | 27.9 | 1.25 |
| 19100 | VDD089 | 120 | 143 | 23 | 42.6 | 1.00 |
| Including | 128 | 143 | 15 | 29.4 | 1.24 |
NB: Assays are by XRF and ICP
==> picture [546 x 258] intentionally omitted <==
Figure 2 – D Zone DTR Drilling
==> picture [535 x 90] intentionally omitted <==
Table 2 – DTR Results Viscaria D Zone
| North | Drill Hole | From (m) | To (m) | Interval (m) | Wt Rec % | Fe % | SiO₂ % | Al₂O₃ % | Cu % | P % | S % |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 19800 | VDD068 | 40.4 | 62.9 | 22.5 | 33.3 | 71.1 | 0.78 | 0.09 | 0.002 | 0.003 | 0.005 |
| 67.2 | 79.7 | 12.5 | 34.4 | 70.7 | 0.54 | 0.04 | 0.001 | 0.002 | 0.003 | ||
| 19700 | VDD070 | 42.8 | 66.3 | 23.5 | 34.9 | 70.7 | 0.79 | 0.05 | 0.001 | 0.003 | 0.011 |
| 19550 | VDD074 | 98.7 | 104.7 | 6.0 | 40.0 | 70.9 | 1.09 | 0.04 | 0.020 | 0.006 | 0.014 |
| 19750 | VDD075 | 22.0 | 30.5 | 8.5 | 42.1 | 71.5 | 0.64 | 0.05 | 0.003 | 0.005 | 0.009 |
| 19550 | VDD076 | 126.7 | 137.5 | 10.8 | 55.6 | 71.5 | 0.55 | 0.01 | 0.006 | 0.007 | 0.012 |
| 19750 | VDD077 | 43.0 | 57.0 | 14.0 | 39.9 | 71.4 | 0.55 | 0.08 | 0.002 | 0.002 | 0.001 |
| 19550 | VDD078 | 154.0 | 163.0 | 9.0 | 43.4 | 71.4 | 0.57 | 0.06 | 0.002 | 0.005 | 0.006 |
| 196.0 | 201.0 | 5.0 | 36.6 | 71.6 | 0.62 | 0.17 | 0.003 | 0.001 | 0.030 | ||
| 19500 | VDD079 | 42.0 | 47.0 | 5.0 | 32.7 | 67.8 | 2.32 | 0.28 | 0.119 | 0.009 | 0.001 |
| 19475 | VDD080 | 48.0 | 63.0 | 15.0 | 44.8 | 69.8 | 1.02 | 0.10 | 0.211 | 0.009 | 0.006 |
| 19600 | VRC019 | 39.0 | 52.0 | 13.0 | 35.7 | 70.0 | 1.16 | 0.05 | 0.008 | 0.017 | 0.002 |
| AVERAGE | - | - | 12.0 | 38.6 | 70.7 | 0.85 | 0.08 | 0.053 | 0.006 | 0.007 |
NB: DTR results are for Davis Tube Recovery using a75micron screen. Approximate fineness of sample is P₈₀ of 45microns. Assays are by XRF. Assay results are prior to Copper and Sulphur flotation.
D Zone South
In addition to on-going drilling at the D Zone, Avalon has also completed five lines of drilling into the southern portion of the D Zone South prospect.
Results have shown only low grade (0.1%) copper and iron ore mineralisation over the target horizon.
Further exploration work in this area has been deferred pending availability of drill rigs, which are currently fully utilised at the D Zone.
Competent Person’s Statement
The information in this report that relates to Mineral Resources and exploration targets is based upon information reviewed by Mr Andrew Munckton BSc (Mining Geology) who is a Member of the Australasian Institute of Mining and Metallurgy.
Mr Munckton is a full time employee of Avalon Minerals Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Munckton consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
JORC – Exploration Targets
It is common practice for a company to comment on and discuss its exploration in terms of target size and type. The information relating to exploration targets should not be misunderstood or misconstrued as an estimate of Mineral Resources or Ore Reserves. Hence the terms Resource(s) or Reserve(s) have not been used in this context. The potential quantity and grade is conceptual in nature, since there has been insufficient work completed to define them beyond exploration targets and that it is uncertain if further exploration will result in the determination of a Mineral Resource.
– ENDS –
Released by: Nicholas Read Read Corporate Telephone: +61 (0)8 9388 1474
On behalf of: Mr Andrew Munckton Managing Director and CEO Avalon Minerals Limited Mobile: +61 0435 635 598